Skip to main content

Portfolio of Daniel Tristan

Page 1

ARCHITECTURAL TECHNOLOGY - GEORGE BROWN COLLEGE - ONTARIO ADVANCED DIPLOMA


Portfolio / Daniel Tristan

DANIEL T R I S TA N

416.875.2393 daniel.tristancerecero@georgebrown.ca www.linkedin.com/in/danieltristanc/ St Clair Ave W, Toronto, ON, M6N 1K9

ARCHITECTURAL TECHNOLOGIST

E D U CATION

PRO F I L E

ontario advanced diploma, architectural technology

Architectural professional with a multidisciplinary background, holding a Bachelor of Architecture, where my thesis earned first place in a state‑level gov-

George Brown College, Toronto, ON 2024- Expected Apr 2027 master’s degree, magagment & leadership

Universidad Autonoma del Noreste, Mex 2020-2022 bachelor’s degree, architecture

Universidad Autonoma del Noreste, Mex 2013-2017

ernment competition, a Master’s in Management and Leadership, and currently completing my third year of Architectural Technology at George Brown Polytechnic. I bring a strong blend of design ability, technical proficiency, and leadership skills to contemporary architectural practice.

WO R K

E X P E RI E N C E

architectural designer,

[Jan 2018 - Aug 2024]

Arquitectura del Noreste, Saltillo, Mex -Produced architectural drawings, 3D models, and visualizations for residential & commercial projects, ensuring compliance with codes.

S KIL L S [Professional]

Team Collaboration Communication Attention to Detail Time Managment Adaptability

[Technical]

Revit Sketchup ArchiCAD Lumion Adobe Creative Microsoft Office ReCap AutoCAD OBC Part 3 & 9

E XTRA thesis design competition winner

Universidad Autonoma del Noreste, Mex 2017 Page I

-Coordinated design development, permits, and client presentations, collaborating with engineers, contractors, and consultants. -Managed multiple projects simultaneously, leveraging BIM, GIS, and point‑cloud scanning for site analysis and design support. building permit reviewer,

[Jun 2018 - Jun 2024]

Saltillo Municipal Government, Saltillo, Mex -Reviewed and authorized building permit applications, ensuring documentation met zoning, land‑use, and municipal requirements. -Guided architects, engineers, and developers through technical documentation and regulatory approval processes. -Supervised and trained a team of five staff, coordinating workflow and providing technical support to maintain accuracy. instructor,

[Jan 2018 - Jun 2018]

Universidad Autonoma del Noreste, Saltillo, Mex -Taught architecture fundamentals, including construction principles, design, and technical drawing to multiple student groups. -Organized field visits and hands-on activities to enhance practical learning and reinforce classroom concepts. -Supported students’ skill development in design, drafting, and construction understanding through struct lesson plans. furniture designer,

[Sep 2016 - Dec 2016]

Oficentro, Saltillo, Mex -Designed custom furniture solutions for industrial offices, focusing on functionality, ergonomics, and client requirements. -Conducted on‑site visits to industrial warehouses to meet clients, assess needs, and gather design criteria. -Performed precise building measurements to ensure accurate layouts, fit, and installation planning.


Portfolio / Daniel Tristan

TABLE OF CONTENTS

1 2 3 4 5

SUTSGE

institutional multi-use building

Page 01-04

THE BUNKIE PROJECT

residential dwelling unit

Page 05-06

GEORGE AVE. HOUSE

residential dwelling unit

Page 07-10

SAS FIRE & RESCUE EMS firestation

Page 11-14

THE SHATTERBOOK

student residences

Page 15-18

Page II


Portfolio / Daniel Tristan

1 Saltillo, Mexico Academic Project (Bachelor’s Degree Final Thesis) Individual Submission 2017 Software: -AutoCAD -ArchiCAD -Lumion -Photoshop -Illustrator

SUTSGE

INSTITUTIONAL MULTI-USE BUILDING [Awarded first place in a state-level government competition] [Project under construction]

Saltillo Cathedral

The SUTSGE project is located within the Historic Centre of the city, directly facing “The Mirador” (The public viewpoint of the city), a prominent urban lookout frequently used by residents and tourists as a gathering and observation place.

Metropolitan Center

The project scope includes three primary buildings and a five-level parking structure, in addition to integrated underground parking. The total constructed area is 13,036.73 m². The site presents a significant topographical condition, with elevations ranging from 1490 m to 1515 m above sea level, resulting in approximately 25 meters of vertical difference across the property. I was responsible for the architectural design development, preparation of construction drawings (architectural plans, sections, elevations), preliminary structural coordination, foundation proposal, and integration of mechanical and plumbing systems. The project required detailed revision and recalculation during the transition from academic proposal to construction phase.

The Town Hill

SUTSGE Development

Desert Museum

East Facade Perspective Render Page 01


Portfolio / Daniel Tristan

12

11

13

10 4

5

6 1

2

3

9 8

7

1.- PARKING A 2.- OUTDOOR MECHANICAL

3.- RECREATIVE BUILDING 4.- ADMINISTRATIVE BUILDING 5.- ELEVATOR & STAIRS

6.- CENTRAL PLAZA 7.- OUTDOOR SEATING 8.-PARKETTE 9.-FORECOURT

10.-MULTI-USE BUILDING 11.-PARKING B 12.-OPEN PUBLIC STAIRS 13.-PARKING C

Page 02


Portfolio / Daniel Tristan administrative building recreational building

canopy grid

multi-use building

main parking

Original Physical Model (2017) outdoor mechanical

central plaza

General Program Diagram

1.-Base Massing & Topography. Page 03

forecourt

Original Physical Model (2017)

2.-Programmatic Zoning: Recreation, Admin, Auditorium & Parking.

3.-Mass Distribution Allowing Light, Circulation & Air Gaps.


Portfolio / Daniel Tristan

Aerial Photomontage (2020) Given its adjacency to the Mirador, the project required a sensitive urban response. The lookout functions as a public vantage point where visitors gather to observe the city skyline. To preserve uninterrupted views from street level, the architectural strategy prioritized embedding the building mass into the natural slope rather than constructing above grade. By leveraging the 25-meter topographical difference, the primary built volumes were positioned below street level.

parking

outdoor seating

parkette

forecourt outdoor

pedestrian stairs connection

This approach allowed preservation of the skyline and panoramic views, visual continuity from the public space, reduction of perceived building mass and the integration of architecture with landscape. The project therefore contributes to the urban fabric without competing with the Mirador’s visual dominance.

Updated Physical Model (2020)

4.-Massing Response to Property Lines, Grade & Street Level

5.-Architectural Detail & Facade

6.-Central Canopy & Pedestrian Stairs Connection Page 04


Portfolio / Daniel Tristan

2 Toronto, Canada Academic Project Individual Submission 2024 Software: -AutoCAD -Hand-Drawing Skills -Model Skills

THE BUNKIE PROJECT The student is required to redraw the plans both by hand and in AutoCAD, based on the provided information, ensuring accuracy, clarity, and consistency in the drawings. Following this, the student must construct a model of a specified side from the drawings, demonstrating an understanding of the information to support accurate model construction at a scale of 1/2” = 1’-0”. The model must clearly illustrate framing methods and material assemblies, including finishes such as stucco, wood siding, or brick veneer, as indicated by the professor in class.

Hand-Drawing Front Elevation Page 05

Wood Frame Model


Portfolio / Daniel Tristan

Hand-Drawing Foundation Floor Plan

Hand-Drawing Ground Floor Plan

Second Floor Plan

Hand-Drawing Wall Section

Hand-Drawing Wall Section

Isometric Page 06


Portfolio / Daniel Tristan

.33 119

3.48

20

1.20

119.

GRASS BOULEVARD

.10 46

6.00

6.00

The design process incorporated building code considerations,

2.75m

including spatial standards, egress, stair design, and basic life-safety

1.80

119.

RED MAPLE 0.70Ø

3.15m

WALKWAY

responding to the project brief and applicable building requirements.

1.50

.25 119

design a residential dwelling unit with two floors and one basement,

.35

GRASS BOULEVARD

8.12 N16°17'00"W

119

GRASS BOULEVARD

The student, in collaboration with another student, was required to

25 119.

CONCRETE SIDEWALK

.15 119 .00 119

requirements.

119.

PORCH

21

The project deliverables included floor plans, sections, elevations, and

6.22

Software: -AutoCAD -ArchiCAD -Lumion -Photoshop

150mm CONC. CURB

119

2025

.05 119

Academic Project Partnership with B. Sleman

.17

Toronto, Canada

RESIDENTIAL DWELLING UNIT

CENTER LINE OF PAVEMENT

119

3

GEORGE BROWN AVENUE

selected details, developed to clearly communicate spatial organization,

6.22

ADJACENT DETACHED DWELLING

96

residential design suitable for portfolio presentation.

118.

coordinated drawings, resulting in a comprehensive and well-resolved

.75

submission emphasized technical accuracy, code compliance, and

118

ADJACENT DETACHED DWELLING

circulation, structural logic, and functional relationships. The final

.50

118 71

118.

SITE STATISTICS CHART GENERAL PROJECT DESC. TOTAL LOT AREA

0.92

0.45

BUILDING COVERAGE

REQU

303.

121.2

TOTAL GROSS FLOOR AREA (GFA) 181.2

DECK 6.22

LEFT SIDE RIGHT SIDE

6

.6 118

6m M

0.30

0.92

0.45

REAR

7.5m

PARKING DRIVEWAY LENGTH DRIVEWAY WIDTH

N/A

N/A

TOTAL PARKING SPACE PROVIDED 2

6.22

WALKWAY

37.35 N74°03'00"E

.45

LOT #2

118

37.36 N74°03'00"E

17.46

SETBACK FRONT (HOUSE) GARAGE

HEIGHT BUILDING HEIGHT

10.00

HEIGHT OF FINISHED 1ST FLOOR

1.2m

LANDSCAPE FRONT YARD LANDSCAPE AREA

48.7

REAR YARD LANDSCAPE AREA

141.2

WALKWAY

118 .30 64 118.

0.41

0.61

6.45

PROPOSED DOUBLE CAR WOOD FRAME GARAGE

WALKWAY

.44

118

65

118.

8.12 N16°19'59"W

6.5m WIDE LANEWAY

Site Plan

DETAC DWEL

DETAC DWEL

SITE PLAN

DETAC DWEL

Page 07

BEZHAN SLEMAN - 101


Portfolio / Daniel Tristan

Basement

Main Floor Plan

Second Floor Plan Page 08


Portfolio / Daniel Tristan

Front Elevation

Rear Elevation

Longitudinal Cross Section Page 09


Portfolio / Daniel Tristan

Wall Detail

Front 3D View

Rear 3D View

Interior 3D View

Rear 3D View Page 10


Portfolio / Daniel Tristan

4 Toronto, Canada Academic Project Partnership with B. Sleman 2026 Software: -Revit -Sketchup -Lumion -Photoshop

SAS FIRE & RESCUE EMS This fire station is designed to feel strong, efficient, and welcoming all at once. At its core, the layout is simple and practical, everything revolves around making response times as fast as possible while still creating a comfortable place for firefighters to live and work. The apparatus bay sits at the center of the building, allowing fire trucks to move in and out quickly, while the quieter spaces like sleeping areas, offices, and meeting rooms are set apart to give a sense of privacy and calm. The shape of the building reflects energy and readiness. Its angled forms and bold lines give it a sense of movement, almost like it’s always prepared to respond. At the same time, the large glass façade opens the building up to the community, letting people see inside and feel connected to the work happening within. The exterior envelope is primarily composed of vertical ribbed metal cladding in a matte, earth-toned finish, selected for its longevity, fire resistance, and low maintenance requirements. Accents of natural wood paneling are introduced at the main entrance volume to create warmth and a civic presence, contrasting the industrial character of the metal skin.

Page 11


Portfolio / Daniel Tristan

---

UP

2 1

3

4

14

5

6

---

---

7

15

8 9

10

11

16 12

13

---

1.- LOBBY 2.- ELEVATOR 3.- UNIVERSAL WASHROOM 4.- OFFICE 5.- WATCH/DISPATCH ROOM 6.- CONFERENCE ROOM 7.- HOSE TOWER 8.- CUSTODIAL CLOSET 9.- DATA ROOM 10.- CLEAN/LAUNDRY ROOM 11.- STORAGE 12.- AIR ROOM 13.- GYM 14.- WORKSHOP 15.- MAINTENANCE EQUIPMENT STORAGE 16.- MECHANICAL ROOM 0

1

2

3

4

5

10 m

Ground Floor Plan Page 12


Portfolio / Daniel Tristan

---

1

2

3

-

-

---

---

4

5

5

5

5

5

5

5

5

5 5

6

7

7

6

1.- ELEVATOR 2.- KITCHEN 3.- LOUNGE 4.- HOSE TOWER 5.- BEDROOM 6.- WASHROOMS 7.- UNIVERSAL WASHROOM 0

---

Page 13

1

2

3

4

5

Second Floor Plan

10 m


Portfolio / Daniel Tristan

Front Elevation

Rear Elevation Page 14


Portfolio / Daniel Tristan

5 Toronto, Canada Academic Project Partnership with S. Brown & F. Muhammad 2026 Software: -Revit -Sketchup -Lumion -Photoshop -VRay

THE SHATTERBOOK The Shatterbook Residence is designed as a retreat where students can separate academic pressure from personal well‑being. Its signature facade, inspired by the symbolic act of tearing a book, represents the moment students choose to “break away” from school stress at the end of the day. Rather than suggesting destruction, the fractured form expresses release, balance, and the freedom to pause. The

residence

reinforces

spaces

that

encourage

relaxation,

connection, and healthy routines. Lounges, wellness areas, a cafe, and quiet corners offer opportunities to recharge, while shared amenities foster a sense of belonging. The Shatterbook Residence ultimately embodies the importance of work‑life balance. It stands as a daily reminder that students deserve space to breathe, reset, and grow beyond their academic demands.

Site Plan Page 15


Portfolio / Daniel Tristan

N LINE OF FLOOR ABOVE

LINE OF FLOOR ABOVE

DN

LINE OF FLOOR ABOVE

4

3

6

5 14

1

8 7

8 LINE OF FLOOR ABOVE

2

13

12

11

10

DN

9

LINE OF FLOOR ABOVE

LEVEL 1 01 - CAFE 02 - WASHROOMS 03 - STAIR 2 04 - ELEVATOR 1 05 - ELEVATOR 2 06 - CUSTODIAL ROOM 07 - LAUNDRY ROOM

08 - 1 BEDROOM UNIT 09 - STAIR 1 10 - GYM 11- VESTIBULE 12 - SECURITY/RECEPTION 13 - LOBBY 14 - GARBAGE CHUTE

0m

1m

2m

5m

10m

Page 16


Portfolio / Daniel Tristan

N

1

7 1

1

5

1

6

OPEN TO BELOW

1

1

1

1

1

OPEN TO BELOW

3

2 1 4

LEVEL TYPE 01 - 1 BEDROOM UNIT 02 - 2 BEDROOM UNIT 03 - 3 BEDROOM UNIT 04 - STAIR 1 05 - STAIR 2 06 - ELEVATORS 07 - LOUNGE Page 17

0m

1m

2m

5m

10m


Portfolio / Daniel Tristan

West Elevation - Front Facade

North Elevation - Side Facade

East Elevation - Rear Facade

North Elevation - Side Facade Page 18


THANK YOU!

416.875.2393 daniel.tristancerecero@georgebrown.ca www.linkedin.com/in/danieltristanc/


Turn static files into dynamic content formats.

Create a flipbook
Portfolio of Daniel Tristan by arq.danieltristan - Issuu