Issuu on Google+

EIFS  

A  Façade  For  Performance  


October  18,  2013   Are  you  ready?  


ASHRAE  90.1  -­‐  2010   •  •  •  •  • 

Basis  for  IECC  2012   All  climate  zones  will  require  CI    +  ASHRAE  189.1  –  Air  barriers   Basis  for  IgCC  2012,  CalGreen   Future  codes  will  likely  increase  requirements  


EIFS  –  the  original  CI   Maybe  ECIFS  is  beRer?   •  •  •  •  • 

Incorporate  an  air  barrier/flashing   Rigid  insulaVon  –  EPS  or  XPS  typ.   AestheVcally  diverse   Code  approved  –  IBC  2009   Proven  on  over  1  million  buildings  in  US  since   1969  


OK  …  EIFS  looks  great,  but   what  about  the  cost  savings?  


MCA  Academy  Case  Study  -­‐  2010  


OKC  -­‐  “Bricktown,  USA”  


Designed  for  brick/masonry  –  built  with   EIFS  


Designed  for  brick/masonry  –  built  with   EIFS  


“Not  your  father’s  EIFS!”  


MCA  Savings     Installed  Costs   Installed  Costs:   –   37,000  sq.  d.  Brick  &  Cast  Stone    -­‐  original  design  

•  $    834,410.00          or            $  22.61/sq.d.  


MCA  Savings     Installed  Costs   Installed  Costs:   –   37,000  sq.  d.  Brick  &  Cast  Stone  –  design  opVon   •  $    834,410.00          or            $  22.61/sq.d.  

–   37,000  sq.  d.  4”  thick  EIFS  -­‐  value  engineered   •  $    501,000.00          or            $  13.54/sq.d.  


MCA  Savings     Installed  Costs   Installed  Costs:   –   37,000  sq.  d.  Brick  &  Cast  Stone  –  design  opVon   •  $    834,410.00          or            $  21.40/sq.d.  

–   37,000  sq.  d.  4”  OutsulaVon  Plus  MD  -­‐  value  engineered   •  $    501,000.00          or            $  13.54/sq.d.  

–  Created  a  Direct  Savings  of:   •  $    333,410.00            or          $  8.55/sq.@.  


MCA  Savings       Associated  Costs   Aggregated  Savings:    Direct:

 

Structural:        

       

 

 $    333,410.00                $        50,534.50    $    383,944.50    

 

 

   

 

 

 

   


MCA  Savings       Associated  Costs  

 

Aggregated Savings:    Direct:

 

 $    333,410.00              

Associated:                              $        50,534.50        

 

 

$    383,944.50  

Cost  of  Claddings:   Masonry:  

 $    834,410.00        =          $  22.55  /  sf  

Less  Savings:

 $    383,944.50        =          $  10.37  /  sf  

EIFS:  

 $    450,465.50        =          $  12.18  /  sf  

   

 

 

 

 

 

 

   

 

 

 

   


MCA  Savings       Single  Source     Simplified  ContracKng:   –  One  Contract  to  Administer   •  One  Contractor  –  flashing  to  finish  


MCA  Savings       Single  Source     Simplified  ContracKng:   –  One  Contract  to  Administer   •  One  Contractor  –  flashing  to  finish   •  One  MobilizaVon  


MCA  Savings       Single  Source     Simplified  ContracKng:   –  One  Contract  to  Administer   •  One  Contractor  –  flashing  to  finish   •  One  MobilizaVon   •  One  Manufacturer’s  Materials  


MCA  Savings       Single  Source     Simplified  ContracKng:   –  One  Contract  to  Administer   •  One  Contractor  –  flashing  to  finish   •  One  MobilizaVon   •  One  Manufacturer’s  Materials   •  One  (renewable)  Warranty  


MCA  Savings       Single  Source     Time  &  Labor:   –  8  weeks  cut  from  construc5on  schedule   •  Lower  equipment  costs  


MCA  Savings       Single  Source     Time  &  Labor:   –  8  weeks  cut  from  construc5on  schedule   •  Lower  equipment  costs   •  Lower  manpower  costs  


MCA  Savings       Single  Source     Time  &  Labor:   –  8  weeks  cut  from  construc5on  schedule   •  Lower  equipment  costs   •  Lower  manpower  costs   •  Lower  insurance  costs  


MCA  Savings       Single  Source     Time  &  Labor:   –  8  weeks  cut  from  construc5on  schedule   •  Lower  equipment  costs   •  Lower  manpower  costs   •  Lower  insurance  costs   •  Open  for  business  sooner!  


MCA  Savings       Time  On  Site  


Savings:     Energy  ConsumpVon   Energy  ConservaKon:   –  Oklahoma  uses  ’06  IBC  &  ’03  IECC  


Savings:     Energy  ConsumpVon   Energy  ConservaKon:   –  Oklahoma  City  uses  ’06  IBC  &  ’03  IECC  

Code  Required    R  –  8    U  –  0.125

   

 MCA  Actual                  

 R  –  22    U  –  0.045  


Energy  Savings:     Return  On  Investment     Energy  ConservaKon:   –  AnKcipated  Annual  Costs:   Per  Code:                $    78,440.00

               

       


Energy  Savings:     Return  On  Investment     Energy  ConservaKon:   –  AnKcipated  Annual  Costs:   Per  Code:              $    78,440.00

         As  Built:      $    44,388.00

       


Energy  Savings:     Return  On  Investment     Energy  ConservaKon:   –  AnKcipated  Annual  Costs:   Per  Code:              $    78,440.00

         As  Built:        $    44,388.00  

–  A  Savings  of  $  34,052.00  per  year!  


Energy  Savings:     Return  On  Investment    


MCA  –  LEED  Gold  CerVficaVon  


EIFS  -­‐  Add  up  the  savings   •  •  •  •  • 

Material   Environment   Time   Co-­‐ordinaVon  on  jobsite   Energy  for  the  lifeVme  of  the  building  


EIFS  -­‐    A  Single  Source  SoluVon   •  One  system  “flashing  to  finish”   •  One  manufacturer/warranty   •  One  professional  contractor   •  And  they  got  the  LOOK  they  wanted!  


Metro  Career  Academy  

Ques5ons?  


Facadesplus 2013 nyc mike leroy dryvit