ASEAN SECRETARIAT (ASEC) COMPLEX DESIGN IN JAKARTA WITH ICONIC ARCHITECTURE APPROACH

Page 1

PERANCANGAN KOMPLEKS SEKRETARIAT ASEAN (ASEC) DI JAKARTA DENGAN PENDEKATAN ARSITEKTUR IKONIK

Project : ASEAN Secretariat Year : 2020 Software : AutoCAD, SketchUp, Lumion 4.0

@artworkmargin


PEMAHAMAN TEMA IKONIK

SIRKULASI SERVICE

MAIN ENTRANCE

MAIN ENTRANCE SEBAGAI PINTU MASUK UTAMA KAWASAN ASEC, DENGAN SIDE ENTRANCE DENGAN DUA JALUR SEBAGAI JALAN KELUAR ATAU LURUS MENUJU SERVICE ENTRANCE/EXIT

BERDASARKAN IDENTITAS INILAH, SEPERTI APAPUN KONSEP, BENTUK, WUJUD, DAN SISTEMNYA, TIDAK BOLEH KELUAR DARI MAKNA ASEAN ITU SENDIRI

SIDE ENTRANCE

ZONING VERTIKAL ZONING BANGUNAN DIPISAHKAN BERDASARKAN FUNGSI RUANG

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: KONSEP 1 : 800

01

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


HARMONIS DAN DIALOG

KONSEP HARMONIS DAPAT DILIHAT DARI FASAD YANG MENGAMBIL ELEMEN HORIZONTAL YANG SAMA DENGAN BANGUNAN EKSISTINGNYA KONSEP DIALOG, DILIHAT DARI ADANYA FUNGSI YANG SALING TERKAIT ANTAR BANGUNAN, MISALNYA PADA LANTAI 2 YANG DIHUBUNGKAN DENGAN CONFERENCE ROOM BARU YANG TERSAMBUNG LANGSUNG DENGAN CONFERENCE LAMA,

DIALOG

BENTUK MASSA BANGUNAN

PADA LANTAI 3 TERDAPAT FUNGSI PERKANTORAN PADA BANGUNAN EKSISTING, DAN PADA RENCANA BANGUNAN BARU, LANTAI 3 MERUPAKAN LANTAI PERTEMUAN, SEHINGGA LANTAI TERSEBUT KEMUDIAN DIHUBUNGKAN AGAR MEMUDAHKAN SESEORANG DARI BANGUNAN EKSISTING MENGIKUTI RAPAT PADA BANGUNAN BARU

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: KONSEP 1 : 800

02

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


1. PENENTUAN JUMLAH DAN JENIS TRANSPORTASI VERTIKAL A. TOWER 1) Lift Penumpang

Luas Bruto dan Netto Luas Rerata Bruto Zona Eksekutif = 2096,83 m2 Luas Rerata Bruto Zona Tower = 1957,45 m2 Luas Rerata Bruto All Floor = 2786,59 m2

Menentukan Kecepatan Lift (Tabel 3.3)

Pembagian Zona Lift

Lift Eksekutif → 3,5 m/dtk Lift Tower → 3,5 m/dtk Lift All Floor → 3,5 m/dtk Lift Barang → 6-7 m/dtk

Lift Eksekutif → Lantai B1, Lantai GF, 6,7,10,11,12,15,16, Rooftop (7 Lantai utama) Menentukan Interval Waktu (Tabel 3.4) Lift Tower → Lantai GF, 6-16 (10 Lantai) Kantor 25 – 45 detik Lift All Floor → Lantai GF, 2-16 (15 Lantai) Lift Barang → Lantai B4,B3,B2,B1,GF,Tower, Rooftop (All Floor)

Luas Netto Zona Eksekutif = 2096,83 x 80% = 1677,464 m2 Luas Netto Zona Tower = 1957,45 x 80% = 1565,96 m2 Luas Netto Zona All Floor = 2786,59 x 75% = 2089,9425 m2

Jumlah Penghuni Tiap Zona Zona Eksekutif Okupasi = 2096,83 : 12 m2/orang = 174,74 174,74 = 175 orang Total okupasi = (7 lantai) x 175 = 1225 orang Kp total = 13% x 1225 = 159,25 = 160 orang

800


TABEL Planning Guide Lift Hyundai Geared Drive

Zona Tower Okupasi = 1565,96 : 12 m2/orang = 130,5 130,5 = 131 orang Total okupasi = (10 lantai) x 131 = 1310 orang Kp total = 13% x 1310 = 170,3 = 171 orang Zona All Floor Okupasi = 2089,84 : 12 m2/orang = 174,153 174,153 = 175 orang Total okupasi = (15 lantai) x 175 = 2625 orang Kp total = 13% x 2625 = 341,25 = 342 orang

Mencari KK P = 80% dari kapasitas Lift i = interval waktu tunggu kantor

Menentukan Jumlah Lift

Jika menggunakan Lift kapasitas 20 orang 300𝑥16 Kk = = 160 30

Maka pada zona Eksekutif 160 N = 160 = 1 𝐿𝑖𝑓𝑡 Pada zona tower 171 N = 160 = 1, 068 𝐿𝑖𝑓𝑡 (1 Lift) Pada zona All Floor 342 N = 160 = 2,1375 𝐿𝑖𝑓𝑡 2 𝐿𝑖𝑓𝑡

Total kebutuhan 4 Lift, namun dengan pertimbangan podium yang memiliki fungsi pertemuan yang besar ditambahkan 1 lift lagi dan diberikan 2 lift barang untuk menunjang kegiatan pengangkutan barang ke ruang pertemuan

800


2. SISTEM PEMIPAAN DAN PERHITUNGAN KEBUTUHAN AIR BERSIH Perhitungan kebutuhan air dimaksudkan untuk memperoleh gambaran mengenai volume tangki penyimpanan air yang perlu disediakan dalam suatu bangunan dan kapasitas pompa yang diperlukan. A. Kebutuhan keseharian Kebutuhan air bersih bisa dihitung berdasarkan • Jumlah standar pemakaian rata – rata per hari per unit (orang, tempat duduk atau tempat tidur dll.) (Air dingin atau panas) • Jumlah dan jenis peralatan saniter yang digunakan • Beban peralatan saniter. • Luasan bangunan Kelompok kami memilih perbandingan perhitungan berdasarkan pendekatan jumlah orang dan luas lantai bangunan dengan tabel sebagai berikut: Kemudian untuk jumlah orang kami menggunakan total okupasi dari perhitungan transportasi vertikal Zona All Floor Okupasi = 2089,84 : 12 m2/orang = 174,153 174,153 = 175 orang Total okupasi = (15 lantai) x 175 = 2625 orang Namun, selain itu dapat juga menghitung seluruh jumlah luas lantai kemudian membaginya dengan angka 12 m2/orang Jumlah Luas Lantai Bruto Podium = 23053,51 m2 Tower = 21532 m2 Total = 44585,51 m2 Jumlah Luas Lantai Netto dikurangi Luasan Core 16 lantai = 44585,51 – (324x16) = 39401,51 m2 Perkiraan jumlah penghuni bangunan 44585,51 m2 : 12m2/ orang = 3715,46 = 3716 orang

Tabel 8.2 Kebutuhan air bersih (Air dingin) per hari

Fungsi bangunan

Unit

Kebutuhan (Liter)

Apartemen

Orang

135-225

Bioskop

Kursi

15

Hotel

Orang

185 – 225

Kantor

Orang

45-90

Restoran

Kursi

70

Tempat tidur

280-470

Tanpa asrama

Murid

45-90

Dengan asrama

Murid

135-225

Rumah sakit Sekolah

Tabel 8.3 Kebutuhan Air Panas per Hari Fungsi bangunan

Unit

Kebutuhan (Liter)

Karyawan

orang

45

Pengunjung

orang

5-10

Kantor

Tabel 8.4 Kebutuhan Air per m2 bangunan Fungsi bangunan

Kebutuhan per hari (Liter)

Apartemen

20

Hotel

30

Kantor

10

Pertokoan

5

Rumah sakit

15

800


•Perhitungan melalui jumlah orang Volume air bersih (dingin ) yang dibutuhkan adalah: 3716 orang x 45L/orang = 167220 Liter

Selain dihitung dari air keseharian, air kebutuhan spinkler dan hidran serta kebutuhan air pada sistem tata udara juga masuk ke dalam hitungan dnegan rumus sebagai berikut:

Volume air bersih (hangat) yang dibutuhkan Karyawan adalah = 21532 : 12m2/orang x 45 L/orang = 1795 orang x 45 L/orang = 80775 Liter Pengunjung = 23053,51 : 12 m2/orang x 5 L/orang = 1922 orang x 5 L/orang = 9610 Liter Total kebutuhan air bersih harian 257605 Liter/hari

Setelah semua perhitungan volume air selesai, maka volume tangki atas dan bawah tanah berikut tangki tambahannya dapat dihitung besarannya.

Tabel 8.9 Prakiraan volume tambahan tangki bawah tanah Fungsi bangunan

x Luas lantai bangunan (m3)

Apartemen

0,012 – 0,015

Hotel

0,015 – 0,020

Perbelanjaan

0,005 – 0,006

Perkantoran

0,008 – 0,010

Rumah sakit

0,015 – 0,020

800


JUMLAH TOTAL KEBUTUHAN AIR BERSIH

PENYALURAN AIR HUJAN DAN SUMUR RESAPAN

Total kebutuhan air bersih harian 257605 Liter/hari Total cadangan air kebakaran 613800 Liter

D

Total air untuk tata udara 9684900 Liter/10 jam/hari

A

C B

Qd = 267605 + 613800 + 9684900 = 10.566.305 Liter = 10566,305 m3

JUMLAH TOTAL VOLUME TANGKI Vbt = 40% x 10566305 Liter = 4226522 Liter Va = 15% x 10566305 Liter = 1584945, 75 Liter Jika ingin menambahkan volume tangki maka menggunakan tabel di bawah ini: Tabel 8.9 Prakiraan volume tambahan tangki bawah tanah Fungsi bangunan

x Luas lantai bangunan (m3)

Apartemen

0,012 – 0,015

Hotel

0,015 – 0,020

Perbelanjaan

0,005 – 0,006

Perkantoran

0,008 – 0,010

Rumah sakit

0,015 – 0,020

Luas Atap A = 2560,36 m2 Luas Atap B = 2007,28 m2 Luas Atap C = 1041,13 m2 Luas Atap D = 798,79 m2 Hujan di Indonesia 5-8 Liter/menit, Maka perhitungan atap A adalah: 2560,36 m2 x 5 s/d 8 = 12801,8 – 20482,88 Liter/menit Penggunaan pipa tegak yang digunakan berdiameter 8” untuk luas atap s/d 2445 m2 dengan volume 3470 Liter/menit

Dibutuhkan kurang lebih 6 pipa 8” untuk mengalirkan air hujan secara efisien dalam waktu satu menit pada atap A

800


POMPA BOOSTER

TOREN

DIAGRAM SISTEM AIR

COOLING WATER

KETERANGAN: BIRU = AIR BERSIH MERAH = AIR YG HARUS DIPROSES DULU (FILTRASI) COKLAT = AIR KOTOR

POMPA TRANSFER

TANDON RWH TANDON SPRINGKLER

PDAM

SPT

GWT

800

RIOL KOTA


3. SISTEM PEMADAM KEBAKARAN ෍ 𝐻𝑖𝑑𝑟𝑎𝑛 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝑃𝑜𝑑𝑖𝑢𝑚 =

Springkler kebakaran atau fire sprinkler merupakan komponen dari sistem sprinkler kebakaran (fire sprinkler sysem) yang berfungsi menyemburkan air ketika potensi kebakaran telah terdeteksi. Potensi kebakaran yang umum dideteksi adalah kenaikan suhu yang ditentukan telah terlampaui. Pada sebagian besar bangunan tinggi, sprinkler ini memberikan reaksi respon yang cepat pada saat terjadinya api dan memberikan waktu yang cukup bagi penghuni/ pengguna bangunan untuk mengatur proses evakuasi. Di indonesia, paduan pemasangan sistem sprinkler untuk pencegahan bahaya kebakaran bangunan ditentukan berdasarkan Standar Konstruksi Bangunan Indonesia (SKBI): 3:4:53:1987 yang disahkan dengan Keputusan Menteri Pekerjaan Umum No. 378/KPTS/1987

෍ 𝐻𝑖𝑑𝑟𝑎𝑛 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝑇𝑜𝑤𝑒𝑟 =

4610,702 𝑥 2 = 12 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 800

1957,45 𝑥 2 = 5 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 800

෍ 𝐻𝑖𝑑𝑟𝑎𝑛 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝐵𝑎𝑠𝑒𝑚𝑒𝑛𝑡 =

5088 𝑥 2 = 13 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 800

Volume cadangan air sprinkler = 20% x (jumlah unit/lantai x jumlah lantai) x 18 L/menit x 30 menit = 20% x ((172x5) + (66x11) + (191x4)) x 18 x 30 = 20% x (860 + 726 + 764) x 18 x 30 Liter 253800 Liter

Volume cadangan air hidran box = Jumlah unit/lantai x 400 L (pancaran air hidran) x 30 menit = (12 + 5 + 13) x 400 x 30 = 360000 Liter 4610,702 − 324 ෍ 𝑆𝑝𝑟𝑖𝑛𝑘𝑙𝑒𝑟 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝑃𝑜𝑑𝑖𝑢𝑚 = = 172 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 25 ෍ 𝑆𝑝𝑟𝑖𝑛𝑘𝑙𝑒𝑟 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝑇𝑜𝑤𝑒𝑟 =

Total cadangan air 613800 Liter

1957,45455 − 324 = 66 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 25

෍ 𝑆𝑝𝑟𝑖𝑛𝑘𝑙𝑒𝑟 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝐵𝑎𝑠𝑒𝑚𝑒𝑛𝑡 =

5088 − 324 = 191 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 25

800


4. PERANCANGAN TATA UDARA 1. Perhitungan Beban Ac Zona Podium (R. Pertemuan) Jenis Penghawaan AC Central Luas Zona : 4610, 702 m2 Jumlah Lantai : 5 Lantai Fungsi Area : Kantor besar bagian pinggir Beban AC :: 25 m2/TR

AHU =

𝐿𝑢𝑎𝑠 𝐴𝑟𝑒𝑎 𝐵𝑒𝑏𝑎𝑛 𝐴𝐶

=

4610,702 25

= 184, 5 𝑇𝑅/𝐿𝑎𝑛𝑡𝑎𝑖

Chiller Seluruh podium 184,5 TR x 5 lantai = 922,5 TR Menggunakan Kapasitas AHU 100 TR dan 120 TR Chiller memakai kapasitas 1000 TR 2. Perhitungan Beban Ac Zona Tower Jenis Penghawaan AC Central Luas Zona : 1957,45 m2 Jumlah Lantai : 11 Lantai Fungsi Area : Kantor Beban AC :: 35 m2/TR

AHU =

𝐿𝑢𝑎𝑠 𝐴𝑟𝑒𝑎 𝐵𝑒𝑏𝑎𝑛 𝐴𝐶

=

1957,45 35

= 60 𝑇𝑅/𝐿𝑎𝑛𝑡𝑎𝑖

Volume air sirkulasi = 10 Liter/menit/TR Maka volume air sirkulasi AHU = 10 Liter/menit x 1582,5 = 15825 Liter/menit Volume air pendingin = 2% x Volume air sirkulasi Maka volume air pendingin = 316,5 Liter/menit Total Volume air tata udara 15825 + 316,5 Liter = 16141,5 Liter/Menit Atau 9684900 Liter/10 jam/hari

5.

PERANCANGAN PARKIR

BASEMENT

UNTUK

KANTONG

GF menampung 58 kantong parkir outdoor B1 menampung 75 kantong parkir B2 menampung 97 kantong parkir

Chiller Seluruh podium 60 TR x 11 lantai = 660 TR Menggunakan Kapasitas AHU 60 TR satu unit atau 30 TR 2 unit Chiller memakai kapasitas 800 TR

Rasio parkir menggunakan rasio 1 parkir/100 m2 lantai bruto Luas lantai = 44585,51 m2

Artinya butuh kurang lebih 446 kantong parkir

Karena hal inilah, jumlah lapis basement menjadi 4 lantai, dan keseluruhan dapat menampung 424 kantong parkir

800


LAMPU YANG AKAN DIGUNAKAN TL-D 36W/54-765 1SL/25 PHILLIPS SPESIFIKASI • Cap-Base : G13 [ Medium Bi-Pin Fluorescent] • Luminous Lux (Nom) : 2500 lm • Color Designation : Cool Daylight • Power : 36 Watt Sumber: Phillips.com • Dimmable : Yes Alasan menggunakan lampu ini karena cahaya lampu TL Fluorescent lebih terang dari lampu LED. Selain itu, lebih rapih dan penerangannya juga lebih merata (cahaya lebh menyebar)

RUMUS MENENTUKAN JUMLAH LAMPU DALAM RUANGAN N=

ExLxW Ø x Kp x Kd x n

N = Jumlah titik lampu E = Kuat penerangan (Lux). L = Panjang (Length) ruangan dalam satuan Meter W = Lebar (Width) ruangan dalam satuan Meter. Ø = Total nilai pencahayaan lampu dalam satuan LUMEN Kp = Koefisien Pemakaian Kd = Koefisien depresiasi n = Jumlah Lampu dalam 1 titik

N Tower= 350x 1957,45 = 152 Pasang Lampu 2500 x 0,9 x 1 x 2

RENCANA PELETAKAN LAMPU

• • • • •

Place of Origin : Ceiling Installation : Recessed Adjustability : Fixed Type of Beam : Linear Direction : Down

N Podium= 500x 4610,702 = 512 Pasang Lampu 2500 x 0,9 x 1 x 2 N basement= 100x 5088 = 114 PasangLampu 2500 x 0,9 x 1 x 2

RENCANA RUMAH LAMPU

Menggunakan rumah lampu yang berisi dua lampu TL karena lebih efektif dan efisien pada peletakan lampu di ceiling karena pada ceiling juga terdapat utilitas AC. Sehingga dengan menggunakan rumah lampu ini plafon ruangan tidak terlalu penuh.

Jumlah lampu total 152 x 11 = 1672 Titik pada tower 512 x 5 = 2560 Titik pada podium 114 x 4 = 456 Titik pada basement Jumlah total satu gedung ada 4688 titik lampu (catatan: ini hanya perkiraan perhitungan dengan simulasi jenis lampu yang sama. Tapi pada desain lampu jelas berbeda karna punya fungsi ruang yg berbeda sehingga butuh perhitungan lebih rinci lagi peruangnya.)

800


2000


H

U FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: BLOK PLAN 1 : 2000

1

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


U KETERANGAN: A.MAIN ENTRANCE KAWASAN B.SIDE ENTRANCE C.DROP OFF BANGUNAN LAMA (MAIN DROP OFF) D.DROP OFF BANGUNAN BARU E.ENTRANCE/ EXIT BASEMENT F.PUBLIC PLAZA G.CEREMONIAL PLAZA H. PARKIR KENDARAAN DARURAT I.SERVICE ENTRANCE J,EXIT KAWASAN

A

I

H

D

C

F G H E B

J

800


A

U MAIN ENTRANCE -0.60

PARKING LOT -0.60

A

SERVICE ENTRANCE -0.60

SECURITY POST

TOILET

+/- 0.00

I

TOILET

STORAGE

STORAGE

+/- 0.00

+/- 0.00

SECURITY POST +/- 0.00

PUBLIC VIEWING GALLERY + 0.05

TRAVEL AGENT

LIBRARY-CUM BETAWI ROOM CONFERENCE ROOM

+/- 0.00

+ 0.05

MINI BANK

MINI MART

+/- 0.00

+/- 0.00

DRIVER WAITING ROOM +/- 0.00

TOILET

PABX

TELEX

+/- 0.00

B

PRESS ROOM

POST TELECOMUNICATION

GIFT SHOP

B'

TOILET

RUANG DUDUK SIDE ENTRANCE HALL DROP OFF SLIDING DOOR

RUANG DUDUK

SLIDING DOOR

LIFT

-0.60

SIDE ENTRANCE MAIN ENTRANCE

LIFT LOBBY

+/- 0.00

MAIN ENTRANCE HALL TANGGA CONFERENCE ROOM

IN

ID SL G

AHU

O

D R

O

RESTO AND COFFEE

ENTRANCE

+ 0.05

+/- 0.00

TANGGA

C'

+/- 0.00

KITCHEN SET DROP OFF PANTRY

+/- 0.00

-0.60

D

DROP OFF -0.60

J

C

SECURITY POST

C

WALKING GALLERY +/- 0.00

SERVICE OUT

NAIK

TURUN

-0.60

STORAGE SLIDING DOOR

EXHIBITION AND FUNCTION

CLEANING SERVICE

TURUN

+/- 0.00 TURUN

NAIK

NAIK

KITCHEN

STORAGE +/- 0.00

BAR

FEMALE TOILET PUBLIC SPACE AND DINNING MALE TOILET

SLIDING DOOR

ASEAN INFORMATION CENTRE

KETERANGAN:

TURUN

CEREMONIAL PLAZA -0.50

ASEAN GALLERY, HERITAGE AND ESPERIENCE ROOM + 0.05

MAIN ENTRANCE KAWASAN SIDE ENTRANCE DROP OFF BANGUNAN LAMA (MAIN DROP OFF) DROP OFF BANGUNAN BARU ENTRANCE / EXIT BASEMENT PUBLIC PLAZA CEREMONIAL PLAZA PARKIR KENDARAAN DARURAT SERVICE ENTRANCE EXIT KAWASAN

PARKING LOT -0.60

PUBLIC PLAZA

H

F

A'

A. B. C. D. E. F. G. H. I. J.

NAIK

G

SIDE ENTRANCE

-0.50

E

SIDE ENTRANCE -0.60

B

BASEMENT -0.60

J

PLN

SECURITY POST +/- 0.00

GROUNDFLOOR PLAN SKALA 1:800

0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: GROUNDFLOOR 1 : 800

2

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


C

U

B 1

2

3

4

5

6

7

9

10

11

12

13

8 8.00

8.00

8.00

8.00

2.50

92.00 89.00 8.00

8.00

1.00

8.00

8.00

8.00

8.00

8.00

18.00

6.00 SIDE ENTRANCE +/- 0.00

A

SLIDING DOOR

SLIDING DOOR

STORAGE

PANTRY

+/- 0.00

+/- 0.00

STORAGE

8.00

+/- 0.00

6.00 8.00

DRIVER WAITING ROOM +/- 0.00

B

CLEANING SERVICE

4.00

+/- 0.00

LOBBY

RESTO AND COFFEE +0.05

+/- 0.00

8.00

8.00 6.00

MINI MART +/- 0.00

C

A'

SLIDING DOOR

MINI BANK

TURUN

8.00

TURUN

A

+/- 0.00

8.00

3.00

54.00

WALKING GALLERY +/- 0.00

D 18.00 +/- 0.00

TRAVEL AGENT +/- 0.00

8.00

NAIK

STORAGE

NAIK

8.00 72.00

SLIDING DOOR

E

3.00

65.00

8.00

8.00 ASEAN GALLERY, HERITAGE AND ESPERIENCE ROOM

2.50

+0.05

F WAITING ROOM

LIBRARY-CUM BETAWI ROOM

8.00

+/- 0.00

+0.05

8.008.00 RECEPTIONIST +/- 0.00

G

H 1.00 O

O

R

2.00 G

D

41.00

SL

ID IN

GIFT SHOP

8.00

+/- 0.00

41.00

MAIN ENTRANCE +/- 0.00

I 12.73 8.00

PUBLIC VIEWING GALLERY +0.05

J

8.00

3.78

C'

16.00 32.00

B'

DENAH LANTAI 1 SKALA 1: 500 0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 : 500

3

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


A

U A

B

C

D

E

F

G

I

J

H 65.00 8.00

8.00 1.00

8.00

8.00

8.00

2.50

8.00

8.00

8.00

18.00

FILE

1

STORE

TEMPAT WUDHU PEREMPUAN

TOILET AND LOCKER PEREMPUAN

+ 4.20

+ 4.20

8.00 MASJID

12.50

2

STORE

+ 4.20

UPPER SPACE TOILET AND LOCKER LAKI-LAKI

TEMPAT WUDHU LAKI-LAKI

2.50

+ 4.20

+ 4.20

SEC 3

ASS. DIR 3

ASS. DIR 2

B'

SEC 4

ASS. DIR 1

B

8.00 ASS. DIR 4

3.50

STORE TOILET SEC 2

TOILET

SEC 1

3

32.00

SEC 3

TOILET REPRODUCTION AND PRINTING

FEMALE TOILET

GYM

8.00

+ 4.20

RESERVE

RESERVE

RESERVE

LOUNGE

MALE TOILET

+ 4.20

4

16.00

18.00

LIFT DIR. 3

TOILET

8.00

LIFT LOBBY

SEC 3

FILE

UPPER SPACE

TANGGA

5

TOILET DIR. 2

SEC 2

8.00 AHU AC

FILE

8.00 AUDIO CENTRE

11.29

FILE

6

SEC 1

TANGGA TOILET

C

C'

NAIK

NAIK

8.00 89.00

TURUN

TURUN

DIR. 1 BRIDGE

7

SLIDING DOOR

8

1.00 SMALL CONFERENCE

F&B

LOBBY SKY BRIDGE

FOOD & BEVERAGE

8.00

READING LOUNGE CONFERENCE ROOM

9

F&B

PRIVATE SEC.

INFIRMARY + 4.20

NURSERY ROOM

F&B

+ 4.20 TURUN

NAIK

WALKING LIBRARY

8.00

PERSONAL ASSISTANT F&B

10

F&B SECRETARY GENERAL TOILET

TANGGA

8.00 CANTEEN FOR STAFF TURUN

NAIK

+ 4.20

11

DAY CARE ROOM + 4.20

8.00

12

DINNING ROOM FOR STAFF

PANTRY

+ 4.20

+ 4.20

8.00 SERVING AREA + 4.20

13

4.00

12.00

4.00 6.00

16.00

32.00 48.00

SKALA 1:700 0

5

15

A'

MEZANINE LANTAI 1 35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 : 700

4

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


A

U A

B

C

D

E

F

G

I

J

H 65.00 8.00

8.00 1.00

8.00

8.00

8.00 2.50

8.00

8.00

8.00

18.00

FILE

1

STORE

8.00

16.00

UPPER SPACE

2

STORE

ASEC EXECUTIVE MEETING ROOM

AMS EXECUTIVE MEETING ROOM

EXECUTIVE LOUNGE

+8.40

+8.40

+8.40

CPR-WG MEETING ROOM +8.40

2.50 SEC 4

SEC 3

ASS. DIR 3

ASS. DIR 1

ASS. DIR 2

8.00

STORE TOILET SEC 2

TOILET

SEC 1

3

32.00 SEC 3

TOILET

REPRODUCTION AND PRINTING

FEMALE TOILET

B

B'

ASS. DIR 4

2.50 8.00 VIP HOLDING ROOM +8.40

RESERVE

RESERVE

RESERVE

MALE TOILET

4

18.00 13.50 LIFT

HOST COUNTRY COMMITTEE ROOM DIR. 3

TOILET

LIFT LOBBY

SEC 3

FILE

8.00

+8.40

AWC ROOM

UPPER SPACE

TANGGA

+8.40

5

TOILET DIR. 2

SEC 2 AHU AC

FILE

AUDIO

8.00

NAIK

NAIK

AUDIO CENTRE

TURUN

TURUN

FILE

6

SEC 1

TANGGA CREDENTIAL ROOM

LOBBY

+8.40

C'

+8.40 NAIK

NAIK

CONFERENCE ROOM UPPER SPACE

8.00 89.00

TURUN

TURUN

DIR. 1

C

TOILET

BRIDGE

7

AUDIO

8

SLIDING DOOR

1.00 SMALL CONFERENCE +/- 0.00

+8.40

AUDITORIUM +8.40

STORAGE

LOBBY ASSEMBLY POINT

8.00

9

CONFERENCE ROOM

PRIVATE SEC.

8.00 PERSONAL ASSISTANT

10

SECRETARY GENERAL TOILET

TANGGA

8.00 AUDIO

11

MINISTERIAL ROOM +8.40

8.00

22.00

12

SUMMIT ROOM

8.00

+8.40

13

3.00 24.00

24.00 48.00

DENAH LANTAI 3 SKALA 1:700 A'

0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 : 700

5

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


C

U

B

1

2

3

4

5

6

7

9

10

11

12

13

8 8.00

8.00

8.00

8.00

2.50

89.00 8.00

8.00

8.00

1.00

8.00

8.00

8.00

8.00

18.00

A STORAGE +/- 0.00

8.00 STAFF LOUNGE +12.60

B ICT CONTROL AND SERVERS ROOM

BUILDING MAINTENANCE ROOM AND STORAGE

+12.60

+12.60

8.00

24.00

MEDIUM MULTI PURPOSE HALL +12.60

ARCHIEVE AND DOCUMENT PRESERVATION ROOM

A'

+12.60

NAIK

C

TURUN

A

CONFERENCE MANAGEMENT ROOM

8.00

+12.60

D

48.00 18.00

NAIK

E

TURUN

8.00

65.00 SUMMIT ROOM

AUDITORIUM

+8.40

+8.40

8.00

24.00

TELECONFERENCE ROOM

2.50

SMALL MEETING ROOM

+12.60

+12.60

F SMALL PURPOSE ROOM +12.60

8.00

G

H

I 8.00

PRESS CENTER

+12.60

8.00

MEDIUM MEETING ROOM

1.00

+12.60

J

13.00

3.00

16.00

32.00

C'

B'

DENAH LANTAI 4 SKALA 1:500 0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 : 500

6

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


C

U

B

1

2

3

4

5

6

7

9

10

11

12

13

8 8.00

8.00

8.00 2.50

8.00

89.00 8.00

8.00

1.00

8.00

8.00

8.00

8.00

8.00

18.00

A STORAGE

8.00

8.00

+/- 0.00

SYSTEM AND HALL FURNITURE STORAGE +16.80

B 8.00

SMALL PURPOSE ROOM

8.00

+16.80

A

A' NAIK

TURUN

C 8.00 MULTI PURPOSE BALLROOM +16.80

D

16.0048.00 18.00 SMALL PURPOSE ROOM NAIK

+16.80

E

TURUN

8.00

65.00

8.00 2.50

F

16.00 MULTI PURPOSE BALLROOM AND CONFERENCE MANAGEMENT ROOM +16.80

8.00

G

H 1.00

8.00

LARGE MULTI PURPOSE ROOM

2.00

+16.80

40.00

17.00

I 8.00

J

12.00

3.00 32.00

17.00

C'

B'

DENAH LANTAI 5 SKALA 1:500 0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 : 500

7

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 5.00

8.00

8.00

8.00

8.00

5.00

18.00

A

5.00

DIRECTOR 1

EXECUTIVE DIR.

DIRECTOR 2

ASS. DIR 1

B 8.00 ASS. DIR 2

A

A'

C ASS. DIR 3

8.00 ASS. DIR 4

ASEAN FOUNDATION CC

D

+ 21.00

18.00 8.00

E

42.00

8.00

F 5.00

G

B'

KETERANGAN:

DENAH TOWER LT. 6

LANTAI KHUSUS ASEAN FOUNDATION

SKALA 1:400

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 :400

8

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 5.00

8.00

8.00

8.00

8.00

5.00

18.00

A

5.00

EXECUTIVE DIR.

DIRECTOR 1

DIRECTOR 2

DIRECTOR 3

B 8.00

A

A'

C ASS. DIR 1

8.00 AHA CENTRE DOC ASS. DIR 2

D

+ 25.20

18.00 ASS. DIR 3

8.00 ASS. DIR 4

E

42.00 REPRODUCTION AND PRINTING

8.00

F 5.00

G

B'

DENAH TOWER LT. 7 SKALA 1:400

KETERANGAN: LANTAI KHUSUS AHA CENTRE

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 :400

9

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 5.00

8.00

8.00

8.00

8.00

5.00

18.00

A

5.00

B 8.00

A

A'

C 8.00 + 29.40

D 18.00 8.00

E

42.00

8.00

F 5.00

G

B'

DENAH TOWER LT. 8 SKALA 1:400

KETERANGAN: LANTAI STAFF INSTITUSI ASEAN

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 :400

10

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 5.00

8.00

8.00

8.00

8.00

5.00

18.00

A

5.00

B 8.00

A

A'

C 8.00 + 33.60

D 18.00 8.00

E

42.00

8.00

F 5.00

G

B'

DENAH TOWER LT. 9 SKALA 1:400

KETERANGAN: LANTAI STAFF INSTITUSI ASEAN

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 :400

11

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 5.00

8.00

8.00

8.00

8.00

5.00

18.00

A

5.00

B EXECUTIVE DIR.

EXECUTIVE DIR.

EXECUTIVE DIR.

8.00

ASS. DIR 1

A

C

ASS. DIR 7 ASS. DIR 2

A'

ASS. DIR 8

8.00 ASS. DIR 3

ASS. DIR 9 + 37.80

ASS. DIR 4

ASS. DIR 10

D 18.00 ASS. DIR 11

8.00 ASS. DIR 5

E

ASS. DIR 12

ASS. DIR 6

42.00

8.00 DIRECTOR 1

DIRECTOR 2

DIRECTOR 3

DIRECTOR 4

DIRECTOR 5

DIRECTOR 6

F 5.00

G

B' KETERANGAN: LANTAI KHUSUS PETINGGI INSTITUSI ASEAN LAINNYA - ASEAN INSTITUTE FOR PEACE RECONCILIATION - ASEAN BUSSINES ADVISORY COUNCIL - ASEAN INTRA PARLEMENTARY ASSEMBLY

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

DENAH TOWER LT. 10 SKALA 1:400

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

GAMBAR SKALA

: DENAH 1 :400

NO. LEMBAR

DISAHKAN OLEH:

12

PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 8.00

5.00

8.00

8.00

5.00

9.00

18.00

A 8.00 DP AUSTRALIA

DP CANADA

DP CHINA

DP EUROPE UNION

DP INDIA

B 8.00

A

A'

C 8.00

D

+ 42.00

18.00 8.00

E

48.00

8.00

F DP JAPAN

DP KOREA

DP NEW ZEALAND

DP RUSSIA

DP UNITED STATE

8.00

G

B'

DENAH TOWER LT. 11 SKALA 1:400

KETERANGAN: LANTAI KHUSUS DIALOUGE PARTNERS (DP) PROJECTS

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

GAMBAR SKALA

: DENAH 1 :400

NO. LEMBAR

DISAHKAN OLEH:

13

PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 8.00

5.00

8.00

8.00

5.00

9.00

18.00

A 8.00

B PR/AMS - CPR WG THAILAND

PR/AMS - CPR WG MYANMAR

PR/AMS - CPR WG INDONESIA

PR/AMS - CPR WG PHILIPPINES

PR/AMS - CPR WG CAMBODIA

8.00

A

A'

C 8.00

PR/AMS - CPR WG EAST TIMOR

SMALL PURPOSE ROOM + 46.20

D 18.00 8.00

E

PR/AMS - CPR WG PAPUA NEW GUINEA

48.00

8.00 PR/AMS - CPR WG LAOS

PR/AMS - CPR WG BRUNEI DARUSSALAM

PR/AMS - CPR WG MALAYSIA

PR/AMS - CPR WG VIETNAM

PR/AMS - CPR WG SINGAPORE

F 8.00

G

B'

DENAH TOWER LT. 12 SKALA 1:400

KETERANGAN: LANTAI KHUSUS AMS/COUNTRY

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 :400

14

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 8.00

5.00

8.00

8.00

5.00

9.00

18.00

A 8.00 TECHNICAL OFFICER

TECHNICAL OFFICER

B 8.00

A

A'

C 8.00

+ 50.40

D 18.00 8.00

E

48.00 ATTACHMENT OFFICER INTERN

8.00

TECHNICAL ASSISTANT

F

SHORT-TERM EXPERT/ CONSULTANT

8.00

G

B'

DENAH TOWER LT. 13 SKALA 1:400

KETERANGAN: LANTAI STAFF SEKRETARIAT ASEAN

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

GAMBAR SKALA

: DENAH 1 :400

NO. LEMBAR

DISAHKAN OLEH:

15

PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 8.00

5.00

8.00

8.00

5.00

9.00

18.00

A 8.00

SENIOR OFFICER

SENIOR OFFICER

B 8.00

A

A'

C 8.00 + 54.60

D 18.00 8.00

E

48.00

8.00 GENERAL STAFF

SPECIALIZED STAFF

SMALL LOUNGE AND PANTRY

8.00

REPRODUCTION AND PRINTING

FILE ARCHIEVE

F

G

B'

DENAH TOWER LT. 14 SKALA 1:400

KETERANGAN: LANTAI STAFF SEKRETARIAT ASEAN

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 :400

16

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 8.00

5.00

8.00

8.00

5.00

9.00

18.00

A ASSISTANT ASSISTANT DIR. AEC 1 DIR. AEC 2

8.00

ASSISTANT ASSISTANT DIR. AEC 3 DIR. AEC 4

ASSISTANT DIR. AEC 5

DIR. AEC 1

DIR. CCA 1

B DIR. CCA 2

ASSISTANT ASSISTANT ASSISTANT DIR. AEC 6 DIR. AEC 7 DIR. AEC 8

ASSISTANT DIR. AEC 9

ASSISTANT DIR. AEC 10

DIR. AEC 2

8.00

A

DIR. CCA 3

C 8.00

A'

DIR. AEC 3

ASSISTANT DIR. CCA 1

ASSISTANT DIR. CCA 2

ASSISTANT DIR. CCA 3

ASSISTANT DIR. CCA 4

+ 58.80

ASSISTANT DIR. AEC 11

ASSISTANT DIR. AEC 12

ASSISTANT DIR. AEC 13

ASSISTANT DIR. AEC 14

ASSISTANT DIR. AEC 15

ASSISTANT DIR. AEC 16

ASSISTANT DIR. AEC 17

ASSISTANT DIR. AEC 18

ASSISTANT DIR. AEC 19

ASSISTANT DIR. AEC 20

ASSISTANT DIR. AEC 21

ASSISTANT DIR. AEC 22

D 18.00 8.00

E

48.00

ASSISTANT DIR. CCA 5

ASSISTANT DIR. CCA 6

ASSISTANT DIR. CCA 7

ASSISTANT DIR. CCA 8

ASSISTANT DIR. CCA 9

ASSISTANT DIR. CCA 10

ASSISTANT DIR. CCA 11

ASSISTANT DIR. CCA 12

8.00 REPRODUCTION AND PRINTING

F MEETING AND PRESENTATION

8.00 FILE ARCHIEVE

G

B'

DENAH TOWER LT. 15 SKALA 1:400

KETERANGAN: LANTAI DEPARTEMEN ASEAN ECONOMIC COMUNITY (AEC) DAN DEPARTEMEN COMMUNITY AND CORPORATE AFFAIRS (CCA)

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 :400

17

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 8.00

5.00

8.00

8.00

5.00

9.00

18.00

A 8.00 DSG APSC

DSG CCA SECRETARY GENERAL DSG AEC

B

DSG ASCC

8.00

A

A'

C DIR. APSC 1

DIR. APSC 2

DIR. ASCC 1

DIR ASCC 2

8.00

D

+ 63.00

DIR. ASCC 3

18.00 8.00

E

48.00

ASSISTANT DIR. APSC 1

ASSISTANT DIR. APSC 3

ASSISTANT DIR. ASCC 1

ASSISTANT DIR. APSC 2

ASSISTANT DIR. APSC 4

ASSISTANT DIR. ASCC 2

ASSISTANT DIR. ASCC 3

8.00 ASSISTANT DIR. APSC 5

ASSISTANT DIR. APSC 6

ASSISTANT DIR. ASCC 4

ASSISTANT DIR. ASCC 5

ASSISTANT DIR. ASCC 6

ASSISTANT DIR. ASCC 7

ASSISTANT DIR. ASCC 8

ASSISTANT DIR. ASCC 9

F ASSISTANT DIR. APSC 7

ASSISTANT DIR. APSC 8

ASSISTANT DIR. APSC 9

ASSISTANT DIR. APSC 10

HEAD ES DIVISION

CHIEF IAE DIVISION

HEAD AC DIVISION

8.00

G

B'

KETERANGAN: LANTAI SECRETARY GENERAL, 3 KEPALA DIVISI DEPARTEMEN ASEAN POLITICAL SECURITY COMMUNITY (APSC)

DENAH TOWER LT. 16 SKALA 1:400

DEPARTEMEN ASEAN SOCIO -CULTURAL COMMUNITY (ASCC)

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

GAMBAR SKALA

: DENAH 1 :400

NO. LEMBAR

DISAHKAN OLEH:

18

PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 8.00

5.00

8.00

8.00

5.00

9.00

18.00

A 8.00

GONDOLA RAILING

B 8.00 TOREN

A

A'

C 8.00 RUANG MAINTENANCE

+ 67.20

RUANG CONTROL HELI RADIO IFP

D 18.00 8.00

E

48.00

8.00

F 8.00

G

B'

DENAH TOWER ATAP

KETERANGAN:

SKALA 1:400

LANTAI UNTUK PELETAKAN PERALATAN UTILITAS BANGUNAN, MAINTENANCE BANGUNAN DAN HELIPAD

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 :400

19

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


U

B 1

2

3

4

5

6

7

42.00 8.00

5.00

8.00

8.00

5.00

9.00

18.00

A 8.00

B 8.00

A

A'

C

SAFETY AREA 37.50

8.00 FATO 28.05

H

D 18.00

TLOF 16.20

8.00

E

48.00

8.00

+ 71.40

F 8.00

G

B' KETERANGAN: TLOF (TOUCHDOWN AND LIFT-OFF AREA: 1 RD FATO (FINAL APPROACH AND TAKE-OFF AREA: 1 1/2 D TLOF TO FATO: (0.5 (1.5 D - 1 RD)) SAFETY AREA: MIN. 3 M, (0.25 - 0.50 D),

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

DENAH TOWER HELIPAD SKALA 1:400

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 :400

20

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


HELIPAD DENGAN FATO < 30 M

FATO

DIMENSI HELICOPTER YANG DIGUNAKAN UNTUK PERMODELAN: EUROCOPTER AS 332 SUPER PUMA (MILIK PRESIDEN RI MASIH DALAM JENIS YANG SAMA) L: 16.79 M (FUSELAGE), 18,70 M (ROTOR TURNING) H: 4.97 M MAIN ROTOL DIAMETER: 16.20 M MAIN ROTOL AREA: 206.12 M2

TLOF

FATO

TLOF

SAFETY AREA

H

DETAIL TANGGA RAILING TANGGA STAINLESS STEEL

KOLOM PENOPANG TANGGA

ITEM HELIPAD GENERAL AVIATION SUMBER: ICAO HELIPORT SEMINAR DUBAI, U.A.E 2015 PERATURAN DIREKTUR JENDERAL PERHUBUNGAN UDARA NO. KP 40 TAHUN 2015 HELIPORT DESIGN AND PLANNING FOR EMERGENCY SERVICES BY ARCHITECT SUHAIR SHAFEEK SABRI TLOF (TOUCHDOWN AND LIFT-OFF AREA: 1 RD FATO (FINAL APPROACH AND TAKE-OFF AREA: 1 1/2 D TLOF TO FATO: (0.5 (1.5 D - 1 RD)) SAFETY AREA: MIN. 3 M, (0.25 - 0.50 D), KEMIRINGAN 4%

FASILITAS RADIO VERY HIGH FREQUENCY (VHF) FASILITAS PEMANTAU CUACA SISTEM PENCAHAYAAN MARKA PERALATAN KOMUNIKASI PENERBANGAN PROSEDUR INSTRUMENT FLIGHT PROCEDURES/IFP

3.00

SAFETY AREA

3.00 6.30

3.00 RD

LAMPU GREEN OMNI - DIRECTIONAL LIGHT JARAK ANTAR LAMPU 3 M (UNTUK ELEVATED DECK) H

SAFETY NET MESS 20X20 CM 0.30

0.30

H

D

BATAS HELICOPTER DECK 37.50

SAFETY NET

HASIL PERHITUNGAN

FATO

TLOF: 1 RD = 16.20 M FATO: 1 1/2 D = 28.05 M TLOF TO FATO: (0.5 (1.5 D - 1 RD)) = (0.5 (1.5 X 18.70 - 1 X 16.20)) = MIN. 5.925 M SAFETY AREA: MIN. 3 M, (0.25 - 0.50 D) = 0.25 D = 0.25 X 18.70 = 4.675 M TOTAL PANJANG DECK: FATO + 2 X DIM. SAFETY AREA = 28.05 M + 9.35 M = 37.40 M

TLOF SAFETY NET MESS 20X20 CM

+ 71.40

4.20

SAFETY AREA MENGGUNAKAN JARING MESS TEBAL HURUF DAN MARKA: 30 CM

POTONGAN INTI BANGUNAN (CORE)

6.30

37.50

KOLOM STRUKTUR

POTONGAN HELIDECK SKALA 1:200

0

5

15

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

HELIPAD PLANNING SKALA 1:400 NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

GAMBAR SKALA

: 1 :400

NO. LEMBAR

DISAHKAN OLEH:

21

PEMBIMBING

PETUGAS TU


U

1

2

3

4

5

6

C

7

9

10

11

12

13

8 8.00

8.00

8.00 2.50

8.00

89.00 8.00

8.00

1.00

8.00

8.00

8.00

8.00

180°

8.00

18.00

B 15.00

180° R5.00

A

R6.00

8.00

B PARKIR MOTOR

7.00

R. GENSET DAN TRAFO - 4.20

8.00

- 4.20

R. EXHAUSE - 4.20

55.00

PARKIR MOTOR - 4.20

PARKIR MOBIL

A

- 4.20

C

40.00

A'

8.00

D

48.00 18.00 8.00

E

65.00

65.00

LOBBY LIFT DAN R. TUNGGU SOPIR

8.00

-4.20

7.00

F 8.00 8.00

R. POMPA DAN TANGKI - 4.20

G

10.00

H 1.00

R. MESIN CHILLER

22.00

-4.20

R6.00

8.00

17.00

I 8.00

J

48.00

C'

B'

DENAH BASEMENT B1 SKALA 1:500 0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 : 500

22

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


C

U

B 1

2

3

4

5

6

7

9

10

11

12

13

8 8.00

8.00

8.00

8.00

8.00

89.00 8.00

1.00

8.00

8.00

8.00

8.00

8.00

18.00

A 8.00

B 8.00

A

A'

C 8.00

D

48.00 18.00 8.00

E

65.00

65.00

LOBBY LIFT DAN R. TUNGGU SOPIR

8.00

-7.80

7.00

F 8.00

G

H 1.00

22.00 R6.00

8.00

17.00

I 8.00

J

48.00

C'

B'

DENAH BASEMENT B2-B4 SKALA 1:500 0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DENAH 1 : 500

23

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


A

PEMBAGIAN LUASAN PENAMPANG BEBAN KOLOM PEMBAGIAN DI SESUAIKAN DENGAN FUNGSI PADA LANTAI DI ATASNYA DAFTAR BESARAN KOLOM PODIUM A

B

C

D

E

F

G

I

J

H 65.00

KOLOM PODIUM 0,50 X 0,50 A1,A1,G1, G7

8.00

8.00 1.00

8.00

8.00 2.50

8.00

8.00

8.00

18.00

1

KOLOM PODIUM 0,60 X 0,60 B8, C8, D8, E8, F8, B9, B10, B11, B12, C9, C10, C11, C12, D10, D12, E9, E10, E11, E12, F9, F 10, F11, F12, H2, H4, I1, I2, I3, I4, I5, J2, J4

8.00

8.00 12.50

2 2.50

B'

KOLOM PODIUM 0,70 X 0,70 A2, A3, A4, A5, A6, A8, B1, B7, C1, C7, D1, D7, E1, E7, F1, F7, G2, G3, G4, G5, G6, G8

3.50

3

32.00

8.00

4

16.00

DILATASI STRUKTUR

B

8.00

18.00

KOLOM PODIUM 0,80 X 0,80 H1, H3, H5, J1, J3, J5

8.00

5

KOLOM PODIUM 0,95 X 0,95 B2, B3, B5, B6, C2, C6, D2, D6, E2, E6, F2, F3, F5, F6

6

C

C'

8.00 89.00

7 8

KOLOM PODIUM 1,00 X 1,00 A9, A10, A11, A12, A13, B13, C13, D13, E13, F13, G9, G10, G11, G12, G13

8.00

1.00

8.00

9

KETERANGAN WARNA BALOK 8.00

BALOK UTAMA

10

BALOK UNTUK DINDING 8.00

BALOK TRANSFER

11 8.00

12 8.00

13

TEBAL CORE (DIHITUNG PADA LANTAI BASEMENT 4 LUAS BEBAN (A) = 25 M X 25 M = 2500 X 2500 = 6250000 CM2 F = (n X A) / 1000 F = (19 lt X 6250000) / 1000 = 118.750

MATERIAL BALOK YANG DIGUNAKAN

BALOK RANGKA BAJA, TINGGI BALOK= 1/18 - 1/22 X BENTANG F F

= ((1800 X 2) + (1800 X 2) - (400 X 2) + 100))t = 6300 t

4.00

12.00

4.00 6.00

16.00

32.00 48.00

t (TEBAL)

BALOK BETON BERTULANG, TINGGI BALOK = 1/12 X BENTANG

A'

= 118750 / 6300 = 18.85 CM KARENA BEBERAPA FAKTOR BEBAN YANG BERUBAH DAN DIBUAT SEBAGAI KONSTRUKSI HELIPAD DI LANTAI ATAS AKHIRNYA DI BUAT SETEBAL 20 - 22 CM

PEMBALOKAN GF

BALOK PRA TEGANG/ PRESTRESS UNTUK TRANSFER BEAM

0

5

15

SKALA 1:700

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: 1 : 700

24

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


A

A

TRANSFER BEAM

A

B

C

H

H 8.00 1.00

D

E

F

G

I

J

A

B

C

D

E

F

G

I

J

65.00 65.00

8.00

8.00

8.00 2.50

8.00

8.00

8.00

8.00

BALOK 45/70

8.00

8.00 1.00

8.00

8.00 2.50

8.00

8.00

8.00

8.00

18.00

18.00

AREA BALOK RANGKA BAJA 1

1 8.00 8.00 12.50

2

16.00

2 2.50 8.00 2.50

3

32.00

3

32.00

B

B'

B'

B

8.00 3.50

2.50 8.00 8.00

18.00

4

18.00

4

16.00

13.50

8.00 8.00

5

5 8.00 8.00

6

6

C

C'

C

C'

8.00 89.00

8.00 89.00

7 8

7 8

1.00

1.00 8.00 8.00

9

9 8.00

8.00

10

10 8.00

8.00

11

11 8.00

8.00

22.00

12

AREA BALOK RANGKA BAJA

12

BALOK 45/70

BALOK 45/70

8.00

8.00

13

13 3.00 24.00

24.00 48.00

4.00

12.00

4.00 6.00

16.00

32.00 48.00

A'

A'

PEMBALOKAN LANTAI 3

PEMBALOKAN MEZANINE LT. 1

SKALA 1:700

SKALA 1:700

0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: 1 : 700

25

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


B

1

2

TRANSFER BEAM

3

4

5

6

7

9

10

11

12

13

8 8.00

8.00

8.00 2.50

8.00

8.00

89.00 8.00

1.00

8.00

8.00

8.00

8.00

8.00

18.00

A

AREA BALOK RANGKA BAJA

8.00

B

B

8.00

A

TRANSFER BEAM

A'

C 8.00

1

2

3

4

5

6

18.00

8.00

8.00

8.00

89.00 8.00

9

10

11

12

13

8.00

1.00

8.00

8.00

8.00

8.00

8.00

18.00

A

65.00

8.00 2.50

BALOK 45/70

F

A

H 1.00

8.00

8.00

8.00

8.00

B

8.00

G

8.00 2.50

8.00

E

7 8

D

A'

C 8.00

8.00

D

I

16.0048.00 18.00 8.00

8.00

E

J

65.00

8.00

13.00

2.50 3.00

16.00

F

16.00

32.00 8.00

B'

G

AREA BALOK RANGKA BAJA

H 1.00

8.00

PEMBALOKAN LANTAI 4

2.00 40.00

17.00

I

SKALA 1:700 8.00

J

12.00

3.00 32.00

17.00

AREA BALOK RANGKA BAJA

B' AREA BALOK RANGKA BAJA

PEMBALOKAN LANTAI 5 SKALA 1:700

0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: 1 : 700

26

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


HELI DECK UP TO SUPER PUMA

+ 71.40

HELIPAD

+ 67.20

ROOFTOP

+ 63.00

TOWER LT. 16

+ 58.80

TOWER LT. 15

+ 54.60

TOWER LT. 14

+ 50.40

TOWER LT. 13

+ 46.20

TOWER LT. 12

+ 42.00

TOWER LT. 11

+ 37.80

TOWER LT. 10

+ 33.60

TOWER LT. 9

+ 29.40

TOWER LT. 8

+ 25.20

TOWER LT. 7

+ 21.00

TOWER LT. 6

+ 16.80

LANTAI 5

+ 12.60

LANTAI 4

+ 8.40

LANTAI 3

+ 4.20

MEZANINE LT. 1

+/- 0.00

GROUNDFLOOR

- 4.20

BASEMENT 1

- 7.80

BASEMENT 2

- 11.40

BASEMENT 3

- 15.00

BASEMENT 4

SAFETY NET

ZYNCALUME SPACE FRAME

RAIN WATER RUN OFF LAPISAN WATERPROOF

MULTI PURPOSE BALLROOM + 16.80

AUDITORIUM + 8.40

SUMMIT ROOM + 8.40

DINNING ROOM FOR STAFF + 4.20

ASEAN GALLERY, HERITAGE, EXPERIENCE ROOM +/- 0.05

1.00 8.00

8.00

8.00

8.00

8.00

8.00 89.00

8.00

8.00

8.00

8.00

8.00

8

POTONGAN A - A'

1

2

3

5

4

6

7

9

10

11

12

13

SKALA 1:500 0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: POTONGAN 1 : 500

27

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


HELI DECK UP TO SUPER PUMA

+ 71.40

HELIPAD

+ 67.20

ROOFTOP

+ 63.00

TOWER LT. 16

+ 58.80

TOWER LT. 15

+ 54.60

TOWER LT. 14

+ 50.40

TOWER LT. 13

+ 46.20

TOWER LT. 12

+ 42.00

TOWER LT. 11

+ 37.80

TOWER LT. 10

+ 33.60

TOWER LT. 9

+ 29.40

TOWER LT. 8

+ 25.20

TOWER LT. 7

+ 21.00

TOWER LT. 6

+ 16.80

LANTAI 5

+ 12.60

LANTAI 4

+ 8.40

LANTAI 3

+ 4.20

MEZANINE LT. 1

+/- 0.00

GROUNDFLOOR

- 4.20

BASEMENT 1

- 7.80

BASEMENT 2

- 11.40

BASEMENT 3

- 15.00

BASEMENT 4

SAFETY NET

ZYNCALUME SPACE FRAME

RAIN WATER RUN OFF LAPISAN WATERPROOF

LARGE MULTI PURPOSE BALLROOM + 16.80

18.00 8.00

8.00

8.00

8.00

1.00

8.00

8.00

8.00

8.00

65.00

H

POTONGAN B - B'

J

I

G

F

E

D

C

B

A

SKALA 1:500 0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: POTONGAN 1 : 500

28

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


+ 71.40

HELIPAD

+ 67.20

ROOFTOP

+ 63.00

TOWER LT. 16

+ 58.80

TOWER LT. 15

+ 54.60

TOWER LT. 14

+ 50.40

TOWER LT. 13

+ 46.20

TOWER LT. 12

+ 42.00

TOWER LT. 11

+ 37.80

TOWER LT. 10

+ 33.60

TOWER LT. 9

+ 29.40

TOWER LT. 8

+ 25.20

TOWER LT. 7

+ 21.00

TOWER LT. 6

+ 16.80

LANTAI 5

+ 12.60

LANTAI 4

+ 8.40

LANTAI 3

+ 4.20

MEZANINE LT. 1

+/- 0.00

GROUNDFLOOR

- 4.20

BASEMENT 1

- 7.80

BASEMENT 2

- 11.40

BASEMENT 3

- 15.00

BASEMENT 4

BANGUNAN LAMA

MULTI PURPOSE BALLROOM + 16.80

ZYNCALUME SPACE FRAME

AUDITORIUM CONFERENCE HALL

+ 8.40

CONFERENCE HALL BARU + 7.50

WALKING LIBRARY + 4.20

8.00

8.00

8.00

8.00

8.00

8.00

8.00

8.00

48.00

POTONGAN C - C'

K

J

I

G

F

E

D

B

C

A

SKALA 1:500 0

5

15

35

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: POTONGAN 1 : 500

29

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


PANASAP EURO GREY

RANGKA SPACE FRAME (RIGID)

ZYNCALUME

PLAFOND GYPSUM 0.9 - 1.0 CM TITIK LAMPU

AUDITORUM + 8.40

CONFERENCE HALL BARU + 7.50

PINTU MASUK RUANG

WALKING LIBRARY

+ 4.20

+ 4.20

ASEAN GALLERY, HERITAGE + 0.05

PEDESTRIAN - 0.50

POTONGAN PRINSIP SKALA 1:100 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DETAIL POTONGAN 1 : 100

30

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


KARPET TEBAL (ACOUSTIC) BALOK UTAMA RANGKA BAJA 60/120

BALOK RANGKA BAJA 45/80

BALOK UTAMA RANGKA BAJA 60/120 DINDING BATA TANPA FINISHING

MULTI PURPOSE BALLROOM

ACP WALL CLADDING PUTIH

+ 16.80

PLAT BETON PRECAST

PLAFOND GYPSUM 0.9 - 1.0 CM PANEL ACOUSTIC (MDF) TITIK LAMPU PLAT LANTAI BETON 12 CM

KARPET TEBAL (ACOUSTIC)

AUDITORIUM + 8.40

SUMMIT ROOM + 8.40

PLAFOND GYPSUM 0.9 CM RANGKA HOLO

+ 7.20 + 7.00

KACA PANASAP EURO GREY 5 MM

RAILING STAINLESS STEEL KACA TEMPERED BALOK 25/50

DINNING ROOM FOR STAFF + 4.20

CORRIDOR + 4.20

+ 3.00

BALOK UTAMA BETON BERTULANG 45/70

ASEAN GALLERY, HERITAGE, EXPERIENCE ROOM +/- 0.05 DINDING STRUKTUR BASEMENT

ENTRY BASEMENT - 1. 25

BASEMENT 1 - 4.20

POTONGAN PRINSIP SKALA 1:100 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DETAIL POTONGAN 1 : 100

31

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


PLAFOND GYPSUM 0.9 CM RANGKA HOLO

RUANG KANTOR +54.60

PLAT BETON PRECAST

PLAFOND GYPSUM 0.9 CM RANGKA HOLO TITIK LAMPU

BALOK BETON 45/70

RANGKA ACP WALL CLADDING

RUANG KANTOR + 50.40

TITIK LAMPU BALOK BETON BERTULANG 25/50 DINDING BATA TANPA FINISHING

BALOK BETON 35/70

ACP WALL CLADDING PUTIH

RUANG KANTOR +46.20

KACA PANASAP EURO GREY 5 MM BALOK TRANSFER 2 TUMPUAN BETON PRE STRESS 60/100 TITIK LAMPU

RUANG KANTOR + 42.00

TITIK LAMPU

RUANG KANTOR +37.80

TITIK LAMPU

POTONGAN PRINSIP SKALA 1:100 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

NO. LEMBAR

GAMBAR SKALA

: DETAIL POTONGAN 1 : 100

32

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


TUMPUAN UTAMA

ZYNCALUME

SPACE FRAME (RIGID)

TUMPUAN UTAMA

TUMPUAN SAMPING

PLAFOND GYPSUM 0.9 - 1.0 CM

TUMPUAN SAMPING

TITIK LAMPU

RAIN WATER RUN OFF LAPISAN WATERPROOF

KARPET TEBAL (ACOUSTIC) BALOK UTAMA RANGKA BAJA 60/120

BALOK RANGKA BAJA 45/80

MULTI PURPOSE BALLROOM + 16.80

POTONGAN PRINSIP SKALA 1:100 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

GAMBAR SKALA

: DETAIL POTONGAN 1 : 100

NO. LEMBAR

DISAHKAN OLEH:

33

PEMBIMBING

PETUGAS TU


800

800

800


800

800

800


H A

G F

SLIDING DOOR

E A

D B

J

SLIDING DOOR

C

ASEAN GALLERY, HERITAGE AND ESPERIENCE ROOM +0.05

I K

B C

H

E

D J F

K

I

G

DINDING BAGIAN DALAM

LUASAN DINDING SKALA 1:200 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

GAMBAR SKALA

: DETAIL 1 : 200

NO. LEMBAR

DISAHKAN OLEH:

36

PEMBIMBING

PETUGAS TU


KOLOM 1X1

KOLOM 0.6X0.6 8.00

KOLOM PRAKTIS 0.15X0.15

8.00

BALOK 0.45X0.7

KOLOM 1.4X1.4 8.00

BALOK 0.25X0.5

KOLOM 0.7X0.7 8.00

KOLOM 0.5X0.5

8.00

DENAH PEMBALOKAN SKALA 1:200 8.00 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

8.00 GAMBAR SKALA

: DETAIL 1 : 200

8.00

8.00 NO. LEMBAR

DISAHKAN OLEH:

37

PEMBIMBING

PETUGAS TU


8.00

8.00

SLIDING DOOR

8.00

8.00

SLIDING DOOR

8.00 ASEAN GALLERY, HERITAGE AND ESPERIENCE ROOM +0.05

8.00

DENAH RUANG SKALA 1:200 1.00 8.00 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR

UNIVERSITAS TRISAKTI 2019/2020

TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA

NAMA NIM PU PP

: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT

8.00

8.00

8.00

8.00 NO. LEMBAR

GAMBAR SKALA

: DETAIL 1 : 200

38

DISAHKAN OLEH: PEMBIMBING

PETUGAS TU


PERANCANGAN KOMPLEKS SEKRETARIAT ASEAN (ASEC) DI JAKARTA DENGAN PENDEKATAN ARSITEKTUR IKONIK @artworkmargin


Turn static files into dynamic content formats.

Create a flipbook
ASEAN SECRETARIAT (ASEC) COMPLEX DESIGN IN JAKARTA WITH ICONIC ARCHITECTURE APPROACH by Artwork Margin - Issuu