13929 CENTER LAKE DRIVE AUSTIN, TEXAS
BEST IN CLASS CORPORATE OCCUPANCY SOLUTIONS
IDEAS WORK HERE.
VIEW VIDEO TOUR
INNOVATION CENTERS
Location 5
Minutes Mopac/ Parmer
Minutes The Domain rm
Ln
Ln
Dr ge sR
Amenity District Tech Ridge
Access
DINE
PARMER LANE PLAZA < 5 Mins
s
25
Minutes ABIA
POND
Parmer Ln
as
18
Parmer Ridge
TECH RIDGE CENTER < 5 Mins
Center Lak e
NL am
er
BOWL
Minutes Downtown
rri
De ssa
vd ar B l
d et R Burn
Ln
Fortune 30 Dr
Ya g
Fortune 5
id
C
THE RIDGE
Tech Ridge Blvd
N’ AU ST I
Braker
e
Ridg
Ln
Global IT
te en
d
er
Fortune 200
r eD k a rL
uR
rm
rri s
N NT OW
Pa
DO W
S
2 ND
TECH RIDGE CENTER
Ha
ssa u De
ss
THE DOMAIN < 10 Mins
Fortune 100
Ha
as
py Ex
r
SCOFIELD CROSSING < 8 Mins
n Pa
ma
35
PARMER LN PLAZA
SHOPS AT ARBOR WALK
ter R Cen
Fortune 5
Fortune 15
alle
La
id
r ge D
McC
THE RIDGE < 1 Mins
Ln
TECHRIDGE PLAZA
CROSSING
Fortune 100
rd
SHOPS AT TECH RIDGE
ac
Mop ac
Training Facilities Coming March 2021
wa
er
p Mo
17
Ln
Top 10 Global IT
THE MARKET AT PARMER
SCOFIELD
Minutes 360 Bridge
Future Home of
s
er
Ho
rm
PARMER
Ho wa rd Pa
Pa
SHOPS AT TECH RIDGE < 3 Mins
TECHRIDGE PLAZA < 7 Mins
llenP
Minute IH-35
7
THE MARKET PARMER LN < 10 Mins
6MM SF of Retail within 10 Minutes
McCa
1
Amenities
Unparalleled access to and within parmer maximizing employee mobility
e all C c M
n
P
INNOVATION CENTERS
PARMER POND Spectator Stands
Austin FC
St. David’s Performance Center
Harris Ridge
Dr
Parmer Trails
The Village
Austin FC Academy Pitch
Parmer Pond District
The Village
Retail Pad
Parmer Field (Turf)
Retail Pad
Half Field Practice Area
Spectator Stands ge
Dr
POND
id
Roa
rri
sR
d
Ha
Pon d
Austin FC First Team Super Pitch
Parmer Tra
ils
Opening Q1, 2021
AUSTIN FC ANNOUNCES NEW $45 MILLION TRAINING FACILITY AUSTIN,TEXAS
@Austin FC We are proud to announce the location of #AustinFC’s official training facility @ StDavidsHC Performance Center, “a world-class facility that will be integral to Austin FC realizing its full ambition as a soccer club.” @Aprecourt https://austinfc.com/#news
Ho wa rd La n
7.3
8
M
len
2
FORTUNE 30
RID
5
M cC al le n Pa ss
S OPPORT U
N
FORTUNE 5
FORTUNE 100 GLOBAL IT
r D dg
e
4
FORTUNE 100
FORTUNE 200
POND DISTRICT
FORTUNE 5
TRAILS POSE BUIL T
CA
9
EXISTING
d Fu tu re Po n d R o a
M
PU
8
S OPPORT
Y
SECTOR
SECTOR
FORTUNE 15
GROVE
4.1|4.2
R PU
Fortune 35
3
GE
GLOBAL IT
Ri
Parmer Lane
SECTOR
SECTOR
PO ND
Drive
2.1
SECTOR
ER
PU
1
SECTOR
ris
1
5
N
POSE BUIL T
d
ar
2.2
SECTOR
r Lake Cente
NE RDOD A
5.2
SECTOR
H
Fortune 30
Fu
oa eR tur
S OPPORT U
riv e
3.1
2
POND
5.1
5.1|5.2
SECTOR
ge D
Fortune 5
Global IT
Harris Rid
te en
3.4
M
PA R M
AN
D ke a rL
Parmer Ridge
e riv
PU
9
SECTOR
2.1|2.2
Fortune 200
R PU
D
Global IT
3.2 C
4.2
r La n e
CA
PARMER GROVE
4.1
PL
s Pas
Pa r m e
3.3
35
SECTOR
Fortune 5
Fortune 100
POSE BUIL T
IT
al McC
Fortune 15
R PU
SECTOR
CA
Fortune 100
e
Y
7.2
35
IT
7.2
Y
S&P 500
Center Lake Drive
Global IT
Aerial Overview
Availabilities
IT
Site Plan
Fortune 15
UN
Ce
nte
rL ak e
S&P 500 Dr
i ve
GLOBAL IT H ow
AVAILABLE NEXT DELIVERIES
INNOVATION CENTERS
n a rd L
4.1 4.2
Availability
AUSTIN,TEXAS
PREMIER TWO (2) BUILDING OFFICE CAMPUS, TOTALING APPROX. 303K SF
4.1 AV
L I A
A NEWLY DELIVERED: PARMER 4.1 | PARMER 4.2 Two Building Office Campus with Interconnected Amenity Plaza, Totaling Approx. 303K SF Availability: Up to 186K SF Remaining, Warm Shell, Tenant Improvement Ready. Floor Plates of 30K & 65K SF, Parked 5/1000 Extensive Floor to Ceiling Glass, 15’ Floor to Deck Generous TIA Provided on top of Warm Shell Adjacent to Parmer Pond Amenity District
3
,0 9
AB
I A V
04
R
65,837 RSF AVAILABLE (DIVISIBLE)
63,490 RSF AVAILABLE (DIVISIBLE)
LE
LA SF
E L B
IL A AV
LEASED
AB
LE
AMENITY PLAZA
OCCUPANCY OPPORTUNITIES PARMER 4.1: Up to Approx. 160,230 RSF PARMER 4.2: Up to Approx. 25,700 RSF IDEAS WORK HERE.
CAMPUS:
Up to Approx. 185,930 RSF
13
,0
LE
38
RS
F
LE
12,
66
LE
AS
AS
AS
5R
SF
4.2 ED
ED
ED
AV AIL
AB
LE
(D
IVI
SIB
LE
)
First Floor
4.1
FLOOR PLANS
30,904 RSF AVAILABLE (DIVISIBLE)
Second Floor
4.1
FLOOR PLANS
63,490 RSF AVAILABLE (DIVISIBLE)
Electrical
Mech. Shaft
Stair 1 Telephone Exit Corridor
Restrooms
Electrical Stair 1 Telephone
Restrooms
LEASED Showers Mail Mech. Elevator
Mech. Elevator
Elevators PARMER 4.2
Lobby
Open to Below
Stair 2
Elevators Open to Below Stair 2
AMENITY PLAZA Exit Corridor Telecom Stair 3 Electrical
Restrooms
PARMER 4.2
AMENITY PLAZA Telephone Stair 3 Electrical
Restrooms
30,904 RSF AVAILABLE
Mech. Shaft INNOVATION CENTERS
AUSTIN,TEXAS
Third Floor
4.1
FLOOR PLANS
4.2
65,837 RSF AVAILABLE (DIVISIBLE)
FLOOR PLANS
First Floor
13,038 RSF | 12,665 RSF AVAILABLE | UP TO 25,703 SF (DIVISIBLE)
Mech. Shaft Mech. Shaft
Elevators
Electrical Stair 3 Telephone
Restrooms
Mech. Elevator Elevators PARMER 4.2
Exit Corridor
Exit Corridor
Stair 1
Stair 1
Fire Pump
Stair 2
AMENITY PLAZA Telephone Stair 1 Electrical
Telecom Mail
13,038 RSF (DIVISIBLE)
12,665 RSF (DIVISIBLE)
Restrooms
Restrooms
Lobby
Stair 3 Janitor Electrical Showers
Mech. Shaft Mech. Shaft INNOVATION CENTERS
PREMIER FOUR (4) BUILDING OFFICE CAMPUS (DIVISIBLE), TOTALING APPROX. 775K SF
PARMER 5.1 254K SF
4.1
4.2
POND 3-4
133K SF
PARKING
PARMER 2.1
5.2
5.2
133K SF
POND 1-2
5.1
Parmer Ridge
PARMER 2.2
s
l rai T r
me
r Pa
PARMER 5.2
257K SF
Campus Features
POND
52
Site Plan
AUSTIN,TEXAS
775K SF
Floors Per Building: 4 Avg. Floor Plate: 33K - 65K SF *Approx. Building Sizes
2.2
2.1
Entry plaza
sector 5 view
PARKING
Parmer Lane
Entry plaza
parmer sector 2+5
Parmer Ridge
Four Building Class A Office Campus Totaling Approx. 775K SF PARMER 5.1|5.2: Approx. 254K SF | 133K SF PARMER 2.1|2.2: Approx. 257K SF | 133K SF Expansive Floor Plates with Individual Terraces, Extensive Floor to Ceiling Glass Abundant Campus Amenities Structure + Surface Parking Up to 5/1,000 General TIA Provided on Top of Warm Shell Immediately Adjacent to Parmer Pond Amenity District
CAMPUS Harris Ridge Drive
NEXT DELIVERY: PARMER 5 | PARMER 2
5.1
Gathering space
view
schematic design landscape Pickup / dropoff
Shaded Seating & Meeting Space
Specialty arrival paving Fitness path
Gathering space Covered walk to/from garage
STAIR 3
STAIR 3
STAIR 3
ELEVATORS
VOID
ELEVATORS
STAIR 2
BUILDING LOBBY
VOID
ELEVATORS STAIR 2
ELEC./TELECOM MECH. SHAFT
STAIR 2 ELEC./TELECOM MECH. SHAFT
ELEC./TELECOM
F. TENANT AREA (TENANT 1)
1777.07 SF
29183.56 SF
Area
60'
I. BASE BUILDING CIRCULATION
30'
1110.18 SF
15'
J. SERVICE & AMENITY AREA
0
Area Type
3474.82 SF
2018 STG Design, Inc. ALL RIGHTS RESERVED www.stgdesign.com
C. RENTABLE EXCLUSIONS
25948.39 SF
979.05 SF
60'
I. BASE BUILDING CIRCULATION
30'
2733.83 SF
15'
F. TENANT AREA (TENANT 1)
1527.77 SF
25273.96 SF
BOMA 2017 AREA PLANS
I. BASE BUILDING CIRCULATION
30'
60'
6328.47 SF
15'
BOMA 2017 AREA PLANS
Level 1
2018 STG Design, Inc. ALL RIGHTS RESERVED www.stgdesign.com
0
J. SERVICE & AMENITY AREA
Area
2018 STG Design, Inc. ALL RIGHTS RESERVED www.stgdesign.com
0
J. SERVICE & AMENITY AREA
F. TENANT AREA (TENANT 1) BOMA 2017 AREA PLANS
Level 3
Color
STAIR 1
09/30/219
STAIR 1
TCC PARMER 5.2 OFFICE BUILDING - 2017 BOMA LevelArea 2 Type Color 09/30/219
STAIR 1
TCC PARMER 5.2 OFFICE BUILDING - 2017 BOMA
RESTROOMS
RESTROOMS
RESTROOMS
BUILDING LOBBY
EXIT PASSAGEWAY
INNOVATION CENTERS
MECH. SHAFT
MECH. SHAFT
MECH. SHAFT
EXIT PASSAGEWAY
09/30/219
EXIT CORRIDOR ELEC/TELECOM STAIR 3 STAIR 3
132,819 SF
STAIR 2 STAIR 2 STAIR 2 ELEC/TELECOM
STAIR 3 EXIT CORRIDOR
SHOWERS
RESTROOMS TCC PARMER 5.2 OFFICE BUILDING - 2017 BOMA
ELEC/TELECOM
RESTROOMS RESTROOMS RESTROOMS
BALCONY BALCONY
STAIR 2
BOMA GROSS MEASURED AREA:
BOMA GROSS MEASURED AREA: 253,549 SF
STAIR 3 STAIR 3 ELEVATORS ELEVATORS STAIR 2 ELEVATORS STAIR 2 ELEVATORS
LOBBY
EXIT CORRIDOR
RESTROOMS RESTROOMS
STAIR 1 STAIR 1 STAIR 1
OPEN TO BELOW SHOWERS
RESTROOMS RESTROOMS RESTROOMS
LOBBY OPEN TO BELOW LOBBY
63,544 / 63,544 SF
STAIR 1 ELEC/TELECOM FREIGHT ELEVATOR STAIR 1 ELEC/TELECOM FREIGHT ELEVATOR STAIR 1 ELEC/TELECOM
FREIGHT ELEVATOR
63,486 SF
FLOOR PLATES
62,975 SF
LEVEL 3/4
FLOOR PLATES LEVEL 2 LEVEL 1
EXIT CORRIDOR
LEVEL 3/4
LEVEL 2 LEVEL 1
33,276 SF / 33,276 SF 33,136 SF 33,130 SF
Floor Plans
5.2 5.1
Purpose Built Opportunities
PARMER 5
R PU
POSE BUIL T
35
Pa r m e
r La n e
R PU
PU
9
IT
CA M
Y
SECTOR
S OPPORT U
N
FORTUNE 30
POSE BUIL T
M cC al le n Pa ss
SECTOR
SECTOR
PU
2
Y
S OPPORT U PA R
ME
N
FORTUNE 5
SECTOR
3
FORTUNE 100
R
SECTOR
5
FORTUNE 15
GROVE
GLOBAL IT
GLOBAL IT
e
D
r
FU
E TUR
1
IT
CA M
Ri
dg
FORTUNE 100
SEC-
ris
4
FORTUNE 200
ar
FORTUNE 5
TRAILS Ce
Fu tu re Po nd R o a d
CA M
PU
LT
rL a
ke
S&P 500 Dr
i ve
GLOBAL IT
SECTOR
8
Y
PU
RPOSE BUI
nte
IT
PO ND
H
POND DISTRICT
S OPPORT U
N
PLANNED/PURPOSE BUILT OPPORTUNITIES
SECTOR 1: Four (4) Building Class A Office Campus Totaling Approx. 750K SF SECTOR 8: Ability to Deliver Approx. 800K SF of Office SECTOR 9: Ability to Deliver Approx. 400K SF of Office
INNOVATION CENTERS
AUSTIN’S PREMIER TECHNOLOGY & RESEARCH PARK
IDEAS WORK HERE.
Mark Emerick
Senior Vice President
mark.emerick@cbre.com 512.499.4934
John Barksdale
Senior Vice President
john.barksdale@cbre.com 512.499.4976
VIEW VIDEO TOUR
INNOVATION CENTERS
Bo Beacham
First Vice President
bo.beacham@cbre.com 512.499.4978