ARIB MOMIN I ARCHITECTURE PORTFOLIO

Page 1

CONTENT I. ACADEMIC WORK 2018-21 II. OFFICE WORK 2021-22 01. TRANSFUSION MEDICINE CENTRE 01-05 02. GUGGENHEIM MUSEUM 06-09 03. PEDESTRIAN BRIDGE 10 04. AFFORDABLE HOUSING 11-13 05. MUNICPLE DRAWING 14 06. TOUR MODEL MAKING 15 07. TWIN TOWER 16-19 08. YUNUS RESIDENCY 20-21 09. DNA SONALE 22 10. DARUL- ISLAM 23 11. GRAND KARISHMA DHABA 24-26 12. MID- TOUR TREAT 27 13. SHATRUNJAY HEIGHTS 28 14. DESIGN STUDIO 29-32 15. SANJEEV RESIDENCE 33-34 070201 1408

Public Utility I Medical Facility I Connectivity I SEM 10 I 2000 sq.m I -KHARGHARMEDICINETRANSFUSION2021CENTRE

Transfusion medicine center which is a device having a collection information form of trans fusion medicine, which helps to aware citizens, which creates an impact of being responsible to donate blood. Also a center which creates a wel coming environment, attracts human attention, reduce anxiety and promote positive emotions toward Blood Donation.

Zoning ENTRANCE AUDITORIUM SEMINAR ADMIN DONATION CAFEEXHIBITIONRECREATIONAL RECREATIONAL LABS PARKING

Bycially.the end of the 1990s, the planning authority of Navi Mumbai initiated private par ticipation in the developmental activity of Navi Mumbai. A new railway link between Nerul and Uran was inaugurated on 11 November 2018. Southern Navi Mumbai is be ing developed rapidly with its class infrastructure and modern nodes of Kharghar, Ka mothe, Panvel and Kalamboli.

Transfusion Medicine Center SITE CONTEXTSECTIONVIEWS ZONNING LAND USAGE

Development Strategy Medical Facility

Navi Mumbai is a planned satellite city of Mumbai, on the west coast of Maha rashtra in India. It was developed in 1972 as a new urban township of Mumbai, and is currently the largest planned city in the world. CIDCO carved out 19 small nodes with a view towards facilitating comprehensive development. These nodes were named Ai roli, Ghansoli, Kopar Khairane, Juhu Nagar, Vashi, Turbhe, Sanpada, Juinagar, Nerul, Darave, Karave Nagar, CBD Belapur, Kharghar, Kamothe, New Panvel, Kalambo li, Ulwe, Dronagiri and Taloja. CIDCO planned and constructed all the railway sta tions, roads and public spaces in Navi Mumbai and developed nearby areas commer

2002 2005 2008 2011 2015 2021

-As the Site is in between the Residential Commercial and Medical facilities. The blood bank will help to aware citizens about importance of donating blood. -The blood bank have some Allied activities which promotes good health around neighbor hood. Development In proposed land use site

Strategy

RoadCommercialResidentialGarden

-The activities that will be per formed in my project/program will also have an involvement of the neighborhood Space like Hospital. This will help to in crease the interaction of people. This Blood bank will help the hospital patients by easy avail ability of blood.

GROUND FLOOR

1ST FLOOR

-MUSEUMGUGGENHEIMCHANDIGARHContemporaryIMultipleSpaceIPublic use I SEM 9 I 1600 sq.m I 2020 The Museum will become a Symbol of entry and departure for the users. which has the potential to become the cities landmark. Sitting on the harbour the museum is going to have a conversation with the breeze sunlight, fresh air and the rest of the world.

Guggenheim Museum

The Museum will become a Symbol of entry and departure for the users. which has the potential to become the cities landmark. Sitting on the harbour the museum is going to have a conversation with the breeze sunlight, fresh air and the rest of the world.

ZONNING STRATEGY

GROUND FLOOR 1ST FLOOR 2ND FLOOR

-HOUSINGAFFORDABLEAIROLIMixedEconomyGroupISustainable I Co-Housing I SEM 07 I 1200 sq.m I 2018 Programme for a affordable housing society which will be profitable to the developers as well as the LIG and MIG. Who will occupying the spaces majorly led to the development of an ide ology which brings in the commercial sectors, Private, home owners sector and Rental housing together.

AFFORDABLE HOUSING

GROUND FLOORTYPICAL FLOOR

MUNICIPAL DRAWING

TOUR MODEL MAKING

TWIN TOWER - MILLAT NAGAR Mixed Economy Group I Residential I Commercial I 1BHK I 2BHK I Penthouse I Duplex Housing I 3929 sq.m I 2021-22 Programme for a Mixed use types of 1,2 & 3 BHK flats where the 3BHK is Design in Duplex form. The top floor is Penthouse for the Luxurious life living style.

TILR PLOT AREA PERMISSION GROUND FLOOR

TOILETKITCHEN DN DNTOILETUP UP LIFT-1 LIFT-2 EDIW5'EGASSAP LIVING M.BED ROOM 9'-6" X11'-4" BALCONY 6'-5" WIDE. 10'M.BEDROOMX9'-2" BAL 3'-4"6'-0"WIDE.TOILET4'-9"13'-2''LIVINGX17'-3" PASSAGE 3'-11" W.6'-3"TOILETX3'-11" 8'-9"KITCHENX7'-7"W.3'-10"BAL 14'-2"LIVING11'-4"W.B.W.3'-11"BALTOILET 6'-7"X 3'-11"6'-9" X 3'-11" TOILET 7'-11"KITCHENX8'-5" BALCONY3'-11"W. 2'X5'-9" PASS. 3' W. BALCONY7'-6''2'-4"X 6'-7" WIDE. 2 3 1 4 W.3'-4"BALCONY M.BED ROOM 9'-6" 11'-4" 6'-0" 4'-9" 13'-2'' X 17'-3" 7'-6''2'-4"X PASSAGE 3'-11" W. 8'-9" X 7'-7" W.3'-10"BAL BAL 3'-4" WIDE. 6'-3" X 3'-11" PASS.14'-2"LIVINGX11'-4"3'W.ELECTRICALDUCT EDIW5'EGASSAP KITCHENKITCHEN TOILET TOILET TOILETTOILET M.BED ROOM8 5 7 LIVING LIVING M.BED ROOM FIRE S/C. FD. DUCTFIREFIRE M.BEDROOM10'X9'-2"BAL3'-11"W.TOILET 6'-7"X 3'-11" 6'-9" X 3'-11" TOILET 7'-11"KITCHENX8'-5" BALCONY3'-11"W. 2'X5'-9" W.3'-4"BALCONY 6'-0''X6'-0'' 6'-0''X6'-0'' M.BEDROOM10'9'-2" 14'-2"LIVING11'-4" 3'-11"BAL W. C.B. TOILET 6'-7"X 3'-11"6'-9" X 3'-11" TOILET 7'-11"KITCHENX8'-5" BALCONY3'-11"W. 2'X5'-9" PASS. 3' W. M.BEDROOM10'X9'-2"14'-2"LIVING11'-4" W.3'-11"BAL C.B. TOILET 6'-7"X 3'-11" 6'-9" X 3'-11" TOILET7'-11"KITCHEN8'-5" BALCONY3'-11"W. PASS. 3' W.W.3'-4"BALCONY W.3'-4"BALCONY BAL 3'-4"6'-0"WIDE.X4'-9" 13'-2'' 17'-3" PASSAGE 3'-11" W. 6'-3" 3'-11" 8'-9" X 7'-7"W.3'-10"BAL 7'-6''2'-4" BALCONY 6'-7" WIDE. 9'-6" 11'-4" BAL 3'-4" WIDE. 6'-0" 4'-9" 13'-2'' X 17'-3" PASSAGE 3'-11" W. 6'-3" 3'-11" 8'-9" 7'-7" W.3'-10"BAL X BALCONY 6'-7" WIDE. 9'-6" X 11'-4" 7'-6''2'-4" UP UP UP UP DUCT ELECTRICALDUCT DN DN UP UP LIFT-1 LIFT-2 M.BEDROOM TOILET TOILET BAL 3'-4"6'-1"WIDE.TOILETX4'-9" DW 6'-3"TOILET3'-9" 3'-11"BAL C.B. W.B.TOILET 6'-7" X 3'-11"6'-9" X 3'-11" TOILET 7'-11"KITCHENX8'-5" BALCONY4'-11"W. M.BEDROOM5'-9"X2' W.B.TOILET TOILET BALCONY KITCHEN PASS. 3' W. C.B. TERRACEBELOWBALCONYTERRACEBELOW BALCONY2'-8"W. TOILETTOILET4'-10"7'-7" M.BED ROOM 8'-9" 12'WIDE.3'-4"BAL 8'-6"M.BED3'-10"ROOM9'-6"X11'-2" M.BED ROOM M.BED ROOM 10'-4" X 11'-4" M.BED ROOM 14'-2"LIVINGX11'-4" LIVING M.BED ROOM W.B. TOILET TOILET TERRACEBELOWTERRACEBELOWFIRE S/C. FD. DUCTFIRE ELECTRICALDUCT DUCTFIRE ELECTRICALDUCTBAL3'-4" WIDE. 6'-1" X 4'-9" 2'-8" W. 4'-10"X7'-7" 8'-6" X 3'-10" 9'-6" 11'-2" 10'-4" X 11'-4" TOILET BALCONY TOILET M.BED ROOM M.BED ROOM BAL 3'-4" WIDE. 6'-1" X 4'-9" 4'-1" W. 4'-10"X7'-7" 8'-6" X 3'-10" 9'-6" 11'-2" 10'-4" X11'-4" TOILET BALCONY TOILET M.BED ROOM M.BED ROOM BAL 3'-4"6'-1"WIDE.X4'-9"4'-1" W. 4'-10"X7'-7" 8'-6" 3'-10" 9'-6" X 11'-2" 10'-4" X11'-4" 6'-3" 3'-9" 3'-11"BAL W. 6'-7" X 3'-11" 6'-9" X 3'-11" 7'-11" X 8'-5" 4'-11" W. 5'-9"X2' PASS. W. 8'-9" X 12' WIDE.3'-4"BAL W.3'-4"BALCONY 14'-2" 11'-4" 6'-0''6'-0'' 6'-0''X6'-0'' M.BEDROOM TOILET TOILET BALCONY KITCHEN C.B.LIVING M.BED ROOM 6'-3" X 3'-9" W.3'-11"BAL 6'-7" X 3'-11" 6'-9" X 3'-11" 7'-11" 8'-5" 4'-11" W. 5'-9"X2' PASS. W. 8'-9" X 12' WIDE.3'-4"BAL W.3'-4"BALCONY 14'-2" X 11'-4" M.BEDROOMW.B. TOILETTOILET BALCONY KITCHEN C.B. LIVINGM.BED ROOM 10' 9'-2" 6'-3" 3'-9" W.3'-11"BAL 6'-7" X 3'-11"6'-9" X 3'-11" 7'-11" X 8'-5" 4'-11" W. 5'-9"X2' PASS. 3'8'-9"W. 12'WIDE.3'-4"BAL14'-2" X 11'-4" DN DN DN DN EDIW5'EGASSAP 10' 9'-2" 10' 9'-2" 10' X 9'-2"EDW5'EGASSAP 2ND,4TH,6TH,8TH,10TH, &12TH - BLDG 1 1 4 8 5 DN DN UP UP LIFT-1 LIFT-2KITCHEN10'M.BEDROOMX9'-2" TOILET TOILET BAL 3'-4"6'-0"WIDE.TOILETX4'-9"13'-2''LIVING17'-3" PASSAGE 3'-11" W.6'-3"TOILETX3'-11" 8'-9"KITCHENX7'-7"W.3'-10"BAL 14'-2"LIVINGX11'-4"3'-11"BAL W. C.B. W.B.TOILET 6'-7"X 3'-11"6'-9" X 3'-11" TOILET 7'-11"KITCHEN8'-5" BALCONY3'-11"W. 2'X5'-9" PASS. 3' W. 7'-6''2'-4"X BALCONY WIDE.5'-2"BALCONY WIDE.5'-3" BALCONY 5'-1" WIDE. W.3'-4"BALCONY LIVING M.BED ROOM 9'-6" 11'-4" M.BED ROOM 9'-6" KITCHENX11'-4"KITCHEN TOILET TOILET TOILETTOILET M.BED ROOM LIVING LIVING M.BED ROOM FIRE S/C. FD. DUCTFIREFIRE 6'-0" 4'-9" 13'-2'' X 17'-3" 7'-6''2'-4" PASSAGE 3'-11" W. 8'-9" 7'-7" W.3'-10"BAL BAL 3'-4" WIDE. 6'-3" 3'-11" M.BEDROOM10'9'-2" 14'-2"LIVINGX11'-4" 3'-11"BAL W. C.B. TOILET 6'-7"X 3'-11" 6'-9" X 3'-11" TOILET 7'-11"KITCHEN8'-5" BALCONY3'-11"W. 2'X5'-9" PASS. 3' W. W.3'-4"BALCONYDUCT 6'-0''6'-0'' 6'-0''X6'-0'' M.BEDROOM10'9'-2" 14'-2"LIVINGX11'-4" 3'-11"BAL W. C.B. TOILET 6'-7"X 3'-11"6'-9" X 3'-11" TOILET 7'-11"KITCHEN8'-5" BALCONY3'-11"W. 2'X5'-9" PASS. 3' W. M.BEDROOM10'9'-2"14'-2"LIVINGX11'-4" 3'-11"BAL W. TOILET 6'-7"X 3'-11" 6'-9" 3'-11" TOILET7'-11"KITCHEN8'-5" BALCONY3'-11"W. 2'X5'-9" PASS. 3' W.W.3'-4"BALCONY BAL 3'-4"6'-0"WIDE.4'-9"13'-2'' X 17'-3" PASSAGE 3'-11" W. 6'-3" X 3'-11" 8'-9" X 7'-7"W.3'-10"BAL 7'-6''2'-4"BALCONY WIDE.5'-3" BALCONY 6'-7" WIDE. 9'-6" 11'-4" BAL 3'-4" WIDE. 6'-0" X 4'-9" 13'-2'' 17'-3" PASSAGE 3'-11" W. 6'-3" X 3'-11" 8'-9" 7'-7" W.3'-10"BAL X BALCONY WIDE.5'-3"BALCONY 6'-7" WIDE. 9'-6" 11'-4" 7'-6''2'-4" UP UP UP UP ELECTRICAL DUCT DUCTELE.LEDIW5'EGASSAPPASSAGE5'WDE BALCONY 5'-1" WIDE. 2 3 1 4 8 5 7 6 DN DN UP UP LIFT-1 LIFT-2 FIRE S/C. FD. 6'-0''X6'-0'' 6'-0''X6'-0'' T E R R A C E UTILITY/SERVANTS/STOREBALCONYWIDE KITCHEN DINING ENTRY LIVING UP WARDROBETOILETDRESSING BEDROOMAREA1356SQFTPWDR.10' 13'-8" 18'PASS.17'-7"W.7'-11" 8'-5" 6'-6" 3'-11" 14'-2" 6'-3" 12'-5" 13'-9" 18'-3" T E R R A C E UTILITY/SERVANTS/STORE BALCONYWIDE KITCHEN DININGENTRY LIVING UP WARDROBETOILETDRESSING 1356AREABEDROOMSQFTPWDR. 10' 13'-8" 18' 17'-7" PASS. 3' W. 7'-11" 8'-5" 6'-6" 3'-11" 14'-2" 6'-3" 6' X 12'-5" 13'-9" X 18'-3" T E R R A C E UTILITY/SERVANTS/STOREBALCONYWIDE KITCHEN DINING ENTRY LIVING UP WARDROBETOILETDRESSING BEDROOMAREA1356SQFTPWDR.10' 13'-8" 18'PASS.17'-7"W.7'-11" 8'-5" 6'-6" 3'-11" 14'-2" 6'-3" 12'-5" 13'-9" 18'-3" DUCTFIRE T E R R A C E UTILITY/SERVANTS/STORE BALCONYWIDE KITCHEN DINING ENTRY LIVING UP WARDROBETOILETDRESSING 1356AREABEDROOMSQFTPWDR. 10' 13'-8" 18' 17'-7" PASS. 3' W. 7'-11" 8'-5" 6'-6" 3'-11" 14'-2" 6'-3" 6' X 12'-5" 13'-9" X 18'-3" EDW5'EGASSAPPASSAGE5'WIDE DN DN UP UP LIFT-1 LIFT-2 FIRE S/C. FD. 6'-0''X6'-0'' 6'-0''X6'-0'' DN UP BEDROOM LOUNGE TOILETWARDROBEDRESSING BELOW BALCONYWIDE4' 13'-9"BEDROOMX18'-3"DECKTERRACELEVELBELOW WARDROBEDRESSING 6' TOILET 12'-5" 10' 15" DN UP BEDROOM LOUNGE WARDROBEDRESSINGTOILET BELOW BALCONYWIDE4' DECK13'-9"BEDROOMX18'-3" TERRACELEVELBELOW WARDROBEDRESSING X 8' TOILET 6' X 12'-5" 10' X 15" DN UP BEDROOM LOUNGE TOILETWARDROBEDRESSING BALCONYWIDE4' 13'-9"BEDROOMX18'-3" TERRACELEVELBELOW WARDROBEDRESSING 6' TOILET 12'-5" 10' 15" DN UP BEDROOM LOUNGE WARDROBEDRESSINGTOILET BALCONYWIDE4' 13'-9"BEDROOMX18'-3" TERRACELEVELBELOW WARDROBEDRESSING X 8' TOILET 6' X 12'-5" 10' X 15" DUCTFIRE 5' WIDE BALCONY WIDE BALCONY TERRACELEVELBELOW TERRACELEVELBELOW BELOWDECKTERRACELEVELBELOW DNTERRACETERRACE DECKBELOW TERRACELEVELBELOW DN TERRACETERRACE DNTERRACETERRACE DN TERRACETERRACE TERRACELEVELBELOW TERRACELEVELBELOW CENTERLINE 1ST FLOOR 2ND FLOOR 3RD FLOOR PENTHOUSE FLOOR 1 PENTHOUSE FLOOR 2 TERRACE FLOOR

FD. STAIRCASE 1 10 1211 14 15 16 2120 FFL.+900UP3010 1500 1730 3167 TREAD=270 15001500RISER=175MMMMD1a B' TREAD=270 MM RISER=177 MM FIRST FLOOR+4800LVL GROUND FLOOR LEVEL PLAN+1075MM. LVL +4800 MM. LVL +900 MM.+2673LVL MM.10LVL1312 14 15 19 20 21 1600 39002900TREAD=270 MM RISER=161 MM PLINTH LEVEL (LOWER)+600 PLINTH LEVEL+900(UPPER) 4200 STAIRCASE 01 FD. STAIRCASE 1 2526272829 32 33 37 38 39 FFL.+4800UP3010 1500 3167 TREAD=270 15001500RISER=167MMMMD1a B' 1ST TO 15TH LVL FLOOR DNPLAN TREAD=270 RISER=167MMMM 1221 2002 600 2900600 2900 600 2900600 2900 600 2900600 2900 600 2900 600 2900 600 2900 600 2900 600 2ND FLOOR LVL3RD+7700FLOOR LVL4TH+10600FLOOR LVL5TH+13500FLOOR LVL6TH+16400FLOOR LVL7TH+19300FLOOR LVL8TH+22200FLOOR LVL9TH+25100FLOOR LVL10TH+28000FLOOR LVL11TH+30900FLOOR LVL12TH+33800FLOOR LVL +36700 2900 600 13TH FLOOR LVL +39600 2900600 14TH FLOOR LVL +42500 2900 600 15TH FLOOR LVL +45400 600 O.H.T2100 5470 3850 2400 TERRACE FLOOR LVL +48300 2900 +45400 MM. LVL +42500 MM. LVL +36700 MM. LVL +33800 MM. LVL +28000 MM. LVL +25100 MM. LVL +22200 MM. LVL +19300 MM. LVL +16400 MM. LVL +13500 MM. LVL +10600 MM. LVL +7700 MM. LVL304829002900290029002900290029002900290029002900290029002900+3202 MM. LVL +6339 MM. LVL +12139 MM. LVL +15039 MM. LVL +20839 MM. LVL +23739 MM. LVL +29539 MM. LVL +32439 MM. LVL +35339 MM. LVL +38239 MM. LVL +41139 MM. LVL +44039 MM. LVL +46939 MM. LVL TREAD=270 MM RISER=161 MM RISER 31 41 49 50 58 59 67 68 77 85 86 94 95 103 104 112 113 121 122 130 131 139 140 148 149 157 158 166 167 175 176 184 185 193 194 202 203 211212 220 221 229 230 238 239 247 248 256 257 265 266 274 275 283 284 292TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM TREAD=270 MM RISER=161 MM 23 40 DN DN UP UP FIRES/C. DN DN DN DN B17 B17 B52 B19 B29 B33 B51 B22 B5 B1 B2 B10 B8 B40 B55 B64 B2 B1 B3 B1 B18B13 B16 B10 B23 B19 B9 B21 B15 B30 B24 B20 B32 B34 B29 B31 B35 B25 B34 B34a B24 B30 B31 B28 B5 B26 B27 B23 B37 B36 B22 B19 B19 B15 B18 B16 B13 B3 B1 B9 B14B12 B64 B64 B53 B39 B39 B50 B45 B38B38 B46 B39 B53 B64 B53 B39 B52 B61 B49 B61 B42 B49 B69 B69 B38 B42 B51 B51 B45 B51 B38 B17 B17 B68 B68 B66 B25 B67B65B67 B66 B57 B65 B59 B22 B59 B22 B70 B28 B63 B8 B63 B70 B47 B62 B62 B44 B12 B44 B26 B14 B58 B41 B58 B27 B48 B74 MBMB B74 B55 B48 B40 B63 B54B54B57 B63 B43 B43 S1 S1 S6 S6 S8 S8 S8 S8 S1S1 S6 S6 S1 S1 S1 S1 S2 S3 S3 S3 S3 S5 S5 S5S2 S2 S2S2 S5 S5 S5 S5 S3 S3 "SUNK"275MM "SUNK"275MM "SUNK"275MM "SUNK"275MM SB112 S1 S1S3 S3 S9 "SUNK"275MM S9 "SUNK"275MM S3 S3 S3 B46 S3 "SUNK"275MM "SUNK"275MM S3 S3 S1 S1 S9 "SUNK"275MM S9 "SUNK"275MM S3 S3 S3 S3 "SUNK"275MM "SUNK"275MM S3 S3 B53 AA BB S5 CC DD B71 B71 B11 B6 B7 B6 B7 B50 1.000 S4S4 S4S4 S2 S2 S2 S2B56 B56 B60 B60 S10 S10 S10 S10 B73 B73 HB HB HB HB B72 B72 HB B34b B20 B21 E E "SUNK"275MM "SUNK"275MM "SUNK"275MM "SUNK"275MM S11 S11 S11 S11 S12 CUT OUT FOR STAIRCASE CUT OUT FOR STAIRCASE MB CUT OUT FOR STAIRCASE CUT OUT FOR STAIRCASE S13 S13 S13 S13 S13 S13 S13 FF G G B26aB32aB26aHH S12 S12 S12 S13 S13 S13 S13 B57a B57a SERVICESLAB B47 MB SLABSERVICE SERVICESLAB SLABSERVICE B47B47 MB MB SERVICESLAB SLABSERVICE SERVICESLAB SLABSERVICE SW1 500 X 1200 500SW2X 1200 SW3 300 X 2000 500SW9X 1150 SW11 500 X 1150 SW12 300 X 1100 SW13300X 1100 SW14 SW15 SW19230X 3500 SW18 230 X 230XSW2035003500SW23SW27300X1100 SW31 230 SW351500 300 X 2000 SW22 300SW28X 1100 SW322301500SW38300X2000 SW36525X 1200 SW37 525 X 1200 SW29 500 X 1150 500SW30X 1150 SW26SW25 SW21230X 3500 L2L1 L4 L6L3 L5 SW4400X 1200 SW8 230 x 1500SW7230 1500SW16230X 1500 SW1450X 1200 SW2 450 X 1200 SW17 230 X 1500 SW36 450 X 1200 SW37450X 1200 SW5400X 1150 SW6 400 X 1150 500XSW331150 SW34 500 X 1150 230X300STB STB230X300 230X300STB 230X300STB 2.214 0.850 0.3700.9002.814 3.370 2.814 3.370 1.270 1.250 1.270 1.250 0.470 3.070 2.070 0.603 0.648 1.2060.470 3.070 2.070 0.6030.4950.6452.0700.500 1.570 0.900 1.764 1.290 0.900 1.290 1.764 0.900 0.6200.5000.4951.1201.619 0.500 0.4501.620 1.0006.987 1.570 1.123 1.619 0.4500.500 1.620 2.571 3.500 1.500 2.571 0.850 1.950 0.850 1.950 1.500 4.220 3.449 3.449 4.220 0.970 1.550 0.970 1.550 0.590 0.590 0.741 0.6001.670 2.890 2.640 0.770 2.400 0.741 0.770 0.740 2.400 2.890 2.640 1.6670.600 1.500 2.125 2.320 2.320 2.125 0.300 1.270 1.200 1.120 1.914 0.599 1.976 0.850 2.093 1.270 1.200 1.914 0.599 1.120 1.976 1.499 1.140 1.500 3.010 1.800 1.140 1.349 3.010 2.126 2.125 2.320 2.320 1.270 1.200 1.270 1.200 0.5900.740 0.7410.5900.739 2.4000.770 2.400 0.739 0.770 0.850 2.090 2.063 1.1211.9762.726 1.913 1.121 2.7261.976 0.850 2.090 0.6001.6701.6690.601 2.888 2.640 4.220 3.451 0.970 1.550 1.500 4.220 4.220 0.970 1.550 2.890 0.850 1.950 2.570 3.500 3.500 2.572 0.850 1.949 1.618 1.1200.4500.5001.619 1.570 1.618 1.120 0.5000.450 1.619 0.645 0.606 1.099 0.971 1.306 3.0700.480 2.070 1.250 1.270 1.000 0.900 1.290 1.764 3.370 0.3700.9000.370 2.214 0.850 2.214 1.270 1.250 0.480 2.070 1.570 0.900 1.290 1.764 2.814 3.370 0.6450.6061.306 2.214 0.850 STR. LAYOUT AT 2ND SLAB LEVEL (BUILDING 01). S7 S7 S7 S7 B45a B45a B45aB28a B45a B45aB28aB45a B45aB45a B28a B45aB45a B28a J JS5 S5 S5S5 S5 S5S5 S5 B28a 2.320 0.499 2.320 0.499 2.3202.320 D3W22726 2056 1228 370 235 600 515 2056TOILETX1200 TOILET PLAN TYPE E 2900 275 2000 BRICK WALL 150 BRICKBAT150MMRCCMMSLABTHICKWINDOW600x600MMCOBA275MMTHICKCOUNTERTOP900MMSHOWER2000MM A' ABB SECTIONAL ELEV A-A' 2900 910 2000 BRICK WALL 150 BRICKBAT150MMRCCMMSLABTHICKCOBA275MMTHICKSHOWER2000MMCOUNTERTOP900MMMIRROR SECTIONAL ELEV B-B'

ROAD LVL CAR LIFT DECK 0.270.23 TANKWATER 2.300.15 0.15 0.36 2.51 0.23 0.10 25MM WATER150MMPROOFINGPCCBED 100 MM SOLING 230 MM SOLING 230MM RAFT SLAB AS/DETAIL 270MM RAFT SLAB AS/DETAIL 150MM FLOOR PCC RAFT SLAB AS/DETAIL 150 MM PCC 230 RCC RETAINING WALL 25 MM WATERPROOFING LAYER INVERT BEAM 2.45 0.45 CommercialAffordable-RESIDENCYYUNUSMILLATNAGARHousingIResidentialIILivingSpaceI2BHK I 751 sq.m I 2021-22 1ST FLOOR 2ND FLOORGROUND FLOOR SECTION

9M R O A D NA PLAN RETAINING WALL AT BASEMENT LEVEL 750MM EXCAVATION FROM RETAINING WALL BUILDING LINE 9M R O A D RETAINING WALL AT BASEMENT LEVEL 750MM EXCAVATION FROM RETAINING WALL UG TANK 750MMFROMEXCAVATIONUGTank BHIWANDI-KALYAN ROAD, BHIWANDI (DIST- THANE)-421302 Email: office@hk-design.in BASEMENTSECTIONPLAN SETOUT AT BASEMENT SETOUT AT GROUND FLOOR

DNA SONALE - SONALE GAON Commercial Space I Boxing I Composition I Glazing I 3206 sq.m I 2021-22

ROOMLIVING10'-6"X13'-0" KITCHEN10'-6"X8'-8"W.C. ROOMLIVING 9'-9"X8'-6" WIDE.4'-0"BALCONY ROOMBEDROOMBED9'-9"X13'-0" W.4'-0"BALCONY BATH4'-0"X7'-0" KITCHEN10'-6"X13'-0"10'-8"X8'-8" BATH BALCONY 4'-0" W. ROOMBED9'-0"X12'-0" W.2'-6"C.B. ROOMBED9'-0"X8'-8" 1 2 DW1DW1 W3 DW1 DW1 DW1 LIFT BALCONY 3'-0" WIDE. W.C. up e/d NN W2 LOBBY W2 DW1 W3W3 D D3 D2D1 HH V cornicerccthk4"x4" fixprecastjali 2'8'2'8'2'8'2'8'4'1'-9" 1'-9" 1'-9" 2' 1'-6" 2'1'-6" 1'-9" 2' 1'-9" 5'-6"6'-6" 7'8' RAILINGMOULDINGGLASS85°85°85° 85° 85°85° 7'-4"8' 1'-7"2'-3" 3'MOULDINGRAILINGGLASS 4'-3"3'-3" 7'8' MODULEJALI 8'-3"7'-3" 7'8' RAILINGMOULDINGGLASS85°85°85° 85° 85°85° 1'-6" TYPICAL FLOOR PLAN ROOMLIVING10'-6"X13'-0" KITCHEN10'-6"X8'-8"W.C. ROOMLIVING 9'-9"X8'-6" WIDE.4'-0"BALCONY ROOMBEDROOMBED9'-9"X13'-0" W.4'-0"BALCONY BATH4'-0"X7'-0" KITCHEN10'-6"X13'-0"10'-8"X8'-8" BATH BALCONY 4'-0" W. ROOMBED9'-0"X12'-0" W.2'-6"C.B. ROOMBED9'-0"X8'-8" 1 2 DW1DW1 W3 D3 DW1 DW1 DW1 LIFT BALCONY 3'-0" WIDE. W.C. up e/d NN W2 LOBBY W2 DW1 W3W3W3 TREAD=262.50MMMMRISER=167 D3 D2D1 D D3D3 D2D1 HH V 1'-9" 2'-3" 4'-4" cornicerccthk4"x4" fixprecastjali 2'8'2'8'2'8'2'8'4'1'-9" 1'-9" 1'-9" 2' 1'-6" 2'1'-6" 1'-9" 2' 1'-9" 5'-6"6'-6" 7'8' RAILINGMOULDINGGLASS85°85°85° 85° 85°85°1'-6"1'-6" 7'-4"8' 1'-7"2'-3" 3'MOULDINGRAILINGGLASS 4'-3"3'-3" 7'8' MODULEJALI 8'-3"7'-3" 7'8' RAILINGMOULDINGGLASS85°85°85° 85° 85°85° 1'-6" 1'-6" TYPICAL FLOOR PLAN SECTION BB' 150MMSUNKSUNKSLIDING WINDOW BRICK WORK SECTION SLIDING WINDOW BRICK SECTIONWORKDD'SLIDINGBRICK WORK LINTEL RCC CHAJJA SILL RCC CHAJJASECTIONDETAILSPROFILEWINDOW2'-6"6"7'-6"BB'150MMSUNK150MMSUNKSLIDING WINDOW BRICK WORK SECTION3'-6"CC' 2'150MM150MMSUNKSUNK1'7' SLIDING WINDOW BRICK SECTIONWORKDD'SLIDING WINDOW BRICK WORK LINTEL RCC CHAJJA SILL RCC CHAJJA 100MM100MM@@ WINDOW 8T@125C/CDETAILSPROFILEWINDOW2'-6"6"7'-6" SECTION BB' 150MM150MMSUNKSUNKSLIDING WINDOW BRICK WORK SECTION3'-6"CC'150MMSUNK150MMSUNK1'7' SLIDING WINDOW BRICK SECTIONWORKDD'SLIDING WINDOW BRICK WORK LINTEL RCC CHAJJA SILL RCC CHAJJA 8T@125C/CDETAILSPROFILEWINDOW2'-6"6"7'-6" -DARUL-ISLAMNAEGAONIslamicFormIArchesIIslamicArchitectureI367sq.mI2021-22

GRAND KARISHMA Mixed-DHABAVADPAuseIMultiple Spaces I Connectivity I 4435 sq.m I 2022

GROUND FLOOR 1ST FLOOR TYPICAL FLOOR CONCEPT

GROUND FLOOR 1ST FLOOR 2ND TO 4TH FLOOR CommercialFacade-HEIGHTSSHATRUNJAYANJURPHATADesignIGridFormII2537sq.mI2021-22

6'-8" 3'-6" 13'-42 5" 1'-2" 11'-72 11" 1'-512 3" 2" 12'-22 912 2" 122 4"112 312 212 7" 3" 1" 1'-512 2'-6" AA SECTION A-A' 2'-6" SWITCH SOCKET CONFERENCETABLE 91 4" 3'-43'-812126'-8" 3" 6'-8" 3'-6" 13'-42 5" 1'-2" 11'-72" 11" 1'-51 3" 2" 12'-22 12 2" 122 4"112 3 2 212 7" 3" 1" 1'-512 2'-6" A SECTION A-A' 2'-6" SWITCH SOCKET CONFERENCETABLE 91 4" 3'-43'-86'-8" 3" CONFERENCE TABLE DESIGN STUDIO - SAI BABA 2021-22

3'-4" 1'-3" 1' 2'-9" 1'-2" ARCH BOOK5'-3"SHELF 10 1'-6" 1'-3" 6" 4'-3" 4'-6" 2'-53 4" 6"5" 2'-6" 4" DRAWERDRAWERSHUTTER ARCHITECTSTABLE 1'-6" 1'-3" 6" 4'-3" 4'-6" 2'-9"9" 2'-53 4" 6"5" 2'-6" 4" DRAWERDRAWERSHUTTER ARCHITECTSTABLE 3 DRAWERsL-SHAPESHELF 5" 1'-6" 5'-4" 11 2" 2'-8" 6'-2" 2'-9" 5" 3'-1" 1'-3" 1'-3" 1'-9" 3" 8"2'-6" 2' 3" 1'8"1'8" 3'-2" 1'-6" 1'-3" 1'-3"1'-3" 1'-3" 9" 41 2" 2'-9" 6'-2" SHUTTER DRAWER SHUTTERDRAWERDRAWER 2'-8" 1'-9" 3' 4'-6" 2'-6" 2'-6" 8" 1'-8" 8" FOLDABLE4" TABLE 2'-8" 1'-9" 3' 4'-6" 2'-6" 8" 1'-8" 8" FOLDABLE4" TABLE 3'-6"1' SHUTTER SHUTTERSHUTTERSHUTTER 4' PANTRY STORAGE 9"3'-3" 2" 4" 2.5" SOFT BOARD3'-10" X 6'-9"1'-6" 1'-5" RECEPTIONTABLESOFT BOARD3'-10" X 6'-9" 1'-6" 11'-42" 1'-6"3'-21 4" 6" 2'-6" DRAWERSHUTTER PANELLINGBOARDBIASON 2" 2'-2"8" SHUTTERSHUTTERSHUTTERSHUTTER OPEN4'-5"SHELF 1' 8"2" EQ 2'-2" 2" 4'-1" EQEQEQ PANELLINGBOARDBIASON PANELLINGBOARDBIASON SHOE RACK & SOFT BOAR 4'-5" 1' PANELLINGBOARDBIASON PANELLINGBOARDBIASON SHOE RACK & SOFT BOAR 2" 2'-2"8" SHUTTERSHUTTERSHUTTERSHUTTER OPEN SHELF SOFTBOARD4'-6"X4'-6 SOFTBOARD4'-6"X4'-6 PASSAGE STORAGE 1'-8" 3'-11" 14'-82 1'-6"1'-6" DRAWERDRAWER 6'-10"1' FLAP DOWN SHUTTER SHUTTER WALL & TABLE CABINET DIRECTORPASSAGEOFFICESTORAGE PASSAGE STORAGE PANTRY FOLDABLESTORAGETABLE OFFICE 2 TABLE STAFF TABLE DETAIL BOOK SHELF SHOE RACK & SOFT BOARD 2' 13'-12 4'-23 4 12'-4" 116'-526'-54 1'-3"1'-3" KEYBOARD DRAWERS21 WORKSTATION UNIT 2 NOS. PANELLINGBOARDBIASON 14'-2 3'-1 2 26"6"5" 11628"102 12'-42'-11 2 1'1'-6" 2' 5'-3 2 2 1'-6" 1'-212 2 2' 13'-12 4'-23 12'-4" 116'-526'-54 DRAWERDRAWERDRAWER 1'-3"1'-3" 2'-6" KEYBOARD DRAWER KEYBOARD DRAWERS24 5 1' 2'-4" 4" WORKSTATION UNIT 2 NOS. PANELLINGBOARDBIASON 4'-2 3'-1 6"6"5" 11628"10 2 2'-412'-11 2 1'1'-6" 2' 5'-3 2 1'-6" 1'-212 DRAWERDRAWERDRAWER KEYBOARD DRAWER KEYBOARD DRAWERS3 2 1 4 5 1' 2'-4" 4" BIASON 14'-22 3'-11 26"6"5" 11628"102 12'-42'-112 2 1'1'-6" 2' 5'-3 2 1 1'-6" 1'-212 4' 5'-8" 1'-82'-81'-7 4' 1'-2" SOFT PANELBOARD2'-9"X5'-10" WHITE BOARD PANEL3'-2"X 5'-10" BOOK SHELF 2'-4" STORAGEDIA UNIT- DIR+ARCH PELMET1'-4" SHUTTERSHUTTERSHUTTERSHUTTER FLAP FLAP SHUTTER SHUTTER SHUTTER SHUTTER

8'-9" 3'-11" 2'-5"MAIN DOOR2"2"2" 2'-4"3'-11" 9" 2'-8" 1'-3" 1'-6" 2" 3'2"BOTTOMBEAM 2" 3'-6" 1' 182 10'-3" 8'-8" DRAWER PARTITION CUM STORAGE RECEPTIONBETWEEN&CONFERENCE 3-SHELFSTORAGE DOOR SHUTTER 10'-3" 3'-3"2'-10"2'-6" SHUTTERSHUTTERDRAWER2'-8"SHUTTERSHUTTER STUDIO PARTITIONSTORAGEWALL STUDIO STORAGE 10'-6"2'-6"5'2'-6" SHUTTERSHUTTER SHUTTERSHUTTER SHUTTERSHUTTER SHUTTERSHUTTER SHUTTERSHUTTER SHUTTERSHUTTER OPEN SHELF L E D G E 1 D E E P 4'-5"SOFTBOARDX2'-6" SOFTBOARD3'-9"X4'-6

SANJEEV KAPOOR'S RESIDENCE, JVPD ELEVATIONS - BEDROOM 4 THIS DRAWING IS FOR INTENT ONLY. NO STRUCTURAL ELEMENTS SHOULD BE IMPACTED BY THIS PROPOSAL. NOTE JUNE 05 2019 CD /SK/1/ V-1 | JVPDRESIDENCE,KAPOOR'SSANJEEVMR 4BEDROOM-FLOORFIRSTLAYOUT-INTERIOR ONLY.INTENTFORISDRAWINGTHISSHOULDELEMENTSSTRUCTURALNOPROPOSAL.THISBYIMPACTEDBE :NOTE D/SK/007-CD|201908JUNE CURTAINMOTORISEDTABLESIDEMOVABLEFIXEDSIDETABLESOFTHEADBOARDWARDROBEINVENEER/FINSIHDECOPU/LAMINATE/ONFIXEDMIRRORDRESSERWITHWARDROBEIT.BEHINDSTORAGE VENEER/INWARDROBEFINSIHDECOPU/LAMINATE/ BELOWNICHESTORAGELUGGAGEFOR TEXTURE/WALLPAPERWALL PAINTWALL ASCONTINUESSTONECOUNTERWCFORWALLLEDGETHEFORTOP TRAPFLOORBELOW EAST WALL ELEVATION -RESIDENCESANJEEVTHANEROAD2021-22

NOTES : 1) ALL LIGHT FITTINGS SHALL BE AS PER APPROVED MAKE AND SPECIFICATIONS

5) WARDROBE SHALL HAVE UPPER LEVEL AND LOWER LVL LIGHTS ALL SIDE TABLE PLUG PTS SHALL HAVE 1 NOS. OF INTERNATIONAL STANDARD PLUG POINT ALONG WITH 2 USB PORTS. VANITY COUNTERS SHALL HAVE 2 PLUG POINTS WITH 1 USB PORT. ALL CURTAINS TO BE CONSIDERED AS MOTORIZED. ALL COB'S WILL HAVE DIMMERS. ALL ELECTRONICS AND ELECTRICAL APPLIANCES SHALL HAVE SWITCH ON THE MAIN BOARD AND THE PLUG PTS ON THE SEC. BOARD FIXED CLOSE TO THEM. SANJEEV KAPOOR'S

6)

3) NO STRUCTURAL CHANGES SHOULD BE DONE DURING THE COURSE OF THIS WORK. IN CASE A POINT IS TO BE TAKEN NEAR A STRUCTURAL MEMBER THE SAME SAME SHALL BE DONE IN PANELING.

10)

7)

4) ALL AUTO LIGHTS TO WILL BE MOTION SENSOR LIGHTS WITH A MAIN SWITCH. (AT COVE, ROOM ENTRY, LOFTS & WARDROBES.)

3) NO STRUCTURAL CHANGES SHOULD BE DONE DURING THE COURSE OF THIS WORK. IN CASE A POINT IS TO BE TAKEN NEAR A STRUCTURAL MEMBER THE SAME SAME SHALL BE DONE IN PANELING.

5) WARDROBE SHALL HAVE UPPER LEVEL AND LOWER LVL LIGHTS

4) ALL AUTO LIGHTS TO WILL BE MOTION SENSOR LIGHTS WITH A MAIN SWITCH. (AT COVE, ROOM ENTRY, LOFTS & WARDROBES.)

1) ALL LIGHT FITTINGS SHALL BE AS PER APPROVED MAKE AND SPECIFICATIONS

RESIDENCE, JVPD INTERIOR ELEVATIONS - BEDROOM 4 THIS DRAWING IS FOR INTENT ONLY. NO STRUCTURAL ELEMENTS SHOULD BE IMPACTED BY THIS PROPOSAL. NOTE NORTH WALL ELEVATION SOUTH WALL ELEVATION JUNE 05 2019 | CD /SK/ 015-D SC : 1:25 MR SANJEEV KAPOOR'S RESIDENCE, JVPD INTERIOR ELEVATIONS - BEDROOM 4 THIS DRAWING IS FOR NO STRUCTURAL ELEMENTS BE IMPACTED BY THIS NOTE NORTH WALL ELEVATION SOUTH WALL ELEVATION JUNE 05 2019 CD /SK/

MR

NOTES :

2) THIS DWG IS SCHEMATIC AND NEEDS TO BE CHECKED WRT THE SITE CONDITIONS.

2) THIS DWG IS SCHEMATIC AND NEEDS TO BE CHECKED WRT THE SITE CONDITIONS.

8)

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.