PERANCANGAN KOMPLEKS SEKRETARIAT ASEAN (ASEC) DI JAKARTA DENGAN PENDEKATAN ARSITEKTUR IKONIK
Project : ASEAN Secretariat Year : 2020 Software : AutoCAD, SketchUp, Lumion 4.0
@artworkmargin
PEMAHAMAN TEMA IKONIK
SIRKULASI SERVICE
MAIN ENTRANCE
MAIN ENTRANCE SEBAGAI PINTU MASUK UTAMA KAWASAN ASEC, DENGAN SIDE ENTRANCE DENGAN DUA JALUR SEBAGAI JALAN KELUAR ATAU LURUS MENUJU SERVICE ENTRANCE/EXIT
BERDASARKAN IDENTITAS INILAH, SEPERTI APAPUN KONSEP, BENTUK, WUJUD, DAN SISTEMNYA, TIDAK BOLEH KELUAR DARI MAKNA ASEAN ITU SENDIRI
SIDE ENTRANCE
ZONING VERTIKAL ZONING BANGUNAN DIPISAHKAN BERDASARKAN FUNGSI RUANG
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: KONSEP 1 : 800
01
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
HARMONIS DAN DIALOG
KONSEP HARMONIS DAPAT DILIHAT DARI FASAD YANG MENGAMBIL ELEMEN HORIZONTAL YANG SAMA DENGAN BANGUNAN EKSISTINGNYA KONSEP DIALOG, DILIHAT DARI ADANYA FUNGSI YANG SALING TERKAIT ANTAR BANGUNAN, MISALNYA PADA LANTAI 2 YANG DIHUBUNGKAN DENGAN CONFERENCE ROOM BARU YANG TERSAMBUNG LANGSUNG DENGAN CONFERENCE LAMA,
DIALOG
BENTUK MASSA BANGUNAN
PADA LANTAI 3 TERDAPAT FUNGSI PERKANTORAN PADA BANGUNAN EKSISTING, DAN PADA RENCANA BANGUNAN BARU, LANTAI 3 MERUPAKAN LANTAI PERTEMUAN, SEHINGGA LANTAI TERSEBUT KEMUDIAN DIHUBUNGKAN AGAR MEMUDAHKAN SESEORANG DARI BANGUNAN EKSISTING MENGIKUTI RAPAT PADA BANGUNAN BARU
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: KONSEP 1 : 800
02
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
1. PENENTUAN JUMLAH DAN JENIS TRANSPORTASI VERTIKAL A. TOWER 1) Lift Penumpang
Luas Bruto dan Netto Luas Rerata Bruto Zona Eksekutif = 2096,83 m2 Luas Rerata Bruto Zona Tower = 1957,45 m2 Luas Rerata Bruto All Floor = 2786,59 m2
Menentukan Kecepatan Lift (Tabel 3.3)
Pembagian Zona Lift
Lift Eksekutif → 3,5 m/dtk Lift Tower → 3,5 m/dtk Lift All Floor → 3,5 m/dtk Lift Barang → 6-7 m/dtk
Lift Eksekutif → Lantai B1, Lantai GF, 6,7,10,11,12,15,16, Rooftop (7 Lantai utama) Menentukan Interval Waktu (Tabel 3.4) Lift Tower → Lantai GF, 6-16 (10 Lantai) Kantor 25 – 45 detik Lift All Floor → Lantai GF, 2-16 (15 Lantai) Lift Barang → Lantai B4,B3,B2,B1,GF,Tower, Rooftop (All Floor)
Luas Netto Zona Eksekutif = 2096,83 x 80% = 1677,464 m2 Luas Netto Zona Tower = 1957,45 x 80% = 1565,96 m2 Luas Netto Zona All Floor = 2786,59 x 75% = 2089,9425 m2
Jumlah Penghuni Tiap Zona Zona Eksekutif Okupasi = 2096,83 : 12 m2/orang = 174,74 174,74 = 175 orang Total okupasi = (7 lantai) x 175 = 1225 orang Kp total = 13% x 1225 = 159,25 = 160 orang
800
TABEL Planning Guide Lift Hyundai Geared Drive
Zona Tower Okupasi = 1565,96 : 12 m2/orang = 130,5 130,5 = 131 orang Total okupasi = (10 lantai) x 131 = 1310 orang Kp total = 13% x 1310 = 170,3 = 171 orang Zona All Floor Okupasi = 2089,84 : 12 m2/orang = 174,153 174,153 = 175 orang Total okupasi = (15 lantai) x 175 = 2625 orang Kp total = 13% x 2625 = 341,25 = 342 orang
Mencari KK P = 80% dari kapasitas Lift i = interval waktu tunggu kantor
Menentukan Jumlah Lift
Jika menggunakan Lift kapasitas 20 orang 300𝑥16 Kk = = 160 30
Maka pada zona Eksekutif 160 N = 160 = 1 𝐿𝑖𝑓𝑡 Pada zona tower 171 N = 160 = 1, 068 𝐿𝑖𝑓𝑡 (1 Lift) Pada zona All Floor 342 N = 160 = 2,1375 𝐿𝑖𝑓𝑡 2 𝐿𝑖𝑓𝑡
Total kebutuhan 4 Lift, namun dengan pertimbangan podium yang memiliki fungsi pertemuan yang besar ditambahkan 1 lift lagi dan diberikan 2 lift barang untuk menunjang kegiatan pengangkutan barang ke ruang pertemuan
800
2. SISTEM PEMIPAAN DAN PERHITUNGAN KEBUTUHAN AIR BERSIH Perhitungan kebutuhan air dimaksudkan untuk memperoleh gambaran mengenai volume tangki penyimpanan air yang perlu disediakan dalam suatu bangunan dan kapasitas pompa yang diperlukan. A. Kebutuhan keseharian Kebutuhan air bersih bisa dihitung berdasarkan • Jumlah standar pemakaian rata – rata per hari per unit (orang, tempat duduk atau tempat tidur dll.) (Air dingin atau panas) • Jumlah dan jenis peralatan saniter yang digunakan • Beban peralatan saniter. • Luasan bangunan Kelompok kami memilih perbandingan perhitungan berdasarkan pendekatan jumlah orang dan luas lantai bangunan dengan tabel sebagai berikut: Kemudian untuk jumlah orang kami menggunakan total okupasi dari perhitungan transportasi vertikal Zona All Floor Okupasi = 2089,84 : 12 m2/orang = 174,153 174,153 = 175 orang Total okupasi = (15 lantai) x 175 = 2625 orang Namun, selain itu dapat juga menghitung seluruh jumlah luas lantai kemudian membaginya dengan angka 12 m2/orang Jumlah Luas Lantai Bruto Podium = 23053,51 m2 Tower = 21532 m2 Total = 44585,51 m2 Jumlah Luas Lantai Netto dikurangi Luasan Core 16 lantai = 44585,51 – (324x16) = 39401,51 m2 Perkiraan jumlah penghuni bangunan 44585,51 m2 : 12m2/ orang = 3715,46 = 3716 orang
Tabel 8.2 Kebutuhan air bersih (Air dingin) per hari
Fungsi bangunan
Unit
Kebutuhan (Liter)
Apartemen
Orang
135-225
Bioskop
Kursi
15
Hotel
Orang
185 – 225
Kantor
Orang
45-90
Restoran
Kursi
70
Tempat tidur
280-470
Tanpa asrama
Murid
45-90
Dengan asrama
Murid
135-225
Rumah sakit Sekolah
Tabel 8.3 Kebutuhan Air Panas per Hari Fungsi bangunan
Unit
Kebutuhan (Liter)
Karyawan
orang
45
Pengunjung
orang
5-10
Kantor
Tabel 8.4 Kebutuhan Air per m2 bangunan Fungsi bangunan
Kebutuhan per hari (Liter)
Apartemen
20
Hotel
30
Kantor
10
Pertokoan
5
Rumah sakit
15
800
•Perhitungan melalui jumlah orang Volume air bersih (dingin ) yang dibutuhkan adalah: 3716 orang x 45L/orang = 167220 Liter
Selain dihitung dari air keseharian, air kebutuhan spinkler dan hidran serta kebutuhan air pada sistem tata udara juga masuk ke dalam hitungan dnegan rumus sebagai berikut:
Volume air bersih (hangat) yang dibutuhkan Karyawan adalah = 21532 : 12m2/orang x 45 L/orang = 1795 orang x 45 L/orang = 80775 Liter Pengunjung = 23053,51 : 12 m2/orang x 5 L/orang = 1922 orang x 5 L/orang = 9610 Liter Total kebutuhan air bersih harian 257605 Liter/hari
Setelah semua perhitungan volume air selesai, maka volume tangki atas dan bawah tanah berikut tangki tambahannya dapat dihitung besarannya.
Tabel 8.9 Prakiraan volume tambahan tangki bawah tanah Fungsi bangunan
x Luas lantai bangunan (m3)
Apartemen
0,012 – 0,015
Hotel
0,015 – 0,020
Perbelanjaan
0,005 – 0,006
Perkantoran
0,008 – 0,010
Rumah sakit
0,015 – 0,020
800
JUMLAH TOTAL KEBUTUHAN AIR BERSIH
PENYALURAN AIR HUJAN DAN SUMUR RESAPAN
Total kebutuhan air bersih harian 257605 Liter/hari Total cadangan air kebakaran 613800 Liter
D
Total air untuk tata udara 9684900 Liter/10 jam/hari
A
C B
Qd = 267605 + 613800 + 9684900 = 10.566.305 Liter = 10566,305 m3
JUMLAH TOTAL VOLUME TANGKI Vbt = 40% x 10566305 Liter = 4226522 Liter Va = 15% x 10566305 Liter = 1584945, 75 Liter Jika ingin menambahkan volume tangki maka menggunakan tabel di bawah ini: Tabel 8.9 Prakiraan volume tambahan tangki bawah tanah Fungsi bangunan
x Luas lantai bangunan (m3)
Apartemen
0,012 – 0,015
Hotel
0,015 – 0,020
Perbelanjaan
0,005 – 0,006
Perkantoran
0,008 – 0,010
Rumah sakit
0,015 – 0,020
Luas Atap A = 2560,36 m2 Luas Atap B = 2007,28 m2 Luas Atap C = 1041,13 m2 Luas Atap D = 798,79 m2 Hujan di Indonesia 5-8 Liter/menit, Maka perhitungan atap A adalah: 2560,36 m2 x 5 s/d 8 = 12801,8 – 20482,88 Liter/menit Penggunaan pipa tegak yang digunakan berdiameter 8” untuk luas atap s/d 2445 m2 dengan volume 3470 Liter/menit
Dibutuhkan kurang lebih 6 pipa 8” untuk mengalirkan air hujan secara efisien dalam waktu satu menit pada atap A
800
POMPA BOOSTER
TOREN
DIAGRAM SISTEM AIR
COOLING WATER
KETERANGAN: BIRU = AIR BERSIH MERAH = AIR YG HARUS DIPROSES DULU (FILTRASI) COKLAT = AIR KOTOR
POMPA TRANSFER
TANDON RWH TANDON SPRINGKLER
PDAM
SPT
GWT
800
RIOL KOTA
3. SISTEM PEMADAM KEBAKARAN 𝐻𝑖𝑑𝑟𝑎𝑛 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝑃𝑜𝑑𝑖𝑢𝑚 =
Springkler kebakaran atau fire sprinkler merupakan komponen dari sistem sprinkler kebakaran (fire sprinkler sysem) yang berfungsi menyemburkan air ketika potensi kebakaran telah terdeteksi. Potensi kebakaran yang umum dideteksi adalah kenaikan suhu yang ditentukan telah terlampaui. Pada sebagian besar bangunan tinggi, sprinkler ini memberikan reaksi respon yang cepat pada saat terjadinya api dan memberikan waktu yang cukup bagi penghuni/ pengguna bangunan untuk mengatur proses evakuasi. Di indonesia, paduan pemasangan sistem sprinkler untuk pencegahan bahaya kebakaran bangunan ditentukan berdasarkan Standar Konstruksi Bangunan Indonesia (SKBI): 3:4:53:1987 yang disahkan dengan Keputusan Menteri Pekerjaan Umum No. 378/KPTS/1987
𝐻𝑖𝑑𝑟𝑎𝑛 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝑇𝑜𝑤𝑒𝑟 =
4610,702 𝑥 2 = 12 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 800
1957,45 𝑥 2 = 5 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 800
𝐻𝑖𝑑𝑟𝑎𝑛 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝐵𝑎𝑠𝑒𝑚𝑒𝑛𝑡 =
5088 𝑥 2 = 13 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 800
Volume cadangan air sprinkler = 20% x (jumlah unit/lantai x jumlah lantai) x 18 L/menit x 30 menit = 20% x ((172x5) + (66x11) + (191x4)) x 18 x 30 = 20% x (860 + 726 + 764) x 18 x 30 Liter 253800 Liter
Volume cadangan air hidran box = Jumlah unit/lantai x 400 L (pancaran air hidran) x 30 menit = (12 + 5 + 13) x 400 x 30 = 360000 Liter 4610,702 − 324 𝑆𝑝𝑟𝑖𝑛𝑘𝑙𝑒𝑟 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝑃𝑜𝑑𝑖𝑢𝑚 = = 172 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 25 𝑆𝑝𝑟𝑖𝑛𝑘𝑙𝑒𝑟 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝑇𝑜𝑤𝑒𝑟 =
Total cadangan air 613800 Liter
1957,45455 − 324 = 66 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 25
𝑆𝑝𝑟𝑖𝑛𝑘𝑙𝑒𝑟 𝑅𝑒𝑟𝑎𝑡𝑎 𝑙𝑢𝑎𝑠 𝐵𝑎𝑠𝑒𝑚𝑒𝑛𝑡 =
5088 − 324 = 191 𝑢𝑛𝑖𝑡ൗ𝑙𝑎𝑛𝑡𝑎𝑖 25
800
4. PERANCANGAN TATA UDARA 1. Perhitungan Beban Ac Zona Podium (R. Pertemuan) Jenis Penghawaan AC Central Luas Zona : 4610, 702 m2 Jumlah Lantai : 5 Lantai Fungsi Area : Kantor besar bagian pinggir Beban AC :: 25 m2/TR
AHU =
𝐿𝑢𝑎𝑠 𝐴𝑟𝑒𝑎 𝐵𝑒𝑏𝑎𝑛 𝐴𝐶
=
4610,702 25
= 184, 5 𝑇𝑅/𝐿𝑎𝑛𝑡𝑎𝑖
Chiller Seluruh podium 184,5 TR x 5 lantai = 922,5 TR Menggunakan Kapasitas AHU 100 TR dan 120 TR Chiller memakai kapasitas 1000 TR 2. Perhitungan Beban Ac Zona Tower Jenis Penghawaan AC Central Luas Zona : 1957,45 m2 Jumlah Lantai : 11 Lantai Fungsi Area : Kantor Beban AC :: 35 m2/TR
AHU =
𝐿𝑢𝑎𝑠 𝐴𝑟𝑒𝑎 𝐵𝑒𝑏𝑎𝑛 𝐴𝐶
=
1957,45 35
= 60 𝑇𝑅/𝐿𝑎𝑛𝑡𝑎𝑖
Volume air sirkulasi = 10 Liter/menit/TR Maka volume air sirkulasi AHU = 10 Liter/menit x 1582,5 = 15825 Liter/menit Volume air pendingin = 2% x Volume air sirkulasi Maka volume air pendingin = 316,5 Liter/menit Total Volume air tata udara 15825 + 316,5 Liter = 16141,5 Liter/Menit Atau 9684900 Liter/10 jam/hari
5.
PERANCANGAN PARKIR
BASEMENT
UNTUK
KANTONG
GF menampung 58 kantong parkir outdoor B1 menampung 75 kantong parkir B2 menampung 97 kantong parkir
Chiller Seluruh podium 60 TR x 11 lantai = 660 TR Menggunakan Kapasitas AHU 60 TR satu unit atau 30 TR 2 unit Chiller memakai kapasitas 800 TR
Rasio parkir menggunakan rasio 1 parkir/100 m2 lantai bruto Luas lantai = 44585,51 m2
Artinya butuh kurang lebih 446 kantong parkir
Karena hal inilah, jumlah lapis basement menjadi 4 lantai, dan keseluruhan dapat menampung 424 kantong parkir
800
LAMPU YANG AKAN DIGUNAKAN TL-D 36W/54-765 1SL/25 PHILLIPS SPESIFIKASI • Cap-Base : G13 [ Medium Bi-Pin Fluorescent] • Luminous Lux (Nom) : 2500 lm • Color Designation : Cool Daylight • Power : 36 Watt Sumber: Phillips.com • Dimmable : Yes Alasan menggunakan lampu ini karena cahaya lampu TL Fluorescent lebih terang dari lampu LED. Selain itu, lebih rapih dan penerangannya juga lebih merata (cahaya lebh menyebar)
RUMUS MENENTUKAN JUMLAH LAMPU DALAM RUANGAN N=
ExLxW Ø x Kp x Kd x n
N = Jumlah titik lampu E = Kuat penerangan (Lux). L = Panjang (Length) ruangan dalam satuan Meter W = Lebar (Width) ruangan dalam satuan Meter. Ø = Total nilai pencahayaan lampu dalam satuan LUMEN Kp = Koefisien Pemakaian Kd = Koefisien depresiasi n = Jumlah Lampu dalam 1 titik
N Tower= 350x 1957,45 = 152 Pasang Lampu 2500 x 0,9 x 1 x 2
RENCANA PELETAKAN LAMPU
• • • • •
Place of Origin : Ceiling Installation : Recessed Adjustability : Fixed Type of Beam : Linear Direction : Down
N Podium= 500x 4610,702 = 512 Pasang Lampu 2500 x 0,9 x 1 x 2 N basement= 100x 5088 = 114 PasangLampu 2500 x 0,9 x 1 x 2
RENCANA RUMAH LAMPU
Menggunakan rumah lampu yang berisi dua lampu TL karena lebih efektif dan efisien pada peletakan lampu di ceiling karena pada ceiling juga terdapat utilitas AC. Sehingga dengan menggunakan rumah lampu ini plafon ruangan tidak terlalu penuh.
Jumlah lampu total 152 x 11 = 1672 Titik pada tower 512 x 5 = 2560 Titik pada podium 114 x 4 = 456 Titik pada basement Jumlah total satu gedung ada 4688 titik lampu (catatan: ini hanya perkiraan perhitungan dengan simulasi jenis lampu yang sama. Tapi pada desain lampu jelas berbeda karna punya fungsi ruang yg berbeda sehingga butuh perhitungan lebih rinci lagi peruangnya.)
800
2000
H
U FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: BLOK PLAN 1 : 2000
1
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
U KETERANGAN: A.MAIN ENTRANCE KAWASAN B.SIDE ENTRANCE C.DROP OFF BANGUNAN LAMA (MAIN DROP OFF) D.DROP OFF BANGUNAN BARU E.ENTRANCE/ EXIT BASEMENT F.PUBLIC PLAZA G.CEREMONIAL PLAZA H. PARKIR KENDARAAN DARURAT I.SERVICE ENTRANCE J,EXIT KAWASAN
A
I
H
D
C
F G H E B
J
800
A
U MAIN ENTRANCE -0.60
PARKING LOT -0.60
A
SERVICE ENTRANCE -0.60
SECURITY POST
TOILET
+/- 0.00
I
TOILET
STORAGE
STORAGE
+/- 0.00
+/- 0.00
SECURITY POST +/- 0.00
PUBLIC VIEWING GALLERY + 0.05
TRAVEL AGENT
LIBRARY-CUM BETAWI ROOM CONFERENCE ROOM
+/- 0.00
+ 0.05
MINI BANK
MINI MART
+/- 0.00
+/- 0.00
DRIVER WAITING ROOM +/- 0.00
TOILET
PABX
TELEX
+/- 0.00
B
PRESS ROOM
POST TELECOMUNICATION
GIFT SHOP
B'
TOILET
RUANG DUDUK SIDE ENTRANCE HALL DROP OFF SLIDING DOOR
RUANG DUDUK
SLIDING DOOR
LIFT
-0.60
SIDE ENTRANCE MAIN ENTRANCE
LIFT LOBBY
+/- 0.00
MAIN ENTRANCE HALL TANGGA CONFERENCE ROOM
IN
ID SL G
AHU
O
D R
O
RESTO AND COFFEE
ENTRANCE
+ 0.05
+/- 0.00
TANGGA
C'
+/- 0.00
KITCHEN SET DROP OFF PANTRY
+/- 0.00
-0.60
D
DROP OFF -0.60
J
C
SECURITY POST
C
WALKING GALLERY +/- 0.00
SERVICE OUT
NAIK
TURUN
-0.60
STORAGE SLIDING DOOR
EXHIBITION AND FUNCTION
CLEANING SERVICE
TURUN
+/- 0.00 TURUN
NAIK
NAIK
KITCHEN
STORAGE +/- 0.00
BAR
FEMALE TOILET PUBLIC SPACE AND DINNING MALE TOILET
SLIDING DOOR
ASEAN INFORMATION CENTRE
KETERANGAN:
TURUN
CEREMONIAL PLAZA -0.50
ASEAN GALLERY, HERITAGE AND ESPERIENCE ROOM + 0.05
MAIN ENTRANCE KAWASAN SIDE ENTRANCE DROP OFF BANGUNAN LAMA (MAIN DROP OFF) DROP OFF BANGUNAN BARU ENTRANCE / EXIT BASEMENT PUBLIC PLAZA CEREMONIAL PLAZA PARKIR KENDARAAN DARURAT SERVICE ENTRANCE EXIT KAWASAN
PARKING LOT -0.60
PUBLIC PLAZA
H
F
A'
A. B. C. D. E. F. G. H. I. J.
NAIK
G
SIDE ENTRANCE
-0.50
E
SIDE ENTRANCE -0.60
B
BASEMENT -0.60
J
PLN
SECURITY POST +/- 0.00
GROUNDFLOOR PLAN SKALA 1:800
0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: GROUNDFLOOR 1 : 800
2
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
C
U
B 1
2
3
4
5
6
7
9
10
11
12
13
8 8.00
8.00
8.00
8.00
2.50
92.00 89.00 8.00
8.00
1.00
8.00
8.00
8.00
8.00
8.00
18.00
6.00 SIDE ENTRANCE +/- 0.00
A
SLIDING DOOR
SLIDING DOOR
STORAGE
PANTRY
+/- 0.00
+/- 0.00
STORAGE
8.00
+/- 0.00
6.00 8.00
DRIVER WAITING ROOM +/- 0.00
B
CLEANING SERVICE
4.00
+/- 0.00
LOBBY
RESTO AND COFFEE +0.05
+/- 0.00
8.00
8.00 6.00
MINI MART +/- 0.00
C
A'
SLIDING DOOR
MINI BANK
TURUN
8.00
TURUN
A
+/- 0.00
8.00
3.00
54.00
WALKING GALLERY +/- 0.00
D 18.00 +/- 0.00
TRAVEL AGENT +/- 0.00
8.00
NAIK
STORAGE
NAIK
8.00 72.00
SLIDING DOOR
E
3.00
65.00
8.00
8.00 ASEAN GALLERY, HERITAGE AND ESPERIENCE ROOM
2.50
+0.05
F WAITING ROOM
LIBRARY-CUM BETAWI ROOM
8.00
+/- 0.00
+0.05
8.008.00 RECEPTIONIST +/- 0.00
G
H 1.00 O
O
R
2.00 G
D
41.00
SL
ID IN
GIFT SHOP
8.00
+/- 0.00
41.00
MAIN ENTRANCE +/- 0.00
I 12.73 8.00
PUBLIC VIEWING GALLERY +0.05
J
8.00
3.78
C'
16.00 32.00
B'
DENAH LANTAI 1 SKALA 1: 500 0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 : 500
3
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
A
U A
B
C
D
E
F
G
I
J
H 65.00 8.00
8.00 1.00
8.00
8.00
8.00
2.50
8.00
8.00
8.00
18.00
FILE
1
STORE
TEMPAT WUDHU PEREMPUAN
TOILET AND LOCKER PEREMPUAN
+ 4.20
+ 4.20
8.00 MASJID
12.50
2
STORE
+ 4.20
UPPER SPACE TOILET AND LOCKER LAKI-LAKI
TEMPAT WUDHU LAKI-LAKI
2.50
+ 4.20
+ 4.20
SEC 3
ASS. DIR 3
ASS. DIR 2
B'
SEC 4
ASS. DIR 1
B
8.00 ASS. DIR 4
3.50
STORE TOILET SEC 2
TOILET
SEC 1
3
32.00
SEC 3
TOILET REPRODUCTION AND PRINTING
FEMALE TOILET
GYM
8.00
+ 4.20
RESERVE
RESERVE
RESERVE
LOUNGE
MALE TOILET
+ 4.20
4
16.00
18.00
LIFT DIR. 3
TOILET
8.00
LIFT LOBBY
SEC 3
FILE
UPPER SPACE
TANGGA
5
TOILET DIR. 2
SEC 2
8.00 AHU AC
FILE
8.00 AUDIO CENTRE
11.29
FILE
6
SEC 1
TANGGA TOILET
C
C'
NAIK
NAIK
8.00 89.00
TURUN
TURUN
DIR. 1 BRIDGE
7
SLIDING DOOR
8
1.00 SMALL CONFERENCE
F&B
LOBBY SKY BRIDGE
FOOD & BEVERAGE
8.00
READING LOUNGE CONFERENCE ROOM
9
F&B
PRIVATE SEC.
INFIRMARY + 4.20
NURSERY ROOM
F&B
+ 4.20 TURUN
NAIK
WALKING LIBRARY
8.00
PERSONAL ASSISTANT F&B
10
F&B SECRETARY GENERAL TOILET
TANGGA
8.00 CANTEEN FOR STAFF TURUN
NAIK
+ 4.20
11
DAY CARE ROOM + 4.20
8.00
12
DINNING ROOM FOR STAFF
PANTRY
+ 4.20
+ 4.20
8.00 SERVING AREA + 4.20
13
4.00
12.00
4.00 6.00
16.00
32.00 48.00
SKALA 1:700 0
5
15
A'
MEZANINE LANTAI 1 35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 : 700
4
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
A
U A
B
C
D
E
F
G
I
J
H 65.00 8.00
8.00 1.00
8.00
8.00
8.00 2.50
8.00
8.00
8.00
18.00
FILE
1
STORE
8.00
16.00
UPPER SPACE
2
STORE
ASEC EXECUTIVE MEETING ROOM
AMS EXECUTIVE MEETING ROOM
EXECUTIVE LOUNGE
+8.40
+8.40
+8.40
CPR-WG MEETING ROOM +8.40
2.50 SEC 4
SEC 3
ASS. DIR 3
ASS. DIR 1
ASS. DIR 2
8.00
STORE TOILET SEC 2
TOILET
SEC 1
3
32.00 SEC 3
TOILET
REPRODUCTION AND PRINTING
FEMALE TOILET
B
B'
ASS. DIR 4
2.50 8.00 VIP HOLDING ROOM +8.40
RESERVE
RESERVE
RESERVE
MALE TOILET
4
18.00 13.50 LIFT
HOST COUNTRY COMMITTEE ROOM DIR. 3
TOILET
LIFT LOBBY
SEC 3
FILE
8.00
+8.40
AWC ROOM
UPPER SPACE
TANGGA
+8.40
5
TOILET DIR. 2
SEC 2 AHU AC
FILE
AUDIO
8.00
NAIK
NAIK
AUDIO CENTRE
TURUN
TURUN
FILE
6
SEC 1
TANGGA CREDENTIAL ROOM
LOBBY
+8.40
C'
+8.40 NAIK
NAIK
CONFERENCE ROOM UPPER SPACE
8.00 89.00
TURUN
TURUN
DIR. 1
C
TOILET
BRIDGE
7
AUDIO
8
SLIDING DOOR
1.00 SMALL CONFERENCE +/- 0.00
+8.40
AUDITORIUM +8.40
STORAGE
LOBBY ASSEMBLY POINT
8.00
9
CONFERENCE ROOM
PRIVATE SEC.
8.00 PERSONAL ASSISTANT
10
SECRETARY GENERAL TOILET
TANGGA
8.00 AUDIO
11
MINISTERIAL ROOM +8.40
8.00
22.00
12
SUMMIT ROOM
8.00
+8.40
13
3.00 24.00
24.00 48.00
DENAH LANTAI 3 SKALA 1:700 A'
0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 : 700
5
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
C
U
B
1
2
3
4
5
6
7
9
10
11
12
13
8 8.00
8.00
8.00
8.00
2.50
89.00 8.00
8.00
8.00
1.00
8.00
8.00
8.00
8.00
18.00
A STORAGE +/- 0.00
8.00 STAFF LOUNGE +12.60
B ICT CONTROL AND SERVERS ROOM
BUILDING MAINTENANCE ROOM AND STORAGE
+12.60
+12.60
8.00
24.00
MEDIUM MULTI PURPOSE HALL +12.60
ARCHIEVE AND DOCUMENT PRESERVATION ROOM
A'
+12.60
NAIK
C
TURUN
A
CONFERENCE MANAGEMENT ROOM
8.00
+12.60
D
48.00 18.00
NAIK
E
TURUN
8.00
65.00 SUMMIT ROOM
AUDITORIUM
+8.40
+8.40
8.00
24.00
TELECONFERENCE ROOM
2.50
SMALL MEETING ROOM
+12.60
+12.60
F SMALL PURPOSE ROOM +12.60
8.00
G
H
I 8.00
PRESS CENTER
+12.60
8.00
MEDIUM MEETING ROOM
1.00
+12.60
J
13.00
3.00
16.00
32.00
C'
B'
DENAH LANTAI 4 SKALA 1:500 0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 : 500
6
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
C
U
B
1
2
3
4
5
6
7
9
10
11
12
13
8 8.00
8.00
8.00 2.50
8.00
89.00 8.00
8.00
1.00
8.00
8.00
8.00
8.00
8.00
18.00
A STORAGE
8.00
8.00
+/- 0.00
SYSTEM AND HALL FURNITURE STORAGE +16.80
B 8.00
SMALL PURPOSE ROOM
8.00
+16.80
A
A' NAIK
TURUN
C 8.00 MULTI PURPOSE BALLROOM +16.80
D
16.0048.00 18.00 SMALL PURPOSE ROOM NAIK
+16.80
E
TURUN
8.00
65.00
8.00 2.50
F
16.00 MULTI PURPOSE BALLROOM AND CONFERENCE MANAGEMENT ROOM +16.80
8.00
G
H 1.00
8.00
LARGE MULTI PURPOSE ROOM
2.00
+16.80
40.00
17.00
I 8.00
J
12.00
3.00 32.00
17.00
C'
B'
DENAH LANTAI 5 SKALA 1:500 0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 : 500
7
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 5.00
8.00
8.00
8.00
8.00
5.00
18.00
A
5.00
DIRECTOR 1
EXECUTIVE DIR.
DIRECTOR 2
ASS. DIR 1
B 8.00 ASS. DIR 2
A
A'
C ASS. DIR 3
8.00 ASS. DIR 4
ASEAN FOUNDATION CC
D
+ 21.00
18.00 8.00
E
42.00
8.00
F 5.00
G
B'
KETERANGAN:
DENAH TOWER LT. 6
LANTAI KHUSUS ASEAN FOUNDATION
SKALA 1:400
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 :400
8
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 5.00
8.00
8.00
8.00
8.00
5.00
18.00
A
5.00
EXECUTIVE DIR.
DIRECTOR 1
DIRECTOR 2
DIRECTOR 3
B 8.00
A
A'
C ASS. DIR 1
8.00 AHA CENTRE DOC ASS. DIR 2
D
+ 25.20
18.00 ASS. DIR 3
8.00 ASS. DIR 4
E
42.00 REPRODUCTION AND PRINTING
8.00
F 5.00
G
B'
DENAH TOWER LT. 7 SKALA 1:400
KETERANGAN: LANTAI KHUSUS AHA CENTRE
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 :400
9
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 5.00
8.00
8.00
8.00
8.00
5.00
18.00
A
5.00
B 8.00
A
A'
C 8.00 + 29.40
D 18.00 8.00
E
42.00
8.00
F 5.00
G
B'
DENAH TOWER LT. 8 SKALA 1:400
KETERANGAN: LANTAI STAFF INSTITUSI ASEAN
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 :400
10
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 5.00
8.00
8.00
8.00
8.00
5.00
18.00
A
5.00
B 8.00
A
A'
C 8.00 + 33.60
D 18.00 8.00
E
42.00
8.00
F 5.00
G
B'
DENAH TOWER LT. 9 SKALA 1:400
KETERANGAN: LANTAI STAFF INSTITUSI ASEAN
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 :400
11
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 5.00
8.00
8.00
8.00
8.00
5.00
18.00
A
5.00
B EXECUTIVE DIR.
EXECUTIVE DIR.
EXECUTIVE DIR.
8.00
ASS. DIR 1
A
C
ASS. DIR 7 ASS. DIR 2
A'
ASS. DIR 8
8.00 ASS. DIR 3
ASS. DIR 9 + 37.80
ASS. DIR 4
ASS. DIR 10
D 18.00 ASS. DIR 11
8.00 ASS. DIR 5
E
ASS. DIR 12
ASS. DIR 6
42.00
8.00 DIRECTOR 1
DIRECTOR 2
DIRECTOR 3
DIRECTOR 4
DIRECTOR 5
DIRECTOR 6
F 5.00
G
B' KETERANGAN: LANTAI KHUSUS PETINGGI INSTITUSI ASEAN LAINNYA - ASEAN INSTITUTE FOR PEACE RECONCILIATION - ASEAN BUSSINES ADVISORY COUNCIL - ASEAN INTRA PARLEMENTARY ASSEMBLY
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
DENAH TOWER LT. 10 SKALA 1:400
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
GAMBAR SKALA
: DENAH 1 :400
NO. LEMBAR
DISAHKAN OLEH:
12
PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 8.00
5.00
8.00
8.00
5.00
9.00
18.00
A 8.00 DP AUSTRALIA
DP CANADA
DP CHINA
DP EUROPE UNION
DP INDIA
B 8.00
A
A'
C 8.00
D
+ 42.00
18.00 8.00
E
48.00
8.00
F DP JAPAN
DP KOREA
DP NEW ZEALAND
DP RUSSIA
DP UNITED STATE
8.00
G
B'
DENAH TOWER LT. 11 SKALA 1:400
KETERANGAN: LANTAI KHUSUS DIALOUGE PARTNERS (DP) PROJECTS
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
GAMBAR SKALA
: DENAH 1 :400
NO. LEMBAR
DISAHKAN OLEH:
13
PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 8.00
5.00
8.00
8.00
5.00
9.00
18.00
A 8.00
B PR/AMS - CPR WG THAILAND
PR/AMS - CPR WG MYANMAR
PR/AMS - CPR WG INDONESIA
PR/AMS - CPR WG PHILIPPINES
PR/AMS - CPR WG CAMBODIA
8.00
A
A'
C 8.00
PR/AMS - CPR WG EAST TIMOR
SMALL PURPOSE ROOM + 46.20
D 18.00 8.00
E
PR/AMS - CPR WG PAPUA NEW GUINEA
48.00
8.00 PR/AMS - CPR WG LAOS
PR/AMS - CPR WG BRUNEI DARUSSALAM
PR/AMS - CPR WG MALAYSIA
PR/AMS - CPR WG VIETNAM
PR/AMS - CPR WG SINGAPORE
F 8.00
G
B'
DENAH TOWER LT. 12 SKALA 1:400
KETERANGAN: LANTAI KHUSUS AMS/COUNTRY
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 :400
14
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 8.00
5.00
8.00
8.00
5.00
9.00
18.00
A 8.00 TECHNICAL OFFICER
TECHNICAL OFFICER
B 8.00
A
A'
C 8.00
+ 50.40
D 18.00 8.00
E
48.00 ATTACHMENT OFFICER INTERN
8.00
TECHNICAL ASSISTANT
F
SHORT-TERM EXPERT/ CONSULTANT
8.00
G
B'
DENAH TOWER LT. 13 SKALA 1:400
KETERANGAN: LANTAI STAFF SEKRETARIAT ASEAN
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
GAMBAR SKALA
: DENAH 1 :400
NO. LEMBAR
DISAHKAN OLEH:
15
PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 8.00
5.00
8.00
8.00
5.00
9.00
18.00
A 8.00
SENIOR OFFICER
SENIOR OFFICER
B 8.00
A
A'
C 8.00 + 54.60
D 18.00 8.00
E
48.00
8.00 GENERAL STAFF
SPECIALIZED STAFF
SMALL LOUNGE AND PANTRY
8.00
REPRODUCTION AND PRINTING
FILE ARCHIEVE
F
G
B'
DENAH TOWER LT. 14 SKALA 1:400
KETERANGAN: LANTAI STAFF SEKRETARIAT ASEAN
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 :400
16
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 8.00
5.00
8.00
8.00
5.00
9.00
18.00
A ASSISTANT ASSISTANT DIR. AEC 1 DIR. AEC 2
8.00
ASSISTANT ASSISTANT DIR. AEC 3 DIR. AEC 4
ASSISTANT DIR. AEC 5
DIR. AEC 1
DIR. CCA 1
B DIR. CCA 2
ASSISTANT ASSISTANT ASSISTANT DIR. AEC 6 DIR. AEC 7 DIR. AEC 8
ASSISTANT DIR. AEC 9
ASSISTANT DIR. AEC 10
DIR. AEC 2
8.00
A
DIR. CCA 3
C 8.00
A'
DIR. AEC 3
ASSISTANT DIR. CCA 1
ASSISTANT DIR. CCA 2
ASSISTANT DIR. CCA 3
ASSISTANT DIR. CCA 4
+ 58.80
ASSISTANT DIR. AEC 11
ASSISTANT DIR. AEC 12
ASSISTANT DIR. AEC 13
ASSISTANT DIR. AEC 14
ASSISTANT DIR. AEC 15
ASSISTANT DIR. AEC 16
ASSISTANT DIR. AEC 17
ASSISTANT DIR. AEC 18
ASSISTANT DIR. AEC 19
ASSISTANT DIR. AEC 20
ASSISTANT DIR. AEC 21
ASSISTANT DIR. AEC 22
D 18.00 8.00
E
48.00
ASSISTANT DIR. CCA 5
ASSISTANT DIR. CCA 6
ASSISTANT DIR. CCA 7
ASSISTANT DIR. CCA 8
ASSISTANT DIR. CCA 9
ASSISTANT DIR. CCA 10
ASSISTANT DIR. CCA 11
ASSISTANT DIR. CCA 12
8.00 REPRODUCTION AND PRINTING
F MEETING AND PRESENTATION
8.00 FILE ARCHIEVE
G
B'
DENAH TOWER LT. 15 SKALA 1:400
KETERANGAN: LANTAI DEPARTEMEN ASEAN ECONOMIC COMUNITY (AEC) DAN DEPARTEMEN COMMUNITY AND CORPORATE AFFAIRS (CCA)
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 :400
17
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 8.00
5.00
8.00
8.00
5.00
9.00
18.00
A 8.00 DSG APSC
DSG CCA SECRETARY GENERAL DSG AEC
B
DSG ASCC
8.00
A
A'
C DIR. APSC 1
DIR. APSC 2
DIR. ASCC 1
DIR ASCC 2
8.00
D
+ 63.00
DIR. ASCC 3
18.00 8.00
E
48.00
ASSISTANT DIR. APSC 1
ASSISTANT DIR. APSC 3
ASSISTANT DIR. ASCC 1
ASSISTANT DIR. APSC 2
ASSISTANT DIR. APSC 4
ASSISTANT DIR. ASCC 2
ASSISTANT DIR. ASCC 3
8.00 ASSISTANT DIR. APSC 5
ASSISTANT DIR. APSC 6
ASSISTANT DIR. ASCC 4
ASSISTANT DIR. ASCC 5
ASSISTANT DIR. ASCC 6
ASSISTANT DIR. ASCC 7
ASSISTANT DIR. ASCC 8
ASSISTANT DIR. ASCC 9
F ASSISTANT DIR. APSC 7
ASSISTANT DIR. APSC 8
ASSISTANT DIR. APSC 9
ASSISTANT DIR. APSC 10
HEAD ES DIVISION
CHIEF IAE DIVISION
HEAD AC DIVISION
8.00
G
B'
KETERANGAN: LANTAI SECRETARY GENERAL, 3 KEPALA DIVISI DEPARTEMEN ASEAN POLITICAL SECURITY COMMUNITY (APSC)
DENAH TOWER LT. 16 SKALA 1:400
DEPARTEMEN ASEAN SOCIO -CULTURAL COMMUNITY (ASCC)
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
GAMBAR SKALA
: DENAH 1 :400
NO. LEMBAR
DISAHKAN OLEH:
18
PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 8.00
5.00
8.00
8.00
5.00
9.00
18.00
A 8.00
GONDOLA RAILING
B 8.00 TOREN
A
A'
C 8.00 RUANG MAINTENANCE
+ 67.20
RUANG CONTROL HELI RADIO IFP
D 18.00 8.00
E
48.00
8.00
F 8.00
G
B'
DENAH TOWER ATAP
KETERANGAN:
SKALA 1:400
LANTAI UNTUK PELETAKAN PERALATAN UTILITAS BANGUNAN, MAINTENANCE BANGUNAN DAN HELIPAD
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 :400
19
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
U
B 1
2
3
4
5
6
7
42.00 8.00
5.00
8.00
8.00
5.00
9.00
18.00
A 8.00
B 8.00
A
A'
C
SAFETY AREA 37.50
8.00 FATO 28.05
H
D 18.00
TLOF 16.20
8.00
E
48.00
8.00
+ 71.40
F 8.00
G
B' KETERANGAN: TLOF (TOUCHDOWN AND LIFT-OFF AREA: 1 RD FATO (FINAL APPROACH AND TAKE-OFF AREA: 1 1/2 D TLOF TO FATO: (0.5 (1.5 D - 1 RD)) SAFETY AREA: MIN. 3 M, (0.25 - 0.50 D),
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
DENAH TOWER HELIPAD SKALA 1:400
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 :400
20
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
HELIPAD DENGAN FATO < 30 M
FATO
DIMENSI HELICOPTER YANG DIGUNAKAN UNTUK PERMODELAN: EUROCOPTER AS 332 SUPER PUMA (MILIK PRESIDEN RI MASIH DALAM JENIS YANG SAMA) L: 16.79 M (FUSELAGE), 18,70 M (ROTOR TURNING) H: 4.97 M MAIN ROTOL DIAMETER: 16.20 M MAIN ROTOL AREA: 206.12 M2
TLOF
FATO
TLOF
SAFETY AREA
H
DETAIL TANGGA RAILING TANGGA STAINLESS STEEL
KOLOM PENOPANG TANGGA
ITEM HELIPAD GENERAL AVIATION SUMBER: ICAO HELIPORT SEMINAR DUBAI, U.A.E 2015 PERATURAN DIREKTUR JENDERAL PERHUBUNGAN UDARA NO. KP 40 TAHUN 2015 HELIPORT DESIGN AND PLANNING FOR EMERGENCY SERVICES BY ARCHITECT SUHAIR SHAFEEK SABRI TLOF (TOUCHDOWN AND LIFT-OFF AREA: 1 RD FATO (FINAL APPROACH AND TAKE-OFF AREA: 1 1/2 D TLOF TO FATO: (0.5 (1.5 D - 1 RD)) SAFETY AREA: MIN. 3 M, (0.25 - 0.50 D), KEMIRINGAN 4%
FASILITAS RADIO VERY HIGH FREQUENCY (VHF) FASILITAS PEMANTAU CUACA SISTEM PENCAHAYAAN MARKA PERALATAN KOMUNIKASI PENERBANGAN PROSEDUR INSTRUMENT FLIGHT PROCEDURES/IFP
3.00
SAFETY AREA
3.00 6.30
3.00 RD
LAMPU GREEN OMNI - DIRECTIONAL LIGHT JARAK ANTAR LAMPU 3 M (UNTUK ELEVATED DECK) H
SAFETY NET MESS 20X20 CM 0.30
0.30
H
D
BATAS HELICOPTER DECK 37.50
SAFETY NET
HASIL PERHITUNGAN
FATO
TLOF: 1 RD = 16.20 M FATO: 1 1/2 D = 28.05 M TLOF TO FATO: (0.5 (1.5 D - 1 RD)) = (0.5 (1.5 X 18.70 - 1 X 16.20)) = MIN. 5.925 M SAFETY AREA: MIN. 3 M, (0.25 - 0.50 D) = 0.25 D = 0.25 X 18.70 = 4.675 M TOTAL PANJANG DECK: FATO + 2 X DIM. SAFETY AREA = 28.05 M + 9.35 M = 37.40 M
TLOF SAFETY NET MESS 20X20 CM
+ 71.40
4.20
SAFETY AREA MENGGUNAKAN JARING MESS TEBAL HURUF DAN MARKA: 30 CM
POTONGAN INTI BANGUNAN (CORE)
6.30
37.50
KOLOM STRUKTUR
POTONGAN HELIDECK SKALA 1:200
0
5
15
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
35 TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
HELIPAD PLANNING SKALA 1:400 NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
GAMBAR SKALA
: 1 :400
NO. LEMBAR
DISAHKAN OLEH:
21
PEMBIMBING
PETUGAS TU
U
1
2
3
4
5
6
C
7
9
10
11
12
13
8 8.00
8.00
8.00 2.50
8.00
89.00 8.00
8.00
1.00
8.00
8.00
8.00
8.00
180°
8.00
18.00
B 15.00
180° R5.00
A
R6.00
8.00
B PARKIR MOTOR
7.00
R. GENSET DAN TRAFO - 4.20
8.00
- 4.20
R. EXHAUSE - 4.20
55.00
PARKIR MOTOR - 4.20
PARKIR MOBIL
A
- 4.20
C
40.00
A'
8.00
D
48.00 18.00 8.00
E
65.00
65.00
LOBBY LIFT DAN R. TUNGGU SOPIR
8.00
-4.20
7.00
F 8.00 8.00
R. POMPA DAN TANGKI - 4.20
G
10.00
H 1.00
R. MESIN CHILLER
22.00
-4.20
R6.00
8.00
17.00
I 8.00
J
48.00
C'
B'
DENAH BASEMENT B1 SKALA 1:500 0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 : 500
22
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
C
U
B 1
2
3
4
5
6
7
9
10
11
12
13
8 8.00
8.00
8.00
8.00
8.00
89.00 8.00
1.00
8.00
8.00
8.00
8.00
8.00
18.00
A 8.00
B 8.00
A
A'
C 8.00
D
48.00 18.00 8.00
E
65.00
65.00
LOBBY LIFT DAN R. TUNGGU SOPIR
8.00
-7.80
7.00
F 8.00
G
H 1.00
22.00 R6.00
8.00
17.00
I 8.00
J
48.00
C'
B'
DENAH BASEMENT B2-B4 SKALA 1:500 0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DENAH 1 : 500
23
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
A
PEMBAGIAN LUASAN PENAMPANG BEBAN KOLOM PEMBAGIAN DI SESUAIKAN DENGAN FUNGSI PADA LANTAI DI ATASNYA DAFTAR BESARAN KOLOM PODIUM A
B
C
D
E
F
G
I
J
H 65.00
KOLOM PODIUM 0,50 X 0,50 A1,A1,G1, G7
8.00
8.00 1.00
8.00
8.00 2.50
8.00
8.00
8.00
18.00
1
KOLOM PODIUM 0,60 X 0,60 B8, C8, D8, E8, F8, B9, B10, B11, B12, C9, C10, C11, C12, D10, D12, E9, E10, E11, E12, F9, F 10, F11, F12, H2, H4, I1, I2, I3, I4, I5, J2, J4
8.00
8.00 12.50
2 2.50
B'
KOLOM PODIUM 0,70 X 0,70 A2, A3, A4, A5, A6, A8, B1, B7, C1, C7, D1, D7, E1, E7, F1, F7, G2, G3, G4, G5, G6, G8
3.50
3
32.00
8.00
4
16.00
DILATASI STRUKTUR
B
8.00
18.00
KOLOM PODIUM 0,80 X 0,80 H1, H3, H5, J1, J3, J5
8.00
5
KOLOM PODIUM 0,95 X 0,95 B2, B3, B5, B6, C2, C6, D2, D6, E2, E6, F2, F3, F5, F6
6
C
C'
8.00 89.00
7 8
KOLOM PODIUM 1,00 X 1,00 A9, A10, A11, A12, A13, B13, C13, D13, E13, F13, G9, G10, G11, G12, G13
8.00
1.00
8.00
9
KETERANGAN WARNA BALOK 8.00
BALOK UTAMA
10
BALOK UNTUK DINDING 8.00
BALOK TRANSFER
11 8.00
12 8.00
13
TEBAL CORE (DIHITUNG PADA LANTAI BASEMENT 4 LUAS BEBAN (A) = 25 M X 25 M = 2500 X 2500 = 6250000 CM2 F = (n X A) / 1000 F = (19 lt X 6250000) / 1000 = 118.750
MATERIAL BALOK YANG DIGUNAKAN
BALOK RANGKA BAJA, TINGGI BALOK= 1/18 - 1/22 X BENTANG F F
= ((1800 X 2) + (1800 X 2) - (400 X 2) + 100))t = 6300 t
4.00
12.00
4.00 6.00
16.00
32.00 48.00
t (TEBAL)
BALOK BETON BERTULANG, TINGGI BALOK = 1/12 X BENTANG
A'
= 118750 / 6300 = 18.85 CM KARENA BEBERAPA FAKTOR BEBAN YANG BERUBAH DAN DIBUAT SEBAGAI KONSTRUKSI HELIPAD DI LANTAI ATAS AKHIRNYA DI BUAT SETEBAL 20 - 22 CM
PEMBALOKAN GF
BALOK PRA TEGANG/ PRESTRESS UNTUK TRANSFER BEAM
0
5
15
SKALA 1:700
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: 1 : 700
24
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
A
A
TRANSFER BEAM
A
B
C
H
H 8.00 1.00
D
E
F
G
I
J
A
B
C
D
E
F
G
I
J
65.00 65.00
8.00
8.00
8.00 2.50
8.00
8.00
8.00
8.00
BALOK 45/70
8.00
8.00 1.00
8.00
8.00 2.50
8.00
8.00
8.00
8.00
18.00
18.00
AREA BALOK RANGKA BAJA 1
1 8.00 8.00 12.50
2
16.00
2 2.50 8.00 2.50
3
32.00
3
32.00
B
B'
B'
B
8.00 3.50
2.50 8.00 8.00
18.00
4
18.00
4
16.00
13.50
8.00 8.00
5
5 8.00 8.00
6
6
C
C'
C
C'
8.00 89.00
8.00 89.00
7 8
7 8
1.00
1.00 8.00 8.00
9
9 8.00
8.00
10
10 8.00
8.00
11
11 8.00
8.00
22.00
12
AREA BALOK RANGKA BAJA
12
BALOK 45/70
BALOK 45/70
8.00
8.00
13
13 3.00 24.00
24.00 48.00
4.00
12.00
4.00 6.00
16.00
32.00 48.00
A'
A'
PEMBALOKAN LANTAI 3
PEMBALOKAN MEZANINE LT. 1
SKALA 1:700
SKALA 1:700
0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: 1 : 700
25
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
B
1
2
TRANSFER BEAM
3
4
5
6
7
9
10
11
12
13
8 8.00
8.00
8.00 2.50
8.00
8.00
89.00 8.00
1.00
8.00
8.00
8.00
8.00
8.00
18.00
A
AREA BALOK RANGKA BAJA
8.00
B
B
8.00
A
TRANSFER BEAM
A'
C 8.00
1
2
3
4
5
6
18.00
8.00
8.00
8.00
89.00 8.00
9
10
11
12
13
8.00
1.00
8.00
8.00
8.00
8.00
8.00
18.00
A
65.00
8.00 2.50
BALOK 45/70
F
A
H 1.00
8.00
8.00
8.00
8.00
B
8.00
G
8.00 2.50
8.00
E
7 8
D
A'
C 8.00
8.00
D
I
16.0048.00 18.00 8.00
8.00
E
J
65.00
8.00
13.00
2.50 3.00
16.00
F
16.00
32.00 8.00
B'
G
AREA BALOK RANGKA BAJA
H 1.00
8.00
PEMBALOKAN LANTAI 4
2.00 40.00
17.00
I
SKALA 1:700 8.00
J
12.00
3.00 32.00
17.00
AREA BALOK RANGKA BAJA
B' AREA BALOK RANGKA BAJA
PEMBALOKAN LANTAI 5 SKALA 1:700
0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: 1 : 700
26
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
HELI DECK UP TO SUPER PUMA
+ 71.40
HELIPAD
+ 67.20
ROOFTOP
+ 63.00
TOWER LT. 16
+ 58.80
TOWER LT. 15
+ 54.60
TOWER LT. 14
+ 50.40
TOWER LT. 13
+ 46.20
TOWER LT. 12
+ 42.00
TOWER LT. 11
+ 37.80
TOWER LT. 10
+ 33.60
TOWER LT. 9
+ 29.40
TOWER LT. 8
+ 25.20
TOWER LT. 7
+ 21.00
TOWER LT. 6
+ 16.80
LANTAI 5
+ 12.60
LANTAI 4
+ 8.40
LANTAI 3
+ 4.20
MEZANINE LT. 1
+/- 0.00
GROUNDFLOOR
- 4.20
BASEMENT 1
- 7.80
BASEMENT 2
- 11.40
BASEMENT 3
- 15.00
BASEMENT 4
SAFETY NET
ZYNCALUME SPACE FRAME
RAIN WATER RUN OFF LAPISAN WATERPROOF
MULTI PURPOSE BALLROOM + 16.80
AUDITORIUM + 8.40
SUMMIT ROOM + 8.40
DINNING ROOM FOR STAFF + 4.20
ASEAN GALLERY, HERITAGE, EXPERIENCE ROOM +/- 0.05
1.00 8.00
8.00
8.00
8.00
8.00
8.00 89.00
8.00
8.00
8.00
8.00
8.00
8
POTONGAN A - A'
1
2
3
5
4
6
7
9
10
11
12
13
SKALA 1:500 0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: POTONGAN 1 : 500
27
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
HELI DECK UP TO SUPER PUMA
+ 71.40
HELIPAD
+ 67.20
ROOFTOP
+ 63.00
TOWER LT. 16
+ 58.80
TOWER LT. 15
+ 54.60
TOWER LT. 14
+ 50.40
TOWER LT. 13
+ 46.20
TOWER LT. 12
+ 42.00
TOWER LT. 11
+ 37.80
TOWER LT. 10
+ 33.60
TOWER LT. 9
+ 29.40
TOWER LT. 8
+ 25.20
TOWER LT. 7
+ 21.00
TOWER LT. 6
+ 16.80
LANTAI 5
+ 12.60
LANTAI 4
+ 8.40
LANTAI 3
+ 4.20
MEZANINE LT. 1
+/- 0.00
GROUNDFLOOR
- 4.20
BASEMENT 1
- 7.80
BASEMENT 2
- 11.40
BASEMENT 3
- 15.00
BASEMENT 4
SAFETY NET
ZYNCALUME SPACE FRAME
RAIN WATER RUN OFF LAPISAN WATERPROOF
LARGE MULTI PURPOSE BALLROOM + 16.80
18.00 8.00
8.00
8.00
8.00
1.00
8.00
8.00
8.00
8.00
65.00
H
POTONGAN B - B'
J
I
G
F
E
D
C
B
A
SKALA 1:500 0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: POTONGAN 1 : 500
28
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
+ 71.40
HELIPAD
+ 67.20
ROOFTOP
+ 63.00
TOWER LT. 16
+ 58.80
TOWER LT. 15
+ 54.60
TOWER LT. 14
+ 50.40
TOWER LT. 13
+ 46.20
TOWER LT. 12
+ 42.00
TOWER LT. 11
+ 37.80
TOWER LT. 10
+ 33.60
TOWER LT. 9
+ 29.40
TOWER LT. 8
+ 25.20
TOWER LT. 7
+ 21.00
TOWER LT. 6
+ 16.80
LANTAI 5
+ 12.60
LANTAI 4
+ 8.40
LANTAI 3
+ 4.20
MEZANINE LT. 1
+/- 0.00
GROUNDFLOOR
- 4.20
BASEMENT 1
- 7.80
BASEMENT 2
- 11.40
BASEMENT 3
- 15.00
BASEMENT 4
BANGUNAN LAMA
MULTI PURPOSE BALLROOM + 16.80
ZYNCALUME SPACE FRAME
AUDITORIUM CONFERENCE HALL
+ 8.40
CONFERENCE HALL BARU + 7.50
WALKING LIBRARY + 4.20
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
48.00
POTONGAN C - C'
K
J
I
G
F
E
D
B
C
A
SKALA 1:500 0
5
15
35
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: POTONGAN 1 : 500
29
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
PANASAP EURO GREY
RANGKA SPACE FRAME (RIGID)
ZYNCALUME
PLAFOND GYPSUM 0.9 - 1.0 CM TITIK LAMPU
AUDITORUM + 8.40
CONFERENCE HALL BARU + 7.50
PINTU MASUK RUANG
WALKING LIBRARY
+ 4.20
+ 4.20
ASEAN GALLERY, HERITAGE + 0.05
PEDESTRIAN - 0.50
POTONGAN PRINSIP SKALA 1:100 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DETAIL POTONGAN 1 : 100
30
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
KARPET TEBAL (ACOUSTIC) BALOK UTAMA RANGKA BAJA 60/120
BALOK RANGKA BAJA 45/80
BALOK UTAMA RANGKA BAJA 60/120 DINDING BATA TANPA FINISHING
MULTI PURPOSE BALLROOM
ACP WALL CLADDING PUTIH
+ 16.80
PLAT BETON PRECAST
PLAFOND GYPSUM 0.9 - 1.0 CM PANEL ACOUSTIC (MDF) TITIK LAMPU PLAT LANTAI BETON 12 CM
KARPET TEBAL (ACOUSTIC)
AUDITORIUM + 8.40
SUMMIT ROOM + 8.40
PLAFOND GYPSUM 0.9 CM RANGKA HOLO
+ 7.20 + 7.00
KACA PANASAP EURO GREY 5 MM
RAILING STAINLESS STEEL KACA TEMPERED BALOK 25/50
DINNING ROOM FOR STAFF + 4.20
CORRIDOR + 4.20
+ 3.00
BALOK UTAMA BETON BERTULANG 45/70
ASEAN GALLERY, HERITAGE, EXPERIENCE ROOM +/- 0.05 DINDING STRUKTUR BASEMENT
ENTRY BASEMENT - 1. 25
BASEMENT 1 - 4.20
POTONGAN PRINSIP SKALA 1:100 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DETAIL POTONGAN 1 : 100
31
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
PLAFOND GYPSUM 0.9 CM RANGKA HOLO
RUANG KANTOR +54.60
PLAT BETON PRECAST
PLAFOND GYPSUM 0.9 CM RANGKA HOLO TITIK LAMPU
BALOK BETON 45/70
RANGKA ACP WALL CLADDING
RUANG KANTOR + 50.40
TITIK LAMPU BALOK BETON BERTULANG 25/50 DINDING BATA TANPA FINISHING
BALOK BETON 35/70
ACP WALL CLADDING PUTIH
RUANG KANTOR +46.20
KACA PANASAP EURO GREY 5 MM BALOK TRANSFER 2 TUMPUAN BETON PRE STRESS 60/100 TITIK LAMPU
RUANG KANTOR + 42.00
TITIK LAMPU
RUANG KANTOR +37.80
TITIK LAMPU
POTONGAN PRINSIP SKALA 1:100 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
NO. LEMBAR
GAMBAR SKALA
: DETAIL POTONGAN 1 : 100
32
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
TUMPUAN UTAMA
ZYNCALUME
SPACE FRAME (RIGID)
TUMPUAN UTAMA
TUMPUAN SAMPING
PLAFOND GYPSUM 0.9 - 1.0 CM
TUMPUAN SAMPING
TITIK LAMPU
RAIN WATER RUN OFF LAPISAN WATERPROOF
KARPET TEBAL (ACOUSTIC) BALOK UTAMA RANGKA BAJA 60/120
BALOK RANGKA BAJA 45/80
MULTI PURPOSE BALLROOM + 16.80
POTONGAN PRINSIP SKALA 1:100 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
GAMBAR SKALA
: DETAIL POTONGAN 1 : 100
NO. LEMBAR
DISAHKAN OLEH:
33
PEMBIMBING
PETUGAS TU
800
800
800
800
800
800
H A
G F
SLIDING DOOR
E A
D B
J
SLIDING DOOR
C
ASEAN GALLERY, HERITAGE AND ESPERIENCE ROOM +0.05
I K
B C
H
E
D J F
K
I
G
DINDING BAGIAN DALAM
LUASAN DINDING SKALA 1:200 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
GAMBAR SKALA
: DETAIL 1 : 200
NO. LEMBAR
DISAHKAN OLEH:
36
PEMBIMBING
PETUGAS TU
KOLOM 1X1
KOLOM 0.6X0.6 8.00
KOLOM PRAKTIS 0.15X0.15
8.00
BALOK 0.45X0.7
KOLOM 1.4X1.4 8.00
BALOK 0.25X0.5
KOLOM 0.7X0.7 8.00
KOLOM 0.5X0.5
8.00
DENAH PEMBALOKAN SKALA 1:200 8.00 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
8.00 GAMBAR SKALA
: DETAIL 1 : 200
8.00
8.00 NO. LEMBAR
DISAHKAN OLEH:
37
PEMBIMBING
PETUGAS TU
8.00
8.00
SLIDING DOOR
8.00
8.00
SLIDING DOOR
8.00 ASEAN GALLERY, HERITAGE AND ESPERIENCE ROOM +0.05
8.00
DENAH RUANG SKALA 1:200 1.00 8.00 FAKULTAS TEKNIK SIPIL DAN PERENCANAAN JURUSAN ARSITEKTUR
UNIVERSITAS TRISAKTI 2019/2020
TUGAS AKHIR PERANCANGAN KOMPLEKS ASEAN SECRETARIAT DENGAN PENDEKATAN ARSITEKTUR IKONIK DI JAKARTA
NAMA NIM PU PP
: GILANG DEWI RAHAYU : 052001600088 :IR. ENNY S. SADIYARSO, MS. :IR. SRI HANDJAJANTI, MT
8.00
8.00
8.00
8.00 NO. LEMBAR
GAMBAR SKALA
: DETAIL 1 : 200
38
DISAHKAN OLEH: PEMBIMBING
PETUGAS TU
PERANCANGAN KOMPLEKS SEKRETARIAT ASEAN (ASEC) DI JAKARTA DENGAN PENDEKATAN ARSITEKTUR IKONIK @artworkmargin