I N T R O D U C T I O N I am a Senior Architectural Designer with experience in complex, multidisciplinary residential, commercial, and mixed-use projects across all phases. My work focuses on shaping clear design strategies early in the process and carrying them through to refined, buildable outcomes, resulting in cohesive, well-resolved solutions. This approach reflects a strong commitment to design expression, technical performance, and the high-quality presentation of project deliverables. This portfolio showcases professional work completed over the past eight years in Canada. Projects are organized into five categories: Masterplans, High-rise, Medium-rise, Low-rise, and Other Selected Works, presented briefly. Gusto 501 is a built project completed in 2020, developed during my time at PARTISANS. All other projects included in this portfolio were undertaken at Turner Fleischer, with design concepts and associated graphics produced by me. Masterplan work was developed collaboratively under my leadership. The Moorings on Cameron Lake is another completed project, delivered in 2024. Bloor Crossing is a six-block development; this portfolio highlights three blocks I worked on as part of the project team. It is currently under construction, with completion anticipated in 2026. All remaining work is progressing through studies and approvals. In addition to design concept development, I contributed to project documentation, translating ideas into coordinated drawing sets for approvals and construction; a selection of these drawings is included in this portfolio. Throughout this work, I collaborated closely with the Design Director, Project Managers, internal teams, and external stakeholders, ensuring functional performance, regulatory compliance, budget alignment, sustainability, and the delivery of comfortable and well-composed spaces.


C

O

MASTERPLANS

N H

I

G

T H

-

R

I

E

S

E

N

M I D - R I S E

T

S

L O W - R I S E

06

10

15

26

29

32

36

39

43

48

53

WOODBRIDGE SQUARE

THE GORE RD BLOCK 140

123 EDWARD ST

2079 YONGE ST

955 WESTON RD

1230 THE QUEENSWAY

84 NANCY ST

GUSTO 501

(pre-construction)

(built)

(pre-construction)

(pre-construction)

BLOOR CROSSING BLOCKS B, C, D

(pre-construction)

(pre-construction)

(pre-construction)

(pre-construction)

THE MOORINGS ON CAMERON LAKE

OTHER SELECTED WORKS

(under construction)

(built)


M

A

S

T

E

R

P

L

A

N

S


WOODBRIDG E SQUARE Vaughan, ON | 2025 | Mixed-use | Pre-construction Site: 9.88 acres | 320,314 m² residential | 6,382 m² retail Role: Job Captain

Project Team: 8

Firm: Turner Fleischer

This proposal reimagines the existing Woodbridge Square shopping centre, located at the intersection of Weston Road and Highway 7, as a mixed-use community in downtown Vaughan. The project comprises nine towers ranging from 12 to 57 storeys, and delivers 4,388 residential units and ground-level retail, including a large grocery store. Starting from an extruded site block, the mass was strategically carved to shape the buildings while accommodating light, views, and streetscape connections. This process established a central open area — a privately owned public space (POPS) of over 3,700 m² — where curved forms introduce continuity and spatial flow, with building heights stepping down toward the south to optimize solar access. The architectural concept adopts a contemporary aesthetic, expressed through articulated façades that avoid rigid compositions, and supported by a refined material palette. At the terminus view, the building is emphasized as a focal point through a bolder design gesture. Balcony forms were strategically varied according to solar orientation, supporting passive performance while enhancing façade composition. This approach was complemented by a 30–40% window-to-wall ratio that improves thermal performance by reducing seasonal heat loss and gain. Developed under a condensed schedule, the project required rapid progression and close coordination across a large internal team. As Job Captain, I led a team of three designers, shaping the design while coordinating schedule and budget. The architectural approach was refined through ongoing collaboration with the client, aligning the architectural language with the project vision through iterative discussions and refinements. I also worked closely with the Project Manager, Design Director, and external stakeholders to translate the architectural vision into View from Weston Rd Looking South (conceptual render)

coordinated drawing sets.

6 MASTERPLAN


MASSING CONCEPT

HWY 7

N

SEPARATE COURTS

A:A 45 - 45st - 45st D:D 45

- 50st E:E 50

- 57 F: F57 st

CENTRAL SQUARE

DIAGRAM - MASSING ARTICULATION

POPS

Woodbridge Square - Hwy 7 + Weston Road

3. SEPARATE COURTS

G: G -45 45 st

UARE

G ARTICULATION

G ARTICULATION

ge rid RE odb QUA o W S

- 25st C:C25 DIAGRAM - MASSING ARTICULATION

Woodbridge Square - Hwy 7 + Weston Road

2. CENTRAL SQUARE

DIFFERENT TOWER HEIGHTS

feature tower

12st I:I -12

WESTON R D

B:B 32 - 32st

H -45 45 st H:

Site Plan Articulation Diagram

FEATURE TOWER

Woodbridge Square - Hwy 7 + Weston Road

1. INITIAL BLOCK

SITE PLAN

Woodbridge Square - Hwy 7 + Weston Road

tower at terminus view

BLOCKS SEPARATIONS

TOWER AT VIEW TERMINUS

DIAGRAM - MASSING ARTICULATION

DIAGRAM - MASSING ARTICULATION

Woodbridge Square - Hwy 7 + Weston Road

6. HEIGHTS VARIATION

Woodbridge Square - Hwy 7 + Weston Road

5. BLOCKS SEPARATION

View from Internal Park Looking Northeast (conceptual render)

Woodbridge Square - Hwy 7 + Weston Road

4. FLOW

7 MASTERPLAN


SUSTAINABLE PASSIVE DESIGN: MASSING AND BALCONIES STRATEGY

SOUTH ELEVATIONS Intense sun exposure Continuous projecting balconies

LOWER SOUTHERN MASSING Central open space solar access

View from North - Towers I, C, B (conceptual render)

WEST AND EAST ELEVATIONS Mild sun exposure Individual projecting balconies

NORTH ELEVATIONS Minimal sun exposure Inset balconies

View from North - Towers I, H (conceptual render) 8 MASTERPLAN


3B 5 m CK 120 S.M. 3.1 BA ±±1,289 S.F. T SE

1B

1B

± 53 S.M. ± 567 S.F.

± 53 S.M. ± 570 S.F.

2B+D

± 78 S.M. ± 839 S.F.

16.63 m 8.05 m

24.02 m

6.45 m

6.50 m

6.50 m

6.50 m

6.50 m

2B

1B

1B

1B

1B

1B

1B

± 70 S.M. ± 759 S.F.

± 52 S.M. ± 556 S.F.

± 52 S.M. ± 556 S.F.

± 52 S.M. ± 556 S.F.

± 52 S.M. ± 556 S.F.

± 52 S.M. ± 556 S.F.

± 52 S.M. ± 556 S.F.

6.50 m

13.31 m

1B

21.00 m

± 54 S.M. ± 581 S.F.

30.00 m

OUTDOOR AMENITY AT FLOOR 9

6.50 m

1B

± 55 S.M. ± 593 S.F. m 53.81

6.50 m

1B

6.50 m

± 51 S.M. ± 548 S.F.

FUTURE ROAD 12 STOREYS

1B+D

± 57 S.M. ± 619 S.F.

6.50 m

1B

± 53 S.M. ± 570 S.F.

2B

± 71 S.M. ± 766 S.F.

6.50 m

BUILDING I

2B

1B

1B

1B

1B

± 70 S.M. ± 759 S.F.

± 52 S.M. ± 556 S.F.

± 52 S.M. ± 556 S.F.

± 52 S.M. ± 556 S.F.

± 52 S.M. ± 556 S.F.

1B

1B

1B

± 52 S.M. ± 556 S.F.

± 52 S.M. ± 556 S.F.

± 54 S.M. ± 581 S.F.

N 73°36'15"E (180.66)

21.00 m

6.50 m

9.21 m 2.50 m

32.54 m TOWER SEPARATION 27.00 m

8.00 m

6.50 m

6.50 m

6.50 m

6.50 m

6.50 m

6.50 m

53.81 m

2.50 m

6.50 m

21.00 m

± 52 S.M. ± 560 S.F.

± 57 S.M. ± 611 S.F.

± 61 S.M. ± 662 S.F.

6.50 m 6.50 m

6.50 m 6.50 m

6.28 m 6.46 m

42.50 m

± 70 S.M. ± 756 S.F.

10.50 m 8.13 m 2.50 m

1B

1B+D

1B

1B

1B+D

3B

± 58 S.M. ± 629 S.F.

± 48 S.M. ± 521 S.F.

± 48 S.M. ± 521 S.F.

± 50 S.M. ± 537 S.F.

± 96 S.M. ± 1,034 S.F.

6.50 m

6.50 m

6.50 m

19.39 m

6.50 m

1B+D

2B+D

1B

1B

1B

± 78 S.M.

± 61 S.M.

± 52 S.M. ± 560 S.F.

± 57 S.M. ± 611 S.F.

8.40 m

6.50 m

6.50 m

6.50 m

42.50 m

2B

1B

1B

± 68 S.M. ± 735 S.F.

± 55 S.M. ± 595 S.F.

± 55 S.M. ± 592 S.F.

1B

8.97 m

2B

± 69 S.M. ± 743 S.F.

6.50 m

1B

± 49 S.M. ± 526 S.F.

OUTDOOR AMENITY AT FLOOR 2

2B 8.97 m

± 68 S.M. ± 735 S.F.

1B 6.50 m

± 55 S.M. ± 595 S.F.

2B

± 61 S.M. ± 662 S.F.

6.46 m

± 70 S.M. ± 756 S.F.

8.13 m

1B

1B

1B+D

± 46 S.M. ± 490 S.F.

± 46 S.M. ± 495 S.F.

± 59 S.M. ± 634 S.F.

23.21 m

± 446 S.F.

4.36 m 7.63 m

19.39 m 6.50 m 1B

6.50 m 1B

± 61 S.M. ± 652 S.F.

± 52 S.M. ± 559 S.F.

1B 6.50 m

1B 6.50 m

6.50 m 1B+D ± 60 S.M. ± 647 S.F.

N 73°36'15"E (180.66)

PHASE 5

FUTURE ROAD TOWER I

2.50 m

4.36 m 7.63 m 3B ± 81 S.M. ± 869 S.F.

± 46 S.M. ± 490 S.F.

6.501B m ± 46 S.M. ± 495 S.F.

1B+D

7.63 m

± 59 S.M. ± 634 S.F.

42.60 m

4.36 m

1B ± 41 S.M. ± 446 S.F.

2B

1B

± 69 S.M. ± 743 S.F.

± 49 S.M. ± 526 S.F.

8.97 m 2.50 m

6.50 m

6.50 m

31.30 m

3.00 m SETBACK

OUTDOOR AMENITY AT FLOOR 9

± 55 S.M. ± 592 S.F.

BUILDING H 451BSTOREYS 1B

1B+D

3B

± 61 S.M. ± 652 S.F.

± 52 S.M. ± 559 S.F.

± 60 S.M. ± 647 S.F.

± 81 S.M. ± 869 S.F.

6.50 m

6.50 m

6.50 m

7.63 m

1 ______ RZ404

TOWER G

PHASE 1 BUILDING G PHASE 2 45 STOREYS

OUTDOOR AMENITY AT FLOOR 9

42.60 m

PODIUM SEPARATION

BUILDING I 12 STOREYS

BUILDING G 45 STOREYS

2B

WESTON ROAD ROAD

± 61 S.M. ± 655 S.F.

TOWER F

WESTON

1B+D

1B

6.50 m 6.50 m

2.50 m± 41 S.M.

30.00 m

6.81 m

6.50 m

2.50 m

2.50 m

OUTDOOR AMENITY AT FLOOR 9

1B

8.05 m 10.25 m

16.75 m

31.30 m

3B ± 96 S.M. ± 1,034 S.F.

TOWER SEPARATION 3.04 m

1 ______ RZ403

N

1B+D

2.50 m

PODIUM SEPARATION

PHASE 2

3.55 m

SCALE

1:400

4.46 m

10.25 m

16.75 m 31.30 m 6.50 m 8.05 m

TOWER SEPARATION

PODIUM SEPARATION

RZ151

2.50 m

30.00 m

6.81 m

20.00 m

1B+D

± 64 S.M. ± 689 S.F.

11.28 m

6.50 m

19.29 m

3.04 m

1B

± 54 S.M. ± 583 S.F.

28.52 m ± 50 S.M. ± 537 S.F.

23.21 m

6.77 m

2B

± 69 S.M. ± 742 S.F.

PODIUM SEPARATION

6.50 m

1B ± 48 S.M. ± 521 S.F.

1B

2.50 m

± 62 S.M. ± 672 S.F.

1 ______ RZ403

2.50 m

3B

± 78 S.M. ± 837 S.F.

PHASE 2

± 63 S.M. ± 679 S.F.

± 53 S.M. BUILDING ±C 575 S.F.

1B+D 25 STOREYS

8.00 m

8.01 m

1B+D

32.54 m TOWER SEPARATION 27.00 m

PHASE 5

1B

± 64 S.M. ± 686 S.F.

5 m CK 3.1 BA T SE

± 54 S.M. ± 576 S.F.

2.50 m

23.39 m

1B+D

9.21 m 1B

9.81 m

6.50 m

19.29 m

3.55 m

2B+D ± 80 S.M. ± 858 S.F.

1B

30.00 m

2.50 m 2.50 m 7.00 m

10.41 m

13.17 m

7.76 m

PODIUM SEPARATION

2B ± 71 S.M. ± 766 S.F.

± 65 S.M. ± 699 S.F.

10.50 m

6.50 m

± 48 S.M. ± 521 S.F.

± 845 S.F. AMENITY ± 655 S.F. OUTDOOR AT FLOOR 2

6.73 m

1B ± 53 S.M. ± 570 S.F.

± 42 S.M. ± 447 S.F.

6.22 m 8.40 m

8.97 m

6.50 m

1B+D ± 57 S.M. ± 619 S.F.

0.00 m

1B+D

2B

1B 6.28 m

6.50 m

± 78 S.M. ± 845 S.F.

2.50 m

20.00 m

1B ± 51 S.M. ± 548 S.F.

11.28 m

1B ± 55 S.M. ± 593 S.F.

19.29 m

10.21 m 19.29 m

32.54 m

1B+D ± 64 S.M. ± 689 S.F.

8.01 m

2B

1B ± 54 S.M. ± 583 S.F.

3.04 m 9.48 m

8.19 m

± 69 S.M. ± 742 S.F.

9.81 m

9.50 m

27.00 m

3B ± 78 S.M. ± 837 S.F.

2.50 m 10.41 m

OUTDOOR AMENITY AT FLOOR 9

± 62 S.M. ± 672 S.F.

2.50 m

OUTDOOR AMENITY AT FLOOR 9

6.50 m

7.76 m

42.50 m

10.68 m 21.00 m 30.00 m

1B ± 47 S.M. ± 506 S.F.

± 756 S.F.

± 51 S.M. ± 546 S.F.

11.82 m

6.50 m

13.31 m

2.50 m 2.50 m 7.00 m 6.77 m

6.50 m

6.73 m

13.17 m

6.50 m

6.50 m

6.50 m

2B

42.50 m ± 70 S.M.

1 ______ RZ401

BUILDING F 51 STOREYS

1B

OUTDOOR AMENITY ± 53 S.M. AT FLOOR 9 ± 569 S.F.

6.50 m

± 58 S.M. ± 629 S.F.

2.50 m

1B ± 48 S.M. ± 520 S.F.

2B

4.46 m

20.00 m

6.50 m

2.50 m 10.21 m

± 63 S.M. ± 679 S.F.

± 53 S.M. ± 575 S.F.

2.50 m

11.60 m

1B

32.79 m

1B+D 6.50 m1B+D6.50 m

6.21 m

1B+D ± 64 S.M. ± 686 S.F.

BUILDING C 25 STOREYS

RMM

2025-05-23 2:09:45 PM

24.02 m

6.45 m

2.50 m ± 54 S.M. ± 576 S.F.

6.50 m

1B

2B+D ± 80 S.M. ± 858 S.F.

28.71 m

2B+D ± 78 S.M. ± 839 S.F.

6.50 m

1B ± 53 S.M. ± 570 S.F.

9.48 m

0)

16.63 m 8.05 m

2.50 m

.0

1B ± 53 S.M. ± 567 S.F.

2.50 m

3B ± 120 S.M. ± 1,289 S.F.

9.50 m

R1 27

3.04 m

32.54 m

6.50 m

5,

27.00 m

8.19 m

28.71 m

6.3

6.50 m

6.50 m

2.50 m

(7

10.06 m

'00 "W

OUTDOOR AMENITY AT FLOOR 9

10.90 m

15.18 m

°5 6

2.50 m

6.50 m

6.21 m

2.50 m 47.76 m

0)

TOWER SEPARATION

.0

PODIUM SEPARATION 10.06 m 52.76 m

R1 27

15.18 m

5,

32.79 m 11.60 m

28.52 m

2B

± 69 S.M. ± 748 S.F.

6.50 m

1B+D

± 59 S.M. ± 640 S.F.

7.76 m

30.00 m 10.90 m 9.10 m N 15°48'55"W (152.96) 30.00 m 10.90 m 9.10 m N 15°48'55"W (152.96) 30.00 m 8.05 m 6.50 m 6.50 m TOWER SEPARATION TOWER SEPARATION TOWER SEPARATION 18.00 m 2.50 m 20.00 m 30.00 m 20.00 m 30.00 m 31.30 m PODIUM SEPARATION

3.33 m

1B

± 54 S.M. ± 585 S.F.

9.50 m 2.50 m

8.05 m

6.50 m

8.81 m

6.50 m

0.00 m

± 65 S.M. ± 699 S.F.

± 42 S.M.

± 447 S.F. 2B ± 76 S.M. ± 822 S.F.

11.19 m 30.00 m

6.50 m

42.10 m

2B+D

11.82 m

2B+D ± 74 S.M. ± 798 S.F.

± 87 S.M. 6.50 m ± 940 S.F.

BUILDING F 51 STOREYS

3.00 m SETBACK

2B

1B

± 47 S.M. ± 506 S.F.

7.76 m

3B

14.44 m

20.00 m

1B ± 44 S.M. ± 472 S.F.

2.50 m 2.50 m

1B ± 52 S.M. ± 559 S.F.

1B

± 70 S.M. ± 756 S.F.

± 68 S.M. ± 736 S.F.

± 51 S.M. ± 546 S.F.

10.68 m

20.19 m

1B ± 54 S.M. ± 583 S.F.

2B

8.05 m

1B

9.90 m

1B ± 59 S.M. ± 640 S.F.

± 53 S.M. ± 569 S.F.

OUTDOOR AMENITY AT FLOOR 2

2.50 m

1B ± 60 S.M. ± 647 S.F.

23.39 m

DRAWING NO.

2.19 m

8.13 m

POPS AT GROUND FLOOR

1B

± 69 S.M. ± 748 S.F.

TOWER SEPARATION 20.00 m 18.00 m

± 81 S.M. ± 872 S.F.

1B ± 48 S.M. ± 520 S.F.

2B

1 ______ PHASE 1 RZ402 PHASE 2

2.50 m 9.50 m

± 62 S.M. ± 668 S.F.

2B

3.00 m SETBACK

20.00 m

± 53 S.M. ± 571 S.F.

3.00 m SETBACK

1B+D

± 59 S.M. ± 640 S.F.

N 10°38'15"W (5.07) 11.19 m 8.81 m

± 78 S.M. ± 835 S.F.

6.50 m

PHASE 1

PHASE 3

6.50 m 6.50 m

2.50 m

1B ± 54 S.M. ± 585 S.F.

1 ______ RZ402

2.50 m

± 82 S.M. ± 883 S.F.

± 44 S.M. ± 476 S.F.

2.50 m

2025-05-23 2:09:45 PM

PROJECT DATE

2025-02-06

CHECKED BY

SOUTHEAST CORNER OF LOT 3, REGISTERED PLAN 65M-2339

6.50 m 8.13 m

10.86 m 20.29 m

2B ± 76 S.M. ± 822 S.F.

4.36 m

TOWER H

BUILDING H 45 STOREYS

N 10°38'15"W (5.07)

2B+D

5.12 m

6.3

TOWER C

PROJECT NO.

16.281P01

NGE

MH TOP=193.08 CB TOP=192.86

8.37 m 6.50 m 8.37 m 2.50 m

2B ± 76 S.M. ± 813 S.F.

N

2.50 m

5.04 m

± 68 S.M. ± 736 S.F.

OUTDOOR AMENITY AT FLOOR 2

14.44 m

2B+D

2.50 m

3B ± 87 S.M. ± 940 S.F.

OUTDOOR SPACE AT GROUND FLOOR

2.50 m

1B+D

6.50 m

42.50 m 2.19 m

6.50 m

1B ± 48 S.M. ± 512 S.F.

9.43 m

25.00 m

6.50 m

± 57 S.M. ± 609 S.F.

1B+D

5.46 m

N 78°55'20"E (30.23)

30.00 m 6.50 m

± 50 S.M. ± 538 S.F.

2.50 m

6.50 m

1 ______ RZ401

OUTDOOR SPACE AT GROUND FLOOR

2.50 m 42.50 m

1B

20.29 m

28.52 m

TOWER SEPARATION

6.50 m

1B

2.50 m

10.86 m

0.00 m 11.52 m

2.50 m

1B

8.05 m

PHASE 1

PHASE 3 3.00 m SETBACK

9.43 m

14.44 m 30.00 m

6.50 m

8.13 m 6.50 m 6.39 m

42.50 m

6.50 m 6.50 m 8.13 m 8.48 m 6.50 m 6.39 m

2.50 m 42.50 m

1B ± 52 S.M. ± 556 S.F.

6.50 m 30.00 m

2B 1B+D ± 76 S.M.± 51 S.M. ± 813 S.F. ± 553 S.F.

1B ± 50 S.M. ± 541 S.F.

± 80 S.M. ± 862 S.F.

2.50 m

2B 1B

± 72 S.M. ± 48 S.M.S.F. ± 773 ± 512 S.F.

1B 2B+D

± 62 S.M. ± 663 S.F.

8.99 m 20.00 m

± 55 S.M. ± 80 S.M. ± 592 S.F. ± 862 S.F.

8.48 m

± 76 S.M. ± 821 S.F.

± 57 S.M. ± 609 S.F.

2B+D 1B+D

± 85 S.M. ± 62 S.M.S.F. ± 920 ± 663 S.F.

6.50 m

8.25 m 6.50 m 42.50 m

6.27 m

2B+D

2B

8.25 m

6.50 m 8.25 m

6.50 m

1B ± 59 S.M. ± 632 S.F.

± 76 S.M. ± 814 S.F.

2.50 m

8.48 m 6.50 m

± 54 S.M. ± 586 S.F.

1B+D ± 62 S.M. ± 668 S.F.

25.00 m

± 50 S.M. ± 538 S.F.

2.50 m

± 51 S.M. ± 544 S.F.

2.50 m

2.50 m

2.50 m

1B

6.50 m

20.00 m

1B

30.00 m

2.50 m

2.50 m

6.27 m

± 48 S.M.

± 517 S.F. 8.99 m

11.02 m

1B

6.50 m

± 51 S.M. ± 544 S.F.

OUTDOOR AMENITY AT FLOOR 9

2.50 m 42.50 m

1B

1B

8.48 m

8.25 m 6.50 m 6.50 m

42.50 m 5.12 m

6.50 m 6.50 m 8.25 m 8.25 m 6.50 m

1B

6.50 m

2.50 m 42.50 m

6.50 m 6.50 m

± 52 S.M. ± 76 S.M.S.F. ± 561 ± 821 S.F.

1B ± 52 S.M. ± 556 S.F.

3.00 m SETBACK

5.12 m

2.40 m

PHASE 3

7.83 m

PHASE 4

6.50 m

28.67 m

6.50 m

2.40 m

7.83 m 7.83 m 6.50 m 6.50 m

30.00 m 28.67 m

7.83 m

10.29 m 20.19 m 30.00 m 9.90 m

6.50 m

20.19 m 30.00 m

OUTDOOR AMENITY AT FLOOR 2

2.50 m

7.19 m 20.19 m

6.50 m

1B+D 2B+D

2B1B

± 53 S.M. ± 76 S.M.S.F. ± 571 ± 814 S.F.

1B

± 541 S.F.

N 76°31'40"E (70.62) ± 50 S.M.

13.06 m

6.22 m

1B

52.76 m 6.50 m TOWER SEPARATION

2B+D 1B ± 82 S.M. ± 59 S.M. ± 887 S.F. ± 632 S.F.

10.29 m

3.00 m SETBACK 2.40 m 7.83 m 6.50 m

28.67 m

3.00 m SETBACK

2.40 m

7.83 m 7.83 m 6.50 m 6.50 m OUTDOOR AMENITY AT FLOOR 2

30.00 m 28.67 m TOWER SEPARATION

N 10°13'45"W

(133.46) N 10°13'45"W

CONCRETE ISLAND

SUBJECT TO EASEMENT AS IN INSTRUMENT LT255068 PIN 03227-00 27

SIDEWALK

193

CONCRETE ISLAND

PLANT

ASPHALT GRASS

BLOCK 27 (0.30 RESERV E)

BLOCK 36

DAYLIGHT TRIANGLE

15.00 m

BED

GRASS

SHAFT

N10~39'5 (P1&SET) (P1&SET)0"W 5.07

FLOOR 01

1 ______ RZ404

REV.

1

View from South - Towers C, I, H (conceptual render)

FIRE ROUTE SIGN

SPOT ELEVATION

GAS/HYDRO METER

PIN 03227-005 9

ROAD

2B

DRAWN BY

MH TOP=192.88

ND

WESTON CONCRETE ISLA

193

BY-LAW S IN 699381)

± 54 S.M. ± 586 S.F.

2B 1B+D ± 74 S.M. ± 62 S.M. ± 792 S.F. ± 668 S.F.

2.50 m

1B+D ±9.27 51 S.M. m ± 553 S.F.

3.33 m

3B

5.12 m

ROAD

WESTON

193

32.00 m

(0.30 RESERV E) PIN 03227-00 58

SHAFT

B

56

Highway 7 and Weston Road, Vaughan,RZ402 ON

(0.30 RESER VE)

GRASS ASPHALT

8.00 m

6.00 m

IRE ROUTE

(7

1 CFU ______ BY RZ402

DRAWING

PLANT TYPE B LOADING 11m x 3.5m x 4m

TYPE C LOADING 6m x 3.5m x 3m

7.83 m

CONCRETE ISLAND

PIN 03227-00 59

PLANT

GRASS ASPHALT

18.00 m

6.00 m

FIRE ROUTE

3.00 m 3.00 m

PART 2, PLAN 65R-105 76 (DEDICATED RD-316-90-10 BY BY-LAW 3 INSTRUMENT AS IN LT699381) PIN 03227-00 66

TYPE B LOADING 11m x 3.5m x 4m

TYPE C LOADING 6m x 3.5m x 3m TYPE C LOADING 6m x 3.5m x 3m

TYPE B LOADING 11m x 3.5m x 4m

ND

CONCRETE ISLA

GRASS

BED N 15°48'55"W (152.96)

DROP OFF

± 51 S.M. ± 544 S.F.

20.29 m

1B

Typical Floor Plan

FIRE HYDRANT

A

2025-05-23 DATE

ISSUED FOR REZONING AND OPA DESCRIPTION

1 ______

1 ______ RZ402

MASTERPLAN #

'00 "W

WOODBRIDGE SQUARE

9 1

°5 6

PROJECT

MH TOP=192.33 MH TOP=192.34

CB TOP=192.33

1B

11.02 m

3.33 m

42.10 m

47.76 m 2.50 m PODIUM SEPARATION

BED N 15°48'55"W (152.96)

DROP OFF

BLOCK 36 (0.30 RESERV E)

CONCRETE GRASS ASPHALT

86.30 m

.0 15 8.48

8.50

PHASE 2

PHASE 5

EXISTING SITE ENTRANCE. REFER TO SURVEY

BLOCK 36

SIDEWALK

CONCRETE GRASS ASPHALT

86.30 m

15

.00 m 3.00 m

PHASE 1

TOWER SEPARATION 6.50 m 6.50 m 7.19 m

CROSSW ALK BRICK

PLANT BED

UV

24.41 m

SHELTE R

SIDEWALK

EXIT

m 0

7.50 m 5.00 m 7.50 m TYPE D LOADING 13m x 4m x 6.1m

OUTDOOR AMENITY AT GROUND FLOOR SHAFT

m O/H DOORS

EXIT

EXIT

BRICK

PLANT BED

UV

24.41 m

SHELTER

EXIT

m .0 0

7.50 m 5.00 m 7.50 m TYPE D LOADING 13m x 4m x 6.1m

m 9.0 0

(133.46)

.60 B IL N D 0 K 3 )0 T (L U 1 - G O 0 O T 0 (L 6 1 )

A L U IN N N O N O C N IO G IN E P A O R S E G B K 2 te M . S N D IL U O T rb P u G IC B Y E R 3 D 1 9 2 R o K R R OS Y N 2 W 6 3 .1 O T c re 1 n N IC B Y E 0 (R .& 3 se t) °N F E "W 5 '4 3 1 (R .B 0 A 1 E G3 IN R 2 6 .4 3 a s)1 e l)m (p 0 5 .8 4 (m s2 2 .7 4 3 ) .5 a e (m .5 )s stn (R 0 2

IT EX O AT UT G DO R O O R U A N M D E FL N O ITY O R

0m

3.0

OSSW

m

PRIVATE ROAD

.6 )0 O B O N 0 D IL U G 0 0 0 3 )K T (L 1 T (L 6 1

N 2 IO G E N R O C Ou D A O R S E G B K te O T S U P IN M N IL U rb D IC B Y E N N A L G IN .2 P 3 1 9 2 S O Y N c re 3 n K R R W 6 3 .1 O T N IC B Y E R o 0 (R .& 1 se t) F .B E °(R 0 N 1 "W 5 '4 3 A 1 E 4 1 3 0 5 8 a e l.)m R (p G IN 2 6 .4 3 s) a (m 2 .7 4 3 (m R .5 s)2 e (s stn 0 2 .)5

O/H DOOR

W L (A 0 2 6 .5 1 2 stn 0 7 .6 1 W ID LO 1 N E I A N .) 29°1'5"E 31(R N LN P A C O F E G 4 Y B .7 6 1 0 3 R P 4 6 N LA 0 4 9 .4 6 1 5 0 .7 6 1 IN O 3 0 D A (P . 4 1 0 3 5 . B 17 E 3 T 0 8 2 16 N E W . 4 1 0 6 5 5 LO 4 6 .1 stn 7 2 1(LT 8 )2 3 4 5 S T X X ) 2 3 9 ) A F 6 A 0 N D 6 0 Q C 3 . X 6 .4 8 9 7 2 .3 (0 A R L P 0 E 6 S N T (L 9 5 )0 V R E 8 O 2 M N 0 4 T N (L 5 1 D .7 ,3 .) O T IS S . 1 9 4 5 3 - 9 6 0 IN , T 3 0 1 S .L )9 9 6 1 8 3 3 R 0 K C L .R IN 2 B N IO P 'D G E . N 2 L 3 0 lt X X R O P P T IA N IO S E C S .5 P A R N W ) 6 N , N 6 A O D D A R O h E p s e c tra n 6 .3 .1 ( 0 2 7 4 5 8 mE l& p s) B a e E C 6 R N 8 2 A P R O F A O M E 5 0 Y T 9 R 0 T C (L 6 5 1 , 0 6 S E B E 2 ) O V R E W T )3 N E N O 0 6 .9 2 5 1 1 5 0 6 7 D IC T A D B )E T (L 8 5 C N O N ESIO T S E L R ° S 1 N I 9 P '5 8 4 W E O 'D 2 G .E N A A L P 2 3 0 K C O "A R (0 8 6 M A P 3 )5 T (L 7 2 0 ,W .N 0 3 5 6 N A L E R E V )2 IN P 2 3 .0 7 IN B 3 2 W E L R 'D (0 IN P A L P B .G 2 3 0 K C O 7 2 L C 6 N . ) )1(LT O 0

15 9 2 0

IO

P IN .

14.55

14.56

IT EX

O AT UT G DO R O O R U A N M D E FL N O ITY O R

0m

3.0 OUTDOOR AMENITY AT GROUND FLOOR SHAFT

BRIC K CR

14.71 m

CROSSW ALK

SHAFT

D N U S A 0 2 R V O S IA C 3 4 1 T Y E S R IO N R A T F O

PRIVATE ROAD

DROP OFF

15.01

16.78

LA

BIKE PATH

BIKE PATH

EXIT

PHASE 1

6.0 0

6.46 m 3.00 m 5.25 m

m 6.0

0

6.00 m

PHASE 3 EXIT

PRIVATE ROAD

9.0 0

6.00 m

POULS

PHASE 3

PHASE 4

OSSW BRICK CR W 2 0 6 .5 1 2 L (A stn 0 7 .6 1 ID LO 1 W N E I A ) 29°1'5"E 1.3(R N N G Y B LA P 4 C N O F E 4 6 N LA P 3 R 0 .7 6 1 (P 0 3 7 6 4 .0 5 IN O D A 0 1 9 .4 6 1 17 0 3 .5 4 1 . B E 16 8 2 3 W 0 T N E 3 4 )2 1(LT 8 5 S T 0 6 .5 4 1 7 LO 2 stn 5 .4 6 1 ) A F ) 2 X X 3 9 6 A 0 N D 6 3 Q C 0 . D 9 .4 8 A R L P 7 .2 (0 6 X 3 6 S N 0 E M N T (L 9 5 )0 V R E - 0 8 2 T (L 5 .7 1 O , )IN 3 4 . O T S S 9 6 4 .5 3 1 9 0 S 9 ,IN 3 0 1 6 9 .L T ) 1 8 3 ,C lt X X 'D P G E R 2 3 .0 IN P K C O L IN R B P 2 3 T .IO 0 A R P L N N 6 A N N IO S E S .5 W A N O )R 6 D P C N T 2 .3 7 6 1 5 .4 8 p s A e c tra n h ,E 6 m l.& O 5 0 F T E C R s)D a 0 e 6 9 2 5 1 6 7 A O R O 8 2 6 R N A E (D E B )p 0 0 E D L 8 5 0 M E 5 T B A IC E W T S E T (L 6 5 1 - R N ) O V R 3 1 - C B Y N O )2 E 9 (0 L A P W O ,)E 2 T R IN P E L R '.3 8 °4 5 1 N R 5 6 N A L I2 P N IN B 3 2 "W 2 3 'D 2 G .9 0 S K C O 2 3 O N ESIO T 7 A L P (0 8 0 6 (A N S M .0 5 7 0 V A E ) E E 3 6 N L C W B E L R IN P K C O 'D 2 G 2 3 .0 (0 7 A L P ) . IO

15 9 2 0

)O 1(LT 0

D N U S A R 0 2 IV C O S A 1 T 3 4 IO S R Y E R A T F O N

GRASS

8.88 m

O/H DOORS

EXIT 9.0 0m

2.50 m

6.0 0m

5.70 m 3.30 m2.70 m 6.00 m

3.00 m SETBACK

8.88 m

O/H DOORS

9.0 0m

PHASE 1

2.50 m 5.00 m

15.00 m

2.50 m

6.00 m

O/H DOORS

EXIT

PRIVATE ROAD

5.70 m 6.00 m TYPE C LOADING 6m x 3.5m x 3m

TYPE D LOADING 13m x 4m x 6.1m

SHAFT

2.50 m 2.50 m

EXIT

15.00 m

5.00 m 6.00 m 6.00 m

PHASE 3 EXIT

EXIT BIKE PATH

9.0 0m

BIKE PATH

7.20 m 2.50 m 3.50 m

BIKE PATH

TYPE B LOADING 11m x 3.5m x 4m

TYPE C LOADING 6m x 3.5m x 3m

Y

33.71 m

EXIT

2.50 m

CONCRETE N 10°38'15"W (5.07)

10.00 m

PRIVATE ROAD

DROP OFF DROP OFF DROP OFF

TYPE A LOADING 17m x 3.5m x 4.4m

27.2M @ 15% SLOPE

TYPE D LOADING 13m x 4m x 6.1m

3.65M @ 7.5% SLOPE

47.76 m

(26. 26.5 61 P4) (M6)

T DRIVEWA ASPHAL

O/H DOORS

3.00 m SETBACK

DAYLIGHT TRIANGLE

DAYLIGHT TRIANGLE

EXIT

BIKE PATH OUTLINE OF PODIUM ABOVE

83.76 m

CON N 10°13 CRET'45"W E CUR (133. B 46)

N10°13'4 (P5&M 5"W )

6.00 m

PHASE 3

PHASE 4

m 15 .0 0

10.00 m

3.00 m SETBACK

(134.85 P1) 134.8 (M) 1

600 YORK CO NDOMINIU M PLAN BLOCK

29133

6.00 m

ICV

m

AN

8.05 m 8.05 m

1B

TOWER SEPARATION

TOWER E

± 55 S.M. 11.02 m ± 592 S.F.

1 ______ RZ404

3.45 m SETBACK

AN AN AN

± 74 S.M. ± 798 S.F.

6.50 m 6.50 m

± 48 S.M. ± 517 S.F.

30.00 m

± 72 S.M.

3.45 m SETBACK

PRIVATE ROAD

EXIT

± 44 S.M. ± 472 S.F.

6.50 m 6.50 m

1B

"E (33.05)

± 51 S.M. ± 544 S.F.

OUTDOOR30.00 AMENITY m AT FLOOR 9

2B

BUILDING E ± 773 S.F. 51 STOREYS

)

CANOPY ABOVE

9.0 0

± 52 S.M. ± 559 S.F.

42.10 m

1B

1B+D ± 52 S.M.

10.57 m ± 561 S.F.

2B+D

± 85 S.M. ± 920 S.F.

.43

CRW 0.2W

O/H DOORS

8.60 m 6.50 m

(12.91) N 77°43'10

HIGHWAY 7

(27

± 300.3 m² ± 3233 ft²

MH TOP=193.31

± 54 S.M. ± 583 S.F.

2B+D

5.04 m

"W

± 8 m² ± 86 ft²

± 59 S.M. ± 640 S.F.

12.44 m 8.05 m 6.50 m

1B

5.46 m

'15

MOVING

AMENITY

± 60 S.M. ± 647 S.F.

1B

2.50 m

6.50 m

°56

CRW 0.4E

1B

28.52 m 11.52 m

46

BUILDING G 45 STOREYS

1B

0.00 m

N

CB TOP=192.72

± 439.9 m² ± 4735 ft²

1B

OUTDOOR AMENITY AT FLOOR 2

14.44 m 30.00 m

TOWER SEPARATION

)

CB TOP=192.70

RETAIL

± 81 S.M. ± 872 S.F.

3.95 m SETBACK

OUTLINE OF TOWER ABOVE

± 62 S.M. ± 668 S.F.

3.95 m SETBACK

± 316.2 m² ± 3403 ft²

56

N

0.10∅

FFE: 193.55

OUTDOOR AMENITY AT FLOOR 9

13.06 m

m

GAS/HYDRO METER GAS/HYDRO METER GAS/HYDRO METER GAS/HYDRO METER

#

2025-05-23 DATE

± 43.3 m² ± 466 ft²

m

± 53 S.M. ± 571 S.F.

0 6.5

MOVING

± 75.1 m² ± 809 ft²

8.05 m

m

12 .36

AMENITY

± 78 S.M. ± 835 S.F.

m

2.50 m

± 82 S.M. ± 883 S.F.

20.00 m

1B

N 76°16'50"E

8.32 m

82 BUILDING±± 887 DS.M. S.F. 45 STOREYS

± 53 S.M. 9.43 m ± 571 S.F.

2B+D10.31 m

6.50 m

1B

± 44 S.M. ± 476 S.F.

TOWER D

1B+D

6.50 m

29.65 m 1B

N 76°31'40"E (70.62)

2B+D

2.50 m

3.33 m

2.50 m

9.27 m

m

7.50 m

SIAMESE CONNECTION

POULS PLANTER 0.5E 0.4E

2B+D ± 77 S.M. ± 825 S.F.

6.50 m

6.50 m

2B

4 .1 19

AN AN

8.60 m

3B

0 6.5

6.00 m

SPOT ELEVATION SPOT ELEVATION SPOT ELEVATION SPOT ELEVATION

m

G

PRIVATE ROAD

0.45∅ 0.20∅

± 184.3 m² ± 1984 ft²

FFE: 193.55

LOBBY

FIRE ROUTE SIGN FIRE ROUTE SIGN FIRE ROUTE SIGN FIRE ROUTE SIGN

00 6.

G M G G

LOBBY 27.2M @ 15% SLOPE

1B

"E (33.05)

EXIT

000.00

G

1B

± 43 S.M. ± 42 S.M. 42.10 m ± 459 S.F. ± 456 S.F.

m

000.00 000.00

000.00 EXISTING 000.00 FOOD STORE M (4,000SQM) M M

0.40∅

AT FLOOR 2

0 6.5

TRANSFORMER WITH CLEARANCES TRANSFORMER WITH CLEARANCES TRANSFORMER WITH CLEARANCES TRANSFORMER WITH CLEARANCES

1

TRANSFORMER WITH CLEARANCES

BUILDING F 57 STOREYS

0.30∅

2B+D ± 77 S.M. ± 826 S.F.

4 6.1

CONVEX MIRROR CONVEX MIRROR CONVEX MIRROR CONVEX MIRROR

A

CB

± 281.1 m² ± 3026 ft²

AT FLOOR 9

m

3,727.5 SQM

A A A

AMENITY

O/H DOOR

SIAMESE CONNECTION SIAMESE CONNECTION POPS SIAMESE CONNECTION SIAMESE CONNECTION

CB TOP=192.33

CONVEX MIRROR

M

2B ± 75 S.M. AMENITY ±OUTDOOR 805 S.F.

10.90 m

N

SIAMESE CONNECTION

BUS STOP

± 64 S.M. ± 691 S.F.

2B ± 61 S.M. AMENITY ±OUTDOOR 652 S.F.

11.02 m

PHASE 5

MH TOP=193.10

1 ______ RZ401

AY KW AL W

EXIT

m

OUTLINE OF UG BELOW

10.31 m

2B

± 74 S.M. ± 792 S.F.

27.00 m PODIUM SEPARATION 39.81 m TOWER SEPARATION

20.29 m

30.00 m TOWER SEPARATION

N 78°55'20"E (30.23)

8.32 m

1B+D

m

9. 00

FIRE HYDRANT FIRE HYDRANT FIRE HYDRANT FIRE HYDRANT

FH

2B ± 73 S.M. ± 786 S.F.

(12.91) N 77°43'10

30.00 m

10.57 m

PHASE 4

MH TOP=192.33 MH TOP=192.34

RETAIL ENTRANCE

EXIT

1B ± 55 S.M. ± 597 S.F.

6.50 m

29.65 m

± 53 S.M. ± 571 S.F.

4 .1 19

EXIT

(3 .5 (M9 30

1B ± 52 S.M. ± 556 S.F.

6.50 m

1B

0 6.5

EXIT FH FH FH FH

POULS

SECONDARY6) RESIDENTIAL 3P ENTRANCE 0.6 )

HW

BED 0.7E

m

EXIT EXIT EXIT

PHASE 4

BUILDING B TOWER B PHASE 5 32 STOREYS

± 887.2 m² ± 9550 ft²

3.65M @ 7.5% SLOPE

0m 15.0

EXIT EXIT EXIT

MH TOP=193.59

BUILDING B 32 STOREYS

GAS/HYDRO METER

POULS

AN

3.00 m SETBACK

OUTLINE OF TOWER ABOVE

m

RETAIL ENTRANCE RETAIL ENTRANCE RETAIL ENTRANCE RETAIL ENTRANCE

SIB(1176)

2B+D ± 77 S.M. ± 825 S.F.

m

0

CURB ON-LINE

BUILDING H 45 STOREYS

1B ± 42 S.M. ± 456 S.F.

4 6.1

0 9m. 00 9.

CURB 0.1N,32.4W

1B ± 43 S.M. ± 459 S.F.

2B

AD O

0 .0 15

0m 3.0

RESIDENTIAL ENTRANCE SECONDARY RESIDENTIAL SECONDARY ENTRANCE RESIDENTIAL SECONDARY RESIDENTIAL ENTRANCE RESIDENTIAL SECONDARY ENTRANCE ENTRANCE

OUTDOOR AMENITY AT GROUND FLOOR

LEGEND

PRIMARY IB MH TOP=192.87 RESIDENTIAL ENTRANCE

CB TOP=193.05

"E 0.31 38'00 N58~

13.09 m

0

PRIMARY PRIMARY RESIDENTIAL ENTRANCE PRIMARY RESIDENTIAL ENTRANCE PRIMARY RESIDENTIAL ENTRANCE

L AL

TYPE B LOADING 11m x 3.5m x 4m

POTL

AN

PB(JDB)

RETAIL

6.50 m 2.47 m

m m is theand contractor must and accept for3.00 all dimensions conditions on site and must This drawing, asverify an instrument of responsibility service, is provided by and property of Turner Fleischer. The This asverify an instrument of responsibility service, is provided by and is theand property Turner notifydrawing, Turner Fleischer. of any variations from the information. This of drawing isFleischer. not to must be The contractor must and accept forsupplied all dimensions conditions on site and contractor and accept forsupplied all dimensions conditions on site and scaled. Themust architect is notany responsible for accuracy survey, structural, mechanical, electrical, This drawing, asverify an instrument of responsibility service, isthe provided by of and is theand property Turner notify Turner Fleischer. of variations from the information. This of drawing isFleischer. not to must be The notify Turner Fleischer. of variations from supplied This drawing is before not to must be etc., information shown on this drawing. Refer to the consultant's drawings contractor verify and accept responsibility for allappropriate dimensions and conditions on site and scaled. Themust architect is notany responsible for thethe accuracy of information. survey, structural, mechanical, electrical, 0m .0 scaled. Thewith architect is of notConstruction responsible for the accuracy of survey, structural, mechanical, 5information. proceeding the work. conform to1all applicable codes and requirements notify Turner Fleischer. any variations from the supplied This drawing is before notelectrical, to beof etc., information shown on this drawing.must Refer to the appropriate consultant's drawings etc., information shown this drawing. Refer to the appropriate consultant's drawings before authorities jurisdiction. The contractor working from drawings not specifically marked 'For scaled. Thehaving architect is on notConstruction responsible for the accuracy of survey, structural, mechanical, electrical, proceeding with the work. must conform to all applicable codes and requirements of proceeding with the work. must to all drawings applicable codes and of Construction' must assume fullThe responsibility and bear costs for any corrections orrequirements damages etc., information shown onConstruction this drawing. Referconform to the appropriate consultant's drawings before'For authorities having jurisdiction. contractor working from not specifically marked authorities having jurisdiction. contractor working from not specifically marked 'For resulting from histhe work. proceeding with work. Construction must conform all drawings applicable codes andorrequirements of Construction' must assume fullThe responsibility and bearto costs for any corrections damages Construction' must assume fullThe responsibility bearfrom costsdrawings for any corrections or damages authorities having jurisdiction. contractor and working not specifically marked 'For resulting from his work. resulting frommust his work. Construction' assume full responsibility and bear costs for any corrections or damages resulting from his work.

ALK ALK ALK ALK

W

7.00 m

67 Lesmill Road 67 Lesmill Road Toronto, M3BRoad 2T8 67ON, Lesmill Toronto, ON, M3B 2T8 67416 Lesmill T 425 2222 Toronto, ON, M3BRoad 2T8 T 416 425 2222 Toronto, ON, 425 M3B2222 2T8 turnerfleischer.com T 416 turnerfleischer.com T 416 425 2222 turnerfleischer.com turnerfleischer.com 3 .0 The This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer.

OOR AMENITY OUND FLOOR

)

2.53 m 6.50 m

SHAFT

MOVING

TYPE C LOADING 6m x 3.5m x 3m ± 7.1 m² ± 76 ft²

DRIVEWAY

CROSSWALK BRICK 180.66

± 75 S.M.

N 73°48'05"E ± 805 S.F. (5.82)

2B+D ± 77 S.M. ± 826 S.F.

± 70 S.M. ± 755 S.F.

R

.43

TYPE D LOADING 13m x 4m x 6.1m

N SIG

(27

DROP OFF

SIAMESE CONNECTION

ASPHALT

MH TOP=193.38

193

SPOT ELEVATION

View from West - Towers A, B, C (conceptual render)

OUTDOOR SPACE 1,921 SQM

residential units amenities horizontal circulation, lobby vertical circulation, service areas, parking retail firePRIVATE route LEGEND ROAD LEGEND LEGEND LEGEND primary residential entrance secondary residential entrance retail entrance exit

TYPE C LOADING 6m x 3.5m x 3m

0.35∅

1 ______ RZ404

± 61 S.M.

10.31 m

2B 8.49 m

6.50 m

± 652 S.F. (17.40) N 73°04'40"E

ES G

K IC BR

"W CANOPY ABOVE

AMENITY

ASPH ALT

MH TOP=193.56

0.05∅

± 410.2 m² ± 4416 ft²

WV

GM

BL

0

contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For 49.46 m Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

15.00 m

1B+D ± 64 S.M. ± 691 S.F.

29.65 m 6.50 m

12.53 m

PHASE 1

± 109 m² OUTLINE OF TOWER ABOVE ± 1173 ft² This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer. The

CANOPY ABOVE

0m

FIRE ROUTE SIGN

m

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

RETAIL

AN DAYLIGHT TRIANGLE

0.30∅

UB ON CONC. PAD

'15

6.6 m² 839 ft²

CB TOP=193.53

POULS

ICV

3.00 m SETBACK

AMENITY

1B

AD O

CANOPY ABOVE

9.0

BL

MH TOP=192.66 POTLS

AN

AN AN AN

± 5.4 m² ± 58 ft²

± 214 m² ± 2303 ft²

m

9.0

LOBBY

ROW

BF

MH TOP=193.67

± 78.9 m² ± 849 ft²

ENITY

UV

9.0 0

MOVING TYPE D LOADING 13m x 4m x 6.1m

± 73 S.M. ± 786 S.F.

2B m 8.16

R

SHELTER

0.45∅

21.00 m

BF

MH BPV TOP=192.62

(180.66) BUILDING I N 73°36'15"E0.35∅ 0.05∅ SIB(OU) 12 STOREYS

27.2M @ 15% SLOPE

FFE: 193.55

A

000.00

IN W

BPV

SPEED CAMERA

TH

± 51.2 m² ± 551 ft²

OUTDOOR AMENITY AT GROUND FLOOR

9.0 0m

BUS STOP

MH TOP=193.68

± 49.4 m² ± 531 ft²

± 55 S.M. ± 597 S.F.

8.32 m

PHASE 2

6.00 m

FUTURE ROAD

0.05∅

SIDEWALK

UV N 78°55'20"EAN N73°35'40"E (30.23) 0.05∅

3.65M @ 7.5% SLOPE

SIAMESE CONNECTION

WK WK

CB TOP=192.53

TH

± 49.4 m² ± 531 ft²

± 52 S.M. ± 556 S.F.

± 53 S.M. ± 571 S.F.

9.81 m

ES G

WK

MH TOP=193.31

WALKWAY

FIRE ROUTE

RAISED BIKE LANE

WK

TH

± 50.1 m² ± 540 ft²

± 70 S.M. ± 755 S.F.

12.44 m

IN W

WK WK WK WK WK

BUILDING G 45 STOREYS

EXIT

3.00 m 3.00 m

BRICK

21.36 m BL

LOBBY ± 152.9 m² ± 1646 ft²

L AL

MH TOP=193.51

WK

BRICK

m

SHAFT

OUTDOOR AMENITY

WK

0

13 VISITOR BIKE SPACES

± 165.3 m² ± 1779 ft² OUTLINE OF TOWER ABOVE

AT GROUND FLOOR MH CANOPY ABOVE TOP=193.58

GM

SHAFT

± 988.8 m² ± 10643 ft²

14 VISITOR BIKE SPACES

AMENITY

± 67.8 m² ± 730 ft²

°56

FFE: 193.75

± 182.1 m² ± 1960 ft²

CRW 0.2W

EXIT

2B

TRANSFORMER WITH CLEARANCES

G

CB TOP=192.72

O/H DOORS

CONCRETE SIGN WALL ON BRICK

MH TOP=194.03

13m x 4m x 6.1m

TH

± 67.8 m² ± 730 ft²

46

LOBBY

± 23.2 m² ± 250 ft²

± 8 m² ± 86 ft²

1B

20.00 m

9.43 m

POPS AT GROUND FLOOR

193

TH

± 68.7 m² ± 739 ft²

33 VISITOR BIKE SPACES

MOVING

MOVING

± 300.3 m² ± 3233 ft²

1B

CONVEX MIRROR

M

CB TOP=192.70

RETAIL ± 439.9 m² ± 4735 ft²

AMENITY

2B

12.53 m

CRW 0.4E

TH

POTLS

BPV

5&"W M)

TH

± 69.1 m² ± 744 ft²

63.35 m

POLS

TOP=193.64 PB(JDB)

0.05∅

± 103.5 m² ± 1114 ft²

FFE: 193.00

6.0

BPV

CB TOP=193.82 TYPE D LOADING

GARBAGE

± 348.8 m² ± 3754 ft²

TH

± 67.8 m² ± 730 ft²

BL

CONCRETE 37.16 mPLANTER

CURB 0.1N

TH

E R T N C 8 4

TH

± 52.4 m² ± 564 ft²

± 564 ft²

CONC. RAMP

N

Ground Floor Plan

TH

± 67.8 m² ± 730 ft²

LOBBY

M E R E T S 4 0 .8 N A A L E N R IE B N T IV Y B .Y D G 3 0 S O I O W H P S D T R E V N T E F N N A T IS D E B C E C 7 . M A I R T E A A C D N N Y O ) T K R G I 8 W H 1 0 2 3 9 2 8 I 9 2 0 7 , Y 6 A V 4 R 1 - R 6 1 1 7 0 7 1 8 2 R 0 0 1 8 O T S ' O P L A E R E P E 9Y 3 2 A P R S Y T I L .2 (0 5 3 O )L V R E R 6 N A L P 7 ( - E G 9 2 0 T H 'S , S L . M 5 - O 7 2 ( L 4 IA 7 )0 T ( S P 9 8 L P N N Y A A 7 7 2 R IA P N O 2 R 0 P O: Y E 1 AR P U 5 ) 1 T V S0 IB 8 2 6 A L P 5 N O I IB S )(1 E , 3 L T R B L A K R E T 6 C I N U D E E R IN N A L P K C O T (L 5 1 . M F H G U B N I P 'D G 3 .0 R U E 0 S 1 4 2 )T 1 8 7 0 N 2 R Y 0 1 e c n ig S IN 3 P R P X ,E 2 O 1 .0 7 2 T IA R P (L 9 V T E 7 )0 3 2 E O n ig 46°5'0"W N IN P Sc (R e l a 2 0 1 2 3 , T 1 eR (m X R 0 P N M E S P G E T A Tn A 2730N pl& N ,p m .& .e 3 ( 6 IB C F CM S R T E N L A IG S N V4 Y I R T "E 0 '2 °5 8 7 .46°5'19 H s)S a )IB (R 3 .7 ) 0 Y T E 9 17 "W S 0 .R 9 (1 ) 0 7 F n trW A R P T IN A L P - 8 7 2 (0 5 3 3 .0 M N (L 0 S E )2 T ° (7 6 7 N 0 '4 1 3 "E R P X 2 )5 .6 0 2 O O T T IA R P E M Y P O N A C IB 9 B NS T S N T )C 7 OE L F t8 se L C IB S )S IB 7 0 9 (1 P 3 1 , a 3 6 (R P C sT e ,E c ltn .& 2 0 .)ase2 8 7 2 6 rb 1 .0 0 5 1 )6 T (L 3 8 7 5 1 6 9 5 8 R 5 6 E V Y R U S Y M L R I IT L O (W IB S )c IT 0 9 (1 6 7 R E IN IN P B D 'L G 2 3 .0 K C O ° P 7 N 0 1 0 '6 8 0 R 2 .8 "E 3 R 3 R 4 A °& 7 N .9 2 '5 6 1 "E 0 U (S T stn en 9 .8 2 C E J B A 0 E R L 7 G M N A L P 'D G m .& (R O5 9 A 3 -2 m .& s)(R a e s)(5 a Y P O N A 6380°'5"1 IN S B IB n E t)(R se C C B D A o e tre h p s C t)"4 se .& c a u W LB K B IC R 2 4 IB c5 c c4 fC 3 1 1 5 2 U C T S D N 6 5 6 4 3 2 L O 7 T 'N °1 6 N A A 0 R N A L ,P .1 2 3 1 8 Y P 7 2 E .W R E IT T E M H ,E H T R O E 0 H E 0 W IG R E E T S N F O ° ," 5 '4 3 1 . ° 9 7 N 8 'e 3 "E E 0 A P 6 N A L ,P 5 1 T WR N m1 stn TIO N 7 .2 1 s6 a 1 3 0 7 .)" a E ')6& °1 (N .5 2 '5 °1 7 N (R 4 .2 Ir X ).B R 4 "E 0 A a tF s B L N F n P O T S S L N ,IU G N ILD U D G O T S O R P 2 8 .8 A E ,S X E IR N T A 7 o 4 6 4 E N S N A _ U E D A M C N D W E D A IC N F - O E M D S E R M 5 V P ,H 9 B T N 3 2 T E B A G D 2 N U O F S . L S N A O T D _ E 5 N 4 .8 5 C .0 3 2 stn B B .L H T S 1 M O ID C B IC N A 8 0 U R E A .L M B A L R K H IT W E 0 D .T N A L P O 7 B 1 9 2 1 0 A U T S D -2 U G E _ I P C 2 c N O T A A 9 en 3 D R C IO ,_ IL R ._ 8 1 0 5 3 2 0 G C O M Y D R E T IS A D U N O 6 N L P R IS N D R S 3 2 R E A 9 S B O 8 5 S 0 K C O R X C S E N T F P E 0 1 .5 .8 2 E T e S c F A IE F T R A E n ig IN D L W R T G C N .& e 1 (C m & IF .B R 7 2 N O E T C A D R O Y A L P C A s)6 a T 3 ) A N T (L 3 7 0 - L 7 2 S P M O D IU R 3 O P ,A T _ C th E R D N .6 O N A L E _ 4 3 4 H Y T 0 M 5 6 _ 0 TIO 5 D N IrS X R E A .D _ o IO X F n n S N O 2 .L T E A N . A 9 7 4 ,E 2 T R R P IT R P O L N 1 B , (4 2 5 )7 6 1 B R IN U S O L G V B C ,A '3 N A ' O O T U C Y T B M 5 6 D ,- N th 9 M B M R P IC H n E 0 9 C S 2 1 E O Y trs D X R T 7 H I6 O 'P R Y E 2 A G L E T IS G 'S R K N 6 O 3 4 0 .7 2 tn A P L P D E _ N IO G A O N E V R 8 1 0 ,2 N O M B Oa H T S R O Y E E R C A . D T E L _ 2 3 0 :2 R IN R P T N ,P T P V IS H R 5 6 N A G O S P 3 B E O R 1 5 N A L 0 4 8 N M D R IU N S T .- IO , M O .M D L R E A 3 IB '7 C P l U p e d U D E T rS Y V A X E L T C S T O A U S R 7 V tn s E X 0 U :th X O Y ,S D A N V R _ 'C E V R _ K P B U E H '1 C S W Y S R V O T N B H T Y T A H E P O F .4 rb 0 I2 E R O N N W T R A D L C O A 8 1 L R V U .Y D Y E B U 0 1 8 7 S D N Y 5 .2 1 3 W E D L A N .O 0 A O L S A 8 V N R U S D N T O A Y E S T R B R L IF IU D G N .5 fC 2 1 1 M H I P g c a rb lo c a G n E X A D .E 2 C A n _ U S U Y C O IT T R E W O V S A Y E R Y )C o e O T E A & S E U K C R B L IS G IN B u H G A N R E , 0 C U T P M E O T D o fC e c IN 2 R N O O B B B .E 0 rb u I A T 6 C 1 3 2 4 ,T 4 R 3 5 2 D 5 4 estFa 0 7 m r& e s) retR etaing5 a e 0 N 4 .3 6 1 .0 1S A :J P T R R ib d IB H T E F 1 .S 5 (1 2 IS O L N )in 3 a s E 1 7 6 rd T C n E S O R O T .9 0 s2 a e u h m lo (m W B U 0 B a tF s 1 (C .5 B )6 k ric O C .S N 6 .7 C E r tn B 0 O W R Y E L 1 1 8 A B IB S K 7 2 0 ,2 .C N F 8 D E B IR U S A O T 6 1 4 0 esu 4 5 8 st0 6 r 7 u l C 3 o e (9 ) W & (C 4 3 .6 e 2 c trn a h p s n IB E A a G n E O :5 2 0 7 8 4 5 S N rb lo c N P W R A a P g A C D .p E IL R 1 L H 1 .T r W to a a p re u s IB 0 3 IS R lc D .5 0 l a °(S 0 N '1 8 S B B X "W 5 re a 7 3 u 3 C te 8 3 9 3 o .0 th s u a C fF t)ceo se l& p t)0 e == 0 )7 4 .B 7 1 IN Y A O S E U K C R B L IN G k B W 56°0"'W N 3 C = ( lt B R n E A ric .6 D 8 0 e o c a F C rb o u fC c E n B 2 8 .5 O 2 3 1 6 3 3 4 9 4 (1 me l.& p s)b a .0 5 IB S 2 N T W 0 8 .1 R O = pl.& set) trasph eapl)s125,03A o u OM D l S a W (9 76.251=,A 7.46(m th (m U P IN N N A L IB S 5 s) 1S a e ° 5 7 N '1 6 "E NG30.79& I e(C as)ncelt m R E N C IO G N O B 5 3 3 R S N S A OR Y U E itR w L A V h R O F N O IS M B K E o tiY IE 9 2 n S (3 .D R O ). D IE L N a L n P l a u g S A B D O rd o c 6 I2 tio E H T Y A N S L A N IG R e c ,n T P O c 0 C 1 M e E U S Y A S O B H U T e R L IS P

MH TOP=193.52

0m 9.0

BL

MH TOP=192.36 MH CONCRETE SIDEWALK

BUILDING C N7 3°0 25 STOREYS 8'4 (P 6

OUTLINE OF TOWER ABOVE

± 316.2 m² ± 3403 ft²

3.45 m SETBACK

0.05∅

RETAIL

± 672 m² ± 7233 ft²

TH

± 69.6 m² ± 750 ft²

TOP=192.32

0.35∅

OUTLINE OF TOWER ABOVE

RETAIL

BRICKMH

MH TOP=192.62

SIB(GP) WIT,0.07E

± 63.3 m² ± 681 ft²

27.00 BLm

0m

1 ______ RZ404

TH TH ± 52.4 m² PLANTER

± 53.7 m² ± 578 ft²

POLP BPV

SIAMESE CONNECTION

0.10∅

m

O/H DOORS

K IC ALK BR EW SID

HELD N/S ESTABLISHED BY INTERSECTION

9.0

PLATFORM

AMENITY ± 186.7 m² SHELTER ± 2010 ft²

TH

BL

1 ______ RZ401

± 43.3 m² ± 466 ft²

FFE: 193.55

13.03 m

CONC. PLANTER

ALK EW

UTLINE OF TOWER ABOVE

0.05∅ RZ403 POLS

SID

EXISTING SITE 0.05∅ ENTRANCE. REFER TO SURVEY

1 ______

TE RE NC CO

N 76°31'40"E (70.62)

PB(JDB)

CB

DAYLIGHT TRIANGLE TOP=193.35

Y WA IVE DR

CONC. PLANTER

2) 3P MH (18.5 8.58 1 TOP=192.42

BARRIER

BRICK

± 63.3 m² ± 681 ft²

SHAFT

25.89 m

8.00 m

18.00 m

0.05∅

MH TOP=193.36

MH TOP=193.35

CONCRETE

194 TH

)4 9 7

0.05∅

3.95 m SETBACK

E 0m GL 8.0 IAN TR HT IGx2 YULV DA

2 7.7

192

17 C=

AD O

TB

SIAMESE CONNECTION

4 LT2 O T. S IN TIN )2 9 U 3 O M ET S S 6 A T) 5 M E TN 3 0 (L 15 0 E N S 4 8 E 0 LA R 5 6 N LA - P E 7 2 'D TO G Y 2 3 .0 3 0 R 4 8 T2 ,P R JEC IN P A (B R 5 P 6 N B LA T1,P R U A (S P

R

0.05∅

CB TOP=191.98

TH

± 67.5 m² ± 727 ft²

± 68.8 m² ± 740 ft²

POLP

2.00 m 6.00 m

± 58.2 m² ± 627 ft²

OUTLINE OF TOWER ABOVE

EXIT

TH

BPV

TH

± 111.9 m² ± 1205 ft²

m

13 VISITOR BIKE SPACES

CB TOP=193.63 TH

MH TOP=192.33BRICK MH TOP=192.26 CB TOP=191.99 RAISED BIKE LANE 0.05∅ MH 0.05∅ TOP=192.10 0.35∅ MH TOP=192.10

75.29 m

POLS

6.0 0

1 ______ RZ401

BUS STOP

MOVING

± 75.1 m² ± 809 ft²

PRIVATE ROAD

SIAMESE CONNECTION

± 2910 ft²

SS RA G

0.05∅

BRICK

AMENITY

CANOPY ABOVE

UB ON LOBBY PAD CONC. ± 270.4 m²

BUILDING E 50 STOREYS

2.50 m

12 .36

EXIT

m

6.00 m

EXISTING FOOD STORE (4,000SQM) PRIVATE ROAD

DROP OFF

GARBAGE

5m K 3.1 BACFH T SE

7.50 m

SIAMESE CONNECTION

POULS PLANTER 0.5E 0.4E

3.40 m

FFE: 192.75

POLP

ES G

03 22 700 15

0.25∅

MH TOP=193.33 CB TOP=193.43

1.80 m

± 69.8 m² ± 752 ft²

MH TOP=193.420.05∅

33.05

0m

2.50 m

CB TOP=193.83

HIGHWAY 7

BUILDING D 45 STOREYS

TER

± 480 m² ± 5167 ft²

0.05∅

IN W PIN

AMENITY

W

192

1 ______

RZ402 0.45∅ 19 2

0)

N SIG

R1

)

OUTDOOR AMENITY AT GROUND FLOOR

5,

.43

'00A= "W196 (7 .85 6.3

K IC BR

(27

N

°5 6

"W

56

CB TOP=193.82

0.05∅

EXIT

AN AN

LOBBY

m

N AP RO

CONCRETE27.0 PLANTER

0.05∅

9.0 0

0

HA LT

EXISTING SITE ENTRANCE. REFER 0.40∅ TO SURVEY

ANGLE LK 77°43'10"E (33.05 )

EXIT

27.2M @ 15% SLOPE

m

6.0

0

m

O/H DOORS

CONC. PAD 0.45∅ BRICK 0.05∅

∅

0

POPS 3,727.5 SQM

6.65 m

2.40 m

7.5

3.65M @ 7.5% SLOPE

0.45∅ 0.20∅

± 184.3 m² ± 1984 ft²

O/H DOOR

6.0

FIRE HYDRANT

MH TOP=193.10

BUILDING F 57 STOREYS

0.30∅

LOBBY

m

0m 15.0

DRIVEWAY 7.67 m

OUTDOOR AMENITY AT GROUND FLOOR

AS P

m

0 .0 15

PRIVATE ROAD

2.20 m 3.40 m

FH

1 ______ RZ403

8.32 m

5.00 m SETBACK

BUILDING A 45 STOREYS

EXIT

EXIT

BED 0.7E

CB

± 281.1 m² ± 3026 ft²

DROP OFF

2.40 m

TOWER A

RETAIL ENTRANCE

AY KW AL W

AMENITY

0m 3.0

EXIT

CB TOP=193.05 POULS HW

OUTLINE OF UG BELOW

0.40∅

m

CURB 0.4W

0.05∅ 0.05∅

0.45∅

OUTDOOR AMENITY AT GROUND FLOOR

m.0 09 9.0

2.00 m

MH TOP=192.02

(P1& SET) FH 0.05∅

m

0 9.0

R=1 27.0 0

0m 15.0

SECONDARY RESIDENTIAL ENTRANCE

POTL

AN AN MH TOP=193.59

3.00 m SETBACK

13.09 m

20 VISITOR BIKE SPACES

0m 6.0

192

3.00 m

OUTDOOR AMENITY AT GROUND FLOOR

CROSSWALK

± 887.2 m² ± 9550 ft²

6.50 m 2.47 m

3.00

BRICK

PB(JDB)

RETAIL

10.89 m

± 148.8 m² ± 1601 ft²

192

LOT

UB ON CONC. PAD 0.25∅

3.50 m

TYPE B LOADING 11m x 3.5m x 4m

PRIMARY RESIDENTIAL ENTRANCE

MH TOP=193.38

"E 0.31 38'00 N58~

OUTLINE OF TOWER ABOVE

MOVING

TYPE C LOADING 6m x 3.5m x 3m ± 7.1 m² ± 76 ft²

SIAMESE CONNECTION

GARBAGE

SHAFT

7.00 m

SHAFT

FFE: 193.55

± 75.7 m² ± 815 ft²

EXIT

OUTDOOR SPACE 1,921 SQM

6.65

PHASE 5 4&M) .22 (P M) A=68 .40 (P4& "W C=67 49(P 4&M) '35 N89~

SIAMESE CONNECTION

2.53 m 6.50 m

0.50 m

AMENITY

m

PHASE 4

PARK ING

DROP OFF

TYPE D LOADING 13m x 4m x 6.1m

3.00 m

0.50 m

LOBBY

O/H DOORS

± 152.9 m² ± 1646 ft²

± 78.9 m² ± 849 ft²

TYPE C LOADING 6m x 3.5m x 3m

21.00 m

CANOPY ABOVE

LOBBY

± 182.1 m² ± 1960 ft²

AMENITY

1.60 m 1.80 m

0 .0 10

# 136 2 STOREY BRICK BUILDING

LOBBY

± 23.2 m² ± 250 ft²

1.80 m1.60 m

STAIR TRANSFER ABOVE 6.64

FFE: 193.75

0.05∅

UB ON CONC. PAD

'15

MOVING

OUTLINE OF TOWER ABOVE

BUILDING B 32 STOREYS

MH TOP=193.67 CANOPY ABOVE

33 VISITOR BIKE SPACES

6.00 m

OUTLINE OF UG BELOW

0.05∅

°56

6.65

ASPH POTLS ALT CB TOP=193.53 MH TOP=193.56

UV

SHELTER

MH TOP=193.68 SIB(OU)

6.00 m

3.50 m

UV

BUILDING A 45 STOREYS

1 ______ RZ401

LEGEND

BPV

BPV

SPEED CAMERA

0.05∅

SIDEWALK

46

± 2850.5 m² ± 30682 ft²

POLS

BRICK

N 78°55'20"EAN (30.23)

± 988.8 m² ± 10643 ft²

± 356.6 m² ± 3839 ft²

SHAFT

MH CONCRETE SIDEWALK TOP=193.64 PB(JDB)

RETAIL

± 672 m² ± 7233 ft²

CANOPY ABOVE

3.00 m

RAISED BIKE LANE

0.05∅

OUTLINE OF TOWER ABOVE

RETAIL

OUTLINE OF TOWER ABOVE

FOOD STORE

POLS

CONC. PLANTER

SHAFT OUTLINE OF TOWER ABOVE

6.65

2 STOREY BRICK BUILDING

N 76°31'40"E (70.62)

PB(JDB)

N

BUS STOP

2.50 m

N 76°16'50"E

.43

33.05

21.36 m

MH TOP=193.51

N

WALKWAY

0.05∅

CONC. PLANTER

"E (33.05)

MH TOP=193.58

MH TOP=193.52

CONCRETE 37.16 mPLANTER

BRICK

TOWER SEPARATION

(27

ROW

0.05∅

RAISED BIKE LANE 0.05∅ 0.05∅

5.00 m SETBACK

27.00 m PODIUM SEPARATION 39.81 m

8.49 m

N 73°48'05"E (5.82)

"W

21.00 m

0.05∅

CB TOP=193.35

BRICK

0.05∅

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

10.31 m

6.50 m

'15

N77~43'10"E

MH TOP=193.35 BRICK

75.29 m

POLS

6.50 m

°56

0.05∅

DAYLIGHT TRIANGL CONC. E N 76°16'50"E SIDEWALK (12.91) N 77°43'10

PB

SIAMESE CONNECTION

STAIR TRANSFER ABOVE CONCRETE

10.00 m

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

BPV

FFE: 193.25

1 ______ RZ401

0.05∅

MH TOP=193.36

K IC ALK BR EW SID

± 214.3 m² ± 2307 ft²

± 225 m² ± 2422 ft²

5.00 m SETBACK

MH TOP=193.33 CB TOP=193.43

BRICK CONC. PLANTER

OUTLINE OF UG BELOW

LOBBY

AMENITY

PARKING

CC (JDB)

N76~16'50"E

OUTDOOR AMENITY AT GROUND FLOOR

SHAFT

BUILDING A 45 STOREYS

27.00 m POLS

0.05∅

DAYLIGHT TRIANGLE

24.94

N73°30'20"E

MH TOP=193.27 CONC. PLANTER

TOP=193.20

BRICK

BUILDING E 50 STOREYS

MH TOP=193.42

29.65 m 8.16 m

N 73°04'40"E (17.40)

1 ______ RZ404

46

ASPHALT APRON RAISED BIKE LANE 10.00 m POLS

N 73°48'05"E (5.82)

N 73°04'40"E (17.40) PB(JDB) 26.81

OUTLINE OF UG BELOW

8 4 E R T N C

MH TOP=194.03

CB TOP=193.82

M E R E T S 0 4 8 . N A A L E N R I N B T E IV B Y D Y G .3 0 S O I T W H P S D T R E V N O F E N N A T IS D E B C C E 7 . M A I R T E A A C D N N Y O ) G I W H T K R 8 1 0 2 3 9 2 8 R 9 2 0 7 , Y 6 A V 4 E 1 - R 6 1 1 7 0 7 1 8 2 R 0 0 1 8 G H 'S O O R P S ' T L A 6 S N A L P 7 2 E R E P .R (0 5 3 A P I 9Y 9 2 0 T )L V R E 3 2 ( - T I L Y E M 5 , S L . O - T 7 2 (L 4 7 )0 IA A P N O L Y 7 N 2 R ( S P 9 8 IA S P O S IB 8 2 R 0 P )(1 6 B NN A 4 2 O E R IN L P K E P N I AR P U : 1 Y E 0 1 5 H G U I F O ) 1 T V S. K C T (L 5 1 6 A L 0 5 D IB E , 3 L T R 'N G 3 .0 L A RU E T 2 R P C I N M B U O D E )A 7 1 8 7 N T 0 2 R Y 0 1 e c n ig S IN .0 P X ,E 1 n ig R E P 2 3 O P 7 E 2 T IA V R 3 (L 9 7 0 T )2 2 0 1 IN P 0 S R T E 2 3 0 P N M E , T 1 X T N L Sc O Tn A 279 epl& S m ,p m .& (R ( 6 IB C R F P CM A .4306°5'1"W S "E '0 °5 8 7 N H 9 V4 e l a s). S a e Y I G R T E 3 2 IB (R Y ) 17 A (R 3 .7 46°5'0"W N N IG N ) 0 T E 0 .R 9 (1 ) S 7 F n tr9 A 3 P T R A L P 7 2 IN .3 (0 5 M 5 6 N (L 8 2 )0 T S E R R M P ,X 2 E O IT R O A E P I5 (0 B 9 )C 7 P C 7 E 1 6 0 2 9 5 8 s,0 0 8 7 2 6 L C IB S N T S N T )sae. S S (1 )P 7 0 T L 8 3 1 1 3 6 6 8 .)B (R 2 5 .6 0 t 2 se & ° (7 6 7 N 0 - )F '4 1 3 "E n T Ile 3 T L r a tc O C b .1 5 W B A Y P O N E V R U S Y Y M L R I IT L O (W IB )7 IT 0 9 (1 7 E L R IN P B 'D G 2 3 .0 K C O 0 1 3 R A P U T R C E J 7 'N °1 6 0 4 2 4 6 6 3 1 cceo 5 5 6 4 1 c(R 3 6 2 5 2 B B D LA K IC t) se .& R 0°38A 6IN IN S B IB IB C n E t)(R se C A C R B c WS s)(tr5 a e 5"'1 m .& s)(R a e m .& a h B p s Y P O N 3 "E 4 °& 7 N .9 2 '5 6 1 "E 0 9 3 -2 u c fC 0 2 .8 "E M 5 N A L P 'D G stn en 9 E R .G ° (S 7 N 0 T R 2 3 0 .8 2 'A 8 4 N A L ,P 1 O L A P U C T S D N O N A L R 7 2 1° 8 .1 IT T R E E M H E T Y O ,H E 0 H IG R E E 0 W N F O E T S ," 5 4 'W 3 . A P 6 N A L ,P 5 1 T E 4 R G N ILD ,U a E 3 '0 °1 (N 7 .5 2 '5 °1 7 N (R 4 .2 Ir S o O T S "E .)0 1 7 N 4 6 4 8 A 2 S L N a tF s F n X B B )6 1 L IU D G stn TIO N 7 s3 a e .P 1 2 O N T ,S m & WR N "E .)"E 0 .L 2 ° 9 7 N 8 O R P X E '6 A E T IA R N A _ S N C N U E D A M W E D O A IC N D F P M 5 B E M D F E R V ,H 9 3 2 T N T 8 E S B A G D N U O S . S N A O T D _ E O e C U T S D N A .L9 S H T 7 B 1 9 B 1 0 2 0 1 8 C M O D IU B .S R E L A 0 N A B B A L 5 3 0 K IC 5 -2 .R 3 stn D T 4 .8 2 H IT W E .5 O N A L 9 c n U G E I P N _ A T A C 2 ,_ IL R IC D R O ._ 8 1 0 G C O O D R E T IS D Y 6 N A L P S R IM D R U N N S 3 M 2 R E A B P O 8 5 3 S 0 2 0 K C O R X C S E N T F P E E T A C F T R F W D L N T R IA G E e S c E T 0 1 T .B .5 & R IF ) A N T (L 3 7 0 .8 2 7 2 Y A L P - L 7 2 n ig N O C 4 3 4 0 5 IN C A S S .& e 1 (C m s)6 a D R O T 3 P M 5 6 A P IO M O ID N R 3 O Ir T X o ,A T _ C th E R F n n E D N A L P _ .6 O 0 H Y T _ D N A .D R E _ O N I X S O E N 2 A .L T . A 9 B U IN A 7 4 O C L S B U ,E 2 T R ,G '3 V O R R P 'A O N T L IT R P O N C E Y B M 1 B M 5 6 - U , (4 2 ,D th 9 5 )7 6 1 B M R N IC H 0 1 C Y E 2 9 O D 'S R X E R Y n E T S 7 H 6 IG '2 A K N P R trT O B 1 5 Oa H . L E T IS IN R P D E O G 6 3 4 0 2 3 0 .7 2 stn A P L P E V R _ A O N M N IO G S R O Y 8 1 0 ,2 E O R D T E L N O C A _ ,P T N : T R 2 M V P IS H R E E B R 5 6 N S P 3 0 4 G O N A L S T 8 N M D IO , M R ..A D L IU N O R E A IB '7 C lP U p e d U A rS E Y V D T X E L 3 T C S T O A U S V tn s X 0 X R 8 5 .3 1 E 8 1 B B U :4 ,S O Y 'C _ D A N V R IR H T Y E V A D L C O U E H C P 0 K R S _ V O T N T S W Y .A th H E 0 7 IL O Y E V R .U P 2 S D N F N O N W A O L Y E B U T R A R D L A N O V N R U S D N 0 1 8 Y E D O A Y E .R rb S A 2 S 7 W T T R B '1 L F IU D G N .5 ceo 2 1 1 M n B 3 5 2 B 5 2 4 Y D E a G n E X 6 clorbagC ceo 1 B A D I A B & S E U K C R B L G IN E C A .H 2 U Y C _ O U S C U T W O V , 0 T R E D S A R S )C IT O E P N O O Y H IG A N R E I A T T P M E O T IN 2 R u fC fC 0 rb u .E 3 ,T 4 R 4 0 A :0 P m estFa r& s) retR etaing5 a e e d 0 TO 4 .3 6 1 T .R R .0 1S 1 (C .5 a W e s)6 (m 4 5 1 4 0 esu E B stn 8 6 3 st0 1 r7 T C n S R .9 0 2 6 7 N O k B IB H T E F 1 h m lo B N 2 0 B 6 .7 B 0 O r S IS O L N ib d IB .S ric u L 1 O C 5 )(1 B U 6 7 .S 3 R C E J 1 8 A 7 2 a E a tF s E K C N F ,2 S A O T IR U D E r W u 8 e in l C Y o (9 ) W "W 5 t)0 se l.& 7 °S 0 N '1 8 t)0 e n IB E A a G n E 2 0 7 8 3 2 8 3 9 3 IB B B 4 5 & (C 4 3 .6 N P e c trn a h p s rb lo c g a a p re u s lc r W to l a .5 X 0 S a re S N W R C A D P .a p u (3 C te 1O :5 A IR L H 1 E .T 0 S o p D 3 IL R th s u a C fF o e c 0 )7 .4 7 1 l.& p (0 s)b a me C IN Y 2 3 1 6 3 3 4 9 4 W B ric 3 B B 8 1 = ( lt EnA R A O S E U K C R B L G IN '0"W C =5N 6°= k B .6 D 2 8 .5 O e C c a F ro o fu b c E n IB S 2 .0 S N T s) 1S a e W 0 8 .1 R O = pl.& 5 (9 = 7.46(m IB S 76.251,A set) trasph eapl)s1235,0A o u OM D U P IN N N A L W th (m l5 a 5 3 3 B e(C nceltas) m NG30.79& I R E N O N C IO G "E ° 5 7 N '1 6 N S A U E OR Y I O K R S B S M R F N O itR w h L o A E V 9 2 n ti. (3 E S ID R O Y ). L n P tio a lI a u g S L N A B D E rd o c 0 C 1 O 6 I2 E H T Y A N S D e c n L B A N IG ,R M E T U S P O Y A c e S O H IS T e R L P U

CONCRETE SIGN WALL ON BRICK

BPV

BUILDING E 51 STOREYS

N

0.05∅

N73°00'10"E

SSIB (JDB)

193

ASPHALT

0.05∅

m

0.05∅

YR2277685

PLAN

EXPROPRIATION

CB TOP=193.27

BRICK

0.05∅

BRICK

0 .0

POLP

AN

PART 2,

MH TOP=193.15

CONC. SIDEWALK

SHELTER

1 ______ RZ404

9.81 m

POTLS

CONC. RAMP

)4 9 7

BRICK 0.10∅

0.10∅

0.10∅ BRICK

HIGHWAY 7

BUILDING D 45 STOREYS

TOP=193.35

PART 3, EXPROPRIATION PLAN YR2278100 CB

MH TOP=193.25

CONCRETE PLANTER

FIRE ROUTE 3.00 MHm 3.00 m

15

MG 0.10∅

PLANTER POLP BPV

PLATFORM

4 LT2 O T. S IN T IN )2 9 U 3 O

MH TOP=193.04 POLP

MH TOP=192.98 CB TOP=193.15

CONCRETE PLANTER

CONCRETE PLANTER

BARRIER

BRICK

CONCRETE

6.00 m

EXISTING SITE ENTRANCE. REFER TO SURVEY

35 BLOCK (0.30 RESERVE)

194

ET M S 5 TA S )T6 E N M 0 3 N (L0 E 15 S 4 8

19 3

CB TOP=193.66

POLP

CB TOP=193.63

ISLAND

BRICK

PLANTER

BPV CB TOP=193.83

E LA P - 0 R 5 6 N LA 'D EG 2 TO 7 R Y .3 0 ,P 2 T2 - R 3 0 4 8 B (JEC IN A P R P 5 6 N B LA T1,P R U A (S P

1 ______ RZ403

CB TOP=193.51

CONCRETE

CONCRETE

PLANTER

LA

CONCRETE CB TOP=193.82

IN P .

UB ON CONC. PAD

BRICK CB TOP=193.72

HIGHWAY 7 BUILDING D 45 STOREYS

ISSUED FOR REZONING AND OPA DESCRIPTION

CFU BY

View from East - Towers H, G, F (conceptual render)


T HE G ORE RD - BL O C K 140 Brampton, ON | 2023 | Mixed-use | Pre-construction Site: 7.54 acres|166,050 m2 res.| 2,412 m2 retail | 5,410 m2 office Role: Senior Designer

Project Team: 6

Firm: Turner Fleischer

Located at the intersection of The Gore Road and Queen Street East, this masterplan envisions a seven-tower development delivered across four phases, ranging from 23 to 43 storeys and connected by mid-rise podiums with ground-floor retail, office, and amenity spaces. Together, the development provides 2,461 residences, including a mix of market units and 123 affordable-rate rentals, supported by three levels of underground parking, a central landscaped park with promenades, gardens, and an amenity building. The distribution of tower heights across the site was strategically arranged according to solar orientation to minimize shadow impacts on the central open space. The architectural concept draws inspiration from greenhouses, referencing Brampton’s identity as the “Flower City of Canada”. This idea informs both the formal expression and spatial organization of the project, where transparency, lightness, and layered volumes evoke greenhouse structures. A key design challenge was translating this inspiration across multiple towers while ensuring each building maintained a distinct identity and avoided visual repetition. As Senior Designer, I led the overall design process, overseeing a team of three designers, coordinating task assignments, schedule, and project budget, while also contributing to the preparation of the project’s drawing sets for city applications.

View from North (conceptual render)

10 MASTERPLAN


MASTERPLAN CONCEPT ACCESSES AND CONNECTIONS

N Fogal Park

Fogal Valley

6

5 Block 139

4 3

1. Retail plaza 2. Decorative landscape 3. Park with amenity building 4. Market 5. Outdoor amenity 6. Playground Gateway Vehicular + pedestrian circulation Pedestrian circulation Connection with adjacent park system

2

The

1

re

Go n St E

Quee

SUNLIGHT AND STOREY DISTRIBUTION

N Fogal Park

Fogal Valley

Towers heights decrease Aerial View from South (conceptual render)

Block 139

E 45-st

G 36-st

Aerial View of Internal Park (conceptual render) F 33-st

A 32-st

B 28-st

The

C 28-st

D 30-st

Go re n St E

Quee

11 MASTERPLAN

View from North - Outdoor Amenity (conceptual render)


DESIGN CONCEPT GREENHOUSES

HISTORY OF BRAMPTON FLOWER CITY OF CANADA

History of Brampton - Flowertown of Canada

Green House Concept - Application 06 DESIGN INSPIRATION

The Gore Rd + Queen Street - Block 140

“...The plaque we unveil today commemorates the Dale Estate and its importance to the development of Brampton – “the Flower Town of Canada”. The story of the Dale Estate is extraordinary and yet also familiar. In 1863, Edward Dale and his young family arrived in Brampton from England, where Edward had struggled through hard economic times as a market gardener. He hoped that Canada would provide a better life and was drawn to Brampton, perhaps having heard that the surrounding Peel Plain contained some of the richest farmland in Canada...”

View from The Gore Road Looking Northeast (conceptual render)

The success of the Dale Estate had inspired other flower growing businesses and, by the 1920s, there were many other greenhouse operators in Brampton – though Dale’s was still by far the largest. Brampton was well on its way to becoming the “Flower Town of Canada”. ...the Dale Estate was one of the largest greenhouse flower businesses in the world.

FAÇADES FEATURES INSPIRED BY GREENHOUSES source: https://www.heritagetrust.on.ca/pages/

programs/education-and-outreach/presentations/ roofline bramptons-dale-estate top frame roofline

Street - Block 140

balconies shape

roofline 05

balconies railing

06 DESIGN INSPIRATION

South Elevation

The Gore Rd + Queen Street - Block 140

West Elevation

View from Internal Park - Amenity Building with Design Inspired by Greenhouses (conceptual render) 12 MASTERPLAN


Turner Fleischer Architects Turner Fleischer Inc. Architects Inc.

67 Lesmill Road 67 Lesmill Road Toronto, ON, M3B 2T8 Toronto, ON, M3B 2T8 T 416 425 2222 T 416 425 2222 turnerfleischer.com turnerfleischer.com

BUILDING BUILDING 3 3

This drawing, as an instrument This drawing, of service, as isanprovided instrument by and of service, is the property is provided of Turner by andFleischer is the property of Turner Fleischer Architects Inc. The contractor Architects must verify Inc. The andcontractor accept responsibility must verify for andallaccept dimensions responsibility and conditions for all dimensions and conditions on site and must notify Turner on site Fleischer and must Architects notify Turner Inc. ofFleischer any variations Architects from Inc. the supplied of any variations from the supplied information. This drawing information. is not to be scaled. This drawing The architect is not toisbe not scaled. responsible The architect for the accuracy is not responsible of for the accuracy of survey, structural, mechanical, survey, electrical, structural, etc., mechanical, informationelectrical, shown onetc., this information drawing. Refer shown to the on this drawing. Refer to the appropriate consultant's drawings appropriate before consultant's proceeding drawings with thebefore work. proceeding Construction with must theconform work. Construction to all must conform to all applicable codes and requirements applicableofcodes authorities and requirements having jurisdiction. of authorities The contractor having jurisdiction. working from The contractor working from drawings not specifically marked drawings 'For notConstruction' specifically marked must assume 'For Construction' full responsibility must assume and bearfull costs responsibility and bear costs for any corrections or damages for anyresulting corrections fromorhis damages work. resulting from his work.

TOWER E

TOWER E TOWER E

N0 8

°5

0'4

0" W

N1 9

°0

4'0

N

0" W

N

BUILDING BUILDING 4 4

° 02

TOWER G

' 44 PH A PH SE 4 AS E 2

8.6 m SET BAC K 6.61 m

59.7 m² 643 ft²

57.1 m² 614 ft²

57.2 m² 616 ft²

60.4 m² 650 ft²

1B+D

6.50 m

26.60 m

.65 m 40

5° N7

6.50 m 6.50 m 6.80 m

0°

54

'4

E2 PHAS 1 E PHAS

N8 '55"W

.19 m

"E

'05

36

5°

N7

.19 m

61

'40

43 m

OFFICE

61

.1 9

2096.8 m² 22570 ft²

RR TE

E AC

m .60 26

m .95 19 OUTLIN E OF FLOOR S 4-6 ABOVE

S

°5

4'4 0" E

EE T

E 0"

E 5"

N8 0

3'4 °4

5m 6.6

EA

0m 2.0

m .00 21

78 N

TR ST EE RE ET TE EA AS ST T

25

SE 2.8 TB m A CK

6'0 °3

m

6.65

ST R

15.25 m

61 .65 m

8.6 m SE TB AC K 6.50 m

m .6 5

°5

15.25 m

6.8 m

TOWER C 577.3 m² 6214 ft²

m

N45° 17'55"W

m

N45° 17

OUTLIN TOWER E OF ABOVE

INDOOR AMENITY

m

m

E 0"

This drawi Architects ng, as an Inc. The instrument on site of contra and must ctor musts inform notify Turne ation. This survey, structural, drawing is r Fleisc appropriate mechanicanot to be consu applic l, electr ltant's able i drawings drawings codes and befo requiremen for any not specifically corrections marke ts of d 'For or dama ges result C in

SE 2.8 TB m AC K

1 #

2024-04-0 5 DATE

ISSUED FOR

EN

6.8 m SE TB ACK

m

6.50 m 6.50 m 6.50 m

6.80 m 1.78 m

40 2.00

m

TOWER D

REZONIN G SUB DESCRIP MISSION TION BY

UE

26.60

m

21.00

m

m

2096.8 m² 22570 ft²

8°

6.50 m 6.50 m

54.86 m

2.00 m

m

6.50

6.80

19.95 2.00

.00 m

Q

6.50 m 6.50 m

6.50 m

6.50

E RAC TER

OFFICE

N7

54.86 m

6.50 m

6.50 m

6.50 m 6.50 m

29.49 m

6.80 m 1.78 m

1.80 m

6.50 m 6.50 m

5.50 m

6.50 m

6.50 m

5.50 m

6.50 m

54.86 m6.50 m

17.25 m 29.49 m

6.8 m SETB ACK

9.36 m

'00"E N44° 33

6.50 m 6.80 m

1.78 m

9.36 m

m

m

6.80

m² 6214 ft²

26.60

m

57.2 m² 616 ft²

2B+D

77.4 m² 833 ft²

0" W

75 N

m .60 26

m

0"W

E2 AS PH SE 1 A PH

1B+D

61.2 m² 659 ft²

1B+D

57 m² 614 ft²

0m 2.0

INDOO AMENITR Y 577.3

0m 6.5

6.00

1B+D

m

68.49 m

0m 6.5

77.4 m² 833 ft²

0 6.8 N45° 17'55"W

RZ402

RS

56.7 m² 610 ft²

61.7 m² 664 ft²

7.50 m

0m 6.8

57.2 m² 616 ft²

2B+D

6.00

2024-04-05 5:25:52 PM

7.50 m

m

2024-0 4-05 5:2 5:52 PM

1B+D

16.15

57.2 m² 616 ft²

LOCKE

1B+D

1

0'3

m

E AC

5m 6.6

m

6.50 m

1B+D

RR TE

5m 9.9

0 6.0

57 m² 614 ft²

TERRACE

.0 0

OUTLINE OF FLOORS 4-6 ABOVE

E2 AS PH SE 1 A PH

TO BELOW 6.50 m

OPEN

TOWER B

61.2 m² 659 ft²

1B+D

m

1B+D

56.5 m² 608 ft²

6.50 m

1B+D

m

6.50 m

1B+D

56.4 m² 607 ft²

'35"W

OPEN TO BELOW

56.7 m² 610 ft²

61.7 m² 664 ft²

0 6.0

m .60 26

1B+D

54.7 m² 588 ft²

E RAC TER

0m 2.0 1B+D

56.5 m² 608 ft²

m .54 19

57.2 m² 616 ft²

LOCKERS

1B+D

56.5 m² 608 ft²

.00 21

m

m19.54

8.00

68.49 m

1B+D

m

THE RE RO THE GORE ROAD GOTHE AD ROAD GORE

1B+D

6.50 m TERR ACE

5"W

0m 6.5

56.5 m² 609 ft²

11.36

13'3

6.50 m

m

56.5 m² 608 ft²

°3

OPEN TO BELOW

5m 16.1

7.39 m

6.80

m 1B+D

0m 6.5

OUTLIN E OF TOWER ABOVE

56.5 m² 608 ft²

6.50 m

6.50

0m 6.86.50 m

N33° 13

m .30 26

1B+D

OUTLINE OF TOWER ABOVE

m

608 ft²

0m 2.0

m

m

6.50 m

26.60 m 1B+D 6.556.50m²

m

m

6m 11.3

7.39 m

8.23 m

N3 3°

25.00

0m 6.8

m

6.50 m

1B+D

56.5 m² 608 ft²

37

2

0 8.0

6.50 m

1B+D

56.5 m² 608 ft²

m

E AC 0 TOm RR TE 6.6OPEN BELOW

OPEN TO BELOW

26.30

m 6.76

56.5 m² 609 ft²

OUTLINE OF FLOORS 4-6 ABOVE

m

0m 30.0

6.80

.0 8

m .00 25

1

54.7 m² 588 ft²

30'3

OUTLINE OF TOWER ABOVE

OPEN TO BELOW

m

77.4 m² 833 ft²

64.2 m² 691 ft²

.8 6

0 7.0

2B+D

1B+D

61.7 m² 664 ft²

1B+D

1B+D

64.2 m² 691 ft²

1B+D

30.00

9.50 m

1B+D

61.7 m² 664 ft²

57 m² 614 ft²

57.2 m² 616 ft²

1B+D

'40"W

INDOOR AMENITY

m

8.23 m 1B+D

60.2 m² 648 ft²

6.50 m

56.4 m² 607 ft²

1B+D

OUTLINE OF TOWER ABOVE

TERR ACE

N43° 25

577.3 m 6 m² 6.76214 ft²

1B+D

1B+D

.08 m

.86 m

N2 7 19 21

1.80 m

5m 13.8

0m 6.8 61.2 m² 659 ft²

1B+D

60.2 m² 648 ft²

11.20 m

30.00 m

0m 6.5

1B+D

TERRACE

1B+D

OUTLIN TOWER E OF ABOVE

8.24 m

0m 30.0

2B

68.2 m² 734 ft²

OPEN TO BELOW

0m 6.5

399.6 m² 4301 ft²

56.7 m² 610 ft²

TERRACE

19 21

37

2B+D

78.9 m² 850 ft²

10.56 m

0m 6.8

m .60 26

INDOOR AMENITY

7.50 m

56 m² 602 ft²

2B

68.2 m² 734 ft²

9.50 m

5.69 m

13.85

56 m² 602 ft²

ROO INDOOR F OF AMENITY

24.52 m 1B+D

24.52 m

1B+D

"W

OPEN TO BELOW

61.7 m² 664 ft²

6.50 m

1'1 5

69.4 m² 747 ft²

ROOF OF INDOOR AMENITY

6.50 m

25.00 m

N27 °

1.80 m

2B

6.50 m

0m

m² 4301 ft²

1B+D

68.49 m

8.23 m

INDOO AMENITR Y 399.6

2B+D

70.2 m² 755 ft²

RS

29.1 m² 314 ft²

0m 15.0

6.50 m

11.20 m

OUTLIN E OF FLOOR 3 ABOVE

LOCKE

57.2 m² 615 ft²

2 6.31 m

1B+D

54.9 m² 591 ft²

N2 5° 3

E TO ACOPEN BELOW

2B

7.00

1

14.00 m

'10" W

74 m² 796 ft²

LOCKERS

TO BELOW

1B+D

3'35"W

REV.

6.80 m

14.00 m

OPEN TO BELOW

1B+D

RR TE

RS

0" W

2096.8 m² 22570 ft²

10.00 m

2B

66.2 m² 712 ft²

23.5 m² 253 ft²

2B

6m 6.7

0m 5.0

m

TOWER A

REV.

6.50 m

30.00

DRAWING NO.

1 RZ402 RZ402

100.6 m² 1082 ft²

56.5 m² 608 ft²

7'3

OFFICE

1B+D

6.50 m

m

DRAWING NO.

OPEN

54.9 m² 591 ft²

8.23 m

INDOOR AMENITY

1B+D

56.5 m² 608 ft²

m .54 19

1B+D

72.2 m² 777 ft²

15.00

8.23 m

m² 1082 ft²

6.50 m

LOCKE

1B

50.7 m² 546 ft²

TERR ACE

74.3 m² 800 ft²

2B+D

m

1 : 400 1:400

INDOO AMENITR Y 100.6

6.50 m

N33° 1

OUTLINE OF TOWER ABOVE

8.34 m

7.00 m

OUTLIN TOWERE OF ABOVE

1B

50.7 m² 546 ft²

54.7 m² 588 ft²

2.00

SCALE

7.39 m

6.50 m

56.4 m² 607 ft²

6m 11.3

CHECKED BY

6.50 m

1B

57.2 m² 616 ft²

TERRACE

m .30 26

2B+D

6.0

6.50 m

NGE NMC

608 ft²

1B+D

30.00 m

6.50 m

N40 ° 18

7.00 m

RS

1B+D

56.5 m² 609 ft²

9.50 m

30.01B+D 0m

1B+D

1B

49.9 m² 537 ft²

76.5 m² 824 ft²

54.7 m² 588 ft²

1B+D TO BELOW

TERR ACE

7.89 m

57.2 m² 616 ft²

OPEN TO BELOW

78.9 m² 850 ft²

8.24 m

1B+D

55.9 m² 602 ft²

RS

32.5 m² 350 ft²

50.9 m² 548 ft²

2B+D

30.00 m

m

6.50 m

m² 1544 ft²

10.56 m

1B+D

55.9 m² 602 ft²

LOCKE

1B+D

21.50 m

TERRACE

9.50 56.5 m² m

8.34 m

5.69 m

1B+D

56 m² 603 ft²

RS

86.6 m² 932 ft²

0m

9.50 m

0m 6.5

48.2 m² 519 ft²

8.23 OPEN m

0m 6.5

OPEN TO BELOW

0m 6.8

INDOO AMENITR Y 143.5

56.5 m² 608 ft²

0m 6.6

TERRACE

13.16 m

OUTLIN TOWERE OF ABOVE

1B+D

2

143.5 m²

1B+D 1544 ft²

52.4 m² 564 ft²

OUTLINE OF TOWER ABOVE

1B

TERR ACE

5.80 m

6.0

8.23 m

INDOOR AMENITY

6.50 m

25.00 m

1B+D

0m 6.8

1B+D

53.3 m² 573 ft²

21.50 m

64.2 m² 691 ft²

61.7 m² 664 ft²

6.50 m

0m

DRAWN BY

1B

48.2 m² 519 ft²

55.2 m² OF OUTLINE 594 ft² FLOOR 3-7 ABOVE

13.16 m

1B+D

1B+D

60.2 m² 648 ft²

6.31 m 6.50 m

8.0

2023-10-19

CHECKED BY

1 : 400 1:400

1B+D

1B

53.3 m² 573 ft²

2B

69.4 m² 747 ft²

"W

6.50 m

60.4 m² 650 ft²

OUTLIN TOWERE OF ABOVE

2B

74 m² 796 ft²

0 2.0

56 m² 602 ft²

2B

55.2 m² 594 ft²

°5

40

'00

6.50 m

57.1 m² 614 ft² 57.2 m² 616 ft²

57.2 m² 615 ft²

29.1 m² 314 ft²

60.1 m² 647 ft²

1B+D

OUTLIN FLOOR E OF 3-7 ABOVE

1B+D

68.2 m² 734 ft²

1B+D

63.2 m² 680 ft²

52.7 m² 567 ft²

OUTLINE OF TOWER ABOVE

1B+D LOCKERS

TERRACE

6.50 m 103.106.80 m m

26.60 m

70.2 m² 755 ft²

1.80 m

6.50 m

2B+D

72.2 m² 777 ft²

2B+D

° 38

OUTLINE OF FLOOR 3 ABOVE

SE 2.8 TB m AC K

OUTLINE OF TOWER ABOVE

N0 4

PH PH AS E A SE 4 2

N3 4

6.61 m

2B

OPEN TO BELOW

66.2 m² 712 ft²

2B

50.7 m² 546 ft²

.70 m

OPEN TO BELOW

59.7 m² 643 ft²

1B+D

26.60 m

1B+D

1B+D

1B

50.7 m² 546 ft²

0m

29.49 m

54.9 m² 591 ft²

PROJECT DATE

NMC SCALE

1B

1B

PHASE 3 PHASE 1

1B+D

1B

50.9 m² 548 ft²

74.3 m² 800 ft²

1B+D

73.9 m² 796 ft²

6.80 m

52.4 m² 564 ft²

1B+D

PHASE 1

1B

34.8 m² 374 ft²

7.0

PROJECT NO.

16.201RZ

NGE

6.50 m

1B+D

63.2 m² 680 ft²

PHASE 3

LOCKERS

54.7 m² 588 ft²

2B

1B+D

62.9 m² 677 ft²

57.2 m² 616 ft²

OUTLINE OF TOWER ABOVE

25

73.9 m² 796 ft²

34.8 m² 374 ft²

52.7 m² 567 ft²

62.9 m² 677 ft²

1B+D

76.5 m² 824 ft²

2B

23.5 m² 253 ft²

74.5 m² 802 ft²

LOCKE

1B+D

m .93 16

1B+D

51.5 m² 554 ft²

8.23 m

PROJECT NO.

DRAWN BY

2B+D

2.50 m

59.1 m² 636 ft²

59.1 m² 636 ft²

1B+D

LOCKERS

5m 16.1

DRAWING

16.201RZ 2023-10-19

7.00 m

74.5 m² 802 ft²

3m 1.1

N43° 25'40"W

E 0"

399.6 m² 4301 ft²

OPEN TO BELOW

BUILDING BUILDING 2 SECTION2 SECTION

PROJECT DATE

2

1B+D

1B

49.9 m² 537 ft²

86.6 m² 932 ft²

0m 30.0

DRAWING

60.1 m² 647 ft²

2B+D

24.52 m

55.9 m² 602 ft²

2B+D

32.5 m² 350 ft²

6.50 m

5.50 m

57.8 m² 622 ft²

6.50 m

1B+D

21.50 m

55.4 m² 596 ft²

55.9 m² 602 ft²

1B

N8 0

57.6 m² 620 ft²

6.50 m

1B+D

1B

TERR ACE

1B+D

LOCKERS

1B+D

8.26 m

6.50 m

55.4 m² 596 ft²

1B+D

LOCKERS

0" W

ROOF OF INDOOR AMENITY

m

6.50 m

58.7 m² 632 ft²

1B+D

5"W

OPEN TO BELOW

.70 m

6'2

6.80 m 6.50 m6.50 m

58.7 m² 631 ft²

1B+D

1B

31'1

1B+D

0m 30.0

INDOOR AMENITY

100.6 m² 1082 ft²

N25 °

10.00 m

6.80 m

5.50 m

m

6.50 m

51.5 m² 554 ft²

1B+D

0m 15.0

INDOOR AMENITY

7.00 m

OUTLINE OF TOWER ABOVE

°2

ROOF 6.50OF m INDOOR AMENITY6.61 m

2.50 m 32 .8 6 m

2.00 m

Proposed Residential Proposed Development Development TERRACEResidential

7.00 m

6.50 m

1B+D

57.6 m² 620 ft²

30.00 m 14.00 m

7.89 m

6.80 m

N1 8 57.8 m² 622 ft²

6.50 m

2B+D

6.50 m

4.89 m

1B+D

56 m² 603 ft²

N55° 54'30"W

1B+D

6.50 m

5.80 m

.7 0

4.89 m 8.96 m

1B+D

1B+D

16 .9 3

7.00 m

79.3 m² 854 ft²

6.50 m

8.34 m

9.50 m

6.50 m

6.80 m

58.7 m² 632 ft²

1B+D

8.26 m 6.69 m

79.3 m² 854 ft²

12.00 m

21.50 m

PROJECT

6.50 m

2B+D

SETB ACK

PROJECT

6.50 m

"E

6.50 m

4'4 0" E

10.75 m

2B+D

23 .1 5

2B+D

15.51 m

SETBAC K

13.16 m

N40° 18'10"W

'05

6.50 m

.00 m

.86 m

'00"W

"E

58.7 m² 631 ft²

6.61 m

0"W

EE N

74.7 m² 804 ft²

6.50 m

74.7 m² 804 ft²

16.0 m

TERRACE

OUTLINE OF FLOOR 3-7 ABOVE

1.80 m

37 .08 m

SQ TU

6.50 m

6.50 m

BY

6.50 m

30.00 m

19 21

SETB ACK

6.69 m

m

3 .1 21

12.00 m

6.50 m

OPEN TO BELOW

11.20 m

103.10 m

0" W

TERRACE

8.94 m

143.5 m² 1544 ft²

8.24 m

30'3

36

10.56 m

26.60 m

4'0

78.9 m² 850 ft²

8.6 m

°0

2B+D

0"W 5.69 m

N27 °

PH A PH SE 4 AS E 2

6'2

6.50 m

N34° 38

LOCKE

INDOOR AMENITY

ISSUED 1 2024-04-05 FOR REZONING ISSUED SUBMISSION FOR REZONING SUBMISSION OUTLINE OFDESCRIPTION # DATE DESCRIPTIONTOWER BY ABOVE

2B

69.4 m² 747 ft²

"W

6.80 m

°2

1B+D

9.36 m

#

2024-04-05 DATE

Block 140 - TheBlock Gore140 Road - The andGore Queen Road Street and Queen Street Brampton, ON Brampton, ON

2024-04-05 5:25:52 PM

2B

74 m² 796 ft²

1B+D

1

57.2 m² 615 ft²

25.00 m

N1 9

21.50 m

8.96 m

1B

48.2 m² 519 ft²

8.23 m

S-N Cross-section - Towers C and D

N1 8

6.50 m

6.50 m

SETBACK

6.50 m

1B

6.31 m

30.70 m

10.75 8.94mm

55.2 m² 594 ft²

53.3 m² 573 ft²

6.80 m

N55°

5.50 m 6.50 m 6.50 m 6.50 m 54.86 m

6.50 m

6.50 m 6.50 m

1B+D

63.2 m² 680 ft²

6.50 m

54'30"W

15.51 m

6.50 m

174.25

1B+D

2B+D

6.50 m

9.36 m

174.25

52.4 m² 564 ft²

72.2 m² 777 ft²

1B+D

26.60 m

6.80 m

177.25 UG 3

1B+D

62.9 m² 677 ft²

2B

50.7 m² 546 ft²

7' 30

'0 04

177.25 UG 3

1B+D

1B

50.7 m² 546 ft²

TERRACE

ROOF OF EXIT STAI R

6.50 m

184.75

UG 1

52.7 m² 567 ft²

6.50 m

184.75

180.25 UG 2

1B+D

59.1 m² 636 ft²

1B

50.9 m² 548 ft²

1.80 m

5.50 m

m

16 .9 3

6.50 m

6.50 m 6.50 m 6.50 m 6.50 m

PHASE 1

UG 1

1B+D

1B

34.8 m² 374 ft²

25

8.26 m

8.96 m 8.94 m 54.86 m

PHASE 3

180.25 UG 2

6.80 m

10.75 m 4.89 m

60.1 m² 647 ft²

2.00 m

6.50 m

6.50 m

191.25 Floor 1

6.50 m

6.50 m

UG 3 PARKING - PHASE UG23 PARKING - PHASE 2

1B+D

1B

6.50 m

RAMP

Floor 2 Bldg 2

23.5 m² 253 ft²

LOCKERS

0" W

OPEN TO BELOW

30.70 m

6.50 m

RAMP

57.6 m² 620 ft²

6.80 m

UG 3 PARKING - PHASE UG23 PARKING - PHASE 2

UG 1 PARKING - PHASE UG21 PARKING - PHASE 2

1B+D

16.0 m

191.25

4'0

74.3 m² 800 ft²

1B+D

17.25 m

RAMP UG 2 PARKING - PHASE UG22 PARKING - PHASE 2

55.4 m² 596 ft²

1B

15.25 m

RAMP

RAMP

TOWER E

Floor 1

°0

54.7 m² 588 ft²

2B

ROOF OF EXIT STAIR

54.86 m

RAMP

UG 2 PARKING - PHASE UG22 PARKING - PHASE 2

4.50 m

UG 1 PARKING - PHASE UG21 PARKING - PHASE 2

3.00 m

RETAIL SERVICE

5.10 m

184.8

51.5 m² 554 ft²

73.9 m² 796 ft²

6.80 m

79.3 m² 854 ft²

6.80 m

LOCKERS

RETAIL

184.8

m

70.2 m² 755 ft²

29.1 m² 314 ft²

6.50 m

N44° 33'00"E

197.25

°5

1° N1

LOCKERS

LOCKERS

RETAIL RAMP

3.00 m 3.00 m

LOCKERS

STAIR RAMP

3.00 m

TRANSFORMER ROOM TRANSFORMER ROOM

FFE: 184.95

GARBAGE STAIR

RETAIL SERVICE

FFE: 184.95

GARBAGE

5.10 m

STAIR

ELEVATOR

GARBAGE

2.50 m 32 .8 6 m

2B+D

LOCKERS

6.50 m

Floor 3 Bldg 2

197.25

N0 4

26.60 m

PROPERTY LINE

7.50 m

Floor 3 Bldg 2

Floor 2 Bldg 2

GARBAGE

7.00 m

23 .1 5

m

9.36 m

OFFICE

6.00 m

6.00 m OFFICE

6.00 m

OFFICE

1.40 m

1.40 m

LOBBY

ELEVATOR OFFICE

225.24 225.24 Floor 10 Bldg 2 Floor 10 Bldg 2

203.25

N1 9

OUTLINE OF FLOOR 3 ABOVE

LOCKERS

74.5 m² 802 ft²

228.19 228.19 Floor 11 Bldg 2 Floor 11 Bldg 2

203.25

OPEN TO BELOW

66.2 m² 712 ft²

OUTLINE OF TOWER ABOVE

32.5 m² 350 ft²

86.6 m² 932 ft²

1B+D

2B+D

6.50 m

STAIR

ELEVATOR

STAIR

4.70 m

1.30 m

1.30 m STAIR

ELEVATOR RETAIL SERVICE

1.30 m

5.20 m

4.70 m

RETAIL SERVICE

4.00 m

1.20 m 4.00mm 3.00

1.20 m 3.00 m

LOBBY

ELEVATOR

231.14 231.14 Floor 12 Bldg 2 Floor 12 Bldg 2

206.2 Floor 4 Bldg 2

2B

57.2 m² 616 ft²

W 0"

UG 3 PARKING - PHASE UG23 PARKING - PHASE 2

OFFICE

234.09 234.09 Floor 13 Bldg 2 Floor 13 Bldg 2

209.15 Floor 5 Bldg 2

1B+D

76.5 m² 824 ft²

5m 13.8

UG 2 PARKING - PHASE UG22 PARKING - PHASE 2

OFFICE

SETBACK

237.04 237.04 Floor 14 Bldg 2 Floor 14 Bldg 2

212.55 Floor 6 Bldg 2

2B+D

49.9 m² 537 ft²

RZ402

7'3

UG 1 PARKING - PHASE UG21 PARKING - PHASE 2

AMENITY

3 .1 21

21.50 m 12.00 m

239.99 239.99 Floor 15 Bldg 2 Floor 15 Bldg 2

206.2 Floor 4 Bldg 2

1B

55.9 m² 602 ft²

LOCKERS

0" W

2B+D

16.0 m

242.94 242.94 Floor 16 Bldg 2 Floor 16 Bldg 2

LOCKERS

57.8 m² 622 ft²

6.50 m

TERRACE

245.89 245.89 Floor 17 Bldg 2 Floor 17 Bldg 2

0'4

15.51 m

248.84 248.84 Floor 18 Bldg 2 Floor 18 Bldg 2

209.15 Floor 5 Bldg 2

1

°5

RETAIL

AMENITY

251.79 251.79 Floor 19 Bldg 2 Floor 19 Bldg 2

212.55 Floor 6 Bldg 2

N43° 25'40"W

4 N0

RETAIL 184.9

AMENITY

255.19 255.19 Floor 20 Bldg 2 Floor 20 Bldg 2

215.94 Floor 7 Bldg 2

1B+D

55.9 m² 602 ft²

0m

UG 3 PARKING - PHASE UG13 PARKING - PHASE 1

AMENITY TERRACE

258.14 258.14 Floor 21 Bldg 2 Floor 21 Bldg 2

218.89 Floor 8 Bldg 2

1B+D

2.0

UG 2 PARKING - PHASE UG12 PARKING - PHASE 1

CORRIDOR RESIDENTIAL CORRIDOR RESIDENTIAL

261.09 261.09 Floor 22 Bldg 2 Floor 22 Bldg 2

°5

m .86 32

UG 1 PARKING - PHASE UG11 PARKING - PHASE 1

184.9

LOCKERS

264.04 264.04 Floor 23 Bldg 2 Floor 23 Bldg 2

215.94 Floor 7 Bldg 2

5"W

1B+D

m .15 23

TERRACE

5.20 m

1.30 m

LOCKERS

TERRACE

N0 8

6.50 m

6.50 m

SHAFT

TERRACE

266.99 266.99 Floor 24 Bldg 2 Floor 24 Bldg 2

218.89 Floor 8 Bldg 2

31'1

60.4 m² 650 ft²

1B+D

56 m² 603 ft²

9.36 m

SHAFT

BUILDING HEIGHT - TOWER D

STAIR

ELEVATOR

STAIR

ELEVATOR

96.79 m CORRIDOR

CORRIDOR RESIDENTIAL

N25 °

10.00 m

E 0"

CORRIDOR

CORRIDOR RESIDENTIAL STAIR

7.00 m

'0 04

ELEVATOR

RESIDENTIAL STAIR

7.00 m

° 11

PIPE SPACE

RESIDENTIAL

7.89 m

N

PIPE SPACE

5.80 m

OUTLINE OF TOWER ABOVE

269.94 269.94 Floor 25 Bldg 2 Floor 25 Bldg 2

221.84 Floor 9 Bldg 2

57.2 m² 616 ft²

1B+D

1B+D

Floor 26 Bldg 2 Floor 26 Bldg 2

221.84 Floor 9 Bldg 2

57.1 m² 614 ft²

1B+D

W 0"

OUTDOOR AMENITY OUTDOOR AMENITY

59.7 m² 643 ft²

1B+D

'1 44

CORRIDOR RESIDENTIAL

6.50 m

2° N0

CORRIDOR RESIDENTIAL

58.7 m² 632 ft²

1B+D

W 0"

RESIDENTIAL

N40° 18'10" W

6.50 m

0'4

CORRIDOR

RESIDENTIAL

58.7 m² 631 ft²

4 E 3 AS PH SE A PH

CORRIDOR

6.50 m

°5

88.04 m

SHAFT

BUILDING HEIGHT - TOWER C

SHAFT

6.61 m

8 N0

88.04 m

CORRIDOR

RESIDENTIAL

74.7 m² 804 ft²

2B+D

4 SE 3 A E PH AS PH

BUILDING HEIGHT - TOWER C

CORRIDOR

RESIDENTIAL STAIR

6.50 m

"E 00

RESIDENTIAL STAIR

6.50 m

' 04

RESIDENTIAL

CORRIDOR

CORRIDOR

274.04

6.61 m

° 11 N

RESIDENTIAL

PIPE SPACE

MPH Tower D

274.04

6.50 m

W 0"

RESIDENTIAL

PIPE SPACE

MPH Tower D

6.50 m

'1 44

RESIDENTIAL

CORRIDOR

281.54

6.69 m

° 02

RESIDENTIAL

CORRIDOR

281.54

TOWER F

'00"W

103.10 m

N

CORRIDOR

CORRIDOR

Roof Tower D

N34° 38

TOWER G 30.70 m

17.25 m

261.09

Roof Tower D

N44° 33'00"E

MPH

6.00 m

MPH

BUILDING HEIGHT - TOWER D

4.10 m

MPH

96.79 m

MPH

2.95 m 2.95 m 3.40 m 3.39 m 2.95 m 2.95 m 3.40 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 3.40 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m

MPH

7.50 m

MPH

4.50 m

265.19

Floor 23 Tower C Floor 23 Tower C 261.09

MPH

STAIR MPH

MPH

3.00 m 3.00 m

265.19

MPH

MPH

4.10 m

MPH Tower C 4.10 m

MPH Tower C

MPH

7.50 m

Roof Tower C 272.69

4.10 m

STAIR

TOWER C TOWER C

Roof Tower C

MPH

2.95 m 2.95 m 3.40 m 3.39 m 2.95 m 2.95 m 3.40 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 3.40 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m

MPH

7.50 m

BUILDING BUILDING 2 2 TOWER C

TOWER B TOWER B

272.69

PROPERTY LINE

PHASE 2

PHASE 1

PHASE 2

PHASE 1

PROPERTY LINE

PROPERTY LINE

TOWER D TOWER D

4 SE 3 A E PH AS PH

BUILDING BUILDING 1 1B TOWER

BUILDING BUILDING 2 2D TOWER

0"W

"E

ROOF OF EXIT STAIR

TOWER F TOWER F

6'2

EE N

TOWER BUILDING BUILDING 4 4 F

°2

'40

N1 8

QU

'30"W

43

N55° 54

TOWER A TOWER A

8°

BUILDING BUILDING 1 1 TOWER A

N7

"W 10

TOWER G TOWER G

PROJEC T

Propos ed Re sidentia l Deve lopme nt Block 140

DRAWIN G

Floor 2

- The Go re Roa d and Bramp ton, ON Queen Stre et

FLOO R 02 PROJEC T NO.

residential units amenities horizontal circulation, lobby RZ152 vertical circulation, service areas, parking retail office 16.201 RZ

PROJEC T DAT E

2023-1 0-19 DRA WN BY

NGE

CHECKE D BY

NMC

SCALE

1 : 400

N

DRAWIN G NO.

View from Northwest - Office Entrance (conceptual render) 13 MASTERPLAN

REV.

1


H

I

G

H

-

R

I

S

E


BL OOR CROSSING - B L O C K S B , C , D BLOCK C

Toronto, ON | 2021 | Mixed-use | Under Construction Block B: Site: 1.71 acres | 58,175 m² residential | 1,520 m² retail

BLOCK B

Block C: Site: 0.76 acres | 30,144 m² residential | 3,172 m² retail Block D: Site: 1.99 acres | 20,267 m² residential | 1,739 m² retail 2,488 m² office | 2,548 m² institutional BLOCK D

Role: Senior Designer

Project Team: 12

Firm: Turner Fleischer

This proposal introduces a well-integrated urban intervention at the Dufferin Mall

intersection of Bloor Street West and Dufferin Street in Toronto’s West End, adjacent to Dufferin Mall. The development is composed of six building blocks (A–F) and a publicly accessible park located to the south, optimizing sun exposure. It provides an extensive rental housing program, with ground-floor retail activating the streetscape. I led the development of the façade designs for blocks B, C, and D, presented on the following pages, in close collaboration with

Park

the Design Director and the clients. Block B was undertaken for Hazelview, while Blocks C and D were developed for Fitzrovia.

oo

Bl

I also contributed to the project documentation, supporting the

tW

rS

translation of the design concept into technical drawings. The project progressed from concept through to construction within a compressed timeframe, requiring an elevated level of coordination and agility across multiple teams.

View from Northwest (project under construction - 2025)

15 HIGH-RISE


EXISTING 15 STOREY EXISTING15 15STOREY STOREY EXISTING RESIDENTIAL RESIDENTIAL RESIDENTIAL

LOW-RISE LOW-RISE LOW-RISE RESIDENTIAL RESIDENTIAL RESIDENTIAL

BLOCK C 32 STOREYS

BLOCK A 11 STOREYS BLOCK C BLOCK CC 32BLOCK STOREYS 32STOREYS STOREYS 32

BLOCK F BLOCKFF 8BLOCK STOREYS STOREYS 88STOREYS BLOCK A BLOCK AA 11BLOCK STOREYS 11STOREYS STOREYS 11

BROCK CRESCENT BROCKCRESCENT CRESCENT BROCK

FUTURE SECONDARY SCHOOL

FUTURE SECONDARY SCHOOL FUTURESECONDARY SECONDARYSCHOOL SCHOOL FUTURE

NEW PUBLIC STREET NEW PUBLIC STREET NEWPUBLIC PUBLICSTREET STREET NEW

BROCK AVE BROCKAVE AVE BROCK

BROCK AVE

BROCK CRESCENT

BUILDING B1 34 STOREYS

BUILDING B1 37 STOREYS

BUILDING B1 BUILDING B1 BUILDING B1 34 STOREYS 34STOREYS STOREYS 34

BLOCK B

BUILDING B1 BUILDING B1 BUILDING B1 37 STOREYS 37STOREYS STOREYS 37

BLOCK B BLOCKBB BLOCK

PROPOSSED PRIVATE ROAD PROPOSSED PRIVATE ROAD PROPOSSEDPRIVATE PRIVATEROAD ROAD PROPOSSED

LOW-RISE LOW-RISE LOW-RISE RESIDENTIAL RESIDENTIAL RESIDENTIAL

650 m²

BLOCK D 19 STOREYS

BLOCK D BLOCK DD 19BLOCK STOREYS 19STOREYS STOREYS 19

445 m²

CROATIA ST

Turner Fleischer Archite

Turner Fleischer Arch Turner Fleischer Architec 67 Les Toronto, ON, 67 L 67 Lesm T 416 4 Toronto, Toronto, ON,ON M turnerfleis T 41 T 416 42 turnerfle turnerfleisch

This drawing, as an instrument of service, is provided by and is the property of Turner Architects Inc. The contractor must verify and accept responsibility for all dimensions on This site and must notify Fleischer Architects Inc. ofby any variations from the drawing, an instrument of is and is the of Turn This drawing, as anas instrument of service, is provided by and is the of Turner This drawing, as an Turner instrument of service, service, is provided provided by and isproperty the property property ofsupp TurF information. is not tomust be scaled. Theaccept architect is not for responsible for thean a Architects Inc. The verify and responsibility all Architects Inc.This The contractor must verify and accept responsibility allfor dimensions Architects Inc. drawing The contractor contractor must verify and accept responsibility for all dimensio dimensio structural, mechanical, electrical, etc., information shown on this drawing. Ref on site and notify Turner Fleischer Architects Inc. of any from the ss onsurvey, site must notify Turner Fleischer Architects Inc. of any from the suppli onand site and must must notify Turner Fleischer Architects Inc. ofvariations any variations variations from the appropriate consultant's drawings proceeding thenot work. mus information. This drawing to be The architect is not responsible for th information. This drawing is notis bebefore scaled. The architect is for the information. This drawing istonot not to be scaled. scaled. The with architect isresponsible notConstruction responsible forac th applicable codes and requirements of authorities having jurisdiction. The contractor wR survey, structural, mechanical, electrical, etc., information shown on this drawing. survey, structural, mechanical, electrical, etc., information shown on this Refer survey, structural, mechanical, electrical, etc., information shown ondrawing. this drawing. drawings not specifically marked 'For before Construction' mustthe assume full responsibility appropriate consultant's drawings proceeding with the Construction m appropriate consultant's drawings before proceeding with work. Construction mustan c appropriate consultant's drawings before proceeding with the work. work. Construction m for applicable any corrections damages resulting his work. codes and requirements of authorities having jurisdiction. The applicable codes andorrequirements of authorities having jurisdiction. The contractor wo applicable codes and requirements offrom authorities having jurisdiction. The contracto contracto drawings not marked 'For assume full drawings not specifically marked 'For Construction' mustmust assume full responsibility and drawings not specifically specifically marked 'For Construction' Construction' must assume full responsibility responsibility for any or resulting his for any or damages resulting from from his work. forcorrections any corrections corrections or damages damages resulting from his work. work.

445 m² 445 445 m²m²

LOW-RISE RESIDENTIAL

POPs

PROPOSED PUBLIC PARK

PROPOSED PUBLIC PARK PROPOSEDPUBLIC PUBLICPARK PARK PROPOSED

This drawing, as an instrument of service, is provided by and is the property of Turner Fleische Architects Inc. The contractor must verify and accept responsibility for all dimensions and cond on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform applicable codes and requirements of authorities having jurisdiction. The contractor working fr drawings not specifically marked 'For Construction' must assume full responsibility and bear c for any corrections or damages resulting from his work.

POPs POPs POPs 650 m² 650 650 m²m²

BLOCK E 22 STOREYS

67 Lesmill Ro Toronto, ON, M3B 2 T 416 425 22 turnerfleischer.co

POPs

DUFFERIN ST DUFFERIN ST DUFFERINST ST DUFFERIN

BLOOR ST W BLOORST STW W BLOOR

BLOCK F 8 STOREYS

LOW-RISE RESIDENTIAL

150 m²

LOW-RISE LOW-RISE LOW-RISE RESIDENTIAL BLOOR ST W RESIDENTIAL RESIDENTIAL

EXISTING 15 STOREY RESIDENTIAL

150 m²m² 150 150 m²

RUSSETT A RUSSETT AVE RUSSETT AVE RUSSETT AVE

PAULINE AV

LOW-RISE LOW-RISE LOW-RISE RESIDENTIAL RESIDENTIAL RESIDENTIAL

LOW-RISE RESIDENTIAL

LOW-RISE RESIDENTIAL

PAULINE AVE PAULINEAVE AVE PAULINE

BROCK AVE BROCKAVE AVE BROCK

BROCK A

LOW-RISE RESIDENTIAL

LOW-RISE LOW-RISE LOW-RISE RESIDENTIAL RESIDENTIAL RESIDENTIAL

POPs POPs POPs

1

BLOCK E BLOCK EE 22BLOCK STOREYS 22STOREYS STOREYS 22

#

2021-12-17 DATE

ISSUED FOR SITE PLAN APPROVAL #1 DESCRIPTION

LK

1 2021-12-17 ISSUED FOR SITE PLAN APPROVAL #1 # DATE DESCRIPTION PROJECT 2021-12-17 ISSUED ISSUED PLAN APPROVAL 1 12021-12-17 FORFOR SITESITE PLAN APPROVAL #1 #1 DATE DESCRIPTION # # DATE DESCRIPTION

PROPOSED MIXED-USE DEVELOPMENT (MASTER PLAN)

1141 Bloor Street West + 980 Dufferin Street, Toron ON DRAWING

CROATIA ST CROATIAST ST CROATIA

BLOCK PLAN

PROJECT

PROPOSED MIXED-USE PROPOSED MIXED-USE PROPOSED MIXED-USE DEVELOPMENT (MASTER PLA DEVELOPMENT (MASTER PL PROJECT NO. DEVELOPMENT (MASTER PLAN PROJECT PROJECT

Site Plan

N

EXISTING COMMERCIAL

1141 Bloor Street West + 980 Dufferin Street, T 21.081CS ON 1141 Bloor Street West + 980 Dufferin Street, 1141 Bloor Street West + 980 Dufferin Street, To PROJECT DATE ONON July 2021 DRAWING DRAWN BY DRAWING DRAWING

DVE

CHECKED BY

CCU SCALE

BROCKTON STADIUM

developed BLOCK PLAN BLOCK PLAN BLOCK PLAN by author

1 : 500 PROJECT NO. N

PROJECT 21.081CS PROJECT NO.NO.

EXISTING EXISTING EXISTING COMMERCIAL

16 HIGH-RISE

PROJECT DATE 21.081CS 21.081CS DRAWING NO. PROJECT DATE July 2021 PROJECT DATE DRAWN BY July 2021 July 2021 DRAWN DVE DRAWN BY BY CHECKED DVE BY DVE CCU CHECKED CHECKED BY BY

SPA006

REV.

1


BLO C K B ( S TATI O N H O U SE I I )

BLOCK B - FAÇADE CONCEPT Kent School

Located in front of the park, this block consists of an 8-storey podium topped by 34- and 37-storey towers, with a total of 856 units. Retail at grade activates the streetscape. The façade design of both the podium and towers is inspired by the composition of the nearby Kent School’s façade, creating respectful dialogue with the historic context.

HORIZONTAL LAYERING

VERTICAL ARTICULATION

PODIUM BAYS

The red cladding was initially conceived as a system of metal panels, selected for their boldness and contemporary expression. However, due to budget constraints, the material was revised to brick-inlay precast concrete panels, requiring a comprehensive rethinking of the façade detailing while preserving the original design intent. This shift presented a key challenge, as details developed for the thinner, more flexible metal panel system had to be adapted to accommodate the thickness, jointing, support conditions, and assembly requirements of the precast panels.

BLOCK B - View from South - Final Design with Brick-inlay Precast Concrete Panels Cladding (conceptual render)

BLOCK B - View from Southeast - Initial Design with Metal Panels Cladding (conceptual render) 17 HIGH-RISE


2B

31.1 m² 335 ft²

61.6 m² 663 ft²

67.1 m² 723 ft²

TOWER B1

6.30 m

1B+D

1B+D

51.3 m² 552 ft²

58.1 m² 625 ft²

TOWER B2 1B

52.5 m² 565 ft²

1B

56.7 m² 610 ft²

6.30 m

55.3 m² 596 ft²

BALCONY AT FLOOR 8

1B+D

35.80 m

57.2 m² 616 ft²

6.36 m

6.22 m

6.30 m

4.87 m

INT BEDROOM 65.1 m² 701 ft²

3.54 m

STAIR B-F

57 m² 614 ft²

56.2 m² 605 ft²

2B

2B

9.52 m

TOWER B1

TOWER B2

12.65 m

10.74 m

STUDIO

9.35 m

OUTDOOR AMENITY AT FLOOR 8

59.6 m² 641 ft²

2B

70.8 m² 762 ft²

STUDIO

28.5 m² 306 ft²

28.5 m² 306 ft²

STUDIO 32.7 m² 352 ft²

87 76 56 42 18 5 1 #

1.30 m ZONING SETBACK AT ST 8

76.80 m

1 ______ SPA401

2B

10.32 m

12.84 m

1B

44.8 m² 482 ft²

3.87 m

PROPERTY LINE

51.5 m² 554 ft²

60.4 m² 650 ft²

2025-01-16 2024-09-30 2024-10-04 2024-04-08 2023-09-18 2023-01-26 2021-12-17 DATE

ISSUED FOR SITE PLAN APPROVAL #6 ISSUED FOR CONSENT ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR MINOR VARIANCE ISSUED FOR SITE PLAN APPROVAL #3 ISSUED FOR SITE PLAN APPROVAL #2 ISSUED FOR SITE PLAN APPROVAL DESCRIPTION

CCU CCU CCU CCU CCU DPA CCU BY

6.18 m

5.54 m

4.92 m

1.30 m ZONING SETBACK AT ST 7

6.16 m

6.43 mm 6.43

N

TOWER B1

1.00 m ZONING SETBACK AT ST 7

PROJECT

PROPOSED MIXED-USE DEVELOPMENT (BLOCK B)

1.02 m

4.92 m

5.29 m

2.40 m

1141 Bloor Street West + 980 Dufferin Street, Toronto, ON

87 76 56 42 18 5 1 #

6.16 m

9.42 m

9.37 m

3B

87.8 m² 945 ft²

3.50 m ZONING SETBACK

6.26 m

110 m² 1184 ft²

1B

1B+D

9.43 m

3B

3B

86.9 m² 936 ft²

5.45 m

3B

91 m² 980 ft²

2B

61.8 m² 665 ft²

5.60 m ZONING SETBACK AT ST 7

0.99 m

DN

3.50 m ZONING SETBACK

5.46 m PROJECT

13.04 m

1B

52 m² 559 ft²

CANOPY BELOW

103.2 m² 1111 ft²

DN

3B

3B

101.9 m² 1097 ft²

6.30 m

1B+D

1B+D

1 ______ SPA401

1 ______ SPA401

ELEC CLOSET

59.4 m² 640 ft²

LOCKERS

10.32 m

6.30 m

1B+D

3B

116.6 m² 1255 ft²

6.19 m

3B

91.8 m² 988 ft²

6.30 m

3B

90.8 m² 977 ft²

ELEC CLOSET

43.4 m² 467 ft²

6.24 m

6.24 m

ELEC CLOSET

STUDIO LOCKERS STAIR B-D

INT BEDROOM 71.9 m² 774 ft²

1.00 m ZONING SETBACK AT ST 7

1141 Bloor Street West + 980 Dufferin Street, Toronto, ON

STUDIO

1B+D

6.24 m

9.27 m

6.30 m

CANOPY BELOW

1B+D

59.2 m² 637 ft²

1B

55.9 m² 601 ft²

6.30 m

9.33 m

2B

1B+D

TERRACE AT FLOOR 8

4.51 m

TOWER B2

66.6 m² 717 ft²

2B

CCU CCU CCU CCU CCU CCU DPA CCU BY

PROPOSED MIXED-USE DEVELOPMENT (BLOCK B)

MIN. TOWER DISTANCE

6.58 m

7.86 m

2B

69.7 m² 750 ft²

7.66 m

7.26 m

6.64 m

34.3 m² 369 ft²

39.77 m

43.51 m

TOWER B1 1.96 m

INT BEDROOM 64.6 m² 696 ft²

1B+D

37.00 m

3B

98.1 m² 1056 ft²

INT BEDROOM 65.6 m² 707 ft²

7.09 m ISSUED FOR SITE PLAN APPROVAL #6 ISSUED FOR CONSENT ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR MINOR VARIANCE ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR SITE PLAN APPROVAL #3 ISSUED FOR SITE PLAN APPROVAL #2 ISSUED FOR SITE PLAN APPROVAL DESCRIPTION

8.93 m

25.00 m

STUDIO 1B+D 61.3 m² 660 ft²

1

PROJECT DATE

JULY 2021

PROJECT

22.80 m

28.78 m

22.80 m

PROPOSED MIXED-USE DEVELOPMENT (BLOCK B)

2.02 m

1141 Bloor Street West + 980 Dufferin Street, Toron ON

FLOORS 9-19

BLOCK B - Floors 3-6

PROJECT NO.

1

PROJECT DATE

JULY 2021

BLOCK B - Typical Tower

FLOORS 9-19 (TOWER B1 AND B2)

SPA156 1 : 150

DRAWN BY

PROJECT NO.

21.081P02 PROJECT DATE

JULY 2021 DRAWN BY

DVE

DVE

CHECKED BY

CHECKED BY

SCALE

N

DRAWING NO.

18 HIGH-RISE

2025-01-16 2025-01-16 2025-01-16 2025-01-16 4:35:56 4:35:56 4:35:56 4:35:56 PM PM PM PM

1. Vision Glazing (clear) 2. Spandrel Panel (warm grey) 3. Vision Glazing (frit) 4. Brick-inlay Precast Panel (red) 5. Metal Panel (dark) 6. Stone Panel (light) 1 1

SOUTH ELEVATION ELEVATION SOUTH

SPA302 1 SPA302 1 1 :: 250 250 SPA302 SPA302 1 :: 250 250

FLOOR 7 FLOOR 7 131.95 131.95 FLOOR 6 6 FLOOR 129 129 FLOOR 5 5 FLOOR 126.05 126.05 FLOOR FLOOR 4 4 123.1 123.1 FLOOR FLOOR 3 3 120.15 120.15 FLOOR FLOOR 2 2 117.2 117.2 FLOOR 1 1 FLOOR 111.2 111.2

4

4 4

4 4

2

COLLEGIATE COLLEGIATE ROAD ROAD

12

2

41144

333 444

3 3

666 110.19 110.19 110.19 110.19

110.86 110.86 110.86 110.86

110.07 110.07 110.07 110.07

RETAIL RETAIL ENTRANCE ENTRANCE

RETAIL RETAIL EXIT EXIT ENTRANCE ENTRANCE

6.00 6.00 6.00 6.00 m mm m

MPH MPH MPH MPH BUILDING BUILDING BUILDING HEIGHT: HEIGHT: HEIGHT: TOWER TOWER TOWER B2 B2 B2 BUILDING HEIGHT: TOWER B2

MPH MPH MPH MPH

5.90 5.90 5.90 5.90 m mm m

444

RETAIL RETAIL ENTRANCE ENTRANCE

EXIT EXIT

RETAIL RETAIL ENTRANCE ENTRANCE

123.90 123.90 123.90 123.90 m mm m

1 1

ZONING ZONING ZONING ZONING HEIGHT HEIGHT HEIGHT HEIGHT

222

4.68 4.68 4.68 4.68 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m3.25 3.25 3.25 3.25 m mm m2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m3.85 3.85 3.85 3.85 m mm m2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m3.25 3.25 3.25 3.25 m mm m2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m3.25 3.25 3.25 3.25 m mm m2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m

111

4.0 4.0 4.0 4.0 m mm m

FLOOR FLOOR 8 8 136.6 136.6

1

1 1

2 2

BIRD FRIENDLY TREATMENT BIRD BIRD BIRD FRIENDLY FRIENDLY FRIENDLY TREATMENT TREATMENT TREATMENT

EXTERIOR FINISHES

B2-T/O B2-T/O ROOF ROOF 238.78 238.78

2 2

16.0 16.0 16.0 16.0 m mm m

BLOCK B - South Elevation

2

2 2

555

EXTENT OF BIRD FRIENDLY TREATMENT EXTENT EXTENT EXTENT OF OF OF BIRD BIRD BIRD FRIENDLY FRIENDLY FRIENDLY TREATMENT TREATMENT TREATMENT

B1-FLOOR 20 B1-FLOOR 20 171.08 171.08 B1-FLOOR 19 19 B1-FLOOR 168.13 168.13 B1-FLOOR 18 18 B1-FLOOR 165.18 165.18 B1-FLOOR B1-FLOOR 17 17 161.93 161.93 B1-FLOOR 16 16 B1-FLOOR 158.98 158.98 B1-FLOOR 15 15 B1-FLOOR 156.03 156.03 B1-FLOOR 14 14 B1-FLOOR 153.08 153.08 B1-FLOOR 12 12 B1-FLOOR 150.13 150.13 B1-FLOOR B1-FLOOR 11 11 147.18 147.18 B1-FLOOR B1-FLOOR 10 10 144.23 144.23 B1-FLOOR 9 9 B1-FLOOR 141.28 141.28

2.95 2.95 2.95 2.95 2.95 4.65 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 4.65 4.65 4.65 m mm m

BLOCK B - View from Southeast - Ground Floor Retail (conceptual render)

6.00 6.00 6.00 6.00 m mm m

B1-EMR B1-EMR 223.53 223.53 B1-MPH B1-MPH 220.98 220.98 B1-FLOOR 35 35 B1-FLOOR (PENTHOUSE) (PENTHOUSE) 216.83 216.83 B1-FLOOR 34 34 B1-FLOOR 213.88 213.88 B1-FLOOR B1-FLOOR 33 33 210.63 210.63 B1-FLOOR B1-FLOOR 32 32 207.68 207.68 B1-FLOOR 31 31 B1-FLOOR 204.73 204.73 B1-FLOOR 30 30 B1-FLOOR 201.78 201.78 B1-FLOOR 29 29 B1-FLOOR 198.83 198.83 B1-FLOOR B1-FLOOR 28 28 195.88 195.88 B1-FLOOR B1-FLOOR 27 27 192.93 192.93 B1-FLOOR 26 26 B1-FLOOR 189.98 189.98 B1-FLOOR 25 25 B1-FLOOR 186.73 186.73 B1-FLOOR B1-FLOOR 24 24 183.78 183.78 B1-FLOOR B1-FLOOR 23 23 180.83 180.83 B1-FLOOR B1-FLOOR 22 22 177.88 177.88 B1-FLOOR 21 21 B1-FLOOR 174.93 174.93

ZONING HEIGHT ZONING ZONING ZONING HEIGHT HEIGHT HEIGHT 4.68 2.95 2.95 2.95 2.95 2.95 2.95 2.95 3.25 2.95 2.95 3.85 2.95 2.95 2.95 2.95 3.25 2.95 2.95 2.95 2.95 2.95 2.95 2.95 3.25 2.95 4.15 2.56 3.44 4.68 4.68 4.68 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m3.25 3.25 3.25 m mm m2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m3.85 3.85 3.85 m mm m2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m3.25 3.25 3.25 m mm m2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m3.25 3.25 3.25 m mm m2.95 2.95 2.95 m mm m 4.15 4.15 4.15 m mm m2.56 2.56 2.56 m mm m 3.44 3.44 3.44 m mm m

B1-T/O ROOF ROOF B1-T/O 226.98 226.98

TOWER B1 B1 TOWER 34 STOREY STOREY 34

SPA156

4.15 4.15 4.15 4.15 m mm m2.56 2.56 2.56 2.56 m mm m 3.44 3.44 3.44 3.44 m mm m

TOWER TOWER B2 B2 38 STOREY STOREY 38

121.58 121.58 121.58 121.58 m mm m

87

6.00 6.00 6.00 6.00 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 4.65 4.65 4.65 4.65 m mm m

SPA153

PROPERTY PROPERTY PROPERTY PROPERTYLINE LINE LINE LINE

87

REV.

PROPERTY PROPERTY PROPERTY PROPERTYLINE LINE LINE LINE

DRAWING NO.

6.00 6.00 6.00 6.00 m mm m

SPA151

N

REV.

DPA 1 : 150

109.78 109.78 109.78 109.78 m mm m

DRAWING NO.

SCALE

1 : 150

BUILDING HEIGHT: TOWER B1 BUILDING BUILDING BUILDING HEIGHT: HEIGHT: HEIGHT: TOWER TOWER TOWER B1 B1 B1 114.90 114.90 114.90 114.90 m mm m

N

DPA

2025-01-16 3:49:18 PM

1:150

2025-01-16 3:50:13 PM

CHECKED BY

C C C C C D C

DRAWING

21.081P02

FLOORS 03-06

SPA153 1 : 150

DRAWN BY

SCALE

ISSUED FOR SITE PLAN APPROVAL #6 ISSUED FOR CONSENT ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR MINOR VARIANCE ISSUED FOR SITE PLAN APPROVAL #3 ISSUED FOR SITE PLAN APPROVAL #2 ISSUED FOR SITE PLAN APPROVAL DESCRIPTION

FLOORS 3-6

BLOCK B - FLOOR 1

PROJECT NO.

21.081P02

DPA

2025-01-16 2024-09-30 2024-10-04 2024-04-08 2023-09-18 2023-01-26 2021-12-17 DATE

N

TOWER B2

DRAWING

DRAWING

DVE

retail horizontal circulation, lobby vertical circulation, service areas amenity residential units

BLOCK A

BLOCK B

RD 118.42

2B

77.8 m² 837 ft²

6.30 m

2B

INT BEDROOM 69.3 m² 746 ft²

6.00 m

6.36 m

2B+D

6.24 m

7.66 m

2B+D

6.36 m

6.22 m

1B+D

11.34 m

1.4% 2.8% DD 17 0. 11 DD 2.0% 3.4%

1.9%

2025-01-16 2024-09-30 2024-10-04 2024-04-08 2024-03-08 2023-09-18 2023-01-26 2021-12-17 DATE

BLOCK B

6.31 m

STAIR B-E

2B+D

5.60 m ZONING SETBACK AT ST 8

1.1%

87 76 56 42 37 18 5 1 #

BLOCK B

RD 118.42

8.90 m

25.00 m MIN. TOWER DISTANCE

3B

DD

BLOCK A 22.80 m 7.56 m

70.4 m² 758 ft²

110.54TC

110.39

110.26 5.51 m 110.19 2.4%

2.4% 1.9%

110.28

N

8.94 m

AD 110.29

INT BEDROOM 71 m² 764 ft²

6.29 m

2.9%

BLOCK A

1.60 m

12.13 m

1.60 m 8.30 m

3B

94.6 m² 1018 ft²

1 ______ SPA401

SETBACK LINE

6.30 m

BALCONY AT FLOOR 8

ELEC CLOSET

39.24 m

LEGEND

CYCLIST ACCESS

110.34TC

110.42

TA N 28 C E .06 TO m H YD R AN T 1.0%

110.45

110.51

2.3% 110.33 110.372.0%

2.5%

FH

7.56 m

BLOCK B

STAIR B-C

GAS/HYDRO METER

G

FUTURE BLOCK A

22.80 m

BLOCK A

58 m² 625 ft²

M

This drawing, as an instrument of service, is provided by and is the property of Turner Fleisch Architects Inc. The contractor must verify and accept responsibility for all dimensions and con on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accurac survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must confor applicable codes and requirements of authorities having jurisdiction. The contractor working f drawings not specifically marked 'For Construction' must assume full responsibility and bear for any corrections or damages resulting from his work.

1B

REFER TO DWG 87 m² 937 ft²

6.24 m

SPOT ELEVATION

BLOCK B

11.00 m

92.3 m² 994 ft²

D IS

BOLLARDS PROPOSED SIAMESE CONNECTION

2.0%

3.02 m

G

50 m² 538 ft²

UG BELOW

110.15TC

EXIT

110.86

MM

DISTANCE BETWEEN BUIDLING B AND A

111.38

111.03 110.96

111.10TC 111.11TC

111.07 111.01

111.14

110.95

111.00

111.02

111.09

111.17 111.20 110.98

111.00 3.1%

111.32TC

111.17 111.00

110.98

110.99 110.98

110.99

0.4%

111.07

111.14

111.17

111.04

0.4%

111.14

STAIR B-E

ELEV. SHAFT

ELEV. SHAFT STAIR B-F

2.1%

1.7%

2.1% 2.0%

2.1%

FIRE ROUTE SIGN

1 ______ SPA401

8.60 m

110.04 110.13

2.4 %

110.64BW

2.0% 2.0%

PUBLIC PARK

MM

110.18110.24 N 15° 25' 05" W 110.29

110.18

2.1%2.0%

2.0%

2.0%

3.3%

MM

3.50 m ZONING SETBAKCS

MM

111.15TC

111.38

111.43

111.23

111.25

111.04

2.4% 2.2%

0.5% 0.5%

2.0% 2.7%

STAIR ABOVE

111.20

EXIT

1. 7%

1.7%

2.1%

1.5%

111.04

111.38 111.39

111.25

3.1%

111.00 110.90 111.05TC 111.05TC 111.10

2.9%

12.33 m

111.10 110.96 2. 0%

1. 1%

2.3%

111.33

2.70 m 6.20 m

2. 1%

0.2%

111.15 2.5%

2 11 .4% 0. 89

2.0%

2.4% 6.00 m

3.2%

STAIR B-D

5 RISERS @0.18m

UP

111.20

6.22 m

24.80 m

92.5 m² 995 ft²

PROPERTY LINE / EASEMENT LINE

DD

6.78 m

3B

PHASE LINES

ALL DOORS LEADING TO BICYCLE PARKING ROOMS WILL INCLUDE ADO

111.20 111.20 111.20 2.3% 111.20 111.20 1.0% 1.30 m 111.29 UP AIR SHAFT AIR SHAFT 110.60 111.20 111.20 ZONING SETBACK AT ST 7 111.20 2.3% 111.17 111.20 111.15 111.12 111.18 111.27 EXTENT OF CANOPY ABOVE PYLON SIGNAGE, 111.23 EXIT EXIT 111.05 REFER TO LANDSCAPE DWGS 111.14 111.10 110.53 111.10 5 111.22 111.23 1 6 1.0% . TOWER B1 TOWER B2 111.10 111.11 111.14 111.14 111.11 111.09 111.00 111.11 111.25TC .DD4 BOLLARDS 111.37TC 111.38TC 111 0 5.6% 111.07 110.82 111.20TC 111.10 11 DD DD DD RAMP UP 5% 110.69 5.6% 3.0% RAMP UP 3% 0.8 111.18 110.49 3.2% 111.17 111.18 111.15 111.03 % 110.82 110.64TC 110.33 111.33TC 111.30TC N 74° 34'111.13 55" E 111.32TC 110.69 3.2% 0.5% 2.2% 110.73BW 110.68BW EXTENT OF U/G BELOW 110.84TC/TW 110.48TC 110.61BW 110.65BW 1 BOLLARDS 110.55 BOLLARDS 3.3% 10. 2.5% 76.80 m 24

2.0%

110.14

111.29

KK2

KK2

KK2

KK2

KK2

KK2

KK2

STAIR ABOVE ELEV. SHAFT

ELEV. SHAFT

111.29 111.27 111.20

4 RISERS @0.18m

111.25 111.29 111.26

EXIT 110.41 110.42

110.40 EXIT 110.40

110.31 110.35 110.36 110.37 110.30 N110.28 15° 25' 00" W

110.23

110.12TC

110.33 110.39 110.33 1.3%

110.24 0.6%

FIRE ROUTE

110.16 110.15 110.30TC 110.31TC

110.23 110.19

110.11 110.03 110.21TC110.26TC 110.18TC

110.11 110.05

109.97

109.89 110.04TC

1499.6 m² 16141 ft²

FFE = 111.20

A

000.00

BOLLARDS

3.88 m

G

28.78 m

12.81 m

SIAMESE CONNECTION

DD

1

109.97

STAIR B-B

RETAIL

3.1%

110.05

DR AN T

9.5 9m

NC E

110.13

110.06TO HY

0.7% DISTA

110.20

110.12

110.13 110.07TC

110.28TC

2.59 m

110.27TC 110.12 110.05TC

110.44

110.20 110.14TC 110.11

110.35TC 29.22 m

110.50

110.39TC 110.39TC 110.24 110.24 110.17TC 110.18TC

110.49 110.45

110.35TC 110.20 110.13TC

110.27TC

110.40

2.4 m² 25 ft²

5.04 m

TRANSFORMER WITH CLEARANCES

1.9%

110.12 110.06 COLLEGIATE ROAD 109.99TC 110.05TC

DN

ELEC. CLOSET

3.15 m

FIRE HYDRANT

111.15TC 111.00

DD

2.7%

STAIR ABOVE

ELEV. SHAFT

FH

6.00 m

BOLLARDS

24.21 m

67 Lesmill R Toronto, ON, M3B 2 T 416 425 2 turnerfleischer.c

BLOCK A

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

FUTURE BLOCK A

1.00 m

EXIT

1.5% 2.60 m

3.1%

110.21TC

108.8 m² 1171 ft²

STAIR ABOVE

SECONDARY RESIDENTIAL ENTRANCE

2.4% 2.4% 2.0% 2.1%

STOR. 8 m² 86 ft²

PARCEL BOXES

LEGEND

CONVEX MIRROR

3.0% 3.0% 0.5% 2.0%

DD

BLOCK B

PRIMARY RESIDENTIAL ENTRANCE

2.88 m

3.2%

110.32

52.7 m² 567 ft²

1.6%

110.12TC

MAIL ROOM

RESIDENTIAL LOBBY

50 m² 539 ft²

TOWER B2 AT

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

BLOCK A

RETAIL ENTRANCE

LEVEL 8 AND 1.9% ABOVE

DD

2.7%

3.2%

110.24

EXIT

111.20

LOUNGE

PARCEL BOXES

2.0%

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

DD

Turner Fleischer Architects I

Turner Fleischer Architects Inc.

Turner Fleischer Architects Inc.

DD

EXIT

1.8%

BOLLARDS

3.4%

109.97 109.91TC

111.18 111.20

2.0% 1.3%

0.1%

110.99 111.14TC

2.2%

FLOOR 1

111.20

DD

29.5 m² 318 ft²

6% 2.

1.0%

1

111.20

VESTIBULE

2.0%

2.0%

1

111.18

111.20

BLOCK B - Ground Floor Plan SPA151 1 : 150

111.00 TOWER B1 111.15TC TOWER B2

2.0%

2.0%

UP

BLOCK B

HIGH VOLT RM

% 1.0

1.0%

2.0% 2.0%

6.40 m

1.7 m² 18 ft²

1.4%

1.0%

3.0%

194 m² 2089 ft²

111.18

6.40 m

110.89

0.5% 2.4%

111.19 1.5% 111.01 PODIUM LEVEL 111.10 ABOVE 111.18 111.12 2.0% 111.05 111.20 0.9% 111.14

ELEC. CLOSET

2.0%

PYLON SIGNAGE, REFER TO LANDSCAPE DWGS

2.0% 2.0%

110.93

1

1.00 m

RESIDENTIAL LOBBY

10.2 m² 110 ft²

1.0% 0.8% 111.13 EXIT 111.19

29.46 m

29.5 m² 317 ft²

OFFICE

DN

1.3%

LOCATION OF THE ARCHITECT OF RECORD OR PRIMARY DESIGN ARCHITECT PLAQUE. THE LETTERING FOR THIS RECOGNITION MUST COVER AN AREA OF AT LEAST 0.2 METRES BY 0.3 METRES, OR 0.06 SQUARE METRES

DD

111.20 LOUNGE

10.4 m² 112 ft²

1.0% 111.08

2.10 m

63.9 m² 688 ft²

DD

DD

2.4%

BLOCK A

111.25TC

6% 1.

2.0% 2.0%

STAIR B-A

11.3 m² 121 ft²

OFFICE

1.6% 110.92

111.02

1.7%

RESIDENTIAL SHORT TERM BICYCLE SPACES [4]

1

2.0% 2.0%

ZONING SETBACK 2.5% 3.0% 2.0% 2.0%AT ST 7 2.0%

3.4%

OFFICE W/C

12.5 m² 135 ft²

20.4 m² 220 ft²

25.00 m

MIN. TOWER DISTANCE

1.0%

2.6%

DN

PET WASH

111.25TC RETAIL SHORT TERM

OUTDOOR AMENITY

2.0% 111.00PROPOSED CANOPY 111.15TC

FFE = 111.20

FUTURE BLOCK A

111.15 111.25TC 111.25TC BICYCLE SPACES [8]10 111.10 111.10 1. 2. 11 0% 1.2%

B M

2.0%

1

2.0% 2.0%

2.6%

71.2 m² 766 ft²

UP

FH

110.89 1.1 %

111.05TC 111.06 110.90 2.10 m 6.20 m 5% 110.85 0.

OFFICE

DN

D CACF

ALL DOORS LEADING TO BICYCLE PARKING ROOMS WILL INCLUDE ADO

1 ______ SPA401

23.73 m

110.46 110.35 D 10.1 M M B110.50 110.37

6.50 m

SIGNAGE TO BE PROVIDED FOR THE LOCATION OF CACF ROOM

1.6% 2.5% 110.84 110.85 111.00TC

110.78

111.30

DD

9% 1.

2.6%

PRIMARY RESIDENCE ENTRANCE

6.00 m

110.25 110.40TC

UP 5.5%

RESIDENTIAL SHORT TERM BICYCLE SPACES [18]

111.16 AIR SHAFT 111.11TC 110.96

111.06TC 110.91

110.98TC 110.83

3.1%

3.0%

PROPOSED SIAMESE CONNECTION

AIR SHAFT

0% 1.

3.0%

111.13

2.7%

7% 0.

2.0% 2.0%

TOWER B1 OUTLINE AT FLOOR 8 AND ABOVE

% 3.4

STRUCTURAL COLUMNS

110.48TC 110.33

0.46 m

4.0% 2.5% 22 0. 2% 11 2.6% 1. B M 0.68 m 2.0%

111.58 111.58TW

3.5%

43.84 m

110.50TC

PYLON SIGNAGE, REFER TO LANDSCAPE DWGS

2.6%

2.0% 2.0%

RAMP 11%

1.4%

3.0%

111.20

TRELLIS ABOVE REFER TO LANDSCAPE

PODIUM LEVEL ABOVE

6 0.3 11

24 0. 11 2.0%

8500 PAVEMENT

110.36 UP 5.5%

110.88 111.04111.06 111.14

2.3%

32.42 m

KK2

KK2

4.0% 2.4% 2.8%

KK2

2.5%

110.52 110.57

2.1%

110.35 110.36 2.7% % 1.3 6.00 m 110.36 110.39

BLOCK B

1.4%

BLOCK A

2.0% 2.0%

CURB TO BE BUILD AS PER T-310.050-1 DESIGN STANDARD. REFER TO CIVIL AND LANDSCAPE DRAWINGS.

110.40 110.39 110.39

2.0%

2.0% 2.0%

2.0%

2.0%

110.26 110.17 0.9% 110.11 2.0% 110.08 11.20 m 110.05 110.11 110.04 110.18 110.10TC 110.27TC 110.21TC 110.11TC 110.10TC 110.19 110.16TC 110.33TC 110.13 110.21 110.32 110.21 6.00 m 6.52 m 7.20 m EXIT 110.31 110.37 110.29 110.45 110.35 110.30 110.28 110.29 110.33 110.40 3. 1% 2.6%

110.45

2.0% 2.0%

110.32TC 110.25TC 110.17 110.10

2.0%

0.7%

2025-05-05 3:08:01 PM

2.0%

WARNING LIGHT SYSTEM

B2-EMR B2-EMR 235.33 235.33 B2-MPH B2-MPH 232.78 232.78 B2-FLOOR 39 39 B2-FLOOR (PENTHOUSE) (PENTHOUSE) 228.63 228.63 B2-FLOOR 38 38 B2-FLOOR 225.68 225.68 B2-FLOOR B2-FLOOR 37 37 222.73 222.73 B2-FLOOR B2-FLOOR 36 36 219.78 219.78 B2-FLOOR 35 35 B2-FLOOR 216.83 216.83 B2-FLOOR 34 34 B2-FLOOR 213.88 213.88 B2-FLOOR B2-FLOOR 33 33 210.63 210.63 B2-FLOOR B2-FLOOR 32 32 207.68 207.68 B2-FLOOR 31 31 B2-FLOOR 204.73 204.73 B2-FLOOR 30 30 B2-FLOOR 201.78 201.78 B2-FLOOR 29 29 B2-FLOOR 198.83 198.83 B2-FLOOR B2-FLOOR 28 28 195.88 195.88 B2-FLOOR B2-FLOOR 27 27 192.93 192.93 B2-FLOOR 26 26 B2-FLOOR 189.98 189.98 B2-FLOOR 25 25 B2-FLOOR 186.73 186.73 B2-FLOOR B2-FLOOR 24 24 183.78 183.78 B2-FLOOR B2-FLOOR 23 23 180.83 180.83 B2-FLOOR B2-FLOOR 22 22 177.88 177.88 B2-FLOOR 21 21 B2-FLOOR 174.93 174.93 B2-FLOOR 20 20 B2-FLOOR 171.08 171.08 B2-FLOOR 19 B2-FLOOR 19 168.13 168.13 B2-FLOOR 18 18 B2-FLOOR 165.18 165.18 B2-FLOOR B2-FLOOR 17 17 161.93 161.93 B2-FLOOR 16 B2-FLOOR 16 158.98 158.98 B2-FLOOR 15 15 B2-FLOOR 156.03 156.03 B2-FLOOR 14 14 B2-FLOOR 153.08 153.08 B2-FLOOR 12 12 B2-FLOOR 150.13 150.13 B2-FLOOR B2-FLOOR 11 11 147.18 147.18 B2-FLOOR B2-FLOOR 10 10 144.23 144.23 B2-FLOOR 9 9 B2-FLOOR 141.28 141.28 FLOOR FLOOR 8 8 136.6 136.6

110.98 110.98 110.98 110.98

HIGH HIGH STREET STREET

FLOOR 7 7 FLOOR 131.95 131.95 FLOOR 6 FLOOR 6 129 129 FLOOR 5 5 FLOOR 126.05 126.05 FLOOR FLOOR 4 4 123.1 123.1 FLOOR FLOOR 3 3 120.15 120.15 FLOOR FLOOR 2 2 117.2 117.2 FLOOR 1 1 FLOOR 111.2 111.2

REV.

87


Turner Fleischer Architects Inc.

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

BLOCK B - View from South (building under construction - 2025)

1.8m WIND SCREEN. (REFER TO WIND REPORT.)

TERRACE EXTERIOR 784

295

STUCCO SEALANT AND TERMINATION BAR R3a

REFER TO 235

295

EW3ba

1109 10

LEVEL 08

PREFINISHED METAL FLASHING

MIN 1800MM

RAILING

10

TOP OF CONCRETE PARAPET

194

SLAB EDGE

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

SLAB EDGE DWGS

TOP OF SLAB

295

325

10

FOR SLAB THICKESS, REFER TO STRUCTURAL DRAWINGS AIR/WATER BARRIER SEALANT JOINT AND BACKER ROD TYPICAL

TRANSITION MEMBRANE

92

10x10mm DRIP EDGE

BLOCK B - View from West (building under construction - 2025) EW2a

CAULKING AND BACKER ROD

SEAL SMART VAPOUR BARRIER TO U/S OF CONCRETE SLAB

EXTERIOR

SPRAY FOAM AT WALLBOX TO FILL VOID

PREFINISHED METAL GRILLE WITH INSECT SCREEN INTEGRAL TO WINDOW WALL SYSTEM (REFER TO ELEVATION FOR FINISH)

METAL DUCT

ENSURE ALL DUCT CONNECTIONS BE SEALED FOR AIRTIGHTNESS

SUITE

REFER TO PLANS FOR CEILING FINISH AND BULKHEAD HEIGHT

BLOCK B - Terrace Detail at Floor 08

2

TERRACE DETAIL AT 8TH.FL.

SPA401 1 : 10

19 HIGH-RISE


BLO C K C ( M A R L O W )

DESIGN EVOLUTION

Marlow is a 32-storey building at the corner of Bloor Street West and Dufferin Street, comprising 413 units, with retail uses activating the ground floor. The design adopts a timeless expression aligned to the client’s identity. The vertical modulation was coordinated with the demising and partition walls of the units to reduce reliance on spandrel glazing. Originally conceived with white brick-inlay precast concrete cladding across the entire building, the material palette was later refined to a medium grey tone for the tower to better relate to its context, and a darker grey at the base to reinforce the building’s visual anchoring. The ground floor corner was designed to enhance the pedestrian experience, with metal panel cladding articulating the galleria entrance and emphasizing its presence. On the 7th floor, a triple-height basketball court and double-height gym and sports lounge are articulated through a distinct metal cladding treatment, introducing additional variation to the façade. INITIAL DESIGN

FINAL DESIGN

BC-FLOOR 06 132.8

1. Vision Glazing (clear) 2. Vision Glazing (frit) 3. Brick-inlay Precast (light) 4. Brick-inlay Precast (dark) 5. Metal Panel (light)

BC-FLOOR 06 132.8

BC-FLOOR 05 129.85

PROPERTY PROPERTY LINE LINE

EXTERIOR FINISHES

C14

C13

C12

C11

C10

C14

C13

C12

C11

C10

1

BC-FLOOR 05 129.85

4

BC-FLOOR 04 126.9

34

BC-FLOOR 04 126.9

5 3 5

23

BC-FLOOR 03 123.95

16.0 m 16.0 m

BC-FLOOR 02 118

(EXTENT (EXTENT OF BIRD FRIENDLY) OF BIRD FRIENDLY)

BC-FLOOR 03 123.95

BC-FLOOR 02 118

112.85

Dufferin St

BC-EST. GRADE 112.7

112.85

BC-EST. GRADE 112.7 BC-FLOOR 01 112 BC-FLOOR 01 112

45

5

54

4

32

4

5

3

2

BLOCK C - Partial North Elevation 20 HIGH-RISE

2024-06-192024-06-19 6:00:37 PM6:00:37 PM

BLOCK C - Aerial View from NE - Dufferin St and Bloor St W (conceptual render) 1

NORTH-1 TO 50 ELEVATION

1

NORTH-1 TO 50 ELEVATION

SPA313 1 : 50

SPA313 1 : 50


2.0%

4.39 m 112.67

5.0 0m

112.78

EXIT

1.0%

112.85 2.65 m

1 112.80 .5%

1.4%

112.86TW

37.61 m

6.0m FIRE ROUTE

BLOCK D/E

BLDG SETBACK 14.01 m

5 2. SHORT-TERM BICYCLE 11 3 SPACES: 5 BLOCK C 8 RESIDENTIAL 2. 112.46TC 11 2.0%

112.76TW

112 .40 1.3% BW

% .6

CP

111.30

112.57TC

BLOCK C 2.0%

2. 2%6.68 m

DISTANCE FROM ENTRANCE TO FIRE5 ROUTE

11 2. 1.9% 51 11 BW 2. 45 1. 2%

BLOCK D

2.0%

112.44

BLOCK C - 1Ground Floor Plan

BC-FLOOR 01

2024-06-21 1:55:34 PM

SPA151 1 : 150

60.74 m

2B+D 2B

89.6 m² 964 ft²

STUDIO 38.6 m² 415 ft²

GOLF SIM

UP 5%

51.9 m² 558 ft²

1B

ELEC. CLST

PIPE

7.18 m

20.14 m

1B 48.7 m² 524 ft²

51.1 m² 550 ft²

1B

3B 95.4 m² 1027 ft²

52 m² 560 ft²

BLDG SETBACK

9.20 m

8.37 m

15.74 m

13.78 m

GREEN ROOF AT FLOOR 3 - 12.7 SQM

F.F.

193 m² 2077 ft²

1.97 m

1B SKII SIM

BASKETBALL COURT

2B 81.6 m² 878 ft²

6.40 m

20.14 m

ZONING SETBACK

ZONING SETBACK

16.04 m 9.50 m

13.18 m

BLDG SETBACK

BLDG SETBACK

PLANTERS AT FLOOR 3 - 86.9SQM

2.52 m

N

GREEN ROOF AT FLOOR 3 - 43.8SQM

348.1 m² 3747 ft²

PLANTERS AT FLOOR 3

31.04 m

SPORTS LOUNGE

6.13 m

KARAOKE

36.12 m

ELEC. CLST

5.12 m

ZONING SETBACK

GYM (L1 OF 2)

WC

3.09 m

6.40 m

CLEVELAND JANITOR CLINIC

WC

AIR SHAFT

361.5 m² 3891 ft²

2B 76 m² 818 ft²

6.14 m

UNIVERSAL WC

76.1 m² 819 ft²

1.52 m BLDG SETBACK

1.49 m

2.90 m

PLANTERS AT FLOOR 3 PLANTERS AT FLOOR 6 - 23.7 SQM

6.42 m

9.53 m

8.97 m ZONING SETBACK

9.16 m

1.10 m

6.00 m TERRACE AT FLOOR 6

ZONING SETBACK AT FL5

6.20 m

8.11 m

36.18 m

ZONING SETBACK AT FLOOR 05

2.52 m BLDG SETBACK

BLDG SETBACK

retail horizontal circulation, lobby vertical circulation, service areas amenity

11.09 m

6.21 m 24.56 m

7.26 m

1.52 m 8.17 m

BLOCK D

BLOCK C - View from SW (project under construction - 2025)

BLOCK C - Floor 7 1

BC-FLOOR 07 Copy 1

HIGH-RISE

2024-06-27 4:45:20 PM

SPA156 1 : 150

21

DUFFERIN STREET

112.73 1.1% 1.1% 23.30 m % 1.8% 2.4 1.6% 112.56 7 2.6 11112.74 112.75 ARTIST MEWS 1.1% 112.82

112.85

1.3%

0.9%

112.09

112.74

112.85

3.8%

6.40 m

.0% 112.58

64.52 3 m

30.16112.77 m

EXIT

388.6 m² 4183 ft²

112.67TC

2.0% 2.50 m

WALKWAY CLEARANCE

112.64 3.07 m

FE

EXIT

1.6% TOWER ABOVE

1.2%

18.67 m

ZONING SETBACK

9.50 m

0% 3.

112.42

3. 0% 3. 1%

1.5%

ZONING SETBACK

11.14 m

112.85

LOBBY

2.63 m

BLDG SETBACK

3.2 %

3.6%

8.9 m² 96 ft²

RESIDENTIAL

CP

111.43

CACF

PROPOSED SIAMESE CONNECTION SHORT-TERM BICYCLE

SPACES: 112.70TC BLOCK C 4

CP

BLDG SETBACK

111.69

ELEC. CLST

OUTLINE OF CANOPY

CP

111.17

2.4%

112.85 1.0%

BICYCLE PARKING BLOCK C: FOR RESIDENTIAL VISITORS 6 SPACES+2 SPACES

12.5 m² 134 ft²

112.85

112.56

1% 3. TERM SHORT

112.32 1.0% 3.0% 3.0% 2.8% 112.443.6% 112.21 112.37 0.7% 3.0% 4.5% 112.42 112.45 3.4% 3.3% 112.40TW 112.47TW 112.15 111.50TC 1.1% 3.3% 111.83 3.3% 112.09 3.1% % 111.43 112.12 112.18 3.6

BLDG SETBACK

1.7%

19.90 m

PET SPA

3.0% 112.68

3. 0%

2.0%

FE

2.7% 112.44

112.55

126 m² 1357 ft² 112.85

1.8% 112.85

4.10 m

1.0%

EXIT

111.95

111.93

111.95

2.0%

112.19

111.95

2.0%

2.0%

1.2%

RETAIL

F.F.

112.85

112.81

13.4 m² 145 ft²

111.92

BLOCK C: SHORT TERM BICYCLE PARKING FOR RETAIL VISITORS

PIPE

37.61 m

ACTIVITY ZONE

112.65

% 2.3 112.61PICK UP / DROP OFF OUTLINE OF CANOPY

OUTLINE OF U/G BELOW

CYCLISTS ACCESS

F.F.

6.8 m² 73 ft²

CANOPY ABOVE AIR SHAFT

112.72TC 2 SPACES

ZONING SETBACK

UP

MECH.

PEDESTRIAN CLEARWAY EASEMENT.

CANOPY PROJECTION D 1.0% 6.40 m

1082.5 m² 11652 ft²

111.92

3.1%

0.27 m

m B CANOPY0.28 PROJECTION M

112.65

GAS METER

0.23 m

4.0% 128.7 m² 1386 ft² 112.85

RETAIL

111.95

3.9%

112.85 2.3% GALLERIA

R1

112.51 112.51 112.51

2.0%

112.85

112.20

2.4%

112.85

112.85 D

DN

112.50112.65

3.0%

3.9%

1.10 m FE

DN DN TO P1

ZONING SETBACK AT ST5

ZONING SETBACK 2.90 m

2.0%

2.0% 2.0%

2.6% 2.6% 2.0%

2.0%

112.20

112.02 112.14 112.14 3.0 % 112.18 112.08 112.20 112.20

0.7%

3.01 m

2.0% 2.0% 2.0%

WALKWAY CLEARANCE

BLDG SETBACK

1.59 m

2.0% 2.0%

2.2%

111.46

R4

% 3.7 112.73 112.73

CP

111.43

ELEVATOR R4 FOR TTC USE

16.1 m² 173 ft²

1.49 m112.65TC

0.7%

2.1%

111.25

SUBWAY TUNNEL ACCESS TO AND FROM STREET LEVEL

112.65

111.95

2.8%

11.21 m

111.45

112.65 112.65 VEST.

112.85

2.0%

2. 4%

111.44 111.47 111.42 111.44 0.6% 111.48 111.52

0.5%

111.41

112.54 CANOPY ABOVE 112.60

112.47

112.60

0.5%

111.38

EXIT

112.42

7% 1.

111.23

2.5%

3.8%

111.38 111.52 111.53 111.55 111.60 111.80 111.80 111.90111.97 111.65 111.32TC 111.43TC 111.57TC111.68TC111.70TC 111.80TC 111.85TC 112.00TC 112.00TC112.05TC

111.83

PROPOSED PRIVATE 111.56 ROAD 111.71 111.74

111.68

3.1%

3.3%

2.0%

3.0%

112.03

3.6%

111.79

0.5% 111.95

111.87TC

111.75 1.4%

111.53 111.67 111.62 111.51 111.49

112.61

112.56

112.51 112.51TC 24.56 m

6.62 m

BLDG SETBACK 112.66TC 112.65

CP

0.2%

111.38

112.38

CP

CANOPY PROJECTION

OUTLINE OF

0.5% 2.4%

112.35

112.43 112.49

CE 5.58112.48TC m CEC 112.54TC

0.23 m

2.9%CANOPY

0.4%

1

N

112.31

112.27 112.32TC

TTC BUSSHELTER REFER TO LANDSCAPE DWGS

112.69TC

112.54TC

CP

0.8%

51 1. 11

111.50

3.0%

1.5% 1.5%

112.22

30.81 m

CP

CP

3.0%

2.0%

3.0% 3.0%

3.0% 1.5%

CP

RAISED BIKE LANE (REFER TO LANDSCAPE DWGS)

CP

3.0%

112.10

64.52 m

1.1%

2.0%

OUTLINE OF CANOPY

3.0%

2.5%

2.8%

2.0%

112.30TC

112.24

1.4%

AIR SHAFT

2.0% 2.0% 0.6%

2.5%

2.6%

07 2. 11 1.2%

1.3% 2.2%

2.5% 2.8%

2.5% 2.5%

.96 TC 112.11 112.13

OUTLINE OF 2ND FLOOR

2.1%

2.5%

2.2% 2.2%

3.5%

0% 3.

1.8% 1.8%

111.91 0.20 m 111.99 111 SETBACK ZONING 2.08 m 112.06TC

112.02 112.05

2.6%

2.7% 2.7%

1.7%

0.23 m

BLOOR STREET WEST 112.47TC 112.52TC DO NOT PASS OPEN DOORS

111.81 111.91

111.98

1.5%

C TC: BLK SHORT TERM BICYCLE PARKING FOR RETAIL VISITORS 00 2.12 SPACES 11 112.14TC

111.85TC

2.4%

2.0% 2.0%

CB13

6.0m FIRE ROUTE


BUILDING C BUILDING BUILDING BUILDING CCC 33 STOREY BUILDING C 33 33 STOREY 33 STOREY STOREY BUILDING BUILDING BU BUILDING BU LD LD NG C NG CC 33 STOREY BUILDING C 3333 STOREY 33 STOREY STOREY MPH 33 STOREY MPH

retail horizontal circulation, lobby vertical circulation, service areas amenity PREFINISHED METAL FLASHING residential units OUTDOOR PREFINISHED METAL FLEXIBLE

OUTDOOR AMENITY

MIN. 1.8M MIN. 1.8M

MIN. 1.8M MIN. 1.8M

MIN.MIN. MIN. 1.8M 1.8MMIN. MIN. 1.8M 1.8M1.8M

PROPERTY PROPER PROPERTY Y LINE NE LINE

PROPERTY PROPERTY LINE LINE

PROPERTY PROPERTY PROPERTY LINE LINE LINE PROPERTY PROPER PROPERTY Y LINE NE LINE

MIN. 1.8M MIN. 1.8M

MIN. 1.8M MIN. 1.8M

PROPERTY PROPER PROPERTY Y LINE NE LINE

PROPERTY PROPER PROPERTY Y LINE NE LINE

PROPERTY PROPER PROPERTY Y LINE NE LINE

PROPERTY PROPERTY PROPERTY LINE LINE LINE PROPERTY PROPER PROPERTY Y LINE NE LINE

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied This This drawing, as an of service, provided is the property Turner Fleischer information. drawing isinstrument not to be scaled. The is architect is by notand responsible for theofaccuracy of The contractor must verify and accept responsibility for all dimensions survey, Architects structural, Inc. mechanical, electrical, etc., information shown on this drawing. Refer to theand conditions on site and must drawings notify Turner Fleischer Architects Inc.work. of any variations from supplied appropriate consultant's before proceeding with the Construction mustthe conform to all This drawing, as an This instrument of is service, is provided by and is the is property of Turner Fleischer information. drawing notauthorities to be scaled. The architect not responsible for the accuracy of applicable codes and requirements of having jurisdiction. contractor working from Architects Inc. The contractor must verify and accept responsibility forThe all on dimensions and Refer conditions survey, structural, mechanical, electrical, etc., information shown this drawing. to the drawings not specifically marked 'For Construction' must full responsibility and bear costs on site and must notify Turner Fleischer Architects Inc. ofassume anywith variations from the supplied appropriate consultant's drawings before proceeding the work. Construction must Fleischer conform to all This This drawing, an offrom service, is provided and is the property Turner for any corrections or as damages resulting his work. information. isinstrument not to be scaled. architect is by notjurisdiction. responsible for contractor theofaccuracy of applicabledrawing codes and requirements of The authorities having working from Inc. The contractor must verify and accept responsibility forThe all dimensions and conditions survey, Architects structural, mechanical, electrical, etc., information shown on this drawing. Refer to the drawings not specifically marked 'For Construction' must full responsibility and bear costs on site and must notify Turner Fleischer Architects Inc. ofassume any variations from supplied appropriate consultant's drawings before proceeding the work. Construction mustthe conform to all for any corrections or damages resulting fromwith his work. information. This drawing is not to be scaled. The architect is not responsible for the accuracy of applicable codes and requirements of authorities having jurisdiction. The contractor working from survey, structural,marked mechanical, electrical, etc., information on this drawing. Refer to the drawings not specifically 'For Construction' must assume shown full responsibility and bear costs appropriate or consultant's drawingsfrom before with the work. Construction must conform to all for any corrections damages resulting hisproceeding work. applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

TERMINATION BAR AND PREFINISHED METAL FLASHING WITH CONTINOUS SEALANT

45MM MINIMUM GAP COORDINATE WITH WINDOW WASHING CONSULTANT

50

appropriate appropriate consultant's appropriate consultant's drawings before drawings proceeding before proceeding before with the with work. the Construction with work. theproperty Construction work. must Construction conform must conform to must all Fleischer conform to all to all This drawing, This drawing, as This anconsultant's drawing, instrument as drawings an instrument as of anis service, instrument of is provided offrom service, is provided byproceeding and is provided is by the and property is by the and of is the Turner property offor Fleischer Turner Fleischer Turner for any corrections or damages resulting his work. information. This drawing not toservice, be scaled. architect is not responsible theof accuracy of applicable applicable codes applicable and codes requirements and codes requirements and of requirements authorities ofmust authorities having of The authorities jurisdiction. having jurisdiction. having The contractor contractor working contractor working from working from from Architects Architects Inc. The Architects Inc. contractor The Inc. contractor The must contractor verify must and verify accept and verify responsibility accept and responsibility accept for responsibility alljurisdiction. dimensions forThe all drawing. dimensions forThe all anddimensions conditions and and conditions survey, structural, mechanical, electrical, etc., information shown on Refer toconditions the drawings drawings specifically drawings specifically not marked specifically marked 'For Construction' marked 'For Construction' 'For must Construction' assume must full must responsibility fullthis responsibility full and responsibility bear and costs bear and costs bear costs on site and onnot site must and onnot notify site must and Turner notify must Fleischer Turner notify Fleischer Turner Architects Fleischer Architects Inc. of Architects any Inc. variations ofassume any Inc. variations ofassume from any variations thefrom supplied thefrom supplied the supplied appropriate consultant's drawings before proceeding with the work. Construction must conform to all This drawing, as an instrument of service, is provided by and the property Turner Fleischer for any corrections for any corrections for any or damages corrections damages resulting or damages resulting his resulting work. hisfrom work. his work. information. information. This information. drawing This drawing isor This not to drawing is be not scaled. tofrom is be not scaled. The tofrom be architect scaled. The architect isThe notjurisdiction. architect responsible is isnot responsible is not forresponsible theofaccuracy for theworking accuracy for ofthe accuracy of of applicable codes and requirements of authorities having contractor from Inc. The contractor must verify and accept responsibility forThe all drawing. dimensions andtoRefer conditions survey, Architects survey, structural, survey, structural, mechanical, structural, mechanical, electrical, mechanical, electrical, etc., electrical, information etc., information etc., shown information on shown this drawing. on shown on Refer this drawing. toRefer the thecosts to the drawings not specifically marked 'For Construction' must fullthis responsibility and bear on site and must notify Turner Fleischer Inc. ofassume any variations from the supplied appropriate appropriate consultant's appropriate consultant's drawings consultant's drawings before drawings proceeding beforeArchitects proceeding before with the with work. theConstruction with work. theConstruction work. must Construction conform must conform to must all conform to all to all for any corrections or damages resulting from hisproceeding work. information. This drawing is not to be scaled. The architect is not responsible for the accuracy of applicable applicable codes applicable and codes requirements and codes requirements andofrequirements authorities of authorities having of authorities jurisdiction. having jurisdiction. having The jurisdiction. contractor The contractor The working contractor working from working from from survey, structural, mechanical, electrical, etc., information shown on drawing. Refer to the drawings drawings not specifically drawings not specifically not marked specifically marked 'For Construction' marked 'For Construction' 'For must Construction' assume must assume full must responsibility assume fullthis responsibility fulland responsibility bear and costs bear and costs bear costs appropriate consultant's drawings before proceeding with the work. Construction must conform to all for any corrections for any corrections for any or damages corrections or damages resulting or damages resulting from his resulting from work. hisfrom work. his work. applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

REFER TO LANDSCAPE DWGS

ZONING O G ZONING MAX BUILDING M MAX BUILDING G HEIGHT G HEIGHT

108.10 108.10 m m HEIGHT 108.10 108.10 108.10 m BUILDING m m HEIGHT ZONING ZONING MAX BUILDING MAX

108.10 108.10 m m HEIGHT ZONING MAX BUILDING MAX BUILDING HEIGHT ZONING MAX HEIGHT ZONING O ZONING G ZONING MAX M BUILDING MAX BUILDING G BUILDING HEIGHT G HEIGHT

108.10 108.10 m m

ZONING O G ZONING MAX BUILDING M MAX BUILDING G HEIGHT G HEIGHT

108.10 108.10 m m

108.10 108.10 m m HEIGHT ZONING O G ZONING MAX BUILDING M MAX BUILDING G G HEIGHT

STAIRS STAIRS STAIRS STAIRS STAIRS STAIRS STA STAIRS RS ELEVATORS ELEVATORS STAIRS STA STAIRS RS ELEVATORS ELEVATORS ELEVATORS ELEVATORS ELEVATORS ELEVATORS ELEVATORS

113.50 113.50 m m

ZONING MAX BUILDING HEIGHT

ZONING O G ZONING HT M MAX/ HT8MAX/ STOREYS O 8 STOREYS

32.60 m8 32.60 m8 STOREYS ZONING HT MAX/ ZONING HT8MAX/ STOREYS HT 8O MAX/ STOREYS 8 STOREYS ZONING O ZONING G ZONING HT MAX/ M HT MAX/ STOREYS

108.10 m

3.25 m 3.25 m 11.25 m11.25 m 3.253.25 m 3.25 m 3.25 m 3.25 m m 32.90 m32.90 m 11.25 m11.25 m11.25 11.25 m11.25 m m 3.25 m 3.25 m 32.90 m32.90 m32.90 32.90 m32.90 m m 11.25 m11.25 m 32.60 m32.60 m 32.90 m32.90 m 32.60 m32.60 m32.60 m m8 32.60 m8 STOREYS ZONING ZONING HT32.60 MAX/ HT MAX/ STOREYS

STAIRS STAIRS STAIRS STAIRS STAIRS STAIRS STA STAIRS RS STAIRS STA STAIRS RS

ZONING O G ZONING HT M MAX/ HT8MAX/ STOREYS O 8 STOREYS

32.90 m32.90 m 32.60 m32.60 m

32.60 m32.60 m O 8 STOREYS ZONING O G ZONING HT M MAX/ HT8MAX/ STOREYS

32.90 m32.90 m

3.25 m 3.25 m 11.25 m11.25 m 3.25 m 3.25 m 11.25 m11.25 m

2.35 m 2.35 m

STAIRS STA STAIRS RS STA STAIRS STAIRS RS

SEALANT VAPOUR BARRIER SEALED TO U/S OF CONCRETE SLAB

2.352.35 m 2.35 m 2.35 m 2.35 m m

113.50 113.50 m m

113.50 113.50 m 113.50 m m m 113.50 m 113.50

PREFINISHED METAL FLASHING FLEXIBLE WATERPROOFING MEMBRANE 19mm EXT. GRADE PLYWOOD SHEATHING BOARD ON WOOD BLOCKING

ALUMINUM PROFILE/EXTRUDED FIN BY CURTAIN WALL MANUFACTURER.

FOR SLAB THICKNESS REFER TO STRUCTURAL DRAWINGS

INDOOR AMENITY J-MOULD AND SEALANT VAPOUR BARRIER SEALED TO WINDOW FRAME

BLOCK C - W-E Cross-section

SPA401 1 : 250

Turner Fleischer Architects Inc.

Turner Turner Fleischer Turner Fleischer Architects Fleischer Architects Architects Inc. Inc. Inc. 67 Lesmill Road Toronto, ON, M3B 2T8 Turner Fleischer Architects Inc. 67 Lesmill 67416 Lesmill Road 67 Lesmill Road T 425 2222 Road Toronto, Toronto, ON, Toronto, M3B ON, 2T8 M3B ON, 2T8 M3B 2T8 turnerfleischer.com Turner Turner Fleischer Turner Fleischer Architects Fleischer Architects Architects Inc. Inc. Inc. 67 Lesmill T 416T425 4162222 T425 416Road 2222 425 2222 Toronto, ON, M3B 2T8 turnerfleischer.com turnerfleischer.com turnerfleischer.com Turner Fleischer Architects Inc. 67 Lesmill 67Turner Lesmill Road 67 Lesmill Road This drawing, as an instrument of service, is provided by and is the property of Fleischer T 416 425 2222 Road Architects Inc. The contractor must verify and accept responsibility for allON, dimensions and conditions Toronto, Toronto, Toronto, M3B ON, 2T8 M3B ON, 2T8 M3B 2T8 on site and must notify Turner Fleischer Architects Inc. of any variations turnerfleischer.com from67 theLesmill supplied Road This drawing, This drawing, as This an This drawing, instrument as an instrument as of anis service, instrument is provided of service, is provided by and is provided is bythe and property is by the and property of is the Turner property of Fleischer Turner of Fleischer Turner Fleischer T 416 T425 416 Taccuracy 425 4162222 425 information. drawing not of toservice, be scaled. The architect is not responsible for the2222 of 2222 Architects Architects Inc. The Architects Inc. contractor TheInc. contractor The mustcontractor verify must and verify must accept and verify responsibility accept and responsibility accept for responsibility all on dimensions forthis all drawing. dimensions for all and dimensions conditions and and conditions Toronto, ON, M3B 2T8 survey, structural, mechanical, electrical, etc., information shown Refer toconditions the turnerfleischer.com turnerfleischer.com on site and on site must and onnotify site must and Turner notify mustFleischer Turner notify Fleischer Turner Architects Fleischer Architects Inc. of Architects any Inc. variations of the any Inc.work. variations ofturnerfleischer.com from any variations thefrom supplied thefrom supplied the supplied appropriate consultant's drawings before proceeding with Construction must conform to all This drawing, as an instrument of service, is provided by and the property Turner Fleischer Taccuracy 416 425 information. information. This information. drawing This drawing isThis not to drawing isbe not scaled. tois be not scaled. The to be architect scaled. Thehaving architect isThe notjurisdiction. architect responsible is isnot responsible is not forresponsible theof for theworking accuracy for ofthe2222 accuracy of of applicable codes and requirements of authorities The contractor from Inc. The contractor must verify and accept responsibility forthis all drawing. dimensions andtoRefer conditions survey, Architects survey, structural, survey, structural, mechanical, structural, mechanical, electrical, mechanical, electrical, etc., electrical, information etc., information etc., shown information on shown this drawing. on shown on Refer this drawing. toRefer the thecosts to the turnerfleischer.com drawings not specifically marked 'For Construction' must assume full responsibility and bear on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied

R2b

2.35 m 2.35 m

6.00 m 6.00 m 5.95 m 5.952.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.45mm 3.45 2.95mm 2.95 2.95 m m 2.95 3.45mm 3.454.86 m m 4.86 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.25m m 3.25 2.95m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.25m m 3.25 2.95m m 2.95 2.95 m m 2.95 4.15 mPROPERTY m 4.15 PROPERTY m 6.00 m LINE 6.00 m LINE 2.80 m 2.805.85 m m 5.85 m

m2.95 m2.95 BUILDING BUILDING HEIGHT HEIGHT HEIGHT BUILDING BUILDING G BUILDING HEIGHT G HEIGHT 6.00 m 6.00 m 5.95 m 5.952.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.45mm 3.45 2.95mm 2.95 2.95 m m 2.95 3.45mm 3.454.86 m m 4.86 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m107.71 2.95 2.95 m m107.71 2.95 m m 2.95 m m 2.95 2.95 m m 2.95 3.25m m 3.25 2.95m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.25m m 3.25 2.95m m 2.95 2.95 m m 2.95 4.15 mm 4.15 m 6.00 m 6.00 m 2.80 m 2.805.85 m m 5.85 m

BUILDING BUILDING HEIGHT G HEIGHT 2.802.80 m 2.80 5.85 m 2.80 m 5.85 m 5.85 m6.00 m 6.00 m 5.95 6.00 mm 5.95 2.95 m 5.95 m 2.95 2.95 m m m 2.95 2.95 2.95 m m m 2.95 3.45 mm2.95 3.45 2.95 m mm3.45 2.95 2.95 mm m 2.95 3.45 mm2.95 3.45 mm 4.86 3.45 m m2.95 m2.95 4.86 mm2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 2.95 m mG2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 2.95 3.25 m m m2.95 3.25 2.95 m m m3.25 2.95 2.95 m m m 2.95 2.95 2.95 m m m 2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 3.25 mm2.95 3.25 2.95 m m m3.25 2.95 2.95 m m m 2.95 4.15 m m 2.95 4.15 m 6.00 4.15 mm 6.00 m 6.00 m 2.80 5.85 m 5.85 m 6.00 m 6.00 m 5.95 m 5.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.45 m m 3.45 2.95 mm 2.95 2.95 m m 2.95 3.45 mm 4.86 3.45 m 4.86 m 4.86 mm2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.25 m m 3.25 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.25 m m 3.25 2.95 m m 2.95 2.95 m m 2.95 4.15 m mm 4.15 m 6.00 m 6.00 m m

107.71 107.71 m m

107.71 107.71 m HEIGHT m HEIGHT 107.71 107.71 m 107.71 m m BUILDING BUILDING

BC-T/O ROOF Turner Fleischer Architects Inc. BC-T/O BC-T/O BC-T/O ROOF ROOF ROOF Turner Fleischer Architects Inc. 226.11 67 Lesmill Road Toronto, ON, M3B 2T8 BC-T/O ROOF Turner Fleischer Architects Inc. 226.11 226.11 226.11 Lesmill T 41667 425 2222 Road Toronto, ON, M3B 2T8 BC-T/O BC-T/O BC BC-T/O BC T ROOF O T ROOF O ROOF EY turnerfleischer.com Turner Fleischer Architects Inc. 226.11 67 Lesmill T 416Road 425 2222 MPH226.11 MPH MPH MPH MPH MPH MPH Toronto, ON, M3B 2T8 BC-T/O ROOF turnerfleischer.com 226.11 226 226.11 226 11 11 BC-MPH Lesmill T 41667 425 2222 Road MPH MPH MPH Toronto, ON, M3B 2T8 turnerfleischer.com 226.11 BC-MPH BC-MPH BC-MPH 220.11 T 416 425 2222 MPH BC-MPH MPH MPH MPH MPH MPH MPH turnerfleischer.com 220.11 220.11 220.11 MPH MPH MPH BC-FLOOR BC-MPH BC-MPH BC BC-MPH BC MPH MPH 33 220.11 BC-FLOOR BC-FLOOR BC-FLOOR BC-MPH 215.96 220.11 220.11 220 220.11 220 11 1133 33 33 1.8m WIND BC-FLOOR 33 PREFINISHED METAL SCREEN(REFER TO 215.96 215.96 215.96 32 220.11 1.8m WIND 1.8m1.8m WIND 1.8m WIND WIND FLASHING WIND REPORT) BC-FLOOR BC BC FLOOR FLOOR 33 32 33 32 33 BC-FLOOR BC-FLOOR 32 PREFINISHED PREFINISHED PREFINISHED METAL METAL METAL SCREEN(REFER TO SCREEN(REFER SCREEN(REFER SCREEN(REFER TO TO 215.96 213.01 FLEXIBLE 1.8m WIND 1.8mTO WIND FLASHING FLASHING FLASHING WIND REPORT) WIND WIND REPORT) WIND REPORT) REPORT) BC-FLOOR 33 PREFINISHED METAL 31 WATERPROOFING SCREEN(REFER SCREEN(REFER 215.96 215.96 215 215.96 215 96 96 32 213.01 213.01 213.01 45MM MINIMUM GAP FLEXIBLE FLEXIBLE FLEXIBLE 1.8m mW WIND TO 1.8m1.8m WIND m1.8m WIND W mTO WIND W FLASHING FLASHING MEMBRANE WIND REPORT) WIND REPORT) OUTDOOR OUTDOOR OUTDOOR OUTDOOR COORDINATE WITH BC-FLOOR BC BC FLOOR FLOOR 32 32 32 PREFINISHED METAL M PREFINISHED PREFINISHED PREFINISHED METAL METAL M METAL M AMENITY BC-FLOOR BC-FLOOR 31 31 31 WATERPROOFING WATERPROOFING WATERPROOFING WATERPROOFING SCREEN(REFER TO O SCREEN(REFER SCREEN(REFER SCREEN(REFER TO TO O TO O 215.96 213.01 210.06 45MM MINIMUM1.8m GAP 45MM 45MM MINIMUM 45MM MINIMUM MINIMUM GAPGAP - GAP - FLEXIBLE FLEXIBLE mW WIND 1.8m WIND 19mmFLASHING EXT. GRADE WINDOW WASHING FLASHING G FLASHING FLASHING G G MEMBRANE MEMBRANE MEMBRANE MEMBRANE WIND REPORT) W O WIND WIND W REPORT) WIND W REPORT) REPORT) O WITH O OUTDOOR OUTDOOR COORDINATE WITH COORDINATE COORDINATE COORDINATE WITH WITH BC-FLOOR PREFINISHED METAL M PREFINISHED METAL AMENITY AMENITY AMENITY AMENITY 50 31 WATERPROOFING WATERPROOFING SCREEN(REFER TO OSCREEN(REFER TOPLYWOOD SHEATHING 213.01 213.01 213 213.01 213 01 01 32 45MM MINIMUM GAP 45MM MINIMUM GAP 210.06 210.06 210.06 CONSULTANT BC-FLOOR 30 FLEXIBLE FLEXIBLE FLEXIBLE FLEXIBLE 19mm EXT. GRADE 19mm 19mm EXT. 19mm EXT. GRADE EXT. GRADE GRADE WINDOW WASHING WINDOW WINDOW WINDOW WASHING WASHING WASHING FLASHING G FLASHING MEMBRANE MEMBRANE WIND W REPORT) O WIND REPORT) BOARD ON WOOD OUTDOOR OUTDOOR OUTDOOR OUTDOOR COORDINATE WITH AMENITY AMENITY 50 50 50 50 45MM BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 31 30 31 30 31 WATERPROOFING W OOFLEXIBLE G WATERPROOFING WATERPROOFING W WATERPROOFING W OO OOG G PLYWOOD SHEATHING PLYWOOD PLYWOOD PLYWOOD SHEATHING SHEATHING SHEATHING 213.01 45MM MMCOORDINATE MINIMUM M M MG GAPWITH 45MM MM MINIMUM 45MM MM MINIMUM M MINIMUM M MCONSULTANT GAP M MG GAP -M G GAP - 210.06 CONSULTANT CONSULTANT CONSULTANT BC-FLOOR BC-FLOOR BC-FLOOR 30 FLEXIBLE 19mm EXT. GRADE 19mm EXT. GRADE 206.81 BLOCKING WINDOW WASHING WINDOW MEMBRANE M M WOOD MEMBRANE MEMBRANE M M MEMBRANE M M WOOD BOARD ON BOARD BOARD BOARD ONSHEATHING WOOD ON WOOD ON OUTDOOR OUTDOOR TERMINATION BAR AND COORDINATE OO WITH COORDINATE COORDINATE OOCOORDINATE OO WASHING WITH WITH W WITH W AMENITY AMEN TY AMENITY AMENITY AMEN AMENITY AMEN TY TY 50 50 BC-FLOOR 31 WATERPROOFING W OO G WATERPROOFING PLYWOOD SHEATHING PLYWOOD 45MM MM M MINIMUM MW MG GAP 45MM MINIMUM GAP 210.06 210.06 210 210.06 210 06 06 30 CONSULTANT CONSULTANT BC-FLOOR 29 19mm mm EXT. GRADE G 19mm 19mm mm EXT. 19mm mm EXT. GRADE EXT. GRADE G GRADE G 206.81 206.81 206.81 BLOCKING BLOCKING BLOCKING BLOCKING PREFINISHED METAL FLASHING WINDOW W OW W WASHING G WINDOW W WINDOW W OW WASHING OW WASHING W WASHING W G G MEMBRANE M M WOOD MEMBRANE BOARD ON BOARD ONSHEATHING WOOD TERMINATION BAR AND TERMINATION TERMINATION TERMINATION BARBAR AND BAR ANDAND 50 50 50 WINDOW COORDINATE OO WITH W COORDINATE WITH AMENITY AMEN TY AMENITY 50 PLYWOOD WOO19mm SHEATHING G PLYWOOD PLYWOOD PLYWOOD WOO SHEATHING WOO SHEATHING G G 210.06 WITH CONTINOUS SEALANT CONSULTANT O CONSULTANT CONSULTANT O CONSULTANT O BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 30 29 30 29 30 29 mm EXT. GRADE G 19mm EXT. GRADE 206.81 BLOCKING BLOCKING 203.86 PREFINISHED METAL FLASHING PREFINISHED PREFINISHED PREFINISHED METAL METAL FLASHING METAL FLASHING FLASHING WINDOW W OW W WASHING G WINDOW WASHING BOARD O ON O WOOD WOO BOARD BOARD O BOARD ON O WOOD ON O WOOD WOO ON O WOOD WOO TERMINATION BAR AND TERMINATION BAR AND 50 50 PLYWOOD WOO SHEATHING G CONTINOUS PLYWOOD SHEATHING WITH CONTINOUS SEALANT WITH WITH CONTINOUS WITH CONTINOUS SEALANT SEALANT SEALANT CONSULTANT O CONSULTANT BC-FLOOR 29 28 206.81 206.81 206 206.81 206 81 81 30 REFER TO LANDSCAPE DWGS BLOCKING O G BLOCKING BLOCKING O BLOCKING O G G 203.86 203.86 203.86 PREFINISHED METAL FLASHING PREFINISHED BOARD O ON O WOOD WOO BOARDALUMINUM ON WOOD TERMINATION M O BAR AND TERMINATION TERMINATION TERMINATION M METAL M BAR O FLASHING BAR OAND BAR ANDAND CONTINOUSDWGS SEALANT WITH CONTINOUS SEALANT BC-FLOOR BC BC FLOOR FLOOR 29 BC-FLOOR BC-FLOOR 28 29 28 29 28 206.81 REFERWITH TO LANDSCAPE REFER REFER REFER TOGLANDSCAPE TO LANDSCAPE TO LANDSCAPE DWGS DWGS DWGS BLOCKING O BLOCKING PROFILE/EXTRUDED 203.86 PREFINISHED METAL M FLASHING PREFINISHED PREFINISHED PREFINISHED METAL METAL M FLASHING METAL M FLASHING FLASHING G G 200.91 ALUMINUM ALUMINUM ALUMINUM ALUMINUM TERMINATION M O BARGAND TERMINATION BAR AND R2b FIN BY CURTAIN WALL WITH W CONTINOUS OTO LANDSCAPE O SEALANT WITH WITH W CONTINOUS WITH W CONTINOUS OLANDSCAPE CONTINOUS O OSEALANT OSEALANT SEALANT BC-FLOOR 28 27 REFER DWGS REFER TO DWGS PROFILE/EXTRUDED PROFILE/EXTRUDED PROFILE/EXTRUDED PROFILE/EXTRUDED 203.86 203.86 203 203.86 203 86 86 29 PREFINISHED METAL FLASHING M G PREFINISHED METAL FLASHING 200.91 200.91 200.91 ALUMINUM ALUMINUM MANUFACTURER. R2bR2bSEALANT R2b FIN BYPROFILE/EXTRUDED CURTAIN WALL FIN FIN BYPROFILE/EXTRUDED CURTAIN FIN BY CURTAIN BY CURTAIN WALL WALL WALL WITH W CONTINOUS O R2b O DWGS SEALANT WITH CONTINOUS BC-FLOOR BC BC FLOOR FLOOR 28 28 28 REFER TO O LANDSCAPE WG REFER REFER REFER TO LANDSCAPE TO O LANDSCAPE TO O LANDSCAPE DWGS DWGS WG DWGS WG BC-FLOOR BC-FLOOR 27 27 27 203.86 200.91 197.96 ALUMINUM M M ALUMINUM ALUMINUM ALUMINUM M MM M MANUFACTURER. MANUFACTURER. MANUFACTURER. MANUFACTURER. R2b R2b FIN WALLTO LANDSCAPE DWGS FIN BY CURTAIN WALL BC-FLOOR REFER TO O LANDSCAPE DWGS WG REFER 27 PROFILE/EXTRUDED O BY CURTAIN PROFILE/EXTRUDED PROFILE/EXTRUDED OPROFILE/EXTRUDED O ALUMINUM 26 200.91 200.91 200 200.91 200 91 91 28 197.96 197.96 197.96 ALUMINUM M M MANUFACTURER. MANUFACTURER. R2b R2bR2bR2b FIN BY CURTAIN WALL W FIN FIN BY CURTAIN FIN BY CURTAIN BY CURTAIN WALL WALL W WALL W BC-FLOOR BC BC FLOOR FLOOR 27 PROFILE/EXTRUDED O PROFILE/EXTRUDED BC-FLOOR BC-FLOOR 26 27 26 27 26 200.91 197.96 195.01 MANUFACTURER. M MANUFACTURER. MANUFACTURER. M MANUFACTURER. M R2b R2b FIN BY CURTAIN W WALL FIN BY CURTAIN WALL BC-FLOOR 26 25 197.96 197.96 197 197.96 197 96 96 27 195.01 195.01 195.01 MANUFACTURER. M MANUFACTURER. BC-FLOOR BC BC FLOOR FLOOR 26 BC-FLOOR BC-FLOOR 25 26 25 26 25 197.96 195.01 192.06 RES. RES. BC-FLOOR 25 24 195.01 195.01 195 195.01 195 01 01 26 192.06 192.06 192.06 RES.BC-FLOOR RES. RES. RES. RES. RES. RES. BC BC FLOOR FLOOR 25 25 25 BC-FLOOR BC-FLOOR 24 24 24 195.01 192.06 189.11 RES. RES. RES. BC-FLOOR 24 23 192.06 192.06 192 192.06 192 06 06 25 189.11 189.11 189.11 RES.BC-FLOOR RES RES. RES. RES RES. RES RES. RES. RES RES. RES BC BC FLOOR FLOOR 24 BC-FLOOR BC-FLOOR 23 24 23 24 23 192.06 189.11 186.16 RES. RES RES. RES. BC-FLOOR FOR SLAB THICKNESS 23 22 189.11 189.11 189 189.11 189 11 11 24 186.16 186.16 186.16 REFER TO STRUCTURAL BC-FLOOR BC BC FLOOR FLOOR 23 FOR SLAB THICKNESS FORFOR SLAB FOR SLAB THICKNESS SLAB THICKNESS THICKNESS BC-FLOOR BC-FLOOR 22 23 22 23 22 189.11 186.16 183.21 DRAWINGS REFER TO STRUCTURAL REFER REFER REFER TO SLAB STRUCTURAL TO STRUCTURAL TO STRUCTURAL BC-FLOOR FOR SLAB THICKNESS FOR THICKNESS 22 21 186.16 186.16 186 186.16 186 16 16 23 183.21 183.21 183.21 DRAWINGS DRAWINGS DRAWINGS DRAWINGS REFER TO STRUCTURAL REFER TO STRUCTURAL FOR O SLAB THICKNESS FOR FOR SLAB O FOR SLAB O THICKNESS SLAB THICKNESS THICKNESS BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 22 22 22 186.16 183.21 180.26 21 21 21 DRAWINGS DRAWINGS REFERFOR TO O STRUCTURAL REFER REFER REFER TO SLAB STRUCTURAL TO O STRUCTURAL TO O STRUCTURAL METAL PANEL O SLAB THICKNESS FOR THICKNESS BC-FLOOR 22 21 183.21 183.21 183 183.21 183 21 21 180.26 180.26 180.26 20 DRAWINGS W G DRAWINGS DRAWINGS DRAWINGS W W G G BC-FLOOR SEALANT REFER TO MATERIAL REFER TO O STRUCTURAL REFER TO STRUCTURAL METAL PANEL VAPOUR METAL METAL PANEL METAL PANEL -PANEL - BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 21 BARRIER SEALED 183.21 180.26 LEGEND FOR DRAWINGS W G BC-FLOOR BC-FLOOR BC-FLOOR 20 21 20 21 20 SEALANT SEALANT SEALANT SEALANT DRAWINGS 177.01 REFER TOMETAL MATERIAL REFER REFER REFER TOMETAL MATERIAL TO MATERIAL TOPANEL MATERIAL TO U/S OF CONCRETE SLAB PANEL - BARRIER COLORSBC-FLOOR 21 VAPOUR BARRIER SEALED VAPOUR VAPOUR VAPOUR BARRIER BARRIER SEALED SEALED SEALED 180.26 180.26 180 180.26 180 26 26 20 LEGEND FOR LEGEND LEGEND LEGEND FORFORFOR BC-FLOOR SEALANT SEALANT 19 177.01 177.01 177.01 REFER TOPANEL MATERIAL REFER TO MATERIAL TO U/S OF CONCRETE SLAB TO U/S TO OF TO CONCRETE U/S OF CONCRETE OF CONCRETE SLAB SLAB SLAB METAL M - U/S METAL METAL M PANEL METAL M PANEL -PANEL - COLORS COLORS COLORS COLORS VAPOUR BARRIER SEALED VAPOUR BARRIER SEALED 180.26 LEGEND FOR LEGEND FOR BC-FLOOR BC BC FLOOR FLOOR 20 SEALANT SEALANT SEALANT SEALANT BC-FLOOR BC-FLOOR 19 20 19 20 19 177.01 REFER TO OM MATERIAL M REFER REFER REFER TOMETAL MATERIAL TO OM MATERIAL TO OPANEL MATERIAL M EW2g 174.06 TO U/S OF CONCRETE SLAB TO U/S OF CONCRETE SLAB METAL PANEL -OBARRIER COLORS COLORSVAPOUR O BARRIER SEALED VAPOUR VAPOUR VAPOUR OBARRIER BARRIER SEALED SEALED SEALED INDOOR AMENITY EXTERIOR LEGEND GTO FOR O LEGEND LEGEND G LEGEND FOR G FOR O FOR O BC-FLOOR SEALANT SEALANT 19 18 177.01 177.01 177 177.01 177 01 01 20 REFER OM MATERIAL REFER TO MATERIAL EW2g EW2g EW2g EW2g 174.06 174.06 174.06 TO O U/S O OF CONCRETE O SLAB TO O U/S OF TO O CONCRETE U/S OF CONCRETE O OF O O CONCRETE O SLAB SLAB SLAB COLORS OTO O U/S COLORS COLORS O COLORS OO O VAPOUR O BARRIER SEALED VAPOUR BARRIER SEALED G FOR O LEGEND FOR INDOOR AMENITY EXTERIORLEGEND INDOOR INDOOR INDOOR AMENITY AMENITY AMENITY EXTERIOR EXTERIOR EXTERIOR BC-FLOOR BC BC FLOOR FLOOR 19 BC-FLOOR BC-FLOOR 18 19 18 19 18 177.01 EW2g EW2g 174.06 171.11 TO O U/S O OF CONCRETE O SLAB COLORS OTO O U/S OF CONCRETE SLAB COLORS INDOOR AMENITY EXTERIOR INDOOR AMENITY EXTERIOR BC-FLOOR 18 17 EW2g W EW2g EW2g W EW2g W 174.06 174.06 174 174.06 174 06 06 19 171.11 171.11 171.11 INDOOR NDOOR AMEN AMENITY TY EXTERIOR EXTER OR INDOOR INDOOR NDOOR INDOOR NDOOR AMENITY AMENITY AMEN AMENITY AMEN TYTY EXTERIOR EXTERIOR EXTER EXTERIOR EXTER OROR BC-FLOOR BC BC FLOOR FLOOR 18 BC-FLOOR BC-FLOOR 17 18 17 18 17 J-MOULD AND SEALANT EW2g W EW2g 174.06 171.11 168.16 VAPOUR BARRIER SEALED INDOOR NDOOR AMENITY AMEN EXTERIOR EXTER OR INDOOR AMENITY EXTERIOR BC-FLOOR 17 J-MOULD AND SEALANTTY J-MOULD J-MOULD J-MOULD AND AND SEALANT AND SEALANT SEALANT 16 171.11 171.11 171 171.11 171 11 11 18 168.16 168.16 168.16 TO WINDOW FRAME VAPOUR BARRIER SEALED VAPOUR VAPOUR VAPOUR BARRIER BARRIER BARRIER SEALED SEALED SEALED BC-FLOOR BC BC FLOOR FLOOR 17 J-MOULD AND SEALANT J-MOULD AND SEALANT BC-FLOOR BC-FLOOR 16 17 16 17 16 171.11 168.16 165.21 TO WINDOW FRAME TO WINDOW TO WINDOW TO WINDOW FRAME FRAME FRAME VAPOUR BARRIER SEALED VAPOUR BARRIER SEALED BC-FLOOR J-MOULD MO AND SEALANT J-MOULD J-MOULD MO J-MOULD MO AND AND SEALANT AND SEALANT SEALANT 16 15 168.16 168.16 168 168.16 168 16 16 17 165.21 165.21 165.21 TO WINDOW FRAME TO WINDOW FRAME VAPOUR O J-MOULD BARRIER SEALED VAPOUR VAPOUR VAPOUR OBARRIER OBARRIER BARRIER SEALED SEALED SEALED MO AND SEALANT J-MOULD AND SEALANT BC-FLOOR BC BC FLOOR FLOOR 16 16 16 BC-FLOOR BC-FLOOR 15 15 15 168.16 165.21 162.26 TO OW WINDOW OW FRAME M TO WINDOW TO OW WINDOW TO OW WINDOW OW FRAME OW FRAME FRAME M M VAPOUR O BARRIER SEALED VAPOUR BARRIER SEALED BC-FLOOR 15 14 165.21 165.21 165 165.21 165 21 21 16 162.26 162.26 162.26 TO OW WINDOW OW FRAME M TO WINDOW FRAME BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 15 14 15 14 15 14 165.21 162.26 159.31 BC-FLOOR 14 13 162.26 162.26 162 162.26 162 26 26 15 159.31 159.31 159.31 BC-FLOOR BC BC FLOOR FLOOR 14 BC-FLOOR BC-FLOOR 13 14 13 14 13 162.26 159.31 156.36 BC-FLOOR 13 12 159.31 159.31 159 159.31 159 31 31 14 156.36 156.36 156.36 BC-FLOOR BC BC FLOOR FLOOR 13 13 13 BC-FLOOR BC-FLOOR 12 12 12 2 SECTION DETAIL AT PARAPET - OUTDOOR AMENITY TERRACE 159.31 156.36 153.41 2 1 : 10 BC-FLOOR 12 AMENITY TERRACE SECTION DETAIL DETAIL DETAIL ATAT PARAPET AT PARAPET PARAPET - OUTDOOR - OUTDOOR - OUTDOOR AMENITY AMENITY AMENITY TERRACE TERRACE TERRACE 2 SECTION DETAIL AT PARAPET - OUTDOOR 2SPA401 2 SECTION 2 SECTION 11 156.36 156.36 156 156.36 156 36 36 13 153.41 153.41 153.41 SPA401 2 2 2 2 SPA401 SPA401 SPA401 1 : 10 1 : 10 1 : 10 1 : 10 BC-FLOOR BC BC FLOOR FLOOR 12 SECTION DETAIL AT PARAPET - OUTDOOR AMENITY TERRACE 2 SECTION DETAIL AT PARAPET - OUTDOOR AMENITY TERRACE 2SPA401 BC-FLOOR BC-FLOOR 11 12 11 12 11 156.36 153.41 150.46 1.8M WIND SCREEN SPA4012 SPA401 SPA401 SPA401 2 SPA401 SPA401 1 : 10 1 : 10 BC-FLOOR 12 SECTION SECT ON DETAIL DETA L AT PARAPET OUTDOOR AMENITY AMEN TY TERRACE SECTION SECTION SECT SECTION SECT ON DETAIL ON DETAIL DETA DETAIL DETA AT L AT PARAPET L AT PARAPET PARAPET OUTDOOR OUTDOOR OUTDOOR AMENITY AMENITY AMEN AMENITY AMEN TY TERRACE TY TERRACE TERRACE 2 2 2 2 11 153.41 153.41 153 153.41 153 41 41 INDOOR 150.46 150.46 150.46 1.8M WIND SCREEN 1.8M1.8M WIND 1.8M WIND SCREEN WIND SCREEN SCREEN OUTDOOR AMENITY SPA401 1 : 10 2SPA401 2 2 SPA401 1 : 10 1 : 10 1 : 10ON DETA SECTION ON DETA DETAIL L AT PARAPET -2SPA401 OUTDOOR AMENITY AMEN TY TERRACE SPA401 SECTION SECT DETAIL L AT PARAPET - OUTDOOR AMEN AMENITY TY TERRACE 2 SECT 2SPA401 BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 11 10 11 11 153.41 INDOOR INDOOR INDOOR INDOOR 150.46 AMENITY BC-FLOOR 1.8M WIND SCREEN 1.8M WIND SCREEN OUTDOOR AMENITY OUTDOOR OUTDOOR OUTDOOR AMENITY AMENITY AMENITY SPA401 1 : 10 SPA4012 SPA401 SPA401 SPA401 2 SPA401 1 : 10 BC-FLOOR 11 INDOOR INDOOR 150.46 150.46 150 150.46 150 46 4610 AMENITY AMENITY AMENITY AMENITY BC-FLOOR BC-FLOOR BC-FLOOR 10 10 1.8M MW WIND SCREEN 1.8M1.8M WIND M1.8M WIND W MSCREEN WIND W SCREEN SCREEN OUTDOOR AMENITY OUTDOOR AMENITY SPA401 SPA401 145.6 INDOOR NDOOR INDOOR INDOOR NDOOR INDOOR NDOOR OUTDOOR 150.46 AMENITY AMENITY BC-FLOOR 10 1.8M MW WIND SCREEN 1.8M WIND SCREEN AMENITY AMEN TY OUTDOOR OUTDOOR AMENITY AMENITY AMEN AMENITY AMEN TYTY 145.6 145.6 145.6OUTDOOR BC-FLOOR 09 INDOOR NDOOR INDOOR AMENITY AMEN TY AMENITY AMENITY AMEN AMENITY AMEN TY TY BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 10 10 10 OUTDOOR AMENITY AMEN TY OUTDOOR AMENITY 145.6 BC-FLOOR BC-FLOOR BC-FLOOR 09 09 09 142.15 INDOOR AMENITY AMENITY AMEN TY145 AMENITY BC-FLOOR 10 145.6 145.6 145 145.6 6 6 BC-FLOOR 09 08 142.15 142.15 142.15 INDOOR AMENITY INDOOR INDOOR INDOOR AMENITY AMENITY AMENITY INDOOR 145.6 BC-FLOOR BC BC FLOOR FLOOR 09 09 BC-FLOOR BC-FLOOR 08 09 08 08 87 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 CCU 142.15 139.2 6.40 m INDOOR AMENITY INDOOR AMENITY 74 2024-03-08 ISSUED FOR SITE PLAN APPROVAL #4 CCU INDOOR INDOOR INDOOR INDOOR AMENITY BC-FLOOR 09 08 07 87 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 CCU 142.15 142.15 142 142.15 142 15 15 38 NOT ISSUED 139.2 139.2 139.2 INDOOR NDOOR AMEN AMENITY TY INDOOR INDOOR NDOOR INDOOR NDOOR AMENITY AMENITY AMEN AMENITY AMEN TY TY 6.40 6.40 m SETBACK 6.40 m m ZONING 74 2024-03-08 ISSUED FORREVIEW SITE PLAN INDOOR INDOOR 35 2023-06-30 ISSUED FOR TTC #5 APPROVAL #4 FZH CCU AMENITY AMENITY AMENITY AMENITY BC-FLOOR BC BC FLOOR FLOOR 08 08 BC-FLOOR BC-FLOOR 07 08 07 07 87 2022-09-27 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 CCU 142.15 38 NOT ISSUED 139.2 13 ISSUED FOR PPR CCU 136.25 INDOOR NDOOR AMENITY AMEN TY INDOOR AMENITY 6.40 m ZONING ZONING ZONING SETBACK SETBACK SETBACK 74 2022-06-29 2024-03-08 ISSUED FOR SITE APPROVAL CCU FZH INDOOR NDOOR INDOOR INDOOR NDOOR INDOOR NDOOR 35 2023-06-30 ISSUED FORPLAN TTC#2REVIEW #5 #4 8 ISSUED FOR PRICING CCU AMENITY AMENITY BC-FLOOR 08 07 87 2022-09-27 2024-06-21 ISSUED FOR FOR SITE PLAN APPROVAL#5 CCU 38 2022-06-28 NOT ISSUED 139.2 139.2 139 139.2 139 2 2 13 ISSUED LOCKERS 136.25 136.25 136.25 5 ISSUED FOR PPR PPR CCU CCU 6.406.40 m SETBACK 6.40 m m BC-FLOOR 06 ZONING 74 2022-06-29 2024-03-08 ISSUED FORREVIEW SITE PLAN #4 CCU INDOOR NDOOR INDOOR 35 2022-04-12 2023-06-30 ISSUED FOR #5#2APPROVAL FZH CCU 8 ISSUED FOR PRICING AMENITY AMEN TY LOCKERS AMENITY AMENITY AMEN AMENITY AMEN TYTY 2 ISSUED FOR TTC SITE PLAN APPROVAL #1 CCU BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 07 38 NOT ISSUED 139.2 13 ISSUED FOR PPR CCU OCKERS LOCKERS LOCKERS 136.25 5 DATE 2022-06-28 ISSUED FOR PPR m SETBACK # 2022-09-27 DESCRIPTION BY CCU BC-FLOOR BC-FLOOR BC-FLOOR 06 07 06 07 06 ZONING ZONING O ZONING SETBACK O6.40 G SETBACK G 132.8 35 2023-06-30 ISSUED FOR #5 0.20 m 8 2022-06-29 ISSUED FOR PRICING #2REVIEW CCU FZH AMENITY AMEN TY LOCKERS AMENITY 2 2022-04-12 ISSUED FOR TTC SITE PLAN APPROVAL #1 CCU BC-FLOOR 07 13 2022-09-27 ISSUED FOR PPR DESCRIPTION LOCKERS 136.25 136.25 136 136.25 136 25 25 5 2022-06-28 ISSUED FOR PPR CCU CCU # DATE BY BC-FLOOR 06 ZONING SETBACK BC-FLOOR LOCKERS 132.8 132.8 132.8 05 0.20 m 0.200.20 m SETBACK 0.20 m m 8 2022-06-29 ISSUED FORPLAN PRICING #2 2 2022-04-12 ISSUED FOR SITE APPROVAL #1 CCU CCU ZONING OCKERS LOCKERS LOCKERS LOCKERS 136.25 5 DATE 2022-06-28 ISSUED FOR PPR # DESCRIPTION BY CCU BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 0605 0605 06 BC-FLOOR BC-FLOOR BC-FLOOR 05 OCKERS LOCKERS LOCKERS LOCKERS 132.8 0.20 m 0.20 m SETBACK 129.85 2 2022-04-12 ISSUED FOR SITE PLAN APPROVAL #1 CCU ZONING SETBACK ZONING ZONING ZONING SETBACK SETBACK LOCKERS LOCKERS # DATE DESCRIPTION BY RES. RES. RES. 0.200.20 BC-FLOOR 06 BC-FLOOR LOCKERS LOCKERS 04 132.8 132.8 132 132.8 132 8 8 05 0.20 m SETBACK m SETBACK 0.20 m m 129.85 129.85 129.85 ZONING ZONING RES. RES. RES. RES. RES. LOCKERS RES. RES. RES. RES. RES. RES. 0.20 m BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 05 OCKERS LOCKERS LOCKERS BC-FLOOR BC-FLOOR BC-FLOOR 0405 0405 04 132.8 0.20 m 129.85 126.9 ZONING O G SETBACK ZONING ZONING O ZONING SETBACK OG SETBACK G SETBACK RES. RES. RES. RES. RES. BC-FLOOR 05 LOCKERS LOCKERS BC-FLOOR 04 03 129.85 129.85 129 129.85 129 85 85 126.9 126.9 126.9 ZONING O G SETBACK ZONING SETBACK RES. RES RES. RES. RES RES. RES RES RES. RES. RES RES. RES RES. RES. RES. RES RES. RES BC-FLOOR BC BC FLOOR FLOOR 04 BC-FLOOR BC-FLOOR 03 04 03 04 03 129.85 126.9 123.95 RES. RES. RES. RES. RES RES. BC-FLOOR 04 03 126.9 126.9 126 126.9 126 9 9RES 123.95 123.95 123.95 BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 03 03 03 PROJECT 126.9 123.95 GALLERIA 0.9 m BC-FLOOR PROJECT PROPOSED MIXED-USE 02 123.95 123.95 123 123.95 123 95 95 03 CANOPY GALLERIA GALLERIA GALLERIA 0.9 m 0.9 m 0.9 m 0.9 m C) PROJECT DEVELOPMENT PROPOSED(BLOCK MIXED-USE BC-FLOOR BC-FLOOR BC-FLOOR 02 02 02 123.95 CANOPY CANOPY CANOPY CANOPY 118 GALLERIA 0.9 m 0.9 m PROPOSED DEVELOPMENT (BLOCK PROJECT PROPOSED MIXED-USE M XED USE C) BC-FLOOR 02 CANOPY CANOPY 118118 118 GRADE GALLERIA GALLER GALLERIA GALLER A A 1141 Bloor Street West + 980 Dufferin Street, Toronto, 112.85 GALLERIA BC-EST. 0.9 m 112.60 0.9 m 0.9 m 0.9 m PROPOSED PROPOSED PROPOSED PROPOSED PRIVATE ROAD DEVELOPMENT (BLOCK BLOCK C) C PROPOSED MIXED-USE M XED USE ON BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 02 02 02 CANOPY CANOPY CANOPY CANOPY RETAIL 118 1141 Bloor Street West + 980 Dufferin Street, Toronto, 112.85 112.85 GALLERIA BC-EST. BC-EST. GRADE GRADE GRADE ST. 112.85 111.51 0.9 112.60 m 112.60 0.9 m 112.7 112.60BC-EST. 112.60 DUFFERIN PROPOSED PROPOSED PRIVATE ROAD PRIVATE PRIVATE PRIVATE ROAD ROAD ROAD DEVELOPMENT BLOCK C C) ON (BLOCK BC-FLOOR 02 CANOPY CANOPY RETAIL RETAIL RETAIL RETAIL 118 118 118 1141 Bloor Street W West + 980 Dufferin Street, Toronto, 112.85 BC-EST. GRADE 111.51 111.51 111.51 111.51 DRAWING 112.7 112.7 112.7 112.60 112.60 DUFFERIN DUFFERIN DUFFERIN ST. ST. ST. PROPOSED PROPOSED PROPOSED PROPOSED PRIVATE ROAD PRIVATE ROAD ON O RETAIL 112.85 RETAIL 118 BC-FLOOR 01 1141 Bloor Street W West + 980 Dufferin Street, Toronto, 112.85 112.85 BC-EST. BC BC-EST. BC EST GRADE EST GRADE GRADE 111.51 111.51 DRAWING 112.7 112.60BC-EST. 112.60 112.60 112.60 DUFFERIN ST. PROPOSED PROPOSED PRIVATE PR VATE ROAD PRIVATE PRIVATE PR PRIVATE PR VATE VATE ROAD ROAD ROAD 111.75 ON O RETAIL RETA L RETAIL RETAIL RETA RETAIL RETA L L BC-FLOOR BC-FLOOR BC-FLOOR 01 01 01 ST. BC-EST. GRADE 111.51 111.51 111.51 111.51 DRAWING 112 112.7 112.7 112.7 112 7DUFFERIN 7DUFFER 112.60 112.60 DUFFERIN DUFFERIN DUFFER N ST ST. NLST ST. 112.85 PRIVATE PR VATE ROAD PRIVATE ROAD 111.75 111.75 111.75 111.75 BUILDING SECTIONS RETAIL RETAIL BC-FLOOR 01 RETA 111.51 111.51 DRAWING 112112.7 112 112 DUFFERIN ST. U/G1 PARKING 111.75 111.75 BUILDING SECTIONS BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR 01 01 01 U/G 1 FLOOR 112 U/G101PARKING U/G1 U/G1 U/G1 PARKING PARKING PARKING 111.75 111.75 111.75 111.75 BUILDING BU LD NG SECT SECTIONS ONS BC-FLOOR U/G U/G 1112 U/G 1 1 112 112 106.15 U/G1 PARKING U/G1 PARKING 111.75 111.75 PROJECT NO. BUILDING BU LD NG SECT SECTIONS ONS U/G2 PARKING GARBAGE 2 U/G 1 112 106.15 106.15 106.15 U/G1 U G1 PARK PARKING NG U/G1 U/G1 U G1 U/G1 U PARKING G1 PARKING PARK PARKING PARK NG NG 21.081CS2 PROJECT NO. U/G2 PARKING U/G2 U/G2 U/G2 PARKING PARKING PARKING GARBAGE GARBAGE GARBAGE U/G 2G U/G 2G 1 2 U/G U 1 U 1 103.35 106.15 PROJECT DATE U/G1 U G1 PARK PARKING NG U/G1 PARKING 21.081CS2 PROJECT NO. U/G2 PARKING U/G2 PARKING GARBAGE 2 U/G 1 103.35 103.35 103.35 106.15 106.15 106 106.15 106 15 15 JULYPROJECT 2021 DATE 21.081CS2 PROJECT NO. U/G2 PARKING NG U/G2 U/G2 U G2 U/G2 U PARKING G2 PARKING PARK PARKING PARK NGNG GARBAGE GARBAGE GARBAGE U/G U/G U 2G U/G U 2GU 2 G2 PARK DRAWN BY 2021 103.35 106.15 JULY PROJECT DATE 21.081CS2 U/G2 G2 PARK PARKING NG U/G2 PARKING GARBAGE LKR U/G 2 35U 103.35 103 103.35 103 35 JULYDRAWN 2021BYDATE PROJECT SECTION A 1 103.35 CHECKED BY LKR DRAWN BY 2021 JULY :103.35 250 SECTION A A A 1SPA401 1 SECTION 1 1SECTION CCUCHECKED BY LKRDRAWN BY SPA401 SPA401 1 : 250 1 : 250 1 : 250 SCALE SECTION A 1SPA401 CCU CHECKED LKRBY As indicated : 250 SECTION SECTION SECT ON A ON A A 1SPA401 1 SECTION 1 1SECT CCUSCALE CHECKED BY As indicated SPA401 SPA401 1 : 250 1 : 250 1 : 250 SCALE SECTION A 1SPA401 CCU

MIN. 1.8M

PROPERTY LINE

C GC C EY G C

1.8m WIND SCREEN(REFER TO WIND REPORT)

As indicated SCALE

As indicated DRAWING NO.

REV.

SPA401 87 SPA401 87 22 SPA401 87 87 HIGH-RISESPA401 DRAWING NO.

DRAWING NO.

DRAWING NO.

REV.

REV.

REV.

87 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 74 2024-03-08 ISSUED FOR SITE PLAN APPROVAL #4 87 2024-06-21 87 2024-06-21 87 2024-06-21 ISSUED ISSUED FOR ISSUED SITE FORPLAN SITE FORPLAN APPROVAL#5 SITE PLAN APPROVAL#5 APPROVAL#5 38 NOT ISSUED 74 2024-03-08 74 2023-06-30 2024-03-08 74 2024-03-08 ISSUED FORISSUED SITE SITE FORREVIEW PLAN APPROVAL SITE PLAN APPROVAL APPROVAL #4 #4 35 ISSUED FORPLAN TTC #5 #4 87 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 38 38 2022-09-27 38 NOT ISSUED NOT ISSUED NOT ISSUED 13 ISSUED FOR PPR 74 2024-03-08 ISSUED SITE PLAN APPROVAL 35 2023-06-30 35 2022-06-29 2023-06-30 35 2023-06-30 ISSUED FORISSUED TTC FORREVIEW TTC FORREVIEW TTC #5#2REVIEW #5 #5 #4 8 ISSUED PRICING 87 2024-06-21 87 2022-06-28 2024-06-21 87 2022-09-27 2024-06-21 ISSUED ISSUED FOR ISSUED SITE FORPLAN SITE FORPLAN APPROVAL#5 SITE PLAN APPROVAL#5 APPROVAL#5 38 NOT ISSUED 13 2022-09-27 13 2022-09-27 13 ISSUED FOR ISSUED PPR FOR PPR 5 ISSUED FOR PPR 74 2024-03-08 74 2022-04-12 2024-03-08 74 2022-06-29 2024-03-08 ISSUED FORISSUED ISSUED SITE SITE FOR PLAN APPROVAL SITE APPROVAL APPROVAL #4 #4 35 2023-06-30 ISSUED FOR TTC #5#2#4 8 2022-06-29 8 2022-06-29 8 ISSUED FOR PRICING PRICING FOR #2REVIEW PRICING #2PLAN 2 ISSUED FORPLAN SITE PLAN APPROVAL #1 87 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 38 38 38 DATE NOT ISSUED NOT ISSUED NOT ISSUED 13 ISSUED FOR PPR 5 2022-06-28 5 2022-06-28 5 2022-06-28 ISSUED FOR ISSUED PPR FOR PPR # 2022-09-27 DESCRIPTION 74 2024-03-08 ISSUED SITE PLAN APPROVAL 35 2023-06-30 35 2022-06-29 2023-06-30 35 2022-04-12 2023-06-30 ISSUED FOR ISSUED TTC FOR TTC FOR TTC #5#2REVIEW #5 #1 #5 #4 8 ISSUED PRICING 2 2022-04-12 2 2022-04-12 2 ISSUED FORISSUED SITE FORREVIEW PLAN SITE FORREVIEW PLAN APPROVAL SITE PLAN APPROVAL APPROVAL #1 #1 38 NOT ISSUED 13 13 2022-09-27 13 2022-09-27 ISSUED FOR ISSUED PPR FOR PPR 5 2022-06-28 FOR PPR # 2022-09-27 # DATE # DATE DATEISSUED DESCRIPTION DESCRIPTION DESCRIPTION 35 2023-06-30 ISSUED FOR TTC REVIEW #5 8 2022-06-29 8 2022-06-29 8 2022-06-29 ISSUED FOR ISSUED PRICING PRICING FOR #2 PRICING #2 #2 2 2022-04-12 ISSUED FOR SITE PLAN APPROVAL #1 13 ISSUED FOR PPR 5 2022-06-28 5# 2022-09-27 2022-06-28 5 DATE 2022-06-28 ISSUED FORISSUED PPR FOR PPR DESCRIPTION 8 2022-06-29 ISSUED FORPLAN PRICING #2PLAN 2 2022-04-12 2 2022-04-12 2 2022-04-12 ISSUED FORISSUED SITE SITE FORPLAN APPROVAL SITE APPROVAL #1 APPROVAL #1 #1 5# DATE 2022-06-28 # # DATE DATEISSUED FOR PPR DESCRIPTION DESCRIPTION DESCRIPTION 2 2022-04-12 ISSUED FOR SITE PLAN APPROVAL #1 # DATE DESCRIPTION

EW2g

CCU CCU CCU CCU CCU CCU FZH CCU CCU CCU CCU CCU FZH CCU FZH FZH CCU CCU CCU CCU CCU CCU CCU FZH CCU CCU CCU CCU CCU CCU CCU CCU BY CCU CCU FZH FZH CCU FZH CCU CCU CCU BY CCU BY CCU BY CCU FZH CCU CCU CCU CCU BY CCU CCU CCU CCU BY CCU BY BY CCU BY

METAL PANEL REFER TO MATERIAL LEGEND FOR COLORS

EXTERIOR

PROJECT

PROPOSED MIXED-USE DEVELOPMENT (BLOCK C) PROPOSED PROPOSED PROPOSED MIXED-USE MIXED-USE MIXED-USE DEVELOPMENT DEVELOPMENT DEVELOPMENT (BLOCK (BLOCK (BLOCK C) C) C) PROPOSED MIXED-USE

PROJECT PROJECT PROJECT PROJECT

PROJECT PROJECT PROJECT

1141 Bloor Street West + 980 Dufferin Street, Toronto, DEVELOPMENT (BLOCK C) PROJECT PROPOSED ONM PROPOSED PROPOSED MIXED-USE MIXED-USE XED MIXED-USE M XED USE USE 11411141 Bloor 1141 Bloor Street Bloor Street West Street West + 980 West + 980 Dufferin + 980 Dufferin Street, Dufferin Street, Toronto, Street, Toronto, Toronto, DEVELOPMENT DEVELOPMENT DEVELOPMENT (BLOCK (BLOCK BLOCK (BLOCK BLOCK C) C C) C C) PROPOSED MIXED-USE ON ON ON 1141 Bloor Street West + 980 Dufferin Street, Toronto, DRAWING DEVELOPMENT ON (BLOCK C) 1141 1141 Bloor 1141 Bloor Street Bloor Street West Street West W + 980 West W + 980 Dufferin + 980 Dufferin Street, Dufferin Street, Toronto, Street, Toronto, Toronto, DRAWING DRAWING DRAWING ON O ON O ON 1141 Bloor Street West + 980 Dufferin Street, Toronto, DRAWING BUILDINGON SECTIONS DRAWING DRAWING DRAWING

BUILDING BUILDING BUILDING SECTIONS SECTIONS SECTIONS BUILDING SECTIONS BUILDING BUILDING BU BUILDING BU LD LD NG SECTIONS NG SECTIONS SECT SECTIONS SECT ONS ONS 21.081CS2 PROJECT PROJECT NO. PROJECT NO. NO. BUILDING SECTIONS DRAWING

PROJECT NO.

PROJECT DATE 21.081CS2 21.081CS2 21.081CS2 PROJECT NO. JULY 2021 PROJECT PROJECT DATE PROJECT DATE DATE 21.081CS2 PROJECT PROJECT NO. PROJECT NO. NO. DRAWN BY JULY JULY 2021 JULY 2021 2021 PROJECT DATE 21.081CS2 21.081CS2 21.081CS2 PROJECT NO. LKR DRAWN DRAWN BY DRAWN BY BY JULY 2021 PROJECT PROJECT DATE PROJECT DATE DATE 21.081CS2 CHECKED BY LKRLKR LKR DRAWN BY 2021 JULY JULY 2021 JULY 2021 PROJECT DATE CCU CHECKED CHECKED BY CHECKED BY BY LKR DRAWN DRAWN BY DRAWN BY BY JULY SCALE 2021 CCUCCU CCU CHECKED BY LKRLKR LKR DRAWN BY As indicated SCALE SCALE SCALE CCU CHECKED CHECKED BY CHECKED BY BY LKR As indicated As indicated As indicated SCALE CCUCCU CCU CHECKED BY As indicated SCALE SCALE SCALE CCU As indicated As indicated As indicated DRAWING NO. SCALE

BLOCK C - Section Detail at Parapet - Outdoor Amenity Terrace REV.

SPA401 87 SPA401 SPA401 SPA401878787 SPA401 87 SPA401 SPA401 SPA401878787 SPA401 87

As indicated DRAWING DRAWING NO. DRAWING NO. NO.

REV. REV. REV.

DRAWING NO.

REV.

DRAWING DRAWING NO. DRAWING NO. NO.

REV. REV. REV.

DRAWING NO.

REV.


BLO C K D ( TH E Q U I N TO N )

BLOCK D - FAÇADE CONCEPT

STAGE 2 - NEW BUILDING KEEPING WIT

STAGE STAGE11- -IDENTIFYING IDENTIFYINGTHE THEMASSES MASSES

A A

The Quinton is a 19-storey building situated along Dufferin Street that incorporates Kent School as a retained heritage element. The development includes 214 residential units, with ground-floor retail activating the public realm and strengthening connections to the park. Within the school, the ground floor is programmed as a

B B CC

1.1 1.1

AA C

2.1

1.2 1.2

community hub to support local initiatives, while the second and third floors are dedicated to office use.

C

brick

BRICK BRICK

glass recess

The façade design draws on the proportions of the existing school, establishing a cohesive architectural

GLASS GLASS

RECESS RECESS

dialogue. Dark brick-inlay precast concrete cladding was selected as a neutral counterpart, complementing the original material palette without competing with it. The initial proposal included a glass volume above the

A CC A

school to mediate the transition to the new construction; however, as it was not required for the program, this

C C

element was removed and replaced with a more restrained glass reveal that articulates the transition. Terraces were originally introduced along the west façade, but the massing was later refined to improve floor plate

HERITAGE HERITAGEBUILDING: BUILDING:KENT KENTSCHOOL SCHOOL

MAIN MAINMASS: MASS:SOLID SOLID/ HEAVY / HEAVY

PROPOSED PROPOSEDBUILDING BUILDING

TRANSITIONAL TRANSITIONALMASS: MASS:TRANSPARENT TRANSPARENT/ LIGHT / LIGHT

heritage building (Kent School) proposed building transitions

efficiency.

CONCEPT CONCEPTDIAGRAMS DIAGRAMS

B B

A

SOLID MASS DEFINITION

A

CONCEPT DIAGRAMS

980 Duff erin Street + 1141 Bloor Street West, Toronto, ONON 980 Duff erin Street + 1141 Bloor Street West, Toronto, (Block D)D) (Block 21.081CS2 21.081CS2 Page 5 5 Page

BLOCK D - INITIAL DESIGN VIEW 1.3 - FROM DUFFERIN ST - DARK GREY BRICK

BLOCK D - View from Dufferin St (conceptual render)

PERSPECTIVE VIEWS

23 HIGH-RISE

BLOCK D - View from Northeast (conceptual render) PERSPECTIVE VIEWS 980 Dufferin Street + 1141 Bloor Street West, Toronto, ON (Block D) 21.081CS2 Page 14

VIEW 3 - FROM WEST

BLOCK D - View from West (conceptual render) 980 Dufferin Street + 1141 Bloor Street West, Toronto, ON (Block D) 21.081CS2 Page 17

980 Dufferin Str


BRICK FAÇADE MODULE

DOUBLE FLOOR MODULE

soldier course

SOLDIER COURSE BRICK

c-channel C-CHANNEL

STACKED COURSE BRICK

stacked course

operable window OPERABLE WINDOW

metal frame METAL FRAME

soldier course

SOLDIER COURSE BRICK

1-VISIONFACADE GLASSMODULES - CLEAR FLOAT GLASS

View from West (project under construction - 2025)

980 Dufferin Street + 1141 Bloor Street West, Toronto, ON (Block D) 21.081CS2 Page 10 Turner Fleischer Architects Inc.

GLAZING APPLY THE RHYTHM OF 26-VISION BAYS / 3 BAYS INCREMENTS - FRIT

1-VISION GLASS - CLEAR FLOAT GLASS

6-VISION GLAZING - FRIT

BLOCK D - View from Dufferin St (project under construction - 2025)

Turner Fleischer Architects Inc.

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Turner Fleischer Architects Inc. Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the 67 Lesmill Road appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from Toronto, ON, M3B 2T8 drawings not specifically marked 'For Construction' must assume full responsibility and bear costs T 416 425 2222 for any corrections or damages resulting from his work.

turnerfleischer.com

BLOCK D - MATERIAL BOARD

1-VISION GLASS - CLEAR FLOAT GLASS

6-VISION GLAZING - FRIT

1-VISION GLASS - CLEAR FLOAT GLASS

2-VISION GLASS - SPANDREL

6-VISION GLAZING - FRIT

1 - Vision Glazing

Turner Fleischer Architects Inc.

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

Turner Fleischer Architects Inc.

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

7-STONE - DARK

2-VISION GLASS - SPANDREL

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

2

7-STONE - DARK

2 - Spandrel Glazing (grey)

3-BRICK INLAY PRECAST PANEL - DARK

2

7-STONE - DARK

1 3

3-BRICK INLAY PRECAST PANEL - DARK 3-BRICK INLAY PRECAST PANEL - DARK

3 - Brick-inlay Precast Concrete Panel 6-VISION GLAZING (dark grey) - FRIT 3-BRICK INLAY PRECAST PANEL

4-METAL - DARK - DARK

4-METAL

4-METAL - DARK - DARK

3 85 2024-06-21 71 2024-03-08 42 2023-09-29 34 2023-08-24 27 DATE

ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR OPA ISSUED FOR SITE PLAN APPROVAL #3 DESCRIPTION

CCU CCU CCU CCU BY

Turner Fleischer Architects Inc.

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

4 - Metal Panel (dark grey)

85 2024-06-21 71 2024-03-08 42 2023-09-29 34 2023-08-24 27 DATE

85 2024-06-21 71 2024-03-08 42 2023-09-29 34 2023-08-24 27 DATE

ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR OPA ISSUED FOR SITE PLAN APPROVAL #3 DESCRIPTION

PROJECT ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR OPA ISSUED FOR SITE PLAN APPROVAL #3 DESCRIPTION

1141 Bloor Street West + 980 Dufferin Street, Toronto, ON

2

BLOCK D - MATERIAL BOARD PROJECT

PROPOSED MIXED-USE

DEVELOPMENT (BLOCK D) PROPOSED PROJECT NO. MIXED-USE DEVELOPMENT (BLOCK D) 21.081CS2

114185Bloor Street ISSUED West FOR + 980 Street, 2024-06-21 SITEDufferin PLAN APPROVAL #5 Toronto,

2024-03-08 SITE PLAN APPROVAL #4 ON 1141 Bloor Street West + 980 Dufferin71Street, Toronto,ISSUED FOR 42 2023-09-29 ISSUED FOR OPA JULY 2021ON 34 2023-08-24 ISSUED FOR SITE PLAN APPROVAL #3 PROJECT DATE

DRAWN BY

DRAWING

- DARK

4

CCU CCU CCU CCU BY

CCU CCU

PROPOSED MIXED-USE CCU CCU DEVELOPMENT (BLOCK D) BY

DRAWING

PROJECT

7-STONE -4-METAL DARK

West Elevation

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

7-STONE - DARK

2-VISION GLASS - SPANDREL

2-VISION GLASS - SPANDREL

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

DRAWING 27

DATE

DESCRIPTION

CCU CCU CCU CCU BY

DVE CHECKED BY

CCU

BLOCK D - MATERIAL BOARD BLOCK D - MATERIAL BOARD SCALE

5 - Stone (dark grey)

PROJECT NO.

PROJECT NO.

21.081CS2

21.081CS2

DRAWING NO.

PROJECT DATE

REV.

85

SPA802

PROJECT DATE

JULY 2021

JULY 2021

DRAWN BY

PROJECT DRAWN BY

DVE CHECKED BY

DVE

CCU

CHECKED BY

CCU

SCALE

PROPOSED MIXED-USE DEVELOPMENT (BLOCK D)

1141 Bloor Street West + 980 Dufferin Street, Toronto, ON

SCALE

5

DRAWING DRAWING NO.

SPA802

REV.

85

DRAWING NO.

SPA802

REV.

85

BLOCK D - MATERIAL BOARD

PROJECT NO.

21.081CS2 PROJECT DATE

JULY 2021 DRAWN BY

MID-AERIAL VIEW LOOKING EAST DVE

24

CHECKED BY

CCU

SCALE

DRAWING NO.

SPA802

REV.

85

HIGH-RISE

BLOCK D - View from West (project under construction - 2025)


6.40 m

BLOCK 11.4.2.6. D - Floor 03

BUILDING SETBACK

ZONING SETBACK

9.50 m

11.4.3.1. 11.4.3.2. 11.4.3.3. 11.4.3.4. 11.4.3.5. 11.4.3.6.

DN

OUTLINE OF FLOOR 05 ABOVE

2B

82.2 m² 885 ft²

UP

1B

52.4 m² 564 ft²

FE

DN

3B BF

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

LOCKERS

FE

120.3 m² 1295 ft²

11.5.1.

2B BF

140.2 m² 1510 ft²

79 m² 851 ft²

1235.2 m² 13296 ft²

KENT SCHOOL (SECOND FL)

2B 88.3 m² 950 ft²

SLOPE 85 71 42 37 36 34 9 6 4 1 27

FE

LOCKERS DN

109.9 m² 1183 ft²

24.30 m

UP

ZONING SETBACK AT ST 3

FE

2B

1B

2B

92.2 m² 992 ft²

54.2 m² 583 ft²

91.4 m² 984 ft²

11.80 m

2024-06-21 2024-03-08 2023-09-29 2023-09-07 2023-09-07 2023-08-24 2022-09-27 2022-06-29 2022-06-28 2022-03-25 DATE

ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR OPA ISSUED FOR MINOR VARIANCE - BUILT FORM ISSUED FOR MINOR VARIANCE ISSUED FOR SITE PLAN APPROVAL #3 ISSUED FOR PPR ISSUED FOR PRICING #2 ISSUED FOR PPR ISSUED FOR SITE PLAN APPROVAL DESCRIPTION

PRECAST COPING

CCU CCU CCU CCU CCU CCU BOL CCU CCU CCU BY

SIDE MOUNTED RAILING PREFINISHED GLAZED ALUM. GUARDRAIL SYSTEM 1100mm HT MIN. (GLASS & FRAME TO MATCH WINDOW) DETAILS REFER TO SHOP DRAWINGS

SEALANT AND TERMINATION BAR

PROJECT

PROPOSED MIXED-USE DEVELOPMENT (BLOCK D)

ZONING SETBACK

DN

FFH

UP

TERRACE AT FLOOR 2

OUTLINE OF FLOOR 05 ABOVE

9.80 m

19.84 m

10.03 m

GREEN ROOF AT FLOOR 2 42.8m2

39.30 m ZONING SETBACK AT ST 7

ELEC CLOSET

3B

MIN. 1100 mm

CORRIDOR

2B

LOCKERS

6.30 m ZONING SETBACK AT ST 12

COMMECRCIAL / OFFICE

6.40 m

TERRACE AT FLOOR 2

5.60 m

92.9 m² 1000 ft²

5.78 m

17.78 m

Turner Fleischer Architects Inc.

11.4.3.7. 11.5.1.

ELEC CLOSET

FFH

UP

TERRACE AT FLOOR 2

GREEN ROOF AT FLOOR 2 42.8m2

10.05 m

19.83 m

9.78 m

1 ______ SPA401

3B

101.9 m² 1097 ft²

SPA601 1 : 10

11.4.2.1. 11.4.2.2. 11.4.2.3. 11.4.2.4. 11.4.2.5.

1.61 m

12.76 m

BUILDING SETBACK

Structural: ☒ No ☐ Yes By Increase in occupant load: ☒ No ☐ Yes By change of major occupancy: ☒ No ☐ Yes Plumbing: ☒ No ☐ Yes Sewage systems: ☒ No ☐ Yes Extension of combustible BLOCK C BLOCK C construction: ☒ No ☐ Yes NN 4.80 m 27.86 m 38.82 m __________________________________________ ☒ No ☐ Yes 11.34 m 6.11 m 22.16 m 16.66 m Structural: ☒ No 10.41 m ☐ Yes _______________ By Increase in occupant load: ☒ No ☐ Yes _______________ By change of major occupancy: ☒ No ☐ Yes _______________ TERRACE AT FLOOR 2 Plumbing: ☒ No ☐ Yes _______________ Sewage systems: ☒ No ☐ Yes _______________ Extension of combustible construction: ☒ No ☐ Yes _______________ __________________________________________ ☒ No ☐ Yes ___(list numbers and describe)__________________________________ ___(list numbers and describe)__________________________________ _______________________________________________________ _______________________________________________________ 3.20 m 12.13 m ZONING SETBACK AT ST 5 _______________________________________________________

evel:

PROJECT DATE

DRAWN BY

CHECKED BY

CCU SCALE

1 : 150 N

BD-FLOOR 03

SPA153 1 : 150

MECH

REV.

85

TOP OF FLOOR SLAB

BLOCK D - W-E Cross-section 67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

U/G 2 103.35

5.15 m

SHAFT

CORR.

KENT - ROOF (EXISTING) 128.64

PARKING

CANOPY

RETAIL 111.30

FUTURE TENANT FIT-OUT 111.98

COMMUNITY HUB

COMMUNITY HUB / INDOOR DAYCARE 111.20

5.01 m 4.37 m

17.20 m

COMMERCIAL / OFFICE

106.05

85 71 36 34 9 6 4 1 27

KENT - FLOOR 03 123.63

KENT - FLOOR 02 119.26 KENT - GROUND FL 114.87

2024-06-21 2024-03-08 2023-09-07 2023-08-24 2022-09-27 2022-06-29 2022-06-28 2022-03-25 DATE

ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR MINOR VARIANCE ISSUED FOR SITE PLAN APPROVAL #3 ISSUED FOR PPR ISSUED FOR PRICING #2 ISSUED FOR PPR ISSUED FOR SITE PLAN APPROVAL DESCRIPTION

CCU CCU CCU CCU BOL CCU CCU CCU BY

residential units horizontal circulation, lobby vertical circulation, service areas, parking retail community hub office PROJECT

112.24

PROPOSED MIXED-USE DEVELOPMENT (BLOCK D)

1

DRAWING

BLOCK D - BUILDING SECTIONS

PROJECT NO.

PARKING

103.34

PARKING

SERV.

PARKING

103.15

21.081CS2

PROJECT DATE

JULY 2021 DRAWN BY

DVE

CHECKED BY

CCU

SCALE

1 : 150

1

SECTION A

SPA401 1 : 150

DRAWING NO.

SPA401

GUARD DETAIL AT PARAPET

SPA601 1 : 10

1141 Bloor Street West + 980 Dufferin Street, Toronto, ON

KENT - LOWER LEVEL 110.05

PARKING

105.96

FUTURE TENANT FIT-OUT

BUILDING HEIGHT

FUTURE TENANT FIT-OUT

COMMERCIAL / OFFICE

4.39 m

LOCKERS

4.82 m

6.80 m

PROPOSED PRIVATE ROAD

LOCKERS RESIDENTIAL

PRIVATE TERRACE HT: 6.15 m

111.30

2.80 m

U/G 1 106.15

STAIRS

ZONING SETBACK AT ST 5

BD-FLOOR 02 118.1

BD ESTABLISHED GRADE 112 BD-FLOOR 01 111.3

HT: 17.20 m

OUTDOOR AMENITY

2.92 m

4.70 m

BD-FLOOR 03 122.8

HT: 17.41 m

CORR.

BD-FLOOR 04 125.75

SUITE BLOCK D - Guard Detail at Parapet

PRIVATE TERRACE

PRIVATE TERRACE

ELEVATOR

BD-FLOOR 05 129.2

EXTERIOR

CORR.

BD-FLOOR 06 132.45

CORR.

BD-FLOOR 07 135.4

FOAM IN PLACE INSULATION(AIR SEAL) SEALANT SEAL WAPOUR BARRIER TO MULLION

RESIDENTIAL

RETAIL SERVICE

BD-FLOOR 08 138.35

3.35 m

BD-FLOOR 09 141.3

RESIDENTIAL

17.70 m

BD-FLOOR 10 144.25

EW2a

6.30 m

MAXIMUM ZONING HEIGHT

BD-FLOOR 11 147.2

SEALANT SEAL WAPOUR BARRIER TO CONCRETE

SEALANT

ZONING SETBACK AT ST 12

62.10 m

BD-FLOOR 13 153.4 BD-FLOOR 12 150.45

WATERPROOFING MEMBRANE

MAXIMUN ZONING HEIGHT

BD-FLOOR 14 156.35

61.86 m

BD-FLOOR 15 159.3

150

SEALANT AND BACKER ROD

RESIDENTIAL

RESIDENTIAL

BUILDING HEIGHT

BD-FLOOR 16 162.25

3.25 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 3.25 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 3.25 m

BD-FLOOR 17 165.2

DRIP EDGE

2.95 m 3.45 m

BD-FLOOR 18 168.45

FOR SLAB THICKNESS REFER TO STRUCTURAL DRAWINGS

125

U/S OF SLAB TO U/S OF PRECAST CONCRETE PANEL

Turner Fleischer Architects Inc.

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

4.98 m

BD-MPH 173.43

OUTDOOR GENERATOR

HT: 61.86 m

HT: 68.39 m

PROPERTY LINE

INTERNAL PROPERTY LINE

SPA153

6.50 m

BD-ROOF 179.93 BD-MPH MEZZANINE 177.13

DRAWING NO.

BUILDING D 19 STOREYS GREEN ROOF

295

125mm PRECAST CONCRETE PANEL

DVE

10

3.80 m

4.59 m

21.081CS2 JULY 2021

16.74 m

295

1

PROJECT NO.

ZONING SETBACK

BLOCK E

22.33 m

BUILDING SETBACK

9.93 m

6.10 m

27.71 m

TWO STAGE CAULKING REQUIRED AT ALL JOINTS AT PRECAST PANEL

BLOCK D - FLOOR 03

ZONING SETBACK

7.18 m

4.75 m

ZONING SETBACK

10.60 m

8.80 m

10.36 m

BUILDING SETBACK

TERRACE AT FLOOR 2

25

1.55 m

1141 Bloor Street West + 980 Dufferin Street, Toronto, ON DRAWING

REV.

85

25 HIGH-RISE


123 EDWARD ST Toronto, ON | 2024 | Mixed-use | Pre-construction Site: 0.83 acres | 102,690 m² residential | 430 m² retail Role: Senior Designer

Project Team: 4

Firm: Turner Fleischer

Located approximately 500 metres from Toronto City Hall, the project responds to the limitations of a constrained downtown site. The initial proposal featured two 72-storey residential towers separated by only 6 metres due to the compact site dimensions. Their architectural expression emphasized vertical articulation, with towers’ profiles conveying the impression of a mass broken into two slender volumes. While well-received by the client group, the minimal separation raised concerns from the City regarding building performance and spatial quality. Additionally, the towers’ prominence risked competing with the visual presence of City Hall when viewed from Nathan Phillips Square. The design evolved to address these challenges through a revised massing strategy. The latest proposal consolidates the towers into a unified composition connected by an intermediate volume, reducing their heights to 59 and 53 storeys. The façade articulation recalls the original concept, maintaining the perception of two distinct volumes, with the connection being expressed through a glazed intermediate link. This iteration responds to regulatory constraints while improving spatial relationships. Working closely with the Design Director, my role included developing the design concept, assisting with feasibility and massing studies, and View from Edward St Looking East (conceptual render)

contributing to the development of the project drawings for submissions.

26 HIGH-RISE


MASSING STUDY - VIEW FROM NATHAN PHILLIPS SQUARE

DESIGN CONCEPT

03

INITIAL MASSING

REVISED MASSING

INITIAL MASSING DESIGN CONCEPT DESIGN CONCEPT

city hall

INITIAL DESIGN

Site Context - Aerial View from North (conceptual render) 27 HIGH-RISE

DESIGN CONCEPT

180 DUNDAS STREET WEST

180 DUNDAS STREET 180 WEST DUNDAS STREET WEST

03 03 REVISED MASSING

REVISED DESIGN


2

THE HOSPITAL FOR THE HOSPITAL FOR SICK CHILDREN SICK CHILDREN

ELM

EET STR

ELM

EET STR

ELM

T T WES WES EET EET D STR D STR RAR RAR GER GER

EET D STR RAR GER

ELM

EET STR

ELM

EET STR

ELM

2024-01-31 5:24:24 PM EET D STR RAR GER

DAS DUN

EET STR

123 EDWARD STREET AND 65 CENTRE AVENUE

6.30 m

6.40 m

6.91 m

DRAWING NO.

SPA814

REV.

2

9.45 m

2B

1B

1B

2B

64.9 m² 698 ft²

46.7 m² 502 ft²

41.9 m² 451 ft²

63.1 m² 679 ft²

6.30 m

6.30 m

6.30 m

0.34 m

2 ______ SPA401

5.54 m

41.9 m² 451 ft²

9.45 m

35.8 m² 385 ft²

1.50 m

STUDIO

6.30 m

1.50 m

STUDIO

1800

9.80 m

53.5 m² 576 ft²

12.00 m

1800

1B+D

6.30 m

56.9 m² 613 ft²

1B+D

CHESTNUT STREET

59.2 m² 637 ft²

N18°04'50"W

1800

1B+D

7.56 m

EXISTING ENTRY COURT TO REMAIN 2000

1B+D

6.30 m

EXTENT OF FLOORS 1-3, 7

17.84 m

3B 80 m² 861 ft²

6.00 m

2B 63.1 m² 679 ft²

2.50 m

1B 44.2 m² 476 ft²

12.00 m

6.30 m

1B 43.6 m² 469 ft²

2B

42.8 m² 460 ft²

ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION

3B

MLE BY

3B

86.3 m² 928 ft²

46.6 m² 501 ft²

EXTENT OF

79.8 m² FLOORS 1-3,10 859 ft²

PROJECT

11.60 m 11.40 m 123 EDWARD STREET AND 65 CENTRE AVENUE

2

EXHAUST SHAFT

MIN. 12.5M SEPARATION FROM EXISTING BUILDING

N72°34'30"E

23.00 m

49.84 m

TORONTO, ON

1 ______ SPA401

TOWER B

30.75 m

180 DUNDAS ST W EXISTING BUILDING 25 STOREYS

0.30 m

1B

1.54 m

EXTENT OF FLOORS 1-3,10

1B

2024-01-31 # DATE

3.50 m

0.39 m

2

64.6 m² 696 ft²

6.30 m

61.3 m² 659 ft²

1.50 m

7.03 m

1B+D 2B

6.30 m

56.9 m² 613 ft²

6.00 m 6.08 m 5.52 m

1B

1.50 m

78.4 m² 843 ft²

67.9 m² 731 ft²

TOWER A DUNDAS STREET WEST

0.30 m

#

2024-01-31 DATE

PROJECT

TORONTO, ON

DRAWING

PROJECT NO.

22.012SPA

PROJECT DATE

PROJECT DATE

2023-09-20

DRAWN BY

DRAWN BY

HHK

MLE

CHECKED BY

CHECKED BY

RMM

NMC

HIGH-RISE 1:200

N

ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION

MLE BY

residential units horizontal circulation, lobby 123 EDWARD STREET AND 65 CENTRE AVENUE vertical circulation, parking, service areas amenity TYPICAL TOWER FLOORS 11-53 retail

2023-09-20

SCALE

1 : 200

SCALE

12.66 m

48.9 m² 527 ft²

8.30 m

6.10 m

1.50 m

2.56 m

28

FLOOR 11-53

6.50 m

1B

2B

2B

PROJECT NO.

1

6.50 m

46.6 m² 501 ft²

66.2 m² 712 ft²

2B

FLOOR 1

SPA160

6.50 m

1925

658 ft²

68.1 m² 734 ft²

66.3 m² 714 ft²

OUTLINE OF FLOOR 4-10, 11-56 ABOVE

30.75 m

TOWER A

6.50 m

1.50 m

5.06 m

2B

GAS/HYDRO METER

DRAWING

2-01 1:20:42 PM

6.50 m

EXTENT OF FLOORS 1-3,10

1B+D

FIRE ROUTE SIGN 68.1 m² 61.1 m²

0.08 m

OUTLINE OF EXISTING BUILDING TO BE DEMOLISHED

NMC 1 : 2500

N72° 23'10"E

2000

49.84 m

DRAWN BY

7.25 m

2

1B000.00 SPOT ELEVATION

6.30 m 6.30 m

53.96 m

CENTRE AVENUE

CHESNUT STREET

N18°04'50"W

CHESTNUT STREET

00 60

13.69 m

BW 93.25 TW 92.60

2023-09-20

N

MARCH 21 - 1618 PM

SPA814 1 : 2500

TRANSFORMER WITH CLEARANCES

N18° 02'00"W

1.10 m

6.00 m

1 ______ SPA402

4.0%

+93.25m

PROJECT DATE

CHECKED BY

SPA814 1 : 2500 REV.

2B+D

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

MLE

0.01 m 1

SIAMESE CONNECTION

50 m² 538M ft²

EET Y STR OUR ARM

45.16 m

6.00 m

6.64 m

2.84 m

2500

13.65 m

OUTLINE OF UG BELOW

INTAKE SHAFT

11.00 m

2.20 m

2.50 m

7.1 8

39.88 m

OFF LEASH DOG RUN 111.41 m² 1199 ft²

EXIT

1.4 % 2.0%

PROJECT

TORONTO, ON

TORONTO CITY HALL

MARCH 21 - 1618 PM

SPA823 EXIT

22.012SPA

200

N

WEST

WEST

EDWARD STREET

EET Y STR OUR ARM

5.00 m

FIRE HYDRANT

G

OUTLINE OF UG BELOW

1800 1800

2.20 m

2024-01-31 5:24:26 PM

2.0 %

2.0%

2.0%

2024-01-31 5:24:50 PM

2.6%

N18° 02'00"W

48.96 m

BC 93.88 TC 94.03 2.89 m

60 00

1.7%

6.00 m

6.00 m

14.23 m

MAIL ROOM

MAIL ROOM B.O.H

TYPE B LOADING (11.0m x 3.5m x 4m)

2.20 m

m

13.00 m

2.0%

1.0%

8.49 m

30 00

300 0

2.0%

MAIL ROOM

6.0M FIRE ROUTE

48.96 m

CENTRE AVENUE

1925

10169 9.14 m

2500

CENTRE AVENUE

EXIT 10.30 m

DUNDAS STREET WEST

LOOR 1 (BUILDING 2)

EET STR

SHADOW STUDIES

RETAIL ENTRANCE DRAWING NO.

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

PROJECT NO.

23.00 m 4

MLE BY

EET STR

TOWER B

N

ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION

BAY

2

SPA402

EET UT STR STN CHE

CITY OF TORONTO STANDARD BIKE ______ PARKING (10)

DAS DUN

EET TH STR ABE

2.0%

1 ______ SPA401

2024-01-31 DATE

22.012SPA

SECONDARY RESIDENTIAL ENTRANCE

733 ft²

SITE ACCESS TO BE CONSTRUCTED TO CITY DESIGN STANDARD T-310.050-01

N72°34'30"E

TC 93.50 BC 93.35

#

DRAWING

TORONTO CITY HALL

4.27 m

MIN. 12.5M SEPARATION 93.56 FROM EXISTING BUILDING

ELIZ

93.66

TC 93.68

EET STR

EET STR

NUE AVE

93.74

21.28 m

23.08 m BC 93.53

1 : 2500

A

93.52 2. 0% % 3.1 93.44 EXHAUST SHAFT

DAS DUN

TOWER A

ARD

TRE CEN

% 1.9

OUTLINE OF FLOORS 4-9, 11-57 ABOVE

2.0%

2.0%

TC 93.81 BC 93.66

2 ______ SPA401

10982

00 60

93.87 1.80 m

93.80

WEST

OUTLINE OF FLOOR 4-10, 11-56 ABOVE CONVEX MIRROR

% 2.0

TC 93.76 BC 93.71

93.87

2.5%

93.71 93.72 +93.50m 93.59

WEST

NUE AVE

93.50

94.64

EDW

SITY UNIVER

94.60

2.30 m

93.91

+93.23m

60 00

180 DUNDAS ST W EXISTING BUILDING 25 STOREYS

94.60

93.66

2.0%

2.0%

94.70

93.80

BIKE LOCKERS 27.19 m² 293 ft²

EET STR

31.58 m

94.20

3.1%

94.09

94.05

1.2% 93.77

TC 93.97 BC 93.82

24 BIKES

30 00

95.02

6.00 m

BAY

3.0% 93.80

94.11

94.15

SHORT TERM BIKE PARKING (36)

EET STR

EET TH STR ABE

2.0%

ELIZ

BW 91.95 TW 94.15

5%

94.39

2000

2.0%

BC 92.94 TC 93.09

2.0%

136 BIKES STORAGE

EET UT STR STN CHE

47.72 m

SEPTEMBER 21 - 1418 PM

SCALE

FH

3000

OUTLINE OF EXISTING BUILDING TO BE DEMOLISHED

94.29

1

SPA823 1 : 2500

BC 93.02 TC 93.07

TW 94.18

2000

93.21

8.10 m

PARKING (120)

DAS DUN

ELM

EET STR

PRIMARY RESIDENTIAL ENTRANCE

NMC

93.90

93.25

4.00 m

TWSHORT 94.44 TERM BIKE

93R .23

+0.00m EXIT OUTLINE OF FLOORS 4-6, 8-53 ABOVE

7.5% 91.95

10%

EET STR

NUE AVE

OVERHEAD DOOR

DRAWN BY

MLE CHECKED BY

FFE=93.50

2.0%

91.74

7.5%

EET STR

ARD

TRE CEN

-1.58m

+91.67m

EDW

NUE AVE

-2.39m

+90.86m

EET STR

Turner Fleischer Architects Inc.

SITY UNIVER

-2.69m

+90.56m

94.40

FFE=94.56

+93.92m

EET STR

2.1%

94.44

BIKE LOCKERS 159.03 m² 1712 ft²

RETAIL GARBAGE 33.08 m² 356 ft²

EET UT STR STN CHE

OVERHEAD DOOR

94.56

AMENITY 48.1 m² 518 ft²

2.14 m

MOVING

2023-09-20

+93.30m

93.28

PARCEL

2.50 m

FFE=92.50

+94.56m

FFE=94.00

2.0%

EET TH STR ABE

1800

3.50 m

STAGING 158.5 M2

FFE=92.20

BIKE ELEVATOR LOBBY

94.56

94.17

94.13

TC 94.05 BC 93.90

RETAIL 397.79 m² 4282 ft²

BAY

ELIZ

4.31 m

EXISTING ENTRY COURT TO REMAIN

2.0%

NUE AVE

FFE=94.00 RECEPTION

2000

TRE CEN

5.23 m

LOBBY (A) 231.48 m² 2492 ft² VEST

PARCEL

93.51

93.63

93.82 6.71 m

2. 0%

00 60

93.60

+93.65m

OUTLINE OF FLOORS 4-6, 8-53 ABOVE

93.99

94.00

FFE=94.25

PET WASH STATION

NUE AVE

93.96 1.0 % 2 .72 m

CACF

RECEPTION

SITY UNIVER

N72° 23'10"E

93.79

93.90

94.00

94.28

94.24

TC 94.16

BC 94.01

6.00 m

93.95

TC 93.38

2.44 m

BC 93.22 TC 93.37

93.98

2.0%

2

SPA812

ELM

2

67 EET Lesmill Road STR ELM Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

TOWER B LEGEND

PROJECT DATE

EET Y STR OUR ARM

00 60

BC 93.06 TC 93.21

SIAMESE CONNECTION

SPA823 1 : 2500 REV.

FH

BC 93.37 TC 93.52

42.72 m

BC

93.48

CACF

DRAWING NO.

BC 93.56 SEPTEMBER 21 - 1418 PM TC 93.71

93.33

+94.12m

4

+93.95m

OUTLINE OF FLOORS 4-9, 11-57 ABOVE

LOBBY (B) 292.55 m² 3149 ft²

EET Y STR OUR ARM

SCALE

: 2500 BC193.72 N TC 93.87

EET STR

MLE BY

DAS DUN

TORONTO CITY HALL

3000

94.30

VEST

8.98 m

EDWARD STREET

NMC

93.94EXIT

94.17

WEST

THE HOSPITAL FOR SICK CHILDREN

Turner Fleischer Architects Inc.

ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of PROJECT survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with65 the CENTRE work. Construction must conform to all 123 EDWARD STREET AND applicable codes and requirements of authorities having jurisdiction. The contractor working from AVENUE drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his ON work. TORONTO,

WEST

T WES

SHADOW STUDIES

2.0%

94.32

1.40 m

93.96

2.0%

3000

8296

m .96 37

94.11

2.8%

94.10

94.07

POPS

EET STR

EET STR

TORONTO CITY HALL

0 300

94.47

TC 94.35

BC 94.20

94.29

1.72 m

94.14

94.18

DAS DUN

DAS DUN

DRAWING

SIAMESE CONNECTION

CHECKED BY

BC 93.91 TC 94.06

POPS 140.4 m² 1511 ft² 94.16

+94.20m

2500

WEST

EET STR

PROJECT NO.

DRAWN BY

1500

2000

N

WEST

ARD

22.012SPA

MLE

3.0%

EDW

EDWARD STREET

2023-09-20

28.00 m

OUTLINE OF UG BELOW

EET STR

2024-01-31 DATE

#

150m

REV.

EET D STR RAR GER

ELM

Typical Floor Plan

100m

MARCH 21 - 1518 PM

T WES

EET STR

50m

SPA814 1 : 2500

THE HOSPITAL FOR SICK CHILDREN

EET STR

20m

2 15:18

SPA813

EET D STR RAR GER

SHADOW STUDIES

26.28 m

94.42

DAS DUN

ELM

2

DRAWING NO.

T WES

PROJECT NO.

PROJECT DATE

OUTLINE OF EXISTING BUILDING TO BE DEMOLISHED

3000 .8 m 92.0%

14:18

13:18

22.012SPA

2.0%

0 750

1050 0

2.0%

0 50 13

60 00

EET STR

N

MARCH 21 - 1418 21 - PM 1518 PM 3 MARCH

SPA813 1 : 2500 SPA814 1 : 2500

2

SPA812

EET STR

EET Y STR OUR ARM

MARCH 21 - 1218 PM

1

SEPTEMBER 21 - 1318 PM 2 SPA813 1 : 2500 SPA823 1 : 2500 REV.

EET TH STR ABE

DRAWING

2400

BC 94.14 TC 94.29

DAS DUN

TOWER A

TORONTO CITY HALL

0 00 R6

1

SCALE

MARCH 21 - 1418 PM

4

DRAWING NO.

BAY

ELIZ

TOWER B

EET UT STR STN CHE

TORONTO, ON

WEST

EET STR

NUE AVE

123 EDWARD STREET AND 65 CENTRE AVENUE

ARD

EET Y STR OUR ARM

1 : 2500

N

ELM

TRE CEN

PROJECT

WEST

NUE AVE

EET STR

SITY UNIVER

EET UT STR STN CHE

DAS DUN

1.72 m

SCALE

1 : 2500

2

EDW

TORONTO CITY HALL

DRAWN BY

MLE CHECKED BY

EET STR

EET STR

SCALE 1:2500

WEST

2023-09-20

NMC

MLE BY ELM

6.0M FIRE ROUTE

SPA812 1 : 2500

ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION

EET TH STR ABE

NUE AVE

NUE AVE

EET STR

EET STR

TRE CEN

SITY UNIVER

DAS DUN

ARD

2024-01-31 DATE

EET STR

ELIZ

EDW

#

EET STR

PROJECT DATE

TORONTO CITY HALL

EET EET Y STR Y STR OUR OUR ARM ARM

THE HOSPITAL FOR SICK CHILDREN

ELM

2 BAY

ELM

EET EET STR Y STR OURY OUR ARM ARM

EET D STR RAR GER

TYPE G LOADING (13.0m x 4.0m x 6.1m)

ELM

EASEMENT

EET STR

TORONTO CITY HALL

CHECKED BY

THE HOSPITAL FOR SICK CHILDREN

Ground Floor Plan

TORONTO CITY HALL

NMC

T WES

THE HOSPITAL FOR SICK CHILDREN

EET STR

T WES

EET UT STR STN CHE

EET D STR RAR GER

EET TH STR ABE

12:18

BAY

ELIZ

11:18

SHADOW CAST BY BUILDINGS UNDER CONSTRUCTION

WEST

SHADOW STUDIES

DRAWN BY

MARCH 21 - 1218 PM 3 SEPTEMBER 21 - 1318 PM

1

EET STR

PROJECT NO.

MLE

SPA812 1 : 2500 SPA823 1 : 2500

DAS DUN

SHADOW CAST BY SUBMITTED / NOT YET CONSTRUCTED BUILDINGS

22.012SPA TORONTO CITY HALL

2023-09-20

EET EET Y STR Y STR OUR OUR ARM ARM

NUE AVE

EET EET STR Y STR OURY OUR ARM ARM

SHADOW CAST BY PROPOSED DEVELOPMENT

DRAWING

PROJECT DATE

TORONTO CITY HALL

EET STR

0m

TORONTO, ON

WEST WEST EET STR

DAS DUN

ARD

TRE CEN

123 EDWARD STREET AND 65 CENTRE AVENUE

SHADOW STUDIES

TORONTO CITY HALL

NUE AVE

EET STR

SITY UNIVER

PROJECT

WEST WEST EET STR

DAS DUN

150m

DAS DUN

EET STR

EDW

PROJECT NO.

TORONTO CITY HALL

21 - AM 1218 PM 4 MARCH MARCH 21 - 1118

shadow cast by existing development shadow cast by proposed development shadow cast by submitted / not yet constructed developments shadow cast by developments under construction

MLE BY ELM

EET STR

EET STR

EET STR

NUE AVE DAS DUN

#

ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION

BAY

BAY

EET STR

2024-01-31 DATE

EET TH STR ABE

ARD

ELIZ

EDW

EET UT STR STN CHE

EET STR

TRE CEN

NUE AVE

NUE AVE

100m

TRE CEN

50m

NUE AVE

20m

SCALE 1:2500

ST WEST EET WE EET STR STR DAS DUN

SITY UNIVER

SHADOW CAST BY BUILDINGS UNDER CONSTRUCTION

ST WEST EET WE EET STR STR DAS DUN

ARD

EET TH STR ABE

EDW

EET UT STR STN CHE

SHADOW CAST BY SUBMITTED / NOT YET CONSTRUCTED BUILDINGS SITY UNIVER

DAS DUN

ELIZ

EET STR

EET STR

BAY

BAY

EET SHADOW CAST BY EET STR STR ELM ELM PROPOSED DEVELOPMENT

EET TH STR ABE

EET UT STR STN CHE

EET UT STR STN CHE

EET TH STR ABE

NUE AVE

NUE AVE DAS DUN

ELIZ

ELIZ

EET EET STR STR ARD EDW

0m

TORONTO, ON

WEST

TRE CEN

EET STR

ARD

TRE CEN

WEST

DAS DUN

NUE AVE

123 EDWARD STREET AND 65 CENTRE AVENUE

NUE AVE

EET STR

SITY UNIVER

PROJECT

WEST

SITY UNIVER

EET STR

EET EET STR STR ELM

22.012SPA

2

LEGEND

EET STR

SHADOW CAST BY EXISTING DEVELOPMENT

DRAWING

SPA812 SPA812 1 : 2500 1 : 2500

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

THE HOSPITAL FOR SICK CHILDREN

2

EDW

150m

DAS DUN

TORONTO CITY HALL

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

T WES

THE HOSPITAL FOR THE HOSPITAL FOR SICK CHILDREN SICK CHILDREN

LEGEND

EET EET STR STR ELM

MLE BY ELM

EET STR

NUE AVE

DAS DUN

EET STR

EET STR

TRE CEN WEST

DAS DUN

#

ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION

BAY

BAY

EET STR

2024-01-31 DATE

EET TH STR ABE

ARD

EET UT STR STN CHE

EDW

EET TH STR ABE

EET STR

EET UT STR STN CHE

NUE AVE

NUE AVE

100m

TRE CEN

NUE AVE

SITY UNIVER

50m

SITY UNIVER

NUE AVE

20m

SCALE 1:2500

ST WEST EET WE EET STR STR DAS DUN

ARD

ELIZ

ELIZ

EET STR

EET STR

BAY

BAY

EDW

SHADOW CAST BY BUILDINGS UNDER CONSTRUCTION

0m

DAS DUN

March 21st Turner Fleischer Architects Inc.

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

SHADOW CAST BY EXISTING DEVELOPMENT

SHADOW CAST BY SUBMITTED / NOT YET CONSTRUCTED BUILDINGS

ST WEST EET WE EET STR STR DAS DUN

150m

MARCH 21 - 1318 PM

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

THE HOSPITAL FOR THE HOSPITAL FOR SICK CHILDREN SICK CHILDREN

EET SHADOW CAST BY EET STR STR ELM ELM PROPOSED DEVELOPMENT

EET TH STR ABE

EET UT STR STN CHE

EET UT STR STN CHE

TRE CEN

NUE AVE

NUE AVE

NUE AVE

SITY UNIVER

SITY UNIVER

TRE CEN

EET TH STR ABE

EET EET STR STR ARD EDW

DAS DUN

ELIZ

ELIZ

ARD

100m

SPA813 1 : 2500

T T WES WES EET EET STR D STR RARD RAR GER GER

2

EDW

50m

Turner Fleischer Architects Inc. T T WES WES EET EET D STR D STR RAR RAR GER GER

LEGEND

EET EET STR STR ELM

20m

SCALE 1:2500

WEST

TORONTO CITY HALL

SHADOW CAST BY EXISTING DEVELOPMENT

ELM

EET STR

SHADOW STUDY

MARCH 21 - 1318 PM

3

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

EET EET STR STR ELM

SHADOW CAST BY BUILDINGS UNDER CONSTRUCTION

WEST

EET Y STR OUR ARM

Turner Fleischer Architects Inc.

ELM

ET

DAS DUN

SPA813 1 : 2500

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

THE HOSPITAL FOR THE HOSPITAL FOR SICK CHILDREN SICK CHILDREN

EET STR

TORONTO CITY HALL

SPA812 1 : 2500

T T WES WES EET EET STR D STR RARD RAR GER GER

DAS DUN

EET Y STR OUR ARM

MARCH 21 - 1118 AM

2

EET T STR

MARCH 21 - 1118 AM

NUE AVE

WEST

EET Y STR OUR ARM

SPA812 1 : 2500

TRE CEN

EET STR

TORONTO CITY HALL

EET Y STR OUR ARM

3

WEST

0m

DAS DUN

TORONTO CITY HALL

EET STR

150m

SCALE 1:2500

WEST

DAS DUN

NUE AVE

EET STR

100m

SITY UNIVER

DAS DUN

50m

ET

WEST

20m

EET T STR

EET STR

NUE AVE

NUE AVE

0m

DAS DUN

TRE CEN

SHADOW CAST BY BUILDINGS UNDER CONSTRUCTION

WEST

EET STR

SITY UNIVER

DAS DUN

T

NUE AVE

NUE AVE

WEST

EET T STR

TRE CEN

SITY UNIVER

NUE AVE

NUE AVE

EET STR

T

EET T STR

TRE CEN

SITY UNIVER

DAS DUN

SCALE

1 : 200 N


2079 YONG E ST Toronto, ON | 2023 | Mixed-use High-rise | Pre-construction Site: 1.24 acres | 33,662 m² residential | 1,893 m² retail Role: Senior Designer

Project Team: 5

Firm: Turner Fleischer

Situated on a prominent midtown block between Hillsdale Avenue and Manor Road, the proposed redevelopment introduces a 29-storey mixed-use building that thoughtfully integrates elements of the site’s heritage at the ground floor. The project reflects the challenges and opportunities of densifying a well-connected Yonge Street corridor while respecting its historical context. Ground-floor retail activates the public realm along Yonge Street and Hillsdale Avenue East. The streetscape design evolved through multiple iterations in collaboration with the heritage consultant to align with the vision for the site and its context. Clad in aluminumtoned metal panels, the tower presents a refined contemporary expression that enhances visual lightness, durability, and skyline presence. The design and material palette were carefully selected to complement the heritage character at the base without competing with it. I was responsible for developing the design concept and coordinating its translation into the drawing sets, working closely with the project documentation team, consultants, and city planners. One of the challenges was achieving a sensitive transition between the building and the adjacent low-rise neighbourhood to the east. The terraced podium mediates this change in scale, while four townhouses along Manor Road introduce a finer-grain residential frontage that further reinforces this interface.

View from Yonge St Looking North (conceptual render)

29 HIGH-RISE


MAN

OR

RD

MAN

OR

E

RD

E

MASSING CONCEPT

YONGE

ST

HILLSDALE AVE E

T

ES

NG

YO

HILL

HILL

SDA

T

ES

NG

YO

MAN

OR

MANOR RD E

RD

MAN

OR

E

SDA

LE A VE E

RD

LET A E S VE E

NG

YO

HILL

SDA

T

ES

NG

YO

MAN

OR

E

RD

MAN

OR

E

RD

LE A VE E

HILL

SDA LET E S AVE E NG

YO

HILL

SDA

T

ES

NG

YO

MAN

OR

E

RD

MAN

OR

E

RD

LE A VE E

HILL

SDA

LE A VE E

E

transition to low-rise neighbourhood Turner Fleischer Architects Inc.

03

HILLSDALE AVE E HILLSDALE AVE E

ST

TRANSFORMER WITH CLEARANCES FIRE ROUTE SIGN

A

SPOT ELEVATION "ADJACENT LANDS000.00 OWNED BY CSG YONGE-MANOR LIMITED M AND CSG HILLSDALE LIMITED" GAS/HYDRO METER

2100

000.00 SPOT ELEVATION M

GAS/HYDRO METER

G

13.00 m

N15°47'45"W

N15°47'30"W

93.65 m

N15°35'30"W

N15°34'10"W

N15°35'20"W

6.15 m

N15°47'45"W

81.65 m

20.65 m

2100

N15°47'30"W

4670

(P6&SET) 89°32'10"

(P6&SET) 89°32'10"

N73°03'45"E(P5) 7.62(P) N74°42'20"E N72°59'45"E (M)

7.601 (P5&M)

2.10 m

2100

15.24(P) 15.25(P5)

View from Manor Rd E - Townhouses (conceptual render)

CONVEX MIRROR

FIRE ROUTE SIGN

A

FIRE HYDRANT SIAMESE CONNECTION

03

TRANSFORMER WITH CLEARANCES

PART 7, PLAN 66R-14429 SUBJECT TO RIGHT-OF-WAY

PART 6, PLAN 66R-14429 SUBJECT TO RIGHT-OF-WAY

EXIT

03

2900 4500

4500

4540

OUTLINE ABOVE

15.254 (M)

FLOOR 2

42.878 (M)

6.30 m

41.05(P)

41.040 (M)

41.000 (M)

40.99(P)

PROP. SAN. CONTROL MH CONVEX MIRROR

23.20 m

EXIT

16.60 m

42.878 (M)

42.91(P6)

6900 (22' - 8")

12378 (40' - 7")

6.00 m

5570

EXIT

6000

4500

93.65 m

N15°35'30"W

N15°35'20"W

SIAMESE CONNECTION

6.720 (P6&SET) N74°40'20"E (M) N74°40'05"E(P6)

N77°06'00"E

N77°11'15"E N77°07'20"E

15.254 (M)

6.720 (P6&SET) N74°40'20"E (M)

15.24(P) 15.25(P5)

25206 (82' - 8")

2.10 m

8.10 m

C

B

8.70 m

39.745 (M)

39.72(P) 39.75(P5)

PART 3, PLAN 66R-31329 SUBJECT TO RIGHT-OF-WAY

10.50 m

36.30 m

EXIT 2.05 m 6.00 m

6.15 m

2.10 m

D M 6.20 m

7.10 m

7.70 m

1.15 m

6.65 m 26.70 m

CB

MANOR ROAD E. EX. 450∅ STORM SEWER EX. 300∅ COMB. SEWER EXISTING FIRE HYDRANT

6.75 m

1.50 m

1.07

N74°14'05"E

N74°13'45"E

FH

8.10 m

N15°49'30"W N15°52'30"W

1.07 6.55(P&SET)

PROJECT

7.620(P&M)

43.598 (M) 43.62(P)

REZONING RESUBMISSION REZONING RESUBMISSION ISSUED FOR REZONING DESCRIPTION

NMU NMU NMU BY

3 2 1

DRAWING

MANOR ROAD E. EX. 300∅ COMB. SEWER

CB

. DR

. DR

IS LL TU

IS LL TU

FH

2023-12-07 2023-11-08 2023-08-15 DATE

REZONING RESUBMISSION REZONING RESUBMISSION ISSUED FOR REZONING DESCRIPTION

NMU NMU NMU BY

PROJECT

Hillsdale Ave E + Yonge St + Manor Rd E Toronto, Ontario

DRAWING

FLOOR 01

PROJECT NO.

THW

#

Toronto, Ontario

7.70 m

EXISTING FIRE HYDRANT

EX. 300∅ WM

#

residential units horizontal circulation, lobby vertical circulation, service areas Hillsdale Ave E + Yonge St + Manor Rd E amenity retail garbage room FLOOR 01 bicycle parking

2023-12-07 2023-11-08 2023-08-15 DATE

N15°52'30"W

6170

13.393(P1) 13.41(P) 13.401 (M) (SET)

N8°27'35"W

N15°49'30"W N15°52'30"W

N15°52'30"W

N9°01'50"W N9°25'10"W

TH 59.6 m² 641 ft²

35.978(M) 36.00(P)

43.62(P)

EX. HYDRANT

CB

TH 66.1 m² 711 ft²

43.598 (M)

EXISTING FIRE HYDRANT

CB

TH 70.3 m² 756 ft²

3 2 1

5.80 m

26.70 m

TH 55.2 m² 594 ft²

7.25 m

6.75 m

6.55(P&SET)

17320

8.45 m

6.65 m

0.80 m

1.07

TYPE "B" LOADING SPACE 11.0 m X 3.5 m X 4.0 m

PROP.PART 150∅ FIRE CONNECTION 2, PLAN 66R-31329 SUBJECT TO RIGHT-OF-WAY PROP. 100∅ DOM CONNECTION

36.63(P) 36.637(P1)

7.620(P&M)

1.50 m

35.978(M) 36.00(P)

71.8 m² 773 ft²

36.661 (M)

2.10 m

D M

DOWN TO UG1 RETAIL SERVICE

39.745 (M)

39.72(P) 39.75(P5)

RESIDENTIAL BIKE PARKING (98 SHORT-TERM) (38 LONG-TERM)

285.4 m² 3072 ft²

11.60 m

TH EXISTING BUILDING 59.6 m² 641 ft²

11.55 m

AMENITY

2.70 m

TH 66.1 m² 711 ft²

10.50 m

TH

7.25 m

8.45 m

81.65 m

N15°34'10"W

N15°35'20"W

2.10 m 11.55 m

765.6 m² 8241 ft²

OUTLINE OF UG BELOW

70.3 m² 756 ft²

CB

4500

N77°06'00"E

N77°11'15"E N77°07'20"E

PROP. 150∅ FIRE CONNECTION

EX. 300∅ WM

CB

SIAMESE CONNECTION

29035 (95' - 3")

17320

N74°14'50"E

CB

4500

View from West (conceptual render)

EXIT

FH

G

SHORT TERM PARKING ONLY

4600

2.00 m

6170

N74°11'55"E

1.15 m

6700

VEST.

7.601 (P5&M)

PART 3, PLAN 66R-31329 SUBJECT TO RIGHT-OF-WAY

N8°38'20"W(P,P 2)

TYPE "B" LOADING SPACE 11.0 m X 3.5 m X 4.0 m

6.15 m

D

6.25 m

YONGE

YONGE

23.20 m 20.65 m

6.15 m

249.3 m² 2684 ft² FFE: 154.9 N72°59'45"E

36.30 m

FLOOR 2 OUTLINE ABOVE

0.05 m

15229 (50' - 0")

41.05(P)

41.040 (M)

41.000 (M)

16.60 m

40.99(P)

6900 (22' - 8") EXIT

13.00 m

2900

1.20

6.00 m

THW

G

FIRE HYDRANT

EXIT

N15°35'20"W

6.30 m

1.00 m

1.95 m

EXIT

3.50 m

LOBBY

RETAIL B

m DOWN TO UG1

THW

B

G

EXIT

EXIT

N74°40'05"E(P6)

285.4 m² 3072 ft²

CB

C

G

N73°03'45"E(P5) 7.62(P) N74°42'20"E (M)

AMENITY

7.10 m

1.15 m

G

G

33.9 m² 364 ft²

2.10 m

CB

CB

6.20 m

G

G

MAIL

EX. 150∅ WM FH EX. 2300 x 2200 COMB. SEWER

N74°14'05"E

450∅ STORM SEWER

THW

10.9 m² 117 ft²

4540

0.15 m

THW

N74°13'45"E

EX. HYDRANT

THW

CACF

TYPE "G" LOADING SPACE

G

G

STAIR EXIT FROM FL02 / UG1

1.07

X. 150∅ WM WER MANOR RD. W.

1.95 m

2100 13.393(P1) 13.41(P)

N8°27'35"W

(SET)

55.2 m² 594 ft²

N9°01'50"W N9°25'10"W

2.70 m

THW

O O O O R R

2100

N74°50'20"E(P,P2)

TH

0.80 m

CB

CB

11.60 m

ONNECTION

FIRE RO

BELOW

13.401 (M)

36.661 (M) 36.63(P) 36.637(P1)

71.8 m² 773 ft²

2.00 m

95' - 3")

4670

VEST.

N74°15'50"E (M) 0.240 (P,P2&SET)

1.20 m

E

4500

1.65 m

EX. 2030.8 0∅0 mWM

RESIDENTIAL BIKE PARKING (98 SHORT-TERM) (38 LONG-TERM)

1 ______ SPA401

R

G

PROP.PART 150∅ FIRE CONNECTION 2, PLAN 66R-31329 SUBJECT TO RIGHT-OF-WAY PROP. 100∅ DOM CONNECTION

OUTLINE ABOVE FLOOR 2

CB

765.6 m² 8241 ft²

SIAMESE CONNECTION 6000

11.65 m

.1M - .2M YONGE STREET R.O.W. WIDENING

25206 (82' - 8")

RETAIL B

SIAMESE CONNECTION

VEST.

6.00 m 4500

EX. 1350 ∅ STORYONG M SEWER E STREET (27m R.O .W.) EX UTE RETAIL SERVICE. 750∅ C OMB. SE WER LAY-BY EX. 450∅ ST ORM SEWE R

LOBBY 249.3 m² 2684 ft² FFE: 154.9

4500

4500

SHORT TERM PARKING ONLY

4600

33.9 m² 364 ft²

N8°22'30"W

G

MAIL

N8°23'30"W 4500

G

STAIR EXIT FROM FL02 / UG1

2100

G

161.8 m² 1741 ft²

RETAIL ENTRANCE

(P+P6&SET)

FH

13.0 m X 4.0 m X 6.1 m "ADJACENT LANDS OWNED BY GARBAGE CSG YONGE-MANOR LIMITED 4190 14930 R AND CSG HILLSDALE LIMITED"

R

R

(M)

G

6700

36.8 m² 396 ft²

R R R R R R R

R

27.017

G

28.3 m² 304 ft²

BULKY ITEMS

29.290

HILLSDALE AVE HILLSDALE E + YONGE AVE2.10 ST Em + YONGE ST RETAIL SERVICE

RES. MOVING STAIR TRANSFER ABOVE

13243 (43 ' - 5")

29675 (97' - 4")

G

7.60 m

7.620(P&SET)

MANOR RD E

SECONDARY RESIDENTIAL ENTRANCE

RESIDENTIAL ENTRANCE PROP. 250∅ CONNECTION TO EX. 29.30 m PROP. 150∅ CONNECTION TO EX. 525∅ COMB. SEWER RETAIL ENTRANCE 525∅ STORM SEWER

15.80 m 8.15 m

(P+P6&SET)

MANOR RD E

52923 (173' - 8")

26.99(P)

G

3.05 m

G

14930

CB

R

G G

EXIT

O O O O R R

R

4190

PART 7, PLAN 66R-14429 SUBJECT TO RIGHT-OF-WAY

161.8 m² 1741 ft²

2.10 m

6.00 m

GARBAGE

)

1017.7 m² 10955 ft²

.4M YONGE TYPE "G" LOADING SPACE STREET R.O.W. 13.0 m X 4.0 m X 6.1 m WIDENING

5570

R R R

29.290

62.48(P)

MH

PART 6, PLAN 66R-14429 SUBJECT TO RIGHT-OF-WAY

R R R R R R R

7.620(P&SET)

PROP. SAN. CONTROL 51648 (169' - 5")

0.40 m

27.70 m

BULKY ITEMS

41.91(P,P2)

2.20 m

RETAIL A

36.8 m² 396 ft²

STAIR TRANSFER ABOVE

N8°35'50"W

1.20 m

28.3 m² 304 ft²

41.914 (M)

OMB. SE WER

RES. MOVING

0.90 m

EXIT 2.05 m 6.00 m

B

0.80 m

1.30 m 6.15 m

RETAIL SERVICE MASSING CONCEPT MASSING CONCEPT PODIUM PODIUM

SECONDARY

54.30 m CONNECTION TO EX. PROP. 250∅ 29.30 m m PROP. 150∅ CONNECTION TO EX. 525∅ COMB. SEWER PROP.35.25 STORM CONTROL 525∅ STORM SEWER MH

7.60 m 1.65 m

LEGEND PRIMARY RESIDENTIAL ENTRANCE

RESIDENTIAL ENTRANCE

62.460 (M)

2.15 m

EX. 675∅ C

51648 (169' - 5")

CB

C

15229 (50' - 0")

HILLSDALE AVE. W.

Ground Floor Plan

12 SHORT TERM NONRESIDENTIAL BIKE PARKING SPACES

CB

15.80 m

62.48(P)

62.460 (M)

52923 (173' - 8")

A

8.15 m 17.40 m

5.80 m

CB

6.15 m 12378 (40' - 7")

1.00 m

CB

CB

CB

m PROP.35.25 STORM CONTROL 4.90MH m

1.65 m

6.25 m

6.25 m

54.30 m

7.40 m

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

LEGEND HILLSDALE AVENUE E. PRIMARY

EX. 400∅ STORM SEWER (ABANDONED)

1.20 m

CB

CB

12 SHORT TERM NONRESIDENTIAL BIKE PARKING SPACES

CB

CB

EX. 525∅ STORM SEWER EX. 525∅ COMB. SEWER HILLSDALE AVENUE E.

1 ______ SPA402

8.30 m

8.30 m CB

EX. 400∅ STORM SEWER (ABANDONED)

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

EXISTING FIRE HYDRANT

ST

CB

EX. 525∅ STORM SEWER EX. 525∅ COMB. SEWER

N

1 ______ SPA402

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

42.91(P6)

FH

EXISTING FIRE HYDRANT

HILLSDALE AVE E + YONGEEX.ST 150∅ WM

LAY-BY

FH

EX. 150∅ WM

Turner Fleischer Architects Inc.

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

PROJECT NO.

20.222P01

20.222P01

PROJECT DATE

PROJECT DATE

2023-03-10

2023-03-10

DRAWN BY

DRAWN BY

NMU CHECKED BY

RMM SCALE

1:250 N

DRAWING NO.

REV.

30

NMU

HIGH-RISE

1:250

CHECKED BY

RMM SCALE

N

DRAWING NO.

REV.


HERITAGE BUILDING RESTAURATION STUDY

roofline modillions dentilled cornice

original 2nd floor openings

chamfered entrance visual break between heritage and proposed new building 1917 photograph showing the original design of the primary elevation of 2111 Yonge Street (Source: City of Toronto Archive).

Proposed restoration of the North elevation of 2111 Yonge Street

View from Hillsdale Ave E and Yonge St - Retained Corner Heritage Building (conceptual render)

STREETSCAPE STUDY

View along Yonge St - Initial Iteration - New Corner Building (conceptual render)

View along Yonge St - Latest Iteration - Retained Corner Heritage Building (conceptual render) 31 HIGH-RISE


955 WEST ON RD Toronto, ON | 2023 | Residential | Pre-construction Site: 1.85 acres | 61,151 m² Role: Senior Designer

Project Team: 4

Firm: Turner Fleischer

Located in Toronto’s Mount Dennis neighbourhood, the project comprises two towers, 34 and 24 storeys high, rising above an eightstorey podium and delivering 1,003 residential units ranging from studio to three-bedroom layouts. A portion of the site is dedicated to a new public park, contributing to the neighbourhood’s public realm. The initial application proposed a larger building footprint occupying most of the site. The revised design reduces the site coverage while maintaining density by shifting mass vertically and setting the towers further back from the street. This strategy lowers the perceived scale at the streetscape, and introduces an internal courtyard that enhances light, openness, and shared outdoor space. A terraced podium establishes a pedestrian-scaled frontage. The façade combines metal and precast panels, with the podium finished in warm-toned materials that add richness to the streetscape. Rounded internal podium corners soften the massing and enhance the flow of the outdoor spaces. Working closely with the Design Director, I assisted in feasibility studies, developed the design for the revised massing, and View from West (conceptual render)

contributed to project documentation for submissions.

32 HIGH-RISE


MASSING CONCEPT ORIGINAL MASSING

3

1. INITIAL MASSING

2

02 DESIGN CONCEPT DIAGRAM

ORIGINAL MASSING

955-975 Weston Road

Aerial View from Southwest Latest Submission (conceptual render)

2. FLOW ORIGINAL MASSING

3 3

2

3. RECESSES

4. STREETVIEW BLOCKS

ORIGINAL MASSING

2

02

ONCEPT DIAGRAM

955-975 Weston Road

02

DESIGN CONCEPT DIAGRAM

955-975 Weston Road

3

3 3 2

2

2

Aerial View from East Latest Submission (conceptual render)

5. GRID

02 955-975 Weston Road

SIGN CONCEPT DIAGRAM

02 955-975 Weston Road

33 HIGH-RISE


N METROLINX RAILWAY ENTRANCES

TERRACE AT LEVEL 2

TERRACE AT LEVEL 6 BUILDING A 11 STOREYS ROOF OF LEVEL 12 MECHANICAL

TERRACE AT LEVEL 2

TERRACE AT LEVEL 11 TERRACE AT LEVEL 10 TERRACE AT LEVEL 9 TERRACE AT LEVEL 8 TERRACE AT LEVEL 7 TERRACE AT LEVEL 6 TERRACE AT LEVEL 5

ROOF OF LEVEL 12 MECHANICAL

LAMBTON AVE

BUILDING B 11 STOREYS

TERRACE AT LEVEL 2

TERRACE AT LEVEL 11 TERRACE AT LEVEL 10 TERRACE AT LEVEL 6 TERRACE AT LEVEL 2

D

NR

TERRACE AT LEVEL 9 TERRACE AT LEVEL 8 TERRACE AT LEVEL 7

STO WE

Site Plan - 1st Submission (larger footprint)

View Along Weston Rd Latest Submission (conceptual render)

Site Plan - Latest Submission (reduced footprint)

View from South Latest Submission (conceptual render)

N METROLINX RAILWAY

TERRACE AT LEVEL 5

TERRACE AT LEVEL 7

ENTRANCES

BUILDING A 34 STOREYS

GREEN ROOF AT LEVEL 9

BUILDING B 24 STOREYS

TERRACE AT LEVEL 3 GREEN ROOF AT LEVEL 3

LAMBTON AVE

OUTDOOR AMENITY AT LEVEL 1

OUTDOOR AMENITY AT LEVEL 8

PUBLIC PARK

VEL 7 E AT LE 6 TERRAC E AT LEVEL 5 L TERRAC E AT LEVE L 1 TERRAC E AT LEVE TERRAC

ROOF OF LEVEL 8 MECHANICAL

D

NR

STO

WE

34 HIGH-RISE


M

I

D

-

R

I

S

E


1230 T HE QUEENSWAY Toronto, ON | 2025 | Mixed-use | Pre-construction Site: 0.43 acres | 10,623 m² residential | 500 m² retail Role: Job Captain

Project Team: 4

Firm: Turner Fleischer

This is a proposed 11-storey development along The Queensway corridor in Toronto’s South Etobicoke area, located near Kipling Avenue. The project comprises 143 residential units above a four-level underground parking structure, with retail integrated at grade. An initial submission proposed a higher datum line along The Queensway, resulting in a street wall perceived by the City as overly tall in relation to its context and at the pedestrian scale. The massing was subsequently revised to reduce the building’s bulk along the street. A contemporary palette of light-colored panels and glazing emphasizes vertical modulation. The final façade design evolved through multiple iterations in close collaboration with the client. I led the design concept process, developing and advancing the architectural expression throughout these iterations. Accommodating the required parking within the constrained site presented a significant challenge. The site did not allow for a continuous 15% ramp across all levels; instead, 5% sloped drive aisles were integrated along the parking rows, enabling incremental level transitions while optimizing the layout. I was part of the team responsible for producing the drawing sets and coordinating with external stakeholders.

View from The Queensway Looking North (conceptual render)

36 MID-RISE


INITIAL DESIGN DESIGN EVOLUTION

OPTION 02a

OPTION 02c

OPTION 02d

03d 03d

OPTION OPTION03c 03c

INITIAL DESIGN VARIATIONS 1

OPTION 02

design Building 1230 The Queensway final - Residential

OPTION 02b INITIAL DESIGN INITIAL DESIGN

INITIAL DESIGN 1230 The Queensway - Residential Building

OPTION 02d OPTION OPTION03e 03e 03b

OPTION 03a

OPTION 02

01

03f 03f

1230 The Queensway - Residential Building

VARIATIONS 2

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

OPTION 02c

MASSING STUDY

This drawing, as Architects Inc. Th on site and must information. This survey, structural, appropriate consu applicable codes drawings not spec for any correction

EXTERIOR FINISHES LEGEND

OPTION 03c

03d

FINAL DESIGN

E

1

PRECAST/METAL PANEL/EIFS (LIGHT COLOUR)

1

P

2

BRICK/PRECAST/EIFS WITH BRICK PATTERN (LIGHT COLOUR)

2

B (L

3

METAL PANEL (DARK COLOUR)

3

M

4A

SPANDREL GLASS (LIGHT COLOUR)

4A

S

4B

SPANDREL GLASS (DARK COLOUR)

4B

S

5A

CLEAR GLAZING

5A

C

5B

CLEAR GLAZING WITH CERAMIC FRIT

5B

C

6

ALLUMINUM MULLION (DARK COLOUR)

6

A

7

METAL CORNICE (DARK COLOUR)

7

M

Revised Massing - Lower Datum Line

2

RZ302

LOBBY

WEST ELEVATION

2

RZ302

1 : 200

LOBBY ENTRANCE

RETAIL

WEST ELEVATION2 1 : 200

RZ302

LOBBY LOBBY ENTRANCE

RETAIL

LOBBY

SETBACK

FLOOR 1 111.50 111.59 111.85 THE QUEENSWAY

5A111.50

RETAIL RETAIL

3 2 1

FLOOR 2 116.35

2

CULNAN AVE. 1 FLOOR

5A

#

2025-05-02 2025-04-15 2024-09-20 DATE

ISSUED FOR REZONING SUBMISSION NO.2 ISSUED FOR SUBMISSION TO CITY ISSUED FOR REZONING SUBMISSION DESCRIPTION

2.00 m SETBACK

0.05 m SETBACK 111.50

111.59

TCH TCH TCH BY

111.85 RETAIL

RETAIL

WEST ELEVATION 1 SOUTH ELEVATION 1 : 200

RZ302

1 : 200

1

RZ302

SOUTH ELEVATION 1 1 : 200

RZ302

SOUTH ELEVATION 1 : 200

North Elevation 1

RZ302

PROPERTY LINE

FLOOR 4 123.4 FLOOR 3 120.45 FLOOR 2 0.05 m 116.35

02

SETBACK 111.50

FLOOR 1 111.85

4.10 m 2.95 m 3.25 m 3.25 m

FL

FL

DETAIL

1. FRITTE VISUAL M FIRST 16M

3.25 m

43.50 m

FLOOR 5 126.35

BUILDING HEIGHT

FLOOR 6 129.3

FLO

FL

3.25 m

FLOOR 7 132.55

FLO

FL

2.95 m

FLOOR 9 139.05 FLOOR 8 135.8

MPH

6.00 m

MPH

FLOOR 10 142.3

FL

FL

FL 3 2 1

2025-05-02 2025-04-15 2024-09-20 DATE

FL

#

FL

RETAIL PROJECT

2

FLOOR 11 145.25

2.95 m

4.10 m 2.95 m 3.25 m 3.25 m 3.25 m

43.50 m

2.95 m

6

MPH 149.35

REDUCT • REDUC LIGHTS • SELEC FIXTUR REDUC

2.95 m

FLOOR 3 120.45

1

ROOF 155.35

4.10 m

FLOOR 4 123.4

2.95 m

FLOOR 5 126.35

5A

2.95 m

FLOOR 6 129.3

1. FRITTED GLASS WILL BE TREATED WITH A DENSITY PATTERN OF VISUAL MARKERS NO MORE THAN 50mm X 50mm APART FOR THE FIRST 16M ABOVE GRADE. (TORONTO GREEN STANDARD EC4.1)

4A

4.10 m

FLOOR 7 132.55

DETAIL NOTES:

BUILDING HEIGHT

FLOOR 8 135.8

VISUAL MARKERS MUST HAVE A MINIMUM DIAMETER OF 5MM

3.25 m

FLOOR 9 139.05

THAN 50mm X 50mm APART (*1)

FLOOR 10 142.3

6.00 m

PROPERTY LINE

PROPERTY LINE

MPH

THAN 50mm X 50mm APART (*1)

16.01 m

3.25 m

3.25 m

3.25 m

2.95 m

4.10 m

6.00 m

FLOOR 2 0.05 m 116.35

3.25 m

43.50 m

FLOOR 3 120.45

2.95 m

BUILDING HEIGHT

FLOOR 4 123.4

2.95 m

FLOOR 5 126.35

2.95 m

FLOOR 6 129.3

DENSITY PATTERN BETWEEN NO MORE

DENSITY PATTERN BETWEEN NO MORE

PROPERTY LINE

PROPERTY LINE

MPH

6.00 m

2.00 m 2.00 m SETBACKSETBACK

FLOOR 7 132.55

7

GENERA FRIENDL METERS FEATUR PROVISI • VISUAL PROVID OF GLA IS ONE • APPLIC • MUTTIN USE OF GLASS 11 STOREY BUILDI • CANOP TO PRO IMAGES • USE CE VISION

4.50 m

CULNAN 111.59 AVE.

FLOOR 8 135.8

MPH 149.35

4.50 m

2.00 m SETBACK

4

2

FLOOR 9 139.05

REDUCTION OF LIGHT POLLUTION • REDUCTION OF LIGHT POLLUTION FROM INTERIOR LIGHTS, PARTICULARLY DURING MIGRATION PERIODS. • SELECTION OF APPROPRIATE EXTERNAL LIGHTING FIXTURES TO ELIMINATE DIRECT UPWARDS LIGHT. REDUCE SPILL LIGHT AND OPTIMIZE USEFUL LIGHT.

FLOOR 11 145.25

EXTENT OF 85% BIRD FIRENDLY GLAZING

2

FLOOR 2 2 116.35

6

FLOOR 10 142.3

4.10 m

5

16.01 m

FLOOR 3 120.45

1

MPH 149.35 FLOOR 11 145.25

BIRD

GENERAL NOTES IN ACCORDANCE WITH THE BIRDFRIENDLY DEVELOPMENT GUIDELINES (FIRST 16 METERS ABOVE GRADE AND 4 METERS ABOVE GREEN FEATURE): PROVISION OF VISUAL MARKERS • VISUAL MARKERS TO ALERT BIRDS WILL BE PROVIDED. INCREASING THE SOLID TO GLASS RATIO OF GLAZING BY PROVIDING A TIGHTER GLAZING GRID IS ONE METHOD CONSIDERED, OTHERS ARE: • APPLICATION OF FILM AND DECALS TO THE GLASS • MUTTING REFECTIONS IN THE GLASS THROUGH THE USE OF INTERNAL SCREENS PLACED CLOSE TO THE GLASS SURFACE. OUTDOOR OUTDOOR 11 STOREY BUILDING • CANOPIES LOCATED ALONG THE BUILDING FACADE MUTING OF REFLECTED AMENITY TO PROVIDE ADDITIONAL AMENITY IMAGES • USE CERAMIC FRIT PANEL GLASS FROM AGC FOR ALL VISION GLASS ON LEVEL 1 & 2

ROOF 155.35

4.50 m

111.50

4.10 m 2.95 m 2.95 m

1 1

FLOOR 4 123.4 6

2.95 m

FLOOR 5 126.35

3.25 m

3.25 m

5A

3.25 m

5A 4

2.95 m

FLOOR 6 129.3

03f

43.50 m

4A

BUILDING HEIGHT

3

FLOOR 7 4A 132.55

4.10 m

FLOOR 8 135.8

3.25 m

FLOOR 9 139.05

FLOOR FLOOR 1 5A CULNAN THE1 AVE. 111.85 111.85 THE QUEENSWAY QUEENSWAY THE QUEENSWAY

111.80 111.59

PROPERTY LINE

PROPERTY LINE

MPH

7

FLOOR 10 142.3

16.01 m

3.25 m

3.25 m

3.25 m

3.25 m

2.95 m

4.10 m

6.00 m

FLOOR 2 2.00 m 116.35 SETBACK

2.95 m

43.50 m

FLOOR 3 120.45

LOBBY ENTRANCE

RETAIL

BUILDING HEIGHT

FLOOR 4 123.4

2.95 m

FLOOR 5 126.35

2.95 m

FLOOR 6 129.3

4.10 m

3.25 m 3.25 m 2.95 m

2.00 m SETBACK

PRIVATE CULNAN 111.50 5A DRIVEWAY AVE.

RZ302

1 : 200

FLOOR 7 132.55

6

4.50 m

2

2 2.00 m SETBACK

West Elevation

WEST ELEVATION

MPH

6.00 m 2.95 m 3.25 m

6

FLOOR 2 116.35

6

4.10 m

16.01 m

FLOOR 3 120.45

1

2.95 m

1

FLOOR 4 123.4

FLOOR 8 135.8

2.95 m

FLOOR 5 126.35

5A

FLOOR 9 139.05

3.25 m

4A

5A

FLOOR 6 129.3

43.50 m

6

FLOOR 7 132.55

BUILDING HEIGHT

4A

FLOOR 8 135.8

LOBBY

FLOOR 10 142.3

MPH 149.35 7

11 STOREY BUILDING

ROOF 155.35

FLOOR 11 145.25

EXTENT OF 85% BIRD FIRENDLY GLAZING

PROPERTY LINE PROPERTY LINE

PROPERTY LINE BEYOND

PROPERTY LINE PROPERTY LINE

FLOOR 9 139.05

FLOOR 1 111.85 THE QUEENSWAY

111.80

1230 The Queensway - Residential Building LOBBY ENTRANCE

FLOOR 10 142.3

OUTDOOR AMENITY

OUTDOOR AMENITY

EXTENT OF 85% BIRD FIRENDLY GLAZING

PRIVATE 111.50 DRIVEWAY

MPH 149.35 FLOOR 11 145.25

11 STOREY BUILDING

ROOF 155.35

4.50 m

111.80

7

4.10 m

MPH

6.00 m 2.95 m 2.95 m

16.00 m

4.10 m

2.00 m 2SETBACK

2

PRIVATE DRIVEWAY

OUTDOOR AMENITY

4.50 m

2

111.80

5

6

7

EXTENT OF 85% BIRD FIRENDLY GLAZING

PRIVATE DRIVEWAY

1

1

MPH 149.35

11 STOREY BUILDING

ROOF 155.35

FLOOR 11 145.25

16.00 m

4

6

4.10 m 2.95 m 3.25 m

5A

3.25 m

5A

3.25 m

5

3.25 m

6

2.95 m

6

OUTDOOR AMENITY

EXTENT OF 85% BIRD FIRENDLY GLAZING

2

PROPERTY LINE

3

EXTENT OF 85% BIRD FIRENDLY GLAZING

16.00 m

6

PROJECT

PROPOSED MIXED-USE RESIDENTIAL DEVELOPMENT

PROP

1230 The Queensway, Etobicoke, ON

SOUTH ELEVATION 1 : 200

DRAWING

DRAWING

ELEVATIONS

37 02 AM

02 AM

MID-RISE 02 AM

Initial Massing - Higher Datum Line

4A

1

EXTENT OF 85% BIRD FIRENDLY GLAZING

16.00 m

OPTION 02

EXTENT OF 85% BIRD FIRENDLY GLAZING

1

4A

4.50 m

5A

6

7

11 STOREY BUILDING

ROOF 155.35

43.50 m

6

11 STOREY BUILDING

BUILDING HEIGHT

4A

1230 1230The TheQueensway Queensway- Residential - ResidentialBuilding Building

OUTDOOR AMENITY

7

OPTION 02d OPTION 03e

PROPERTY LINE BEYOND

1. Precast (light) 2. Precast with pattern (light) 3. Spandrel glass 4. Clear glass 5. Aluminum mullion 6. Metal cornice (dark)

PROPERTY LINE

11 STOREY BUILDING

7

INITIAL DESIGN

PROPERTY LINE

EXTERIOR FINISHES

PROPERTY LINE BEYOND

PROPERTY LINE

INITIAL DESIGN

OPTION OPTION0303

PROPERTY LINE BEYOND

BIRD FRIENDLY GUIDELINES

02 AM

The Queensway)

03b 03b

OPTION OPTION03a 03a

PROJECT NO.

PROJECT NO

22.278P01

22.278P01

PROJECT DATE

PROJECT DA

2024-05-29

2024-05-2

DRAWN BY

DRAWN BY

NGE

NGE

CHECKED BY

CHECKED BY

NMC

NMC

SCALE

SCALE


0.85 m

6.00 m 4.10 m 2.95 m 3.25 m 3.25 m 3.25 m 3.25 m 2.95 m 4.10 m 4.50 m 4.50 m 2.80 m 2.80 m

5600

1000 MAX.

6000

DRIVE AISLE

4.90 m

5600

EV

EV EV

5600

31.78

EV

EV

N17°13'10"W 24.55 m

EV EV

EV

EV SLOPE UP AT 5%

TRANSFOR

000.00 M

V

VISITOR PA ELECTRIC

PROPOSED EV P

WITH AN ENERG

6.00 m

3 2 1

#

2025-05-02 2025-04-15 2024-09-20 DATE

LOCKERS

42.85 m

PROPOSED MIXED-USE RESIDENTIAL DEVELOPMENT 0.80 m

N72°54'40"E

44.53

0.85 m

PROJECT

PROPOSED MIX DEV

1230 The Qu

DRAWING

DRAWN BY

NGE CHECKED BY

38 MID-RISE

NMC SCALE

1:100 N

REV.

3

UNDERGRO

1 ______ RZ401

PROJECT NO.

22.278P01

PROJECT NO.

22.278P01

PROJECT DATE

PROJECT DATE

2024-05-29

2024-05-29

DRAWN BY

DRAWN BY

NGE

NGE

CHECKED BY

025-05-09 10:05:51 AM

2024-05-29

ISSUED FOR ISSUED FOR ISSUED FOR

106.10

UNDERGROUND LEVEL 01

1 ______ RZ401

PROJECT DATE

SPOT ELEV

GAS/HYDR

G

25.4 m² 274 ft²

PROJECT

UNDERGROUND LEVEL 04

PROJECT NO.

150

CONVEX M

1230 The Queensway, Etobicoke, ON

22.278P01

RZ101

SLOPE UP AT 5%

EV EV SLOPE UP AT 5%

105.50

18.2 m² 196 ft²

0.85 m

3400

2 ______ RZ401

EV

EV

TCH TCH TCH BY

LOCKERS

2.85 m

MIN 3.4 x 5.6 x 2.1m H

0.80 m

44.53

8.2 m² 88 ft²

LEVEL 2 CHARG

1.50 m 0.35 m

ISSUED FOR REZONING SUBMISSION NO.2 ISSUED FOR SUBMISSION TO CITY ISSUED FOR REZONING SUBMISSION DESCRIPTION

300

VESTIBULE

DRAWING

DRAWING NO.

ELEV #2

0.80 m

N72°54'40"E

LOCKERS

6.00 m

EV 2025-05-02 2025-04-15 2024-09-20 DATE

1.25 m

TYPICAL B

EV

0.30 m SLOPE UP AT 5%

1.50 m

FIRE FIGHTER ELEV #1

WITH AN ENERGIZED OUTLET CAPABLE OF PROVIDING

108.90

DRAWING

025-05-09 10:05:51 AM

VESTIBULE DN

6.00 m

PROPOSED EV PARKING SPACES TO BE EQUIPPED

114.5 m² 1232 ft²

#

0.80 m

7.29

6.00 m

1.55 m

EV VISITOR PARKING

1230 The Queensway, Etobicoke, ON

1 ______ RZ401

2.60 m

5.60 m

SWM TANK

3 2 1

TYPICAL P

TYPICAL PARKING S MIN 2.6 x 5.6 x 2.0m H

104.10

EV

EV EV EV EV

31.78

V

1.20 m 40.00 m

PROPOSED MIXED-USE RESIDENTIAL DEVELOPMENT 0.80 m

0.80 m

6.00 m

1000 MAX.

OBSTRUCTION

EV 6000 EV

5600

1000 MAX.

6000

DRIVE AISLE

5600 5600

N17°10'20"W

39.25 m

1500

GAS/HYDRO METER

G

MINIMUM PE DI

AISLE WIDTH: MIN 6

UP

6.5 m² 70 ft²

SPOT ELEVATION

M

This drawing, as an instrument of servic Architects Inc. The contractor must verif on site and must notify Turner Fleischer information. This drawing is not to be sc survey, structural, mechanical, electrica appropriate consultant's drawings before applicable codes and requirements of au drawings not specifically marked 'For Co for any corrections or damages resulting

N72°51'00"E

UP

0.80 m

0.80 m

0.80 m

0.80 m

42.85 m

1.40 m

2025-05-09 10:06:03 AM

1.55 m 4.90 m

EV EV EV

EV EV

SLOPE UP AT 5%

108.30

PROJECT

UG 1 107.35 UG 2 104.55 UG 3 101.75 UG 4 98.95

2600

5.60 m

25.4 m² 274 ft²

44.53

FLOOR 2 116.35 FLOOR 1 111.85

300

LOCKERS

N72°54'40"E

SLOPE UP AT 5%

INTAKE SHAFT

40.86

EV

300

STORAGE VOLUME: 60m3

6.00 m

#

100.50

FLOOR 3 120.45

1.55 m

0.80 m

9.14 0.85 m N17°10'20"W 9.80 m

TYP

0.60 m

EV EV

7.5% SLOPE

EV EV

1.55 m

EV EV

300

LEVEL 2 CHARGING OR HIGHER.

TCH TCH TCH BY

FLOOR 4 123.4

2600

ELECTRIC VEHICLE PARKING

26.2 m² 282 ft²

EV

UG LEVEL 2 39 PARKING SPACES TOTAL 32 PARKING SPACES 7 TANDEM PARKNG SPACES

TRANSFORMER WITH CLEARANCES

000.00

EV

ISSUED FOR REZONING SUBMISSION NO.2 ISSUED FOR SUBMISSION TO CITY ISSUED FOR REZONING SUBMISSION DESCRIPTION

EV

13.2 m² 142 ft²

104.70

50.4 m² 543 ft²

1.45 m

6.00 m

0.35 m

SLOPE UP AT 5%

99.90

18.2 m² 196 ft²

2600

CONVEX MIRROR

6.00 m

MECH.

VESTIBULE

MECH. 2025-05-02 2025-04-15 2024-09-20 DATE

EV

EXHAUST SHAFT

LEGEND

2 ______ RZ401

WITH AN ENERGIZED OUTLET CAPABLE OF PROVIDING

1.55 m

EV

EV EV

LOCKERS

2600

3400

2 ______ RZ401

LEVEL 2 CHARGING OR HIGHER.

3 2 1

EV

0.30 m

2600

MIN 3.4 x 5.6 x 2.1m HIGH

PROPOSED EV PARKING SPACES TO BE EQUIPPED

EX. H&V

FLOOR 5 126.35

1.55 m

ELECTRIC VEHICLE PARKING

OPEN TO BELOW

EV

3.40 m

VISITOR PARKING

EV

VESTIBULE

EV

3.40 m

V

6.00 m

2600

N17°13'10"W 23.35 m

GAS/HYDRO METER

G

ELEV #2

EV

M

FIRE FIGHTER ELEV #1

EV

TYPICAL BARRIER FREE SPACE

EV UP

OPEN TO BELOW

SPOT ELEVATION

V

N17°13'10"W 24.55 m

000.00

EV

343 ft²

TYPICAL PARKING SPACE: MIN 2.6 x 5.6 x 2.0m HIGH

8.2 m² 88 ft²

EV

DN

LOCKERS

EV

6.00 m

1.25 m

UP

17.5 m² 188 ft²

RAMP UP TO LVL 1 15% SLOPE

V

31.78

VESTIBULE

5.60 m

0.80 m

7.29

6.00 m

DN

EV

SLOPE UP AT 5%

V

1500

CONVEX MIRROR

TYPICAL PARKING DIMENSIONS

N72°51'00"E

BIKE LOCKERS

6.5 m² 70 ft²

LEGEND

2 ______ RZ401

1.80 m TYP

INTAKE SHAFT

V

39.25 m

5600

EV EV EV

EV EV

EV

3400

2 ______ RZ401

FLOOR 6 129.3

0.80 m

37.23

AISLE WIDTH: MIN 6m

EV

300

1.80 m

106.90

RESIDENTIAL PARKING GATE

TRANSFORMER WITH CLEARANCES

EV

TANDEM PARKING SPACES

EV SLOPE UP AT 5%

EV

EV EV

ELEV #2

2600

40.86

300

SLOPE UP AT 5%

N72°51'00"E

LOCKERS MINIMUM PERMITTED PARKING DIMENSIONS 31.8 m²

16 LONG TERM RESIDENTIAL STACKED BIKE PARKING SPACES MIN. 2.4M VERTICAL CLEARANCE

SLOPE UP AT 5%

6000

4.90 m

300

107.50

MIN 3.4 x 5.6 x 2.1m HIGH

1.55 m SLOPE UP AT 5%

2.60 m 1.50 m

FIRE FIGHTER ELEV #1

3.40 m

EV

2600

5600

0.30 m

EV EV EV

VESTIBULE UP

5.60 m

2600

UG LEVEL 1 19 PARKING SPACES TOTAL 9 RESIDENT PARKING SPACES 9 VISITOR PARKING SPACES 1 TANDEM PARKING SPACE

TYPICAL BARRIER FREE SPACE

UNEXCAVATED

6.00 m

2600

V

6.00 m

OUTLINE OF BUILDING ABOVE

V

EV

0.80 m

6.8 m² 73 ft²

5.60 m

EV

13.2 m² 142 ft²

V

7.29

1.25 m

6000

6.00 m

6.00 m

1000 MAX.

2600

N72°51'00"E

UP

EV

40.86 N17°10'20"W

39.25 m

2 ______ RZ401

EV

0.30 m

1.40 m

TYPICAL PARKING SPACE: MIN 2.6 x 5.6 x 2.0m HIGH

98.50

INTAKE SHAFT

EV

35.60 m

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

EXHAUST SHAFT

31.8 m² 343 ft²

TYPICAL PARKING DIMENSIONS

EV

SLOPE UP AT 5%

EV

AISLE WIDTH: MIN 6m

1.55 m

1.40 m

EV

UG LEVEL 4 35 PARKING SPACES TOTAL 29 PARKING SPACES 6 TANDEM PARKING SPACES 99.10

EV

EV

V

13.2 m² 142 ft²

0.30 m

EV

37.23

TANDEM PARKING SPACES

0.80 m

N17°10'20"W 9.80 m

31.8 m² 343 ft²

MINIMUM PERMITTED PARKING DIMENSIONS

0.85 m

0.80 m

ELECTRICAL ROOM

EXHAUST SHAFT

V

EV

3.40 m

EV

FLOOR 7 132.55

1 ______ RZ401

1.50 m

EV

OBSTRUCTION

EV

N17°10'20"W

EV

5600

EV

1000 MAX.

EV

LOCKERS

N72°51'00"E

FLOOR 8 135.8

Underground Level 4

35.60 m

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

DRIVE AISLE

EV

37.23

9.14 0.85 m

0.80 m

N72°51'00"E

0.85 m

0.80 m

EV

35.60 m

FLOOR 9 139.05

R

1 ______ RZ401

0.85 m

FLOOR 10 142.3

1 : 200

Underground Levels 2 & 3 1 ______ RZ401

FLOOR 11 145.25

W-E Cross-section

SECTION B

EV

Underground Level 1

2.95 m 2.95 m

2

UG 4 PARKING

EV

Ground Floor

UG 3 PARKING

2.80 m

3

2.75 m

REV.

RZ151

2.80 m

UG 4 PARKING

N

DRAWING NO.

4.80 m

UG 3 PARKING

UG 2 PARKING

EV

1:100

UG 2 PARKING

EV

SCALE

VESTIBULE

EV

CHECKED BY

NMC

UG 1 PARKING

9.14 0.85 m

DRAWN BY

NGE

EXISTING 2 STOREY BUILDING 111.50

MPH 149.35

N17°10'20"W 9.80 m

PROJECT DATE

2024-05-29

TANDEM PARKING SPACES

PROJECT NO.

22.278P01

RAMP

CACF

FFE: 111.85

111.85

EV

10 1

1. THE RECONSTRUCTED SIDEWALKS ALONG THE QUEENSWAY AND CULNAN AVENUE FRONTAGES OF THE SITE WILL BE BUILT TO CITY STANDARDS AND AT NO COST TO THE MUNICIPALITY.

.9 6

GENERAL NOTES

CULNAN AVENUE

RETAIL FFE: 111.50

EV

SITE PLAN/GROUND FLOOR

AMENITY

LOADING

LOBBY

2.90 m

.1 5

.1 3 1

1

11

11 1

11

.1 9

1230 The Queensway, Etobicoke, ON

DRAWING

AMENITY

EV

1

.2 3 11 1

1 .1 9

11

HAZARDOUS WASTE

PROPOSED MIXED-USE RESIDENTIAL DEVELOPMENT

PIN 07528-0451 (LT)

STAIR

1.45 m

.4 2 11

11

.2 7 11

PROJECT

EXISTING MUNICIPAL SIDEWALK

RESIDENTIAL

TCH TCH TCH BY

2.80 m

.6 7

ISSUED FOR REZONING SUBMISSION NO.2 ISSUED FOR SUBMISSION TO CITY ISSUED FOR REZONING SUBMISSION DESCRIPTION

RZ401

025-05-09 10:05:50 AM

6.00 m 43.50 m 37.50 m

.7 6 11 1

.4 0

#

2025-05-02 2025-04-15 2024-09-20 DATE

PART 14, EXPROPRIATION PLAN 7901

EXISTING DRIVEWAY ACCESS AND DROPPED CURB TO BE REMOVED AND RESTORED WITH CONCRETE CURB, SIDEWALK, AND SOD ACCORDING TO CITY STANDARDS.

THE QUEENSWAY

3 2 1

MET

CORRIDOR

residential units amenities horizontal circulation, lobby vertical circulation, service areas, parking

DS

1

6.00 m

FIRE ROUTE

3.00 m 3.00 m

EXISTING DROPPED CURB

SAN MH. REFER TO CIIVL WVDWGS. WV

0.15 m

2.10 m

EXISTING BUS SHELTER

1 ______ RZ401

PROPERTY LINE

17 Ro .7 of 4 11 1 .6 1

11 1 .8 3

11

1 .7 8

11 11 1

OGS & SWM MH. REFER TO CIIVL DWGS. SIAMESE CONNECTION

2.10 m

12 .0 0

2.10 m

42.40 m

PROPOSED NEW PROPERTY LINE

GV

44.53

1

2.00 m SETBACK

.2 7

RETAIL ENTRANCE

N72°54'40"E EXISTING DRIVE WAY

m

.6 7

1.55 m SETBACK 5.40 m .5 0 11 1 .7 7

TYP.

0.60 m

11 1 1 11 1

2.00 m SETBACK

6. 00

RETAIL ENTRANCE

8. 00

DS

DS

.6 5

DS

m

6.00 m

EXISTING 2 STOREY BUILDING

FFE: 111.5

2.10 m

6.00 m

1

6485.00 m (21' - 3")

12464.50 m (40' - 11")

476 m² 5124 ft²

GAS/HYDRO METER

STAIR

OUTLINE OF FLOOR 3-9 ABOVE

EX. ROAD PAINTED LINE

EXISTING TACTILE INDICATOR TO REMAIN

RETAIL

FFE: 111.5

2.00 m SETBACK

CORNER ROUNDING TO BE CONVEYED TO CITY SIGN

TYP.

31.78

FFE: 111.85

FFE: 111.50

PRIVATE TERRACE AT FLOOR 9

2 ______ RZ401

11

10.8 m² 116 ft²

PRIVATE TERRACE AT FLOOR 9

TYP.

1

12.9 m² 139 ft²

M

UP

.8 0

RETAIL SERVICE

FIRE ROUTE SIGN

SPOT ELEVATION

G

11

RETAIL WASTE

6.15 m

3.00 m

0.60 m

TYP.

TYP.

0.60 m

0.60 m

TYP.

1.80 m

1

1.85 m

ELEVATOR LOBBY

TYP.

2.00 m

STAIR

82 LONG TERM RESIDENTIAL STACKED BIKE PARKING SPACES

.6 7

16.65

9082.00 m (29' - 10")

1.80 m

RESIDENTIAL

DS

DS

11

STAGING 15.00m2 VERTICAL CLEARANCE MIN. 6.1m AT STAGING AREA

ELEV #2

TYP.

1.80 m

A

000.00

PIN 07528-0238 (LT)

17 PARKING SPACES EQUIPPED WITH ENERGIZED OUTLET (120 V )

1

8.7 m² 94 ft²

FIRE FIGHTER ELEV #1

4.00 m

1.95 m

STAIR

SIAMESE CONNECTION

CONVEX MIRROR

TRANSFORMER WITH CLEARANCES

.7 4

DN

UP

2.00 m

1.80 m

CORRIDOR

FIRE HYDRANT

LOT 104

1 18 N17°13'10"W P .01 ar a 22.85pem t

MOVING

9.15 m

9.14 N17°10'20"W TYP

0.60 m

7.5% SLOPE

6.00 m

± 10 S.M.

HAZARDOUS WASTE 2.00m 2

TYP

FH

12 SHORT TERM RESIDENTIAL STACKED BIKE PARKING SPACES

PIN 075280237 (LT)

0.60 m

MIN. 2.4M VERTICAL CLEARANCE

EXIT

EXIT

15982.00 m (52' - 5")

BULK WASTE STORAGE RM

117.3 m² 1262 ft²

RAMP UP FROM UG 1 15% SLOPE

MGMT

CACF

BIKE REPAIR

BIKE LOCKERS 13.00 m

TYPE "G" LOADING (13.00m x 4.00m x 6.10m H)

PARCEL ROOM

GARBAGE ROOM TOTAL FLOOR AREA

AD

DN

111.45

WASTE COMPACTOR (TRI-SORTER)

± 48 S.M.

CONCIERGE

SIAME SE CO NNEC TION

N17°10'20"W

DIST ANCE FROM 20.55 FIRE m HYDR ANT TO

22.10 m

EXTENT OF NEW CURB AND SOD

CULNAN AVENUE

EXISTING EDGE OF ASPHALT

152 m² 1636 ft²

2.10 m

.5 0 11

LOBBY

4.40 m

6.00 m

7.29

2.00 m

40.86

2.10 m

2.10 m

FIRE ROUTE

1

6.1 m² 66 ft²

54.2 m² 584 ft²

FH

3.00 m

.5 9

N72°51'00"E

11

2.60 m

WASTE STORAGE

MAIL ROOM

TYPE G LOADING SPACE AND STAGING PAD TO BE CONSTRUCTED OF MIN. 200mm REINFORCED CONCRETE AT +/2% SLOPE

UP

INDOOR AMENITY

ROOF 155.35

RETAIL ENTRANCE EXIT

111.75

6.30 m

INTAKE SHAFT

ROOF OF MPH

OUTDOOR AMENITY AT MPH

PRIMARY RESIDENTIAL ENTRANCE

m

EXIT

OVERHEAD DOOR

OVERHEAD DOOR

MAIL B.O.H.

EX. H&V 8.00 m

APPROX. WIDTH OF EXISTING ON-STREET PARKING

11

WALL MOUNTED FLASH WARNING LIGHT SYSTEM

LEGEND

1

PRIMARY RESIDENTIAL ENTRANCE

EXTENT OF DROPPED CURB

EXIT

GAS METER

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

SECONDARY RESIDENTIAL ENTRANCE

109.17

3.00 m

2025-05-09 10:05:52 AM

.7 9

1

11

6.00 m

m

FFE: 111.85

EXISTING FIRE HYDRANT

1. 50

G

VESTIBULE

SIAMESE CONNECTION AT GROUND FLOOR

2 ______ RZ401

13.2 m² 142 ft²

FLUSH CURB

FLUSH CURB

1.50 m

00 5.

PUDO SPACE

DISTANCE FROM PRINCIPAL ENTRANCE TO FIRE ROUTE

NEW CONCRETE CURB AND SOD TO BE CONSTRUCTED ACCORDING TO CITY STANDARDS AND AT NO COST TO THE MUNICIPALITY

EXHAUST SHAFT

6.70 m

9.15 m

FIRE ROUTE

NEW CONCRETE PAD FOR TTC WHEELS-TRANS SERVICE

1

LOT 149

.7 4

10.60 m SETBACK

m

CONVEX MIRROR

PRIVATE DRIVEWAY

OUTLINE OF FLOORS 03-06 ABOVE

75 0.

6.00 m

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

PIN 07528-0242 (LT) OUTLINE OF UG LEVEL BELOW

3.00 m

0.05 m SETBACK

2.00 m WP

1

11

38.95 m 37.23

2.80 m

12

1

12 1

1 ______ RZ401 N72°51'00"E

VEHICLE ENTRANCE ACCESS DESIGN PER CITY OF TORONTO T-310.050-1

3.00 m

N

EXISTING 1 STOREY BUILDING

2.80 m

.2 9

.0 8

1

DS

MET

3.50 m

5:1 TRANSITION TO MATCH EXISTING SIDEWALK

PROPERTY LINE

.1 0 12

.7 6 11 1

EXISTING MUNICIPAL SIDEWALK

CHECKED BY

NMC

NMC

SCALE

SCALE

1:100

1:100 N

N

DRAWING NO.

RZ103

REV.

3

DRAWIN

R


84 NANCY ST Bolton, ON | 2023 | Residential | Pre-construction Site: 1.90 acres | 15,160 m² residential Role: Senior Designer

Project Team: 4

Firm: Turner Fleischer

This proposal demonstrates a contextually responsive architectural approach to a sensitive sloping site adjacent to established neighbourhoods and protected natural landscapes. With an elevation difference of approximately 12 metres between the southeast and northwest edges, the building steps along the slope, allowing it to integrate naturally with its surroundings. The 6-storey, 123-unit building is shaped by a modulated massing strategy that reduces perceived scale and responds to the site’s topography. Its architectural expression draws on the site’s natural character, using a refined material palette that complements Bolton’s evolving urban fabric while maintaining a strong relationship to the southern landscape edge. A material transition at the corner visually divides the building into two masses, reducing its apparent bulk. An alternative scheme explored a more fluid expression with continuous, undulating balconies. Durable, low-maintenance materials, and thoughtful site planning contribute to long-term environmental performance while preserving adjacent green space. The project reflects a coordinated design effort from concept through development, including cross-disciplinary collaboration to address site constraints, refine the building envelope, View from North (conceptual render)

and support planning submissions.

39 MID-RISE


outdoor amenity uses.

recreation will be provided in these locations, details of which are to be provided in future stages of the design.

The west and south sides of the development will inc significant landscaped amenity areas for activities.

P P

P

3$5.,1* /(9(/ 3$5.,1* /(9(/

5(6,'(17,$/

5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/

5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ $0(1,7<

3 $0(1,7< $0(1,7< $0(1,7< $0(1,7< $0(1,7< 3 $0(1,7< 3 $0(1,7< 3 3 3 3 3 3 3 3 $0(1,7< $0(1,7< 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

S-N Cross-section

3$5.,1* /(9(/

3 3

5(6,'(17,$/ 5(6,'(17,$/ /2&.(56

/2&.(56 /2&.(56

+/- 238.70

/2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56

PARKING

/2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56

PARKING

/2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56

/2&.(56 /2&.(56

P

5(6,'(17,$/ 5(6,'(17,$/

+/- 236.10

3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1(

P P P P P P P P

5(6,'(17,$/

P P

5(6,'(17,$/

P P P P P P P P

)/225 +/- 252.00 )/225 +/- 250.00 )/225 )/225 )/225 )/225 )/225 )/225

5(6,'(17,$/

P

P

0(&+ 3 +

P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P

522)

P P

horizontal circulation, lobby service areas, parking

P P

P

3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1(

3$5.,1* /(9(/

18: S i te cross section looki ng west prepared by Turner Fleisc he r A rchite40ct s Inc. MID-RISE 1 8 : S i te cross section looki ng west prepared by Turner Fleische r A rchite ct s Inc.

3$5.,1* /(9(/ 3$5.,1* /(9(/

QUEEN ST SOUTH

P

17: S i te cross section looki ng no rth prepared by Turner Fleische r A rchite ct s Inc. East 1 7 :View S i from te cross section looki ng no rth prepared by Turner Fleische r A rchite ct s Inc. 17: S i te cross no rth prepared by Turner Fleische ct ss Inc. Site cross section secti on looki ng north Fleis che r A rchite 17: 17: S S ii te te cross section section looki looki ng ng no no rth rth prepared prepared by by Turner Turner Fleische Fleische rr A A rchite rchite ct ct s Inc. Inc. units 17:InSciresidential te cross section looki ng no rth prepared by Turner Fleische r A rchite ct s Inc. cts . amenities 3 3

84 Nancy Street, Bolton, Town of Caledon TED HOUSTON MEMORIAL PARK

Urban Design Brief PERGOLA AMENITY FEATURE

BBQ PIT

ALBION-BOLTON The floor plan below (Figure 15) shows how the units are COMMUNITY CENTRE arranged along a central corridor facilitating the units to face the surrounding landscaped areas and the central courtyard. Balconies are provided with each unit as amenity andpe to improve exterior F igprivate ure 23: L aspace n ds ca P la n . interior S o urce : MH BC. connections.

Site Plan 5=

522) 0(&+ 3 + 522) 522) 522) 522) 522) 0(&+ 3 + )/225 0(&+ 3 + 0(&+ 3 + 0(&+ 3 + )/225 522) 0(&+ 3 + 522) 0(&+ 3 + )/225 )/225 )/225 )/225 )/225 )/225 0(&+ 3 + )/225 0(&+ 3 + )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 3$5.,1* /(9(/ )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ )/225 )/225 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/

N

522)

(; (;

(;

(;

P P

P

(;

(;

P

ϯ

ϵϮ ŵϸ ϵϵϬ Ĩƚϸ

Ϯ н ϴϱ͘ϭ ŵϸ ϵϭϲ Ĩƚϸ

(;7(17 2) )/225 $%29(

ϭ н Ϯ н

ϲϱ͘ϲ ŵϸ ϳϬϲ Ĩƚϸ

(;

ϴϮ͘ϱ ŵϸ ϴϴϴ Ĩƚϸ

Ϯ

(;

ϴϱ͘ϭ ŵϸ ϵϭϳ Ĩƚϸ

ϯ н

ϭϬϮ͘ϱ ŵϸ ϭϭϬϯ Ĩƚϸ

P

P

ϭ

ϭ н

ϭ н

P

P

P

Ϯ

ϴϳ ŵϸ ϵϯϲ Ĩƚϸ

>K < Z^ (;

P

ϭϯϬ͘ϳ ŵϸ ϭϰϬϲ Ĩƚϸ

ϲϮ͘ϯ ŵϸ ϲϳϭ Ĩƚϸ

ϭ н

ϲϱ͘ϲ ŵϸ ϳϬϲ Ĩƚϸ

ϭ

ϭ

ϲϱ͘ϲ ŵϸ ϳϬϲ Ĩƚϸ

ϲϭ͘ϰ ŵϸ ϲϲϭ Ĩƚϸ

ϱϳ͘ϵ ŵϸ ϲϮϯ Ĩƚϸ

ϭ н

ϭ н

Ϯ н

ϯ н

ϭϬϵ͘ϱ ŵϸ ϭϭϳϴ Ĩƚϸ

P

$0(1,7< $0(1,7<

ϲϱ͘ϯ ŵϸ ϳϬϯ Ĩƚϸ

5=

P

:& :&

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

6-STOREY BUILDING

RETAINING

)/225 ))(

(;

ϯ н

ϯ

ϭϮϳ͘ϴ ŵϸ ϭϯϳϲ Ĩƚϸ

ϵϲ͘ϭ ŵϸ ϭϬϯϱ Ĩƚϸ

P

P

ϭ н ϲϱ͘ϰ ŵϸ ϳϬϰ Ĩƚϸ

ϭ н ϲϱ͘ϰ ŵϸ ϳϬϰ Ĩƚϸ

ϭ н ϲϱ͘ϰ ŵϸ ϳϬϰ Ĩƚϸ

ϲϱ͘ϰ ŵϸ ϳϬϰ Ĩƚϸ

ϲϱ͘ϰ ŵϸ ϳϬϰ Ĩƚϸ

ϴϬ͘ϯ ŵϸ ϴϲϱ Ĩƚϸ

ϯ

ϵϵ͘Ϯ ŵϸ ϭϬϲϴ Ĩƚϸ

P

$0(1,7< $0(1,7<

3 3 3 3 3 3 3 3

$0(1,7< $0(1,7< $0(1,7< $0(1,7< $0(1,7< $0(1,7<

P

:& :&

3

$0(1,7<

P

3

:& :& :& :& :& :&

P

:&

:& :& :& :& :& :&

(;

(;

P

P

:&

P

3

$0(1,7< $0(1,7< $0(1,7< $0(1,7< $0(1,7< $0(1,7<

P

$0(1,7<

$0(1,7< 5(6,'(17,$/ 5(6,'(17,$/

P P P P P P P P

67$,56 :&

P

3$5.,1* /(9(/

:& 5(6,'(17,$/ 5(6,'(17,$/

5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/

PROPERTY LINE ENTRY SIGNAGE

P

3$5.,1* /(9(/

$0(1,7<

5(6,'(17,$/

ART FEATURE EXISTING RESIDENTIAL

P

5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/

0(&+ 3 + 522) 522) 522) 522) 522) )/225 0(&+ 3 + 522) 0(&+ 3 + 0(&+ 3 + )/225 0(&+ 3 + 0(&+ 3 + 522) )/225 0(&+ 3 + 522) )/225 )/225 )/225 )/225 )/225 )/225 0(&+ 3 + )/225 0(&+ 3 + )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 3$5.,1* /(9(/ )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ )/225 )/225 )/225 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/

P

5(6,'(17,$/

P P

5(6,'(17,$/

67$,56 67$,56 67$,56 67$,56 67$,56 67$,56 67$,56 67$,56

P

5(6,'(17,$/

67$,56 67$,56

(/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7

/2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56

P

P

)/225 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ )/225 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ )/225 $0(1,7< 5(6,'(17,$/ 5(6,'(17,$/ )/225 $0(1,7< )/225 $0(1,7< $0(1,7< $0(1,7< $0(1,7< )/225 $0(1,7< $0(1,7< )/225 $0(1,7< $0(1,7< )/225

P P P P

0(&+ 3 + 0(&+ 3 +

0(&+ 3 +5(6,'(17,$/

/2&.(56

P

522)

P P P

0(&+ 3 + 0(&+ 3 + 0(&+ 3 + 0(&+ 3 + 0(&+ 3 + 0(&+ 3 +

P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P

0(&+ 3 +

N

522)

P

3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1(

0(&+ 3 +

P

3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1(

Landscaping will also be used to screen the development from its neighbours.

P

P

P

P

(; P

P

P

P

(; (;

)/225

5=

F i g ure 1 5: F l o o r pl a n 1 -6 prepa red by Tur n er F l ei sh e r Ac h i te c t s .

(;

Typical Floor Plan 19


DESIGN OPTION 2 - FLUIDITY

DESIGN OPTION 1 - MODULATION

View from North (conceptual render)

View from North (conceptual render)

View from Northwest (conceptual render)

View from Northwest (conceptual render) 41 MID-RISE


L

O

W

-

R

I

S

E


G UST O 501 Toronto, ON | 2018 | Commercial | Built 630 m² Role: Designer

Project Team: 6

Firm: Partisans

Gusto 501 is a restaurant project located along the eastern edge of Toronto’s downtown, realized as a purpose-built two-storey building with a rooftop at the intersection of Queen Street East and Broadview Avenue. The design features a refined industrial aesthetic, articulated through a Corten steel façade, terracotta brick, dark metal accents, and warm wood elements, creating a layered and inviting atmosphere. I contributed to the development of the interior material strategy, particularly in the articulation of the terracotta brick. By incorporating a range of brick types and subtle variations, the design achieves a more organic and textured surface, introducing a sense of movement while enhancing the tactile quality of the space and avoiding a repetitive or overly rigid expression. Integrated lighting within the brick further emphasizes its depth and material richness, highlighting its natural variation. Careful consideration was given to the development of construction details that allow HVAC grilles to be seamlessly integrated within the brickwork, ensuring they remain visually concealed and do not disrupt the continuity and clarity of the design. In parallel, I worked on producing construction drawings and developing millwork details for interior areas, including the secondfloor bar. The furniture and millwork were custom-designed, requiring View from King St E Looking Southeast (completed project - 2020)

a high level of coordination and precision.

43 LOW-RISE


1. Rooftop Patio 2. Cocktail Bar 3. Chef’s Kitchen / Attico 4. Mezzanine Wine Bar 5. Exit Stair 6. Street Level Patio

8. Mechanical 9. Office 10. Liquor Cage 11. Fridge 12. Prep Kitchen 13. Dishwash

7. Kitchen

Perspective Cross-section

View from 2nd Floor (completed project - 2020) 44 LOW-RISE


DIAGRAMS - INTERIOR WALLS TERRACOTA BRICKS TYPES

LOCATION

View from Mezzanine (completed project - 2020) 45 LOW-RISE


TERRACOTA GRILL CONSTRUCTION DRAWINGS

WORKING DRAWINGS DETAILS WORKING DRAWINGS DETAILS

Terracota Grille Floor Plan Detail

Terracota Grille Elevation Detail

78

Terracota Grille Floor Plan Detail Terracota Grille Floor Plan Detail Terracota Grille Floor Plan Detail

Terracota Grille Section Detail

Terracota Grille Elevation Detail

78Terracota Grille Elevation Terracota Grille ElevationDetail Detail 78

Terracota Grille Section Detail 46 LOW-RISE

79


MILLWORK CONSTRUCTION DRAWINGS

2nd Floor Bar (completed project - 2020)

Second Floor Bar Isometric View

2nd Floor Bar - Floor Plan

Second Floor Bar and Waitstation Floor Plan Second Floor Bar and Waitstation Floor Plan

Second Floor Bar Front Elevation Second Bar Front Elevation 2nd Floor Bar - Floor Elevation

Waitstation Front Elevation Waitstation - Front Elevation 47 LOW-RISE

80

Section Waitstation Waitstation - Cross-section


T HE MOORING S ON C A M E R O N L A K E Site: 3.95 acres | Fenelon Falls, ON | 2021 | Residential | Built 8,680 m² Role: Senior Designer

Project Team: 5

Firm: Turner Fleischer

Situated at 99 Louisa Street in Fenelon Falls, the building is a threestorey, 57-unit condominium that integrates contemporary lodge architecture with prairie influences and its lakeside setting. The project highlights materiality and form through a façade that pairs two tones of stone for depth and texture, wood-clad elements that add warmth and a resort character, and expansive glazing that enhances transparency and views. The initial massing featured a symmetrical composition with a central entrance element, informed by historical references from the site. The final design evolved through iterative refinement, optimizing the form for greater program efficiency. Terraces and articulated rooflines reduce visual mass and strengthen the connection between indoor and outdoor spaces. Prairie influences are expressed through a strong horizontal emphasis, a layered façade with projecting elements, and a close connection to the landscape. I led the development of the design concept in close collaboration with the Design Director and client, supported the creation of efficient unit layouts, and contributed to design refinements with the construction drawings team to ensure constructability, long-term View from Northwest (completed project - 2024)

durability, and alignment with the project budget.

48 LOW-RISE


INITIAL DESIGN CONCEPT

DESIGNDESIGN CONCEPT CONCEPT

DESIGN CONCEPT

MASS STUDY MASS STUDY

OVERALL SHAPE

MASSING

FINAL DESIGN

MATERIALITY

DESIGN CONCEPT

OVERALL SHAPE

glass

GLAS SS SEXTANT

Sextant: artifact related to David Thompson (1770–1857), the renowned surveyor and explorer who mapped the region between Hudson Bay and the Pacific Ocean CANOE DETAIL

SEXTANT

WOOD CANOE DETAIL

GLAS SS

SHAPE APPLIED TO THE BUILDING

SHAPE APPLIED TO THE BUILDING

SHAPE APPLIED TO THE BUILDING

DESIGN CONCEPT

SCHEMATIC SECTION

CONCEPTUAL CROSS-SECTION

GLASS

GLASS

DEFINING THE DEFINING VOLUMES THE VOLUMES

OVERALL SHAPE OVERALL SHAPE

BALCONIESBALCONIES / TERRACES/ TERRACES

FOR DIFFERENT FOR DIFFERENT FACADE FACADE

SHAPE APPLIED TO THE BUILDING

TREATMENTS TREATMENTS

mechanical room

ME ECHANICAL ROOM

amenity amenity

AMENITY

AMENITY

amenity A AMENITY

LOBBY

lobby View from East (completed project - 2024)

View from West - Initial Design (conceptual render)

View from West - Final Design (conceptual render)

49 LOW-RISE


N

N

FIREPIT

VISITOR PARKING

PROPOSED 3-STOREY RESIDENTIAL BUILDING RO

TE

OF

RR

AC

EA T2 nd FL PA OO TIO R AT GR OU ND

Secondary residential entrance

BASKETBALL COURT

Exit MECH. PENTHOUSE ROOF

Fire hydrant TENNIS COURT

JACUZZI

Siamese connection

AC

TIO PA

OF R RO OO FL nd ND T2 OU EA GR AT

RR

TE

CAMERON LAKE

Report PLAN2024-061 Condominium Description Exemption Application for 99 Louisa Street, Fenelon Falls – The Moorings on Cameron Limited 7 of 8

PLAYGROUND

Primary residential entrance

Schedule ‘B’ – Site Plan

Site Plan

LOUISA STREET

2-bedroom Unit - 2nd Floor

N TERRACE

PRIMARY BEDROOM

KITCHEN LIVING

BEDROOM 2

DINING

W.I.C. W.I.C.

OPT. FIREPLACE

W/D

2-bedroom + den Unit - 3rd Floor

N BALCONY

PRIMARY BEDROOM

KITCHEN

BEDROOM 2

DINING W.I.C. W.I.C.

TERRACE

LIVING PANTRY

DEN W/D

2-bedroom Unit - 3rd Floor

N OPT. FIREPLACE

PANTRY

W/D

LIVING

BEDROOM 2 DINING

View from Southwest (completed project - 2024)

KITCHEN

TERRACE

50 LOW-RISE

W.I.C.

PRIMARY BEDROOM


View from Southwest (conceptual render)

View from Southwest (project under construction - 2023)

View from Southwest (completed project - 2024)

View from West (completed project - 2024) 51 LOW-RISE


O T H E R

S E L E C T E D

W O R K


CONCEPTUAL RENDERS

MASTERPLAN GREEN SPACES DIAGRAM N

B1

A2

B2 C

A3

D1 A1

BRAM R OS E SQ U A R E

E1

F PARK

Brampton, ON | 2024 | Mixed-use | Pre-construction

PARK

525,152 m² residential | 3,328 m² retail |7,265 m² office

E2

D2

Role: Senior Designer Project Team: 8

G1

Firm: Turner Fleischer

H2 H1

G2 PARK

POPS

53 OTHER SELECTED WORKS


GROUND FLOOR AND TYPICAL FLOOR PLANS

1.05 m

G

1000 MAX.

7.06 m 8.80 m 5.75 m 6.04 m

36.37 m

FFE = 112.10 46.9 m² 505 ft²

6.40 m 2 1

#

2023-12-08 2022-02-23 DATE

ELECTRICAL CLOSET 2600

300 MIN.

6.76 m

1000 MAX.

PEMBROKE ST.

2600

RE-ISSUED FOR RZ & SPA ISSUED FOR RZ & SPA DESCRIPTION

HHK HHK BY

#

10.80 m

3B

75.2 m² 809 ft²

1B+D

1B+D

45.9 m² 494 ft²

48.1 m² 518 ft²

PROJECT

PROPOSED MIXED-USE DEVELOPMENT

DRAWING

6.00 m FIRE ROUTE

88.41

OT EC TION

TC 88.20

2023-12-11 4:57:52 PM

5850

ZO NE

Toronto, ON | 2023 | Mixed-use | Pre-construction 36,750 m² residential | 149 m² retail Role: Senior Designer Project Team: 5 Firm: Turner Fleischer

54 OTHER SELECTED WORKS

BY

PROJECT

PROPOSED MIXED-USE DEVELOPMENT

DRAWING

FLOOR 01

6.0m FIRE ROUTE

PR

BC 88.05

TR EE

DESCRIPTION

239-255 DUNDAS ST. E, TORONTO, ON

9.30 m

0.57 m

0.58 m

PROJECT NO.

21.272SPA

6.40 m

4.80 m

4.80 m 22.22 m

FLOOR 07-20

6.22 m 0.28 m

PROJECT NO.

21.272SPA

PROJECT DATE

PROJECT DATE

2022-01-04

2022-01-04

DRAWN BY

DRAWN BY

HHK

Author

CHECKED BY

CHECKED BY

RMM

Checker

SCALE

SCALE

1:100

1 : 100

N

DRAWING NO.

SPA151

REV.

2

1 ______ SPA401

CONCEPTUAL RENDER - HERITAGE BUILDING INTEGRATION

23 5 D U ND A S ST E

DATE

2B

62.2 m² 669 ft²

9.02 m

GAS METER

N17°04'45"W (57.400)

6.64 m

6.30 m

37.43 m

43.50 m

CACF

ELEV-1

1B+D

NE

EXHAUST SHAFT

Y LI RT

TYP.

OPE PR

5.60 m

G IN

15.64 m

3B

79.2 m² 853 ft²

2600

OUR

88.17

88.30

EXISTING 2 STOREY BUILDING 48-50 PEMBROKE ST

1 ______ SPA401

PIPE SPACE

2600

5m 6.4

88.41

2600

8m 1.8

N73°27'15"W (27.737)

m .65

88.62

2600

239-255 DUNDAS ST. E, TORONTO, ON

88.65 4 88.8

2 ______ SPA401

52.8 m² 568 ft²

17

87) "W (11.7 N18°41'45

88.35

4m 3.3

NE

88.40

CONVEX MIRROR

TURN TABLE

27.9 m² 300 ft²

1B+D (FLEX)

OUTLINE OF UNDERGROUND LEVEL

EV

3 VISITOR PARKING SPACES (2 EV)

x 4.0m)

HB IG

Y LI RT

6

88.50

V

V

TYP

LOADING 88.65(11.0mEx'B'3.5m

NE

OPE PR

88.8

1.50 m

8m 1.8

G IN

2.60 m

E LIN

OUR

E LIN

11.68 m

INTAKE SHAFT

STUDIO

OUTLINE OF MPH. ABOVE

TYPICAL PARKING SPACE: MIN 2.6 x 5.6 x 2.1m HIGH

RTY

HB IG

RTY

2.28 m

EVSE PARKING

AISLE WIDTH: MIN 6m

OPE PR

NE

OPE PR

STAGING AREA = 51 m2

VISITOR PARKING

TYPICAL PARKING DIMENSIONS:

6.30 m

ELEV-3 ELEV-2

CANOPY ABOVE

BC 88.25 TC 88.40

MAIL

V EV

2 ______ SPA401

G RIN OU

1800 (5' - 11")

m .57

B GH NEI

BC 88.28 TC 88.43 0m 4.1

6.3 m² 67 ft²

88.75

13

BC 88.32 2 ______ TC 88.47 SPA401

88.60

G RIN OU

.80 88

7) 97

B GH NEI

MOVE RM.

PULL RM

54.7 m² 589 ft²

OUTLINE OF RELOCATED HERITAGE FACADE

5600

ELEV-4

FIRE ROUTE

13.71 m

(16. RETAIL GARBAGE

88.91

FIRE ROUTE TO ENTRANCE

VEST.

FFE = 88.90

1B+D (FLEX)

OUTLINE OF EXISTING HERITAGE FACADE OUTLINE OF EXISTING RETAIL FACADE

6.00 m

88.62

"W 3'55

88.90

15.48 m

m GAS/HYDRO .09METER 10

>1000

9.58 m

2.3m

EXIT

1100

FF

ELEV-5

BIKE ELEV.

°4

GARBAGE ELEV.

N48

96.1 m² 1034 ft²

UP

2B

58.1 m² 625 ft²

000.00 SPOT ELEVATION M

0m 0.0

5.79 m

RES. LOBBY

BULK GARBAGE 10m2

1B

40.6 m² 437 ft²

FIRE ROUTE SIGN

A

OUTLINE OF EXISTING 255 DUDAS HERITAGE FACADE

BC 88.43 TC 88.58

88.70

2m 4.4

70.5 m² 759 ft²

2023-12-11 11:21:04 AM

TRANSFORMER WITH CLEARANCES

26.7 m² 287 ft²

HAZARDOUS WASTE 6.5m2

GARBAGE

EXISTING 219 DUNDAS STREET E 21 STOREY (60.95M)

1B

41.4 m² 445 ft²

CONVEX MIRROR

SIAMESE CONNECTION

LOUNGE 1.34 m

9.66 m

M

PARCEL

EXISTING 237 DUNDAS STREET E 4 STOREY (12.4M)

BC 88.49 TC 88.64

(3' - 7")

6.56 m

LOW HEADROOM ABOVE

2 ______ SPA401

FIRE HYDRANT

m

B

3.89 m

4.51

3.3m

Z

FFE = 88.90

6.35 m

SIAMESE CONNECTION 3.31 m

88.75

130 m² 1399 ft²

UP

FH

7.22 m

101 - RENTAL REPLACEMENT 65.1 m² 701 ft²

6.31 m

m .10 36

EXIT

EXIT

5.65 m

102 - RENTAL REPLACEMENT 62.1 m² 668 ft²

.00 89

BC 88.62 TC 88.77

3B MULTI LEVEL UNIT

RETAIL

5.67 m

RETAIL ENTRANCE

EXISTING FIRE HYDRANT

88.75

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

22.22 m

SECONDARY RESIDENTIAL ENTRANCE

FH

OUTLINE OF FLOOR 6 ABOVE

2B

88.97 AD T/G 88.94

88.90

EXISTING 235 DUNDAS STREET E 4 STOREY (12.4M)

3.06 m

Z

LEGEND PRIMARY RESIDENTIAL ENTRANCE

OUTLINE OF EXISTING HERITAGE FACADE

1.80 m

50 00 RO UN DIN G R

OUTLINE OF FLOORS 7-52 ABOVE

OUTLINE OF RELOCATED PORTION OF 255 DUNDAS HERITAGE FACADE

2.08 m

8.67 m

89.00

E .00 89

Turner Fleischer Architects Inc.

11.19 m

m

.00 89

88.95 AD T/G 88.89

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

2.47

644) (36.

BC 88.73 OUTLINE OF EXISTING RETAIL FACADE TC 88.88

88.90

.00 89

3m 6.5

"E 06'05 N47°

.00 89

Y TR EN

.02 89

6.75 8 m 88.9 5 88.9

SIAMESE CONNECTION

EXIT

XIT

3m 19.6 9m 9.0

.81 88 6 BC 88.9 TC

.80 88 .95 BC 88 TC

8 88.7 BC 88.93 TC

0m

0 36.1 88.8 BC 88.95 TC

CO RN E

17.31 m

.E ST AS ND DU

residential units rental replacement units horizontal circulation, lobby vertical circulation, service areas retail garbage room

1 ______ SPA401

Turner Fleischer Architects Inc.

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com

.99 88

m 1.6

3.92 m

7 88.7 BC 88.92

TC 0.9m

6 88.7 BC 8.916.75 m 8 TC

30.81 m

N

BC 88 .8 TC 88 0 .95

OBSTRUCTION

1 ______ SPA401

3.9m

N

DRAWING NO.

SPA158

REV.


CONCEPTUAL RENDERINGS

TYPICAL FLOOR PLAN

BEDROOM ± 8 S.M. ± 82 S.F.

BEDROOM ± 9 S.M. ± 102 S.F.

BEDROOM ± 8 S.M. ± 88 S.F.

N75o28'40"E

2008

2009

4B+2BATH 73.84 m² 795 ft²

BEDROOM ± 9 S.M. ± 97 S.F.

BEDROOM ± 8 S.M. ± 87 S.F.

4B+2BATH 76.52 m² 824 ft²

BEDROOM ± 8 S.M. ± 89 S.F.

2004 (E)

COMMON 248 ft² ± 14 S.M. ± 151 S.F.

± 20 S.M. ± 212 S.F.

CHUTE ± 2 S.M. ± 26 S.F.

ELEVATOR ± 13 S.M. ± 135 S.F.

12.907

2010

BEDROOM ± 7 S.M. ± 76 S.F.

0.48 m

N

1 ______ SPA401

55 OTHER SELECTED WORKS

2007

2B+1BATH COMMON 35.02 m² ± 11 S.M. ± 114 S.F. 377 ft²

± 13 S.M. ± 144 S.F.

± 2 S.M. ± 23 S.F.

ELECTRICAL CLOSET ± 2 S.M. ± 25 S.F.

N17o04'10"W

ELEVATOR ± 14 S.M. ± 150 S.F.

PIPE SHAFT ± 2 S.M. ± 25 S.F.

13.457

5.02 m

BEDROOM ± 8 S.M. ± 86 S.F. COMMON ± 18 S.M. ± 199 S.F.

BEDROOM ± 9 S.M. ± 100 S.F.

BEDROOM ± 8 S.M. ± 86 S.F.

BEDROOM ± 8 S.M. ± 86 S.F.

± 91 S.M. ± 975 S.F.

47.340 45.49 m

2005

2B+2BATH 48.83 m² 526 ft²

COMMON

2B+1BATH 37.58 m² 405 ft² AIR SHAFT

COMMON ± 17 S.M. ± 182 S.F.

2006

3B+2BATH 63.28 m² 681 ft²

1 ______ SPA401

BEDROOM ± 8 S.M. ± 86 S.F.

0.30 m

14.035 10.08 m

BEDROOM ± 7 S.M. ± 74 S.F.

STAIR

BEDROOM ± 8 S.M. ± 91 S.F.

INDOOR AMENITY

BEDROOM ± 9 S.M. ± 96 S.F.

BEDROOM ± 8 S.M. ± 88 S.F.

BEDROOM ± 8 S.M. ± 90 S.F.

2B+1BATH 23.06 m²

COMMON ± 14 S.M. ± 152 S.F.

25.34 m

TELECOM

2001 (E)

2B+2BATH 25.22 m² 271 ft²

N73o46'20"E

BEDROOM ± 8 S.M. ± 87 S.F.

± 3 S.M. ± 29 S.F.

12.776

2.51 m

BEDROOM ± 8 S.M. ± 89 S.F.

BEDROOM ± 9 S.M. ± 93 S.F.

5.02 m

BEDROOM ± 8 S.M. ± 89 S.F.

2.88 m

N16o38'45"W

BEDROOM ± 9 S.M. ± 102 S.F.

AIR SHAFT

BEDROOM ± 10 S.M. ± 107 S.F.

1.01 m

Role: Job Captain

ROOF AT FLOOR 19

± 16 S.M. ± 171 S.F.

5.02 m

10.32 m

BEDROOM ± 8 S.M. ± 82 S.F.

COMMON ± 19 S.M. ± 202 S.F.

COMMON

BEDROOM ± 8 S.M. ± 89 S.F.

5.17 m

5.12 m

COMMON ± 21 S.M. ± 228 S.F.

4B+3BATH 78.84 m² 849 ft²

PLUMBING CLOSET

0.28 m

11.48 m

2002

2003

4B+3BATH 77.44 m² 834 ft²

N73o46'20"E

5.10 m

± 13 S.M. ± 144 S.F.

± 1 S.M. ± 11 S.F.

5.10 m

22.10 m

21.370

5.02 m

16.16 m

BEDROOM ± 8 S.M. ± 81 S.F.

2.51 m

9.70 m

Firm: Turner Fleischer

BEDROOM ± 10 S.M. ± 109 S.F.

STAIR

BEDROOM ± 10 S.M. ± 103 S.F.

N73o44'30"E

27,727 m² residential | 220 m² retail

Project Team: 3

N16o43'00"W 0.64 m

39.624

BEDROOM ± 8 S.M. ± 81 S.F.

13.408

Toronto, ON | 2025 | Student Housing | Pre-construction

10.30 m

18.43 m 0.39 m

20 8- 210 B L O O R ST W

10.44 m

± 2 S.M. ± 21 S.F.

residential units horizontal circulation, lobby vertical circulation, service areas amenity

N16o40'10"W 5.35 m


FAÇADE CONCEPT

BREWERY BARRELS BREWERY BARRELS

HUETHER HOTEL

PODIUM RHYTHM

DESIGN CONCEPT DESIGN CONCEPT BUILDING FRAMES BUILDING INSPIRED FRAMES BY BREWERY INSPIREDBARRELS BY BREWERY BARRELS

DESIGN CONCEPT HOTEL PROPORTIONS x PODIUM DESIGN

59 King Street N

05

CONCEPTUAL RENDERS

59 K ING S T N Waterloo, ON | 2024 | Mixed-use | Pre-construction 56,200 m² residential |490 m² retail Role: Senior Designer Project Team: 4 Firm: Turner Fleischer 56 OTHER SELECTED WORKS

BUILDING FRAMES BUILDING FRAMES

BREWERY BARRELS

FAÇADE MODULES 59 King Street N59 King Street N

03

03


2

DESIGN CONCEPT

1

2 1

3 ANGLED BALCONIES RESPONDING TO ANGLED PROPERTY LINES

2 TRANSITIONAL FLOORS (GLASS)

ANGLED BALCONIES RESPONDING TO ANGLED PROPERTY LINES

1 RETAIL + 6 STOREY RESIDENTIAL PODIUM

TRANSITIONAL FLOORS (GLASS)

1. +RETAIL + 6 STOREY + 33 STOREY 33 STOREY RESIDENTIAL TOWERS

3

2. TRANSITIONAL FLOORS

ANGLED BALCONIES RESPONDING TO ANGLED PROPERTY LINES

3. ANGLED BALCONIES 02

DESIGN CONCEPT DIAGRAMS

8127-8149 Yonge Street

RETAIL + 6 STOREY RESIDENTIAL PODIUM + 33 STOREY RESIDENTIAL TOWERS

TRANSITIONAL FLOORS (GLASS)

CROSS-SECTION

DESIGN CONCEPT DIAGRAMS

289 FLOOR 33 285.75 FLOOR 32 282.8 FLOOR 31 279.85 FLOOR 30 276.9 FLOOR 29 273.95 FLOOR 28 271 FLOOR 27 268.05 FLOOR 26 265.1 FLOOR 25 262.15 FLOOR 24 259.2 FLOOR 23 256.25 FLOOR 22 253 FLOOR 21 250.05 FLOOR 20 247.1 FLOOR 19 244.15 FLOOR 18 241.2 FLOOR 17 238.25 FLOOR 16 235.3 FLOOR 15

81 27 YONG E ST

232.35 FLOOR 14 229.4 FLOOR 13 226.15 FLOOR 12 223.2 FLOOR 11

Markham, ON | 2022 | Mixed-use| Pre-construction

220.25 FLOOR 10 217.3 FLOOR 09 214.35 FLOOR 08

69,656 m² residential | 1,192 m² retail

211.4 FLOOR 07 208.45 FLOOR 06 205.5 FLOOR 05 202.55 FLOOR 04 199.6 FLOOR 03

Role: Senior Designer

196.65 FLOOR 02

DESIGNRESIDENTIAL CONCEPT DIAGRAMS RESIDENTIAL

GRADE

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

30.0 m OUTDOOR AMENITY

RESIDENTIAL

185.45 U/G 1

Firm: Turner Fleischer

183.05 U/G 2

2022-08-03 5:56:00 PM

180.25 U/G 3 177.45 U/G 4 174.65

6.8 m

7000

AMENITY FFE = 186.55

2800 2800 2800 3000

FLOOR 01

Project Team: 4

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

0.8 m

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

8.5 m

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

16.8 m

B

A

PROPERTY LINE

C

MECH PENTHOUSE

02 8127-8149 Yonge Street

Turner Fleischer Architects Inc.

67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

A #

July 29, 2022 DATE

Issued for RZ/OPA

DESCRIPTION

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

MOVE

RESIDENTIAL LOBBYY

DRIVEWAY 185.59

6.3 m

LOADING

RETAIL FFE = 186.05

PARKING

LOCKER

PARKING

PARKING

LOCKER

PARKING

PARKING

LOCKER

PARKING

PARKING

LOCKER

PARKING

residential units horizontal circulation, lobby vertical circulation, parking retail garbage room amenity

PROJECT

PROPOSED CONDOMINIUM 8127-8149 Yonge Street Markham, ON

DRAWING

Cross-Section

PROJECT NO.

21.158P01 PROJECT DATE

DRAWN BY

Author CHECKED BY

Checker SCALE

1 : 300

DRAWING NO.

57 OTHER SELECTED WORKS

BY

13.4 m

RESIDENTIAL

193.05 186.05

D T2 40 = STOREY

6.8 m

291.95 FLOOR 34

E

6.8 m CLEAR HEIGHT

294.9 FLOOR 35

F

RESIDENTIAL

ELEVATOR

297.85 FLOOR 36

G

RESIDENTIAL

ELEVATOR

300.8 FLOOR 37

H T1 40 = STOREY

ELEVATOR LOOBY

7000 303.75 FLOOR 38

3600 2950 2950 2950 2950 2950 2950 2950 2950 2950 2950 3250 2950 2950 2950 2950 2950 2950 2950 2950 3250 2950 2950 2950 2950 2950 2950 2950 2950 2950 2950 3250 2950 2950 2950 2950 2950 2950

FLOOR 40 306.7 FLOOR 39

J

8127-8149 Yonge Street

RETAIL + 6 STOREY RESIDENTIAL PODIUM MECH PENTHOUSE + 33 STOREY RESIDENTIAL TOWERS

4150

MPH 310.85

K

PROPERTY LINE

L T/O ROOF 317.85

CONCEPTUAL RENDERS 02

A3.1

REV.

A


GROUND AND TYPICAL FLOOR PLANS EGLINTON AVENUE EAST

2 ______

SPA401

AND LOT 1, CONCESSION 1, EAST OF YONGE STREET PIN 10364-0190(LT)

N

EGLINTON AVENUE EAST

PIN 10364-0190(LT)

4.00 m

Toronto, ON | 2022 | Mixed-use| Pre-construction 20,970 m² residential | 710 m² retail Role: Senior Designer Project Team: 4 Firm: Turner Fleischer

58 OTHER SELECTED WORKS

1.88 m

4.00 m

2B

58.2 m² 627 ft²

55.5 m² 598 ft²

55.5 m² 598 ft²

64.4 m² 693 ft²

6.10 m

6.10 m

1B 47.2 m² 508 ft²

1B+D

2B

53.8 m² 579 ft²

65.5 m² 706 ft²

N15°42'45''W 24.689m

24.40 m

6.10 m

1B 48 m² 516 ft²

E BALCONY

BALCONY

BALCONY 6.18 m

BALCONY

ROOF AT LEVEL 8

#

2022-09-02 DATE

F

w)

ISSUED FOR RZ AND SPA DESCRIPTION

HHK BY

8.55 m

5.75 m

6.45 m

16.38 m

20.093 (P4&M)

12.80 (BR)(P1,P2&S)

9.41 m

30.16 m

Skale Developments

V

33 7. 15

No. 55 HOYLE AVENUE 3 STOREY STUCCO DWELLING

CRW CORNER 0.04S

78 6. 15

82 6. 16 OF RO

6

5

4

CONCRETE RETAINING WALL

WOOD DECK

35 6. 15

BOARD FENCE

BF END 0.27S

3

BF 0.29S

90 93 w) 5. 5. (T 15 15 5.93 15 05 6. 15

73 5. 73 15 155.

85 5. 15 CRW CORNER 0.11E BF END 0.12E

BF

2022-09-15 10:47:14 AM

0.20S (STU)(M)

0.20S (STU)(M)

6.22E (FDN)(P3&S)

7

0.26S/6.15E (STU)(M)

35 7. 15

0.77S (STU)

5.24 (STU) 12 7. 15 RETAINING WALL

1

2

1 : 100

N15°42'45''W 15.826m

N15°38'10''W 15.826m

G

FLOOR 1 N74°13'25''E 45.69 m

BOARD FENCE PROJECT NO.

CONCRETE RETAINING WALL 0.4∅

0.6∅

22.184P01 PROJECT DATE

DRAWN BY

HHK

Floor 9-25SSIB(WIT)

BOARD FENCE

SPA156 BF 0.32S

DRAWING

BF CORNER 1.02E

02 6. 15

4

1.000W BF CORNER 0.27S/0.21W

1

CHECKED BY

RMM SCALE

As indicated N

21128-0129(LT)

N15°38'10''W 15.826m

N74°13'25''E 45.69 m

28 4. 15

LOT 4 BLOCK R STERED PLAN 722

DG E

OUTLINE OF U/G BELOW

537-547 Eglinton Avenue E. and 59 & 61 Hoyle Ave, Toronto, ON

32 4. 15

BOARD FENCE

BF CORNER 0.95E

80 5. 15155.81 (Tw)

0.13E 2.21N

GASMETER

A/C

5 WOOD

39 4. 15

BP

EXHAUST SHAFT/GRILLE

62 6. 6.63 15 15 62 6. 15

56CONCRETE WALKWAY 6. 15

HEDGE

PROPOSED MIXED-USE DEVELOPMENT

G

0.06 m 10.20 m

27.60 m

N15°42'45''W (M)

15.27 m

N15°42'45''W 15.826m

2.67 m

15.826 (D2,P4&M)

PROJECT

50 6. 15

24.40 m

BALCONY

BALCONY

2B 57.2 m² 616 ft²

E

1

(T

1B 46 m² 495 ft²

UP

D

28 4. 15

78 5. 15

6.10 m

OUTDOOR AMENITY AT LEVEL 8

UP

32.71 m

6.10 m

PIN 21128-0130(LT)

SUBJECT TO EASEMENT AS IN INST. CA681827

HOYLE AVENUE

52.8 m² 568 ft²

BALCONY

24.40 m

GAS/HYDRO METER

92 3. 15

F

RETAINING WALL

BIKE REPAIR STATION

BALCONY

6.10 m

OUTDOOR AMENITY AT LEVEL 8

M

6.10 m

LOT 1, BLOCK R,REGISTERED PLAN 722

32.71 m

CONCRETE RETAINING WALL

D

1B+D

10.20 m

V

SPOT ELEVATION

16.38 m

OUTLINE OF BUILDING ABOVE V

E 24 E 0. 35 N/ 0. 04 N/ 0. 02 0.

1B 46.1 m² 497 ft²

FIRE ROUTE SIGN

6.10 m

INTAKE SHAFT 7.56 m² 81 ft²

24.689 (P5&M)

N15°42'45''W

N15°42'45''W (M) CONCRETE RETAINING WALL

RAMP UP FROM U/G 1 @ 15% 13.34 m

EXIT

TRANSFORMER WITH CLEARANCES

residential units horizontal circulation, lobby vertical circulation, service areas DRAWING NO.

SPA151

REV.

CONCEPTUAL RENDERS

54 5 EGLINT O N AVE E

1B+D

24 4. 15

IT BETWEEN REGISTERED PLANS 694 AND 722

WV

BALCONY

1B+D

FIRE HYDRANT

000.00

C

77 3. 15

R

CONCRETE

N15°38'10''W (M)

0.30 m 0.30 m

CAR SHARE

20 00

3.85 m

0.30 m

2.60 m

-30 SHORT TERM RESIDENTIAL -2 LONG TERM RETAIL

RAMP UP FROM U/G 1 @ 7.5%

SI GN

0.30 m

C

CRW CORNER 0.36E CRW CORNER 0.34E

UP

12 7. 15

1 : 100

2.13 m

1.73 2.10

SIGN

CONCRETE LANDING

2.19 m

OUTLINE OF U/G BELOW

CC(OU)

1.50 m

1 ______

w) (T w) 66 (T 4. 78 15 5. 15

HE

10.20 m

TYPE 'G' LOADING 13.0m X 4.0m X 6.1m

A

SPA401

w) NE R (T OR NE 28 C COR 4. w) 15 CRWRW (T C 60 4. 15 08 4. 15 CC(R&C) 0.07E 0.02S

61.6 m² 663 ft²

156.7 m² 1687 ft²

0.38S (FDN)(P3,P4&S)

w) (T 81 65 6. 6. 15 15 66 6. 15

EXIT

G

BIKE LOCKER

LOBBY

3.40 m

43 6. 15

STONES

100.7 m² 1084 ft²

FFE = 156.28

02 6. 15

WRW 0.35N 3.14W

CC(WIT) 4.000W ON PRODUCTION c) (B 56 c) 6. (T 15 62 6. 15

BALCONY

2B

SIAMESE CONNECTION

B

4.11 m

00 20

CONCRETE CURB

BULKY STORAGE (10m2)

55 6. 15

Floor 1

BALCONY

SECONDARY RESIDENTIAL ENTRANCE

EXIT

24.689m LIMIT BETWEEN REGISTERED PLANS 694 AND 722

24.689m

44.782 (P4&M) N15°38'10''W

3.49 m

0.42S (FDN)(P3&S) 0.35S (STU)(M)

CONCRETE WALKWAY

86 c) 5. 15 (B(Tc) 84 5. 89 15 5. 15

52 6. 15

58 6. 15

9.41 m

N74°13'25''E 26.936m

BALCONY

A

B

82 3. w) 15 (T 05 4. 15

GARBAGE 9

RECEPTION

14.41 m

15 5.7

38 6. 15

55 6. 15

6.10 m

LEGEND PRIMARY RESIDENTIAL ENTRANCE

N15°38'10''W 24.689m

14.45 m

EXIT EXIT

BF END 1.10W

BOARD FENCE

BF CORNER 0.89W

6.76 m

CONCRETE CURB CURB CUT

CONCRETE SIDEWALK

PIN 21128-0038(LT)

(VICTORIA STREET BY REGISTERED PLAN 694)

(BY UNREGISTERED BY-LAW No. 6402)

STAGING AREA

VEST.

69 5. 15

WV

71

RETAIL BIKE PARKING (6)

UP

CACF

07 6. 15

30 6. 15 33 6. 15 33 6. 15

6.10 m

RETAIL ENTRANCE

RETAIL GARBAGE

52 5. 15

0.1∅

356.3

STREET LINE

FH

PARCEL

CP

06 6. 15

N

1

PIN 10364-0190(LT)

A

MAIL

UP

IB(OU) 0.01N ON LINE E/W

99 5. 15

8.55 m

WIDENED BY BY-LAW No. 12395, INST. EN26301

0.610 (D5,D6,P5,P7&M)

25.9 m² 279 ft²

77 5. 15

88 5. 15

G

1 152.3

N74°13'25''E (M) CC(KBN)

EXIT

16.8 m² 181 ft²

68 5. 15

17'21' 'E

4 152.4

0.09 m 9.054 (M)

MOVING

0.2∅

HOYLE AVENUE

HOYLE AVENUE

155.33

GM

33 36 5. 5. 39 15 15 5. 36 15 GATE 5. 15

65 5. 15 66 5. 15

2

30.16 m

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.

LOT 1

45.630 (P1,P2,P5&M)

CANOPY

7.96 m FIRE ACCESS

HCM 02019781014

CONCRETE SIDEWALK

CONVEX MIRROR

0.3∅

46 5. 15

c) (B c) 23 (T 6. 29 15 6. 15

95 2. 15

684.1 m² 7364 ft²

0.3∅

6.00 m FIRE ROUTE

85 5. c) 15 (T 94 5. 15

WV

73 3. 15 77 3. 9.030 (D7,P7&M) 15

75 3. 15

RETAIL

155.30

66 5. 15

c) (T 62 5. 56 15 5. 15

10 3. 15 3.64 15

12 3. 15

46 67 3. 3. 50 15 15 3. 15

3

turnerfleischer.com

1 152.2 4 152.2

LOT 6

00 5. 15 08 5. 15

CONCRETE WALKWAY

5. 15 5.20 15

61 6. 15

20 3. 15 32 3. 15

4

Inc.

67 Lesmill Road Toronto, ON, M3B 2T8

HP\LS

2 3.0 15

Architects

5

T 416 425 2222

CONCRETE SIDEWALK

9 3.0 15

2

Turner Fleischer

1

A/C

c) (B c) 14 (T 5. 20 15 5. 15

C

19 3. (Tc) c) 15 26 (B 3. 21 15 3. 15 83 c) 3. (T c) 15 68 (B 3. 52 15 3. 15

2

c) (B c) 77 (T 2. 90 15 2. 15

CONCRETE CURB

FFE = 156.28

17 5. 15 31 5. 15

33 5. 15

2.10 19

1 ______

SPA401

28 6. 15

45.54 m

3

GRASS

FH

17 5. 15

F

35 30 3. 3. 15 15 32 36 3. 3. 15 15 68 CONCRETE 3. 15 3.83 STEPS 65 15 3. 79 WV 15 3. 15 CONCRETE LANDING WV N74°13'25''E 9.021 (M)

04 5. 15

CONCRETE SIDEWALK

CO NN 17.20 EC TIO m 97 4. ND 15 IST AN B CE TO

E

60 3. 15

26.936m

CANOPY

0.3∅

79 5. 15

CRW 1.97N

w)

w) (T w) 60 (T 3. 80 15 3. 15

(T

153.47 84 3. 15

SHRUB

CRW

88 3. 15

8.976 (M)

c)

CONCRETE STEPS

LOT 5

153.47

3. 99

153.79(Tw)

CONCRETE RETAINING WALL SHRUB

68 4. 15

94 (T 2. 03 15 3. 15

CURB CUT

SOUTH LIMIT OF ORIGINAL ROAD ALLOWANCE

CRW 2.38N

15

CONCRETE WALKWAY

86 CONCRETE 3. WALKWAY 15

N74°13'25''E (M) 153 03 154 .98 .18

4.87 m154.

c)

OUTLINE OF U/G BELOW

81 4. 15

SIAMESE CONNECTION

2022-09-15 10:47:11 AM

08 98 WOOD 4. 3. 03 4. 15 15 RETAINING 15 14 WALL 4. 15 4.34 0.25∅ 15 53 4. 15 IB(H&J) (D10,P6&M) 4.596

09 (T 3. 16 15 3. 15

CONCRETE CURB

6

86 4. 15

HP\LS

c) (B c) 71 (T 4. 78 15 4. 15

1

8

4

c)

UBOX

CONCRETE SIDEWALK

CRW 2.36N 153.83 (Tw)

153.79 153.94(Tw)

(T

3.30 m

FH

D

22 3. 3.30 15 15

CURB CUT

CONCRETE CURB

FH

SPA151

154.15 15 4.3

(D10,D11,P6&M) 57 4. 4.343 15

TL

) op 56 HMH (T 3. 15

WRW 2.43N LOT 4

153.88

2.10

C UT

LK

UR B C

SI TE ON C

64 4. 15

) op 57 (T 4. 15 CB

A

N85°

5

c) c) (T (T 45 45 56 3. 3. 3.35 3. 15 15 CONCRETE CURB 15 15

c) 53 (T 3. 61 15 3. CURB CUT 15

1.88 m

154.60(Tc) ) op 54 (T 4. 15 CB

WV

154.02(Tw)

3 4.4 15

1

21.38 m IB(KBN) SIAMESE CONNECTION DISTANCE TO FH 154.50(Bc)

HW

154.01

06 4. 15 154.18 154.19 CONCRETE STEPS

39 4. 15

C RE

36 4. c) (T

15 43 4. 15

63 4. 15

WV

22 4. 15

ING CK Y LO ER WA LK INT WA

EGLINTON AVENUE EAST AS WIDENED BY BY-LAW No. 12395, INST. EN26301

SIA ME SE

NORTHWEST CORNER OF LOT 4, IN BLOCK Q REGISTERED PLAN 694

DE W A

MH

PIN 10364-0190(LT)

6

HP\LS 154.26(Tc) 154.22

) op 52 (T 4. 15

(VICTORIA STREET BY REGISTERED PLAN 694)

7 CONCRETE CURB

SIGN

c) (B c) 90 (T 3. 01 15 4. 15

0

) op 36 (T 4. 15 MH

CONCRETE CURB

22.77

41 4. 15

7

1.88 m

2 ______

SPA401 WIDENED BY BY-LAW No. 12395, INST. EN26301

1

retail garbage room bicycle locker


GLENAVY TYPICAL FLOOR AVENUEPLAN

1 ______ RZ402

N

ROEHAMPTON AVENUE

OUTLINE OF FLOOR 14 - 15 ABOVE

1B

1B

43 S.M. 462 S.F.

42 S.M. 453 S.F.

44 S.M. 477 S.F.

45 S.M. 487 S.F.

46 S.M. 493 S.F.

BALC. TYP

BALC. TYP

BALC. TYP

BALC. TYP

BALC. TYP

BALC. TYP

TERRACE AT FLOOR 02

6.50 m

6.50 m

127.95 6.50 m

6.50 m

7.00 m

residential units 1 FLOOR 6 - 13 horizontal circulation vertical circulation, service areas

RZ157

2025-01-17 3:16:37 PM

CONCEPTUAL RENDER

Toronto, ON | 2025 | Residential | Pre-construction 15,285 m² Role: Job Captain Project Team: 4 Firm: Turner Fleischer

59 OTHER SELECTED WORKS

7.34 m

BALC. TYP

BALC. TYP

TERRACE AT FLOOR 02

10.00 m

16.46 m 26.02 m

19.09

15.68 m

AIR SHAFT

3B 104 S.M. 1,122 S.F.

1 ______ RZ402

1 : 200

60 9 R OEH A M PTO N AVE

UP

DN

0.00 m SETBACK

6.50 m

0.00 m SETBACK

N74O25'30"E 8.96 m

DN UP

2B 88 S.M. 945 S.F.

0"W

70 S.M. 759 S.F.

ELEVATOR LOBBY

N7 O07'5

1B

66 S.M. 708 S.F.

1 ______ RZ401

E1

8.33 m

1B

3.00 m

3.00 m

7.02 m

2B 1B

96 S.M. 1,029 S.F.

E2 | FIRE FIGHTER ELEV

1.80 m

DN

2B

BALC. TYP

2B

ELEC.

AIR SHAFT

19.82 m SETBAC K

3.00 m

18.58 m

ELEC.

1B 68 S.M. 734 S.F.

15.68 m

ELEVATOR LOBBY

15.49 m

UP

10.92 m

E1

PIPE SPACE

2B 73 S.M. 788 S.F.

28.71 m 13.23 m

4.75 m

1B 50 S.M. 542 S.F.

E2 | FIRE FIGHTER ELEV

3.00 m

43 S.M. 459 S.F.

5.52 m

1B

34 S.M. 371 S.F.

UP

18.58 m

STUDIO

130.78

10.07 m

3B 91 S.M. 981 S.F.

18.87 N15O39'00"W

13.50 m

N74O25'10"E

PIPE SPACE

9.75 m

DN

14.94 m SETBACK

18.50 m

6.50 m

1.80 m

8.56 m

1 ______ RZ401

6.50 m

0.00 m SETBACK

0.00 m SETBACK

48.46 m 12.21 m


CONCEPTUAL RENDERS

20 65 F INC H AVE W Toronto, ON | 2023 |Mixed-use | Pre-construction 28,540 m² residential | 980 m² retail| 5,810 m² office Role: Senior Designer Project Team: 4 Firm: Turner Fleischer

60 OTHER SELECTED WORKS


This drawing, as an in Architects Inc. The co on site and must notify information. This draw survey, structural, mec appropriate consultant applicable codes and drawings not specifica for any corrections or

6.00 m

6.00 m 4.10 m

2.95 m

2.95 m

8.5 m

3.25 m

3.25 m

8.5 m

PROPERTY LINE

167.5

MPH

MPH

MPH

161.5

161.5

161.5

Floor 12

Floor 12

Floor 12

157.4

157.4

157.4

Floor 11

Floor 11

Floor 11

154.45

154.45

154.45

Floor 10

Floor 10

8.5 m

151.2

151.2

151.2

Floor 9

Floor 9

Floor 9

148.25

148.25

148.25

Floor 8

Floor 8

Floor 8

145.3

145.3

145.3

Floor 7

Floor 7

Floor 7

4.8 m

2.95 m 2.95 m 3.55 m

2 STOREY TOWNHOME

PARKING

4.50 m

FFE : 121.00 FFE : 121.00 120.90

2 LOADING STOREY MOV. LOADING TOWNHOME FFE : 121.00 FFE : 121.00

FFE : 121.00

MOV. LOADING GARBAGE MOV.

GARBAGE RETAIL

GARBAGE RETAIL

Floor 6 139.1

Floor 5 136.15

FFE : 120.40

FFE : 120.40

120.00 FFE : 120.40

4.0 m

PARKING

PARKING

PARKING

142.05

142.05

Floor 6

Floor 6

139.1

Floor 5 136.15

Floor 4

139.1

Floor 5 136.15

Floor 4

132.9

132.9

132.9

Floor 3

Floor 3

Floor 3

129.95

129.95

129.95

4.0 m127

4.0 m127

Floor 2

Floor 2

MEZZANINE

MEZZANINE

MEZZANINE

124.05

124.05

124.05

Floor 2

RETAIL

4.8 m

142.05

33.6 m

RESIDENTIAL

CORRIDOR

33.6 m

CORRIDOR

LOCKERS RESIDENTIAL

RESIDENTIAL

LOCKERS RESIDENTIAL

ELEVATOR CORRIDOR

LOCKERS

RESIDENTIAL

RESIDENTIAL

ELEVATOR

RESIDENTIAL STAIRS

ELEVATOR

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL STAIRS

2.95 m 2.95 m 47.00 m

BUILDING HEIGHT

3.25 m 2.95 m

RESIDENTIAL

2.95 m 3.25 m

4.8 m

4.0 m

2.95 m

2.95 m 2.95 m 3.55 m 4.50 m

4.50 m

STAIRS

2.95 m 2.95 m 47.00 m

BUILDING HEIGHT

3.25 m 2.95 m 2.95 m 2.95 m

2.95 m

2.95 m 2.95 m RESIDENTIAL

2 STOREY TOWNHOME

121.85 FFE : 121.95 121.85 121.00 120.90 FFE 121.00 : 121.00 120.90

PARKING

T.O. OF MPH

167.5

4.10 m

MPH

Floor 4

3.55 m

RESIDENTIAL

RESIDENTIAL

BUILDING HEIGHT

RESIDENTIAL

9.15 m RESIDENTIAL

3.25 m

2.95 m 47.00 m

3.25 m 2.95 m

BUILDING HEIGHT

2.95 m

AN G D EG R EE 45

2.95 m 3.25 m

35.0 m

T.O. OF MPH

33.6 m

6.00 m 4.10 m 2.95 m 3.25 m

PL AN E U LA R

PL AN E U LA R AN G D EG R EE 45 3.25 m 2.95 m

9.15 m

EASTABLSHED GRADE 120.35

2.95 m

BUILDING HEIGHT

RESIDENTIAL

2.95 m 2.95 m

9.15 m

2.95 m

EASTABLSHED GRADE 120.35

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE PL AN E

U LA R

AN G

D EG R EE 45 3.25 m

3.25 m

BUILDING HEIGHT

2.95 m

EASTABLSHED GRADE 120.35

167.5

E AN PL

35.0 m

FFE :FFE 121.95 : 121.95 121.85121.85 FFE : FFE 121.95 : 121.95 121.00

R LA U

121.85 FFE : 121.95 121.85 DUNDIX ROAD

3.6 m

G AN

DUNDIX ROAD

3.6 m

FLOOR 2 (TOWNHOME)

124.95

E AN PL

DUNDIX ROAD

124.95

EE R EG D

124.95

45

FLOOR 3 (TOWNHOME) 127.9

3.6 m

FLOOR 2 (TOWNHOME)

R LA U

FLOOR 3 (TOWNHOME) 127.9

FLOOR 2 (TOWNHOME)

E AN PL

FLOOR 3 (TOWNHOME) 127.9

G AN

R LA U

T.O. OF TOWNHOME 131.15

EE R EG D

G AN

38.3 m

RESIDENTIAL TOWNHOMES RESIDENTIAL TOWNHOMES RESIDENTIAL TOWNHOMES 3 STOREY 3 STOREY 3 STOREY

T.O. OF TOWNHOME 131.15

MPH

T.O. OF MPH

Floor 10

38.3 m

35.0 m

T.O. OF TOWNHOME

1 ______ SPA401

EE R EG D

MPH

38.3 m

131.15

1 ______ SPA401 45

PROPERTY LINE

1 ______ SPA401 RESIDENTIAL BUILDING RESIDENTIAL BUILDING RESIDENTIAL BUILDING 12 STOREY 12 STOREY 12 STOREY

45

residential units horizontal circulation vertical circulation, service areas, parking retail garbage room

PROPERTY LINE

N-S CROSS-SECTION

127

1

#

July 08, 2022 DATE

DUNDAS STREET DUNDAS STREET DUNDAS STREET

120.00

Floor 1

120.00

Floor 1

Floor 1

120.5

120.5

120.5

120.35

120.35

120.35

3.0 mEASTABLSHED 4.0GRADE m 3.0 mEASTABLSHED 4.0GRADE m 3.0 mEASTABLSHED GRADE

PARKING

U/G 1

U/G 1

U/G 1

U/G 1

U/G 1

U/G 1

116

116

116

116

116

116 PROJECT

PROPOS

1225

DRAWING

PROJECT NO.

22.117P01 PROJECT DATE

DRAWN BY

WJB

2022-07-07 3:59:33 PM

2022-07-07 3:59:33 PM

2022-07-07 3:59:33 PM

CHECKED BY

12 25 D U N D A S ST E Mississauga, ON | 2022 |Mixed-use | Pre-construction 26,112 m² residential | 676 m² retail Role: Senior Designer Project Team: 5 Firm: Turner Fleischer

61 OTHER SELECTED WORKS

Checker SCALE

TOWNHOUSES CONCEPTUAL RENDER

1 : 200


mass 2 SITE CONTEXT

terracing

CONCEPT DIAGRAMS

DESIGN CONCEPT 04 projecting balconies

CONCEPT DIAGRAMS

mech. penthouse

mech. penthouse

04

SCARBOROUGH BLUFFS

Kin gst on

Rd

SUBJECT SITE

Brim

ley

bluffs outline brick x glass

22 storey tower

Rd

bluffs outline brick x glass

terracing

SITE CONTEXT

projecting balconies

SCARBOROUGH BLUFFS

04

mass 2 bluffs outline brick x glass

terracing

Scarborough, ON

projecting balconies

mass 1

22 storey tower 9 storey podium

CONCEPT DIAGRAMS

Scarborough Bluffs

mass 1

mech. penthouse

park mech. penthouse

CONCEPT DIAGRAMS

04

mass 2

9 storey podium

S

park

mech. penthouse

projecting balconies

mass 1

mass 2

mech. penthouse terracing

22 storey tower

1. INITIAL MASSING mech. park penthouse

bluffs outline brick x glass

Scarborough Bluffs mass 1

2. TERRACES

3. OUTLINE

4. BALCONIES

9 storey mech. podium penthouse

mass 2

terracing

Scarborough Bluffs

22 storey tower

CONCEPTUAL RENDER park mech. penthouse

9 storey podium

mech. penthouse

Scarborough Bluffs

22 storey tower 9 storey podium park Scarborough Bluffs

28 00 KINGST O N R D Scarborough, ON | 2021 |Residential | Pre-construction 34,597 m² Role: Intermediate Designer Project Team: 4 Firm: Turner Fleischer

62 OTHER SELECTED WORKS


ROOF PLAN

Driveway Access

ATE

Mechanical Penthouse Roof

RO AD

THULE STREET

WESTON

o

N

NAKUMARA G

Mechanical Penthouse Roof

Swimming Pool

LE

ISELER GATE

Floor 9 Roof Outdoor Amenity Terrace

TENNANT CIRC

Fire Route

Building A

RM2

RM2

Building B

P.O.P.S. Private Driveway

P.O.P.S.

P.O.P.S.

Extent of Heat Traced Walkway

Zoning By-Law 1-88 RM2, Multiple Residential

Patios at Floor 1

Floor 7 Roof Green Roof

Roof of Floor 9 Garden Roof

Zoning By-Law 001-2021

CONCEPTUAL RENDER

RM2, Multiple Unit Residential Zone

Site Plan and Proposed Zoning

10 069 WE STO N R D

Document Path: N:\GIS_Archive\Attachments\OP\2020-2024\OP.23.003_Z.23.005\OP.23.003_Z.23.005_C_3_SitePlan.mxd

Role: Senior Designer Project Team: 4 Firm: Turner Fleischer

63 OTHER SELECTED WORKS

Metres 50

25

FILES: OP.23.003 and Z.23.005

APPLICANT: Ikore (Major Weston) Ltd.

28,878 m²

12.5

Attachment

LOCATION: 10069 Weston Road and Part 15, Plan 65R-37024 Part of Lot 21, Concession 5

Vaughan, ON | 2022 |Residential | Pre-construction