O R TH N
N
All Phases at Bowlands Hey, Westhoughton, Bolton
www.astlepd.co.uk
PHASE 1 APPROVED
PHASE 2B APPROVED
PHASE 2A APPROVED
PROPOSED PHASES 3 & 4 K E Y :The Fairways and access constructed through phase 2
PROPOSED PHASE 5
Proposed Access
Extensive green buffer
Levels across phases 3, 4 & 5
Public Rights of Way retained
Public Right of Way to be diverted
Boundary to Phase 2 to be considered
Boundary to existing residential development to be considered
Filtered views out of site through existing landscaping
Retained landscaping
Railway line to cosidered noise implications
Approximate allignment of existing water main and easement
Drainage easement
Pennington Brook
Existing ponds
Appendix A - Constraints & Opportunities SoC Urban Design - Planning Appeal
Drawing Number Revision Date Scale /Sheet Size -
APD/BHM180/CP01 11/08/22 NTS/A0