Aureos Rail Capability Document - 2025

Page 1

Capability Document 2025

AUREOS RAIL Capability Statement 2025 1

AUREOS | Capability Document | 2025


AUREOS | Capability Document | 2025

2


Contents Aureos Infrastructure Services 4 Business Structure 5 Our Vision 6 Our Locations 7 Memberships & Accreditations 8 Sustainability & Social Value 10 Integrating Digital & Design 12 Training & Development 14 Aureos Rail 16 Our Leadership 20 Key Operating Areas 21 Aureos International 22 Aureos Technical Solutions 26 Rail Systems & Engineering 32 Trackside Infrastructure Delivery 44 - Aureos Infrastructure Plant 56 Digital Engineering & Asset Assurance 62 Select Project Portfolio 72

3

AUREOS | Capability Document | 2025


Aureos Infrastructure Services Aureos is a leading construction engineering specialist. We offer fully integrated delivery of complex projects featuring innovative engineering solutions across key infrastructure sectors. Aureos provide whole life solutions through our in-house design team, providing detailed consultancy and project management services across all stages of project delivery. We provide specialist solutions across a range of markets - rail civil engineering, overhead line electrification, multi-discipline, renewable energy and power & utilities distribution, transmission network services, complex urban road and highways solutions. This combination creates a unique capability, blending business wide skill sets, values and experience to provide holistic, best-in-class project solutions for our clients.

Darren James CHIEF EXECUTIVE OFFICER AT AUREOS

AUREOS | Capability Document | 2025

4


Aureos Business Structure AUREOS INFRASTRUCTURE SERVICES LIMITED

5

AUREOS

AUREOS

AUREOS

AUREOS

AUREOS

AUREOS

INFRASTRUCTURE MANAGEMENT SERVICES

RAIL LIMITED

TECHNICAL SOLUTIONS LTD.

INFRASTRUCTURE PLANT LTD.

ENERGY LIMITED

HIGHWAYS LIMITED

AUREOS

AUREOS

AUREOS

RENEWABLES

DISTRIBUTION & TRANSMISSION

IDEC LIMITED

ELECTRICITY WORX AUREOS GROUP COMPANY

ENERGY LINE AUREOS GROUP COMPANY

GA CONSTRUCTION AUREOS GROUP COMPANY

AS DESIGN AUREOS GROUP COMPANY

AUREOS | Capability Document | 2025


Our Vision At Aureos, our vision is to lead the delivery of complex, high-integrity infrastructure across the UK and global markets, by integrating technical excellence, digital innovation, and sustainable design at every stage of the project lifecycle. We leverage our deep knowledge of UK regulatory frameworks, public and private sector delivery models, and sector-specific requirements to provide tailored approaches that address local and national priorities, such as decarbonisation, energy resilience digital transformation, and levelling up regional connectivity. Through the integration of multi-disciplinary design, digital engineering, and data-led insights, we de-risk programme delivery and enhance asset performance. Our digitalfirst ethos enables us to create dynamic, responsive solutions that support smarter infrastructure from real-time construction analytics to whole-life asset strategies.

Phill Price CHIEF OPERATING OFFICER AT AUREOS

AUREOS | Capability Document | 2025

6


Our Locations 1

2

3

4

6

7

Muir of Ord

8

Dumfries

9

Swatragh

10

Carlisle

11

Preston Brook

12

Dunchurch

13

Treforest

14

Wimbish

15

Laindon

16

Ashford

18

17

York

14

18

St. Ives

Registered Office Farringdon London

7

Crewe

Crewe Enterprise Park Crewe 5

Sheffield

Churchill Way Chapeltown

9

8

10

4

Stockton-on-Tees

Preston Farm Business Park Stockton-on-Tees

17 3

11

5

7

Bathgate

2

Whitehill Industrial Estate Bathgate

Mansfield

Ransom Wood Business Park Nottingham

6 12

13

15 1

16

AUREOS | Capability Document | 2025


Our Professional Memberships

AUREOS | Capability Document | 2025

8


Our Accreditations

ISO 3834 CERTFICATION

PRINCIPAL CONTRACTORS LICENSE

9

POS LICENSE AND AUDIT

AUREOS | Capability Document | 2025


Embedding Sustainability into Everything We Do At Aureos, sustainability is central to how we operate and our CIRCLE strategy is the framework through which we deliver infrastructure that’s not only high-performing, but also environmentally responsible, socially inclusive, and resilient for the future. CIRCLE reflects our commitment to supporting the UK’s net zero goals and contributing to greener, more reliable infrastructure. We recognise that true sustainability means caring for our people, our communities, and the environments we work in. CIRCLE is built around six core pillars: • Climate Action • Improving the Environment • Resilience • Communities • Lean Engineering • Equality, Diversity & Inclusion Each pillar is supported by a roadmap of tangible actions and measurable outcomes, ensuring that sustainability is embedded across every part of our business, from project delivery to long-term planning. We actively engage our teams and partners to shape and evolve these roadmaps, drawing on real-world insights to drive continuous improvement.

AUREOS | Capability Document | 2025

Certified & Committed We operate a fully certified ISO14001 Environmental Management System and hold PAS2080 accreditation for carbon management in infrastructure. Real Social Value In 2024, our Social Value Spend exceeded £2.2 million, tracked via our Thrive portal for full transparency. Community Engagement Our Social Value Hubs, supported by a national Social Value Network, ensure consistent delivery to communities across the UK. Empowered Culture We foster a strong sustainability culture, with informed teams, robust processes, and a commitment to continuous improvement.

10


11

AUREOS | Capability Document | 2025


Training & Development At Aureos, we believe that a highly skilled workforce is the cornerstone of quality project delivery. Our commitment to training and development is built on our strong culture of safety, technical excellence, and continuous improvement. We are passionate about upskilling our workforce through comprehensive internal training to ensure every single one of our disciplines is delivered by a highly competent workforce. We provide all of our Graduates and Apprentices with a structured development pathway, as well as providing existing employees with world-class training programs through our two Centres of Excellence, dedicated to the Rail and Power Systems Industry. These Centres ensure our employees and our clients have the expertise needed to thrive in our infrastructure sectors. Our Training Centres of Excellence Power Networks Training Centre, Bathgate Our state-of-the-art facility in Bathgate is EUSR & UKPN approved, specializing in overhead line training across low to extra-high voltage. The centre features three adjustable steel pylon towers, capable of representing single wire, dual wire, or four-wire configurations.

Rail Training Centre, Crewe Our NSAR-approved Rail Centre in Crewe is a cutting-edge training facility with four classrooms and a 40m overhead line electrification training span. Designed by a fully qualified OLE technician, the span is adjustable to accommodate specific project requirements. Outdoor training equipment, including TensorEx systems, allows for bespoke learning experiences working at height.

Empowering Communities and Addressing Skills Gaps through Strategic Partnerships At Aureos, we are committed to bridging the skills gap in the power and rail industries by creating opportunities for under-represented communities and individuals seeking to re-enter the workforce. A prime example of this vision in action is our award winning collaboration with City & Guilds and HMP Highpoint to create the Rail Centre of Excellence. This innovative facility is designed to provide offenders with valuable, hands-on training, equipping them with industry-recognized qualifications that will help them reintegrate into society and secure employment upon release. By offering these opportunities, we are not only improving the future prospects of individuals but also addressing the critical skills shortages in the power and rail sectors. This initiative reflects Aureos’ core values of inclusivity, opportunity, and a strong commitment to developing the workforce of tomorrow.

AUREOS | Capability Document | 2025

12


13

AUREOS | Capability Document | 2025


Integrating Digital & Design Aureos delivers secure, intelligent, and future-ready digital solutions that underpin the UK’s most vital infrastructure. From rail and highways to energy, water, and global telecoms, we provide end-to-end digital services across the full project lifecycle, from initial survey and consultancy through to design, installation, commissioning, and ongoing maintenance. Through the acquisitions of IDEC Technical Services (2022), Linbrooke Rail (2024) and Helix (2025), Aureos has significantly expanded its capabilities in Industrial Automation and Control Systems (IACS) and Telecommunications networks, positioning us at the forefront of the Digital Transformation market. Our integrated offering includes: • In-house design capability for tailored, scalable solutions • Expertise in cyber and network security across OT, IT, and IIoT environments • Compliance with anti-static and specialist environments for safe pre-staging and assembly • Proven delivery of critical communications networks, data centre transformation, and IACS integration • Ongoing support and training to drive operational excellence We partner with clients to build the digital backbone of infrastructure connecting, protecting, and enabling the systems that keep the UK moving. Digitalisation is a core pillar of our identity, we strengthen collaboration across the Aureos Group, leveraging group-wide expertise. We enhance operational efficiency and service excellence for our clients and drive revenue growth and diversify across industries for long-term resilience. As your digital transformation partner, Aureos deliver tailored, scalable solutions that evolve with our clients needs, focussed on harnessing emerging technologies to future-proof the UK’s critical infrastructure.

AUREOS | Capability Document | 2025

14


15

AUREOS | Capability Document | 2025


AUREOS RAIL Our Capabilities

AUREOS | Capability Document | 2025

16


17

AUREOS | Capability Document | 2025


Aureos Rail Aureos Rail are at the forefront of innovation and best practice solutions in rail design, engineering and operational delivery and due to our wider business capabilities, we are able to offer clients a fully-turnkey solution from conception to commissioning. Aureos has been involved in the construction of a number of the UK’s most prominent and successful infrastructure projects. Our direct-delivery philosophy in design, project management, engineering, construction, maintenance services, and rail plant supply allows us to control all aspects of a project, minimising delivery risk and providing greater certainty for our clients. Our leading multi-disciplinary design house, Aureos Technical Solutions, has unrivalled expertise in existing and new build railway design. We prioritise our clients’ key performance drivers, and push our innovative and technological approaches to offer them a fully integrated, holistic solution from design, construction, commissioning and handover. Our practical experience and design-led philosophy are brought together to drive innovation, health, safety and wellbeing, time and quality benefits for our clients and passengers of the UK’s rail network.

Neil Lindley MANAGING DIRECTOR OF AUREOS RAIL

AUREOS | Capability Document | 2025

18


Our Capabilities

Offering a fully-integrated, holistic solution from design to delivery, supported by our in-house design firm Aureos Technical Solutions.

RAIL SYSTEMS & ENGINEERING

HEAVY CIVIL ENGINEERING

Power & Distribution

Permanent Way

DIGITAL ENGINEERING & ASSET ASSURANCE

Electrification

Lineside Rail Civils

Examinations & Surveys

Mechanical & Electrical

Infrastructure Plant

Isolations

Signalling & Power

Rail Piling & Geotechnical

Helix Workflo

Communications

Stations

Digitalisation

Light Rail

19

AUREOS | Capability Document | 2025


Our Leadership Structure Darren James CHIEF EXECUTIVE OFFICER

Phill Price CHIEF OPERATING OFFICER

Neil Lindley

Richard Plant

MANAGING DIRECTOR OF RAIL

INFRASTRUCTURE COMMERCIAL DIRECTOR

Ben Lynch

Nat McArdle

Mark Carroll

Dave Speakman

BUSINESS UNIT DIRECTOR (EASTERN)

BUSINESS UNIT DIRECTOR (WESTERN & INTERNATIONAL)

BUSINESS UNIT DIRECTOR (SOUTHERN)

ENGINEERING DIRECTOR & MANAGING DIRECTOR OF ATSL

Saul Brennan RAIL COMMERCIAL DIRECTOR

Kieran Quinn COMMERCIAL MANAGER

Paul Worsley VICE PRESIDENT OF AUREOS INTERNATIONAL

AUREOS | Capability Document | 2025

20


Key Operating Areas in the UK Our key operating locations in the Western Region include Crewe, Dunchurch, and Treforest, delivering trusted rail solutions across the NW&C and W&W regions. Led by Business Unit Director Nat McArdle, who brings over 25 years of Tier 1 experience, the business is supported by regional directors Warren Jones in W&W and Jake Berry in NW&C.

Nat McArdle WESTERN & INTL

Our key operating locations in the Eastern Region include Sheffield, York, Laindon and St. Ives, Cambridge. Led by Business Unit Director Ben Lynch, who brings over 25 years of Tier 1 experience and client knowledge. The business is supported by regional directors, Lee Poole, David Binnie and Andy Claydon who all bring a wealth of experience in Signalling, Power, Pway and Telecoms.

Ben Lynch EASTERN

Mark Carroll

Our key operating locations in the Southern Region include Ashford, Laindon and our registered office location of Farringdon, London. Led by Business Unit Director Mark Carroll who brings over 35 years of Tier 1 experience delivering multi-discipline projects across every railway discipline. The business is supported by key senior managers and Project Managers delivering long term frameworks.

SOUTHERN

21

AUREOS | Capability Document | 2025


AUREOS INTERNATIONAL Our Capabilities

AUREOS | Capability Document | 2025

22


23

AUREOS | Capability Document | 2025


Aureos International At Aureos, we bring the best of UK rail expertise to international markets, offering comprehensive, innovative, and reliable rail infrastructure solutions. Our international services are grounded in the proven delivery model that has earned the trust of leading UK clients, now tailored to meet the specific demands of diverse global environments. With a strong footprint in Canada and future expansions into Ireland and Europe, Aureos is dedicated to building long-term partnerships through collaboration, innovation, and a commitment to local adaptation. Our team of UK-trained, railcertified professionals, alongside our cutting-edge plant and on-track machinery, ensures that we deliver world-class solutions wherever they are needed. We don’t just work in rail — we understand it, we shape it, and we innovate within it.

Paul Worsley VICE PRESIDENT OF AUREOS INTERNATIONAL

AUREOS | Capability Document | 2025

24


Aureos International OUR INTERNATIONAL OFFERING Our International services are built to reflect the best of our UK business, bringing added value, technical excellence, and specialist capability across all rail disciplines, including: • Early Contractor Involvement (ECI): Strategic input at concept stage to support planning, feasibility, and programme optimisation. • Civils, Piling & Foundations: Comprehensive delivery of rail-specific civil engineering solutions, including substructure, superstructure, piling, and foundation works. • Overhead Contact Systems (OCS) – Design & Delivery: Endto-end OCS capabilities including scheme development, detailed design, installation, and maintenance. • OCS Isolations & Safety-Critical Operations: Industrycertified teams delivering safe and efficient isolations and energisation activities. • Plant Expertise & In-House On-Track Machinery: Ownership and operation of specialist rail plant and on-track machinery tailored for international deployment. • Rail & OCS Training Services: Development and delivery of rail-specific technical training programmes, training materials, and competency frameworks. • Standards & Process Development: Advisory support and consultancy in defining operational standards, technical specifications, and best practices. 25

• Strategic Partnerships & Supply Chain Integration: Longterm collaboration with key clients and local partners to ensure resilient, scalable delivery models. • Specialist Rail Personnel & Expertise: A multi-disciplinary team of rail professionals covering design, operations, safety, and project delivery. • Track Systems (S&C), Light Rail & Heavy Rail: Full technical and delivery capability across track infrastructure, including switches & crossings, light rail systems, and heavy rail upgrades. WHY PARTNER WITH US INTERNATIONALLY? • Proven delivery model, trusted by leading UK rail clients • Scalable solutions tailored to local environments • Access to UK-trained, rail-certified personnel • Strong safety and compliance culture • Adaptable plant, tools, and technology • Deep integration between design, delivery, and assurance • Track record of innovation in rail systems and operations

AUREOS | Capability Document | 2025


AUREOS TECHNICAL SOLUTIONS Our Capabilities

AUREOS | Capability Document | 2025

26


27

AUREOS | Capability Document | 2025


Aureos Technical Solutions Aureos Technical Solutions Limited (ATSL) is a leading multi-disciplinary engineering design consultancy delivering high-quality, technically assured solutions across the rail, energy, and highways sectors. We provide specialist support to Network Rail, tier-one contractors, and a broad portfolio of UK and international clients. With extensive expertise in railway electrification, ATSL is fully accredited to NR/SP/ELP/21130 – Technical Competency Requirements for the Design of Overhead Line Equipment (OLE). We offer comprehensive OLE design services, including basic, system, allocation, and construction design, underpinned by a practical, constructible, and Safe by Design approach. As one of the UK’s largest dedicated OLE design consultancies, we are recognised for our ability to deliver scalable, agile, and high-performing design solutions. In addition to our core rail offering, ATSL supports the wider Aureos Infrastructure Group, providing dedicated design services for its Highways, Energy, and Construction businesses. Our civil and structural teams deliver permanent and temporary works design to support complex construction environments, ensuring safety, efficiency, and buildability from concept through to delivery. Through close collaboration, digital engineering expertise, and a commitment to technical excellence, Aureos Technical Solutions delivers solutions that are safe, compliant, innovative, and tailored to meet the specific demands of each client and project.

Dave Speakman MANAGING DIRECTOR OF AUREOS TECHNICAL SOLUTIONS

AUREOS | Capability Document | 2025

28


Core Capabilities Driving design innovation across Rail, Energy, and Highways. Overhead Line Electrification (OLE) Design Full-service OLE design for heavy and light rail networks, including staging, sectioning, bonding, structural analysis, layout plans, and 3D modelling. We provide constructible, safety-compliant solutions from concept through to AFC and handover. Electrification & Plant (E&P) Design High and low voltage electrification design services including traction and non-traction power, substation and switchgear design, transformer integration, cabling layouts, and system commissioning support. Signalling, Power & Communications (SP&C) Design 650V/400V AC and 110V DC signalling power systems, lineside communications, FTN/ FTNx, SCADA, GSM-R, SISS, and level crossing technology. Our integrated approach ensures technical compliance and system resilience. Civil & Structural Engineering Delivery of both temporary and permanent works design for rail, highways, and energy infrastructure. Capabilities include foundations, bridgeworks, platform extensions, containment, drainage, access roads, structural strengthening, and working-at-height solutions.

29

Infrastructure Design – Energy & Highways Aureos Technical Solutions also plays a critical role in the wider Energy and Highways sectors, providing design services to support: • Distribution and Transmission: Substation civils, transformer bases, switch yards, and HV/LV cable routing • Renewables: Foundations, access roads, and infrastructure interfaces for wind, solar, and battery storage projects • Highways: Bridge and retaining structures, drainage and flood mitigation, road realignment, junction design, and embankment stability. Our multi-sector design teams ensure seamless integration of new infrastructure with existing assets, delivering robust, compliant, and sustainable outcomes. Digital Engineering & BIM We use advanced digital work flows, Common Data Environment (CDE) platforms, and fully federated 3D/4D models in compliance with BS EN ISO 19650, enabling efficient collaboration, data-driven decision-making, and greater transparency across project lifecycles.

AUREOS | Capability Document | 2025


Core Capabilities Continued Construction Support ATSL provide end-to-end design support during the construction phase of a project. This includes assessment of allocation designs, development of installation methodologies, and identification of required modifications in response to site conditions or construction constraints aligned with construction sequencing, safety, and buildability. Our design team is also equipped to provide rapid responses to technical queries and redline changes, ensuring minimal disruption to site progress.

• This approach allows us to deliver optimal and innovative solutions that meet – and often exceed – client expectations while supporting programme certainty and design assurance. Supported by the wider Aureos Group and embedded within a collaborative delivery model, Aureos Technical Solutions delivers infrastructure design that is safe, buildable, digitally enabled, and aligned with the programme, budget, and performance goals of our clients.

Feasibility Studies Leveraging deep expertise in both allocation and construction design, ATSL supports clients with the development of early-stage design options. Our approach considers structural, geotechnical, and operational constraints to ensure practical and buildable outcomes. With extensive experience in multi-disciplinary infrastructure environments, our team ensures that designs are integrated, safe, and aligned with stakeholder expectations. Our feasibility studies also evaluate: • Planning and statutory requirements • Environmental and sustainability considerations • Land use and access constraints • International best practices and cost-effective alternatives

AUREOS | Capability Document | 2025

30


Digital Design and Engineering ATSL employs advanced digital engineering processes to manage complex, data-rich infrastructure projects. We operate within a connected Common Data Environment (CDE) framework to enable seamless integration, collaboration, and information exchange across project stakeholders. This approach enhances transparency, drives efficiency, and builds trust throughout the entire project lifecycle. Ourteamistrainedinindustry-leadingBuildingInformationModelling(BIM)methodologies and delivers digital design solutions that are secure, coordinated, and cost-effective. By embedding digital engineering at the core of our processes, we strengthen collaboration with clients and other delivery partners, supporting well-informed decisions and optimised design outcomes. We are continuously investing in innovative technologies and software to support: • Model-based design and asset tagging • Workflow automation and data management • 4D schedule simulation for visual planning and sequencing • Resource coordination and risk-informed decision-making • Safer methods of construction and operation • Our design outputs are compliant with the BS EN ISO 19650 suite of standards, ensuring best practice in the organisation and digitisation of project information. Through this forward-thinking approach, Aureos Technical Solutions supports clients in responding rapidly and effectively to system emergencies, design changes, and operational challenges - ensuring safety, continuity, and engineering assurance at every stage. 31

AUREOS | Capability Document | 2025


RAIL SYSTEMS & ENGINEERING Our Capabilities

AUREOS | Capability Document | 2025

32


Rail Systems & Engineering Specialist services supporting railway power, systems, and technology infrastructure. SIGNALLING & POWER Functional Supply Points Migration to New Systems Maintenance, Testing & Protection Upgrades Equipment Replacement & Modification

POWER & DISTRIBUTION Intrusive Substation Works SSP Transformers HV Installation, Testing & Commissioning OLE Distribution Connections

COMMUNICATIONS Copper and Fibre Telecomms GSMR Communications Remote Alarm Monitoring SCADA Systems 4G & 5G Connections

33

MECHANICAL Mechanical Installation Public Health Services Water Quality Management Underground and Above Ground Drainage Systems Rain Water Harvesting

ELECTRICAL Distribution & Sub-distribution Electrical Small Power & Lighting DNO Connections Reactive Maintenance EV Charging

ELECTRIFICATION Design, Plan, Install, Commission & Recoveries Conductor Wiring, ATF, Bonding, Internal OLEC Competency Foundations & Piling

AUREOS | Capability Document | 2025


Signalling & Power At Aureos, we specialise in delivering robust and reliable Signalling & Power solutions tailored to the needs of the rail industry. Our comprehensive capabilities span from design and supply through to installation, testing, and commissioning, ensuring seamless integration with existing systems and future-proofing your infrastructure. With a deep understanding of the operational and safety demands of the rail environment, we offer scalable and cost-effective power solutions that support both conventional and modern signalling systems. Our team of skilled engineers and technicians work collaboratively with clients to deliver efficient upgrades, maintenance, and new installations that meet the latest industry standards and regulatory requirements. As a professional Tier 1 contractor in the UK, Aureos has delivered high-quality signalling and power works across a wide portfolio of rail projects for major infrastructure owners, operators, and principal contractors. Leveraging our wider business capabilities, we integrate cutting-edge digital tools, in-house design, and advanced planning techniques to ensure projects are delivered efficiently and with enhanced value for our clients. SPECIALIST SERVICES • Design, supply, and installation of Functional Supply Points (FSPs) • Provision of Principal Supply (PSPs) and Auxiliary Supply Points (ASPs) • Seamless migration of legacy systems to new infrastructure • Protection system upgrades to enhance safety and resilience • Renewal of legacy signalling systems to modern equivalent and life extension campaigns • Comprehensive testing and commissioning services • Ongoing maintenance and fault diagnosis support • Installation and maintenance of Auto Reconfiguration Systems (ARS) • Life extension works for critical assets

AUREOS | Capability Document | 2025

34


35

AUREOS | Capability Document | 2025


Mechanical & Electrical Aureos provides comprehensive Mechanical & Electrical (M&E) solutions across the rail sector, supporting the safe, efficient, and sustainable operation of rail infrastructure. Our M&E services are delivered by experienced in-house teams who understand the critical interfaces between systems and the operational environments in which they perform. We work closely with our clients to provide full turnkey services from design and installation through to testing, commissioning, and long-term maintenance. Whether supporting station upgrades, depots, or track side infrastructure, our M&E solutions are tailored to meet the specific technical, regulatory, and environmental requirements of each project. With a strong track record as a Tier 1 contractor in the UK, Aureos combines practical delivery expertise with advanced digital and design capabilities. This allows us to offer fully integrated M&E packages that reduce project risk, improve efficiency, and enhance whole-life asset performance. SPECIALIST MECHANICAL SERVICES • Mechanical installations for rail buildings and public health services • Water quality management and regulatory compliance (WRAS) • Foul discharge consent licence management and coordination • Design and installation of underground and above-ground drainage systems • Provision of temporary electrical and mechanical services for construction sites • Installation, maintenance and upgrades of HVAC systems for critical operational infrastructure

AUREOS | Capability Document | 2025

SPECIALIST ELECTRICAL SERVICES • Small power and lighting installations for stations, platforms, and operational facilities • DNO (Distribution Network Operator) connections and coordination • Earthing and bonding systems to ensure safety and compliance • Private network management and ongoing compliance • Reactive and planned electrical maintenance • Sub-distribution board maintenance and upgrades • EV (Electric Vehicle) charging infrastructure for operational and staff facilities, including tariff based machines for public interfaces

36


37

AUREOS | Capability Document | 2025


Power & Distribution Aureos provides comprehensive Power & Distribution solutions that form the backbone of electrified rail infrastructure across the UK. Our expertise spans all aspects of traction and non-traction power, supporting both new installations and upgrades to existing assets. From substations and supply points to distribution systems and HV commissioning, we deliver safe, efficient, and fully compliant works across a wide range of operational environments. Our teams are highly experienced in working within live rail systems, managing complex interfaces, and ensuring minimal disruption to services during delivery. We maximise possession opportunities, adapt schedules to fit, integrate seamlessly with the possession owner, and collaborate to reduce disruption and costs. SPECIALIST SERVICES • Managed access and egress for substation environments • Execution of intrusive access works for cable route and asset installation • Integration of OLE (Overhead Line Equipment) distribution connections • Installation and replacement of SSP (Sub-Station Plant) transformers • Comprehensive high-voltage (HV) testing and commissioning services • Protection Studies • Gradient Earthing • SCADA

AUREOS | Capability Document | 2025

38


39

AUREOS | Capability Document | 2025


Communications At Aureos, we deliver intelligent and resilient communications infrastructure that supports the operational and digital needs of the modern rail industry. Our Communications capability spans both legacy and next-generation systems, enabling seamless data flow, real-time monitoring, and secure connectivity across rail environments. We specialise in the design, installation, integration, and maintenance of robust telecoms and data systems, providing the critical link between trackside assets, operational control centres, and end-users. Whether deploying GSM-R systems or enabling 5G connectivity, our in-house specialists ensure full compliance with industry standards and future proof performance. Aureos has a proven track record of delivering communications infrastructure for some of the UK’s most complex rail programmes. We offer endto-end solutions backed by digital design, engineering integration, and the ability to scale our services to support everything from station upgrades to hyper-scale data centre deployments. SPECIALIST SERVICES • Installation and integration of copper and fibre telecoms networks • Deployment and support of GSM-R (Global System for Mobile Communications – Railway) systems • Remote alarm monitoring solutions for real-time asset management and safety • Design and construction of clean room facilities for secure and controlled installations • Integration of SCADA (Supervisory Control and Data Acquisition) systems • Enabling of 4G and 5G communications infrastructure across rail and station environments • Support for hyper-scale data centre builds, including secure power, cooling, and connectivity infrastructure • Life extension works for critical assets

AUREOS | Capability Document | 2025

40


41

AUREOS | Capability Document | 2025


Electrification (OCS) Aureos focus on optimising rail access availability, maximising possession utilisation, minimising service interruption and providing safe, quality, multi-disciplinary infrastructure solutions. Through our highly motivated, experienced, competent rail teams we are committed to providing high standard rail solutions, which are delivered safely, on time and in budget. Aureos has extensive experience in all aspects of railway electrification. Aureos Technical Solutions delivers leading electrification design and Aureos has one of the country’s largest project management and construction capabilities, for cost effective overhead line electrification installation, upgrades and maintenance services. Our people are highly trained and accredited, experienced and committed to ensuring the safety and quality of the UK’s rail infrastructure. When operating in new geographies, Aureos is committed to securing and developing local labour pools, developing their skills through our established training centres, and building industry skills and employability as part of our inclusive sustainability strategy. This approach creates significant socio-economic benefits for projects, including minimising travel times, reducing project costs, and providing a long term sustainable resource whilst reducing our carbon footprint. SPECIALIST SERVICES • Internal OLEC competency and training • Experienced in design and build for multiple OLE ranges including GEFF, MK1, MK3, UK1, Series 1, Series 2, UKMS, Siemens and others • Main part – steel design/plan/install/removal • Small part – steel design/plan/install/removal • Foundation (CHS/Augers/DTH) • Switching Works

AUREOS | Capability Document | 2025

• • • • •

Testing and commissioning Maintenance Wiring (Incl ancillaries wiring) Bonding Associated Civils (Tunnel/Viaduct and Bridge fixings)

42


43

AUREOS | Capability Document | 2025


TRACKSIDE INFRASTRUCTURE DELIVERY Our Capabilities

AUREOS | Capability Document | 2025

44


Trackside Infrastructure Delivery Covering construction, installation, and maintenance across core rail assets. PERMANENT WAY Track Remodelling & Renewals

STATIONS

Re-railing & Stress Restoration

New Builds, Upgrades & Refurbishments

Wheel Timber Installation & Replacement Switch & Crossing Installation & Track Welding

RAIL CIVILS Under Road/ Track Crossing Installation Platform Works Temporary Works & Piling

PILING OLE & Trackside Piling Specialists CHS, Rotary Bored, King Post & Sheet Piling ALO Installation Expertise

Inclusive, AfA & Urban Realm Enhancements

LIGHT RAIL Light Rail Integration & Interchange Design Live Environment Delivery Expertise

RAIL PLANT Aureos Owned Rail Plant Overhead Line & Piling Plant Innovative Plant Solutions POS Planning and Management

POS Delivery & BDA Accredited

45

AUREOS | Capability Document | 2025


Permanent Way Aureos’ P-Way capability specialises in both track maintenance support from our key operating bases including Crewe, Basildon, Ashford, St. Ives, York and Sheffield. Aureos delivers to accredited and award-winning standards using its own safety-critical labour supply and specialist rail plant and has a track record of delivering on complex projects in the critical design, construction, maintenance and renewal phases. SPECIALIST SERVICES • Permanent way renewals and remodelling schemes including complex, multidisciplinary staged works • Inspection and maintenance including heavy maintenance and hot weather patrolling • Tamping schemes and realignment work including track geometry plate installation and datum plate works • IBJ installation and removals. – Re-railing and stress restoration works including both plain line and S&C • Wheel timber installation and replacement works • Sleeper installation and replacement works including long bearers • Switch and crossing inspection, grinding and replacement works • Drainage works, installation and maintenance • Lateral resistance plate installation • CRT management and track monitoring works • Rail Welding (Nationally)

AUREOS | Capability Document | 2025

46


47

AUREOS | Capability Document | 2025


Rail Civils Rail civil engineering consists of the design, construction and maintenance of railway systems. This includes track groundworks, Overhead Line Electrification (OLE), piling, demolition and deconstruction of redundant railway structures, welding, permanent way, signalling systems maintenance, and management and removal of hazardous and non-hazardous waste. Aureos has been delivering rail civils construction works for over ten years and has worked on many high-profile projects across the UK, delivering significant elements of the rail infrastructure for many of the rail network operators. SPECIALIST SERVICES • One of the largest rail piling divisions within the UK • High-output OLEMI style foundation installation using our rail mounted batching unit • Bespoke foundation installation including gravity pads and padstones built into retaining walls • Structure strengthening – Overhead line structural cutbacks, prop and cut • High-output bridge and tunnel drilling using the Aureos high output drilling unit • Cable route installation including ground level and elevated GRP route • Under-road / track crossing installation using our in-house track hand back support • Asbestos surveys and handling using our in-house specialists • Demolition and precast structure installation • High-level works using our in-house staff with working at height capability and mobile elevated work platforms • Platform works including new build and platform extensions • Fencing and surfacing

AUREOS | Capability Document | 2025

48


49

AUREOS | Capability Document | 2025


Rail Piling One of the UK’s largest rail Piling and overhead line foundation contractors, with nationwide depots and large fleet of owned OLE foundation Road Rail Vehicles. Aureos brings a wealth of experience to rail piling from major electrification projects and track resilience in planning, management and safe productive delivery reviling all other piling contractors. Aureos hold Network Rail POS provider and British Drilling Association (BDA) Accreditation. Aureos have significant experience in ALO (Any Line Open) Installation working adjacent to live operational infrastructure. ON & OFF-TRACK PILING SOLUTIONS Aureos’ capability includes numerous techniques such as; • Circular Hollow Section (CHS) Piles • Concrete Auger/Rotary Bored • Gravity Pad foundations • Down the Hole Hammer (DTH) capability • King Post Walls • Sheet Piling • Soil Nails and Anchors • Screw/Helical Piles

in our ability to deliver all types of rail piling including, OLE foundations on major electrification schemes, kingpost and sheet piling for bank retention, station platforms, lineside structures, stabilisation and track resilience. Working with our clients and supply chain partners we will manage and deliver all rail piling packages working safely, efficiently and in a controlled manner that is unrivalled on projects throughout the UK. SPECIALIST SERVICES • Project and construction management embedded within our clients teams • Safety-critical support from planning and preparation to on-site delivery management and supervision • Full civils and design capabilities from our specialist Aureos Technical Solutions design house • Full Plant Operations Scheme (POS) management • Full Plant Operations Scheme (POS) on site supervision • Full in house team of piling Machine Operators, Supervisors and Installers providing experience, commitment and continuity of both staff and all piling works

Complimented with our large range of Movax Vibratory Hammers, BSP and Fambo Impact Hammers, Down the Hole Hammer, TAD auger drill and flight attachments, this combination gives client confidence

AUREOS | Capability Document | 2025

50


OUR GEOTECHNICAL EXPERTISE

Aureos undertake Ground and Site Investigation supporting projects across the Infrastructure, Energy, Highways and Rail environment. We offer Nationwide coverage and support for both operations and technical needs with our staff holding PTS qualifications, Highways Passport/Common Induction, CSCS/CPCS and Substation Access & Awareness training. Our works are all undertaken in accordance with BS5930 and Eurocode 7 Part 2 under our ISO accredited management and quality systems. Sampling and reporting is captured on site using digital logging systems for enhanced accuracy and efficiency of reporting. SPECIALIST SERVICES • Window Sampling • Rotary Drilling • Handheld Window Sampling and Automatic Ballast Sampling (ABS) • CPT Testing • Hand/Machine excavated trial pits • Concrete/Structural core drilling • Sample logging and storage • Laboratory Testing, Analysis and Factual Reports • Topographical Survey • Possession and Isolation Planning • In House Design & Engineering Support • Temporary Works Design and Engineering

51

AUREOS | Capability Document | 2025


Dart Rig Specifications Archway DART Lightweight Rig RIG MODEL GROSS WEIGHT

AUREOS | Capability Document | 2025

733kg

TYPE

HEIGHT

WIDTH

LENGTH

TRAVEL DIMENSIONS

1450mm

1200mm

2600mm

OPERATIONAL DIMENSIONS

2400mm

1200mm

2900mm

CATEGORY

The Archway Dart is an integrated system, offering an innovative solution to undisturbed soil core sampling, groundwater sampling and monitoring, contaminant logging, window sampling, standard penetration testing and dynamic probing. The mini-tracked lightweight rig consists of the rig mounted on a self-propelled tracked undercarriage. The entire unit can be tracked easily between borehole locations, up gentle slopes and inside buildings. This rig is the lowest weight option for a tracked rig and has good mobility. The rig is ideally suited for restricted access and can be loaded onto a track trolley or RRV trailer to access rail sites with relative ease.

Archway Dart Lightweight

ENGINE

SPECIFICATION Single-cylinder 9HP Diesel

HAMMER / DRIVE

63.5kg; 0-50 blows/ min; 500-750mm drop; approx. 5,00kg pullback

SAMPLING DEPTHS

Sampling to 10m (Max 15m) Probing to 20m

IN-SITU TESTING

SPT, DPH/ DPSH, U70/U100 samplers; casing up to 115mm O.D.

52


Dart Rig Specifications Modular Windowless Sampling Rig RIG MODEL

Modular Windowless Sampling Rig

GROSS WEIGHT

285kg (Max module weight 50kg)

TYPE

HEIGHT

WIDTH

LENGTH

TRAVEL DIMENSIONS

1450mm

450mm

700mm

OPERATIONAL DIMENSIONS

3100mm

900mm

1200mm

CATEGORY ENGINE

The Dart modular rig is designed to be a compact and extremely versatile system for working within restricted sites, railway embankments, line side locations and areas where a tracked rig cannot easily access. The system consists of a mast with a separate power pack. Whilst compact, the system can still deliver drilled cased boreholes with SPTs, take undisturbed samples and carry out Dynamic Probing (DPH & DPSH).

53

HAMMER / DRIVE SAMPLING DEPTHS IN-SITU TESTING

SPECIFICATION Hydraulic Power Pack 63.5kg: 0-50 blows/ min; 500-750mm drop; approx. 5,00kg pullback Up to 5m SPT, DPH/ DPSH, U70/U100 samplers; casing up to 115mm O.D.

AUREOS | Capability Document | 2025


Stations At Aureos, we specialise in the delivery of high-quality stations that connects communities and supports sustainable urban growth. With a deep understanding of the UK’s transport landscape, we deliver passenger-focused solutions that enhance operational efficiency, future proof capacity, and contribute to the regeneration of urban environments. Our multidisciplinary teams work closely with clients, operators, and local stakeholders to design and deliver complex transport hubs that place users at the heart of every decision. Our work across the stations sector combines strategic insight, engineering excellence, and operational know-how. From modernising heritage assets to building new multi-modal interchanges, we deliver infrastructure that is inclusive, accessible, and adaptable to evolving transport needs. Aureos brings a strong track record in safety-led design, seamless programme integration, and delivering within live operational environments. Whether as Principal Contractor, specialist delivery partner, or client-side advisor, we provide the technical leadership and collaborative approach required to unlock value at every stage of the project lifecycle. SPECIALIST SERVICES • Station upgrades, refurbishments, and new build design & construction • Passenger flow analysis and station capacity modelling • Access for All (AfA) enhancements and inclusive design • MEP and systems integration within station environments • Operational interface planning in live rail settings • Urban realm improvements and interchange development • Stakeholder engagement and third-party coordination • BIM-led delivery and digital construction support • Sustainable design and low-carbon construction methods

AUREOS | Capability Document | 2025

54


55

AUREOS | Capability Document | 2025


Light Rail At Aureos, we specialise in the delivery of high-quality light rail infrastructure that connects communities and supports sustainable urban growth. With a deep understanding of the UK’s transport landscape, we deliver passenger-focused solutions that enhance operational efficiency, future proof capacity, and contribute to the regeneration of urban environments. Our multidisciplinary teams work closely with clients, operators, and local stakeholders to design and deliver integrated light rail systems that place users at the heart of every decision. Our work across the light rail sector combines strategic insight, engineering excellence, and operational know-how. We deliver infrastructure that is inclusive, accessible, and adaptable to evolving transport needs. Aureos brings a strong track record in safety-led design, seamless programme integration, and delivering within live operational environments. Whether as Principal Contractor, specialist delivery partner, or client-side advisor, we provide the technical leadership and collaborative approach required to unlock value at every stage of the project lifecycle. SPECIALIST SERVICES • Light rail route planning, infrastructure design, and turnkey delivery • Systems integration including signalling, power, and communications • Inclusive design and Access for All (AfA) enhancements • MEP integration and interface management • Live operational delivery and safety-led construction • Stakeholder engagement and public consultation • BIM and digital engineering support • Sustainable design and carbon-conscious construction

AUREOS | Capability Document | 2025

56


57

AUREOS | Capability Document | 2025


AUREOS INFRASTRUCTURE PLANT Our Capabilities

AUREOS | Capability Document | 2025

58


59

AUREOS | Capability Document | 2025


Aureos Infrastructure Plant Aureos owns, maintains and operates a comprehensive range of specialist plant providing high specification and fully-supported equipment to projects associated with rail civil engineering and overhead line electrification. Our machines are designed to add value and increase safety and sustainability performance to client projects. All specialist rail plant is self-maintained to manufacturer’s specifications to deliver market-leading emissions performance, and all operatives undertake a rolling programme of skills training and methodology statement updates to ensure we remain at the forefront of industry thinking. Aureos Rail Plant own, supply and operate specialist overhead line and road rail plant with a capability that outperforms rival equipment available in the market. We are committed to the maintenance and operation of plant to the highest standards and in full compliance with Network Rail POS standards. This capability gives us confidence that our people and customers are working with the most modern and well maintained specialist equipment available, therefore guaranteeing their safety and ability to deliver.

Dave Wright HEAD OF INFRASTRUCTURE PLANT

AUREOS | Capability Document | 2025

60


Our Fleet

61

PILING Aureos’ Colmar-based piling system utilising the 40t Tracked T10000FSC and 32t Wheeled T10000FS units offers customers an industry-leading process that installs CHS piles using the Movax side-grip vibrating unit and BSP impact hammers to drive to depth.

SPECIALIST Our innovative specialist equipment that consists of Crane, Remote Control Drilling Unit and PFD99 wire-lifting system ensures all site operations can be conducted in the safest way possible, removing manual handling and vibration risk to the operating teams.

WIRING Aureos uses cutting-edge wiring machinery for fast and accurate wire tensioning and cutting, ensuring high-quality installations. Our team operates the machinery safely and efficiently to complete projects on time and within budget.

ACCESS Utilising a mix of lorry-based and traditional RRV platforms, Aureos operates a diverse fleet of equipment to meet all access requirements, providing the utmost in flexibility, efficiency, safety, and reliability.

AUREOS | Capability Document | 2025


Plant Operation Scheme License Holder Aureos’ Rail Plant business is a Plant Operation Scheme (POS) provider you can trust, with an exemplary track record of providing a safe, quality service. We are proud to be part of Network Rail’s POS, when working on the UK’s train network. Aureos have held a Plant Operating Scheme certificate since 2014, replacing the previous RPOL scheme and have managed works (POS, RPOL and Railway Safety Case) on the rail infrastructure since the 90’s, which provide a one stop shop for all rail projects.

This collaborative approach ensures all operations are performed safely and with certainty of outcome. We support you throughout the planning right through to the completion stage. There will be continuous feedback given throughout the project from our POS rep to our POS manager to ensure continuous improvements and productivity gains are achieved wherever possible.

We are an accredited Principal Contractor supplying on-track plant and fully-qualified operators to the largest projects across the country. Aureos Rail Plant POS services provides a full site survey listing the numerous hazards and risks facing your project. We produce lift plans and OTP plans/method statements, allocate the most suitable equipment and plan the most cost-effective means to complete the work. Once on site, our POS supervisors will work closely with your project team to ensure they deliver as efficiently and safely as possible. We will conduct site walks with clients, site meetings, planning meetings and determine site requirements. We engage early with our customers and align with the project objectives and technical requirements.

AUREOS | Capability Document | 2025

62


Attachments & Accessories Aureos’ Plant will provide the following equipment rental to clients across the UK from our strategic locations. • Isolation equipment – such as Live Line Testers, earths and G-Clamps • Bonding equipment – such as Cembre Rail Drills and Crimping tools • Lifting and Wiring – such as Pull Lifts and Slings • Access and Welfare – such as RRAP, Lighting, cabins and barriers Aureos’ activities are based on putting customer needs first; and so as part of the hire service, the company will also provide nationwide support services.

63

CONVENTIONAL ATTACHMENTS

PILING ATTACHMENTS

Bag lifters

BSP DXRT25 Impact Hammer

Ballast brooms

BSP DXRT30 Impact Hammer

Beams

SG60 Movax Side Grip

Cable carriers, shafts & rollers

SG75 Movax Side Grip

Flails

SP50 Movax Side Grip

Grabs and buckets

TAD-30 Movax Soil Drill

Track Mat lifters

TAD-32 Movax Soil Drill

Pallet forks

FAMBO HR2000 Impact Hammer

Rail thimbles

Daedong EMV Piling Unit

Rhino Horn Jib extension attachment (3, 4 & 5m)

Auger Torque Head – Screw Pile attachment

Chieftain Trailer SB

Down The Hole Hammer (DTH) assembly

Chieftain Trailer 5m

Soil Nailing/Anchor Drill masts

Highways permissible vehicle attachments 1. Large Tension unit – 5,000kg max. weight of Drum – 1,130mm max. width of Drum – 2,120mm max. diameter – 1,500mm min. diameter – Max. torque 250kg/m 2. Small Tension unit – 1,200kg max. Weight of Drum – 800mm max. width of Drum – 1,370mm max. Diameter – 900mm min. diameter – Max. torque 315kg/m 3. Small Drum Carrier with Manual Brake – 1,200kg max. weight of Drum – 900mm max. width of Drum 4. Unimog Drum Carrier with Manual Brake – 2,100kg max. weight of Drum – 900mm to 1020mm max. width of Drum – 1,800mm max. diameter – Unimog drum carriers have been modified to fit two types of drum widths 5. Winch units – CBS C-1395 (0-45 metres / min. winch-in) – CBS C-1070-002 (0-40 metres / min. winch-in) 6. Decoiler and Rail Trailers for use with HV Cable – 12,000kg max. Drum weight – 1,700mm max. Drum width – 2,800mm max. diameter – All the above units are made to fit 110mm square holes on drum centres

AUREOS | Capability Document | 2025


Tracked Colmar T10000FSC

Wheeled Colmar T10000FS

A powerful tracked RRV with an extended counterweight to give a greater lift when effectively using attachments. It has extendable tracks which allows the machine to lower itself down on to the approved lifting pads. The lifting capacity and exceptional hydraulic system performance make the T10000 FSC ideal for crane and piling applications that would not be possible using a traditional converted excavator.

A wheeled RRV with an extended counterweight to give a greater lift when using attachments effectively. The lifting capacity and exceptional hydraulic system performance make the T10000 FS ideal for crane and piling applications that would not be possible using a traditional converted excavator.

Weight 40 tonne Max Lifting Capacity (kg) 16 tonne Max height (m)

7m standard (optional rhino horn extra 3m and 5m extension)

Work under live OLE Yes Maximum Cant (mm) 150mm Working /200mm Travelling Twin cab machine available Yes

Weight 32 tonne Max Lifting Capacity (kg) 12 tonne Max height (m)

7m standard (optional rhino horn extra 3m and 5m extension)

Work under live OLE Yes Maximum Cant (mm) 150mm Working /200mm Travelling Twin cab machine available Yes Adjacent to Open line working Yes

Adjacent to Open line working Yes

AUREOS | Capability Document | 2025

64


SRS LRB 18 TCC

SRS LRB 12-2-T1

Our fleet of six LRB 18 TCC machines reduce manual handling by having a lifting capability that works in conjunction with the MEWP basket.

Our fleet of four MEWP’s have recordable pantograph video capability. VAB certified to on-track and travel under live OLE and work adjacent line open.

Weight 18 tonne Max Lifting Capacity (kg) Max height (m)

1.2 tonne (Crane), 500Kg (MEWP) (330kg and 500kg working together) 12m Basket 14m Crane

Work under live OLE Yes Max Cant (mm) Working 150mm / Travelling 180mm Twin Cab machine available Yes

Weight 18 tonne Max Lifting Capacity (kg) 350kg (450kg fully retracted) Max height (m) 12m Basket Travel under Live OLE Yes Max Cant (mm) Working 180mm / Travelling 150mm Adjacent to open line working Yes

Adjacent to open line working Yes

65

AUREOS | Capability Document | 2025


SRS LRB 10-2-T1

SRS LRB 8-2-T1

Built on SRS’s proven reliable history of lorry based RRV’s. Our fleet of five machines are VAB certified to ontrack and travel under live OLE and work adjacent line open.

VAB certified to on-track and travel under live OLE, powered rear bogie to facilitate fast self-powered access on minimum width RRAP’s. A fleet of two, one of which carries a pantograph and the other a PFD99 wire lifter.

Weight 18 tonne Max Lifting Capacity (kg) 450kg

Weight 18 tonne Max Lifting Capacity (kg) 350kg

Max height (m) 10m

Max Reach (m) 8m

Travel under live OLE Yes

Travel under live OLE Yes

Maximum Cant (mm) 150mm Working/200mm travelling

Maximum Cant (mm) 150mm Working/200mm travelling

Adjacent to Open line working Yes

AUREOS | Capability Document | 2025

Adjacent to Open line working Yes

66


HTT MEWP

Genie Z60 Self-Propelled

Our fleet of eight HTTs have a reach of 9m. Four of the fleet also carry pantographs.

Our Fleet of four Z60 MEWPs are VAB certified to on track and travel under live OLE and work adjacent line open. Compatible MEWP Trailers are also available.

Weight 18 tonne Max Lifting Capacity (kg) 350kg Max height (m) 9m

Max Lifting Capacity (kg) 227kg (300kg when fully retracted) Max height (m) 10.4m

Travel under live OLE Yes

Travel under live OLE Yes

Maximum Cant (mm) 150mm Working /200mm travelling

Maximum Cant (mm) 150mm Working /200mm travelling

Adjacent to Open line working Yes (low integrity)

67

Weight 16.5 tonne

Adjacent to Open line working Yes

AUREOS | Capability Document | 2025


SRS Palfinger PKR 290 MEWP

SRS Palfinger PKR 290 Crane

The PKR 290 Road Rail Crane comes complete with two trailers. The Paltronic 150 movement limiting device has been approved for ALO working.

The PKR 290 Road Rail Crane comes complete with two trailers. The Paltronic 150 movement limiting device has been approved for ALO working.

Weight 26 tonne Max Lifting Capacity (kg) 350kg Max height (m) 18.2m Height / 14.5m (lateral)

Weight 26 tonne Max Lifting Capacity (kg) 5.59 tonne @ 4.46m Max height (m) 16m Height / 12.4m (lateral)

Travel under live OLE Yes

Travel under live OLE Yes

Maximum Cant (mm) 180mm Working /150mm travelling

Maximum Cant (mm) 180mm Working /150mm travelling

Adjacent to Open line working Yes

AUREOS | Capability Document | 2025

Adjacent to Open line working Yes

68


SRS Zeck Wiring Unit

SRS Twin Drum Tensioner

The high-output wiring unit installs contact and catenary wire at full operational tension.

The SRS / CBS twin drum tensioning unit delivers contact and catenary wire at part operational tension.

Weight 32 tonne Max force at Bull Wheels 20kN Max Drum diameter 1.8m Max Weight of Drum diameter 3,000kg

Max force at Bull Wheels 7.2kN Max Drum diameter 2m Max Weight of Drum diameter

2,350kg (tower end) 1,450kg (cab end)

Max width (cable Drum) 1,113mm

Max width (cable Drum) 1,100mm

Travel under live OLE Yes

Travel under live OLE Yes

Maximum Cant (mm) 180mm Working /150mm travelling

Maximum Cant (mm) 160mm Working /150mm travelling

Adjacent to Open line working Yes

69

Weight 18 tonne

Adjacent to Open line working Yes

AUREOS | Capability Document | 2025


Mercedes Benz Unimog

SRS PRB 8KL

Our two Unimogs are certified to be a winch, tensioner, drum carrier or flat bed, additionally, they tow or propel trailers.

Our four PRB 8 lightweights can be configured with a Winch or Drum Carrier.

Weight 11.1 tonne

Weight 8 tonne

Travel under live OLE Yes

Travel under live OLE Yes

200mm Working / Maximum Cant (mm) 150mm travelling / 100mm on/off tracking

Maximum Cant (mm) 200mm Working /150mm Travelling Adjacent to Open line working Yes

Adjacent to Open line working Yes

AUREOS | Capability Document | 2025

70


Lorry-Mounted Drilling Unit

Lorry-mounted remote control drilling unit. Can drill upto four holes simultaneously. The template can be configured to project requirements. Weight 11.1 tonne Max Reach (m) 9m Max Weight of Drilling Head 350kg Travel under live OLE Yes Maximum Cant (mm) 160mm Working / 150mm Travelling Adjacent to Open line working No

71

AUREOS | Capability Document | 2025


Asset Assurance & Compliance

Inspection, testing, and assurance services supporting safe operation and compliance.

DIGITAL ENGINEERING & ASSET ASSURANCE ISOLATIONS

EXAMINATIONS & SURVEYS

Full or Part Isolation Management

Building and Structures Condition Surveys

AC & DC Isolations & Isolation Planning

Route Installation, Planning & Delivery

Fully Qualified SIP & SIP+

Commissioning New & Modified OLE

Pre and Post Construction Dilapidation Surveys LIDAR, 3D Imaging to Assist with Design

Our Capabilities

DIGITALISATION

HELIX

Track Remodelling & Renewals

Aureos Owned Rail Plant

Re-railing & Stress Restoration

Overhead Line & Piling Plant

Wheel Timber Installation & Replacement

Innovative Plant Solutions

Switch & Crossing Installation & Track Welding

AUREOS | Capability Document | 2025

POS Planning and Management

72


Digital Engineering & Asset Assurance Inspection, testing, and assurance services supporting safe operation and compliance.

ISOLATIONS Full or Part Isolation Management AC & DC Isolations & Isolation Planning Route Installation, Planning & Delivery Fully Qualified SIP & SIP+ Commissioning New & Modified OLE

DIGITALISATION End-to-End Intelligent Infrastructure Solutions

73

EXAMINATIONS & SURVEYS Building and Structures Condition Surveys Pre and Post Construction Dilapidation Surveys LIDAR, 3D Imaging to Assist with Design

HELIX WORKFLO Optimised Programme & Possession Planning

Design, Install, Commission & Maintain

Real-Time Interface with Network Rail Systems

Cyber-Secure Networks & PreStaged Systems

Enhanced Access Strategy & Worksite Sequencing

Rail, Highways, Energy, Water & Telecoms Expertise

Improved Efficiency, Collaboration & Delivery Assurance

AUREOS | Capability Document | 2025


Isolations Aureos’ 25kV AC Electrified Lines isolation capability is supported by Isolations Management, Planning and Supervision by our dedicated in-house teams for all levels of isolation delivery. This unique skills service also incorporates the subsequent competency assessments to maintain the capabilities and professional accreditations of our people for the future. As one of the largest Isolations providers in the UK, we are fully compliant with NR standards, NR/L3/ELP/29987 - working on or about 25kV AC Electrified Lines; ensuring that all updates and revisions are included in our methods of working. SPECIALIST SERVICES • Dedicated route isolation planning and delivery, with technical support for the installation & commissioning of OLE • Project and isolation management • Key roles embedded in our clients’ teams SAFETY CRITICAL SUPPORT FROM OUR IN-HOUSE TEAM OF • Duty Managers • Isolation Planners • Nominated Persons • Authorised Persons • Earthing Assistants PLANNING, PREPARATION TO ON-SITE DELIVERY • Full or part isolation management • Commissioning and Testing support • Isolation of switches (manual or motorised) • Fully qualified SIP’s + (GWEP) • Test and commissioning of new and modified OLE using in house staff

AUREOS | Capability Document | 2025

74


75

AUREOS | Capability Document | 2025


Building & Structures Examinations Our diverse team of engineers based throughout the UK, have the ability to undertake all types of structural examinations, including; detailed, recon, visual and additional examinations, working collaboratively with our clients and key stakeholders to promote safety and efficiency whilst delivering high quality outputs. We are delivering compliant, high standard examinations, submitted within time-scales - ensuring that quality information is delivered to Asset Engineers so that they can make critical decisions whilst undertaking planned preventative maintenance. We have the internal resource to self-deliver structural examinations of all types to meet requirements owing to our competency in the NR standard for structures (STE04, STE06 and STE07). Similarly, we have the capability to deliver building examinations of all types to meet requirements owing to our competency in the NR standard for buildings (STE05). All staff have Authority to Work (ATW) to competently undertake all tasks, as issued by our Engineering Director. UTILISING TECHNOLOGY • Utilising drone technology on our projects provides several technical and access benefits; • Manoeuvrability in hard-to-reach areas • Using Pix4D Mapper, the drone can complete full external and internal 3D cloud point scans. • High-Resolution Imaging • Precise and accurate measurements Aureos, have successfully delivered over 1,886 examinations to a value of £8m since April 2021, demonstrating our ability to complete the works to the highest quality, safely and efficiently.

AUREOS | Capability Document | 2025

76


77

AUREOS | Capability Document | 2025


Helix Workflo At Aureos, we leverage Helix technology to transform how work is planned, programmes are integrated, and delivery certainty is achieved across our infrastructure projects. As a proven digital planning platform, Helix enables our teams to visualise, refine, and optimise access strategies, delivering safer, smarter, and more efficient outcomes in complex, high-risk rail environments. Helix sits at the heart of our delivery model, connecting possession timelines, programme data, resource planning, material logistics, and stock control into a single, integrated platform. Through real-time synchronisation with multiple common data environments, we drive cross-discipline coordination, reduce planning conflicts, and maximise productive output on site. From major blockades to rolling access and multi-worksite possessions, Aureos applies Helix to provide clients with clear, data-driven insights that reduce risk, ensure material readiness, and support real-time assurance and compliance. Our approach delivers transparency, informed decisionmaking, and consistent execution across every phase of the project lifecycle. SPECIALIST SERVICES • Access planning and possession strategy development to optimise track access and minimise disruption • Integrated programme and worksite visualisation for clear, collaborative planning across stakeholders • Real-time integration with Network Rail systems for aligned, up-to-date operational delivery • Worksite sequencing, constraint analysis, and resource planning to drive efficient execution • Material management and stock control to ensure just-in-time availability and reduce site delays • Real-time data capture, on-site assurance, and reporting to support evidence-led decision-making • Access compliance and impact forecasting to identify risks early and prevent overruns • Scenario modelling and contingency planning for resilient, adaptable delivery strategies • Data-led performance insights to continuously optimise outcomes and programme efficiency

AUREOS | Capability Document | 2025

78


79

AUREOS | Capability Document | 2025


Digitalisation At Aureos, our digital strategy is built around transforming the rail sector and beyond, through cutting-edge technology, intelligent infrastructure, and a passenger-first mindset. We deliver future-ready solutions that enhance safety, connectivity, and operational efficiency. Our approach is rooted in two strategic pillars: Infrastructure Assets and Passenger Experience, both working in harmony to create a seamless digital ecosystem. We are not just adapting to the digital age, we are defining it. By leveraging our deep industry expertise, strategic partnerships, and a commitment to innovation, Aureos is positioned to lead the digital transformation across rail and adjacent sectors. DIGITAL INFRASTRUCTURE ASSETS • Computer-Based Interlocking (CBI) installation • Axle Counter train detection systems • Technician terminals and VDU control systems • State-of-the-art telefonic concentrators • FTNx transmission design and installation • 435 fibre installation and termination • ROC network design and deployment • HV transmission SCADA-based systems

AUREOS | Capability Document | 2025

PASSENGER EXPERIENCE • 5G network coverage and integration • IP CCTV with AI analytics • SISS networks and digital display screens • Passenger Help Points • Station annunciation systems • Cloud-based train control and communication systems

STRATEGIC GROWTH & INNOVATION • OEM development and digital product ownership • Rural and port area digitisation • Integration of 5G into signalling systems • Open-source protocol development • Digital MVP policy transformation • R&D in 5G signalling transmission • Strategic partnerships with CISCO, Mitel, CSEE, and more

80


81

AUREOS | Capability Document | 2025


AUREOS RAIL Project Portfolio & Sector Experience

AUREOS | Capability Document | 2025

82


83

AUREOS | Capability Document | 2025


Norwich Victoria Sidings CLIENT

Greater Anglia Abellio

VALUE c. £10m LOCATION

Norwich

PROJECT DESCRIPTION Aureos was awarded the multidisciplinary designbuild contract for Norwich Victoria Sidings project in April 2019. The project was to upgrade and renew train sidings to enable stabling capacity for trains to accommodate the increased passenger service and to incorporate the renewal of adjacent structures and conductors on the Great Eastern Main Line.

AUREOS | Capability Document | 2025

84


Several structures needed to be installed in close proximity. We were required to construct a 350m retaining wall adjacent to the North West siding construction, in addition to a number of cantilevered OLE structures over the sidings. The space available adjacent to the retaining wall was insufficient. Therefore, Aureos designed a bespoke solution whereby the foundations were incorporated into the retaining wall, providing sufficient space for a compliant walkway to be constructed. Furthermore, upon receiving the GRIP 3 documentation from the client, Aureos established an issue associated with the installation of gantry columns between the sidings & main line. Through GRIP 4 and 5 we redeveloped designs to extend the lengths of the gantries to span the sidings and the existing main line track, eliminating any issues with line of site between train drivers and the signal box. The extended gantries upgraded existing assets and removed redundant structures, decreasing maintenance requirements along the asset. During the design stage, Aureos proposed the introduction of an innovative and environmentally friendly product to alleviate walkway issues. Both Cabling and a walkway were required between each siding, however the space between each siding was insufficient for the cable route to run adjacent to the walking route. We proposed the use of TroTred units which provide a system to incorporate the cabling route beneath the walking route. The product complies with Network Rail’s standards and provided significant programme benefits whilst reducing imported materials and use of mobile plant should we have installed the conventional concrete alternative. The integration of this solution allowed Aureos to operate across all 4 sidings concurrently rather than sequentially if mobile plant was required. The 350m bespoke OLE foundations and retaining wall required backfilling. The original design required virgin aggregates to backfill the structure. Furthermore, during inspection of the proposed area for perimeter fencing we determined that the existing topography of the site needed to be brought to level prior to installing the fencing. We designed a solution which utilised over 80% of the spoil derived from an earthworks cut, to construct the sidings, as material to backfill the retaining wall and level the site for fencing, rather than sending this site won material to landfill.

85

AUREOS | Capability Document | 2025


Manningtree Platform 1 Project NEAT CLIENT

Bombardier

VALUE c. £12m LOCATION

Manningtree Station

PROJECT DESCRIPTION As part of Bombardier’s £800m investment to modernise the Eastern Region’s passenger fleet with new Class 720 rolling stock, Aureos was engaged to deliver infrastructure enhancements across multiple stations. At Manningtree Station, we undertook critical upgrade works on Platform 1 to accommodate the longer, more efficient trains, while ensuring greater passenger safety, comfort, and operational reliability.

AUREOS | Capability Document | 2025

86


Working under a fast-paced, multi-disciplinary Design & Build contract, Aureos self-delivered the permanent way, OLE, and civils scope, supported by trusted supply chain partners for signalling, telecoms, and power. Acting as Lead Design Organisation (LDO), we managed the full GRIP 1–8 lifecycle—achieving Entry Into Service within a condensed eleven-month period. Our integrated project management approach enabled early constructibility reviews, efficient approvals, and seamless coordination across disciplines and stakeholders, including Network Rail and Bombardier. Key works at Manningtree included: • 150m Cat 16 track renewal, upgrading from timber to G44 concrete sleepers and new rail • 80m of platform coper adjustments to support new train alignments • OLE geometry modifications and cantilever replacement • Removal and replacement of the existing buffer stop with a new RAWIE fixed buffer to improve site safety and access Due to deteriorating asset conditions, additional remedial work was required. Aureos proposed valueengineered solutions that combined gauging and track renewal, improving long-term reliability and reducing future maintenance costs. Early client engagement and flexibility allowed these enhancements to be implemented efficiently and cost-effectively. Over the wider NEAT package, we successfully delivered over 395 hours of disruptive and 550 hours of non-disruptive works with minimal impact to train services. During the core works at Manningtree, 2 of 3 platforms remained open - achieved through careful staging, plant segregation, and live environment safety protocols. Sustainability and Carbon: Reduction In line with Aureos’ carbon reduction goals, we implemented a Battery Storage Unit (BSU) on site. The BSU reduced generator runtime by 85%, saved 2,640L of fuel, and avoided 6,996kg of CO₂ emissions delivering cost savings and contributing to broader sustainability targets. Health, Safety & Collaboration: The project maintained a zero LTIFR and was delivered with no major incidents, underpinned by our ISO 45001 compliant safety management system. An Alliance style collaboration with Bombardier and supply chain partners ensured transparent communication, adaptive planning, and a shared focus on project outcomes.

87

AUREOS | Capability Document | 2025


Infrastructure Change Package A CLIENT

Greater Anglia Abellio

VALUE c. £20m LOCATION

Hertford East, Ware & St. Margarets

PROJECT DESCRIPTION This ambitious scheme included: the extension of platforms, remodelling of track and associated signalling assets, piling and structure installations, overhead line equipment implementation, power upgrades, non-operational and operational telecoms installations across three stations in Hertfordshire - Hertford East, Ware and St Margarets.

AUREOS | Capability Document | 2025

88


The completed works will accommodate the new rolling stock and a number of critical improvements to the existing infrastructure across Hertfordshire. At St Margarets, works also included replacement of rails though a public crossing. These works were coordinated though Hertfordshire County Council and took place with a pre-planned road closure. We also installed an under road crossing (URX) at Ware Level Crossing, to enable us to run high voltage and low voltage cables from one side of the crossing to the other. Aureos were responsible for the GRIP stages 5-8. The works involved include: platform extensions, installation of 2 x conventional DV crossovers, 1 x conventional DV turnout and associated plain line, installation of OLE equipment, installation of new signal structures and associated signalling equipment (including signalling data change), installation of operational and non-operational telecoms equipment, installation of various LOR civils assets including troughing routes, walkways and concrete foundations. Our works involved the installation of track to mainline standards in excess of 800m throughout the three stations. We removed Removal of redundant track components and installation of new track including the installation of two DV crossovers, one DV turnout and associated plain line. Remodelled the loop line at Ware, to accommodate an 80m platform extension. Our works involved building an access road at Hertford East along the site perimeter, allowing site vehicular access from the main highway for material delivery. Existing services (HV cables and signalling cables) were present necessitating a temporary works design to protect existing assets which were protected with bulk timbers and steel plates.

89

AUREOS | Capability Document | 2025


Crossrail North East Spur CLIENT

Network Rail / Costain / Crossrail

VALUE c. £50m LOCATION

East Anglia

PROJECT DESCRIPTION The £25Bn Crossrail project is one of the most prestigious railway engineering projects in Europe. The now-established Crossrail route called the Elizabeth Line runs 132km from Reading and Heathrow in the west, through new twin-bore 21 km long tunnels under central London to Shenfield and Abbey Wood in the East.

AUREOS | Capability Document | 2025

90


Aureos were involved from GRIP4 design and subsequently informed the planning, integration and remodelling of the route through one of the most complex and congested rail infrastructure areas within the UK. This included both Track, OLE, Civils and Signalling remodelling works at Shenfield station, Gidea Park station, Harold Wood station, Ilford, Chadwell Heath, Romford and Stratford. All upgrades from Stratford through to Shenfield were to allow the Train Operator to run longer trains on the route, with a key part of the scheme being a new bay platform giving more capacity at Shenfield. At Shenfield and Gidea Park, we installed new sidings with train access points at both ends, as well as installing a run round track at Gidea Park. Over the delivery of this upgrade, Aureos installed: 4695m of plain line track, including 3 new sidings) at Shenfield and Brentwood Turnback and 1810m of Plan Line Track, including remodelling of 5 existing sidings at Gidea Park. At Shenfield & Brentwood Turnback, we also installed 29 units of S&C and 6 units of S&C at Gidea Park. This was a highly specialist and ambitious package of works for essential national infrastructure, with keen public and political interest. Delivering to time and programme was of utmost importance to both our client, Costain, and the ultimate client, Crossrail. We took a leading role in the integration of the works with Costain’s wider programme, preparing detailed construction staging and phasing which allowed other subcontractors to build their programme around our schedule of key works.

91

AUREOS | Capability Document | 2025


Transpennine Route Upgrade West 1 CLIENT

Amey

VALUE c. £25m LOCATION

Various Locations

PROJECT DESCRIPTION This project involved the construction of 633 Overhead line foundations, 895 overhead line structures, 777 cantilevers, E&P, signalling and OLE traction bonding to name a few as part of the upgrades to the TransPennine Route.

AUREOS | Capability Document | 2025

92


The project is being fulfilled on complete self-delivery, with a site team that manned between 1 and 3 Aureos Plant machines, dependent on possession and works. Our key milestones have been split into EIS (entry into service) stages. To date we’ve hit all EIS dates on time and are now approaching EIS stages 6, 7 & 8. Due to the weather across the Pennines Aureos developed a Cantilever restraint that lock the cantilever into a safe position and would withstand a higher wind load and not fail when left over time. Due to the success of the restraint the Project had a full design created so it can be available across the industry. This was a multidisciplinary project (Track, Lineside Civils, Major Civils, E&P) so required us to work closely alongside multiple contractors involved with other disciplines and providing support to enable works that required an OLE interface to be completed. We provided OLE Component Staff with the opportunity to attend DDR (design development reviews), working alongside designers to give input into design constructibility and equipment suitability for certain on-site scenarios, enabling a seamless close out to red line drawings. We arranged traffic management and the closure of highways with local councils (Manchester and Tameside) when working on wall mounted foundations and during the installation of OLE main steel locations. We had several multi-tasking operatives on site, not only reducing the number of people on site but reducing the potential for accidents too. We also used vehicles that could be drove on the road and rail in order to reduce the impact of noise and light pollution of the constant delivery of non-road MEWPs, due to the number of different accesses required to be used. This along with the decision to not use delivery lorries for the MEWPs greatly reduced the carbon emissions on this project. We developed a Bridge Drilling unit to eliminate HAVs (Hand Arm Vibration), remove human error and reduce the exposure to dust. During the trials that we have conducted, the time it was taking an operative drilling a single hole using the standard method was circa 6 minutes, the Drilling Machine was completing 4 holes to the same spec in 3 minutes - increasing productivity by 80%. Both methods require a on track plant, 2 x MEWP for the standard method and 1x MEWP accompanied with the Drilling machine for the alternative method. 93

AUREOS | Capability Document | 2025


MK1 OLE Mid Life Refurbishment (LTS) CLIENT

Network Rail

VALUE c. £20m LOCATION

Various Locations

PROJECT DESCRIPTION The MK1 refurbishment project focussed on the overhead line contact and catenary (OCS) renewal including all new Small Part Steel (SPS) replacement between Rainham and Pitsea on behalf of NR.

AUREOS | Capability Document | 2025

94


This project utilised dedicated skilled labour workforce, innovative plant and fabrication supply chain to successfully deliver weekly major renewal on the OCS network on an existing operational line without any customer impact on one of the busiest freight routes in the country. The core design for LTS was undertaken by NR’s incumbent design contractor, Furrer + Frey. With our in-house design team, we undertook the design and implementation of the isolation diagrams and instructions for the system operational literature. Aureos owned this process from start to finish by identifying the changes and aligned the system changes to our program, requesting master files, designing updates, holding required reviews with the NR project team and stakeholders, and submitting the resulting updates to NR STE. During this process, we also undertook legacy errors in these documents, correcting them as part of project delivery. Working with the project team and the local authorities 44No Full road/ level crossing closures were mitigated by the production and deployment of a project specific level crossing management plan. This Aureos produced plan allowed the OTP to work and operate to rolling stock rules, closing crossings as and when required providing the following benefits: • 100% more program flexibility - with the T-12 application time-scale removed, • Removal of rate and cost of lost work owing to the factors above. • Zero cost for traffic management consultancy that would otherwise have to have been contracted. During the project we have been called out to three separate de-wirement emergencies at Bentley, Stratford and Fobbing during unsociable hours. Our team were able to attend and establish control of this situation as PC on site, quickly and skilfully. Our expert engineering discipline were able to quickly establish cause of the issue and with use of our internal design team, establish necessary engineering solutions. Our Construction Management team efficiently dealt with local landowners and traffic management, to secure the area safely and protect the general public as well as the asset.

95

AUREOS | Capability Document | 2025


Eglinton Crosstown LRT CLIENT

Metrolinx

VALUE c. £40m LOCATION

Toronto, Canada

PROJECT DESCRIPTION Eglinton Crosstown Light Rail Transit (ECLRT), commonly referred to as Crosstown, is part of Metrolinx’s 25-year regional transportation plan for the Greater Toronto area, launched in 2008 called The Big Move.

AUREOS | Capability Document | 2025

96


Crosstown is a $5.5bn, 19km light rail transit (LRT) line being constructed from Kennedy Station to Mount Dennis (Weston Road) in Toronto, Canada. Approximately 10km of the line will be located underground and up to 26 stations will be built along the stretch. Aureos has been awarded the contract to install the mainline infrastructure and wayside equipment that supports the Bombardier CITYFLO 650 system; a Communication Based Train Control (CBTC) moving block solution developed by Bombardier Transportation (BT) for new or existing mass transit and urban rail applications. The CITYFLO 650 solution achieves high reliability by applying a distributed wayside structure and full utilization of redundancy principles with the wayside and onboard equipment. The Eglinton project is a fast moving build which Aureos assists on its progression by also undertaking design reviews and multi-discipline integration, where unforeseen design clashes are uncovered requiring a buildable solution to the specific site conditions to be identified. This has allowed the project to progress and enabled the achievement of significant staged milestones. The Eglinton project is complex in its construction with multiple stakeholders and station projects running in parallel. Aureos’ scope runs the full length of the mainline and as such requires Aureos to be flexible in its approach to allow all contractors to integrate and continue to work to tight timeframes. Works include; • Siemens 750DC Overhead Catenary System • Signalling infrastructure & wayside equipment • Tunnel Lighting • Fibre Optic Communications • Medium Voltage DC Cabling • CCTV, ANC & Stray Current • Guideway Intrusion & Detection • Switch Machine Heater Control & Power

97

AUREOS | Capability Document | 2025


AUREOS | Capability Document | 2025

98


99

AUREOS | Capability Document | 2025


Want to find out more?

Contact Us Chris Withers

HEAD OF BUSINESS DEVELOPMENT E: chris.withers@aureos.com

Neil Lindley

MANAGING DIRECTOR OF RAIL E: neil.lindley@aureos.com

aureos.com aureosinfrastructureplant.com

Aureos Infrastructure Services Limited 2nd Floor, 1 Lindsey Street, London EC1A 9HP AUREOS | Capability Document | 2025