Thursday, Aug 17, 2017
Since Sept 27, 1879
Retail $1.70 Home delivered from $1.05
THE INDEPENDENT VOICE OF MID CANTERBURY
www.guardianonline.co.nz
TAB shutting its doors
P2
Property 2017 August 17,
E & LIFESTYL
Too good to last
Greenstreet resident Ali Miller believes this stretch of road is in such a state of bad repair that the next accident on it could be a fatality. PHOTO MATT MARKHAM 160817-MM-002
Road a ticking time bomb BY MATT MARKHAM
MATT.M@THEGUARDIAN.CO.NZ Bayleys rketed by Proudly ma P2 LS TAI DE ER FURTH
Precision
s • Site work • Carparks ys • Drivewa
tion
In Excava
e • Landscap on levelling more • Demoliti h e + so muc patios • Drainag ring • Paths & on • Site clea • Foundati n oud.com raas@icl excavatio jansen.b – 021 554 584 | z en raas.co.n senandb 716 165 | Ilco Jans www.jan s – 021 Alex Braa
INSIDE
A Greenstreet resident is worried that after two vehicle accidents on a stretch of road near his property, the next one could be a fatality. Ali Miller has been appealing to the Ashburton District Council to do something about a lengthy portion of road where the seal has completely come away, leaving an almost completely tar surface that becomes a huge danger to motorists when either icy or wet. “We’ve had two accidents here recently and both could have been a lot more serious than they were,” Miller said.
“It really is a case of us having had two strikes and potentially the third one could be a case of out, and the worst fear is of course that there are kids involved.” The most recent accident, which occurred on Sunday, had Miller sprinting from his property which is a few hundred metres off the road after a car lost control on the surface and fishtailed across the road before hitting a fence. The female driver of the vehicle and her children escaped relatively unharmed. “They were all pretty white though,” Miller said. “They were actually lucky that they came to rest on the fence because if they
had gone through it they would have flipped over due to a rise in the paddock which is the bank of a creek that runs almost alongside the road.” Miller believes that the stretch of road is a serious accident just waiting to happen and that a lot of his neighbours and others from the area are feeling the same. “No-one is worried about the odd fence that might be brought down, but there’s a lot of support out there about just how bad it has become.”
CONTINUED
Gluyas Motor Group
SPECIAL OFFER $ *
37,990
79 Kermode Street | (03) 307 7620
+GST +ORC
P2
Ph 03 307 7900 to subscribe!
Kendall Sandrey Sales Consultant Mob 027 486 0016 Scott Donaldson Sales Manager Mob 027 225 5530
nissan.co.nz *OOer based on Nissan Navara SL 4WD manual only. SL 4WD automatic $39,990 +GSt +ORC. Finance oOer available to approved applicants of Nissan Financial Services only & excludes all lease & some eet purchasers. Vehicles must be registered by August 31st. The 1.9% p.a. xed interest rate nance oOer applies to new Nissan Navara models only. Zero deposit for approved applicants only. Maximum 48 month term. $375 establishment fee, $8.05 PPSR fee, & $10 monthly account keeping fee apply. Terms & conditions apply. OOer cannot be used in conjunction with any other oOers & must end August 31st 2017 or while stocks last. Nissan reserves the right to vary, withdraw or extend this oOer.
Weather: High 17˚ - Overnight 6˚ Page 30
Puzzles: Page 29
Television: Page 31
Family Notices: Page 29
www.gluyasmotorgroup.co.nz
www.guardianonline.co.nz