Skip to main content

Westhoughton Appeal - Figures Document

Page 1

N O R TH

N

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

Approved Phase 1

Approved Phase 2A & 2B

Proposed Phase 5

Figure 1 - Aerial location plan SoC Urban Design - Planning Appeal

Proposed Phase 3&4

www.astlepd.co.uk


N O R TH

N

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

www.astlepd.co.uk

PHASE 1 APPROVED

PHASE 2B APPROVED

PHASE 2A APPROVED

PROPOSED PHASES 3 & 4 K E Y :-

PROPOSED PHASE 5

The Fairways and access constructed through phase 2 Proposed Access

Extensive green buffer

Levels across phases 3, 4 & 5

Public Rights of Way retained

Public Right of Way to be diverted

Boundary to Phase 2 to be considered

Boundary to existing residential development to be considered

Filtered views out of site through existing landscaping

Retained landscaping

Railway line to cosidered noise implications

Approximate allignment of existing water main and easement

Drainage easement

Pennington Brook

Existing ponds

Figure 2 - Constraints and Opportunities Plan SoC Urban Design - Planning Appeal


N O R TH

N

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

www.astlepd.co.uk

PHASE 1 APPROVED

PHASE 2B APPROVED

PHASE 2A APPROVED

PROPOSED PHASES 3 & 4

PROPOSED PHASE 5

Figure 3 - Coloured Overall Planning Layout SoC Urban Design - Planning Appeal


N O R TH

N

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

www.astlepd.co.uk

TS

0m 2 00

100 0m

m 400

PHASE 5

PHASE 3 AND 4

K E Y :Phase 1 approved

Phase 2A and 2B approved

Phase 3 and 4

Phase 5

Local footpaths

Railway line

BS

Immediate bus stops

Place of worship

Parks/playing fields

Post office

Library

TS

Train station

Education

Recreation opportunities

Public house

Cemetery

Garden centre

Retail

Figure 4 - Existing Facilities Plan SoC Urban Design - Planning Appeal

TS


N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

N

www.astlepd.co.uk

Key Phase 3 & 4 Site Boundary

Phase 5 Site Boundary

Proposed Built Form

Proposed Native Tree Planting

Proposed Street Trees

Proposed Open Space Trees

Proposed Enhancement to Existing Ponds

Proposed Attenuation Basin

Proposed Seasonal Native Bulb Mix

Proposed Gardens

Proposed Native Hedgerow LAP

The provision of a ‘Local Area for Play’ (LAP) within the central area of the site provides an opportunity for play on the doorstep for local residents and offers natural surveillance for safety and security.

The creation of a substantial landscaped corridor (minimum 10m width) either side of Dobb Brow offers a setback to development that protects the amenity of users of this key footpath and offers valuable Green Infrastructure to the local residents. The width of the landscaping reflects the previous phase buffer to Dobb Brow which will create a strong visual feature as the vegetation mature.

Proposed Ornamental Shrub Mix

Proposed Shallow Rooting Shrub Mix over Attenuation Basin

Proposed Low Maintenance Grassland to Pubic Open Space

The PRoW footpath (WES093) that currently cuts through the southern parcel will be diverted to a more suitable location that will meander through the Green Infrastructure network between phases 2 and 3. This designated footpath will be a suitable surface for year-round use and buffered on either side to create a green corridor that leads to the large area of open space surrounding the wildlife pond, providing a destination for local residents to meet and travel around the circular route that flows around the site. Atte

nua

tion

Bas

in

A green buffer along the western edge with a block of native tree planting retains the perceived rural character towards the open countryside beyond. The addition of a dense mix of evergreen and deciduous planting will offer filtering effects that will soften the visual effects of development from residents and footpath users to the west, whilst offering biodiversity benefits and retaining and buffering the existing landscape framework.

The majority of existing trees have been retained throughout the site alongside the historic field structure to limit the effect of development upon the landscape character and topography of the site. The existing landscape framework will assist with the assimilation of development upon the site which will improve as proposed vegetation matures.

Figure 5 - Landscape Masterplan Tyler Grange Group Ltd

© Crown copyright, All rights reserved 2021. Licence number 0100031673

SoC Urban Design - Planning Appeal

Pennington Brook will be maintained as a Green Infrastructure corridor that joins with the previous phase to create a desirable walking route for local residents. Vegetation lost due to the installation of an attenuation tank in the south west corner of Phase 3 will be mitigated with scattered trees of native species, sesonal bulb mix and areas of shallow rooting shrub planting over the tank. The corridor will be designed and managed to enhance terrestrial habitat for wildlife and incorporating varieties of berry and nectar bearing species that encourages insects and birds to the local area. The grassland habitat will also be improved with the inclusion of wildflower meadow to provide herbaceous diversity. The PRoW footpath (WES094) will be retained and buffered along this edge.

Project Drawing Title Scale

Phases 3-5, Land at Bowlands Hey, Westhoughton Landscape Masterplan 1:1,000 @ A1

Drawing No.

13755/P10g

Date

March 2022

Checked

KC/LS

Marsden Estate, Rendcomb, Cirencester, GL7 7EX T: 0128 583 1804 E: landscape@tylergrange.co.uk W: www.tylergrange.co.uk


N O R TH

N

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

www.astlepd.co.uk

PHASE 1 APPROVED

PHASE 2B APPROVED

PHASE 2A APPROVED

PROPOSED PHASES 3 & 4

PROPOSED PHASE 5

K E Y :The Crescent

The Heart

The Core

Figure 6 - Character Areas SoC Urban Design - Planning Appeal


N O R TH

N

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton THE HEART N HOUSETYPES

THE CORE HOUSETYPES

www.astlepd.co.uk

THE CRESCENT HOUSETYPES

Examples in the local Area

Tudor boarding Templeton Close

Stone heads and cills A58

Orange brick head detailing Church Street

Lean to door canopy Wigan Road

Stone Wearish Lane

Pitched door canopy A58

Cross bar windows Sandyway Close

Orange brick cill detailing Church Street

Cross bar windows Sandyway Close

Black front door Parkham Close

Straight brick heads Collingwood Way

Black windows facias/RWP Dobb Brow Road

Black facias/RWP Grundys Mews

Black windows facias/RWP Dobb Brow Road

Cross bar windows Sandyway Close

Figure 7 - Local Vernacular Study SoC Urban Design - Planning Appeal

Stone cills Sandyway Close

Black windows facias/RWP Dobb Brow Road

Splayed stone heads Wigan Road


N O R TH

N

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

www.astlepd.co.uk

TS

BS

PHASE 5

BS

PHASE 3 AND 4

BS

WES092

BS

BS WES093

BS BS

WES094

BS

BS BS

K E Y :-

BS

Phase 1 approved

BS

Phase 2A and 2B approved

Phase 3 and 4

BS

Phase 5

Local footpaths

Railway line

BS TS

Figure 8 - Active Movement Plan SoC Urban Design - Planning Appeal

TS

Immediate bus stops

Train station


N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

N

K E Y :Phase 3 and 4

Phase 5

Gateway

Existing track

Focal Building

Proposed green space Existing green

Proposed Street

space

Proposed pedestrain links

Development

Arrival Node

Active frontages

Focal Node

Indicative planting

Buildings framing squares

Indicative planting

blocks

Earlier phases approved Existing development

Figure 9 - Views, Vistas and Landmarks SoC Urban Design - Planning Appeal

www.astlepd.co.uk


N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

N

K E Y :Phase 3 and 4

Phase 5 Proposed Avenue Proposed Street

Indicative planting

Proposed lane

Arrival nodes

Proposed shared drives Proposed parking court Focal node

Gateway

Buildings framing focal spaces

Pedestrian links

Existing PROW

Existing green space

Earlier phases approved Proposed green space

Figure 10 - Movement Framework Plan SoC Urban Design - Planning Appeal

www.astlepd.co.uk


N O R TH

N

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

www.astlepd.co.uk

PHASE 1 APPROVED

PHASE 2B APPROVED

PHASE 2A APPROVED

PROPOSED PHASES 3 & 4

PROPOSED PHASE 5

Figure 11 - Public Amenity Space SoC Urban Design - Planning Appeal


N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

N

K E Y :Phase 3 and 4

Phase 5 Active frontages/ natural surveillance

Proposed road structure Arrival node

Earlier phases approved

Focal node

Existing green space

Gateway

Existing PROW

Proposed pedestrian

Proposed green space

Development blocks

Indicative planting

Figure 12 - Active Frontages/Natural Surveillance Plan SoC Urban Design - Planning Appeal

www.astlepd.co.uk


N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

N

www.astlepd.co.uk

PHASE 1 APPROVED PHASE 2B APPROVED

PHASE 2A APPROVED

PROPOSED PHASES 3 & 4

PROPOSED PHASE 5

K E Y :-

4 bedroom

3 bedroom

2 bedroom

1 bedroom

Figure 13 - Proposed Housing Mix SoC Urban Design - Planning Appeal


N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

N

www.astlepd.co.uk

PHASE 1 APPROVED PHASE 2B APPROVED

PHASE 2A APPROVED

PROPOSED PHASES 3 & 4

PROPOSED PHASE 5

K E Y :-

Affordable dwellings

Figure 14 - Proposed Tenure Types SoC Urban Design - Planning Appeal


N O R TH

N

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

www.astlepd.co.uk

PHASE 1 APPROVED

PHASE 2B APPROVED

PHASE 2A APPROVED

PROPOSED PHASES 3 & 4

PROPOSED PHASE 5

Figure 15 - Private Amenity Space SoC Urban Design - Planning Appeal


N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

N

www.astlepd.co.uk

Long Island Golf Course

P OP

4B

DDG

B

AS

4B SC 14 12

BO-4

4B

70

SDG

71

SC 4B

AS

AS

MA

AS

SA

4B PHASE 2A APPROVED SC FO 4B

AS

AS

LY

-3

B

FO 4B

G

SD

72

CS 1 B4 412

-4B BO 56 13

B TA-3 802

3B MA 9 5 10 G

G

SD

Pond

4B SC 214 1

SD

G

B -4 BO 356 1

B

AS

4 SC

AS

G

SC

G SD

-3B TA P -3B OP TA AS

AS

TA

LY-3B OPP

G

4B SC 214 1

-3B

JO

2B

JO

SH

2B

3B

3B

2B

J

2B

P

OP

-3B

TA

AS

P

OP

P

OP

AS

AS

P

OP

AS

P

OP

AS

Pe

nn

to ing

k

roo

nB

AS

P

OP

SD

G

3B

92

P OP B 3 TH

THE BRAMBLES

4B

P

P

-3B -3B

TA

2B

JO SH

B O2

JO

LY 3 AS B

4B FA 71 11

SD

B

-3B

-3B TA AS

3B TH AS

G

AS

MA 3B

SDG

3B SY 083 1

OP

TA

SC 12 4B 14

1059

B -4 BO 356 1

AS -3B

SC 4B 1214

4B FA 171 1

BO-4B 1356

P TA

SDG

1

TH

3B SY 083 1

OP

3B

B 13 O-4B 56

SD

B

SD

OP

SH

-3

SC 12 4B 14

P OP B 3 TH

AS

3B

FA 11 4B 71

-3 TA

P

-3B SH

TA -3 80 B T 2 A 80 -3B 2

TA

OP

TA

LY

SC 12 4B 14

-3B

B

4

2

AS

TA

G

FA 4B 1171

92 1

SD

G

SD

17

JO

B

-3 TA

19 18

14

Cunningha

S

3B

-3

LY-3B

FO 4B 1528

3B

AS

MA

28

13

m Brook

4B

21 20

16

B

4 SC

22

26

15

1 Spring 98

5

LO

4B FA 71 11

3B TH AS

6

8

13

13

ck

9 8

25

29

LO

23

24

27

30

1

G

SD

-3B

Old Lane Farm

13

Tra

2

10

7

LY

4

12

SoC Urban Design - Planning Appeal

C4 B

AS

OP

Hill Crest

5 6

P

AS

11

AS

P

AS

P

-3B

2B

2B

OP

FB

3

OP

JO

JO

2B

P OP B 3 TH

TH

3B

SDG

T 80 A-3B 2

G

-3B

TA

JO

3B TH AS

33 34

General Notes

m)

MA SD

G

LY

G

3B TH AS

AS

32

TA

Figure 16 - Waste Management Plan

4

31

2B

Shared Bin Collection Point

Landscaping Layout Boundary Treatment Plan Materials Plan Hard Surfacing Plan

-3B

P

37

This drawing needs to be read in conjunction with the following plans;

LY

54

Pa

50

36

Approximate Bin Route

· · · ·

-3B

55

LY

JO

OP

151

Approximate location of bin storage within the curtilage of the property

53

56

LY-3B AS

G

SD

57

-3B TA P OP

38

2B

40

MA 3B 1059

SC 4B 1214

AS

-3B

TA

G

B

-3

LY

152

AS 41

-3B

AS

SD

3B

52

TA

-3B

G

147

AS

JO

TA -3B

SD

148

146

TA -3B OP P

G

SD

SD G

T 80 A-3B 2

49 39

TH

51

58

48

35 150

149

144

145

44

AS

SC 12 4B 14

SC 12 4B 14

MA 10 3B 59

143

59

43 42

153

Pond

47

TA

3B SY 083 1 B

155

154

OPP

159

TA-3B TA-3B 802 802

-3

LY

60

46 160

AS

SY 3B 1083

163

QU 3B

161

164

45

SDG

162

-3B

SD

SD

157

158

173

LY

3B SY 083 1

SDG

172

156

142

Waste Management Key

165

3B SY 083 1

141

136

4B FA 171 1

139 140

129

4B FA 71 11

-3B

SDG

S

G

CH 95 3B 1

138 130

LY

170

169

166

SD

C 95 H 3B 1

-3B

LY

137

131 LY

-3

135

132

126

3B SY 083 1

168

PROPOSED PHASES 3167& 4

B

171

SC 4B 1214

3B SY 3 108

FA 4B 1171

G 133

PROPOSED PHASE 5

-3

LY

134

DG

127

SC 12 4B 14

124

B

SC 4B 1214

3B SY 3 108

SD

180

LY 3 AS B

AS

SC

4B

SD G 3B

SD G SD G AM B3

LY

3B

SC 12 4B 14

-3B LY

G

3B AS OPP

4B SC 14 12

S

3B MA 9 5 10

SD

TA-3B TA-

G

4B SC 14 12

G

SD

SALE OFF S ICE +

AS

FA

4B

DD G S OF A L E S FIC E+ SD G

SD G

SC 12 4B 14

921

B 3 TH

SD G

FA

1 92 3B TH TA -3 80 B 2

2B JO 0 68

TA -3 80 B 2

2B JO 80 6

2B JO 80 6

G SD

DE RY

G

62

65

LY-3B

2B JO 0 68

921

-4B BO 56 13 SD

2B JO 0 68

SY 10 3B 83

SDG

SD

63

SDG

3B SH 750

B

SC 4B

SC 4B

SD

DG

LY 3B

OPP

AS

QU 3B

3B

G

SY

Y3 B

S

P

OP

4B

SD

AS

FO

3B CH 951

SC 4B 1214

P

OP

AS

AS

AS

3B CH 1 95 SDG

SC 4B

4B

LY 3B

-3B LY AS

G

LA P

SD

B LY-3S A

4B

FO 4B

G

SD

G

SD

B 13 O-4B 56

3 TH

P

-3B

G

SD

B LY-3 P OP

TA

OP

3B

921

FA

OPP

AS

-3B

MA

B

MA 3

3B

AS

59

10 TA

4B

P

OP

FO 4B

P

-3B

TH

LO

4B

OP

TA

3B SH 750

P

OP AS FA

59

10

AS

921

-3B

3B

TA

TH

4B

B

FO

SD

178

181

128

125

SC

BO-4

109

SC

AS

73 69

AS

177

PHASE 2B APPROVED

100

FO 4B

61

176

183

G

FA 4B 1171

77

4B

175

182

AS

64

66

68

SD

FA 4B 1171

TA-3 B 802 TA-3B 802

Issues

AS

FA 4B

AS

SDG

4B SC 214 1

MA 3B 1059

FO

O

SC 4B

67

OPP

111

SC 12 4B 14

123

76

CS

G

B -4 BO 356 1

B TA-3 B 802 TA-3802

122

78

75

PP

179

121

S

174

4B FA 71 11

110 120

79

GD

B4

B 13 O-4B 56

921

115

4B

LY 3B

4B FO 28 15

114

119

SDG

P

113

118

FO

OP

14

112

G

TH 3B

TA-3B TA-3B 802 802

117

80

74

86

4B FA 71 11

4B FO 28 15

24 22

116

SD

G

SD

4B SC 14 12

SY 3B 1083

12 12

1313

14

AS

99

98

97

FA 4B

-3B

11 11

15 15

LY-3B

SDG

96

OPP

81

OPP

92

3B

OPP

368

4B SC 4 121

2325

10 10

3B

102 G

SD

95

4B

83

85 LY

103 112

101

FO 4B

B TA

16 16

23 21

FO AS

105 104

111

94

82

97

106

113

114 4B

84

7 35

3B SY 83 10

B A-3 B T802 TA-3802

115

93 FA

B 13 O-4B 56

34 33

17

92

4B

AS

33 32

3B SY 83 10

21

22

P

SC 4B

FA 117 4B 1

G

SD

19

FO

OP

5

P

18 20

116

32 31

30 18

19 20

FA 4B 1171 2426

31

6

89

91

B

5

88

90

OP

27 29 26 28

29

28 30

4

AS

921

25 27

4

37 34

FA 4

G

TA-3

B TA-3802

9598

3

-4B BO AS

SD

SC 12 4B 14

9699

3B

3

AS

1

TH

39 42

38 35

107 110

117

B4 OL

G

118

87

O

SD

109

PP

38 41

39 36

FA 4B

3B

Pond

FA 4B

TH

37 40

AS

921

6

TH

-3B

B

3B SH 750

108 PHASE 1 APPROVED

119 LY

5659

SC 12 4B 14

2B JO 80 6

2B JO 0 68

97100

G

2 2

5760 B TA-3802

B TA-3802

98 101

1 1

SD 3B

LY -3

2B JO 0 68

MA

78 75

-3B

B TA-32 80

40 43

10

9295

2B JO 80 6

41 44

59

94 91

93 96

42 45 TA -3 80 B T 2 A 80 -3B 2

LY

108

90

94 97 TA-3B TA-3 802 802 B

107

2B JO 0 68

93

3B SH 750

B TA-32 80

61 58

B TA-3802

B TA-3 B 802 TA-3802

83 80

921

3B

5855

43

OPP

3B SH 750

104 105 106

2B JO 80 6

89 92

2B JO 80 6

79 76

46

SDG

B

103

2B JO 0 68

82 79

57 54

62 59

TH

80 77

44 47 TA -3 80 B T 2 A 80 -3B 2

53 56

B TA-32 80

3 SH 750

105 102

104 101

77 74

84 81

45 48

JO 68 2B 0

60 63

AS

76 73

46 49 JO 68 2B 0

-4B

2B JO 80 6

8285

81 78

9188

102 99

64 61

7275

86 83

47

T 80 A-3B 2

BO

2B JO 0 68

9087

103 100

65

BO-4B

84 87

62

2B JO 80 6

2B JO 0 68

86 89

2B JO 80 6

2B JO 0 68

50

66 63

2B JO 80 6

7174

70 73

2B JO 0 68

67 64

68 OY 65

2B JO 0 68

8588

YO

ED YR

72 69

2B JO 80 6

OPP

48 51

69 66 70 67

71 68

2B JO 80 6

2B JO 80 6

2B JO 0 68

2B JO 0 68

49 52

50 53

54 51

52 55

4B

P

OP


N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

N

K E Y :-

2 storey

Figure 17 - Proposed Scale of Height SoC Urban Design - Planning Appeal

www.astlepd.co.uk


N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

N

K E Y :-

2 storey

1 storey

Figure 18 - Existing Scale of Height SoC Urban Design - Planning Appeal

www.astlepd.co.uk


4

11

TH

3B TA

-3B

5 1

2m 26. 14.

2m

3m

1m

k

ton

23.

TA

-3B TA

-3B

1m

3B

1

15 16 15

m

14.

LY-3B

3B TH

3B

SH

3m 17.

3B

21.

TH

3

12 14 13 14

3 m 24.4 10.

4B SC

3B LY

G SD

-3B TA

m

2

13

19

22.4 m 4B SC

G SD

-3B TA

-3B

3B

TA

SH

.5

-3B 2B

5m

2m

JO

J

-3B

7m

19. 9m

HE BRAMBLES

TA

21.

19.

T 2 JO

B

TA

Figure 19 - Interfac e Distances Plan (Phase 3) Hill Crest

-3B

TA

22.

2B

JO

1m

-3B

3B

JO

2B

21.

LY

TH

13 4 12

JO

B O2

B A-3

3 SH SH

G

2m

4m

8

13

13 6

13

2B

4B

B

18 17

15

G

3B

9m

18.

18.

20 19

14

SC

8

22

28

4B

9

21

16

LO

23

26

30

10

G

SD

24

27

2 1

7

25

29

11

5 6

13

g nin

n

Pe

FB

3

SD

2B

.7 m

TH

JO

2B

17.

B A-3

JO

JO

2B

T

SoC Urban Design - Planning Appeal

4

SD

36

3B

35

33

th

Pa

3B

TH

-3B

TA

34

.8 m

54

32

37

4

55

31

2B

40

22

56

50

33

8m 29.

-3B

LY

MA

41

53

4B

JO

2

20

18 17 17

25.6 m

-3B TA -3B TA 38

m

4B

BO-4B

G

2B

57

LY-3B

-3B

TA

JO

14

L

49

7m

Y-3 B

43

39

38.5 m

SD

14

48

42

3B

6.8 m

10.4 m 12.6 m

m

26 .3 -3B TA

3B

.4 m

16

3m 14.

1m

58

-3B TA

T

44

52

m

11.

51

-3B TA

47

TA -3B

31.

TH

MA

3B

MA 3B

TH

59

TA -3B

m

60

46

A-3 B

27.8

QU 3B

1m

159

-3B

31.

9m

31

LY

38.

SDG

m

SC

LY-3B

45

m

158

7.1

LO

m

m

.9

19

9.9

6m

157

10.5

29.

11

12

4

3

N O R TH

19

20

Phases 3, 4 & 5 at Bowlands Hey,Pond Westhoughton, Bolton

N

www.astlepd.co.uk

10

oo Br

14.

7m


N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

N 44 43 42

TA

-3B

41

TA

-3B

40

TA

-3B

m .1 14

m .5

DDG

SD

3B LY

G

3B

SD

MA

31

m .6

32 33

34

30 31

32

32

31

33

34

34

33

FO 4B

SC 4B

35

4B

FO 4B

-4B

17

m

19

18

19

18

171

10

3B

13

29

22.4 m

17 17

m .3

SoC Urban Design - Planning Appeal

B

-3

LY

20

Figure 20- Interface Distances Plan (Phase 4) 18

179

B -4

SD

4B

m

SC

.5

17

180

BO

G

G

Pond

4B

SY

SD

SD

SC

SY

3B

G

G

SD

21

17

MA

178

CS

25.6 m

3B

SD

B4

LY

3B

177

20

MA

G

SD

24

23

2m

SC 4B

25

26

15.

23

71

24

FO

SDG

25

m

70

G

SD

28

69

27

29

BO

BO4B

73 72

28

62

65

68

27

26

29

m

3m

TA-3B TA -3B

64

66

SDG

12.3

51.

63

SDG

27

.5

SC 4B

SC 4B

77

4B

QU 3B

4B

44

24 B LY 3

3B

SC

45

m .2

4B

3B FO

4B

G

1m 30

m 25 SY

SY

B

CS

67

BO-

SD

9m

26.

LY 3B

4B

.3 18 FO

LY 3

78

76

176

183

4B

44.

m

61

.

B SC 4

20.5 m

12.7

18.5 m

19.9 m

m

G

SD S

B4

33

100 SC

FO 4B

FA 4B

75

175

8m

B3

3B LY

22

SC 4B

SDG

99

98

97

FA 4B

174

S

SDG

96 B

79

GD

2m

24.

AM

SC 4B

G

SC

FO 4B

4B

23.7

4B

4B

G

BO SD

SC

FO

FO 4B

4B

G

SD -4B

B

80

74

86

95

81

85

3B

1m

101

FO 4

84

LY

24.

102 G SD

94

FO

6m

45

4B FA

4B

B T A-3

83

112

51.

SC 4B

4B FA

m

-3B

TA-3

3m

103

113

114

4B

G

G SD

DD G SA OF LES FIC E+

TA

82

43.

DG

13.7 m

m

.8

-3B

4B

FA

13 M

TA

4B

115

7m

104

SD

SY 3

7.7 .5

-3B

SD G

LO

TA

19

-3B

SD G

TA

FA

4B

40 m

FA

4B

28.

105

B4 OL

92 93

182

m

116

91

106

111

90

FO

107 110

17

89

14.9 m

117

88

-4B

BO

4

9m

18

87

109

18.

.2 m

118

3

Pond

FA

-3B

4B

LY

24.2 m 21.2 m

FA

25 m m 21.2

119

FA 4 B

2

4B

B

-4B

3B

108 SA OFFLES ICE +

BO

m

1

G

SC

SD

SDG

MA

BO-4B

-3B

m

www.astlepd.co.uk


49

50 51

52

JO

B O2

JO

2B

JO

2B

2B

J

m .2 15

.1

m

4B FA

14

3B

.3 m

LY

-3B LY

m

18

.2 25

.5 m

27 SC

S

4B

DG

SD

G

MA

3B

LY 3

B

4B

FO 4B

B

15.2

G

SD

72

SC 4B

TH

3B SY 3B

SDG

BO-4B

3B

SY

4B FA 3B

3B

JO

2B

38

JO

41

2B

40 35

.5

m

SD G

-3B

m FA

4B

-3B TA

22 .4

TA

B

TH

TH

38.5 m

4B FA -3B TA -3B

-3

m

TA

4B

LY

17 .9

28.7 m

-4B

BO

12 m

-3B

SD G

D

B B

SC

3

B -3 LY

4B SC

-3

G SD

LY

SC 4B

TA

G

G

-3B

SD

SD

39

-3B

151

36

22

G

4B

37

SC

3B

SC 4B

G

SD

-3B

TA

TH

147

-3B

49

42

m

SD

G

148

146

TA

1m

149

144

145

B

-3

LY

152

150

SD

5m

31.

48

43

TA

.4

G

4B

3B

13.

MA 3B

4

8m

29.

Old Lane Farm

6

8

13

13

Figure 21 - Interface Distances Plan (Phase 5)

SD

SC

MA

143

m

-3B

.

23

153

17.7 m

27.8

TA

B

-3

LY

2m

47 44

-3B

m

154 142

Pond

MA 3B

SC 4B

BO

B -4

SDG

-4 BO

FA 4B

SC 4B

G

SDG

SD

SD G

SDG

SDG

163

22

m

4B

.3

SC

20

46

TA

.3

22

155

1m

159 TA -3B

m

160

TA-3B TA-3B

3B

.8

156

31.

9m

SY 3B

SY

19

45

38.

SDG

161

164

.9

19

3B

3B

m

m

158

173

162

3B

140

141

23

165 SY

139

129

157 LY-3B

G

LY-3B

FO 4B

SD

4B

m

-3B

172

FA

.2 .3

3B

130

LY

169

4B

15

138

CH

-3B

SY

4B

FA 4B

G

3B

167

FA

SD G

CH 3B

131 LY

.6

SDG

FA

TA-3

m

SD G

B

29

170

TA

-4B

3B

.8 13

168

166 136

m

m m

4B

4B

L

137

MA

FO 4B

.5 17 .3 18

SC

SC

132

m

4B SC

171

SC 4B

3B

B

MA SD

G

4B B

-3

LY

3 Y-

135

SD G

m

22

m .5

FO

SDG

71

-3B

4B

G

SC

-4B

BO-4

BO

G

m

70

TA-3B TA

.1 33 4B

G

SC

BO

SD

SC

B TA-3

m

SC 4B

SY

SD

69

4B

180

SY

3B

B

B

127

.5

13

SD G

.8 m

.6

G

-4

CS B4

178

SC

SD G

FA

4B

DD G S OF ALES FIC E+

19 SC

SC

39 SD

SD

13.7 m

.5 m G SD 4B

G SD 4B

G SD -3B LY AS

B LY-3 P OP

SY

3B

m

SDG

73

68

17

177

B3 AM

SY 3B

17 .7 m

TA -3B

B 3 TH

3B TH

G SD

TH 3B

17 TA -3B

B O2 J

B 3 SH

3B

.8 m

DE RY

2B JO

2B JO

2B JO 2B JO

m

24

62

65

SDG

12.3

176

G SD

181

134

133

126

13 4

ham Brook

66

TH

CH

SD

3B

SC 4B

SC 4B

3B B LY-3S A

S

SY

2m

3.

183

BO

TA-3

125

SoC Urban Design - Planning Appeal

LY 3B

CH

12 m

4B

Y3 B

77

4B

63

64

SD

182

m

.4

13

124

A-3B

FO

67

B

111

128

B T

76

CS

G

FA 4B

Issues

B4

3

4B

m

78

BO-4

-4B

109

TA-3

FO

m

TH 3B

m

TA-3B TA-3B

123

S

12.7

61

179

FA 4B

79

174

110

MA 3B

80

GD

75

175

SC SC 4B

FO 4B

FA 4B

QU 3B

3B TH

G

.5

m

16.9

4B

14

112

121

FO 4B

13

BO SD

m

4B

113

122

SDG

4B

.4

FO

114 115

4B

38

13

SC 4B

38

23.4

1m

38.

FA

G

4B

FO 4B

G

SD

G

SD

-4B

SD

4B

FO

98

97

FA 4B

100

20.5 m

SC

SY 3B

12

BO

118

FO 4B

SDG

99

18.5 m

FA

FO

SDG

96

B

3B

11

101 95

4B

81

74

86

4B

102 G

SD

LY 3

SY

FA 4B

8

FA

116

3B

103

94

19.9 m

LY

10

10

112

113

114 4B

FO

G

3B

16

4B

22

120

115

23.7 m

9

15

LY-3B

83

85

7

17

21

119

92 4B

84

SY

B

A-3

B T

3m

SD

4B

G

43.

33

C4 B

FA

19

TA-3

117

-3B

SH

TA

82

31

30

20

23

4B

-4B

32

18

SD

SC

-3B

B

TA

BO

S

m

28

26

24

FO

FA

B T A-3B

20

29

27

25

4B

G

SD

3 TH

MA

40 m

TA-3

2m

T

116

5

6

19.

B

TA-3

95

B H3

90

91

1 110

111

93

1m 17.

96

-3B

3B

2B

4B

117

88

LO

MA

JO

2B

3B

JO

97

SC

TA

98

4

34

TA

2m

-3B

G

9m

4B

SD

4B

87

109

18.

18.

89

- 4B

SC

BO

J

TA-3

3

35

LY -3B

B O2

39

G

2

B4 OL

SD

24.2 m 21.2 m

Pond

1.2 m

118

38

36

-3B

m

m

25 m

119 LY

14.9 m

.8

-3B

94

2

17

17

108

FA

3B

1

G

3B

FA

LY

B

93

SD

-3B

TA-3 TH

40 -3B

MA

m

37

92

m

41 TA

TA

.1

56

B

8m 26.

-3B

SDG

B

2B

14

3B

TA-3

3B

42

TA

FA 4B

3 SH

JO

SH

SH

TA-3

91

13

57 B

79

90

3B

B

2B

B TA-3

3B

108

JO

58

75

80

89

2B

TA-3B TA-

107

B

A-3

B T

TA-3

2B

JO

-3B

-3B

3B

SH

104 105 106

JO

2B

43 TA

TA

TH

2B JO

103

JO

2B

2B

100

3B

76 78

88

101

55 TH

2B

54

59

74

81

44

60

JO

JO

73

45

2B

JO

5m

2B

82

46

JO

53

77

99

102

YO

72 83

61

20.

JO

84

86 87

63

-3B

2B

71

85

47 TA

62

JO

70

2B

JO

2B

OY 65

2B

JO

JO

2B

JO

69

JO

2B

64

-4B

68

48

ED YR

66 67

BO

N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

BO-4B

N

Long Island Golf Course

www.astlepd.co.uk

8m

33.


OT OT 120 119 118 TP 117

116 115

OT

114

113 112 111

121

110 109

122

108 107

123

TP U

U

106

124

105 104

U

U

125

U

103 102

77

U

U

101 100

78

99

129

U

98

128

U

97

127

79

U

96 95

76

U

81 74

U U

91

U

U

U

U

U

94

93

19

23

11

24

31

7

30 25

8

10

9

18

U

33

34 65

6 12

32

64 57

13

5 20

21 22

U

U

38.0/HA 5.32/AC U

62 UU

1

4

U

92

63

2 U

66 61

3

88

89 90

68 67

U

84

87

71 70 69

60

83

86

72

Club House

82

85

73

U

U

35

43

17

26

44

36 38

27

28

Leigh

DU

U

E

Co

U

2

op's

U

141

2 14

14

6

14

0

U

INDICATIVE ATTENUATION BASIN

8

U

140

0

14

46

ET

14

9

5 14

2

4

14

14 3 7 4

4

3

6

5

16

2

2

16

16

16

16

3

2

6

16

16

16

16

7 14

16

0

16

9

8

0

14

14

15

0

7

16

D

2

16

15

9

16

1

1

15

2

11

53

16

9 15 9

15

15

8

4

15

11

2

1

3 15

3

1

15

0 12

t

15 7

7

15 6

15 6 15

4

5

15

15

5

11

3

6 9 13

4

5

10

10

AP

10

10

5

1

LE

0 10

89

0 10

90

99

87

99 91

91

86 85

92

97

85

98

86

87 88 63

96

63

95 94

83

92

84

84

86 64

94 94

81

79

80

78

69 70

79

77

68

76

71 69

78

75

69

77

71

74

78

70

61 61

73

60

76

72

75

72

74

ation

Ba

75

sin

60

51

60

tenu

58

52

58

51

59

At 57 56

57

53

15

41

tle Te 's rra ce

95

95

81 80

82

67 68 67 67

68

46 47

62

48 49

62

61 50

42

40

43

36

54

32 32

39

37

38

26

54

33 33

34 27

55

40

31

39

31

35

53

34

96

93

96

83 66 65 65 66 48 49

50 44

43

42

45 45

44 30

31 32

33 30

Whit

64 46 46 47

LY 3B AS

97

97

82

93

65

64

2 13

1

84

83

13

85

0

98

87

88 88

8 9 12

+

DDG

SAL OFF ES ICE

G

4B

SD

SC AS

G SD G

3B

SD

MA AS

B3

3B LY

36

25

37

28

23

7

7

24

27

TA-3B TA-3B

AS OPP

8

28

2

29

6

9

8

22

7 5

9

10

23

22

21

17

6 21

10

11

19

4

6

18

20

5

3

4

11

1

3

13

2

2

20

12

1

1

14

SC 4B 1214

-4B BO 56 13

15

11

ok

ton

ing

nn

Pe

Bro

*

AS TA

-3B

*

LY-3B

3B

*

*

*

m)

98

116

3 88

92 OLD LANE

80

Pond

THE

6

GRANG

E

Old Fold Farm

1

35.8/HA 14.5/AC

36

FO 4B 1528

1 Spring

5

Tennis Court

Pond

2

LY 3B AS

OP

27.9/HA 13.7/AC

Hill Crest

19

14

NUE LL AVE BARDWE

AS

169

*

G

4B SC 14 12

16 14

15

AS

SC

SC

P

OP

-3B TA

-3B TA

OP

P

4B

-3B TA

AS

MA 3B 1059

SDG

BO-4B 1356

-3B TA

AS

3B

*

SD

15 -3B

**

FA 117 4B 1

16

*

*

*

4B FA 1 117 FA 4B 1171

G

19

* *

4B FA 71 11

G

P

FA 4B 1171

SDG

17

OP

*

TA 802 -3B

4B

-3B

4B FA 71 11

SD

AS TA

TA

**

TA-

**

3B SY 83 10

SD

*

*

P

P OP 3B TH

183

*

OP

3B

3B SY 83 10

LY-3B OPP

SH

TA -3B 802

G

3B

*

TA 802 -3B

AS

TH AS

*

AS

SH

SD

18

-4B BO 56 13

*

G

*

3B

P

3B

P OP 3B TH

OP

TA-

921

TH

THE BRAMBLE S

*

-3B

SD

3B

LY

SC 121 4B 4

TA-

G

**

* *

SC 121 4B 4

AS

SD

G

SD

*

BO 135 -4B 6

2

4B

*

*

*

921

SC

3B

*

*

3B SY 83 10

**

3B

AS MA

*

*

TH

2

12

4B P

6 7

YS 98.0m

5 3 1

SD

G

4

25 29

24

4B BO-

AS

G SD

4B SC 4 121

LY

B

59

3B G

3B SY 83 10

*

* *

*

TA-3 802

10

G

SD

41 37

2 10

3 10

8

9

13

13 8 12

9 12 0 13

12

3 13 3 13

P OP

FA

4B

3B LY

13

G SD

AS

FA

4B

DD G SA OF LES FIC E+ G SD

SD

SC 121 4B 4

G -4B BO 6 135

* *

Brook

LO P

OP

* *

P

OP

AS

P

OP

118

Path (u

39

6

15

15

5

10

10 7 10 6

7

13

13

6 13 5 13

5 13 4

4

13

13

921

3B

TH

TA -3B 802 TA -3B 802

G G SD

3B

G

DE RY

JO

G

SD

SDG SDG

SDG

3B SY 3 108 3B SY 3 108

* *

Cunningham

AS

AS

P

-3B

TA

AS

ld

WA

35

2B

2B

AS

3B

P

OP

FAIR

27

JO

AS

2B

11

AS

3B

2B

TEMPLETON CLOSE

2B

JO

SH SH

2B

24/HA 9.7/AC

8

r Fo

1

P

OP

3B

TAJO

JO

Nursing Home

Esthe THE

19

8

4

13 JO -3B

TA

JO

P

3B LY-

3B TH AS

13

6

13

16 15

4B

4B

22 21 20 19

14 13

LO

OP

SC

OP

25

18

30

1 G

SD

9 8

26 27

17

12

2

10

7

FAIRSTEAD CLOSE

23

24

28

29

11

5 6

4

FB

3

17

P

OP

1

AS

2B

3B

JO

P OP 3B TH

AS

LY-

2B

*

3B

TA-

JO

*

AS

7

1

h

4

3B TH AS

2B

12

LY-

54

Pat

LY-3B AS

P

OP

55

22

G

P

33 34

JO -3B

Old Lane Farm

SoC Urban Design - Planning Appeal

Bowling Green

33

3B

SD

3B

OP

TA-

3B

31 32

TA

53

3B

50

36

1059

57

56

2B

P

37

MA

*

SC 4B 1214

SC 4B 1214

LY-3B

AS

TA-

AS

JO

OP

52

58 -3B

-3B

38

2B

51

TA

TA

P

39

JO

151

MA 3B

SC 4B 1214

OP

G

49

AS

41

40

-3B

LY

152

59

48

3B

G

SD

G

SD

147

TA-

SD 149 148

146

AS

TH 3B AS

150

G

TA 802 -3B

44 43

42

35

SD

MA 105 3B 9

143

144

145

47

-3B

G

SD

SC 121 4B 4

Pond

3B TH AS

159

TA

SC 121 4B 4

154

*

46 160

TA-3B TA-3B 802 802

AS

3B SY 83 10

SY 3B 1083 163

-3B

60

19

3B SY 83 10

161

164

45 SDG

LY

153

Figure 22 - Density Plan

T

15

SC 121 4B 4

157

158

173

155

142

k

REE

9

172

162

AS

* *

SD

AM

(PH)

16

165

156

Trac

ST

7

Red Lion

4

4B FA 71 11

141

169

4B FA 71 11

139 140

129

-3B

CH 951 3B

3B

LY

G

CH 951 3B

138 130

LY-

167

136

OPP

2B 680

2B JO 680

921

SD

G

4B SC 4 121

LY-

-3B

Path (um)

AM

13

QU 3B

*

JO

2B 680

59

3B MA

*

-3B LY AS

SA

S

AH

17

171

170

166

SD

3B

-3B

LY

137

131 LY-

El Sub Sta

BR

20

G

SD

G

SD

SC 121 4B 4

135

132

126

TCB

WIL

2

SC 121 4B 4

127

168

106

101.1m

CLO

5

G

12

LY

3B

921

3B

3B CH 951

10

SD

SE

AY

YW

D AN

4B SC 14 12

3B TA3B 802 TA- 802

133

LY-

3B

TH

4B SC 14 12

-4B BO 56 13 MA

* * *

2B JO 680

SY 108 3B 3

SDG

*

*

3B CH 951 SD

3B

*

G

SY 3B

* *

*

SC 4B

SC 4B

*

SD

OPP

AS

QU 3B

SDG AS

1 to

SD

SC 4B 1214

AS

*

TH

G

* *

*

B LY-3 AS

AS

P

OP

SY LY 3B

4B

AS

Pond

179

124

Grundys Mews

Bowland's Hey Farm

38

31

*

*

2B JO 680

G

*

SD

SD

G

SC 121 4B 4

4B

4B

FO 4B

PH

112 War Meml

St Bartholemew's C of E Primary School

6

*

3B

SD

BO 135 -4B 6 G

FO

SC

AS

Lych Gate Clinic

11 55

3

P

-3B

SD

* * * * *

921

TA

OP

*

3B

-3B

AS

BO-

G

SD

-4B BO 56 13

SDG

56

45

MA

MA 105 3B 9 AS

TA

*

3B SH 750

P

3B

4B

FO 4B G

SD

71

SC 4B

AS

4B SC 14 12

180

ET

4

FA

OPP

9

OP

TA-

4B

OPP

AS

FO 4B

3B

**

*

TH

LO

4B

SDG

FO 4B

Church

STRE

12

3B

73 70

4B

G

-3B

134

OL

5

* *

B LY-3 OPP

OP AS

FA

TH

105

AS

TA-

P

* ** ** *

* *

3B SH 750

4B

SC 4B

61

OPP

921

CS 1 B4 412

SCHO

7

*

921

-4B

26

62

65

72 69

FO AS

35

63

64

66

68

177

Bowland's Hey

35

*

921

BO

4B

176 G

178

St Bartholomew's 10 25

2

67 77

SD

SD

s

21

2 4

30.08/HA 12.2/AC 52

S/S

21

**

**

3B

73 73

1

alk

1

AS

59

W

1 to

BO-4B

OPP

AS FA

41

h

99

AS

P

OP

urc

29

OPP

4B

AS

4

3

26

FO

76

5

Ch

109

** SC

SC 4B

AS

71

1

SP

30

LY 3B

76

CS

O

175

182

PT

80

18

TH

Cemetery

12

100

FO 4B

44

FA 4B

OPP

G

78

75

PP

183

181

128

125

AS

34

79

S

174

BO 135 -4B 6

FA 4B 1171

TA-3 B 802 TA-3B 802

SD

G

4B FO 8 152 4B FA 1 117

14

109

OL

B

SD

4B SC 4 121

TH 3B

TA-3B TA-3B 802 802

FA 4B 1171

80

GD

B4

110 121

B TA-3

3B SY 3 108

SY 3B 1083

4B FO 28 15

111

123

3B

4B

P

112

122

MA

FO

OP

113

115

120

FA 4B

AS

81

74

86

114

1059

SC 4B

SDG

99

98

97 FA 4B

AS

4B

3B SY 3 108

FA 4B 1171

12

13

119

3B

4B FA 71 11

11

22

SDG

TA-3

P

LY

10

8

LY-3B

117

102 G

SD

101

SDG

96

OPP

SC

OP

9

16

4B SC 4 121

118

105

112

95

4B FO 4B

85

7

17

89

82

66

106

103

94 FO AS

13

104 111

113

114

4B

83

84

15

116

115

93

FA AS

33 32

21

23

92

4B

82

OPP

FA 117 4B 1

3B TA3B TA-802 802

OP

P

BO 135 -4B 6

AS

18 19 20

SDG

FO

91

1

110

117

116

31

30

27 26

25

87 88

89 90

5

6

2

107

B4

SC 121 4B 4

29

AS

4

34

-4B

3B

G

O

3

SD

BO

35

104.9m 1

10

90

63

13

109

118

PP

39

G

108

Pond

4B

SD

28

3B

FA

38

36

95

24

Issues

LY-

37

SC 121 4B 4

921

119

2

LY-

3B TA- 802

3B

2B JO 680

2B JO 680

97

96

TH

3B TA-802

94 98

1

G

3B

AS

921

3B

2

10

32

SD 9

56

92 93

40

MA

105

57

4

STRE

ET

89

41 TA -3B 802 TA 802 -3B

3B

TH

42

TA 802 -3B

SDG

58

43 TA -3B 802

LY-

3B SH 750

54 55

921

44 JO 6802B

46

2B 680

3B

CEME

TERY

4

10

45 JO 680 2B

JO

3B SH 750

3B TA802

91

2B 680

3B TA- 802

46

TA 802 -3B

60

3B TA- 802

79 80

90

61

59

TH

75 76

3

10

6

JO

74

14

10

7

13

47

2B JO 680

89

2B 680

63

8

13

48

62

53

77 78

2B 680

64

2B OY 65 680

3B TA802

JO

2B 680

JO

2B 680

ED YR

2B JO 680

73

81

3B SH 750

2B JO 680

2B 680

2B 680

TA-3B TA-3B 802 802

3B TA802

JO

JO

82

3B SH 750

106 107 108

2B JO 680

*

3B TA3B TA-802 802

83

2B 680

99 100 101 102 103 104

JO

JO

72

JO

88

105

84

2B JO 680

87

2B JO 680

86

YO 70

71

85

2B JO 680

JO

2B JO 680

2B JO 680

2B JO 680

18

1

51

52

66 67 68

15

12

2 12

10

49

50

52

PT

8

69

BY Y-

1

10

7

PT

LA

3

12

28

7

12

0

11

12

3

4

11

4

51

15

8

11

Stree

R

4

Silk

PE

12

EM

15

9

0

14

9 10

11

0

12

1

7

11

9 11

1

3

2

5

12

12

5

12

9

15

KT

4

EA

12

0

16

3

11

8

10

60

BR

Long Island Golf Course

0

16

4

2

16

1

12

16

11

0

9

11

10

1 11

1 11

6 5

11

11

5

4

8 14 8

8

14

6 11

11

5 11

7 12

CH

1

15

1

OR

AR

ok Bro

6

5

16

n

7

11

16

to

8

11

6

12

3

41.8/HA 16.8/AC

65

16 1 15 1

15

14

14

15

3 14 3 14

0

15

ing

7

11

nn

7

12

Wo rks

4

14

PT

Pe

PT

4

14

SP

MP 16

5

BIN

MP 16

THE

SP

Ya

RE

6

14

9

141

45

6

14

5

55

H ST

GERR

U

U

47

LEIG

ARD

48

67

U

ST

14

40

39 54

16

PLAC

18

16

15

49

INGT

ON

15

U

41

50

53

7 to

RR

Common

16

U

42

51 52

14

U

29

37

56

17

58

U

80

75 PT

59

U

126

U

9

N O R TH

Phases 3, 4 & 5 at Bowlands Hey, Westhoughton, Bolton

OT

N

www.astlepd.co.uk

rd


Turn static files into dynamic content formats.

Create a flipbook
Westhoughton Appeal - Figures Document by astlepd - Issuu