ARCHITECTURE PORTFOLIO 2
0
1
8
C a r o l i n a
-
2
0
2
5
C a m p o s
C
O
N
T
A
C
T
a r c h i t e c t u r e . c a r o l i n a @ g m a i l . c o m +
1
6
4
7
8
3
6
5
6
0
7
I N T R O D U C T I O N I am a Senior Architectural Designer with experience in complex, multidisciplinary residential, commercial, and mixed-use projects across all phases. My work focuses on shaping clear design strategies early in the process and carrying them through to refined, buildable outcomes, resulting in cohesive, well-resolved solutions. This approach reflects a strong commitment to design expression, technical performance, and the high-quality presentation of project deliverables. This portfolio showcases professional work completed over the past eight years in Canada. Projects are organized into five categories: Masterplans, High-rise, Medium-rise, Low-rise, and Other Selected Works, presented briefly. Gusto 501 is a built project completed in 2020, developed during my time at PARTISANS. All other projects included in this portfolio were undertaken at Turner Fleischer, with design concepts and associated graphics produced by me. Masterplan work was developed collaboratively under my leadership. The Moorings on Cameron Lake is another completed project, delivered in 2024. Bloor Crossing is a six-block development; this portfolio highlights three blocks I worked on as part of the project team. It is currently under construction, with completion anticipated in 2026. All remaining work is progressing through studies and approvals. In addition to design concept development, I contributed to project documentation, translating ideas into coordinated drawing sets for approvals and construction; a selection of these drawings is included in this portfolio. Throughout this work, I collaborated closely with the Design Director, Project Managers, internal teams, and external stakeholders, ensuring functional performance, regulatory compliance, budget alignment, sustainability, and the delivery of comfortable and well-composed spaces.
C
O
MASTERPLANS
N H
I
G
T H
-
R
I
E
S
E
N
M I D - R I S E
T
S
L O W - R I S E
06
10
15
26
29
32
36
39
43
48
53
WOODBRIDGE SQUARE
THE GORE RD BLOCK 140
123 EDWARD ST
2079 YONGE ST
955 WESTON RD
1230 THE QUEENSWAY
84 NANCY ST
GUSTO 501
(pre-construction)
(built)
(pre-construction)
(pre-construction)
BLOOR CROSSING BLOCKS B, C, D
(pre-construction)
(pre-construction)
(pre-construction)
(pre-construction)
THE MOORINGS ON CAMERON LAKE
OTHER SELECTED WORKS
(under construction)
(built)
M
A
S
T
E
R
P
L
A
N
S
WOODBRIDG E SQUARE Vaughan, ON | 2025 | Mixed-use | Pre-construction Site: 9.88 acres | 320,314 m² residential | 6,382 m² retail Role: Job Captain
Project Team: 8
Firm: Turner Fleischer
This proposal reimagines the existing Woodbridge Square shopping centre, located at the intersection of Weston Road and Highway 7, as a mixed-use community in downtown Vaughan. The project comprises nine towers ranging from 12 to 57 storeys, and delivers 4,388 residential units and ground-level retail, including a large grocery store. Starting from an extruded site block, the mass was strategically carved to shape the buildings while accommodating light, views, and streetscape connections. This process established a central open area — a privately owned public space (POPS) of over 3,700 m² — where curved forms introduce continuity and spatial flow, with building heights stepping down toward the south to optimize solar access. The architectural concept adopts a contemporary aesthetic, expressed through articulated façades that avoid rigid compositions, and supported by a refined material palette. At the terminus view, the building is emphasized as a focal point through a bolder design gesture. Balcony forms were strategically varied according to solar orientation, supporting passive performance while enhancing façade composition. This approach was complemented by a 30–40% window-to-wall ratio that improves thermal performance by reducing seasonal heat loss and gain. Developed under a condensed schedule, the project required rapid progression and close coordination across a large internal team. As Job Captain, I led a team of three designers, shaping the design while coordinating schedule and budget. The architectural approach was refined through ongoing collaboration with the client, aligning the architectural language with the project vision through iterative discussions and refinements. I also worked closely with the Project Manager, Design Director, and external stakeholders to translate the architectural vision into View from Weston Rd Looking South (conceptual render)
coordinated drawing sets.
6 MASTERPLAN
MASSING CONCEPT
HWY 7
N
SEPARATE COURTS
A:A 45 - 45st - 45st D:D 45
- 50st E:E 50
- 57 F: F57 st
CENTRAL SQUARE
DIAGRAM - MASSING ARTICULATION
POPS
Woodbridge Square - Hwy 7 + Weston Road
3. SEPARATE COURTS
G: G -45 45 st
UARE
G ARTICULATION
G ARTICULATION
ge rid RE odb QUA o W S
- 25st C:C25 DIAGRAM - MASSING ARTICULATION
Woodbridge Square - Hwy 7 + Weston Road
2. CENTRAL SQUARE
DIFFERENT TOWER HEIGHTS
feature tower
12st I:I -12
WESTON R D
B:B 32 - 32st
H -45 45 st H:
Site Plan Articulation Diagram
FEATURE TOWER
Woodbridge Square - Hwy 7 + Weston Road
1. INITIAL BLOCK
SITE PLAN
Woodbridge Square - Hwy 7 + Weston Road
tower at terminus view
BLOCKS SEPARATIONS
TOWER AT VIEW TERMINUS
DIAGRAM - MASSING ARTICULATION
DIAGRAM - MASSING ARTICULATION
Woodbridge Square - Hwy 7 + Weston Road
6. HEIGHTS VARIATION
Woodbridge Square - Hwy 7 + Weston Road
5. BLOCKS SEPARATION
View from Internal Park Looking Northeast (conceptual render)
Woodbridge Square - Hwy 7 + Weston Road
4. FLOW
7 MASTERPLAN
SUSTAINABLE PASSIVE DESIGN: MASSING AND BALCONIES STRATEGY
SOUTH ELEVATIONS Intense sun exposure Continuous projecting balconies
LOWER SOUTHERN MASSING Central open space solar access
View from North - Towers I, C, B (conceptual render)
WEST AND EAST ELEVATIONS Mild sun exposure Individual projecting balconies
NORTH ELEVATIONS Minimal sun exposure Inset balconies
View from North - Towers I, H (conceptual render) 8 MASTERPLAN
3B 5 m CK 120 S.M. 3.1 BA ±±1,289 S.F. T SE
1B
1B
± 53 S.M. ± 567 S.F.
± 53 S.M. ± 570 S.F.
2B+D
± 78 S.M. ± 839 S.F.
16.63 m 8.05 m
24.02 m
6.45 m
6.50 m
6.50 m
6.50 m
6.50 m
2B
1B
1B
1B
1B
1B
1B
± 70 S.M. ± 759 S.F.
± 52 S.M. ± 556 S.F.
± 52 S.M. ± 556 S.F.
± 52 S.M. ± 556 S.F.
± 52 S.M. ± 556 S.F.
± 52 S.M. ± 556 S.F.
± 52 S.M. ± 556 S.F.
6.50 m
13.31 m
1B
21.00 m
± 54 S.M. ± 581 S.F.
30.00 m
OUTDOOR AMENITY AT FLOOR 9
6.50 m
1B
± 55 S.M. ± 593 S.F. m 53.81
6.50 m
1B
6.50 m
± 51 S.M. ± 548 S.F.
FUTURE ROAD 12 STOREYS
1B+D
± 57 S.M. ± 619 S.F.
6.50 m
1B
± 53 S.M. ± 570 S.F.
2B
± 71 S.M. ± 766 S.F.
6.50 m
BUILDING I
2B
1B
1B
1B
1B
± 70 S.M. ± 759 S.F.
± 52 S.M. ± 556 S.F.
± 52 S.M. ± 556 S.F.
± 52 S.M. ± 556 S.F.
± 52 S.M. ± 556 S.F.
1B
1B
1B
± 52 S.M. ± 556 S.F.
± 52 S.M. ± 556 S.F.
± 54 S.M. ± 581 S.F.
N 73°36'15"E (180.66)
21.00 m
6.50 m
9.21 m 2.50 m
32.54 m TOWER SEPARATION 27.00 m
8.00 m
6.50 m
6.50 m
6.50 m
6.50 m
6.50 m
6.50 m
53.81 m
2.50 m
6.50 m
21.00 m
± 52 S.M. ± 560 S.F.
± 57 S.M. ± 611 S.F.
± 61 S.M. ± 662 S.F.
6.50 m 6.50 m
6.50 m 6.50 m
6.28 m 6.46 m
42.50 m
± 70 S.M. ± 756 S.F.
10.50 m 8.13 m 2.50 m
1B
1B+D
1B
1B
1B+D
3B
± 58 S.M. ± 629 S.F.
± 48 S.M. ± 521 S.F.
± 48 S.M. ± 521 S.F.
± 50 S.M. ± 537 S.F.
± 96 S.M. ± 1,034 S.F.
6.50 m
6.50 m
6.50 m
19.39 m
6.50 m
1B+D
2B+D
1B
1B
1B
± 78 S.M.
± 61 S.M.
± 52 S.M. ± 560 S.F.
± 57 S.M. ± 611 S.F.
8.40 m
6.50 m
6.50 m
6.50 m
42.50 m
2B
1B
1B
± 68 S.M. ± 735 S.F.
± 55 S.M. ± 595 S.F.
± 55 S.M. ± 592 S.F.
1B
8.97 m
2B
± 69 S.M. ± 743 S.F.
6.50 m
1B
± 49 S.M. ± 526 S.F.
OUTDOOR AMENITY AT FLOOR 2
2B 8.97 m
± 68 S.M. ± 735 S.F.
1B 6.50 m
± 55 S.M. ± 595 S.F.
2B
± 61 S.M. ± 662 S.F.
6.46 m
± 70 S.M. ± 756 S.F.
8.13 m
1B
1B
1B+D
± 46 S.M. ± 490 S.F.
± 46 S.M. ± 495 S.F.
± 59 S.M. ± 634 S.F.
23.21 m
± 446 S.F.
4.36 m 7.63 m
19.39 m 6.50 m 1B
6.50 m 1B
± 61 S.M. ± 652 S.F.
± 52 S.M. ± 559 S.F.
1B 6.50 m
1B 6.50 m
6.50 m 1B+D ± 60 S.M. ± 647 S.F.
N 73°36'15"E (180.66)
PHASE 5
FUTURE ROAD TOWER I
2.50 m
4.36 m 7.63 m 3B ± 81 S.M. ± 869 S.F.
± 46 S.M. ± 490 S.F.
6.501B m ± 46 S.M. ± 495 S.F.
1B+D
7.63 m
± 59 S.M. ± 634 S.F.
42.60 m
4.36 m
1B ± 41 S.M. ± 446 S.F.
2B
1B
± 69 S.M. ± 743 S.F.
± 49 S.M. ± 526 S.F.
8.97 m 2.50 m
6.50 m
6.50 m
31.30 m
3.00 m SETBACK
OUTDOOR AMENITY AT FLOOR 9
± 55 S.M. ± 592 S.F.
BUILDING H 451BSTOREYS 1B
1B+D
3B
± 61 S.M. ± 652 S.F.
± 52 S.M. ± 559 S.F.
± 60 S.M. ± 647 S.F.
± 81 S.M. ± 869 S.F.
6.50 m
6.50 m
6.50 m
7.63 m
1 ______ RZ404
TOWER G
PHASE 1 BUILDING G PHASE 2 45 STOREYS
OUTDOOR AMENITY AT FLOOR 9
42.60 m
PODIUM SEPARATION
BUILDING I 12 STOREYS
BUILDING G 45 STOREYS
2B
WESTON ROAD ROAD
± 61 S.M. ± 655 S.F.
TOWER F
WESTON
1B+D
1B
6.50 m 6.50 m
2.50 m± 41 S.M.
30.00 m
6.81 m
6.50 m
2.50 m
2.50 m
OUTDOOR AMENITY AT FLOOR 9
1B
8.05 m 10.25 m
16.75 m
31.30 m
3B ± 96 S.M. ± 1,034 S.F.
TOWER SEPARATION 3.04 m
1 ______ RZ403
N
1B+D
2.50 m
PODIUM SEPARATION
PHASE 2
3.55 m
SCALE
1:400
4.46 m
10.25 m
16.75 m 31.30 m 6.50 m 8.05 m
TOWER SEPARATION
PODIUM SEPARATION
RZ151
2.50 m
30.00 m
6.81 m
20.00 m
1B+D
± 64 S.M. ± 689 S.F.
11.28 m
6.50 m
19.29 m
3.04 m
1B
± 54 S.M. ± 583 S.F.
28.52 m ± 50 S.M. ± 537 S.F.
23.21 m
6.77 m
2B
± 69 S.M. ± 742 S.F.
PODIUM SEPARATION
6.50 m
1B ± 48 S.M. ± 521 S.F.
1B
2.50 m
± 62 S.M. ± 672 S.F.
1 ______ RZ403
2.50 m
3B
± 78 S.M. ± 837 S.F.
PHASE 2
± 63 S.M. ± 679 S.F.
± 53 S.M. BUILDING ±C 575 S.F.
1B+D 25 STOREYS
8.00 m
8.01 m
1B+D
32.54 m TOWER SEPARATION 27.00 m
PHASE 5
1B
± 64 S.M. ± 686 S.F.
5 m CK 3.1 BA T SE
± 54 S.M. ± 576 S.F.
2.50 m
23.39 m
1B+D
9.21 m 1B
9.81 m
6.50 m
19.29 m
3.55 m
2B+D ± 80 S.M. ± 858 S.F.
1B
30.00 m
2.50 m 2.50 m 7.00 m
10.41 m
13.17 m
7.76 m
PODIUM SEPARATION
2B ± 71 S.M. ± 766 S.F.
± 65 S.M. ± 699 S.F.
10.50 m
6.50 m
± 48 S.M. ± 521 S.F.
± 845 S.F. AMENITY ± 655 S.F. OUTDOOR AT FLOOR 2
6.73 m
1B ± 53 S.M. ± 570 S.F.
± 42 S.M. ± 447 S.F.
6.22 m 8.40 m
8.97 m
6.50 m
1B+D ± 57 S.M. ± 619 S.F.
0.00 m
1B+D
2B
1B 6.28 m
6.50 m
± 78 S.M. ± 845 S.F.
2.50 m
20.00 m
1B ± 51 S.M. ± 548 S.F.
11.28 m
1B ± 55 S.M. ± 593 S.F.
19.29 m
10.21 m 19.29 m
32.54 m
1B+D ± 64 S.M. ± 689 S.F.
8.01 m
2B
1B ± 54 S.M. ± 583 S.F.
3.04 m 9.48 m
8.19 m
± 69 S.M. ± 742 S.F.
9.81 m
9.50 m
27.00 m
3B ± 78 S.M. ± 837 S.F.
2.50 m 10.41 m
OUTDOOR AMENITY AT FLOOR 9
± 62 S.M. ± 672 S.F.
2.50 m
OUTDOOR AMENITY AT FLOOR 9
6.50 m
7.76 m
42.50 m
10.68 m 21.00 m 30.00 m
1B ± 47 S.M. ± 506 S.F.
± 756 S.F.
± 51 S.M. ± 546 S.F.
11.82 m
6.50 m
13.31 m
2.50 m 2.50 m 7.00 m 6.77 m
6.50 m
6.73 m
13.17 m
6.50 m
6.50 m
6.50 m
2B
42.50 m ± 70 S.M.
1 ______ RZ401
BUILDING F 51 STOREYS
1B
OUTDOOR AMENITY ± 53 S.M. AT FLOOR 9 ± 569 S.F.
6.50 m
± 58 S.M. ± 629 S.F.
2.50 m
1B ± 48 S.M. ± 520 S.F.
2B
4.46 m
20.00 m
6.50 m
2.50 m 10.21 m
± 63 S.M. ± 679 S.F.
± 53 S.M. ± 575 S.F.
2.50 m
11.60 m
1B
32.79 m
1B+D 6.50 m1B+D6.50 m
6.21 m
1B+D ± 64 S.M. ± 686 S.F.
BUILDING C 25 STOREYS
RMM
2025-05-23 2:09:45 PM
24.02 m
6.45 m
2.50 m ± 54 S.M. ± 576 S.F.
6.50 m
1B
2B+D ± 80 S.M. ± 858 S.F.
28.71 m
2B+D ± 78 S.M. ± 839 S.F.
6.50 m
1B ± 53 S.M. ± 570 S.F.
9.48 m
0)
16.63 m 8.05 m
2.50 m
.0
1B ± 53 S.M. ± 567 S.F.
2.50 m
3B ± 120 S.M. ± 1,289 S.F.
9.50 m
R1 27
3.04 m
32.54 m
6.50 m
5,
27.00 m
8.19 m
28.71 m
6.3
6.50 m
6.50 m
2.50 m
(7
10.06 m
'00 "W
OUTDOOR AMENITY AT FLOOR 9
10.90 m
15.18 m
°5 6
2.50 m
6.50 m
6.21 m
2.50 m 47.76 m
0)
TOWER SEPARATION
.0
PODIUM SEPARATION 10.06 m 52.76 m
R1 27
15.18 m
5,
32.79 m 11.60 m
28.52 m
2B
± 69 S.M. ± 748 S.F.
6.50 m
1B+D
± 59 S.M. ± 640 S.F.
7.76 m
30.00 m 10.90 m 9.10 m N 15°48'55"W (152.96) 30.00 m 10.90 m 9.10 m N 15°48'55"W (152.96) 30.00 m 8.05 m 6.50 m 6.50 m TOWER SEPARATION TOWER SEPARATION TOWER SEPARATION 18.00 m 2.50 m 20.00 m 30.00 m 20.00 m 30.00 m 31.30 m PODIUM SEPARATION
3.33 m
1B
± 54 S.M. ± 585 S.F.
9.50 m 2.50 m
8.05 m
6.50 m
8.81 m
6.50 m
0.00 m
± 65 S.M. ± 699 S.F.
± 42 S.M.
± 447 S.F. 2B ± 76 S.M. ± 822 S.F.
11.19 m 30.00 m
6.50 m
42.10 m
2B+D
11.82 m
2B+D ± 74 S.M. ± 798 S.F.
± 87 S.M. 6.50 m ± 940 S.F.
BUILDING F 51 STOREYS
3.00 m SETBACK
2B
1B
± 47 S.M. ± 506 S.F.
7.76 m
3B
14.44 m
20.00 m
1B ± 44 S.M. ± 472 S.F.
2.50 m 2.50 m
1B ± 52 S.M. ± 559 S.F.
1B
± 70 S.M. ± 756 S.F.
± 68 S.M. ± 736 S.F.
± 51 S.M. ± 546 S.F.
10.68 m
20.19 m
1B ± 54 S.M. ± 583 S.F.
2B
8.05 m
1B
9.90 m
1B ± 59 S.M. ± 640 S.F.
± 53 S.M. ± 569 S.F.
OUTDOOR AMENITY AT FLOOR 2
2.50 m
1B ± 60 S.M. ± 647 S.F.
23.39 m
DRAWING NO.
2.19 m
8.13 m
POPS AT GROUND FLOOR
1B
± 69 S.M. ± 748 S.F.
TOWER SEPARATION 20.00 m 18.00 m
± 81 S.M. ± 872 S.F.
1B ± 48 S.M. ± 520 S.F.
2B
1 ______ PHASE 1 RZ402 PHASE 2
2.50 m 9.50 m
± 62 S.M. ± 668 S.F.
2B
3.00 m SETBACK
20.00 m
± 53 S.M. ± 571 S.F.
3.00 m SETBACK
1B+D
± 59 S.M. ± 640 S.F.
N 10°38'15"W (5.07) 11.19 m 8.81 m
± 78 S.M. ± 835 S.F.
6.50 m
PHASE 1
PHASE 3
6.50 m 6.50 m
2.50 m
1B ± 54 S.M. ± 585 S.F.
1 ______ RZ402
2.50 m
± 82 S.M. ± 883 S.F.
± 44 S.M. ± 476 S.F.
2.50 m
2025-05-23 2:09:45 PM
PROJECT DATE
2025-02-06
CHECKED BY
SOUTHEAST CORNER OF LOT 3, REGISTERED PLAN 65M-2339
6.50 m 8.13 m
10.86 m 20.29 m
2B ± 76 S.M. ± 822 S.F.
4.36 m
TOWER H
BUILDING H 45 STOREYS
N 10°38'15"W (5.07)
2B+D
5.12 m
6.3
TOWER C
PROJECT NO.
16.281P01
NGE
MH TOP=193.08 CB TOP=192.86
8.37 m 6.50 m 8.37 m 2.50 m
2B ± 76 S.M. ± 813 S.F.
N
2.50 m
5.04 m
± 68 S.M. ± 736 S.F.
OUTDOOR AMENITY AT FLOOR 2
14.44 m
2B+D
2.50 m
3B ± 87 S.M. ± 940 S.F.
OUTDOOR SPACE AT GROUND FLOOR
2.50 m
1B+D
6.50 m
42.50 m 2.19 m
6.50 m
1B ± 48 S.M. ± 512 S.F.
9.43 m
25.00 m
6.50 m
± 57 S.M. ± 609 S.F.
1B+D
5.46 m
N 78°55'20"E (30.23)
30.00 m 6.50 m
± 50 S.M. ± 538 S.F.
2.50 m
6.50 m
1 ______ RZ401
OUTDOOR SPACE AT GROUND FLOOR
2.50 m 42.50 m
1B
20.29 m
28.52 m
TOWER SEPARATION
6.50 m
1B
2.50 m
10.86 m
0.00 m 11.52 m
2.50 m
1B
8.05 m
PHASE 1
PHASE 3 3.00 m SETBACK
9.43 m
14.44 m 30.00 m
6.50 m
8.13 m 6.50 m 6.39 m
42.50 m
6.50 m 6.50 m 8.13 m 8.48 m 6.50 m 6.39 m
2.50 m 42.50 m
1B ± 52 S.M. ± 556 S.F.
6.50 m 30.00 m
2B 1B+D ± 76 S.M.± 51 S.M. ± 813 S.F. ± 553 S.F.
1B ± 50 S.M. ± 541 S.F.
± 80 S.M. ± 862 S.F.
2.50 m
2B 1B
± 72 S.M. ± 48 S.M.S.F. ± 773 ± 512 S.F.
1B 2B+D
± 62 S.M. ± 663 S.F.
8.99 m 20.00 m
± 55 S.M. ± 80 S.M. ± 592 S.F. ± 862 S.F.
8.48 m
± 76 S.M. ± 821 S.F.
± 57 S.M. ± 609 S.F.
2B+D 1B+D
± 85 S.M. ± 62 S.M.S.F. ± 920 ± 663 S.F.
6.50 m
8.25 m 6.50 m 42.50 m
6.27 m
2B+D
2B
8.25 m
6.50 m 8.25 m
6.50 m
1B ± 59 S.M. ± 632 S.F.
± 76 S.M. ± 814 S.F.
2.50 m
8.48 m 6.50 m
± 54 S.M. ± 586 S.F.
1B+D ± 62 S.M. ± 668 S.F.
25.00 m
± 50 S.M. ± 538 S.F.
2.50 m
± 51 S.M. ± 544 S.F.
2.50 m
2.50 m
2.50 m
1B
6.50 m
20.00 m
1B
30.00 m
2.50 m
2.50 m
6.27 m
± 48 S.M.
± 517 S.F. 8.99 m
11.02 m
1B
6.50 m
± 51 S.M. ± 544 S.F.
OUTDOOR AMENITY AT FLOOR 9
2.50 m 42.50 m
1B
1B
8.48 m
8.25 m 6.50 m 6.50 m
42.50 m 5.12 m
6.50 m 6.50 m 8.25 m 8.25 m 6.50 m
1B
6.50 m
2.50 m 42.50 m
6.50 m 6.50 m
± 52 S.M. ± 76 S.M.S.F. ± 561 ± 821 S.F.
1B ± 52 S.M. ± 556 S.F.
3.00 m SETBACK
5.12 m
2.40 m
PHASE 3
7.83 m
PHASE 4
6.50 m
28.67 m
6.50 m
2.40 m
7.83 m 7.83 m 6.50 m 6.50 m
30.00 m 28.67 m
7.83 m
10.29 m 20.19 m 30.00 m 9.90 m
6.50 m
20.19 m 30.00 m
OUTDOOR AMENITY AT FLOOR 2
2.50 m
7.19 m 20.19 m
6.50 m
1B+D 2B+D
2B1B
± 53 S.M. ± 76 S.M.S.F. ± 571 ± 814 S.F.
1B
± 541 S.F.
N 76°31'40"E (70.62) ± 50 S.M.
13.06 m
6.22 m
1B
52.76 m 6.50 m TOWER SEPARATION
2B+D 1B ± 82 S.M. ± 59 S.M. ± 887 S.F. ± 632 S.F.
10.29 m
3.00 m SETBACK 2.40 m 7.83 m 6.50 m
28.67 m
3.00 m SETBACK
2.40 m
7.83 m 7.83 m 6.50 m 6.50 m OUTDOOR AMENITY AT FLOOR 2
30.00 m 28.67 m TOWER SEPARATION
N 10°13'45"W
(133.46) N 10°13'45"W
CONCRETE ISLAND
SUBJECT TO EASEMENT AS IN INSTRUMENT LT255068 PIN 03227-00 27
SIDEWALK
193
CONCRETE ISLAND
PLANT
ASPHALT GRASS
BLOCK 27 (0.30 RESERV E)
BLOCK 36
DAYLIGHT TRIANGLE
15.00 m
BED
GRASS
SHAFT
N10~39'5 (P1&SET) (P1&SET)0"W 5.07
FLOOR 01
1 ______ RZ404
REV.
1
View from South - Towers C, I, H (conceptual render)
FIRE ROUTE SIGN
SPOT ELEVATION
GAS/HYDRO METER
PIN 03227-005 9
ROAD
2B
DRAWN BY
MH TOP=192.88
ND
WESTON CONCRETE ISLA
193
BY-LAW S IN 699381)
± 54 S.M. ± 586 S.F.
2B 1B+D ± 74 S.M. ± 62 S.M. ± 792 S.F. ± 668 S.F.
2.50 m
1B+D ±9.27 51 S.M. m ± 553 S.F.
3.33 m
3B
5.12 m
ROAD
WESTON
193
32.00 m
(0.30 RESERV E) PIN 03227-00 58
SHAFT
B
56
Highway 7 and Weston Road, Vaughan,RZ402 ON
(0.30 RESER VE)
GRASS ASPHALT
8.00 m
6.00 m
IRE ROUTE
(7
1 CFU ______ BY RZ402
DRAWING
PLANT TYPE B LOADING 11m x 3.5m x 4m
TYPE C LOADING 6m x 3.5m x 3m
7.83 m
CONCRETE ISLAND
PIN 03227-00 59
PLANT
GRASS ASPHALT
18.00 m
6.00 m
FIRE ROUTE
3.00 m 3.00 m
PART 2, PLAN 65R-105 76 (DEDICATED RD-316-90-10 BY BY-LAW 3 INSTRUMENT AS IN LT699381) PIN 03227-00 66
TYPE B LOADING 11m x 3.5m x 4m
TYPE C LOADING 6m x 3.5m x 3m TYPE C LOADING 6m x 3.5m x 3m
TYPE B LOADING 11m x 3.5m x 4m
ND
CONCRETE ISLA
GRASS
BED N 15°48'55"W (152.96)
DROP OFF
± 51 S.M. ± 544 S.F.
20.29 m
1B
Typical Floor Plan
FIRE HYDRANT
A
2025-05-23 DATE
ISSUED FOR REZONING AND OPA DESCRIPTION
1 ______
1 ______ RZ402
MASTERPLAN #
'00 "W
WOODBRIDGE SQUARE
9 1
°5 6
PROJECT
MH TOP=192.33 MH TOP=192.34
CB TOP=192.33
1B
11.02 m
3.33 m
42.10 m
47.76 m 2.50 m PODIUM SEPARATION
BED N 15°48'55"W (152.96)
DROP OFF
BLOCK 36 (0.30 RESERV E)
CONCRETE GRASS ASPHALT
86.30 m
.0 15 8.48
8.50
PHASE 2
PHASE 5
EXISTING SITE ENTRANCE. REFER TO SURVEY
BLOCK 36
SIDEWALK
CONCRETE GRASS ASPHALT
86.30 m
15
.00 m 3.00 m
PHASE 1
TOWER SEPARATION 6.50 m 6.50 m 7.19 m
CROSSW ALK BRICK
PLANT BED
UV
24.41 m
SHELTE R
SIDEWALK
EXIT
m 0
7.50 m 5.00 m 7.50 m TYPE D LOADING 13m x 4m x 6.1m
OUTDOOR AMENITY AT GROUND FLOOR SHAFT
m O/H DOORS
EXIT
EXIT
BRICK
PLANT BED
UV
24.41 m
SHELTER
EXIT
m .0 0
7.50 m 5.00 m 7.50 m TYPE D LOADING 13m x 4m x 6.1m
m 9.0 0
(133.46)
.60 B IL N D 0 K 3 )0 T (L U 1 - G O 0 O T 0 (L 6 1 )
A L U IN N N O N O C N IO G IN E P A O R S E G B K 2 te M . S N D IL U O T rb P u G IC B Y E R 3 D 1 9 2 R o K R R OS Y N 2 W 6 3 .1 O T c re 1 n N IC B Y E 0 (R .& 3 se t) °N F E "W 5 '4 3 1 (R .B 0 A 1 E G3 IN R 2 6 .4 3 a s)1 e l)m (p 0 5 .8 4 (m s2 2 .7 4 3 ) .5 a e (m .5 )s stn (R 0 2
IT EX O AT UT G DO R O O R U A N M D E FL N O ITY O R
0m
3.0
OSSW
m
PRIVATE ROAD
.6 )0 O B O N 0 D IL U G 0 0 0 3 )K T (L 1 T (L 6 1
N 2 IO G E N R O C Ou D A O R S E G B K te O T S U P IN M N IL U rb D IC B Y E N N A L G IN .2 P 3 1 9 2 S O Y N c re 3 n K R R W 6 3 .1 O T N IC B Y E R o 0 (R .& 1 se t) F .B E °(R 0 N 1 "W 5 '4 3 A 1 E 4 1 3 0 5 8 a e l.)m R (p G IN 2 6 .4 3 s) a (m 2 .7 4 3 (m R .5 s)2 e (s stn 0 2 .)5
O/H DOOR
W L (A 0 2 6 .5 1 2 stn 0 7 .6 1 W ID LO 1 N E I A N .) 29°1'5"E 31(R N LN P A C O F E G 4 Y B .7 6 1 0 3 R P 4 6 N LA 0 4 9 .4 6 1 5 0 .7 6 1 IN O 3 0 D A (P . 4 1 0 3 5 . B 17 E 3 T 0 8 2 16 N E W . 4 1 0 6 5 5 LO 4 6 .1 stn 7 2 1(LT 8 )2 3 4 5 S T X X ) 2 3 9 ) A F 6 A 0 N D 6 0 Q C 3 . X 6 .4 8 9 7 2 .3 (0 A R L P 0 E 6 S N T (L 9 5 )0 V R E 8 O 2 M N 0 4 T N (L 5 1 D .7 ,3 .) O T IS S . 1 9 4 5 3 - 9 6 0 IN , T 3 0 1 S .L )9 9 6 1 8 3 3 R 0 K C L .R IN 2 B N IO P 'D G E . N 2 L 3 0 lt X X R O P P T IA N IO S E C S .5 P A R N W ) 6 N , N 6 A O D D A R O h E p s e c tra n 6 .3 .1 ( 0 2 7 4 5 8 mE l& p s) B a e E C 6 R N 8 2 A P R O F A O M E 5 0 Y T 9 R 0 T C (L 6 5 1 , 0 6 S E B E 2 ) O V R E W T )3 N E N O 0 6 .9 2 5 1 1 5 0 6 7 D IC T A D B )E T (L 8 5 C N O N ESIO T S E L R ° S 1 N I 9 P '5 8 4 W E O 'D 2 G .E N A A L P 2 3 0 K C O "A R (0 8 6 M A P 3 )5 T (L 7 2 0 ,W .N 0 3 5 6 N A L E R E V )2 IN P 2 3 .0 7 IN B 3 2 W E L R 'D (0 IN P A L P B .G 2 3 0 K C O 7 2 L C 6 N . ) )1(LT O 0
15 9 2 0
IO
P IN .
14.55
14.56
IT EX
O AT UT G DO R O O R U A N M D E FL N O ITY O R
0m
3.0 OUTDOOR AMENITY AT GROUND FLOOR SHAFT
BRIC K CR
14.71 m
CROSSW ALK
SHAFT
D N U S A 0 2 R V O S IA C 3 4 1 T Y E S R IO N R A T F O
PRIVATE ROAD
DROP OFF
15.01
16.78
LA
BIKE PATH
BIKE PATH
EXIT
PHASE 1
6.0 0
6.46 m 3.00 m 5.25 m
m 6.0
0
6.00 m
PHASE 3 EXIT
PRIVATE ROAD
9.0 0
6.00 m
POULS
PHASE 3
PHASE 4
OSSW BRICK CR W 2 0 6 .5 1 2 L (A stn 0 7 .6 1 ID LO 1 W N E I A ) 29°1'5"E 1.3(R N N G Y B LA P 4 C N O F E 4 6 N LA P 3 R 0 .7 6 1 (P 0 3 7 6 4 .0 5 IN O D A 0 1 9 .4 6 1 17 0 3 .5 4 1 . B E 16 8 2 3 W 0 T N E 3 4 )2 1(LT 8 5 S T 0 6 .5 4 1 7 LO 2 stn 5 .4 6 1 ) A F ) 2 X X 3 9 6 A 0 N D 6 3 Q C 0 . D 9 .4 8 A R L P 7 .2 (0 6 X 3 6 S N 0 E M N T (L 9 5 )0 V R E - 0 8 2 T (L 5 .7 1 O , )IN 3 4 . O T S S 9 6 4 .5 3 1 9 0 S 9 ,IN 3 0 1 6 9 .L T ) 1 8 3 ,C lt X X 'D P G E R 2 3 .0 IN P K C O L IN R B P 2 3 T .IO 0 A R P L N N 6 A N N IO S E S .5 W A N O )R 6 D P C N T 2 .3 7 6 1 5 .4 8 p s A e c tra n h ,E 6 m l.& O 5 0 F T E C R s)D a 0 e 6 9 2 5 1 6 7 A O R O 8 2 6 R N A E (D E B )p 0 0 E D L 8 5 0 M E 5 T B A IC E W T S E T (L 6 5 1 - R N ) O V R 3 1 - C B Y N O )2 E 9 (0 L A P W O ,)E 2 T R IN P E L R '.3 8 °4 5 1 N R 5 6 N A L I2 P N IN B 3 2 "W 2 3 'D 2 G .9 0 S K C O 2 3 O N ESIO T 7 A L P (0 8 0 6 (A N S M .0 5 7 0 V A E ) E E 3 6 N L C W B E L R IN P K C O 'D 2 G 2 3 .0 (0 7 A L P ) . IO
15 9 2 0
)O 1(LT 0
D N U S A R 0 2 IV C O S A 1 T 3 4 IO S R Y E R A T F O N
GRASS
8.88 m
O/H DOORS
EXIT 9.0 0m
2.50 m
6.0 0m
5.70 m 3.30 m2.70 m 6.00 m
3.00 m SETBACK
8.88 m
O/H DOORS
9.0 0m
PHASE 1
2.50 m 5.00 m
15.00 m
2.50 m
6.00 m
O/H DOORS
EXIT
PRIVATE ROAD
5.70 m 6.00 m TYPE C LOADING 6m x 3.5m x 3m
TYPE D LOADING 13m x 4m x 6.1m
SHAFT
2.50 m 2.50 m
EXIT
15.00 m
5.00 m 6.00 m 6.00 m
PHASE 3 EXIT
EXIT BIKE PATH
9.0 0m
BIKE PATH
7.20 m 2.50 m 3.50 m
BIKE PATH
TYPE B LOADING 11m x 3.5m x 4m
TYPE C LOADING 6m x 3.5m x 3m
Y
33.71 m
EXIT
2.50 m
CONCRETE N 10°38'15"W (5.07)
10.00 m
PRIVATE ROAD
DROP OFF DROP OFF DROP OFF
TYPE A LOADING 17m x 3.5m x 4.4m
27.2M @ 15% SLOPE
TYPE D LOADING 13m x 4m x 6.1m
3.65M @ 7.5% SLOPE
47.76 m
(26. 26.5 61 P4) (M6)
T DRIVEWA ASPHAL
O/H DOORS
3.00 m SETBACK
DAYLIGHT TRIANGLE
DAYLIGHT TRIANGLE
EXIT
BIKE PATH OUTLINE OF PODIUM ABOVE
83.76 m
CON N 10°13 CRET'45"W E CUR (133. B 46)
N10°13'4 (P5&M 5"W )
6.00 m
PHASE 3
PHASE 4
m 15 .0 0
10.00 m
3.00 m SETBACK
(134.85 P1) 134.8 (M) 1
600 YORK CO NDOMINIU M PLAN BLOCK
29133
6.00 m
ICV
m
AN
8.05 m 8.05 m
1B
TOWER SEPARATION
TOWER E
± 55 S.M. 11.02 m ± 592 S.F.
1 ______ RZ404
3.45 m SETBACK
AN AN AN
± 74 S.M. ± 798 S.F.
6.50 m 6.50 m
± 48 S.M. ± 517 S.F.
30.00 m
± 72 S.M.
3.45 m SETBACK
PRIVATE ROAD
EXIT
± 44 S.M. ± 472 S.F.
6.50 m 6.50 m
1B
"E (33.05)
± 51 S.M. ± 544 S.F.
OUTDOOR30.00 AMENITY m AT FLOOR 9
2B
BUILDING E ± 773 S.F. 51 STOREYS
)
CANOPY ABOVE
9.0 0
± 52 S.M. ± 559 S.F.
42.10 m
1B
1B+D ± 52 S.M.
10.57 m ± 561 S.F.
2B+D
± 85 S.M. ± 920 S.F.
.43
CRW 0.2W
O/H DOORS
8.60 m 6.50 m
(12.91) N 77°43'10
HIGHWAY 7
(27
± 300.3 m² ± 3233 ft²
MH TOP=193.31
± 54 S.M. ± 583 S.F.
2B+D
5.04 m
"W
± 8 m² ± 86 ft²
± 59 S.M. ± 640 S.F.
12.44 m 8.05 m 6.50 m
1B
5.46 m
'15
MOVING
AMENITY
± 60 S.M. ± 647 S.F.
1B
2.50 m
6.50 m
°56
CRW 0.4E
1B
28.52 m 11.52 m
46
BUILDING G 45 STOREYS
1B
0.00 m
N
CB TOP=192.72
± 439.9 m² ± 4735 ft²
1B
OUTDOOR AMENITY AT FLOOR 2
14.44 m 30.00 m
TOWER SEPARATION
)
CB TOP=192.70
RETAIL
± 81 S.M. ± 872 S.F.
3.95 m SETBACK
OUTLINE OF TOWER ABOVE
± 62 S.M. ± 668 S.F.
3.95 m SETBACK
± 316.2 m² ± 3403 ft²
56
N
0.10∅
FFE: 193.55
OUTDOOR AMENITY AT FLOOR 9
13.06 m
m
GAS/HYDRO METER GAS/HYDRO METER GAS/HYDRO METER GAS/HYDRO METER
#
2025-05-23 DATE
± 43.3 m² ± 466 ft²
m
± 53 S.M. ± 571 S.F.
0 6.5
MOVING
± 75.1 m² ± 809 ft²
8.05 m
m
12 .36
AMENITY
± 78 S.M. ± 835 S.F.
m
2.50 m
± 82 S.M. ± 883 S.F.
20.00 m
1B
N 76°16'50"E
8.32 m
82 BUILDING±± 887 DS.M. S.F. 45 STOREYS
± 53 S.M. 9.43 m ± 571 S.F.
2B+D10.31 m
6.50 m
1B
± 44 S.M. ± 476 S.F.
TOWER D
1B+D
6.50 m
29.65 m 1B
N 76°31'40"E (70.62)
2B+D
2.50 m
3.33 m
2.50 m
9.27 m
m
7.50 m
SIAMESE CONNECTION
POULS PLANTER 0.5E 0.4E
2B+D ± 77 S.M. ± 825 S.F.
6.50 m
6.50 m
2B
4 .1 19
AN AN
8.60 m
3B
0 6.5
6.00 m
SPOT ELEVATION SPOT ELEVATION SPOT ELEVATION SPOT ELEVATION
m
G
PRIVATE ROAD
0.45∅ 0.20∅
± 184.3 m² ± 1984 ft²
FFE: 193.55
LOBBY
FIRE ROUTE SIGN FIRE ROUTE SIGN FIRE ROUTE SIGN FIRE ROUTE SIGN
00 6.
G M G G
LOBBY 27.2M @ 15% SLOPE
1B
"E (33.05)
EXIT
000.00
G
1B
± 43 S.M. ± 42 S.M. 42.10 m ± 459 S.F. ± 456 S.F.
m
000.00 000.00
000.00 EXISTING 000.00 FOOD STORE M (4,000SQM) M M
0.40∅
AT FLOOR 2
0 6.5
TRANSFORMER WITH CLEARANCES TRANSFORMER WITH CLEARANCES TRANSFORMER WITH CLEARANCES TRANSFORMER WITH CLEARANCES
1
TRANSFORMER WITH CLEARANCES
BUILDING F 57 STOREYS
0.30∅
2B+D ± 77 S.M. ± 826 S.F.
4 6.1
CONVEX MIRROR CONVEX MIRROR CONVEX MIRROR CONVEX MIRROR
A
CB
± 281.1 m² ± 3026 ft²
AT FLOOR 9
m
3,727.5 SQM
A A A
AMENITY
O/H DOOR
SIAMESE CONNECTION SIAMESE CONNECTION POPS SIAMESE CONNECTION SIAMESE CONNECTION
CB TOP=192.33
CONVEX MIRROR
M
2B ± 75 S.M. AMENITY ±OUTDOOR 805 S.F.
10.90 m
N
SIAMESE CONNECTION
BUS STOP
± 64 S.M. ± 691 S.F.
2B ± 61 S.M. AMENITY ±OUTDOOR 652 S.F.
11.02 m
PHASE 5
MH TOP=193.10
1 ______ RZ401
AY KW AL W
EXIT
m
OUTLINE OF UG BELOW
10.31 m
2B
± 74 S.M. ± 792 S.F.
27.00 m PODIUM SEPARATION 39.81 m TOWER SEPARATION
20.29 m
30.00 m TOWER SEPARATION
N 78°55'20"E (30.23)
8.32 m
1B+D
m
9. 00
FIRE HYDRANT FIRE HYDRANT FIRE HYDRANT FIRE HYDRANT
FH
2B ± 73 S.M. ± 786 S.F.
(12.91) N 77°43'10
30.00 m
10.57 m
PHASE 4
MH TOP=192.33 MH TOP=192.34
RETAIL ENTRANCE
EXIT
1B ± 55 S.M. ± 597 S.F.
6.50 m
29.65 m
± 53 S.M. ± 571 S.F.
4 .1 19
EXIT
(3 .5 (M9 30
1B ± 52 S.M. ± 556 S.F.
6.50 m
1B
0 6.5
EXIT FH FH FH FH
POULS
SECONDARY6) RESIDENTIAL 3P ENTRANCE 0.6 )
HW
BED 0.7E
m
EXIT EXIT EXIT
PHASE 4
BUILDING B TOWER B PHASE 5 32 STOREYS
± 887.2 m² ± 9550 ft²
3.65M @ 7.5% SLOPE
0m 15.0
EXIT EXIT EXIT
MH TOP=193.59
BUILDING B 32 STOREYS
GAS/HYDRO METER
POULS
AN
3.00 m SETBACK
OUTLINE OF TOWER ABOVE
m
RETAIL ENTRANCE RETAIL ENTRANCE RETAIL ENTRANCE RETAIL ENTRANCE
SIB(1176)
2B+D ± 77 S.M. ± 825 S.F.
m
0
CURB ON-LINE
BUILDING H 45 STOREYS
1B ± 42 S.M. ± 456 S.F.
4 6.1
0 9m. 00 9.
CURB 0.1N,32.4W
1B ± 43 S.M. ± 459 S.F.
2B
AD O
0 .0 15
0m 3.0
RESIDENTIAL ENTRANCE SECONDARY RESIDENTIAL SECONDARY ENTRANCE RESIDENTIAL SECONDARY RESIDENTIAL ENTRANCE RESIDENTIAL SECONDARY ENTRANCE ENTRANCE
OUTDOOR AMENITY AT GROUND FLOOR
LEGEND
PRIMARY IB MH TOP=192.87 RESIDENTIAL ENTRANCE
CB TOP=193.05
"E 0.31 38'00 N58~
13.09 m
0
PRIMARY PRIMARY RESIDENTIAL ENTRANCE PRIMARY RESIDENTIAL ENTRANCE PRIMARY RESIDENTIAL ENTRANCE
L AL
TYPE B LOADING 11m x 3.5m x 4m
POTL
AN
PB(JDB)
RETAIL
6.50 m 2.47 m
m m is theand contractor must and accept for3.00 all dimensions conditions on site and must This drawing, asverify an instrument of responsibility service, is provided by and property of Turner Fleischer. The This asverify an instrument of responsibility service, is provided by and is theand property Turner notifydrawing, Turner Fleischer. of any variations from the information. This of drawing isFleischer. not to must be The contractor must and accept forsupplied all dimensions conditions on site and contractor and accept forsupplied all dimensions conditions on site and scaled. Themust architect is notany responsible for accuracy survey, structural, mechanical, electrical, This drawing, asverify an instrument of responsibility service, isthe provided by of and is theand property Turner notify Turner Fleischer. of variations from the information. This of drawing isFleischer. not to must be The notify Turner Fleischer. of variations from supplied This drawing is before not to must be etc., information shown on this drawing. Refer to the consultant's drawings contractor verify and accept responsibility for allappropriate dimensions and conditions on site and scaled. Themust architect is notany responsible for thethe accuracy of information. survey, structural, mechanical, electrical, 0m .0 scaled. Thewith architect is of notConstruction responsible for the accuracy of survey, structural, mechanical, 5information. proceeding the work. conform to1all applicable codes and requirements notify Turner Fleischer. any variations from the supplied This drawing is before notelectrical, to beof etc., information shown on this drawing.must Refer to the appropriate consultant's drawings etc., information shown this drawing. Refer to the appropriate consultant's drawings before authorities jurisdiction. The contractor working from drawings not specifically marked 'For scaled. Thehaving architect is on notConstruction responsible for the accuracy of survey, structural, mechanical, electrical, proceeding with the work. must conform to all applicable codes and requirements of proceeding with the work. must to all drawings applicable codes and of Construction' must assume fullThe responsibility and bear costs for any corrections orrequirements damages etc., information shown onConstruction this drawing. Referconform to the appropriate consultant's drawings before'For authorities having jurisdiction. contractor working from not specifically marked authorities having jurisdiction. contractor working from not specifically marked 'For resulting from histhe work. proceeding with work. Construction must conform all drawings applicable codes andorrequirements of Construction' must assume fullThe responsibility and bearto costs for any corrections damages Construction' must assume fullThe responsibility bearfrom costsdrawings for any corrections or damages authorities having jurisdiction. contractor and working not specifically marked 'For resulting from his work. resulting frommust his work. Construction' assume full responsibility and bear costs for any corrections or damages resulting from his work.
ALK ALK ALK ALK
W
7.00 m
67 Lesmill Road 67 Lesmill Road Toronto, M3BRoad 2T8 67ON, Lesmill Toronto, ON, M3B 2T8 67416 Lesmill T 425 2222 Toronto, ON, M3BRoad 2T8 T 416 425 2222 Toronto, ON, 425 M3B2222 2T8 turnerfleischer.com T 416 turnerfleischer.com T 416 425 2222 turnerfleischer.com turnerfleischer.com 3 .0 The This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer.
OOR AMENITY OUND FLOOR
)
2.53 m 6.50 m
SHAFT
MOVING
TYPE C LOADING 6m x 3.5m x 3m ± 7.1 m² ± 76 ft²
DRIVEWAY
CROSSWALK BRICK 180.66
± 75 S.M.
N 73°48'05"E ± 805 S.F. (5.82)
2B+D ± 77 S.M. ± 826 S.F.
± 70 S.M. ± 755 S.F.
R
.43
TYPE D LOADING 13m x 4m x 6.1m
N SIG
(27
DROP OFF
SIAMESE CONNECTION
ASPHALT
MH TOP=193.38
193
SPOT ELEVATION
View from West - Towers A, B, C (conceptual render)
OUTDOOR SPACE 1,921 SQM
residential units amenities horizontal circulation, lobby vertical circulation, service areas, parking retail firePRIVATE route LEGEND ROAD LEGEND LEGEND LEGEND primary residential entrance secondary residential entrance retail entrance exit
TYPE C LOADING 6m x 3.5m x 3m
0.35∅
1 ______ RZ404
± 61 S.M.
10.31 m
2B 8.49 m
6.50 m
± 652 S.F. (17.40) N 73°04'40"E
ES G
K IC BR
"W CANOPY ABOVE
AMENITY
ASPH ALT
MH TOP=193.56
0.05∅
± 410.2 m² ± 4416 ft²
WV
GM
BL
0
contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For 49.46 m Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
15.00 m
1B+D ± 64 S.M. ± 691 S.F.
29.65 m 6.50 m
12.53 m
PHASE 1
± 109 m² OUTLINE OF TOWER ABOVE ± 1173 ft² This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer. The
CANOPY ABOVE
0m
FIRE ROUTE SIGN
m
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
RETAIL
AN DAYLIGHT TRIANGLE
0.30∅
UB ON CONC. PAD
'15
6.6 m² 839 ft²
CB TOP=193.53
POULS
ICV
3.00 m SETBACK
AMENITY
1B
AD O
CANOPY ABOVE
9.0
BL
MH TOP=192.66 POTLS
AN
AN AN AN
± 5.4 m² ± 58 ft²
± 214 m² ± 2303 ft²
m
9.0
LOBBY
ROW
BF
MH TOP=193.67
± 78.9 m² ± 849 ft²
ENITY
UV
9.0 0
MOVING TYPE D LOADING 13m x 4m x 6.1m
± 73 S.M. ± 786 S.F.
2B m 8.16
R
SHELTER
0.45∅
21.00 m
BF
MH BPV TOP=192.62
(180.66) BUILDING I N 73°36'15"E0.35∅ 0.05∅ SIB(OU) 12 STOREYS
27.2M @ 15% SLOPE
FFE: 193.55
A
000.00
IN W
BPV
SPEED CAMERA
TH
± 51.2 m² ± 551 ft²
OUTDOOR AMENITY AT GROUND FLOOR
9.0 0m
BUS STOP
MH TOP=193.68
± 49.4 m² ± 531 ft²
± 55 S.M. ± 597 S.F.
8.32 m
PHASE 2
6.00 m
FUTURE ROAD
0.05∅
SIDEWALK
UV N 78°55'20"EAN N73°35'40"E (30.23) 0.05∅
3.65M @ 7.5% SLOPE
SIAMESE CONNECTION
WK WK
CB TOP=192.53
TH
± 49.4 m² ± 531 ft²
± 52 S.M. ± 556 S.F.
± 53 S.M. ± 571 S.F.
9.81 m
ES G
WK
MH TOP=193.31
WALKWAY
FIRE ROUTE
RAISED BIKE LANE
WK
TH
± 50.1 m² ± 540 ft²
± 70 S.M. ± 755 S.F.
12.44 m
IN W
WK WK WK WK WK
BUILDING G 45 STOREYS
EXIT
3.00 m 3.00 m
BRICK
21.36 m BL
LOBBY ± 152.9 m² ± 1646 ft²
L AL
MH TOP=193.51
WK
BRICK
m
SHAFT
OUTDOOR AMENITY
WK
0
13 VISITOR BIKE SPACES
± 165.3 m² ± 1779 ft² OUTLINE OF TOWER ABOVE
AT GROUND FLOOR MH CANOPY ABOVE TOP=193.58
GM
SHAFT
± 988.8 m² ± 10643 ft²
14 VISITOR BIKE SPACES
AMENITY
± 67.8 m² ± 730 ft²
°56
FFE: 193.75
± 182.1 m² ± 1960 ft²
CRW 0.2W
EXIT
2B
TRANSFORMER WITH CLEARANCES
G
CB TOP=192.72
O/H DOORS
CONCRETE SIGN WALL ON BRICK
MH TOP=194.03
13m x 4m x 6.1m
TH
± 67.8 m² ± 730 ft²
46
LOBBY
± 23.2 m² ± 250 ft²
± 8 m² ± 86 ft²
1B
20.00 m
9.43 m
POPS AT GROUND FLOOR
193
TH
± 68.7 m² ± 739 ft²
33 VISITOR BIKE SPACES
MOVING
MOVING
± 300.3 m² ± 3233 ft²
1B
CONVEX MIRROR
M
CB TOP=192.70
RETAIL ± 439.9 m² ± 4735 ft²
AMENITY
2B
12.53 m
CRW 0.4E
TH
POTLS
BPV
5&"W M)
TH
± 69.1 m² ± 744 ft²
63.35 m
POLS
TOP=193.64 PB(JDB)
0.05∅
± 103.5 m² ± 1114 ft²
FFE: 193.00
6.0
BPV
CB TOP=193.82 TYPE D LOADING
GARBAGE
± 348.8 m² ± 3754 ft²
TH
± 67.8 m² ± 730 ft²
BL
CONCRETE 37.16 mPLANTER
CURB 0.1N
TH
E R T N C 8 4
TH
± 52.4 m² ± 564 ft²
± 564 ft²
CONC. RAMP
N
Ground Floor Plan
TH
± 67.8 m² ± 730 ft²
LOBBY
M E R E T S 4 0 .8 N A A L E N R IE B N T IV Y B .Y D G 3 0 S O I O W H P S D T R E V N T E F N N A T IS D E B C E C 7 . M A I R T E A A C D N N Y O ) T K R G I 8 W H 1 0 2 3 9 2 8 I 9 2 0 7 , Y 6 A V 4 R 1 - R 6 1 1 7 0 7 1 8 2 R 0 0 1 8 O T S ' O P L A E R E P E 9Y 3 2 A P R S Y T I L .2 (0 5 3 O )L V R E R 6 N A L P 7 ( - E G 9 2 0 T H 'S , S L . M 5 - O 7 2 ( L 4 IA 7 )0 T ( S P 9 8 L P N N Y A A 7 7 2 R IA P N O 2 R 0 P O: Y E 1 AR P U 5 ) 1 T V S0 IB 8 2 6 A L P 5 N O I IB S )(1 E , 3 L T R B L A K R E T 6 C I N U D E E R IN N A L P K C O T (L 5 1 . M F H G U B N I P 'D G 3 .0 R U E 0 S 1 4 2 )T 1 8 7 0 N 2 R Y 0 1 e c n ig S IN 3 P R P X ,E 2 O 1 .0 7 2 T IA R P (L 9 V T E 7 )0 3 2 E O n ig 46°5'0"W N IN P Sc (R e l a 2 0 1 2 3 , T 1 eR (m X R 0 P N M E S P G E T A Tn A 2730N pl& N ,p m .& .e 3 ( 6 IB C F CM S R T E N L A IG S N V4 Y I R T "E 0 '2 °5 8 7 .46°5'19 H s)S a )IB (R 3 .7 ) 0 Y T E 9 17 "W S 0 .R 9 (1 ) 0 7 F n trW A R P T IN A L P - 8 7 2 (0 5 3 3 .0 M N (L 0 S E )2 T ° (7 6 7 N 0 '4 1 3 "E R P X 2 )5 .6 0 2 O O T T IA R P E M Y P O N A C IB 9 B NS T S N T )C 7 OE L F t8 se L C IB S )S IB 7 0 9 (1 P 3 1 , a 3 6 (R P C sT e ,E c ltn .& 2 0 .)ase2 8 7 2 6 rb 1 .0 0 5 1 )6 T (L 3 8 7 5 1 6 9 5 8 R 5 6 E V Y R U S Y M L R I IT L O (W IB S )c IT 0 9 (1 6 7 R E IN IN P B D 'L G 2 3 .0 K C O ° P 7 N 0 1 0 '6 8 0 R 2 .8 "E 3 R 3 R 4 A °& 7 N .9 2 '5 6 1 "E 0 U (S T stn en 9 .8 2 C E J B A 0 E R L 7 G M N A L P 'D G m .& (R O5 9 A 3 -2 m .& s)(R a e s)(5 a Y P O N A 6380°'5"1 IN S B IB n E t)(R se C C B D A o e tre h p s C t)"4 se .& c a u W LB K B IC R 2 4 IB c5 c c4 fC 3 1 1 5 2 U C T S D N 6 5 6 4 3 2 L O 7 T 'N °1 6 N A A 0 R N A L ,P .1 2 3 1 8 Y P 7 2 E .W R E IT T E M H ,E H T R O E 0 H E 0 W IG R E E T S N F O ° ," 5 '4 3 1 . ° 9 7 N 8 'e 3 "E E 0 A P 6 N A L ,P 5 1 T WR N m1 stn TIO N 7 .2 1 s6 a 1 3 0 7 .)" a E ')6& °1 (N .5 2 '5 °1 7 N (R 4 .2 Ir X ).B R 4 "E 0 A a tF s B L N F n P O T S S L N ,IU G N ILD U D G O T S O R P 2 8 .8 A E ,S X E IR N T A 7 o 4 6 4 E N S N A _ U E D A M C N D W E D A IC N F - O E M D S E R M 5 V P ,H 9 B T N 3 2 T E B A G D 2 N U O F S . L S N A O T D _ E 5 N 4 .8 5 C .0 3 2 stn B B .L H T S 1 M O ID C B IC N A 8 0 U R E A .L M B A L R K H IT W E 0 D .T N A L P O 7 B 1 9 2 1 0 A U T S D -2 U G E _ I P C 2 c N O T A A 9 en 3 D R C IO ,_ IL R ._ 8 1 0 5 3 2 0 G C O M Y D R E T IS A D U N O 6 N L P R IS N D R S 3 2 R E A 9 S B O 8 5 S 0 K C O R X C S E N T F P E 0 1 .5 .8 2 E T e S c F A IE F T R A E n ig IN D L W R T G C N .& e 1 (C m & IF .B R 7 2 N O E T C A D R O Y A L P C A s)6 a T 3 ) A N T (L 3 7 0 - L 7 2 S P M O D IU R 3 O P ,A T _ C th E R D N .6 O N A L E _ 4 3 4 H Y T 0 M 5 6 _ 0 TIO 5 D N IrS X R E A .D _ o IO X F n n S N O 2 .L T E A N . A 9 7 4 ,E 2 T R R P IT R P O L N 1 B , (4 2 5 )7 6 1 B R IN U S O L G V B C ,A '3 N A ' O O T U C Y T B M 5 6 D ,- N th 9 M B M R P IC H n E 0 9 C S 2 1 E O Y trs D X R T 7 H I6 O 'P R Y E 2 A G L E T IS G 'S R K N 6 O 3 4 0 .7 2 tn A P L P D E _ N IO G A O N E V R 8 1 0 ,2 N O M B Oa H T S R O Y E E R C A . D T E L _ 2 3 0 :2 R IN R P T N ,P T P V IS H R 5 6 N A G O S P 3 B E O R 1 5 N A L 0 4 8 N M D R IU N S T .- IO , M O .M D L R E A 3 IB '7 C P l U p e d U D E T rS Y V A X E L T C S T O A U S R 7 V tn s E X 0 U :th X O Y ,S D A N V R _ 'C E V R _ K P B U E H '1 C S W Y S R V O T N B H T Y T A H E P O F .4 rb 0 I2 E R O N N W T R A D L C O A 8 1 L R V U .Y D Y E B U 0 1 8 7 S D N Y 5 .2 1 3 W E D L A N .O 0 A O L S A 8 V N R U S D N T O A Y E S T R B R L IF IU D G N .5 fC 2 1 1 M H I P g c a rb lo c a G n E X A D .E 2 C A n _ U S U Y C O IT T R E W O V S A Y E R Y )C o e O T E A & S E U K C R B L IS G IN B u H G A N R E , 0 C U T P M E O T D o fC e c IN 2 R N O O B B B .E 0 rb u I A T 6 C 1 3 2 4 ,T 4 R 3 5 2 D 5 4 estFa 0 7 m r& e s) retR etaing5 a e 0 N 4 .3 6 1 .0 1S A :J P T R R ib d IB H T E F 1 .S 5 (1 2 IS O L N )in 3 a s E 1 7 6 rd T C n E S O R O T .9 0 s2 a e u h m lo (m W B U 0 B a tF s 1 (C .5 B )6 k ric O C .S N 6 .7 C E r tn B 0 O W R Y E L 1 1 8 A B IB S K 7 2 0 ,2 .C N F 8 D E B IR U S A O T 6 1 4 0 esu 4 5 8 st0 6 r 7 u l C 3 o e (9 ) W & (C 4 3 .6 e 2 c trn a h p s n IB E A a G n E O :5 2 0 7 8 4 5 S N rb lo c N P W R A a P g A C D .p E IL R 1 L H 1 .T r W to a a p re u s IB 0 3 IS R lc D .5 0 l a °(S 0 N '1 8 S B B X "W 5 re a 7 3 u 3 C te 8 3 9 3 o .0 th s u a C fF t)ceo se l& p t)0 e == 0 )7 4 .B 7 1 IN Y A O S E U K C R B L IN G k B W 56°0"'W N 3 C = ( lt B R n E A ric .6 D 8 0 e o c a F C rb o u fC c E n B 2 8 .5 O 2 3 1 6 3 3 4 9 4 (1 me l.& p s)b a .0 5 IB S 2 N T W 0 8 .1 R O = pl.& set) trasph eapl)s125,03A o u OM D l S a W (9 76.251=,A 7.46(m th (m U P IN N N A L IB S 5 s) 1S a e ° 5 7 N '1 6 "E NG30.79& I e(C as)ncelt m R E N C IO G N O B 5 3 3 R S N S A OR Y U E itR w L A V h R O F N O IS M B K E o tiY IE 9 2 n S (3 .D R O ). D IE L N a L n P l a u g S A B D O rd o c 6 I2 tio E H T Y A N S L A N IG R e c ,n T P O c 0 C 1 M e E U S Y A S O B H U T e R L IS P
MH TOP=193.52
0m 9.0
BL
MH TOP=192.36 MH CONCRETE SIDEWALK
BUILDING C N7 3°0 25 STOREYS 8'4 (P 6
OUTLINE OF TOWER ABOVE
± 316.2 m² ± 3403 ft²
3.45 m SETBACK
0.05∅
RETAIL
± 672 m² ± 7233 ft²
TH
± 69.6 m² ± 750 ft²
TOP=192.32
0.35∅
OUTLINE OF TOWER ABOVE
RETAIL
BRICKMH
MH TOP=192.62
SIB(GP) WIT,0.07E
± 63.3 m² ± 681 ft²
27.00 BLm
0m
1 ______ RZ404
TH TH ± 52.4 m² PLANTER
± 53.7 m² ± 578 ft²
POLP BPV
SIAMESE CONNECTION
0.10∅
m
O/H DOORS
K IC ALK BR EW SID
HELD N/S ESTABLISHED BY INTERSECTION
9.0
PLATFORM
AMENITY ± 186.7 m² SHELTER ± 2010 ft²
TH
BL
1 ______ RZ401
± 43.3 m² ± 466 ft²
FFE: 193.55
13.03 m
CONC. PLANTER
ALK EW
UTLINE OF TOWER ABOVE
0.05∅ RZ403 POLS
SID
EXISTING SITE 0.05∅ ENTRANCE. REFER TO SURVEY
1 ______
TE RE NC CO
N 76°31'40"E (70.62)
PB(JDB)
CB
DAYLIGHT TRIANGLE TOP=193.35
Y WA IVE DR
CONC. PLANTER
2) 3P MH (18.5 8.58 1 TOP=192.42
BARRIER
BRICK
± 63.3 m² ± 681 ft²
SHAFT
25.89 m
8.00 m
18.00 m
0.05∅
MH TOP=193.36
MH TOP=193.35
CONCRETE
194 TH
)4 9 7
0.05∅
3.95 m SETBACK
E 0m GL 8.0 IAN TR HT IGx2 YULV DA
2 7.7
192
17 C=
AD O
TB
SIAMESE CONNECTION
4 LT2 O T. S IN TIN )2 9 U 3 O M ET S S 6 A T) 5 M E TN 3 0 (L 15 0 E N S 4 8 E 0 LA R 5 6 N LA - P E 7 2 'D TO G Y 2 3 .0 3 0 R 4 8 T2 ,P R JEC IN P A (B R 5 P 6 N B LA T1,P R U A (S P
R
0.05∅
CB TOP=191.98
TH
± 67.5 m² ± 727 ft²
± 68.8 m² ± 740 ft²
POLP
2.00 m 6.00 m
± 58.2 m² ± 627 ft²
OUTLINE OF TOWER ABOVE
EXIT
TH
BPV
TH
± 111.9 m² ± 1205 ft²
m
13 VISITOR BIKE SPACES
CB TOP=193.63 TH
MH TOP=192.33BRICK MH TOP=192.26 CB TOP=191.99 RAISED BIKE LANE 0.05∅ MH 0.05∅ TOP=192.10 0.35∅ MH TOP=192.10
75.29 m
POLS
6.0 0
1 ______ RZ401
BUS STOP
MOVING
± 75.1 m² ± 809 ft²
PRIVATE ROAD
SIAMESE CONNECTION
± 2910 ft²
SS RA G
0.05∅
BRICK
AMENITY
CANOPY ABOVE
UB ON LOBBY PAD CONC. ± 270.4 m²
BUILDING E 50 STOREYS
2.50 m
12 .36
EXIT
m
6.00 m
EXISTING FOOD STORE (4,000SQM) PRIVATE ROAD
DROP OFF
GARBAGE
5m K 3.1 BACFH T SE
7.50 m
SIAMESE CONNECTION
POULS PLANTER 0.5E 0.4E
3.40 m
FFE: 192.75
POLP
ES G
03 22 700 15
0.25∅
MH TOP=193.33 CB TOP=193.43
1.80 m
± 69.8 m² ± 752 ft²
MH TOP=193.420.05∅
33.05
0m
2.50 m
CB TOP=193.83
HIGHWAY 7
BUILDING D 45 STOREYS
TER
± 480 m² ± 5167 ft²
0.05∅
IN W PIN
AMENITY
W
192
1 ______
RZ402 0.45∅ 19 2
0)
N SIG
R1
)
OUTDOOR AMENITY AT GROUND FLOOR
5,
.43
'00A= "W196 (7 .85 6.3
K IC BR
(27
N
°5 6
"W
56
CB TOP=193.82
0.05∅
EXIT
AN AN
LOBBY
m
N AP RO
CONCRETE27.0 PLANTER
0.05∅
9.0 0
0
HA LT
EXISTING SITE ENTRANCE. REFER 0.40∅ TO SURVEY
ANGLE LK 77°43'10"E (33.05 )
EXIT
27.2M @ 15% SLOPE
m
6.0
0
m
O/H DOORS
CONC. PAD 0.45∅ BRICK 0.05∅
∅
0
POPS 3,727.5 SQM
6.65 m
2.40 m
7.5
3.65M @ 7.5% SLOPE
0.45∅ 0.20∅
± 184.3 m² ± 1984 ft²
O/H DOOR
6.0
FIRE HYDRANT
MH TOP=193.10
BUILDING F 57 STOREYS
0.30∅
LOBBY
m
0m 15.0
DRIVEWAY 7.67 m
OUTDOOR AMENITY AT GROUND FLOOR
AS P
m
0 .0 15
PRIVATE ROAD
2.20 m 3.40 m
FH
1 ______ RZ403
8.32 m
5.00 m SETBACK
BUILDING A 45 STOREYS
EXIT
EXIT
BED 0.7E
CB
± 281.1 m² ± 3026 ft²
DROP OFF
2.40 m
TOWER A
RETAIL ENTRANCE
AY KW AL W
AMENITY
0m 3.0
EXIT
CB TOP=193.05 POULS HW
OUTLINE OF UG BELOW
0.40∅
m
CURB 0.4W
0.05∅ 0.05∅
0.45∅
OUTDOOR AMENITY AT GROUND FLOOR
m.0 09 9.0
2.00 m
MH TOP=192.02
(P1& SET) FH 0.05∅
m
0 9.0
R=1 27.0 0
0m 15.0
SECONDARY RESIDENTIAL ENTRANCE
POTL
AN AN MH TOP=193.59
3.00 m SETBACK
13.09 m
20 VISITOR BIKE SPACES
0m 6.0
192
3.00 m
OUTDOOR AMENITY AT GROUND FLOOR
CROSSWALK
± 887.2 m² ± 9550 ft²
6.50 m 2.47 m
3.00
BRICK
PB(JDB)
RETAIL
10.89 m
± 148.8 m² ± 1601 ft²
192
LOT
UB ON CONC. PAD 0.25∅
3.50 m
TYPE B LOADING 11m x 3.5m x 4m
PRIMARY RESIDENTIAL ENTRANCE
MH TOP=193.38
"E 0.31 38'00 N58~
OUTLINE OF TOWER ABOVE
MOVING
TYPE C LOADING 6m x 3.5m x 3m ± 7.1 m² ± 76 ft²
SIAMESE CONNECTION
GARBAGE
SHAFT
7.00 m
SHAFT
FFE: 193.55
± 75.7 m² ± 815 ft²
EXIT
OUTDOOR SPACE 1,921 SQM
6.65
PHASE 5 4&M) .22 (P M) A=68 .40 (P4& "W C=67 49(P 4&M) '35 N89~
SIAMESE CONNECTION
2.53 m 6.50 m
0.50 m
AMENITY
m
PHASE 4
PARK ING
DROP OFF
TYPE D LOADING 13m x 4m x 6.1m
3.00 m
0.50 m
LOBBY
O/H DOORS
± 152.9 m² ± 1646 ft²
± 78.9 m² ± 849 ft²
TYPE C LOADING 6m x 3.5m x 3m
21.00 m
CANOPY ABOVE
LOBBY
± 182.1 m² ± 1960 ft²
AMENITY
1.60 m 1.80 m
0 .0 10
# 136 2 STOREY BRICK BUILDING
LOBBY
± 23.2 m² ± 250 ft²
1.80 m1.60 m
STAIR TRANSFER ABOVE 6.64
FFE: 193.75
0.05∅
UB ON CONC. PAD
'15
MOVING
OUTLINE OF TOWER ABOVE
BUILDING B 32 STOREYS
MH TOP=193.67 CANOPY ABOVE
33 VISITOR BIKE SPACES
6.00 m
OUTLINE OF UG BELOW
0.05∅
°56
6.65
ASPH POTLS ALT CB TOP=193.53 MH TOP=193.56
UV
SHELTER
MH TOP=193.68 SIB(OU)
6.00 m
3.50 m
UV
BUILDING A 45 STOREYS
1 ______ RZ401
LEGEND
BPV
BPV
SPEED CAMERA
0.05∅
SIDEWALK
46
± 2850.5 m² ± 30682 ft²
POLS
BRICK
N 78°55'20"EAN (30.23)
± 988.8 m² ± 10643 ft²
± 356.6 m² ± 3839 ft²
SHAFT
MH CONCRETE SIDEWALK TOP=193.64 PB(JDB)
RETAIL
± 672 m² ± 7233 ft²
CANOPY ABOVE
3.00 m
RAISED BIKE LANE
0.05∅
OUTLINE OF TOWER ABOVE
RETAIL
OUTLINE OF TOWER ABOVE
FOOD STORE
POLS
CONC. PLANTER
SHAFT OUTLINE OF TOWER ABOVE
6.65
2 STOREY BRICK BUILDING
N 76°31'40"E (70.62)
PB(JDB)
N
BUS STOP
2.50 m
N 76°16'50"E
.43
33.05
21.36 m
MH TOP=193.51
N
WALKWAY
0.05∅
CONC. PLANTER
"E (33.05)
MH TOP=193.58
MH TOP=193.52
CONCRETE 37.16 mPLANTER
BRICK
TOWER SEPARATION
(27
ROW
0.05∅
RAISED BIKE LANE 0.05∅ 0.05∅
5.00 m SETBACK
27.00 m PODIUM SEPARATION 39.81 m
8.49 m
N 73°48'05"E (5.82)
"W
21.00 m
0.05∅
CB TOP=193.35
BRICK
0.05∅
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
10.31 m
6.50 m
'15
N77~43'10"E
MH TOP=193.35 BRICK
75.29 m
POLS
6.50 m
°56
0.05∅
DAYLIGHT TRIANGL CONC. E N 76°16'50"E SIDEWALK (12.91) N 77°43'10
PB
SIAMESE CONNECTION
STAIR TRANSFER ABOVE CONCRETE
10.00 m
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
BPV
FFE: 193.25
1 ______ RZ401
0.05∅
MH TOP=193.36
K IC ALK BR EW SID
± 214.3 m² ± 2307 ft²
± 225 m² ± 2422 ft²
5.00 m SETBACK
MH TOP=193.33 CB TOP=193.43
BRICK CONC. PLANTER
OUTLINE OF UG BELOW
LOBBY
AMENITY
PARKING
CC (JDB)
N76~16'50"E
OUTDOOR AMENITY AT GROUND FLOOR
SHAFT
BUILDING A 45 STOREYS
27.00 m POLS
0.05∅
DAYLIGHT TRIANGLE
24.94
N73°30'20"E
MH TOP=193.27 CONC. PLANTER
TOP=193.20
BRICK
BUILDING E 50 STOREYS
MH TOP=193.42
29.65 m 8.16 m
N 73°04'40"E (17.40)
1 ______ RZ404
46
ASPHALT APRON RAISED BIKE LANE 10.00 m POLS
N 73°48'05"E (5.82)
N 73°04'40"E (17.40) PB(JDB) 26.81
OUTLINE OF UG BELOW
8 4 E R T N C
MH TOP=194.03
CB TOP=193.82
M E R E T S 0 4 8 . N A A L E N R I N B T E IV B Y D Y G .3 0 S O I T W H P S D T R E V N O F E N N A T IS D E B C C E 7 . M A I R T E A A C D N N Y O ) G I W H T K R 8 1 0 2 3 9 2 8 R 9 2 0 7 , Y 6 A V 4 E 1 - R 6 1 1 7 0 7 1 8 2 R 0 0 1 8 G H 'S O O R P S ' T L A 6 S N A L P 7 2 E R E P .R (0 5 3 A P I 9Y 9 2 0 T )L V R E 3 2 ( - T I L Y E M 5 , S L . O - T 7 2 (L 4 7 )0 IA A P N O L Y 7 N 2 R ( S P 9 8 IA S P O S IB 8 2 R 0 P )(1 6 B NN A 4 2 O E R IN L P K E P N I AR P U : 1 Y E 0 1 5 H G U I F O ) 1 T V S. K C T (L 5 1 6 A L 0 5 D IB E , 3 L T R 'N G 3 .0 L A RU E T 2 R P C I N M B U O D E )A 7 1 8 7 N T 0 2 R Y 0 1 e c n ig S IN .0 P X ,E 1 n ig R E P 2 3 O P 7 E 2 T IA V R 3 (L 9 7 0 T )2 2 0 1 IN P 0 S R T E 2 3 0 P N M E , T 1 X T N L Sc O Tn A 279 epl& S m ,p m .& (R ( 6 IB C R F P CM A .4306°5'1"W S "E '0 °5 8 7 N H 9 V4 e l a s). S a e Y I G R T E 3 2 IB (R Y ) 17 A (R 3 .7 46°5'0"W N N IG N ) 0 T E 0 .R 9 (1 ) S 7 F n tr9 A 3 P T R A L P 7 2 IN .3 (0 5 M 5 6 N (L 8 2 )0 T S E R R M P ,X 2 E O IT R O A E P I5 (0 B 9 )C 7 P C 7 E 1 6 0 2 9 5 8 s,0 0 8 7 2 6 L C IB S N T S N T )sae. S S (1 )P 7 0 T L 8 3 1 1 3 6 6 8 .)B (R 2 5 .6 0 t 2 se & ° (7 6 7 N 0 - )F '4 1 3 "E n T Ile 3 T L r a tc O C b .1 5 W B A Y P O N E V R U S Y Y M L R I IT L O (W IB )7 IT 0 9 (1 7 E L R IN P B 'D G 2 3 .0 K C O 0 1 3 R A P U T R C E J 7 'N °1 6 0 4 2 4 6 6 3 1 cceo 5 5 6 4 1 c(R 3 6 2 5 2 B B D LA K IC t) se .& R 0°38A 6IN IN S B IB IB C n E t)(R se C A C R B c WS s)(tr5 a e 5"'1 m .& s)(R a e m .& a h B p s Y P O N 3 "E 4 °& 7 N .9 2 '5 6 1 "E 0 9 3 -2 u c fC 0 2 .8 "E M 5 N A L P 'D G stn en 9 E R .G ° (S 7 N 0 T R 2 3 0 .8 2 'A 8 4 N A L ,P 1 O L A P U C T S D N O N A L R 7 2 1° 8 .1 IT T R E E M H E T Y O ,H E 0 H IG R E E 0 W N F O E T S ," 5 4 'W 3 . A P 6 N A L ,P 5 1 T E 4 R G N ILD ,U a E 3 '0 °1 (N 7 .5 2 '5 °1 7 N (R 4 .2 Ir S o O T S "E .)0 1 7 N 4 6 4 8 A 2 S L N a tF s F n X B B )6 1 L IU D G stn TIO N 7 s3 a e .P 1 2 O N T ,S m & WR N "E .)"E 0 .L 2 ° 9 7 N 8 O R P X E '6 A E T IA R N A _ S N C N U E D A M W E D O A IC N D F P M 5 B E M D F E R V ,H 9 3 2 T N T 8 E S B A G D N U O S . S N A O T D _ E O e C U T S D N A .L9 S H T 7 B 1 9 B 1 0 2 0 1 8 C M O D IU B .S R E L A 0 N A B B A L 5 3 0 K IC 5 -2 .R 3 stn D T 4 .8 2 H IT W E .5 O N A L 9 c n U G E I P N _ A T A C 2 ,_ IL R IC D R O ._ 8 1 0 G C O O D R E T IS D Y 6 N A L P S R IM D R U N N S 3 M 2 R E A B P O 8 5 3 S 0 2 0 K C O R X C S E N T F P E E T A C F T R F W D L N T R IA G E e S c E T 0 1 T .B .5 & R IF ) A N T (L 3 7 0 .8 2 7 2 Y A L P - L 7 2 n ig N O C 4 3 4 0 5 IN C A S S .& e 1 (C m s)6 a D R O T 3 P M 5 6 A P IO M O ID N R 3 O Ir T X o ,A T _ C th E R F n n E D N A L P _ .6 O 0 H Y T _ D N A .D R E _ O N I X S O E N 2 A .L T . A 9 B U IN A 7 4 O C L S B U ,E 2 T R ,G '3 V O R R P 'A O N T L IT R P O N C E Y B M 1 B M 5 6 - U , (4 2 ,D th 9 5 )7 6 1 B M R N IC H 0 1 C Y E 2 9 O D 'S R X E R Y n E T S 7 H 6 IG '2 A K N P R trT O B 1 5 Oa H . L E T IS IN R P D E O G 6 3 4 0 2 3 0 .7 2 stn A P L P E V R _ A O N M N IO G S R O Y 8 1 0 ,2 E O R D T E L N O C A _ ,P T N : T R 2 M V P IS H R E E B R 5 6 N S P 3 0 4 G O N A L S T 8 N M D IO , M R ..A D L IU N O R E A IB '7 C lP U p e d U A rS E Y V D T X E L 3 T C S T O A U S V tn s X 0 X R 8 5 .3 1 E 8 1 B B U :4 ,S O Y 'C _ D A N V R IR H T Y E V A D L C O U E H C P 0 K R S _ V O T N T S W Y .A th H E 0 7 IL O Y E V R .U P 2 S D N F N O N W A O L Y E B U T R A R D L A N O V N R U S D N 0 1 8 Y E D O A Y E .R rb S A 2 S 7 W T T R B '1 L F IU D G N .5 ceo 2 1 1 M n B 3 5 2 B 5 2 4 Y D E a G n E X 6 clorbagC ceo 1 B A D I A B & S E U K C R B L G IN E C A .H 2 U Y C _ O U S C U T W O V , 0 T R E D S A R S )C IT O E P N O O Y H IG A N R E I A T T P M E O T IN 2 R u fC fC 0 rb u .E 3 ,T 4 R 4 0 A :0 P m estFa r& s) retR etaing5 a e e d 0 TO 4 .3 6 1 T .R R .0 1S 1 (C .5 a W e s)6 (m 4 5 1 4 0 esu E B stn 8 6 3 st0 1 r7 T C n S R .9 0 2 6 7 N O k B IB H T E F 1 h m lo B N 2 0 B 6 .7 B 0 O r S IS O L N ib d IB .S ric u L 1 O C 5 )(1 B U 6 7 .S 3 R C E J 1 8 A 7 2 a E a tF s E K C N F ,2 S A O T IR U D E r W u 8 e in l C Y o (9 ) W "W 5 t)0 se l.& 7 °S 0 N '1 8 t)0 e n IB E A a G n E 2 0 7 8 3 2 8 3 9 3 IB B B 4 5 & (C 4 3 .6 N P e c trn a h p s rb lo c g a a p re u s lc r W to l a .5 X 0 S a re S N W R C A D P .a p u (3 C te 1O :5 A IR L H 1 E .T 0 S o p D 3 IL R th s u a C fF o e c 0 )7 .4 7 1 l.& p (0 s)b a me C IN Y 2 3 1 6 3 3 4 9 4 W B ric 3 B B 8 1 = ( lt EnA R A O S E U K C R B L G IN '0"W C =5N 6°= k B .6 D 2 8 .5 O e C c a F ro o fu b c E n IB S 2 .0 S N T s) 1S a e W 0 8 .1 R O = pl.& 5 (9 = 7.46(m IB S 76.251,A set) trasph eapl)s1235,0A o u OM D U P IN N N A L W th (m l5 a 5 3 3 B e(C nceltas) m NG30.79& I R E N O N C IO G "E ° 5 7 N '1 6 N S A U E OR Y I O K R S B S M R F N O itR w h L o A E V 9 2 n ti. (3 E S ID R O Y ). L n P tio a lI a u g S L N A B D E rd o c 0 C 1 O 6 I2 E H T Y A N S D e c n L B A N IG ,R M E T U S P O Y A c e S O H IS T e R L P U
CONCRETE SIGN WALL ON BRICK
BPV
BUILDING E 51 STOREYS
N
0.05∅
N73°00'10"E
SSIB (JDB)
193
ASPHALT
0.05∅
m
0.05∅
YR2277685
PLAN
EXPROPRIATION
CB TOP=193.27
BRICK
0.05∅
BRICK
0 .0
POLP
AN
PART 2,
MH TOP=193.15
CONC. SIDEWALK
SHELTER
1 ______ RZ404
9.81 m
POTLS
CONC. RAMP
)4 9 7
BRICK 0.10∅
0.10∅
0.10∅ BRICK
HIGHWAY 7
BUILDING D 45 STOREYS
TOP=193.35
PART 3, EXPROPRIATION PLAN YR2278100 CB
MH TOP=193.25
CONCRETE PLANTER
FIRE ROUTE 3.00 MHm 3.00 m
15
MG 0.10∅
PLANTER POLP BPV
PLATFORM
4 LT2 O T. S IN T IN )2 9 U 3 O
MH TOP=193.04 POLP
MH TOP=192.98 CB TOP=193.15
CONCRETE PLANTER
CONCRETE PLANTER
BARRIER
BRICK
CONCRETE
6.00 m
EXISTING SITE ENTRANCE. REFER TO SURVEY
35 BLOCK (0.30 RESERVE)
194
ET M S 5 TA S )T6 E N M 0 3 N (L0 E 15 S 4 8
19 3
CB TOP=193.66
POLP
CB TOP=193.63
ISLAND
BRICK
PLANTER
BPV CB TOP=193.83
E LA P - 0 R 5 6 N LA 'D EG 2 TO 7 R Y .3 0 ,P 2 T2 - R 3 0 4 8 B (JEC IN A P R P 5 6 N B LA T1,P R U A (S P
1 ______ RZ403
CB TOP=193.51
CONCRETE
CONCRETE
PLANTER
LA
CONCRETE CB TOP=193.82
IN P .
UB ON CONC. PAD
BRICK CB TOP=193.72
HIGHWAY 7 BUILDING D 45 STOREYS
ISSUED FOR REZONING AND OPA DESCRIPTION
CFU BY
View from East - Towers H, G, F (conceptual render)
T HE G ORE RD - BL O C K 140 Brampton, ON | 2023 | Mixed-use | Pre-construction Site: 7.54 acres|166,050 m2 res.| 2,412 m2 retail | 5,410 m2 office Role: Senior Designer
Project Team: 6
Firm: Turner Fleischer
Located at the intersection of The Gore Road and Queen Street East, this masterplan envisions a seven-tower development delivered across four phases, ranging from 23 to 43 storeys and connected by mid-rise podiums with ground-floor retail, office, and amenity spaces. Together, the development provides 2,461 residences, including a mix of market units and 123 affordable-rate rentals, supported by three levels of underground parking, a central landscaped park with promenades, gardens, and an amenity building. The distribution of tower heights across the site was strategically arranged according to solar orientation to minimize shadow impacts on the central open space. The architectural concept draws inspiration from greenhouses, referencing Brampton’s identity as the “Flower City of Canada”. This idea informs both the formal expression and spatial organization of the project, where transparency, lightness, and layered volumes evoke greenhouse structures. A key design challenge was translating this inspiration across multiple towers while ensuring each building maintained a distinct identity and avoided visual repetition. As Senior Designer, I led the overall design process, overseeing a team of three designers, coordinating task assignments, schedule, and project budget, while also contributing to the preparation of the project’s drawing sets for city applications.
View from North (conceptual render)
10 MASTERPLAN
MASTERPLAN CONCEPT ACCESSES AND CONNECTIONS
N Fogal Park
Fogal Valley
6
5 Block 139
4 3
1. Retail plaza 2. Decorative landscape 3. Park with amenity building 4. Market 5. Outdoor amenity 6. Playground Gateway Vehicular + pedestrian circulation Pedestrian circulation Connection with adjacent park system
2
The
1
re
Go n St E
Quee
SUNLIGHT AND STOREY DISTRIBUTION
N Fogal Park
Fogal Valley
Towers heights decrease Aerial View from South (conceptual render)
Block 139
E 45-st
G 36-st
Aerial View of Internal Park (conceptual render) F 33-st
A 32-st
B 28-st
The
C 28-st
D 30-st
Go re n St E
Quee
11 MASTERPLAN
View from North - Outdoor Amenity (conceptual render)
DESIGN CONCEPT GREENHOUSES
HISTORY OF BRAMPTON FLOWER CITY OF CANADA
History of Brampton - Flowertown of Canada
Green House Concept - Application 06 DESIGN INSPIRATION
The Gore Rd + Queen Street - Block 140
“...The plaque we unveil today commemorates the Dale Estate and its importance to the development of Brampton – “the Flower Town of Canada”. The story of the Dale Estate is extraordinary and yet also familiar. In 1863, Edward Dale and his young family arrived in Brampton from England, where Edward had struggled through hard economic times as a market gardener. He hoped that Canada would provide a better life and was drawn to Brampton, perhaps having heard that the surrounding Peel Plain contained some of the richest farmland in Canada...”
View from The Gore Road Looking Northeast (conceptual render)
The success of the Dale Estate had inspired other flower growing businesses and, by the 1920s, there were many other greenhouse operators in Brampton – though Dale’s was still by far the largest. Brampton was well on its way to becoming the “Flower Town of Canada”. ...the Dale Estate was one of the largest greenhouse flower businesses in the world.
FAÇADES FEATURES INSPIRED BY GREENHOUSES source: https://www.heritagetrust.on.ca/pages/
programs/education-and-outreach/presentations/ roofline bramptons-dale-estate top frame roofline
Street - Block 140
balconies shape
roofline 05
balconies railing
06 DESIGN INSPIRATION
South Elevation
The Gore Rd + Queen Street - Block 140
West Elevation
View from Internal Park - Amenity Building with Design Inspired by Greenhouses (conceptual render) 12 MASTERPLAN
Turner Fleischer Architects Turner Fleischer Inc. Architects Inc.
67 Lesmill Road 67 Lesmill Road Toronto, ON, M3B 2T8 Toronto, ON, M3B 2T8 T 416 425 2222 T 416 425 2222 turnerfleischer.com turnerfleischer.com
BUILDING BUILDING 3 3
This drawing, as an instrument This drawing, of service, as isanprovided instrument by and of service, is the property is provided of Turner by andFleischer is the property of Turner Fleischer Architects Inc. The contractor Architects must verify Inc. The andcontractor accept responsibility must verify for andallaccept dimensions responsibility and conditions for all dimensions and conditions on site and must notify Turner on site Fleischer and must Architects notify Turner Inc. ofFleischer any variations Architects from Inc. the supplied of any variations from the supplied information. This drawing information. is not to be scaled. This drawing The architect is not toisbe not scaled. responsible The architect for the accuracy is not responsible of for the accuracy of survey, structural, mechanical, survey, electrical, structural, etc., mechanical, informationelectrical, shown onetc., this information drawing. Refer shown to the on this drawing. Refer to the appropriate consultant's drawings appropriate before consultant's proceeding drawings with thebefore work. proceeding Construction with must theconform work. Construction to all must conform to all applicable codes and requirements applicableofcodes authorities and requirements having jurisdiction. of authorities The contractor having jurisdiction. working from The contractor working from drawings not specifically marked drawings 'For notConstruction' specifically marked must assume 'For Construction' full responsibility must assume and bearfull costs responsibility and bear costs for any corrections or damages for anyresulting corrections fromorhis damages work. resulting from his work.
TOWER E
TOWER E TOWER E
N0 8
°5
0'4
0" W
N1 9
°0
4'0
N
0" W
N
BUILDING BUILDING 4 4
° 02
TOWER G
' 44 PH A PH SE 4 AS E 2
8.6 m SET BAC K 6.61 m
59.7 m² 643 ft²
57.1 m² 614 ft²
57.2 m² 616 ft²
60.4 m² 650 ft²
1B+D
6.50 m
26.60 m
.65 m 40
5° N7
6.50 m 6.50 m 6.80 m
0°
54
'4
E2 PHAS 1 E PHAS
N8 '55"W
.19 m
"E
'05
36
5°
N7
.19 m
61
'40
43 m
OFFICE
61
.1 9
2096.8 m² 22570 ft²
RR TE
E AC
m .60 26
m .95 19 OUTLIN E OF FLOOR S 4-6 ABOVE
S
°5
4'4 0" E
EE T
E 0"
E 5"
N8 0
3'4 °4
5m 6.6
EA
0m 2.0
m .00 21
78 N
TR ST EE RE ET TE EA AS ST T
25
SE 2.8 TB m A CK
6'0 °3
m
6.65
ST R
15.25 m
61 .65 m
8.6 m SE TB AC K 6.50 m
m .6 5
°5
15.25 m
6.8 m
TOWER C 577.3 m² 6214 ft²
m
N45° 17'55"W
m
N45° 17
OUTLIN TOWER E OF ABOVE
INDOOR AMENITY
m
m
E 0"
This drawi Architects ng, as an Inc. The instrument on site of contra and must ctor musts inform notify Turne ation. This survey, structural, drawing is r Fleisc appropriate mechanicanot to be consu applic l, electr ltant's able i drawings drawings codes and befo requiremen for any not specifically corrections marke ts of d 'For or dama ges result C in
SE 2.8 TB m AC K
1 #
2024-04-0 5 DATE
ISSUED FOR
EN
6.8 m SE TB ACK
m
6.50 m 6.50 m 6.50 m
6.80 m 1.78 m
40 2.00
m
TOWER D
REZONIN G SUB DESCRIP MISSION TION BY
UE
26.60
m
21.00
m
m
2096.8 m² 22570 ft²
8°
6.50 m 6.50 m
54.86 m
2.00 m
m
6.50
6.80
19.95 2.00
.00 m
Q
6.50 m 6.50 m
6.50 m
6.50
E RAC TER
OFFICE
N7
54.86 m
6.50 m
6.50 m
6.50 m 6.50 m
29.49 m
6.80 m 1.78 m
1.80 m
6.50 m 6.50 m
5.50 m
6.50 m
6.50 m
5.50 m
6.50 m
54.86 m6.50 m
17.25 m 29.49 m
6.8 m SETB ACK
9.36 m
'00"E N44° 33
6.50 m 6.80 m
1.78 m
9.36 m
m
m
6.80
m² 6214 ft²
26.60
m
57.2 m² 616 ft²
2B+D
77.4 m² 833 ft²
0" W
75 N
m .60 26
m
0"W
E2 AS PH SE 1 A PH
1B+D
61.2 m² 659 ft²
1B+D
57 m² 614 ft²
0m 2.0
INDOO AMENITR Y 577.3
0m 6.5
6.00
1B+D
m
68.49 m
0m 6.5
77.4 m² 833 ft²
0 6.8 N45° 17'55"W
RZ402
RS
56.7 m² 610 ft²
61.7 m² 664 ft²
7.50 m
0m 6.8
57.2 m² 616 ft²
2B+D
6.00
2024-04-05 5:25:52 PM
7.50 m
m
2024-0 4-05 5:2 5:52 PM
1B+D
16.15
57.2 m² 616 ft²
LOCKE
1B+D
1
0'3
m
E AC
5m 6.6
m
6.50 m
1B+D
RR TE
5m 9.9
0 6.0
57 m² 614 ft²
TERRACE
.0 0
OUTLINE OF FLOORS 4-6 ABOVE
E2 AS PH SE 1 A PH
TO BELOW 6.50 m
OPEN
TOWER B
61.2 m² 659 ft²
1B+D
m
1B+D
56.5 m² 608 ft²
6.50 m
1B+D
m
6.50 m
1B+D
56.4 m² 607 ft²
'35"W
OPEN TO BELOW
56.7 m² 610 ft²
61.7 m² 664 ft²
0 6.0
m .60 26
1B+D
54.7 m² 588 ft²
E RAC TER
0m 2.0 1B+D
56.5 m² 608 ft²
m .54 19
57.2 m² 616 ft²
LOCKERS
1B+D
56.5 m² 608 ft²
.00 21
m
m19.54
8.00
68.49 m
1B+D
m
THE RE RO THE GORE ROAD GOTHE AD ROAD GORE
1B+D
6.50 m TERR ACE
5"W
0m 6.5
56.5 m² 609 ft²
11.36
13'3
6.50 m
m
56.5 m² 608 ft²
°3
OPEN TO BELOW
5m 16.1
7.39 m
6.80
m 1B+D
0m 6.5
OUTLIN E OF TOWER ABOVE
56.5 m² 608 ft²
6.50 m
6.50
0m 6.86.50 m
N33° 13
m .30 26
1B+D
OUTLINE OF TOWER ABOVE
m
608 ft²
0m 2.0
m
m
6.50 m
26.60 m 1B+D 6.556.50m²
m
m
6m 11.3
7.39 m
8.23 m
N3 3°
25.00
0m 6.8
m
6.50 m
1B+D
56.5 m² 608 ft²
37
2
0 8.0
6.50 m
1B+D
56.5 m² 608 ft²
m
E AC 0 TOm RR TE 6.6OPEN BELOW
OPEN TO BELOW
26.30
m 6.76
56.5 m² 609 ft²
OUTLINE OF FLOORS 4-6 ABOVE
m
0m 30.0
6.80
.0 8
m .00 25
1
54.7 m² 588 ft²
30'3
OUTLINE OF TOWER ABOVE
OPEN TO BELOW
m
77.4 m² 833 ft²
64.2 m² 691 ft²
.8 6
0 7.0
2B+D
1B+D
61.7 m² 664 ft²
1B+D
1B+D
64.2 m² 691 ft²
1B+D
30.00
9.50 m
1B+D
61.7 m² 664 ft²
57 m² 614 ft²
57.2 m² 616 ft²
1B+D
'40"W
INDOOR AMENITY
m
8.23 m 1B+D
60.2 m² 648 ft²
6.50 m
56.4 m² 607 ft²
1B+D
OUTLINE OF TOWER ABOVE
TERR ACE
N43° 25
577.3 m 6 m² 6.76214 ft²
1B+D
1B+D
.08 m
.86 m
N2 7 19 21
1.80 m
5m 13.8
0m 6.8 61.2 m² 659 ft²
1B+D
60.2 m² 648 ft²
11.20 m
30.00 m
0m 6.5
1B+D
TERRACE
1B+D
OUTLIN TOWER E OF ABOVE
8.24 m
0m 30.0
2B
68.2 m² 734 ft²
OPEN TO BELOW
0m 6.5
399.6 m² 4301 ft²
56.7 m² 610 ft²
TERRACE
19 21
37
2B+D
78.9 m² 850 ft²
10.56 m
0m 6.8
m .60 26
INDOOR AMENITY
7.50 m
56 m² 602 ft²
2B
68.2 m² 734 ft²
9.50 m
5.69 m
13.85
56 m² 602 ft²
ROO INDOOR F OF AMENITY
24.52 m 1B+D
24.52 m
1B+D
"W
OPEN TO BELOW
61.7 m² 664 ft²
6.50 m
1'1 5
69.4 m² 747 ft²
ROOF OF INDOOR AMENITY
6.50 m
25.00 m
N27 °
1.80 m
2B
6.50 m
0m
m² 4301 ft²
1B+D
68.49 m
8.23 m
INDOO AMENITR Y 399.6
2B+D
70.2 m² 755 ft²
RS
29.1 m² 314 ft²
0m 15.0
6.50 m
11.20 m
OUTLIN E OF FLOOR 3 ABOVE
LOCKE
57.2 m² 615 ft²
2 6.31 m
1B+D
54.9 m² 591 ft²
N2 5° 3
E TO ACOPEN BELOW
2B
7.00
1
14.00 m
'10" W
74 m² 796 ft²
LOCKERS
TO BELOW
1B+D
3'35"W
REV.
6.80 m
14.00 m
OPEN TO BELOW
1B+D
RR TE
RS
0" W
2096.8 m² 22570 ft²
10.00 m
2B
66.2 m² 712 ft²
23.5 m² 253 ft²
2B
6m 6.7
0m 5.0
m
TOWER A
REV.
6.50 m
30.00
DRAWING NO.
1 RZ402 RZ402
100.6 m² 1082 ft²
56.5 m² 608 ft²
7'3
OFFICE
1B+D
6.50 m
m
DRAWING NO.
OPEN
54.9 m² 591 ft²
8.23 m
INDOOR AMENITY
1B+D
56.5 m² 608 ft²
m .54 19
1B+D
72.2 m² 777 ft²
15.00
8.23 m
m² 1082 ft²
6.50 m
LOCKE
1B
50.7 m² 546 ft²
TERR ACE
74.3 m² 800 ft²
2B+D
m
1 : 400 1:400
INDOO AMENITR Y 100.6
6.50 m
N33° 1
OUTLINE OF TOWER ABOVE
8.34 m
7.00 m
OUTLIN TOWERE OF ABOVE
1B
50.7 m² 546 ft²
54.7 m² 588 ft²
2.00
SCALE
7.39 m
6.50 m
56.4 m² 607 ft²
6m 11.3
CHECKED BY
6.50 m
1B
57.2 m² 616 ft²
TERRACE
m .30 26
2B+D
6.0
6.50 m
NGE NMC
608 ft²
1B+D
30.00 m
6.50 m
N40 ° 18
7.00 m
RS
1B+D
56.5 m² 609 ft²
9.50 m
30.01B+D 0m
1B+D
1B
49.9 m² 537 ft²
76.5 m² 824 ft²
54.7 m² 588 ft²
1B+D TO BELOW
TERR ACE
7.89 m
57.2 m² 616 ft²
OPEN TO BELOW
78.9 m² 850 ft²
8.24 m
1B+D
55.9 m² 602 ft²
RS
32.5 m² 350 ft²
50.9 m² 548 ft²
2B+D
30.00 m
m
6.50 m
m² 1544 ft²
10.56 m
1B+D
55.9 m² 602 ft²
LOCKE
1B+D
21.50 m
TERRACE
9.50 56.5 m² m
8.34 m
5.69 m
1B+D
56 m² 603 ft²
RS
86.6 m² 932 ft²
0m
9.50 m
0m 6.5
48.2 m² 519 ft²
8.23 OPEN m
0m 6.5
OPEN TO BELOW
0m 6.8
INDOO AMENITR Y 143.5
56.5 m² 608 ft²
0m 6.6
TERRACE
13.16 m
OUTLIN TOWERE OF ABOVE
1B+D
2
143.5 m²
1B+D 1544 ft²
52.4 m² 564 ft²
OUTLINE OF TOWER ABOVE
1B
TERR ACE
5.80 m
6.0
8.23 m
INDOOR AMENITY
6.50 m
25.00 m
1B+D
0m 6.8
1B+D
53.3 m² 573 ft²
21.50 m
64.2 m² 691 ft²
61.7 m² 664 ft²
6.50 m
0m
DRAWN BY
1B
48.2 m² 519 ft²
55.2 m² OF OUTLINE 594 ft² FLOOR 3-7 ABOVE
13.16 m
1B+D
1B+D
60.2 m² 648 ft²
6.31 m 6.50 m
8.0
2023-10-19
CHECKED BY
1 : 400 1:400
1B+D
1B
53.3 m² 573 ft²
2B
69.4 m² 747 ft²
"W
6.50 m
60.4 m² 650 ft²
OUTLIN TOWERE OF ABOVE
2B
74 m² 796 ft²
0 2.0
56 m² 602 ft²
2B
55.2 m² 594 ft²
°5
40
'00
6.50 m
57.1 m² 614 ft² 57.2 m² 616 ft²
57.2 m² 615 ft²
29.1 m² 314 ft²
60.1 m² 647 ft²
1B+D
OUTLIN FLOOR E OF 3-7 ABOVE
1B+D
68.2 m² 734 ft²
1B+D
63.2 m² 680 ft²
52.7 m² 567 ft²
OUTLINE OF TOWER ABOVE
1B+D LOCKERS
TERRACE
6.50 m 103.106.80 m m
26.60 m
70.2 m² 755 ft²
1.80 m
6.50 m
2B+D
72.2 m² 777 ft²
2B+D
° 38
OUTLINE OF FLOOR 3 ABOVE
SE 2.8 TB m AC K
OUTLINE OF TOWER ABOVE
N0 4
PH PH AS E A SE 4 2
N3 4
6.61 m
2B
OPEN TO BELOW
66.2 m² 712 ft²
2B
50.7 m² 546 ft²
.70 m
OPEN TO BELOW
59.7 m² 643 ft²
1B+D
26.60 m
1B+D
1B+D
1B
50.7 m² 546 ft²
0m
29.49 m
54.9 m² 591 ft²
PROJECT DATE
NMC SCALE
1B
1B
PHASE 3 PHASE 1
1B+D
1B
50.9 m² 548 ft²
74.3 m² 800 ft²
1B+D
73.9 m² 796 ft²
6.80 m
52.4 m² 564 ft²
1B+D
PHASE 1
1B
34.8 m² 374 ft²
7.0
PROJECT NO.
16.201RZ
NGE
6.50 m
1B+D
63.2 m² 680 ft²
PHASE 3
LOCKERS
54.7 m² 588 ft²
2B
1B+D
62.9 m² 677 ft²
57.2 m² 616 ft²
OUTLINE OF TOWER ABOVE
25
73.9 m² 796 ft²
34.8 m² 374 ft²
52.7 m² 567 ft²
62.9 m² 677 ft²
1B+D
76.5 m² 824 ft²
2B
23.5 m² 253 ft²
74.5 m² 802 ft²
LOCKE
1B+D
m .93 16
1B+D
51.5 m² 554 ft²
8.23 m
PROJECT NO.
DRAWN BY
2B+D
2.50 m
59.1 m² 636 ft²
59.1 m² 636 ft²
1B+D
LOCKERS
5m 16.1
DRAWING
16.201RZ 2023-10-19
7.00 m
74.5 m² 802 ft²
3m 1.1
N43° 25'40"W
E 0"
399.6 m² 4301 ft²
OPEN TO BELOW
BUILDING BUILDING 2 SECTION2 SECTION
PROJECT DATE
2
1B+D
1B
49.9 m² 537 ft²
86.6 m² 932 ft²
0m 30.0
DRAWING
60.1 m² 647 ft²
2B+D
24.52 m
55.9 m² 602 ft²
2B+D
32.5 m² 350 ft²
6.50 m
5.50 m
57.8 m² 622 ft²
6.50 m
1B+D
21.50 m
55.4 m² 596 ft²
55.9 m² 602 ft²
1B
N8 0
57.6 m² 620 ft²
6.50 m
1B+D
1B
TERR ACE
1B+D
LOCKERS
1B+D
8.26 m
6.50 m
55.4 m² 596 ft²
1B+D
LOCKERS
0" W
ROOF OF INDOOR AMENITY
m
6.50 m
58.7 m² 632 ft²
1B+D
5"W
OPEN TO BELOW
.70 m
6'2
6.80 m 6.50 m6.50 m
58.7 m² 631 ft²
1B+D
1B
31'1
1B+D
0m 30.0
INDOOR AMENITY
100.6 m² 1082 ft²
N25 °
10.00 m
6.80 m
5.50 m
m
6.50 m
51.5 m² 554 ft²
1B+D
0m 15.0
INDOOR AMENITY
7.00 m
OUTLINE OF TOWER ABOVE
°2
ROOF 6.50OF m INDOOR AMENITY6.61 m
2.50 m 32 .8 6 m
2.00 m
Proposed Residential Proposed Development Development TERRACEResidential
7.00 m
6.50 m
1B+D
57.6 m² 620 ft²
30.00 m 14.00 m
7.89 m
6.80 m
N1 8 57.8 m² 622 ft²
6.50 m
2B+D
6.50 m
4.89 m
1B+D
56 m² 603 ft²
N55° 54'30"W
1B+D
6.50 m
5.80 m
.7 0
4.89 m 8.96 m
1B+D
1B+D
16 .9 3
7.00 m
79.3 m² 854 ft²
6.50 m
8.34 m
9.50 m
6.50 m
6.80 m
58.7 m² 632 ft²
1B+D
8.26 m 6.69 m
79.3 m² 854 ft²
12.00 m
21.50 m
PROJECT
6.50 m
2B+D
SETB ACK
PROJECT
6.50 m
"E
6.50 m
4'4 0" E
10.75 m
2B+D
23 .1 5
2B+D
15.51 m
SETBAC K
13.16 m
N40° 18'10"W
'05
6.50 m
.00 m
.86 m
'00"W
"E
58.7 m² 631 ft²
6.61 m
0"W
EE N
74.7 m² 804 ft²
6.50 m
74.7 m² 804 ft²
16.0 m
TERRACE
OUTLINE OF FLOOR 3-7 ABOVE
1.80 m
37 .08 m
SQ TU
6.50 m
6.50 m
BY
6.50 m
30.00 m
19 21
SETB ACK
6.69 m
m
3 .1 21
12.00 m
6.50 m
OPEN TO BELOW
11.20 m
103.10 m
0" W
TERRACE
8.94 m
143.5 m² 1544 ft²
8.24 m
30'3
36
10.56 m
26.60 m
4'0
78.9 m² 850 ft²
8.6 m
°0
2B+D
0"W 5.69 m
N27 °
PH A PH SE 4 AS E 2
6'2
6.50 m
N34° 38
LOCKE
INDOOR AMENITY
ISSUED 1 2024-04-05 FOR REZONING ISSUED SUBMISSION FOR REZONING SUBMISSION OUTLINE OFDESCRIPTION # DATE DESCRIPTIONTOWER BY ABOVE
2B
69.4 m² 747 ft²
"W
6.80 m
°2
1B+D
9.36 m
#
2024-04-05 DATE
Block 140 - TheBlock Gore140 Road - The andGore Queen Road Street and Queen Street Brampton, ON Brampton, ON
2024-04-05 5:25:52 PM
2B
74 m² 796 ft²
1B+D
1
57.2 m² 615 ft²
25.00 m
N1 9
21.50 m
8.96 m
1B
48.2 m² 519 ft²
8.23 m
S-N Cross-section - Towers C and D
N1 8
6.50 m
6.50 m
SETBACK
6.50 m
1B
6.31 m
30.70 m
10.75 8.94mm
55.2 m² 594 ft²
53.3 m² 573 ft²
6.80 m
N55°
5.50 m 6.50 m 6.50 m 6.50 m 54.86 m
6.50 m
6.50 m 6.50 m
1B+D
63.2 m² 680 ft²
6.50 m
54'30"W
15.51 m
6.50 m
174.25
1B+D
2B+D
6.50 m
9.36 m
174.25
52.4 m² 564 ft²
72.2 m² 777 ft²
1B+D
26.60 m
6.80 m
177.25 UG 3
1B+D
62.9 m² 677 ft²
2B
50.7 m² 546 ft²
7' 30
'0 04
177.25 UG 3
1B+D
1B
50.7 m² 546 ft²
TERRACE
ROOF OF EXIT STAI R
6.50 m
184.75
UG 1
52.7 m² 567 ft²
6.50 m
184.75
180.25 UG 2
1B+D
59.1 m² 636 ft²
1B
50.9 m² 548 ft²
1.80 m
5.50 m
m
16 .9 3
6.50 m
6.50 m 6.50 m 6.50 m 6.50 m
PHASE 1
UG 1
1B+D
1B
34.8 m² 374 ft²
25
8.26 m
8.96 m 8.94 m 54.86 m
PHASE 3
180.25 UG 2
6.80 m
10.75 m 4.89 m
60.1 m² 647 ft²
2.00 m
6.50 m
6.50 m
191.25 Floor 1
6.50 m
6.50 m
UG 3 PARKING - PHASE UG23 PARKING - PHASE 2
1B+D
1B
6.50 m
RAMP
Floor 2 Bldg 2
23.5 m² 253 ft²
LOCKERS
0" W
OPEN TO BELOW
30.70 m
6.50 m
RAMP
57.6 m² 620 ft²
6.80 m
UG 3 PARKING - PHASE UG23 PARKING - PHASE 2
UG 1 PARKING - PHASE UG21 PARKING - PHASE 2
1B+D
16.0 m
191.25
4'0
74.3 m² 800 ft²
1B+D
17.25 m
RAMP UG 2 PARKING - PHASE UG22 PARKING - PHASE 2
55.4 m² 596 ft²
1B
15.25 m
RAMP
RAMP
TOWER E
Floor 1
°0
54.7 m² 588 ft²
2B
ROOF OF EXIT STAIR
54.86 m
RAMP
UG 2 PARKING - PHASE UG22 PARKING - PHASE 2
4.50 m
UG 1 PARKING - PHASE UG21 PARKING - PHASE 2
3.00 m
RETAIL SERVICE
5.10 m
184.8
51.5 m² 554 ft²
73.9 m² 796 ft²
6.80 m
79.3 m² 854 ft²
6.80 m
LOCKERS
RETAIL
184.8
m
70.2 m² 755 ft²
29.1 m² 314 ft²
6.50 m
N44° 33'00"E
197.25
°5
1° N1
LOCKERS
LOCKERS
RETAIL RAMP
3.00 m 3.00 m
LOCKERS
STAIR RAMP
3.00 m
TRANSFORMER ROOM TRANSFORMER ROOM
FFE: 184.95
GARBAGE STAIR
RETAIL SERVICE
FFE: 184.95
GARBAGE
5.10 m
STAIR
ELEVATOR
GARBAGE
2.50 m 32 .8 6 m
2B+D
LOCKERS
6.50 m
Floor 3 Bldg 2
197.25
N0 4
26.60 m
PROPERTY LINE
7.50 m
Floor 3 Bldg 2
Floor 2 Bldg 2
GARBAGE
7.00 m
23 .1 5
m
9.36 m
OFFICE
6.00 m
6.00 m OFFICE
6.00 m
OFFICE
1.40 m
1.40 m
LOBBY
ELEVATOR OFFICE
225.24 225.24 Floor 10 Bldg 2 Floor 10 Bldg 2
203.25
N1 9
OUTLINE OF FLOOR 3 ABOVE
LOCKERS
74.5 m² 802 ft²
228.19 228.19 Floor 11 Bldg 2 Floor 11 Bldg 2
203.25
OPEN TO BELOW
66.2 m² 712 ft²
OUTLINE OF TOWER ABOVE
32.5 m² 350 ft²
86.6 m² 932 ft²
1B+D
2B+D
6.50 m
STAIR
ELEVATOR
STAIR
4.70 m
1.30 m
1.30 m STAIR
ELEVATOR RETAIL SERVICE
1.30 m
5.20 m
4.70 m
RETAIL SERVICE
4.00 m
1.20 m 4.00mm 3.00
1.20 m 3.00 m
LOBBY
ELEVATOR
231.14 231.14 Floor 12 Bldg 2 Floor 12 Bldg 2
206.2 Floor 4 Bldg 2
2B
57.2 m² 616 ft²
W 0"
UG 3 PARKING - PHASE UG23 PARKING - PHASE 2
OFFICE
234.09 234.09 Floor 13 Bldg 2 Floor 13 Bldg 2
209.15 Floor 5 Bldg 2
1B+D
76.5 m² 824 ft²
5m 13.8
UG 2 PARKING - PHASE UG22 PARKING - PHASE 2
OFFICE
SETBACK
237.04 237.04 Floor 14 Bldg 2 Floor 14 Bldg 2
212.55 Floor 6 Bldg 2
2B+D
49.9 m² 537 ft²
RZ402
7'3
UG 1 PARKING - PHASE UG21 PARKING - PHASE 2
AMENITY
3 .1 21
21.50 m 12.00 m
239.99 239.99 Floor 15 Bldg 2 Floor 15 Bldg 2
206.2 Floor 4 Bldg 2
1B
55.9 m² 602 ft²
LOCKERS
0" W
2B+D
16.0 m
242.94 242.94 Floor 16 Bldg 2 Floor 16 Bldg 2
LOCKERS
57.8 m² 622 ft²
6.50 m
TERRACE
245.89 245.89 Floor 17 Bldg 2 Floor 17 Bldg 2
0'4
15.51 m
248.84 248.84 Floor 18 Bldg 2 Floor 18 Bldg 2
209.15 Floor 5 Bldg 2
1
°5
RETAIL
AMENITY
251.79 251.79 Floor 19 Bldg 2 Floor 19 Bldg 2
212.55 Floor 6 Bldg 2
N43° 25'40"W
4 N0
RETAIL 184.9
AMENITY
255.19 255.19 Floor 20 Bldg 2 Floor 20 Bldg 2
215.94 Floor 7 Bldg 2
1B+D
55.9 m² 602 ft²
0m
UG 3 PARKING - PHASE UG13 PARKING - PHASE 1
AMENITY TERRACE
258.14 258.14 Floor 21 Bldg 2 Floor 21 Bldg 2
218.89 Floor 8 Bldg 2
1B+D
2.0
UG 2 PARKING - PHASE UG12 PARKING - PHASE 1
CORRIDOR RESIDENTIAL CORRIDOR RESIDENTIAL
261.09 261.09 Floor 22 Bldg 2 Floor 22 Bldg 2
°5
m .86 32
UG 1 PARKING - PHASE UG11 PARKING - PHASE 1
184.9
LOCKERS
264.04 264.04 Floor 23 Bldg 2 Floor 23 Bldg 2
215.94 Floor 7 Bldg 2
5"W
1B+D
m .15 23
TERRACE
5.20 m
1.30 m
LOCKERS
TERRACE
N0 8
6.50 m
6.50 m
SHAFT
TERRACE
266.99 266.99 Floor 24 Bldg 2 Floor 24 Bldg 2
218.89 Floor 8 Bldg 2
31'1
60.4 m² 650 ft²
1B+D
56 m² 603 ft²
9.36 m
SHAFT
BUILDING HEIGHT - TOWER D
STAIR
ELEVATOR
STAIR
ELEVATOR
96.79 m CORRIDOR
CORRIDOR RESIDENTIAL
N25 °
10.00 m
E 0"
CORRIDOR
CORRIDOR RESIDENTIAL STAIR
7.00 m
'0 04
ELEVATOR
RESIDENTIAL STAIR
7.00 m
° 11
PIPE SPACE
RESIDENTIAL
7.89 m
N
PIPE SPACE
5.80 m
OUTLINE OF TOWER ABOVE
269.94 269.94 Floor 25 Bldg 2 Floor 25 Bldg 2
221.84 Floor 9 Bldg 2
57.2 m² 616 ft²
1B+D
1B+D
Floor 26 Bldg 2 Floor 26 Bldg 2
221.84 Floor 9 Bldg 2
57.1 m² 614 ft²
1B+D
W 0"
OUTDOOR AMENITY OUTDOOR AMENITY
59.7 m² 643 ft²
1B+D
'1 44
CORRIDOR RESIDENTIAL
6.50 m
2° N0
CORRIDOR RESIDENTIAL
58.7 m² 632 ft²
1B+D
W 0"
RESIDENTIAL
N40° 18'10" W
6.50 m
0'4
CORRIDOR
RESIDENTIAL
58.7 m² 631 ft²
4 E 3 AS PH SE A PH
CORRIDOR
6.50 m
°5
88.04 m
SHAFT
BUILDING HEIGHT - TOWER C
SHAFT
6.61 m
8 N0
88.04 m
CORRIDOR
RESIDENTIAL
74.7 m² 804 ft²
2B+D
4 SE 3 A E PH AS PH
BUILDING HEIGHT - TOWER C
CORRIDOR
RESIDENTIAL STAIR
6.50 m
"E 00
RESIDENTIAL STAIR
6.50 m
' 04
RESIDENTIAL
CORRIDOR
CORRIDOR
274.04
6.61 m
° 11 N
RESIDENTIAL
PIPE SPACE
MPH Tower D
274.04
6.50 m
W 0"
RESIDENTIAL
PIPE SPACE
MPH Tower D
6.50 m
'1 44
RESIDENTIAL
CORRIDOR
281.54
6.69 m
° 02
RESIDENTIAL
CORRIDOR
281.54
TOWER F
'00"W
103.10 m
N
CORRIDOR
CORRIDOR
Roof Tower D
N34° 38
TOWER G 30.70 m
17.25 m
261.09
Roof Tower D
N44° 33'00"E
MPH
6.00 m
MPH
BUILDING HEIGHT - TOWER D
4.10 m
MPH
96.79 m
MPH
2.95 m 2.95 m 3.40 m 3.39 m 2.95 m 2.95 m 3.40 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 3.40 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m
MPH
7.50 m
MPH
4.50 m
265.19
Floor 23 Tower C Floor 23 Tower C 261.09
MPH
STAIR MPH
MPH
3.00 m 3.00 m
265.19
MPH
MPH
4.10 m
MPH Tower C 4.10 m
MPH Tower C
MPH
7.50 m
Roof Tower C 272.69
4.10 m
STAIR
TOWER C TOWER C
Roof Tower C
MPH
2.95 m 2.95 m 3.40 m 3.39 m 2.95 m 2.95 m 3.40 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 3.40 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m
MPH
7.50 m
BUILDING BUILDING 2 2 TOWER C
TOWER B TOWER B
272.69
PROPERTY LINE
PHASE 2
PHASE 1
PHASE 2
PHASE 1
PROPERTY LINE
PROPERTY LINE
TOWER D TOWER D
4 SE 3 A E PH AS PH
BUILDING BUILDING 1 1B TOWER
BUILDING BUILDING 2 2D TOWER
0"W
"E
ROOF OF EXIT STAIR
TOWER F TOWER F
6'2
EE N
TOWER BUILDING BUILDING 4 4 F
°2
'40
N1 8
QU
'30"W
43
N55° 54
TOWER A TOWER A
8°
BUILDING BUILDING 1 1 TOWER A
N7
"W 10
TOWER G TOWER G
PROJEC T
Propos ed Re sidentia l Deve lopme nt Block 140
DRAWIN G
Floor 2
- The Go re Roa d and Bramp ton, ON Queen Stre et
FLOO R 02 PROJEC T NO.
residential units amenities horizontal circulation, lobby RZ152 vertical circulation, service areas, parking retail office 16.201 RZ
PROJEC T DAT E
2023-1 0-19 DRA WN BY
NGE
CHECKE D BY
NMC
SCALE
1 : 400
N
DRAWIN G NO.
View from Northwest - Office Entrance (conceptual render) 13 MASTERPLAN
REV.
1
H
I
G
H
-
R
I
S
E
BL OOR CROSSING - B L O C K S B , C , D BLOCK C
Toronto, ON | 2021 | Mixed-use | Under Construction Block B: Site: 1.71 acres | 58,175 m² residential | 1,520 m² retail
BLOCK B
Block C: Site: 0.76 acres | 30,144 m² residential | 3,172 m² retail Block D: Site: 1.99 acres | 20,267 m² residential | 1,739 m² retail 2,488 m² office | 2,548 m² institutional BLOCK D
Role: Senior Designer
Project Team: 12
Firm: Turner Fleischer
This proposal introduces a well-integrated urban intervention at the Dufferin Mall
intersection of Bloor Street West and Dufferin Street in Toronto’s West End, adjacent to Dufferin Mall. The development is composed of six building blocks (A–F) and a publicly accessible park located to the south, optimizing sun exposure. It provides an extensive rental housing program, with ground-floor retail activating the streetscape. I led the development of the façade designs for blocks B, C, and D, presented on the following pages, in close collaboration with
Park
the Design Director and the clients. Block B was undertaken for Hazelview, while Blocks C and D were developed for Fitzrovia.
oo
Bl
I also contributed to the project documentation, supporting the
tW
rS
translation of the design concept into technical drawings. The project progressed from concept through to construction within a compressed timeframe, requiring an elevated level of coordination and agility across multiple teams.
View from Northwest (project under construction - 2025)
15 HIGH-RISE
EXISTING 15 STOREY EXISTING15 15STOREY STOREY EXISTING RESIDENTIAL RESIDENTIAL RESIDENTIAL
LOW-RISE LOW-RISE LOW-RISE RESIDENTIAL RESIDENTIAL RESIDENTIAL
BLOCK C 32 STOREYS
BLOCK A 11 STOREYS BLOCK C BLOCK CC 32BLOCK STOREYS 32STOREYS STOREYS 32
BLOCK F BLOCKFF 8BLOCK STOREYS STOREYS 88STOREYS BLOCK A BLOCK AA 11BLOCK STOREYS 11STOREYS STOREYS 11
BROCK CRESCENT BROCKCRESCENT CRESCENT BROCK
FUTURE SECONDARY SCHOOL
FUTURE SECONDARY SCHOOL FUTURESECONDARY SECONDARYSCHOOL SCHOOL FUTURE
NEW PUBLIC STREET NEW PUBLIC STREET NEWPUBLIC PUBLICSTREET STREET NEW
BROCK AVE BROCKAVE AVE BROCK
BROCK AVE
BROCK CRESCENT
BUILDING B1 34 STOREYS
BUILDING B1 37 STOREYS
BUILDING B1 BUILDING B1 BUILDING B1 34 STOREYS 34STOREYS STOREYS 34
BLOCK B
BUILDING B1 BUILDING B1 BUILDING B1 37 STOREYS 37STOREYS STOREYS 37
BLOCK B BLOCKBB BLOCK
PROPOSSED PRIVATE ROAD PROPOSSED PRIVATE ROAD PROPOSSEDPRIVATE PRIVATEROAD ROAD PROPOSSED
LOW-RISE LOW-RISE LOW-RISE RESIDENTIAL RESIDENTIAL RESIDENTIAL
650 m²
BLOCK D 19 STOREYS
BLOCK D BLOCK DD 19BLOCK STOREYS 19STOREYS STOREYS 19
445 m²
CROATIA ST
Turner Fleischer Archite
Turner Fleischer Arch Turner Fleischer Architec 67 Les Toronto, ON, 67 L 67 Lesm T 416 4 Toronto, Toronto, ON,ON M turnerfleis T 41 T 416 42 turnerfle turnerfleisch
This drawing, as an instrument of service, is provided by and is the property of Turner Architects Inc. The contractor must verify and accept responsibility for all dimensions on This site and must notify Fleischer Architects Inc. ofby any variations from the drawing, an instrument of is and is the of Turn This drawing, as anas instrument of service, is provided by and is the of Turner This drawing, as an Turner instrument of service, service, is provided provided by and isproperty the property property ofsupp TurF information. is not tomust be scaled. Theaccept architect is not for responsible for thean a Architects Inc. The verify and responsibility all Architects Inc.This The contractor must verify and accept responsibility allfor dimensions Architects Inc. drawing The contractor contractor must verify and accept responsibility for all dimensio dimensio structural, mechanical, electrical, etc., information shown on this drawing. Ref on site and notify Turner Fleischer Architects Inc. of any from the ss onsurvey, site must notify Turner Fleischer Architects Inc. of any from the suppli onand site and must must notify Turner Fleischer Architects Inc. ofvariations any variations variations from the appropriate consultant's drawings proceeding thenot work. mus information. This drawing to be The architect is not responsible for th information. This drawing is notis bebefore scaled. The architect is for the information. This drawing istonot not to be scaled. scaled. The with architect isresponsible notConstruction responsible forac th applicable codes and requirements of authorities having jurisdiction. The contractor wR survey, structural, mechanical, electrical, etc., information shown on this drawing. survey, structural, mechanical, electrical, etc., information shown on this Refer survey, structural, mechanical, electrical, etc., information shown ondrawing. this drawing. drawings not specifically marked 'For before Construction' mustthe assume full responsibility appropriate consultant's drawings proceeding with the Construction m appropriate consultant's drawings before proceeding with work. Construction mustan c appropriate consultant's drawings before proceeding with the work. work. Construction m for applicable any corrections damages resulting his work. codes and requirements of authorities having jurisdiction. The applicable codes andorrequirements of authorities having jurisdiction. The contractor wo applicable codes and requirements offrom authorities having jurisdiction. The contracto contracto drawings not marked 'For assume full drawings not specifically marked 'For Construction' mustmust assume full responsibility and drawings not specifically specifically marked 'For Construction' Construction' must assume full responsibility responsibility for any or resulting his for any or damages resulting from from his work. forcorrections any corrections corrections or damages damages resulting from his work. work.
445 m² 445 445 m²m²
LOW-RISE RESIDENTIAL
POPs
PROPOSED PUBLIC PARK
PROPOSED PUBLIC PARK PROPOSEDPUBLIC PUBLICPARK PARK PROPOSED
This drawing, as an instrument of service, is provided by and is the property of Turner Fleische Architects Inc. The contractor must verify and accept responsibility for all dimensions and cond on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform applicable codes and requirements of authorities having jurisdiction. The contractor working fr drawings not specifically marked 'For Construction' must assume full responsibility and bear c for any corrections or damages resulting from his work.
POPs POPs POPs 650 m² 650 650 m²m²
BLOCK E 22 STOREYS
67 Lesmill Ro Toronto, ON, M3B 2 T 416 425 22 turnerfleischer.co
POPs
DUFFERIN ST DUFFERIN ST DUFFERINST ST DUFFERIN
BLOOR ST W BLOORST STW W BLOOR
BLOCK F 8 STOREYS
LOW-RISE RESIDENTIAL
150 m²
LOW-RISE LOW-RISE LOW-RISE RESIDENTIAL BLOOR ST W RESIDENTIAL RESIDENTIAL
EXISTING 15 STOREY RESIDENTIAL
150 m²m² 150 150 m²
RUSSETT A RUSSETT AVE RUSSETT AVE RUSSETT AVE
PAULINE AV
LOW-RISE LOW-RISE LOW-RISE RESIDENTIAL RESIDENTIAL RESIDENTIAL
LOW-RISE RESIDENTIAL
LOW-RISE RESIDENTIAL
PAULINE AVE PAULINEAVE AVE PAULINE
BROCK AVE BROCKAVE AVE BROCK
BROCK A
LOW-RISE RESIDENTIAL
LOW-RISE LOW-RISE LOW-RISE RESIDENTIAL RESIDENTIAL RESIDENTIAL
POPs POPs POPs
1
BLOCK E BLOCK EE 22BLOCK STOREYS 22STOREYS STOREYS 22
#
2021-12-17 DATE
ISSUED FOR SITE PLAN APPROVAL #1 DESCRIPTION
LK
1 2021-12-17 ISSUED FOR SITE PLAN APPROVAL #1 # DATE DESCRIPTION PROJECT 2021-12-17 ISSUED ISSUED PLAN APPROVAL 1 12021-12-17 FORFOR SITESITE PLAN APPROVAL #1 #1 DATE DESCRIPTION # # DATE DESCRIPTION
PROPOSED MIXED-USE DEVELOPMENT (MASTER PLAN)
1141 Bloor Street West + 980 Dufferin Street, Toron ON DRAWING
CROATIA ST CROATIAST ST CROATIA
BLOCK PLAN
PROJECT
PROPOSED MIXED-USE PROPOSED MIXED-USE PROPOSED MIXED-USE DEVELOPMENT (MASTER PLA DEVELOPMENT (MASTER PL PROJECT NO. DEVELOPMENT (MASTER PLAN PROJECT PROJECT
Site Plan
N
EXISTING COMMERCIAL
1141 Bloor Street West + 980 Dufferin Street, T 21.081CS ON 1141 Bloor Street West + 980 Dufferin Street, 1141 Bloor Street West + 980 Dufferin Street, To PROJECT DATE ONON July 2021 DRAWING DRAWN BY DRAWING DRAWING
DVE
CHECKED BY
CCU SCALE
BROCKTON STADIUM
developed BLOCK PLAN BLOCK PLAN BLOCK PLAN by author
1 : 500 PROJECT NO. N
PROJECT 21.081CS PROJECT NO.NO.
EXISTING EXISTING EXISTING COMMERCIAL
16 HIGH-RISE
PROJECT DATE 21.081CS 21.081CS DRAWING NO. PROJECT DATE July 2021 PROJECT DATE DRAWN BY July 2021 July 2021 DRAWN DVE DRAWN BY BY CHECKED DVE BY DVE CCU CHECKED CHECKED BY BY
SPA006
REV.
1
BLO C K B ( S TATI O N H O U SE I I )
BLOCK B - FAÇADE CONCEPT Kent School
Located in front of the park, this block consists of an 8-storey podium topped by 34- and 37-storey towers, with a total of 856 units. Retail at grade activates the streetscape. The façade design of both the podium and towers is inspired by the composition of the nearby Kent School’s façade, creating respectful dialogue with the historic context.
HORIZONTAL LAYERING
VERTICAL ARTICULATION
PODIUM BAYS
The red cladding was initially conceived as a system of metal panels, selected for their boldness and contemporary expression. However, due to budget constraints, the material was revised to brick-inlay precast concrete panels, requiring a comprehensive rethinking of the façade detailing while preserving the original design intent. This shift presented a key challenge, as details developed for the thinner, more flexible metal panel system had to be adapted to accommodate the thickness, jointing, support conditions, and assembly requirements of the precast panels.
BLOCK B - View from South - Final Design with Brick-inlay Precast Concrete Panels Cladding (conceptual render)
BLOCK B - View from Southeast - Initial Design with Metal Panels Cladding (conceptual render) 17 HIGH-RISE
2B
31.1 m² 335 ft²
61.6 m² 663 ft²
67.1 m² 723 ft²
TOWER B1
6.30 m
1B+D
1B+D
51.3 m² 552 ft²
58.1 m² 625 ft²
TOWER B2 1B
52.5 m² 565 ft²
1B
56.7 m² 610 ft²
6.30 m
55.3 m² 596 ft²
BALCONY AT FLOOR 8
1B+D
35.80 m
57.2 m² 616 ft²
6.36 m
6.22 m
6.30 m
4.87 m
INT BEDROOM 65.1 m² 701 ft²
3.54 m
STAIR B-F
57 m² 614 ft²
56.2 m² 605 ft²
2B
2B
9.52 m
TOWER B1
TOWER B2
12.65 m
10.74 m
STUDIO
9.35 m
OUTDOOR AMENITY AT FLOOR 8
59.6 m² 641 ft²
2B
70.8 m² 762 ft²
STUDIO
28.5 m² 306 ft²
28.5 m² 306 ft²
STUDIO 32.7 m² 352 ft²
87 76 56 42 18 5 1 #
1.30 m ZONING SETBACK AT ST 8
76.80 m
1 ______ SPA401
2B
10.32 m
12.84 m
1B
44.8 m² 482 ft²
3.87 m
PROPERTY LINE
51.5 m² 554 ft²
60.4 m² 650 ft²
2025-01-16 2024-09-30 2024-10-04 2024-04-08 2023-09-18 2023-01-26 2021-12-17 DATE
ISSUED FOR SITE PLAN APPROVAL #6 ISSUED FOR CONSENT ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR MINOR VARIANCE ISSUED FOR SITE PLAN APPROVAL #3 ISSUED FOR SITE PLAN APPROVAL #2 ISSUED FOR SITE PLAN APPROVAL DESCRIPTION
CCU CCU CCU CCU CCU DPA CCU BY
6.18 m
5.54 m
4.92 m
1.30 m ZONING SETBACK AT ST 7
6.16 m
6.43 mm 6.43
N
TOWER B1
1.00 m ZONING SETBACK AT ST 7
PROJECT
PROPOSED MIXED-USE DEVELOPMENT (BLOCK B)
1.02 m
4.92 m
5.29 m
2.40 m
1141 Bloor Street West + 980 Dufferin Street, Toronto, ON
87 76 56 42 18 5 1 #
6.16 m
9.42 m
9.37 m
3B
87.8 m² 945 ft²
3.50 m ZONING SETBACK
6.26 m
110 m² 1184 ft²
1B
1B+D
9.43 m
3B
3B
86.9 m² 936 ft²
5.45 m
3B
91 m² 980 ft²
2B
61.8 m² 665 ft²
5.60 m ZONING SETBACK AT ST 7
0.99 m
DN
3.50 m ZONING SETBACK
5.46 m PROJECT
13.04 m
1B
52 m² 559 ft²
CANOPY BELOW
103.2 m² 1111 ft²
DN
3B
3B
101.9 m² 1097 ft²
6.30 m
1B+D
1B+D
1 ______ SPA401
1 ______ SPA401
ELEC CLOSET
59.4 m² 640 ft²
LOCKERS
10.32 m
6.30 m
1B+D
3B
116.6 m² 1255 ft²
6.19 m
3B
91.8 m² 988 ft²
6.30 m
3B
90.8 m² 977 ft²
ELEC CLOSET
43.4 m² 467 ft²
6.24 m
6.24 m
ELEC CLOSET
STUDIO LOCKERS STAIR B-D
INT BEDROOM 71.9 m² 774 ft²
1.00 m ZONING SETBACK AT ST 7
1141 Bloor Street West + 980 Dufferin Street, Toronto, ON
STUDIO
1B+D
6.24 m
9.27 m
6.30 m
CANOPY BELOW
1B+D
59.2 m² 637 ft²
1B
55.9 m² 601 ft²
6.30 m
9.33 m
2B
1B+D
TERRACE AT FLOOR 8
4.51 m
TOWER B2
66.6 m² 717 ft²
2B
CCU CCU CCU CCU CCU CCU DPA CCU BY
PROPOSED MIXED-USE DEVELOPMENT (BLOCK B)
MIN. TOWER DISTANCE
6.58 m
7.86 m
2B
69.7 m² 750 ft²
7.66 m
7.26 m
6.64 m
34.3 m² 369 ft²
39.77 m
43.51 m
TOWER B1 1.96 m
INT BEDROOM 64.6 m² 696 ft²
1B+D
37.00 m
3B
98.1 m² 1056 ft²
INT BEDROOM 65.6 m² 707 ft²
7.09 m ISSUED FOR SITE PLAN APPROVAL #6 ISSUED FOR CONSENT ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR MINOR VARIANCE ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR SITE PLAN APPROVAL #3 ISSUED FOR SITE PLAN APPROVAL #2 ISSUED FOR SITE PLAN APPROVAL DESCRIPTION
8.93 m
25.00 m
STUDIO 1B+D 61.3 m² 660 ft²
1
PROJECT DATE
JULY 2021
PROJECT
22.80 m
28.78 m
22.80 m
PROPOSED MIXED-USE DEVELOPMENT (BLOCK B)
2.02 m
1141 Bloor Street West + 980 Dufferin Street, Toron ON
FLOORS 9-19
BLOCK B - Floors 3-6
PROJECT NO.
1
PROJECT DATE
JULY 2021
BLOCK B - Typical Tower
FLOORS 9-19 (TOWER B1 AND B2)
SPA156 1 : 150
DRAWN BY
PROJECT NO.
21.081P02 PROJECT DATE
JULY 2021 DRAWN BY
DVE
DVE
CHECKED BY
CHECKED BY
SCALE
N
DRAWING NO.
18 HIGH-RISE
2025-01-16 2025-01-16 2025-01-16 2025-01-16 4:35:56 4:35:56 4:35:56 4:35:56 PM PM PM PM
1. Vision Glazing (clear) 2. Spandrel Panel (warm grey) 3. Vision Glazing (frit) 4. Brick-inlay Precast Panel (red) 5. Metal Panel (dark) 6. Stone Panel (light) 1 1
SOUTH ELEVATION ELEVATION SOUTH
SPA302 1 SPA302 1 1 :: 250 250 SPA302 SPA302 1 :: 250 250
FLOOR 7 FLOOR 7 131.95 131.95 FLOOR 6 6 FLOOR 129 129 FLOOR 5 5 FLOOR 126.05 126.05 FLOOR FLOOR 4 4 123.1 123.1 FLOOR FLOOR 3 3 120.15 120.15 FLOOR FLOOR 2 2 117.2 117.2 FLOOR 1 1 FLOOR 111.2 111.2
4
4 4
4 4
2
COLLEGIATE COLLEGIATE ROAD ROAD
12
2
41144
333 444
3 3
666 110.19 110.19 110.19 110.19
110.86 110.86 110.86 110.86
110.07 110.07 110.07 110.07
RETAIL RETAIL ENTRANCE ENTRANCE
RETAIL RETAIL EXIT EXIT ENTRANCE ENTRANCE
6.00 6.00 6.00 6.00 m mm m
MPH MPH MPH MPH BUILDING BUILDING BUILDING HEIGHT: HEIGHT: HEIGHT: TOWER TOWER TOWER B2 B2 B2 BUILDING HEIGHT: TOWER B2
MPH MPH MPH MPH
5.90 5.90 5.90 5.90 m mm m
444
RETAIL RETAIL ENTRANCE ENTRANCE
EXIT EXIT
RETAIL RETAIL ENTRANCE ENTRANCE
123.90 123.90 123.90 123.90 m mm m
1 1
ZONING ZONING ZONING ZONING HEIGHT HEIGHT HEIGHT HEIGHT
222
4.68 4.68 4.68 4.68 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m3.25 3.25 3.25 3.25 m mm m2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m3.85 3.85 3.85 3.85 m mm m2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m3.25 3.25 3.25 3.25 m mm m2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m3.25 3.25 3.25 3.25 m mm m2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m
111
4.0 4.0 4.0 4.0 m mm m
FLOOR FLOOR 8 8 136.6 136.6
1
1 1
2 2
BIRD FRIENDLY TREATMENT BIRD BIRD BIRD FRIENDLY FRIENDLY FRIENDLY TREATMENT TREATMENT TREATMENT
EXTERIOR FINISHES
B2-T/O B2-T/O ROOF ROOF 238.78 238.78
2 2
16.0 16.0 16.0 16.0 m mm m
BLOCK B - South Elevation
2
2 2
555
EXTENT OF BIRD FRIENDLY TREATMENT EXTENT EXTENT EXTENT OF OF OF BIRD BIRD BIRD FRIENDLY FRIENDLY FRIENDLY TREATMENT TREATMENT TREATMENT
B1-FLOOR 20 B1-FLOOR 20 171.08 171.08 B1-FLOOR 19 19 B1-FLOOR 168.13 168.13 B1-FLOOR 18 18 B1-FLOOR 165.18 165.18 B1-FLOOR B1-FLOOR 17 17 161.93 161.93 B1-FLOOR 16 16 B1-FLOOR 158.98 158.98 B1-FLOOR 15 15 B1-FLOOR 156.03 156.03 B1-FLOOR 14 14 B1-FLOOR 153.08 153.08 B1-FLOOR 12 12 B1-FLOOR 150.13 150.13 B1-FLOOR B1-FLOOR 11 11 147.18 147.18 B1-FLOOR B1-FLOOR 10 10 144.23 144.23 B1-FLOOR 9 9 B1-FLOOR 141.28 141.28
2.95 2.95 2.95 2.95 2.95 4.65 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 4.65 4.65 4.65 m mm m
BLOCK B - View from Southeast - Ground Floor Retail (conceptual render)
6.00 6.00 6.00 6.00 m mm m
B1-EMR B1-EMR 223.53 223.53 B1-MPH B1-MPH 220.98 220.98 B1-FLOOR 35 35 B1-FLOOR (PENTHOUSE) (PENTHOUSE) 216.83 216.83 B1-FLOOR 34 34 B1-FLOOR 213.88 213.88 B1-FLOOR B1-FLOOR 33 33 210.63 210.63 B1-FLOOR B1-FLOOR 32 32 207.68 207.68 B1-FLOOR 31 31 B1-FLOOR 204.73 204.73 B1-FLOOR 30 30 B1-FLOOR 201.78 201.78 B1-FLOOR 29 29 B1-FLOOR 198.83 198.83 B1-FLOOR B1-FLOOR 28 28 195.88 195.88 B1-FLOOR B1-FLOOR 27 27 192.93 192.93 B1-FLOOR 26 26 B1-FLOOR 189.98 189.98 B1-FLOOR 25 25 B1-FLOOR 186.73 186.73 B1-FLOOR B1-FLOOR 24 24 183.78 183.78 B1-FLOOR B1-FLOOR 23 23 180.83 180.83 B1-FLOOR B1-FLOOR 22 22 177.88 177.88 B1-FLOOR 21 21 B1-FLOOR 174.93 174.93
ZONING HEIGHT ZONING ZONING ZONING HEIGHT HEIGHT HEIGHT 4.68 2.95 2.95 2.95 2.95 2.95 2.95 2.95 3.25 2.95 2.95 3.85 2.95 2.95 2.95 2.95 3.25 2.95 2.95 2.95 2.95 2.95 2.95 2.95 3.25 2.95 4.15 2.56 3.44 4.68 4.68 4.68 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m3.25 3.25 3.25 m mm m2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m3.85 3.85 3.85 m mm m2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m3.25 3.25 3.25 m mm m2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 m mm m3.25 3.25 3.25 m mm m2.95 2.95 2.95 m mm m 4.15 4.15 4.15 m mm m2.56 2.56 2.56 m mm m 3.44 3.44 3.44 m mm m
B1-T/O ROOF ROOF B1-T/O 226.98 226.98
TOWER B1 B1 TOWER 34 STOREY STOREY 34
SPA156
4.15 4.15 4.15 4.15 m mm m2.56 2.56 2.56 2.56 m mm m 3.44 3.44 3.44 3.44 m mm m
TOWER TOWER B2 B2 38 STOREY STOREY 38
121.58 121.58 121.58 121.58 m mm m
87
6.00 6.00 6.00 6.00 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 2.95 2.95 2.95 2.95 m mm m 4.65 4.65 4.65 4.65 m mm m
SPA153
PROPERTY PROPERTY PROPERTY PROPERTYLINE LINE LINE LINE
87
REV.
PROPERTY PROPERTY PROPERTY PROPERTYLINE LINE LINE LINE
DRAWING NO.
6.00 6.00 6.00 6.00 m mm m
SPA151
N
REV.
DPA 1 : 150
109.78 109.78 109.78 109.78 m mm m
DRAWING NO.
SCALE
1 : 150
BUILDING HEIGHT: TOWER B1 BUILDING BUILDING BUILDING HEIGHT: HEIGHT: HEIGHT: TOWER TOWER TOWER B1 B1 B1 114.90 114.90 114.90 114.90 m mm m
N
DPA
2025-01-16 3:49:18 PM
1:150
2025-01-16 3:50:13 PM
CHECKED BY
C C C C C D C
DRAWING
21.081P02
FLOORS 03-06
SPA153 1 : 150
DRAWN BY
SCALE
ISSUED FOR SITE PLAN APPROVAL #6 ISSUED FOR CONSENT ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR MINOR VARIANCE ISSUED FOR SITE PLAN APPROVAL #3 ISSUED FOR SITE PLAN APPROVAL #2 ISSUED FOR SITE PLAN APPROVAL DESCRIPTION
FLOORS 3-6
BLOCK B - FLOOR 1
PROJECT NO.
21.081P02
DPA
2025-01-16 2024-09-30 2024-10-04 2024-04-08 2023-09-18 2023-01-26 2021-12-17 DATE
N
TOWER B2
DRAWING
DRAWING
DVE
retail horizontal circulation, lobby vertical circulation, service areas amenity residential units
BLOCK A
BLOCK B
RD 118.42
2B
77.8 m² 837 ft²
6.30 m
2B
INT BEDROOM 69.3 m² 746 ft²
6.00 m
6.36 m
2B+D
6.24 m
7.66 m
2B+D
6.36 m
6.22 m
1B+D
11.34 m
1.4% 2.8% DD 17 0. 11 DD 2.0% 3.4%
1.9%
2025-01-16 2024-09-30 2024-10-04 2024-04-08 2024-03-08 2023-09-18 2023-01-26 2021-12-17 DATE
BLOCK B
6.31 m
STAIR B-E
2B+D
5.60 m ZONING SETBACK AT ST 8
1.1%
87 76 56 42 37 18 5 1 #
BLOCK B
RD 118.42
8.90 m
25.00 m MIN. TOWER DISTANCE
3B
DD
BLOCK A 22.80 m 7.56 m
70.4 m² 758 ft²
110.54TC
110.39
110.26 5.51 m 110.19 2.4%
2.4% 1.9%
110.28
N
8.94 m
AD 110.29
INT BEDROOM 71 m² 764 ft²
6.29 m
2.9%
BLOCK A
1.60 m
12.13 m
1.60 m 8.30 m
3B
94.6 m² 1018 ft²
1 ______ SPA401
SETBACK LINE
6.30 m
BALCONY AT FLOOR 8
ELEC CLOSET
39.24 m
LEGEND
CYCLIST ACCESS
110.34TC
110.42
TA N 28 C E .06 TO m H YD R AN T 1.0%
110.45
110.51
2.3% 110.33 110.372.0%
2.5%
FH
7.56 m
BLOCK B
STAIR B-C
GAS/HYDRO METER
G
FUTURE BLOCK A
22.80 m
BLOCK A
58 m² 625 ft²
M
This drawing, as an instrument of service, is provided by and is the property of Turner Fleisch Architects Inc. The contractor must verify and accept responsibility for all dimensions and con on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accurac survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must confor applicable codes and requirements of authorities having jurisdiction. The contractor working f drawings not specifically marked 'For Construction' must assume full responsibility and bear for any corrections or damages resulting from his work.
1B
REFER TO DWG 87 m² 937 ft²
6.24 m
SPOT ELEVATION
BLOCK B
11.00 m
92.3 m² 994 ft²
D IS
BOLLARDS PROPOSED SIAMESE CONNECTION
2.0%
3.02 m
G
50 m² 538 ft²
UG BELOW
110.15TC
EXIT
110.86
MM
DISTANCE BETWEEN BUIDLING B AND A
111.38
111.03 110.96
111.10TC 111.11TC
111.07 111.01
111.14
110.95
111.00
111.02
111.09
111.17 111.20 110.98
111.00 3.1%
111.32TC
111.17 111.00
110.98
110.99 110.98
110.99
0.4%
111.07
111.14
111.17
111.04
0.4%
111.14
STAIR B-E
ELEV. SHAFT
ELEV. SHAFT STAIR B-F
2.1%
1.7%
2.1% 2.0%
2.1%
FIRE ROUTE SIGN
1 ______ SPA401
8.60 m
110.04 110.13
2.4 %
110.64BW
2.0% 2.0%
PUBLIC PARK
MM
110.18110.24 N 15° 25' 05" W 110.29
110.18
2.1%2.0%
2.0%
2.0%
3.3%
MM
3.50 m ZONING SETBAKCS
MM
111.15TC
111.38
111.43
111.23
111.25
111.04
2.4% 2.2%
0.5% 0.5%
2.0% 2.7%
STAIR ABOVE
111.20
EXIT
1. 7%
1.7%
2.1%
1.5%
111.04
111.38 111.39
111.25
3.1%
111.00 110.90 111.05TC 111.05TC 111.10
2.9%
12.33 m
111.10 110.96 2. 0%
1. 1%
2.3%
111.33
2.70 m 6.20 m
2. 1%
0.2%
111.15 2.5%
2 11 .4% 0. 89
2.0%
2.4% 6.00 m
3.2%
STAIR B-D
5 RISERS @0.18m
UP
111.20
6.22 m
24.80 m
92.5 m² 995 ft²
PROPERTY LINE / EASEMENT LINE
DD
6.78 m
3B
PHASE LINES
ALL DOORS LEADING TO BICYCLE PARKING ROOMS WILL INCLUDE ADO
111.20 111.20 111.20 2.3% 111.20 111.20 1.0% 1.30 m 111.29 UP AIR SHAFT AIR SHAFT 110.60 111.20 111.20 ZONING SETBACK AT ST 7 111.20 2.3% 111.17 111.20 111.15 111.12 111.18 111.27 EXTENT OF CANOPY ABOVE PYLON SIGNAGE, 111.23 EXIT EXIT 111.05 REFER TO LANDSCAPE DWGS 111.14 111.10 110.53 111.10 5 111.22 111.23 1 6 1.0% . TOWER B1 TOWER B2 111.10 111.11 111.14 111.14 111.11 111.09 111.00 111.11 111.25TC .DD4 BOLLARDS 111.37TC 111.38TC 111 0 5.6% 111.07 110.82 111.20TC 111.10 11 DD DD DD RAMP UP 5% 110.69 5.6% 3.0% RAMP UP 3% 0.8 111.18 110.49 3.2% 111.17 111.18 111.15 111.03 % 110.82 110.64TC 110.33 111.33TC 111.30TC N 74° 34'111.13 55" E 111.32TC 110.69 3.2% 0.5% 2.2% 110.73BW 110.68BW EXTENT OF U/G BELOW 110.84TC/TW 110.48TC 110.61BW 110.65BW 1 BOLLARDS 110.55 BOLLARDS 3.3% 10. 2.5% 76.80 m 24
2.0%
110.14
111.29
KK2
KK2
KK2
KK2
KK2
KK2
KK2
STAIR ABOVE ELEV. SHAFT
ELEV. SHAFT
111.29 111.27 111.20
4 RISERS @0.18m
111.25 111.29 111.26
EXIT 110.41 110.42
110.40 EXIT 110.40
110.31 110.35 110.36 110.37 110.30 N110.28 15° 25' 00" W
110.23
110.12TC
110.33 110.39 110.33 1.3%
110.24 0.6%
FIRE ROUTE
110.16 110.15 110.30TC 110.31TC
110.23 110.19
110.11 110.03 110.21TC110.26TC 110.18TC
110.11 110.05
109.97
109.89 110.04TC
1499.6 m² 16141 ft²
FFE = 111.20
A
000.00
BOLLARDS
3.88 m
G
28.78 m
12.81 m
SIAMESE CONNECTION
DD
1
109.97
STAIR B-B
RETAIL
3.1%
110.05
DR AN T
9.5 9m
NC E
110.13
110.06TO HY
0.7% DISTA
110.20
110.12
110.13 110.07TC
110.28TC
2.59 m
110.27TC 110.12 110.05TC
110.44
110.20 110.14TC 110.11
110.35TC 29.22 m
110.50
110.39TC 110.39TC 110.24 110.24 110.17TC 110.18TC
110.49 110.45
110.35TC 110.20 110.13TC
110.27TC
110.40
2.4 m² 25 ft²
5.04 m
TRANSFORMER WITH CLEARANCES
1.9%
110.12 110.06 COLLEGIATE ROAD 109.99TC 110.05TC
DN
ELEC. CLOSET
3.15 m
FIRE HYDRANT
111.15TC 111.00
DD
2.7%
STAIR ABOVE
ELEV. SHAFT
FH
6.00 m
BOLLARDS
24.21 m
67 Lesmill R Toronto, ON, M3B 2 T 416 425 2 turnerfleischer.c
BLOCK A
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
FUTURE BLOCK A
1.00 m
EXIT
1.5% 2.60 m
3.1%
110.21TC
108.8 m² 1171 ft²
STAIR ABOVE
SECONDARY RESIDENTIAL ENTRANCE
2.4% 2.4% 2.0% 2.1%
STOR. 8 m² 86 ft²
PARCEL BOXES
LEGEND
CONVEX MIRROR
3.0% 3.0% 0.5% 2.0%
DD
BLOCK B
PRIMARY RESIDENTIAL ENTRANCE
2.88 m
3.2%
110.32
52.7 m² 567 ft²
1.6%
110.12TC
MAIL ROOM
RESIDENTIAL LOBBY
50 m² 539 ft²
TOWER B2 AT
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
BLOCK A
RETAIL ENTRANCE
LEVEL 8 AND 1.9% ABOVE
DD
2.7%
3.2%
110.24
EXIT
111.20
LOUNGE
PARCEL BOXES
2.0%
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
DD
Turner Fleischer Architects I
Turner Fleischer Architects Inc.
Turner Fleischer Architects Inc.
DD
EXIT
1.8%
BOLLARDS
3.4%
109.97 109.91TC
111.18 111.20
2.0% 1.3%
0.1%
110.99 111.14TC
2.2%
FLOOR 1
111.20
DD
29.5 m² 318 ft²
6% 2.
1.0%
1
111.20
VESTIBULE
2.0%
2.0%
1
111.18
111.20
BLOCK B - Ground Floor Plan SPA151 1 : 150
111.00 TOWER B1 111.15TC TOWER B2
2.0%
2.0%
UP
BLOCK B
HIGH VOLT RM
% 1.0
1.0%
2.0% 2.0%
6.40 m
1.7 m² 18 ft²
1.4%
1.0%
3.0%
194 m² 2089 ft²
111.18
6.40 m
110.89
0.5% 2.4%
111.19 1.5% 111.01 PODIUM LEVEL 111.10 ABOVE 111.18 111.12 2.0% 111.05 111.20 0.9% 111.14
ELEC. CLOSET
2.0%
PYLON SIGNAGE, REFER TO LANDSCAPE DWGS
2.0% 2.0%
110.93
1
1.00 m
RESIDENTIAL LOBBY
10.2 m² 110 ft²
1.0% 0.8% 111.13 EXIT 111.19
29.46 m
29.5 m² 317 ft²
OFFICE
DN
1.3%
LOCATION OF THE ARCHITECT OF RECORD OR PRIMARY DESIGN ARCHITECT PLAQUE. THE LETTERING FOR THIS RECOGNITION MUST COVER AN AREA OF AT LEAST 0.2 METRES BY 0.3 METRES, OR 0.06 SQUARE METRES
DD
111.20 LOUNGE
10.4 m² 112 ft²
1.0% 111.08
2.10 m
63.9 m² 688 ft²
DD
DD
2.4%
BLOCK A
111.25TC
6% 1.
2.0% 2.0%
STAIR B-A
11.3 m² 121 ft²
OFFICE
1.6% 110.92
111.02
1.7%
RESIDENTIAL SHORT TERM BICYCLE SPACES [4]
1
2.0% 2.0%
ZONING SETBACK 2.5% 3.0% 2.0% 2.0%AT ST 7 2.0%
3.4%
OFFICE W/C
12.5 m² 135 ft²
20.4 m² 220 ft²
25.00 m
MIN. TOWER DISTANCE
1.0%
2.6%
DN
PET WASH
111.25TC RETAIL SHORT TERM
OUTDOOR AMENITY
2.0% 111.00PROPOSED CANOPY 111.15TC
FFE = 111.20
FUTURE BLOCK A
111.15 111.25TC 111.25TC BICYCLE SPACES [8]10 111.10 111.10 1. 2. 11 0% 1.2%
B M
2.0%
1
2.0% 2.0%
2.6%
71.2 m² 766 ft²
UP
FH
110.89 1.1 %
111.05TC 111.06 110.90 2.10 m 6.20 m 5% 110.85 0.
OFFICE
DN
D CACF
ALL DOORS LEADING TO BICYCLE PARKING ROOMS WILL INCLUDE ADO
1 ______ SPA401
23.73 m
110.46 110.35 D 10.1 M M B110.50 110.37
6.50 m
SIGNAGE TO BE PROVIDED FOR THE LOCATION OF CACF ROOM
1.6% 2.5% 110.84 110.85 111.00TC
110.78
111.30
DD
9% 1.
2.6%
PRIMARY RESIDENCE ENTRANCE
6.00 m
110.25 110.40TC
UP 5.5%
RESIDENTIAL SHORT TERM BICYCLE SPACES [18]
111.16 AIR SHAFT 111.11TC 110.96
111.06TC 110.91
110.98TC 110.83
3.1%
3.0%
PROPOSED SIAMESE CONNECTION
AIR SHAFT
0% 1.
3.0%
111.13
2.7%
7% 0.
2.0% 2.0%
TOWER B1 OUTLINE AT FLOOR 8 AND ABOVE
% 3.4
STRUCTURAL COLUMNS
110.48TC 110.33
0.46 m
4.0% 2.5% 22 0. 2% 11 2.6% 1. B M 0.68 m 2.0%
111.58 111.58TW
3.5%
43.84 m
110.50TC
PYLON SIGNAGE, REFER TO LANDSCAPE DWGS
2.6%
2.0% 2.0%
RAMP 11%
1.4%
3.0%
111.20
TRELLIS ABOVE REFER TO LANDSCAPE
PODIUM LEVEL ABOVE
6 0.3 11
24 0. 11 2.0%
8500 PAVEMENT
110.36 UP 5.5%
110.88 111.04111.06 111.14
2.3%
32.42 m
KK2
KK2
4.0% 2.4% 2.8%
KK2
2.5%
110.52 110.57
2.1%
110.35 110.36 2.7% % 1.3 6.00 m 110.36 110.39
BLOCK B
1.4%
BLOCK A
2.0% 2.0%
CURB TO BE BUILD AS PER T-310.050-1 DESIGN STANDARD. REFER TO CIVIL AND LANDSCAPE DRAWINGS.
110.40 110.39 110.39
2.0%
2.0% 2.0%
2.0%
2.0%
110.26 110.17 0.9% 110.11 2.0% 110.08 11.20 m 110.05 110.11 110.04 110.18 110.10TC 110.27TC 110.21TC 110.11TC 110.10TC 110.19 110.16TC 110.33TC 110.13 110.21 110.32 110.21 6.00 m 6.52 m 7.20 m EXIT 110.31 110.37 110.29 110.45 110.35 110.30 110.28 110.29 110.33 110.40 3. 1% 2.6%
110.45
2.0% 2.0%
110.32TC 110.25TC 110.17 110.10
2.0%
0.7%
2025-05-05 3:08:01 PM
2.0%
WARNING LIGHT SYSTEM
B2-EMR B2-EMR 235.33 235.33 B2-MPH B2-MPH 232.78 232.78 B2-FLOOR 39 39 B2-FLOOR (PENTHOUSE) (PENTHOUSE) 228.63 228.63 B2-FLOOR 38 38 B2-FLOOR 225.68 225.68 B2-FLOOR B2-FLOOR 37 37 222.73 222.73 B2-FLOOR B2-FLOOR 36 36 219.78 219.78 B2-FLOOR 35 35 B2-FLOOR 216.83 216.83 B2-FLOOR 34 34 B2-FLOOR 213.88 213.88 B2-FLOOR B2-FLOOR 33 33 210.63 210.63 B2-FLOOR B2-FLOOR 32 32 207.68 207.68 B2-FLOOR 31 31 B2-FLOOR 204.73 204.73 B2-FLOOR 30 30 B2-FLOOR 201.78 201.78 B2-FLOOR 29 29 B2-FLOOR 198.83 198.83 B2-FLOOR B2-FLOOR 28 28 195.88 195.88 B2-FLOOR B2-FLOOR 27 27 192.93 192.93 B2-FLOOR 26 26 B2-FLOOR 189.98 189.98 B2-FLOOR 25 25 B2-FLOOR 186.73 186.73 B2-FLOOR B2-FLOOR 24 24 183.78 183.78 B2-FLOOR B2-FLOOR 23 23 180.83 180.83 B2-FLOOR B2-FLOOR 22 22 177.88 177.88 B2-FLOOR 21 21 B2-FLOOR 174.93 174.93 B2-FLOOR 20 20 B2-FLOOR 171.08 171.08 B2-FLOOR 19 B2-FLOOR 19 168.13 168.13 B2-FLOOR 18 18 B2-FLOOR 165.18 165.18 B2-FLOOR B2-FLOOR 17 17 161.93 161.93 B2-FLOOR 16 B2-FLOOR 16 158.98 158.98 B2-FLOOR 15 15 B2-FLOOR 156.03 156.03 B2-FLOOR 14 14 B2-FLOOR 153.08 153.08 B2-FLOOR 12 12 B2-FLOOR 150.13 150.13 B2-FLOOR B2-FLOOR 11 11 147.18 147.18 B2-FLOOR B2-FLOOR 10 10 144.23 144.23 B2-FLOOR 9 9 B2-FLOOR 141.28 141.28 FLOOR FLOOR 8 8 136.6 136.6
110.98 110.98 110.98 110.98
HIGH HIGH STREET STREET
FLOOR 7 7 FLOOR 131.95 131.95 FLOOR 6 FLOOR 6 129 129 FLOOR 5 5 FLOOR 126.05 126.05 FLOOR FLOOR 4 4 123.1 123.1 FLOOR FLOOR 3 3 120.15 120.15 FLOOR FLOOR 2 2 117.2 117.2 FLOOR 1 1 FLOOR 111.2 111.2
REV.
87
Turner Fleischer Architects Inc.
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
BLOCK B - View from South (building under construction - 2025)
1.8m WIND SCREEN. (REFER TO WIND REPORT.)
TERRACE EXTERIOR 784
295
STUCCO SEALANT AND TERMINATION BAR R3a
REFER TO 235
295
EW3ba
1109 10
LEVEL 08
PREFINISHED METAL FLASHING
MIN 1800MM
RAILING
10
TOP OF CONCRETE PARAPET
194
SLAB EDGE
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
SLAB EDGE DWGS
TOP OF SLAB
295
325
10
FOR SLAB THICKESS, REFER TO STRUCTURAL DRAWINGS AIR/WATER BARRIER SEALANT JOINT AND BACKER ROD TYPICAL
TRANSITION MEMBRANE
92
10x10mm DRIP EDGE
BLOCK B - View from West (building under construction - 2025) EW2a
CAULKING AND BACKER ROD
SEAL SMART VAPOUR BARRIER TO U/S OF CONCRETE SLAB
EXTERIOR
SPRAY FOAM AT WALLBOX TO FILL VOID
PREFINISHED METAL GRILLE WITH INSECT SCREEN INTEGRAL TO WINDOW WALL SYSTEM (REFER TO ELEVATION FOR FINISH)
METAL DUCT
ENSURE ALL DUCT CONNECTIONS BE SEALED FOR AIRTIGHTNESS
SUITE
REFER TO PLANS FOR CEILING FINISH AND BULKHEAD HEIGHT
BLOCK B - Terrace Detail at Floor 08
2
TERRACE DETAIL AT 8TH.FL.
SPA401 1 : 10
19 HIGH-RISE
BLO C K C ( M A R L O W )
DESIGN EVOLUTION
Marlow is a 32-storey building at the corner of Bloor Street West and Dufferin Street, comprising 413 units, with retail uses activating the ground floor. The design adopts a timeless expression aligned to the client’s identity. The vertical modulation was coordinated with the demising and partition walls of the units to reduce reliance on spandrel glazing. Originally conceived with white brick-inlay precast concrete cladding across the entire building, the material palette was later refined to a medium grey tone for the tower to better relate to its context, and a darker grey at the base to reinforce the building’s visual anchoring. The ground floor corner was designed to enhance the pedestrian experience, with metal panel cladding articulating the galleria entrance and emphasizing its presence. On the 7th floor, a triple-height basketball court and double-height gym and sports lounge are articulated through a distinct metal cladding treatment, introducing additional variation to the façade. INITIAL DESIGN
FINAL DESIGN
BC-FLOOR 06 132.8
1. Vision Glazing (clear) 2. Vision Glazing (frit) 3. Brick-inlay Precast (light) 4. Brick-inlay Precast (dark) 5. Metal Panel (light)
BC-FLOOR 06 132.8
BC-FLOOR 05 129.85
PROPERTY PROPERTY LINE LINE
EXTERIOR FINISHES
C14
C13
C12
C11
C10
C14
C13
C12
C11
C10
1
BC-FLOOR 05 129.85
4
BC-FLOOR 04 126.9
34
BC-FLOOR 04 126.9
5 3 5
23
BC-FLOOR 03 123.95
16.0 m 16.0 m
BC-FLOOR 02 118
(EXTENT (EXTENT OF BIRD FRIENDLY) OF BIRD FRIENDLY)
BC-FLOOR 03 123.95
BC-FLOOR 02 118
112.85
Dufferin St
BC-EST. GRADE 112.7
112.85
BC-EST. GRADE 112.7 BC-FLOOR 01 112 BC-FLOOR 01 112
45
5
54
4
32
4
5
3
2
BLOCK C - Partial North Elevation 20 HIGH-RISE
2024-06-192024-06-19 6:00:37 PM6:00:37 PM
BLOCK C - Aerial View from NE - Dufferin St and Bloor St W (conceptual render) 1
NORTH-1 TO 50 ELEVATION
1
NORTH-1 TO 50 ELEVATION
SPA313 1 : 50
SPA313 1 : 50
2.0%
4.39 m 112.67
5.0 0m
112.78
EXIT
1.0%
112.85 2.65 m
1 112.80 .5%
1.4%
112.86TW
37.61 m
6.0m FIRE ROUTE
BLOCK D/E
BLDG SETBACK 14.01 m
5 2. SHORT-TERM BICYCLE 11 3 SPACES: 5 BLOCK C 8 RESIDENTIAL 2. 112.46TC 11 2.0%
112.76TW
112 .40 1.3% BW
% .6
CP
111.30
112.57TC
BLOCK C 2.0%
2. 2%6.68 m
DISTANCE FROM ENTRANCE TO FIRE5 ROUTE
11 2. 1.9% 51 11 BW 2. 45 1. 2%
BLOCK D
2.0%
112.44
BLOCK C - 1Ground Floor Plan
BC-FLOOR 01
2024-06-21 1:55:34 PM
SPA151 1 : 150
60.74 m
2B+D 2B
89.6 m² 964 ft²
STUDIO 38.6 m² 415 ft²
GOLF SIM
UP 5%
51.9 m² 558 ft²
1B
ELEC. CLST
PIPE
7.18 m
20.14 m
1B 48.7 m² 524 ft²
51.1 m² 550 ft²
1B
3B 95.4 m² 1027 ft²
52 m² 560 ft²
BLDG SETBACK
9.20 m
8.37 m
15.74 m
13.78 m
GREEN ROOF AT FLOOR 3 - 12.7 SQM
F.F.
193 m² 2077 ft²
1.97 m
1B SKII SIM
BASKETBALL COURT
2B 81.6 m² 878 ft²
6.40 m
20.14 m
ZONING SETBACK
ZONING SETBACK
16.04 m 9.50 m
13.18 m
BLDG SETBACK
BLDG SETBACK
PLANTERS AT FLOOR 3 - 86.9SQM
2.52 m
N
GREEN ROOF AT FLOOR 3 - 43.8SQM
348.1 m² 3747 ft²
PLANTERS AT FLOOR 3
31.04 m
SPORTS LOUNGE
6.13 m
KARAOKE
36.12 m
ELEC. CLST
5.12 m
ZONING SETBACK
GYM (L1 OF 2)
WC
3.09 m
6.40 m
CLEVELAND JANITOR CLINIC
WC
AIR SHAFT
361.5 m² 3891 ft²
2B 76 m² 818 ft²
6.14 m
UNIVERSAL WC
76.1 m² 819 ft²
1.52 m BLDG SETBACK
1.49 m
2.90 m
PLANTERS AT FLOOR 3 PLANTERS AT FLOOR 6 - 23.7 SQM
6.42 m
9.53 m
8.97 m ZONING SETBACK
9.16 m
1.10 m
6.00 m TERRACE AT FLOOR 6
ZONING SETBACK AT FL5
6.20 m
8.11 m
36.18 m
ZONING SETBACK AT FLOOR 05
2.52 m BLDG SETBACK
BLDG SETBACK
retail horizontal circulation, lobby vertical circulation, service areas amenity
11.09 m
6.21 m 24.56 m
7.26 m
1.52 m 8.17 m
BLOCK D
BLOCK C - View from SW (project under construction - 2025)
BLOCK C - Floor 7 1
BC-FLOOR 07 Copy 1
HIGH-RISE
2024-06-27 4:45:20 PM
SPA156 1 : 150
21
DUFFERIN STREET
112.73 1.1% 1.1% 23.30 m % 1.8% 2.4 1.6% 112.56 7 2.6 11112.74 112.75 ARTIST MEWS 1.1% 112.82
112.85
1.3%
0.9%
112.09
112.74
112.85
3.8%
6.40 m
.0% 112.58
64.52 3 m
30.16112.77 m
EXIT
388.6 m² 4183 ft²
112.67TC
2.0% 2.50 m
WALKWAY CLEARANCE
112.64 3.07 m
FE
EXIT
1.6% TOWER ABOVE
1.2%
18.67 m
ZONING SETBACK
9.50 m
0% 3.
112.42
3. 0% 3. 1%
1.5%
ZONING SETBACK
11.14 m
112.85
LOBBY
2.63 m
BLDG SETBACK
3.2 %
3.6%
8.9 m² 96 ft²
RESIDENTIAL
CP
111.43
CACF
PROPOSED SIAMESE CONNECTION SHORT-TERM BICYCLE
SPACES: 112.70TC BLOCK C 4
CP
BLDG SETBACK
111.69
ELEC. CLST
OUTLINE OF CANOPY
CP
111.17
2.4%
112.85 1.0%
BICYCLE PARKING BLOCK C: FOR RESIDENTIAL VISITORS 6 SPACES+2 SPACES
12.5 m² 134 ft²
112.85
112.56
1% 3. TERM SHORT
112.32 1.0% 3.0% 3.0% 2.8% 112.443.6% 112.21 112.37 0.7% 3.0% 4.5% 112.42 112.45 3.4% 3.3% 112.40TW 112.47TW 112.15 111.50TC 1.1% 3.3% 111.83 3.3% 112.09 3.1% % 111.43 112.12 112.18 3.6
BLDG SETBACK
1.7%
19.90 m
PET SPA
3.0% 112.68
3. 0%
2.0%
FE
2.7% 112.44
112.55
126 m² 1357 ft² 112.85
1.8% 112.85
4.10 m
1.0%
EXIT
111.95
111.93
111.95
2.0%
112.19
111.95
2.0%
2.0%
1.2%
RETAIL
F.F.
112.85
112.81
13.4 m² 145 ft²
111.92
BLOCK C: SHORT TERM BICYCLE PARKING FOR RETAIL VISITORS
PIPE
37.61 m
ACTIVITY ZONE
112.65
% 2.3 112.61PICK UP / DROP OFF OUTLINE OF CANOPY
OUTLINE OF U/G BELOW
CYCLISTS ACCESS
F.F.
6.8 m² 73 ft²
CANOPY ABOVE AIR SHAFT
112.72TC 2 SPACES
ZONING SETBACK
UP
MECH.
PEDESTRIAN CLEARWAY EASEMENT.
CANOPY PROJECTION D 1.0% 6.40 m
1082.5 m² 11652 ft²
111.92
3.1%
0.27 m
m B CANOPY0.28 PROJECTION M
112.65
GAS METER
0.23 m
4.0% 128.7 m² 1386 ft² 112.85
RETAIL
111.95
3.9%
112.85 2.3% GALLERIA
R1
112.51 112.51 112.51
2.0%
112.85
112.20
2.4%
112.85
112.85 D
DN
112.50112.65
3.0%
3.9%
1.10 m FE
DN DN TO P1
ZONING SETBACK AT ST5
ZONING SETBACK 2.90 m
2.0%
2.0% 2.0%
2.6% 2.6% 2.0%
2.0%
112.20
112.02 112.14 112.14 3.0 % 112.18 112.08 112.20 112.20
0.7%
3.01 m
2.0% 2.0% 2.0%
WALKWAY CLEARANCE
BLDG SETBACK
1.59 m
2.0% 2.0%
2.2%
111.46
R4
% 3.7 112.73 112.73
CP
111.43
ELEVATOR R4 FOR TTC USE
16.1 m² 173 ft²
1.49 m112.65TC
0.7%
2.1%
111.25
SUBWAY TUNNEL ACCESS TO AND FROM STREET LEVEL
112.65
111.95
2.8%
11.21 m
111.45
112.65 112.65 VEST.
112.85
2.0%
2. 4%
111.44 111.47 111.42 111.44 0.6% 111.48 111.52
0.5%
111.41
112.54 CANOPY ABOVE 112.60
112.47
112.60
0.5%
111.38
EXIT
112.42
7% 1.
111.23
2.5%
3.8%
111.38 111.52 111.53 111.55 111.60 111.80 111.80 111.90111.97 111.65 111.32TC 111.43TC 111.57TC111.68TC111.70TC 111.80TC 111.85TC 112.00TC 112.00TC112.05TC
111.83
PROPOSED PRIVATE 111.56 ROAD 111.71 111.74
111.68
3.1%
3.3%
2.0%
3.0%
112.03
3.6%
111.79
0.5% 111.95
111.87TC
111.75 1.4%
111.53 111.67 111.62 111.51 111.49
112.61
112.56
112.51 112.51TC 24.56 m
6.62 m
BLDG SETBACK 112.66TC 112.65
CP
0.2%
111.38
112.38
CP
CANOPY PROJECTION
OUTLINE OF
0.5% 2.4%
112.35
112.43 112.49
CE 5.58112.48TC m CEC 112.54TC
0.23 m
2.9%CANOPY
0.4%
1
N
112.31
112.27 112.32TC
TTC BUSSHELTER REFER TO LANDSCAPE DWGS
112.69TC
112.54TC
CP
0.8%
51 1. 11
111.50
3.0%
1.5% 1.5%
112.22
30.81 m
CP
CP
3.0%
2.0%
3.0% 3.0%
3.0% 1.5%
CP
RAISED BIKE LANE (REFER TO LANDSCAPE DWGS)
CP
3.0%
112.10
64.52 m
1.1%
2.0%
OUTLINE OF CANOPY
3.0%
2.5%
2.8%
2.0%
112.30TC
112.24
1.4%
AIR SHAFT
2.0% 2.0% 0.6%
2.5%
2.6%
07 2. 11 1.2%
1.3% 2.2%
2.5% 2.8%
2.5% 2.5%
.96 TC 112.11 112.13
OUTLINE OF 2ND FLOOR
2.1%
2.5%
2.2% 2.2%
3.5%
0% 3.
1.8% 1.8%
111.91 0.20 m 111.99 111 SETBACK ZONING 2.08 m 112.06TC
112.02 112.05
2.6%
2.7% 2.7%
1.7%
0.23 m
BLOOR STREET WEST 112.47TC 112.52TC DO NOT PASS OPEN DOORS
111.81 111.91
111.98
1.5%
C TC: BLK SHORT TERM BICYCLE PARKING FOR RETAIL VISITORS 00 2.12 SPACES 11 112.14TC
111.85TC
2.4%
2.0% 2.0%
CB13
6.0m FIRE ROUTE
BUILDING C BUILDING BUILDING BUILDING CCC 33 STOREY BUILDING C 33 33 STOREY 33 STOREY STOREY BUILDING BUILDING BU BUILDING BU LD LD NG C NG CC 33 STOREY BUILDING C 3333 STOREY 33 STOREY STOREY MPH 33 STOREY MPH
retail horizontal circulation, lobby vertical circulation, service areas amenity PREFINISHED METAL FLASHING residential units OUTDOOR PREFINISHED METAL FLEXIBLE
OUTDOOR AMENITY
MIN. 1.8M MIN. 1.8M
MIN. 1.8M MIN. 1.8M
MIN.MIN. MIN. 1.8M 1.8MMIN. MIN. 1.8M 1.8M1.8M
PROPERTY PROPER PROPERTY Y LINE NE LINE
PROPERTY PROPERTY LINE LINE
PROPERTY PROPERTY PROPERTY LINE LINE LINE PROPERTY PROPER PROPERTY Y LINE NE LINE
MIN. 1.8M MIN. 1.8M
MIN. 1.8M MIN. 1.8M
PROPERTY PROPER PROPERTY Y LINE NE LINE
PROPERTY PROPER PROPERTY Y LINE NE LINE
PROPERTY PROPER PROPERTY Y LINE NE LINE
PROPERTY PROPERTY PROPERTY LINE LINE LINE PROPERTY PROPER PROPERTY Y LINE NE LINE
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied This This drawing, as an of service, provided is the property Turner Fleischer information. drawing isinstrument not to be scaled. The is architect is by notand responsible for theofaccuracy of The contractor must verify and accept responsibility for all dimensions survey, Architects structural, Inc. mechanical, electrical, etc., information shown on this drawing. Refer to theand conditions on site and must drawings notify Turner Fleischer Architects Inc.work. of any variations from supplied appropriate consultant's before proceeding with the Construction mustthe conform to all This drawing, as an This instrument of is service, is provided by and is the is property of Turner Fleischer information. drawing notauthorities to be scaled. The architect not responsible for the accuracy of applicable codes and requirements of having jurisdiction. contractor working from Architects Inc. The contractor must verify and accept responsibility forThe all on dimensions and Refer conditions survey, structural, mechanical, electrical, etc., information shown this drawing. to the drawings not specifically marked 'For Construction' must full responsibility and bear costs on site and must notify Turner Fleischer Architects Inc. ofassume anywith variations from the supplied appropriate consultant's drawings before proceeding the work. Construction must Fleischer conform to all This This drawing, an offrom service, is provided and is the property Turner for any corrections or as damages resulting his work. information. isinstrument not to be scaled. architect is by notjurisdiction. responsible for contractor theofaccuracy of applicabledrawing codes and requirements of The authorities having working from Inc. The contractor must verify and accept responsibility forThe all dimensions and conditions survey, Architects structural, mechanical, electrical, etc., information shown on this drawing. Refer to the drawings not specifically marked 'For Construction' must full responsibility and bear costs on site and must notify Turner Fleischer Architects Inc. ofassume any variations from supplied appropriate consultant's drawings before proceeding the work. Construction mustthe conform to all for any corrections or damages resulting fromwith his work. information. This drawing is not to be scaled. The architect is not responsible for the accuracy of applicable codes and requirements of authorities having jurisdiction. The contractor working from survey, structural,marked mechanical, electrical, etc., information on this drawing. Refer to the drawings not specifically 'For Construction' must assume shown full responsibility and bear costs appropriate or consultant's drawingsfrom before with the work. Construction must conform to all for any corrections damages resulting hisproceeding work. applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
TERMINATION BAR AND PREFINISHED METAL FLASHING WITH CONTINOUS SEALANT
45MM MINIMUM GAP COORDINATE WITH WINDOW WASHING CONSULTANT
50
appropriate appropriate consultant's appropriate consultant's drawings before drawings proceeding before proceeding before with the with work. the Construction with work. theproperty Construction work. must Construction conform must conform to must all Fleischer conform to all to all This drawing, This drawing, as This anconsultant's drawing, instrument as drawings an instrument as of anis service, instrument of is provided offrom service, is provided byproceeding and is provided is by the and property is by the and of is the Turner property offor Fleischer Turner Fleischer Turner for any corrections or damages resulting his work. information. This drawing not toservice, be scaled. architect is not responsible theof accuracy of applicable applicable codes applicable and codes requirements and codes requirements and of requirements authorities ofmust authorities having of The authorities jurisdiction. having jurisdiction. having The contractor contractor working contractor working from working from from Architects Architects Inc. The Architects Inc. contractor The Inc. contractor The must contractor verify must and verify accept and verify responsibility accept and responsibility accept for responsibility alljurisdiction. dimensions forThe all drawing. dimensions forThe all anddimensions conditions and and conditions survey, structural, mechanical, electrical, etc., information shown on Refer toconditions the drawings drawings specifically drawings specifically not marked specifically marked 'For Construction' marked 'For Construction' 'For must Construction' assume must full must responsibility fullthis responsibility full and responsibility bear and costs bear and costs bear costs on site and onnot site must and onnot notify site must and Turner notify must Fleischer Turner notify Fleischer Turner Architects Fleischer Architects Inc. of Architects any Inc. variations ofassume any Inc. variations ofassume from any variations thefrom supplied thefrom supplied the supplied appropriate consultant's drawings before proceeding with the work. Construction must conform to all This drawing, as an instrument of service, is provided by and the property Turner Fleischer for any corrections for any corrections for any or damages corrections damages resulting or damages resulting his resulting work. hisfrom work. his work. information. information. This information. drawing This drawing isor This not to drawing is be not scaled. tofrom is be not scaled. The tofrom be architect scaled. The architect isThe notjurisdiction. architect responsible is isnot responsible is not forresponsible theofaccuracy for theworking accuracy for ofthe accuracy of of applicable codes and requirements of authorities having contractor from Inc. The contractor must verify and accept responsibility forThe all drawing. dimensions andtoRefer conditions survey, Architects survey, structural, survey, structural, mechanical, structural, mechanical, electrical, mechanical, electrical, etc., electrical, information etc., information etc., shown information on shown this drawing. on shown on Refer this drawing. toRefer the thecosts to the drawings not specifically marked 'For Construction' must fullthis responsibility and bear on site and must notify Turner Fleischer Inc. ofassume any variations from the supplied appropriate appropriate consultant's appropriate consultant's drawings consultant's drawings before drawings proceeding beforeArchitects proceeding before with the with work. theConstruction with work. theConstruction work. must Construction conform must conform to must all conform to all to all for any corrections or damages resulting from hisproceeding work. information. This drawing is not to be scaled. The architect is not responsible for the accuracy of applicable applicable codes applicable and codes requirements and codes requirements andofrequirements authorities of authorities having of authorities jurisdiction. having jurisdiction. having The jurisdiction. contractor The contractor The working contractor working from working from from survey, structural, mechanical, electrical, etc., information shown on drawing. Refer to the drawings drawings not specifically drawings not specifically not marked specifically marked 'For Construction' marked 'For Construction' 'For must Construction' assume must assume full must responsibility assume fullthis responsibility fulland responsibility bear and costs bear and costs bear costs appropriate consultant's drawings before proceeding with the work. Construction must conform to all for any corrections for any corrections for any or damages corrections or damages resulting or damages resulting from his resulting from work. hisfrom work. his work. applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
REFER TO LANDSCAPE DWGS
ZONING O G ZONING MAX BUILDING M MAX BUILDING G HEIGHT G HEIGHT
108.10 108.10 m m HEIGHT 108.10 108.10 108.10 m BUILDING m m HEIGHT ZONING ZONING MAX BUILDING MAX
108.10 108.10 m m HEIGHT ZONING MAX BUILDING MAX BUILDING HEIGHT ZONING MAX HEIGHT ZONING O ZONING G ZONING MAX M BUILDING MAX BUILDING G BUILDING HEIGHT G HEIGHT
108.10 108.10 m m
ZONING O G ZONING MAX BUILDING M MAX BUILDING G HEIGHT G HEIGHT
108.10 108.10 m m
108.10 108.10 m m HEIGHT ZONING O G ZONING MAX BUILDING M MAX BUILDING G G HEIGHT
STAIRS STAIRS STAIRS STAIRS STAIRS STAIRS STA STAIRS RS ELEVATORS ELEVATORS STAIRS STA STAIRS RS ELEVATORS ELEVATORS ELEVATORS ELEVATORS ELEVATORS ELEVATORS ELEVATORS
113.50 113.50 m m
ZONING MAX BUILDING HEIGHT
ZONING O G ZONING HT M MAX/ HT8MAX/ STOREYS O 8 STOREYS
32.60 m8 32.60 m8 STOREYS ZONING HT MAX/ ZONING HT8MAX/ STOREYS HT 8O MAX/ STOREYS 8 STOREYS ZONING O ZONING G ZONING HT MAX/ M HT MAX/ STOREYS
108.10 m
3.25 m 3.25 m 11.25 m11.25 m 3.253.25 m 3.25 m 3.25 m 3.25 m m 32.90 m32.90 m 11.25 m11.25 m11.25 11.25 m11.25 m m 3.25 m 3.25 m 32.90 m32.90 m32.90 32.90 m32.90 m m 11.25 m11.25 m 32.60 m32.60 m 32.90 m32.90 m 32.60 m32.60 m32.60 m m8 32.60 m8 STOREYS ZONING ZONING HT32.60 MAX/ HT MAX/ STOREYS
STAIRS STAIRS STAIRS STAIRS STAIRS STAIRS STA STAIRS RS STAIRS STA STAIRS RS
ZONING O G ZONING HT M MAX/ HT8MAX/ STOREYS O 8 STOREYS
32.90 m32.90 m 32.60 m32.60 m
32.60 m32.60 m O 8 STOREYS ZONING O G ZONING HT M MAX/ HT8MAX/ STOREYS
32.90 m32.90 m
3.25 m 3.25 m 11.25 m11.25 m 3.25 m 3.25 m 11.25 m11.25 m
2.35 m 2.35 m
STAIRS STA STAIRS RS STA STAIRS STAIRS RS
SEALANT VAPOUR BARRIER SEALED TO U/S OF CONCRETE SLAB
2.352.35 m 2.35 m 2.35 m 2.35 m m
113.50 113.50 m m
113.50 113.50 m 113.50 m m m 113.50 m 113.50
PREFINISHED METAL FLASHING FLEXIBLE WATERPROOFING MEMBRANE 19mm EXT. GRADE PLYWOOD SHEATHING BOARD ON WOOD BLOCKING
ALUMINUM PROFILE/EXTRUDED FIN BY CURTAIN WALL MANUFACTURER.
FOR SLAB THICKNESS REFER TO STRUCTURAL DRAWINGS
INDOOR AMENITY J-MOULD AND SEALANT VAPOUR BARRIER SEALED TO WINDOW FRAME
BLOCK C - W-E Cross-section
SPA401 1 : 250
Turner Fleischer Architects Inc.
Turner Turner Fleischer Turner Fleischer Architects Fleischer Architects Architects Inc. Inc. Inc. 67 Lesmill Road Toronto, ON, M3B 2T8 Turner Fleischer Architects Inc. 67 Lesmill 67416 Lesmill Road 67 Lesmill Road T 425 2222 Road Toronto, Toronto, ON, Toronto, M3B ON, 2T8 M3B ON, 2T8 M3B 2T8 turnerfleischer.com Turner Turner Fleischer Turner Fleischer Architects Fleischer Architects Architects Inc. Inc. Inc. 67 Lesmill T 416T425 4162222 T425 416Road 2222 425 2222 Toronto, ON, M3B 2T8 turnerfleischer.com turnerfleischer.com turnerfleischer.com Turner Fleischer Architects Inc. 67 Lesmill 67Turner Lesmill Road 67 Lesmill Road This drawing, as an instrument of service, is provided by and is the property of Fleischer T 416 425 2222 Road Architects Inc. The contractor must verify and accept responsibility for allON, dimensions and conditions Toronto, Toronto, Toronto, M3B ON, 2T8 M3B ON, 2T8 M3B 2T8 on site and must notify Turner Fleischer Architects Inc. of any variations turnerfleischer.com from67 theLesmill supplied Road This drawing, This drawing, as This an This drawing, instrument as an instrument as of anis service, instrument is provided of service, is provided by and is provided is bythe and property is by the and property of is the Turner property of Fleischer Turner of Fleischer Turner Fleischer T 416 T425 416 Taccuracy 425 4162222 425 information. drawing not of toservice, be scaled. The architect is not responsible for the2222 of 2222 Architects Architects Inc. The Architects Inc. contractor TheInc. contractor The mustcontractor verify must and verify must accept and verify responsibility accept and responsibility accept for responsibility all on dimensions forthis all drawing. dimensions for all and dimensions conditions and and conditions Toronto, ON, M3B 2T8 survey, structural, mechanical, electrical, etc., information shown Refer toconditions the turnerfleischer.com turnerfleischer.com on site and on site must and onnotify site must and Turner notify mustFleischer Turner notify Fleischer Turner Architects Fleischer Architects Inc. of Architects any Inc. variations of the any Inc.work. variations ofturnerfleischer.com from any variations thefrom supplied thefrom supplied the supplied appropriate consultant's drawings before proceeding with Construction must conform to all This drawing, as an instrument of service, is provided by and the property Turner Fleischer Taccuracy 416 425 information. information. This information. drawing This drawing isThis not to drawing isbe not scaled. tois be not scaled. The to be architect scaled. Thehaving architect isThe notjurisdiction. architect responsible is isnot responsible is not forresponsible theof for theworking accuracy for ofthe2222 accuracy of of applicable codes and requirements of authorities The contractor from Inc. The contractor must verify and accept responsibility forthis all drawing. dimensions andtoRefer conditions survey, Architects survey, structural, survey, structural, mechanical, structural, mechanical, electrical, mechanical, electrical, etc., electrical, information etc., information etc., shown information on shown this drawing. on shown on Refer this drawing. toRefer the thecosts to the turnerfleischer.com drawings not specifically marked 'For Construction' must assume full responsibility and bear on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied
R2b
2.35 m 2.35 m
6.00 m 6.00 m 5.95 m 5.952.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.45mm 3.45 2.95mm 2.95 2.95 m m 2.95 3.45mm 3.454.86 m m 4.86 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.25m m 3.25 2.95m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.25m m 3.25 2.95m m 2.95 2.95 m m 2.95 4.15 mPROPERTY m 4.15 PROPERTY m 6.00 m LINE 6.00 m LINE 2.80 m 2.805.85 m m 5.85 m
m2.95 m2.95 BUILDING BUILDING HEIGHT HEIGHT HEIGHT BUILDING BUILDING G BUILDING HEIGHT G HEIGHT 6.00 m 6.00 m 5.95 m 5.952.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.45mm 3.45 2.95mm 2.95 2.95 m m 2.95 3.45mm 3.454.86 m m 4.86 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m107.71 2.95 2.95 m m107.71 2.95 m m 2.95 m m 2.95 2.95 m m 2.95 3.25m m 3.25 2.95m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.25m m 3.25 2.95m m 2.95 2.95 m m 2.95 4.15 mm 4.15 m 6.00 m 6.00 m 2.80 m 2.805.85 m m 5.85 m
BUILDING BUILDING HEIGHT G HEIGHT 2.802.80 m 2.80 5.85 m 2.80 m 5.85 m 5.85 m6.00 m 6.00 m 5.95 6.00 mm 5.95 2.95 m 5.95 m 2.95 2.95 m m m 2.95 2.95 2.95 m m m 2.95 3.45 mm2.95 3.45 2.95 m mm3.45 2.95 2.95 mm m 2.95 3.45 mm2.95 3.45 mm 4.86 3.45 m m2.95 m2.95 4.86 mm2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 2.95 m mG2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 2.95 3.25 m m m2.95 3.25 2.95 m m m3.25 2.95 2.95 m m m 2.95 2.95 2.95 m m m 2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 2.95 m m 2.95 2.95 2.95 m m m 2.95 3.25 mm2.95 3.25 2.95 m m m3.25 2.95 2.95 m m m 2.95 4.15 m m 2.95 4.15 m 6.00 4.15 mm 6.00 m 6.00 m 2.80 5.85 m 5.85 m 6.00 m 6.00 m 5.95 m 5.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.45 m m 3.45 2.95 mm 2.95 2.95 m m 2.95 3.45 mm 4.86 3.45 m 4.86 m 4.86 mm2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.25 m m 3.25 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 2.95 m m 2.95 3.25 m m 3.25 2.95 m m 2.95 2.95 m m 2.95 4.15 m mm 4.15 m 6.00 m 6.00 m m
107.71 107.71 m m
107.71 107.71 m HEIGHT m HEIGHT 107.71 107.71 m 107.71 m m BUILDING BUILDING
BC-T/O ROOF Turner Fleischer Architects Inc. BC-T/O BC-T/O BC-T/O ROOF ROOF ROOF Turner Fleischer Architects Inc. 226.11 67 Lesmill Road Toronto, ON, M3B 2T8 BC-T/O ROOF Turner Fleischer Architects Inc. 226.11 226.11 226.11 Lesmill T 41667 425 2222 Road Toronto, ON, M3B 2T8 BC-T/O BC-T/O BC BC-T/O BC T ROOF O T ROOF O ROOF EY turnerfleischer.com Turner Fleischer Architects Inc. 226.11 67 Lesmill T 416Road 425 2222 MPH226.11 MPH MPH MPH MPH MPH MPH Toronto, ON, M3B 2T8 BC-T/O ROOF turnerfleischer.com 226.11 226 226.11 226 11 11 BC-MPH Lesmill T 41667 425 2222 Road MPH MPH MPH Toronto, ON, M3B 2T8 turnerfleischer.com 226.11 BC-MPH BC-MPH BC-MPH 220.11 T 416 425 2222 MPH BC-MPH MPH MPH MPH MPH MPH MPH turnerfleischer.com 220.11 220.11 220.11 MPH MPH MPH BC-FLOOR BC-MPH BC-MPH BC BC-MPH BC MPH MPH 33 220.11 BC-FLOOR BC-FLOOR BC-FLOOR BC-MPH 215.96 220.11 220.11 220 220.11 220 11 1133 33 33 1.8m WIND BC-FLOOR 33 PREFINISHED METAL SCREEN(REFER TO 215.96 215.96 215.96 32 220.11 1.8m WIND 1.8m1.8m WIND 1.8m WIND WIND FLASHING WIND REPORT) BC-FLOOR BC BC FLOOR FLOOR 33 32 33 32 33 BC-FLOOR BC-FLOOR 32 PREFINISHED PREFINISHED PREFINISHED METAL METAL METAL SCREEN(REFER TO SCREEN(REFER SCREEN(REFER SCREEN(REFER TO TO 215.96 213.01 FLEXIBLE 1.8m WIND 1.8mTO WIND FLASHING FLASHING FLASHING WIND REPORT) WIND WIND REPORT) WIND REPORT) REPORT) BC-FLOOR 33 PREFINISHED METAL 31 WATERPROOFING SCREEN(REFER SCREEN(REFER 215.96 215.96 215 215.96 215 96 96 32 213.01 213.01 213.01 45MM MINIMUM GAP FLEXIBLE FLEXIBLE FLEXIBLE 1.8m mW WIND TO 1.8m1.8m WIND m1.8m WIND W mTO WIND W FLASHING FLASHING MEMBRANE WIND REPORT) WIND REPORT) OUTDOOR OUTDOOR OUTDOOR OUTDOOR COORDINATE WITH BC-FLOOR BC BC FLOOR FLOOR 32 32 32 PREFINISHED METAL M PREFINISHED PREFINISHED PREFINISHED METAL METAL M METAL M AMENITY BC-FLOOR BC-FLOOR 31 31 31 WATERPROOFING WATERPROOFING WATERPROOFING WATERPROOFING SCREEN(REFER TO O SCREEN(REFER SCREEN(REFER SCREEN(REFER TO TO O TO O 215.96 213.01 210.06 45MM MINIMUM1.8m GAP 45MM 45MM MINIMUM 45MM MINIMUM MINIMUM GAPGAP - GAP - FLEXIBLE FLEXIBLE mW WIND 1.8m WIND 19mmFLASHING EXT. GRADE WINDOW WASHING FLASHING G FLASHING FLASHING G G MEMBRANE MEMBRANE MEMBRANE MEMBRANE WIND REPORT) W O WIND WIND W REPORT) WIND W REPORT) REPORT) O WITH O OUTDOOR OUTDOOR COORDINATE WITH COORDINATE COORDINATE COORDINATE WITH WITH BC-FLOOR PREFINISHED METAL M PREFINISHED METAL AMENITY AMENITY AMENITY AMENITY 50 31 WATERPROOFING WATERPROOFING SCREEN(REFER TO OSCREEN(REFER TOPLYWOOD SHEATHING 213.01 213.01 213 213.01 213 01 01 32 45MM MINIMUM GAP 45MM MINIMUM GAP 210.06 210.06 210.06 CONSULTANT BC-FLOOR 30 FLEXIBLE FLEXIBLE FLEXIBLE FLEXIBLE 19mm EXT. GRADE 19mm 19mm EXT. 19mm EXT. GRADE EXT. GRADE GRADE WINDOW WASHING WINDOW WINDOW WINDOW WASHING WASHING WASHING FLASHING G FLASHING MEMBRANE MEMBRANE WIND W REPORT) O WIND REPORT) BOARD ON WOOD OUTDOOR OUTDOOR OUTDOOR OUTDOOR COORDINATE WITH AMENITY AMENITY 50 50 50 50 45MM BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 31 30 31 30 31 WATERPROOFING W OOFLEXIBLE G WATERPROOFING WATERPROOFING W WATERPROOFING W OO OOG G PLYWOOD SHEATHING PLYWOOD PLYWOOD PLYWOOD SHEATHING SHEATHING SHEATHING 213.01 45MM MMCOORDINATE MINIMUM M M MG GAPWITH 45MM MM MINIMUM 45MM MM MINIMUM M MINIMUM M MCONSULTANT GAP M MG GAP -M G GAP - 210.06 CONSULTANT CONSULTANT CONSULTANT BC-FLOOR BC-FLOOR BC-FLOOR 30 FLEXIBLE 19mm EXT. GRADE 19mm EXT. GRADE 206.81 BLOCKING WINDOW WASHING WINDOW MEMBRANE M M WOOD MEMBRANE MEMBRANE M M MEMBRANE M M WOOD BOARD ON BOARD BOARD BOARD ONSHEATHING WOOD ON WOOD ON OUTDOOR OUTDOOR TERMINATION BAR AND COORDINATE OO WITH COORDINATE COORDINATE OOCOORDINATE OO WASHING WITH WITH W WITH W AMENITY AMEN TY AMENITY AMENITY AMEN AMENITY AMEN TY TY 50 50 BC-FLOOR 31 WATERPROOFING W OO G WATERPROOFING PLYWOOD SHEATHING PLYWOOD 45MM MM M MINIMUM MW MG GAP 45MM MINIMUM GAP 210.06 210.06 210 210.06 210 06 06 30 CONSULTANT CONSULTANT BC-FLOOR 29 19mm mm EXT. GRADE G 19mm 19mm mm EXT. 19mm mm EXT. GRADE EXT. GRADE G GRADE G 206.81 206.81 206.81 BLOCKING BLOCKING BLOCKING BLOCKING PREFINISHED METAL FLASHING WINDOW W OW W WASHING G WINDOW W WINDOW W OW WASHING OW WASHING W WASHING W G G MEMBRANE M M WOOD MEMBRANE BOARD ON BOARD ONSHEATHING WOOD TERMINATION BAR AND TERMINATION TERMINATION TERMINATION BARBAR AND BAR ANDAND 50 50 50 WINDOW COORDINATE OO WITH W COORDINATE WITH AMENITY AMEN TY AMENITY 50 PLYWOOD WOO19mm SHEATHING G PLYWOOD PLYWOOD PLYWOOD WOO SHEATHING WOO SHEATHING G G 210.06 WITH CONTINOUS SEALANT CONSULTANT O CONSULTANT CONSULTANT O CONSULTANT O BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 30 29 30 29 30 29 mm EXT. GRADE G 19mm EXT. GRADE 206.81 BLOCKING BLOCKING 203.86 PREFINISHED METAL FLASHING PREFINISHED PREFINISHED PREFINISHED METAL METAL FLASHING METAL FLASHING FLASHING WINDOW W OW W WASHING G WINDOW WASHING BOARD O ON O WOOD WOO BOARD BOARD O BOARD ON O WOOD ON O WOOD WOO ON O WOOD WOO TERMINATION BAR AND TERMINATION BAR AND 50 50 PLYWOOD WOO SHEATHING G CONTINOUS PLYWOOD SHEATHING WITH CONTINOUS SEALANT WITH WITH CONTINOUS WITH CONTINOUS SEALANT SEALANT SEALANT CONSULTANT O CONSULTANT BC-FLOOR 29 28 206.81 206.81 206 206.81 206 81 81 30 REFER TO LANDSCAPE DWGS BLOCKING O G BLOCKING BLOCKING O BLOCKING O G G 203.86 203.86 203.86 PREFINISHED METAL FLASHING PREFINISHED BOARD O ON O WOOD WOO BOARDALUMINUM ON WOOD TERMINATION M O BAR AND TERMINATION TERMINATION TERMINATION M METAL M BAR O FLASHING BAR OAND BAR ANDAND CONTINOUSDWGS SEALANT WITH CONTINOUS SEALANT BC-FLOOR BC BC FLOOR FLOOR 29 BC-FLOOR BC-FLOOR 28 29 28 29 28 206.81 REFERWITH TO LANDSCAPE REFER REFER REFER TOGLANDSCAPE TO LANDSCAPE TO LANDSCAPE DWGS DWGS DWGS BLOCKING O BLOCKING PROFILE/EXTRUDED 203.86 PREFINISHED METAL M FLASHING PREFINISHED PREFINISHED PREFINISHED METAL METAL M FLASHING METAL M FLASHING FLASHING G G 200.91 ALUMINUM ALUMINUM ALUMINUM ALUMINUM TERMINATION M O BARGAND TERMINATION BAR AND R2b FIN BY CURTAIN WALL WITH W CONTINOUS OTO LANDSCAPE O SEALANT WITH WITH W CONTINOUS WITH W CONTINOUS OLANDSCAPE CONTINOUS O OSEALANT OSEALANT SEALANT BC-FLOOR 28 27 REFER DWGS REFER TO DWGS PROFILE/EXTRUDED PROFILE/EXTRUDED PROFILE/EXTRUDED PROFILE/EXTRUDED 203.86 203.86 203 203.86 203 86 86 29 PREFINISHED METAL FLASHING M G PREFINISHED METAL FLASHING 200.91 200.91 200.91 ALUMINUM ALUMINUM MANUFACTURER. R2bR2bSEALANT R2b FIN BYPROFILE/EXTRUDED CURTAIN WALL FIN FIN BYPROFILE/EXTRUDED CURTAIN FIN BY CURTAIN BY CURTAIN WALL WALL WALL WITH W CONTINOUS O R2b O DWGS SEALANT WITH CONTINOUS BC-FLOOR BC BC FLOOR FLOOR 28 28 28 REFER TO O LANDSCAPE WG REFER REFER REFER TO LANDSCAPE TO O LANDSCAPE TO O LANDSCAPE DWGS DWGS WG DWGS WG BC-FLOOR BC-FLOOR 27 27 27 203.86 200.91 197.96 ALUMINUM M M ALUMINUM ALUMINUM ALUMINUM M MM M MANUFACTURER. MANUFACTURER. MANUFACTURER. MANUFACTURER. R2b R2b FIN WALLTO LANDSCAPE DWGS FIN BY CURTAIN WALL BC-FLOOR REFER TO O LANDSCAPE DWGS WG REFER 27 PROFILE/EXTRUDED O BY CURTAIN PROFILE/EXTRUDED PROFILE/EXTRUDED OPROFILE/EXTRUDED O ALUMINUM 26 200.91 200.91 200 200.91 200 91 91 28 197.96 197.96 197.96 ALUMINUM M M MANUFACTURER. MANUFACTURER. R2b R2bR2bR2b FIN BY CURTAIN WALL W FIN FIN BY CURTAIN FIN BY CURTAIN BY CURTAIN WALL WALL W WALL W BC-FLOOR BC BC FLOOR FLOOR 27 PROFILE/EXTRUDED O PROFILE/EXTRUDED BC-FLOOR BC-FLOOR 26 27 26 27 26 200.91 197.96 195.01 MANUFACTURER. M MANUFACTURER. MANUFACTURER. M MANUFACTURER. M R2b R2b FIN BY CURTAIN W WALL FIN BY CURTAIN WALL BC-FLOOR 26 25 197.96 197.96 197 197.96 197 96 96 27 195.01 195.01 195.01 MANUFACTURER. M MANUFACTURER. BC-FLOOR BC BC FLOOR FLOOR 26 BC-FLOOR BC-FLOOR 25 26 25 26 25 197.96 195.01 192.06 RES. RES. BC-FLOOR 25 24 195.01 195.01 195 195.01 195 01 01 26 192.06 192.06 192.06 RES.BC-FLOOR RES. RES. RES. RES. RES. RES. BC BC FLOOR FLOOR 25 25 25 BC-FLOOR BC-FLOOR 24 24 24 195.01 192.06 189.11 RES. RES. RES. BC-FLOOR 24 23 192.06 192.06 192 192.06 192 06 06 25 189.11 189.11 189.11 RES.BC-FLOOR RES RES. RES. RES RES. RES RES. RES. RES RES. RES BC BC FLOOR FLOOR 24 BC-FLOOR BC-FLOOR 23 24 23 24 23 192.06 189.11 186.16 RES. RES RES. RES. BC-FLOOR FOR SLAB THICKNESS 23 22 189.11 189.11 189 189.11 189 11 11 24 186.16 186.16 186.16 REFER TO STRUCTURAL BC-FLOOR BC BC FLOOR FLOOR 23 FOR SLAB THICKNESS FORFOR SLAB FOR SLAB THICKNESS SLAB THICKNESS THICKNESS BC-FLOOR BC-FLOOR 22 23 22 23 22 189.11 186.16 183.21 DRAWINGS REFER TO STRUCTURAL REFER REFER REFER TO SLAB STRUCTURAL TO STRUCTURAL TO STRUCTURAL BC-FLOOR FOR SLAB THICKNESS FOR THICKNESS 22 21 186.16 186.16 186 186.16 186 16 16 23 183.21 183.21 183.21 DRAWINGS DRAWINGS DRAWINGS DRAWINGS REFER TO STRUCTURAL REFER TO STRUCTURAL FOR O SLAB THICKNESS FOR FOR SLAB O FOR SLAB O THICKNESS SLAB THICKNESS THICKNESS BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 22 22 22 186.16 183.21 180.26 21 21 21 DRAWINGS DRAWINGS REFERFOR TO O STRUCTURAL REFER REFER REFER TO SLAB STRUCTURAL TO O STRUCTURAL TO O STRUCTURAL METAL PANEL O SLAB THICKNESS FOR THICKNESS BC-FLOOR 22 21 183.21 183.21 183 183.21 183 21 21 180.26 180.26 180.26 20 DRAWINGS W G DRAWINGS DRAWINGS DRAWINGS W W G G BC-FLOOR SEALANT REFER TO MATERIAL REFER TO O STRUCTURAL REFER TO STRUCTURAL METAL PANEL VAPOUR METAL METAL PANEL METAL PANEL -PANEL - BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 21 BARRIER SEALED 183.21 180.26 LEGEND FOR DRAWINGS W G BC-FLOOR BC-FLOOR BC-FLOOR 20 21 20 21 20 SEALANT SEALANT SEALANT SEALANT DRAWINGS 177.01 REFER TOMETAL MATERIAL REFER REFER REFER TOMETAL MATERIAL TO MATERIAL TOPANEL MATERIAL TO U/S OF CONCRETE SLAB PANEL - BARRIER COLORSBC-FLOOR 21 VAPOUR BARRIER SEALED VAPOUR VAPOUR VAPOUR BARRIER BARRIER SEALED SEALED SEALED 180.26 180.26 180 180.26 180 26 26 20 LEGEND FOR LEGEND LEGEND LEGEND FORFORFOR BC-FLOOR SEALANT SEALANT 19 177.01 177.01 177.01 REFER TOPANEL MATERIAL REFER TO MATERIAL TO U/S OF CONCRETE SLAB TO U/S TO OF TO CONCRETE U/S OF CONCRETE OF CONCRETE SLAB SLAB SLAB METAL M - U/S METAL METAL M PANEL METAL M PANEL -PANEL - COLORS COLORS COLORS COLORS VAPOUR BARRIER SEALED VAPOUR BARRIER SEALED 180.26 LEGEND FOR LEGEND FOR BC-FLOOR BC BC FLOOR FLOOR 20 SEALANT SEALANT SEALANT SEALANT BC-FLOOR BC-FLOOR 19 20 19 20 19 177.01 REFER TO OM MATERIAL M REFER REFER REFER TOMETAL MATERIAL TO OM MATERIAL TO OPANEL MATERIAL M EW2g 174.06 TO U/S OF CONCRETE SLAB TO U/S OF CONCRETE SLAB METAL PANEL -OBARRIER COLORS COLORSVAPOUR O BARRIER SEALED VAPOUR VAPOUR VAPOUR OBARRIER BARRIER SEALED SEALED SEALED INDOOR AMENITY EXTERIOR LEGEND GTO FOR O LEGEND LEGEND G LEGEND FOR G FOR O FOR O BC-FLOOR SEALANT SEALANT 19 18 177.01 177.01 177 177.01 177 01 01 20 REFER OM MATERIAL REFER TO MATERIAL EW2g EW2g EW2g EW2g 174.06 174.06 174.06 TO O U/S O OF CONCRETE O SLAB TO O U/S OF TO O CONCRETE U/S OF CONCRETE O OF O O CONCRETE O SLAB SLAB SLAB COLORS OTO O U/S COLORS COLORS O COLORS OO O VAPOUR O BARRIER SEALED VAPOUR BARRIER SEALED G FOR O LEGEND FOR INDOOR AMENITY EXTERIORLEGEND INDOOR INDOOR INDOOR AMENITY AMENITY AMENITY EXTERIOR EXTERIOR EXTERIOR BC-FLOOR BC BC FLOOR FLOOR 19 BC-FLOOR BC-FLOOR 18 19 18 19 18 177.01 EW2g EW2g 174.06 171.11 TO O U/S O OF CONCRETE O SLAB COLORS OTO O U/S OF CONCRETE SLAB COLORS INDOOR AMENITY EXTERIOR INDOOR AMENITY EXTERIOR BC-FLOOR 18 17 EW2g W EW2g EW2g W EW2g W 174.06 174.06 174 174.06 174 06 06 19 171.11 171.11 171.11 INDOOR NDOOR AMEN AMENITY TY EXTERIOR EXTER OR INDOOR INDOOR NDOOR INDOOR NDOOR AMENITY AMENITY AMEN AMENITY AMEN TYTY EXTERIOR EXTERIOR EXTER EXTERIOR EXTER OROR BC-FLOOR BC BC FLOOR FLOOR 18 BC-FLOOR BC-FLOOR 17 18 17 18 17 J-MOULD AND SEALANT EW2g W EW2g 174.06 171.11 168.16 VAPOUR BARRIER SEALED INDOOR NDOOR AMENITY AMEN EXTERIOR EXTER OR INDOOR AMENITY EXTERIOR BC-FLOOR 17 J-MOULD AND SEALANTTY J-MOULD J-MOULD J-MOULD AND AND SEALANT AND SEALANT SEALANT 16 171.11 171.11 171 171.11 171 11 11 18 168.16 168.16 168.16 TO WINDOW FRAME VAPOUR BARRIER SEALED VAPOUR VAPOUR VAPOUR BARRIER BARRIER BARRIER SEALED SEALED SEALED BC-FLOOR BC BC FLOOR FLOOR 17 J-MOULD AND SEALANT J-MOULD AND SEALANT BC-FLOOR BC-FLOOR 16 17 16 17 16 171.11 168.16 165.21 TO WINDOW FRAME TO WINDOW TO WINDOW TO WINDOW FRAME FRAME FRAME VAPOUR BARRIER SEALED VAPOUR BARRIER SEALED BC-FLOOR J-MOULD MO AND SEALANT J-MOULD J-MOULD MO J-MOULD MO AND AND SEALANT AND SEALANT SEALANT 16 15 168.16 168.16 168 168.16 168 16 16 17 165.21 165.21 165.21 TO WINDOW FRAME TO WINDOW FRAME VAPOUR O J-MOULD BARRIER SEALED VAPOUR VAPOUR VAPOUR OBARRIER OBARRIER BARRIER SEALED SEALED SEALED MO AND SEALANT J-MOULD AND SEALANT BC-FLOOR BC BC FLOOR FLOOR 16 16 16 BC-FLOOR BC-FLOOR 15 15 15 168.16 165.21 162.26 TO OW WINDOW OW FRAME M TO WINDOW TO OW WINDOW TO OW WINDOW OW FRAME OW FRAME FRAME M M VAPOUR O BARRIER SEALED VAPOUR BARRIER SEALED BC-FLOOR 15 14 165.21 165.21 165 165.21 165 21 21 16 162.26 162.26 162.26 TO OW WINDOW OW FRAME M TO WINDOW FRAME BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 15 14 15 14 15 14 165.21 162.26 159.31 BC-FLOOR 14 13 162.26 162.26 162 162.26 162 26 26 15 159.31 159.31 159.31 BC-FLOOR BC BC FLOOR FLOOR 14 BC-FLOOR BC-FLOOR 13 14 13 14 13 162.26 159.31 156.36 BC-FLOOR 13 12 159.31 159.31 159 159.31 159 31 31 14 156.36 156.36 156.36 BC-FLOOR BC BC FLOOR FLOOR 13 13 13 BC-FLOOR BC-FLOOR 12 12 12 2 SECTION DETAIL AT PARAPET - OUTDOOR AMENITY TERRACE 159.31 156.36 153.41 2 1 : 10 BC-FLOOR 12 AMENITY TERRACE SECTION DETAIL DETAIL DETAIL ATAT PARAPET AT PARAPET PARAPET - OUTDOOR - OUTDOOR - OUTDOOR AMENITY AMENITY AMENITY TERRACE TERRACE TERRACE 2 SECTION DETAIL AT PARAPET - OUTDOOR 2SPA401 2 SECTION 2 SECTION 11 156.36 156.36 156 156.36 156 36 36 13 153.41 153.41 153.41 SPA401 2 2 2 2 SPA401 SPA401 SPA401 1 : 10 1 : 10 1 : 10 1 : 10 BC-FLOOR BC BC FLOOR FLOOR 12 SECTION DETAIL AT PARAPET - OUTDOOR AMENITY TERRACE 2 SECTION DETAIL AT PARAPET - OUTDOOR AMENITY TERRACE 2SPA401 BC-FLOOR BC-FLOOR 11 12 11 12 11 156.36 153.41 150.46 1.8M WIND SCREEN SPA4012 SPA401 SPA401 SPA401 2 SPA401 SPA401 1 : 10 1 : 10 BC-FLOOR 12 SECTION SECT ON DETAIL DETA L AT PARAPET OUTDOOR AMENITY AMEN TY TERRACE SECTION SECTION SECT SECTION SECT ON DETAIL ON DETAIL DETA DETAIL DETA AT L AT PARAPET L AT PARAPET PARAPET OUTDOOR OUTDOOR OUTDOOR AMENITY AMENITY AMEN AMENITY AMEN TY TERRACE TY TERRACE TERRACE 2 2 2 2 11 153.41 153.41 153 153.41 153 41 41 INDOOR 150.46 150.46 150.46 1.8M WIND SCREEN 1.8M1.8M WIND 1.8M WIND SCREEN WIND SCREEN SCREEN OUTDOOR AMENITY SPA401 1 : 10 2SPA401 2 2 SPA401 1 : 10 1 : 10 1 : 10ON DETA SECTION ON DETA DETAIL L AT PARAPET -2SPA401 OUTDOOR AMENITY AMEN TY TERRACE SPA401 SECTION SECT DETAIL L AT PARAPET - OUTDOOR AMEN AMENITY TY TERRACE 2 SECT 2SPA401 BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 11 10 11 11 153.41 INDOOR INDOOR INDOOR INDOOR 150.46 AMENITY BC-FLOOR 1.8M WIND SCREEN 1.8M WIND SCREEN OUTDOOR AMENITY OUTDOOR OUTDOOR OUTDOOR AMENITY AMENITY AMENITY SPA401 1 : 10 SPA4012 SPA401 SPA401 SPA401 2 SPA401 1 : 10 BC-FLOOR 11 INDOOR INDOOR 150.46 150.46 150 150.46 150 46 4610 AMENITY AMENITY AMENITY AMENITY BC-FLOOR BC-FLOOR BC-FLOOR 10 10 1.8M MW WIND SCREEN 1.8M1.8M WIND M1.8M WIND W MSCREEN WIND W SCREEN SCREEN OUTDOOR AMENITY OUTDOOR AMENITY SPA401 SPA401 145.6 INDOOR NDOOR INDOOR INDOOR NDOOR INDOOR NDOOR OUTDOOR 150.46 AMENITY AMENITY BC-FLOOR 10 1.8M MW WIND SCREEN 1.8M WIND SCREEN AMENITY AMEN TY OUTDOOR OUTDOOR AMENITY AMENITY AMEN AMENITY AMEN TYTY 145.6 145.6 145.6OUTDOOR BC-FLOOR 09 INDOOR NDOOR INDOOR AMENITY AMEN TY AMENITY AMENITY AMEN AMENITY AMEN TY TY BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 10 10 10 OUTDOOR AMENITY AMEN TY OUTDOOR AMENITY 145.6 BC-FLOOR BC-FLOOR BC-FLOOR 09 09 09 142.15 INDOOR AMENITY AMENITY AMEN TY145 AMENITY BC-FLOOR 10 145.6 145.6 145 145.6 6 6 BC-FLOOR 09 08 142.15 142.15 142.15 INDOOR AMENITY INDOOR INDOOR INDOOR AMENITY AMENITY AMENITY INDOOR 145.6 BC-FLOOR BC BC FLOOR FLOOR 09 09 BC-FLOOR BC-FLOOR 08 09 08 08 87 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 CCU 142.15 139.2 6.40 m INDOOR AMENITY INDOOR AMENITY 74 2024-03-08 ISSUED FOR SITE PLAN APPROVAL #4 CCU INDOOR INDOOR INDOOR INDOOR AMENITY BC-FLOOR 09 08 07 87 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 CCU 142.15 142.15 142 142.15 142 15 15 38 NOT ISSUED 139.2 139.2 139.2 INDOOR NDOOR AMEN AMENITY TY INDOOR INDOOR NDOOR INDOOR NDOOR AMENITY AMENITY AMEN AMENITY AMEN TY TY 6.40 6.40 m SETBACK 6.40 m m ZONING 74 2024-03-08 ISSUED FORREVIEW SITE PLAN INDOOR INDOOR 35 2023-06-30 ISSUED FOR TTC #5 APPROVAL #4 FZH CCU AMENITY AMENITY AMENITY AMENITY BC-FLOOR BC BC FLOOR FLOOR 08 08 BC-FLOOR BC-FLOOR 07 08 07 07 87 2022-09-27 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 CCU 142.15 38 NOT ISSUED 139.2 13 ISSUED FOR PPR CCU 136.25 INDOOR NDOOR AMENITY AMEN TY INDOOR AMENITY 6.40 m ZONING ZONING ZONING SETBACK SETBACK SETBACK 74 2022-06-29 2024-03-08 ISSUED FOR SITE APPROVAL CCU FZH INDOOR NDOOR INDOOR INDOOR NDOOR INDOOR NDOOR 35 2023-06-30 ISSUED FORPLAN TTC#2REVIEW #5 #4 8 ISSUED FOR PRICING CCU AMENITY AMENITY BC-FLOOR 08 07 87 2022-09-27 2024-06-21 ISSUED FOR FOR SITE PLAN APPROVAL#5 CCU 38 2022-06-28 NOT ISSUED 139.2 139.2 139 139.2 139 2 2 13 ISSUED LOCKERS 136.25 136.25 136.25 5 ISSUED FOR PPR PPR CCU CCU 6.406.40 m SETBACK 6.40 m m BC-FLOOR 06 ZONING 74 2022-06-29 2024-03-08 ISSUED FORREVIEW SITE PLAN #4 CCU INDOOR NDOOR INDOOR 35 2022-04-12 2023-06-30 ISSUED FOR #5#2APPROVAL FZH CCU 8 ISSUED FOR PRICING AMENITY AMEN TY LOCKERS AMENITY AMENITY AMEN AMENITY AMEN TYTY 2 ISSUED FOR TTC SITE PLAN APPROVAL #1 CCU BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 07 38 NOT ISSUED 139.2 13 ISSUED FOR PPR CCU OCKERS LOCKERS LOCKERS 136.25 5 DATE 2022-06-28 ISSUED FOR PPR m SETBACK # 2022-09-27 DESCRIPTION BY CCU BC-FLOOR BC-FLOOR BC-FLOOR 06 07 06 07 06 ZONING ZONING O ZONING SETBACK O6.40 G SETBACK G 132.8 35 2023-06-30 ISSUED FOR #5 0.20 m 8 2022-06-29 ISSUED FOR PRICING #2REVIEW CCU FZH AMENITY AMEN TY LOCKERS AMENITY 2 2022-04-12 ISSUED FOR TTC SITE PLAN APPROVAL #1 CCU BC-FLOOR 07 13 2022-09-27 ISSUED FOR PPR DESCRIPTION LOCKERS 136.25 136.25 136 136.25 136 25 25 5 2022-06-28 ISSUED FOR PPR CCU CCU # DATE BY BC-FLOOR 06 ZONING SETBACK BC-FLOOR LOCKERS 132.8 132.8 132.8 05 0.20 m 0.200.20 m SETBACK 0.20 m m 8 2022-06-29 ISSUED FORPLAN PRICING #2 2 2022-04-12 ISSUED FOR SITE APPROVAL #1 CCU CCU ZONING OCKERS LOCKERS LOCKERS LOCKERS 136.25 5 DATE 2022-06-28 ISSUED FOR PPR # DESCRIPTION BY CCU BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 0605 0605 06 BC-FLOOR BC-FLOOR BC-FLOOR 05 OCKERS LOCKERS LOCKERS LOCKERS 132.8 0.20 m 0.20 m SETBACK 129.85 2 2022-04-12 ISSUED FOR SITE PLAN APPROVAL #1 CCU ZONING SETBACK ZONING ZONING ZONING SETBACK SETBACK LOCKERS LOCKERS # DATE DESCRIPTION BY RES. RES. RES. 0.200.20 BC-FLOOR 06 BC-FLOOR LOCKERS LOCKERS 04 132.8 132.8 132 132.8 132 8 8 05 0.20 m SETBACK m SETBACK 0.20 m m 129.85 129.85 129.85 ZONING ZONING RES. RES. RES. RES. RES. LOCKERS RES. RES. RES. RES. RES. RES. 0.20 m BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 05 OCKERS LOCKERS LOCKERS BC-FLOOR BC-FLOOR BC-FLOOR 0405 0405 04 132.8 0.20 m 129.85 126.9 ZONING O G SETBACK ZONING ZONING O ZONING SETBACK OG SETBACK G SETBACK RES. RES. RES. RES. RES. BC-FLOOR 05 LOCKERS LOCKERS BC-FLOOR 04 03 129.85 129.85 129 129.85 129 85 85 126.9 126.9 126.9 ZONING O G SETBACK ZONING SETBACK RES. RES RES. RES. RES RES. RES RES RES. RES. RES RES. RES RES. RES. RES. RES RES. RES BC-FLOOR BC BC FLOOR FLOOR 04 BC-FLOOR BC-FLOOR 03 04 03 04 03 129.85 126.9 123.95 RES. RES. RES. RES. RES RES. BC-FLOOR 04 03 126.9 126.9 126 126.9 126 9 9RES 123.95 123.95 123.95 BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 03 03 03 PROJECT 126.9 123.95 GALLERIA 0.9 m BC-FLOOR PROJECT PROPOSED MIXED-USE 02 123.95 123.95 123 123.95 123 95 95 03 CANOPY GALLERIA GALLERIA GALLERIA 0.9 m 0.9 m 0.9 m 0.9 m C) PROJECT DEVELOPMENT PROPOSED(BLOCK MIXED-USE BC-FLOOR BC-FLOOR BC-FLOOR 02 02 02 123.95 CANOPY CANOPY CANOPY CANOPY 118 GALLERIA 0.9 m 0.9 m PROPOSED DEVELOPMENT (BLOCK PROJECT PROPOSED MIXED-USE M XED USE C) BC-FLOOR 02 CANOPY CANOPY 118118 118 GRADE GALLERIA GALLER GALLERIA GALLER A A 1141 Bloor Street West + 980 Dufferin Street, Toronto, 112.85 GALLERIA BC-EST. 0.9 m 112.60 0.9 m 0.9 m 0.9 m PROPOSED PROPOSED PROPOSED PROPOSED PRIVATE ROAD DEVELOPMENT (BLOCK BLOCK C) C PROPOSED MIXED-USE M XED USE ON BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR FLOOR 02 02 02 CANOPY CANOPY CANOPY CANOPY RETAIL 118 1141 Bloor Street West + 980 Dufferin Street, Toronto, 112.85 112.85 GALLERIA BC-EST. BC-EST. GRADE GRADE GRADE ST. 112.85 111.51 0.9 112.60 m 112.60 0.9 m 112.7 112.60BC-EST. 112.60 DUFFERIN PROPOSED PROPOSED PRIVATE ROAD PRIVATE PRIVATE PRIVATE ROAD ROAD ROAD DEVELOPMENT BLOCK C C) ON (BLOCK BC-FLOOR 02 CANOPY CANOPY RETAIL RETAIL RETAIL RETAIL 118 118 118 1141 Bloor Street W West + 980 Dufferin Street, Toronto, 112.85 BC-EST. GRADE 111.51 111.51 111.51 111.51 DRAWING 112.7 112.7 112.7 112.60 112.60 DUFFERIN DUFFERIN DUFFERIN ST. ST. ST. PROPOSED PROPOSED PROPOSED PROPOSED PRIVATE ROAD PRIVATE ROAD ON O RETAIL 112.85 RETAIL 118 BC-FLOOR 01 1141 Bloor Street W West + 980 Dufferin Street, Toronto, 112.85 112.85 BC-EST. BC BC-EST. BC EST GRADE EST GRADE GRADE 111.51 111.51 DRAWING 112.7 112.60BC-EST. 112.60 112.60 112.60 DUFFERIN ST. PROPOSED PROPOSED PRIVATE PR VATE ROAD PRIVATE PRIVATE PR PRIVATE PR VATE VATE ROAD ROAD ROAD 111.75 ON O RETAIL RETA L RETAIL RETAIL RETA RETAIL RETA L L BC-FLOOR BC-FLOOR BC-FLOOR 01 01 01 ST. BC-EST. GRADE 111.51 111.51 111.51 111.51 DRAWING 112 112.7 112.7 112.7 112 7DUFFERIN 7DUFFER 112.60 112.60 DUFFERIN DUFFERIN DUFFER N ST ST. NLST ST. 112.85 PRIVATE PR VATE ROAD PRIVATE ROAD 111.75 111.75 111.75 111.75 BUILDING SECTIONS RETAIL RETAIL BC-FLOOR 01 RETA 111.51 111.51 DRAWING 112112.7 112 112 DUFFERIN ST. U/G1 PARKING 111.75 111.75 BUILDING SECTIONS BC-FLOOR BC-FLOOR BC BC-FLOOR BC FLOOR 01 01 01 U/G 1 FLOOR 112 U/G101PARKING U/G1 U/G1 U/G1 PARKING PARKING PARKING 111.75 111.75 111.75 111.75 BUILDING BU LD NG SECT SECTIONS ONS BC-FLOOR U/G U/G 1112 U/G 1 1 112 112 106.15 U/G1 PARKING U/G1 PARKING 111.75 111.75 PROJECT NO. BUILDING BU LD NG SECT SECTIONS ONS U/G2 PARKING GARBAGE 2 U/G 1 112 106.15 106.15 106.15 U/G1 U G1 PARK PARKING NG U/G1 U/G1 U G1 U/G1 U PARKING G1 PARKING PARK PARKING PARK NG NG 21.081CS2 PROJECT NO. U/G2 PARKING U/G2 U/G2 U/G2 PARKING PARKING PARKING GARBAGE GARBAGE GARBAGE U/G 2G U/G 2G 1 2 U/G U 1 U 1 103.35 106.15 PROJECT DATE U/G1 U G1 PARK PARKING NG U/G1 PARKING 21.081CS2 PROJECT NO. U/G2 PARKING U/G2 PARKING GARBAGE 2 U/G 1 103.35 103.35 103.35 106.15 106.15 106 106.15 106 15 15 JULYPROJECT 2021 DATE 21.081CS2 PROJECT NO. U/G2 PARKING NG U/G2 U/G2 U G2 U/G2 U PARKING G2 PARKING PARK PARKING PARK NGNG GARBAGE GARBAGE GARBAGE U/G U/G U 2G U/G U 2GU 2 G2 PARK DRAWN BY 2021 103.35 106.15 JULY PROJECT DATE 21.081CS2 U/G2 G2 PARK PARKING NG U/G2 PARKING GARBAGE LKR U/G 2 35U 103.35 103 103.35 103 35 JULYDRAWN 2021BYDATE PROJECT SECTION A 1 103.35 CHECKED BY LKR DRAWN BY 2021 JULY :103.35 250 SECTION A A A 1SPA401 1 SECTION 1 1SECTION CCUCHECKED BY LKRDRAWN BY SPA401 SPA401 1 : 250 1 : 250 1 : 250 SCALE SECTION A 1SPA401 CCU CHECKED LKRBY As indicated : 250 SECTION SECTION SECT ON A ON A A 1SPA401 1 SECTION 1 1SECT CCUSCALE CHECKED BY As indicated SPA401 SPA401 1 : 250 1 : 250 1 : 250 SCALE SECTION A 1SPA401 CCU
MIN. 1.8M
PROPERTY LINE
C GC C EY G C
1.8m WIND SCREEN(REFER TO WIND REPORT)
As indicated SCALE
As indicated DRAWING NO.
REV.
SPA401 87 SPA401 87 22 SPA401 87 87 HIGH-RISESPA401 DRAWING NO.
DRAWING NO.
DRAWING NO.
REV.
REV.
REV.
87 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 74 2024-03-08 ISSUED FOR SITE PLAN APPROVAL #4 87 2024-06-21 87 2024-06-21 87 2024-06-21 ISSUED ISSUED FOR ISSUED SITE FORPLAN SITE FORPLAN APPROVAL#5 SITE PLAN APPROVAL#5 APPROVAL#5 38 NOT ISSUED 74 2024-03-08 74 2023-06-30 2024-03-08 74 2024-03-08 ISSUED FORISSUED SITE SITE FORREVIEW PLAN APPROVAL SITE PLAN APPROVAL APPROVAL #4 #4 35 ISSUED FORPLAN TTC #5 #4 87 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 38 38 2022-09-27 38 NOT ISSUED NOT ISSUED NOT ISSUED 13 ISSUED FOR PPR 74 2024-03-08 ISSUED SITE PLAN APPROVAL 35 2023-06-30 35 2022-06-29 2023-06-30 35 2023-06-30 ISSUED FORISSUED TTC FORREVIEW TTC FORREVIEW TTC #5#2REVIEW #5 #5 #4 8 ISSUED PRICING 87 2024-06-21 87 2022-06-28 2024-06-21 87 2022-09-27 2024-06-21 ISSUED ISSUED FOR ISSUED SITE FORPLAN SITE FORPLAN APPROVAL#5 SITE PLAN APPROVAL#5 APPROVAL#5 38 NOT ISSUED 13 2022-09-27 13 2022-09-27 13 ISSUED FOR ISSUED PPR FOR PPR 5 ISSUED FOR PPR 74 2024-03-08 74 2022-04-12 2024-03-08 74 2022-06-29 2024-03-08 ISSUED FORISSUED ISSUED SITE SITE FOR PLAN APPROVAL SITE APPROVAL APPROVAL #4 #4 35 2023-06-30 ISSUED FOR TTC #5#2#4 8 2022-06-29 8 2022-06-29 8 ISSUED FOR PRICING PRICING FOR #2REVIEW PRICING #2PLAN 2 ISSUED FORPLAN SITE PLAN APPROVAL #1 87 2024-06-21 ISSUED FOR SITE PLAN APPROVAL#5 38 38 38 DATE NOT ISSUED NOT ISSUED NOT ISSUED 13 ISSUED FOR PPR 5 2022-06-28 5 2022-06-28 5 2022-06-28 ISSUED FOR ISSUED PPR FOR PPR # 2022-09-27 DESCRIPTION 74 2024-03-08 ISSUED SITE PLAN APPROVAL 35 2023-06-30 35 2022-06-29 2023-06-30 35 2022-04-12 2023-06-30 ISSUED FOR ISSUED TTC FOR TTC FOR TTC #5#2REVIEW #5 #1 #5 #4 8 ISSUED PRICING 2 2022-04-12 2 2022-04-12 2 ISSUED FORISSUED SITE FORREVIEW PLAN SITE FORREVIEW PLAN APPROVAL SITE PLAN APPROVAL APPROVAL #1 #1 38 NOT ISSUED 13 13 2022-09-27 13 2022-09-27 ISSUED FOR ISSUED PPR FOR PPR 5 2022-06-28 FOR PPR # 2022-09-27 # DATE # DATE DATEISSUED DESCRIPTION DESCRIPTION DESCRIPTION 35 2023-06-30 ISSUED FOR TTC REVIEW #5 8 2022-06-29 8 2022-06-29 8 2022-06-29 ISSUED FOR ISSUED PRICING PRICING FOR #2 PRICING #2 #2 2 2022-04-12 ISSUED FOR SITE PLAN APPROVAL #1 13 ISSUED FOR PPR 5 2022-06-28 5# 2022-09-27 2022-06-28 5 DATE 2022-06-28 ISSUED FORISSUED PPR FOR PPR DESCRIPTION 8 2022-06-29 ISSUED FORPLAN PRICING #2PLAN 2 2022-04-12 2 2022-04-12 2 2022-04-12 ISSUED FORISSUED SITE SITE FORPLAN APPROVAL SITE APPROVAL #1 APPROVAL #1 #1 5# DATE 2022-06-28 # # DATE DATEISSUED FOR PPR DESCRIPTION DESCRIPTION DESCRIPTION 2 2022-04-12 ISSUED FOR SITE PLAN APPROVAL #1 # DATE DESCRIPTION
EW2g
CCU CCU CCU CCU CCU CCU FZH CCU CCU CCU CCU CCU FZH CCU FZH FZH CCU CCU CCU CCU CCU CCU CCU FZH CCU CCU CCU CCU CCU CCU CCU CCU BY CCU CCU FZH FZH CCU FZH CCU CCU CCU BY CCU BY CCU BY CCU FZH CCU CCU CCU CCU BY CCU CCU CCU CCU BY CCU BY BY CCU BY
METAL PANEL REFER TO MATERIAL LEGEND FOR COLORS
EXTERIOR
PROJECT
PROPOSED MIXED-USE DEVELOPMENT (BLOCK C) PROPOSED PROPOSED PROPOSED MIXED-USE MIXED-USE MIXED-USE DEVELOPMENT DEVELOPMENT DEVELOPMENT (BLOCK (BLOCK (BLOCK C) C) C) PROPOSED MIXED-USE
PROJECT PROJECT PROJECT PROJECT
PROJECT PROJECT PROJECT
1141 Bloor Street West + 980 Dufferin Street, Toronto, DEVELOPMENT (BLOCK C) PROJECT PROPOSED ONM PROPOSED PROPOSED MIXED-USE MIXED-USE XED MIXED-USE M XED USE USE 11411141 Bloor 1141 Bloor Street Bloor Street West Street West + 980 West + 980 Dufferin + 980 Dufferin Street, Dufferin Street, Toronto, Street, Toronto, Toronto, DEVELOPMENT DEVELOPMENT DEVELOPMENT (BLOCK (BLOCK BLOCK (BLOCK BLOCK C) C C) C C) PROPOSED MIXED-USE ON ON ON 1141 Bloor Street West + 980 Dufferin Street, Toronto, DRAWING DEVELOPMENT ON (BLOCK C) 1141 1141 Bloor 1141 Bloor Street Bloor Street West Street West W + 980 West W + 980 Dufferin + 980 Dufferin Street, Dufferin Street, Toronto, Street, Toronto, Toronto, DRAWING DRAWING DRAWING ON O ON O ON 1141 Bloor Street West + 980 Dufferin Street, Toronto, DRAWING BUILDINGON SECTIONS DRAWING DRAWING DRAWING
BUILDING BUILDING BUILDING SECTIONS SECTIONS SECTIONS BUILDING SECTIONS BUILDING BUILDING BU BUILDING BU LD LD NG SECTIONS NG SECTIONS SECT SECTIONS SECT ONS ONS 21.081CS2 PROJECT PROJECT NO. PROJECT NO. NO. BUILDING SECTIONS DRAWING
PROJECT NO.
PROJECT DATE 21.081CS2 21.081CS2 21.081CS2 PROJECT NO. JULY 2021 PROJECT PROJECT DATE PROJECT DATE DATE 21.081CS2 PROJECT PROJECT NO. PROJECT NO. NO. DRAWN BY JULY JULY 2021 JULY 2021 2021 PROJECT DATE 21.081CS2 21.081CS2 21.081CS2 PROJECT NO. LKR DRAWN DRAWN BY DRAWN BY BY JULY 2021 PROJECT PROJECT DATE PROJECT DATE DATE 21.081CS2 CHECKED BY LKRLKR LKR DRAWN BY 2021 JULY JULY 2021 JULY 2021 PROJECT DATE CCU CHECKED CHECKED BY CHECKED BY BY LKR DRAWN DRAWN BY DRAWN BY BY JULY SCALE 2021 CCUCCU CCU CHECKED BY LKRLKR LKR DRAWN BY As indicated SCALE SCALE SCALE CCU CHECKED CHECKED BY CHECKED BY BY LKR As indicated As indicated As indicated SCALE CCUCCU CCU CHECKED BY As indicated SCALE SCALE SCALE CCU As indicated As indicated As indicated DRAWING NO. SCALE
BLOCK C - Section Detail at Parapet - Outdoor Amenity Terrace REV.
SPA401 87 SPA401 SPA401 SPA401878787 SPA401 87 SPA401 SPA401 SPA401878787 SPA401 87
As indicated DRAWING DRAWING NO. DRAWING NO. NO.
REV. REV. REV.
DRAWING NO.
REV.
DRAWING DRAWING NO. DRAWING NO. NO.
REV. REV. REV.
DRAWING NO.
REV.
BLO C K D ( TH E Q U I N TO N )
BLOCK D - FAÇADE CONCEPT
STAGE 2 - NEW BUILDING KEEPING WIT
STAGE STAGE11- -IDENTIFYING IDENTIFYINGTHE THEMASSES MASSES
A A
The Quinton is a 19-storey building situated along Dufferin Street that incorporates Kent School as a retained heritage element. The development includes 214 residential units, with ground-floor retail activating the public realm and strengthening connections to the park. Within the school, the ground floor is programmed as a
B B CC
1.1 1.1
AA C
2.1
1.2 1.2
community hub to support local initiatives, while the second and third floors are dedicated to office use.
C
brick
BRICK BRICK
glass recess
The façade design draws on the proportions of the existing school, establishing a cohesive architectural
GLASS GLASS
RECESS RECESS
dialogue. Dark brick-inlay precast concrete cladding was selected as a neutral counterpart, complementing the original material palette without competing with it. The initial proposal included a glass volume above the
A CC A
school to mediate the transition to the new construction; however, as it was not required for the program, this
C C
element was removed and replaced with a more restrained glass reveal that articulates the transition. Terraces were originally introduced along the west façade, but the massing was later refined to improve floor plate
HERITAGE HERITAGEBUILDING: BUILDING:KENT KENTSCHOOL SCHOOL
MAIN MAINMASS: MASS:SOLID SOLID/ HEAVY / HEAVY
PROPOSED PROPOSEDBUILDING BUILDING
TRANSITIONAL TRANSITIONALMASS: MASS:TRANSPARENT TRANSPARENT/ LIGHT / LIGHT
heritage building (Kent School) proposed building transitions
efficiency.
CONCEPT CONCEPTDIAGRAMS DIAGRAMS
B B
A
SOLID MASS DEFINITION
A
CONCEPT DIAGRAMS
980 Duff erin Street + 1141 Bloor Street West, Toronto, ONON 980 Duff erin Street + 1141 Bloor Street West, Toronto, (Block D)D) (Block 21.081CS2 21.081CS2 Page 5 5 Page
BLOCK D - INITIAL DESIGN VIEW 1.3 - FROM DUFFERIN ST - DARK GREY BRICK
BLOCK D - View from Dufferin St (conceptual render)
PERSPECTIVE VIEWS
23 HIGH-RISE
BLOCK D - View from Northeast (conceptual render) PERSPECTIVE VIEWS 980 Dufferin Street + 1141 Bloor Street West, Toronto, ON (Block D) 21.081CS2 Page 14
VIEW 3 - FROM WEST
BLOCK D - View from West (conceptual render) 980 Dufferin Street + 1141 Bloor Street West, Toronto, ON (Block D) 21.081CS2 Page 17
980 Dufferin Str
BRICK FAÇADE MODULE
DOUBLE FLOOR MODULE
soldier course
SOLDIER COURSE BRICK
c-channel C-CHANNEL
STACKED COURSE BRICK
stacked course
operable window OPERABLE WINDOW
metal frame METAL FRAME
soldier course
SOLDIER COURSE BRICK
1-VISIONFACADE GLASSMODULES - CLEAR FLOAT GLASS
View from West (project under construction - 2025)
980 Dufferin Street + 1141 Bloor Street West, Toronto, ON (Block D) 21.081CS2 Page 10 Turner Fleischer Architects Inc.
GLAZING APPLY THE RHYTHM OF 26-VISION BAYS / 3 BAYS INCREMENTS - FRIT
1-VISION GLASS - CLEAR FLOAT GLASS
6-VISION GLAZING - FRIT
BLOCK D - View from Dufferin St (project under construction - 2025)
Turner Fleischer Architects Inc.
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Turner Fleischer Architects Inc. Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the 67 Lesmill Road appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from Toronto, ON, M3B 2T8 drawings not specifically marked 'For Construction' must assume full responsibility and bear costs T 416 425 2222 for any corrections or damages resulting from his work.
turnerfleischer.com
BLOCK D - MATERIAL BOARD
1-VISION GLASS - CLEAR FLOAT GLASS
6-VISION GLAZING - FRIT
1-VISION GLASS - CLEAR FLOAT GLASS
2-VISION GLASS - SPANDREL
6-VISION GLAZING - FRIT
1 - Vision Glazing
Turner Fleischer Architects Inc.
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
Turner Fleischer Architects Inc.
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
7-STONE - DARK
2-VISION GLASS - SPANDREL
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
2
7-STONE - DARK
2 - Spandrel Glazing (grey)
3-BRICK INLAY PRECAST PANEL - DARK
2
7-STONE - DARK
1 3
3-BRICK INLAY PRECAST PANEL - DARK 3-BRICK INLAY PRECAST PANEL - DARK
3 - Brick-inlay Precast Concrete Panel 6-VISION GLAZING (dark grey) - FRIT 3-BRICK INLAY PRECAST PANEL
4-METAL - DARK - DARK
4-METAL
4-METAL - DARK - DARK
3 85 2024-06-21 71 2024-03-08 42 2023-09-29 34 2023-08-24 27 DATE
ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR OPA ISSUED FOR SITE PLAN APPROVAL #3 DESCRIPTION
CCU CCU CCU CCU BY
Turner Fleischer Architects Inc.
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
4 - Metal Panel (dark grey)
85 2024-06-21 71 2024-03-08 42 2023-09-29 34 2023-08-24 27 DATE
85 2024-06-21 71 2024-03-08 42 2023-09-29 34 2023-08-24 27 DATE
ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR OPA ISSUED FOR SITE PLAN APPROVAL #3 DESCRIPTION
PROJECT ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR OPA ISSUED FOR SITE PLAN APPROVAL #3 DESCRIPTION
1141 Bloor Street West + 980 Dufferin Street, Toronto, ON
2
BLOCK D - MATERIAL BOARD PROJECT
PROPOSED MIXED-USE
DEVELOPMENT (BLOCK D) PROPOSED PROJECT NO. MIXED-USE DEVELOPMENT (BLOCK D) 21.081CS2
114185Bloor Street ISSUED West FOR + 980 Street, 2024-06-21 SITEDufferin PLAN APPROVAL #5 Toronto,
2024-03-08 SITE PLAN APPROVAL #4 ON 1141 Bloor Street West + 980 Dufferin71Street, Toronto,ISSUED FOR 42 2023-09-29 ISSUED FOR OPA JULY 2021ON 34 2023-08-24 ISSUED FOR SITE PLAN APPROVAL #3 PROJECT DATE
DRAWN BY
DRAWING
- DARK
4
CCU CCU CCU CCU BY
CCU CCU
PROPOSED MIXED-USE CCU CCU DEVELOPMENT (BLOCK D) BY
DRAWING
PROJECT
7-STONE -4-METAL DARK
West Elevation
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
7-STONE - DARK
2-VISION GLASS - SPANDREL
2-VISION GLASS - SPANDREL
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
DRAWING 27
DATE
DESCRIPTION
CCU CCU CCU CCU BY
DVE CHECKED BY
CCU
BLOCK D - MATERIAL BOARD BLOCK D - MATERIAL BOARD SCALE
5 - Stone (dark grey)
PROJECT NO.
PROJECT NO.
21.081CS2
21.081CS2
DRAWING NO.
PROJECT DATE
REV.
85
SPA802
PROJECT DATE
JULY 2021
JULY 2021
DRAWN BY
PROJECT DRAWN BY
DVE CHECKED BY
DVE
CCU
CHECKED BY
CCU
SCALE
PROPOSED MIXED-USE DEVELOPMENT (BLOCK D)
1141 Bloor Street West + 980 Dufferin Street, Toronto, ON
SCALE
5
DRAWING DRAWING NO.
SPA802
REV.
85
DRAWING NO.
SPA802
REV.
85
BLOCK D - MATERIAL BOARD
PROJECT NO.
21.081CS2 PROJECT DATE
JULY 2021 DRAWN BY
MID-AERIAL VIEW LOOKING EAST DVE
24
CHECKED BY
CCU
SCALE
DRAWING NO.
SPA802
REV.
85
HIGH-RISE
BLOCK D - View from West (project under construction - 2025)
6.40 m
BLOCK 11.4.2.6. D - Floor 03
BUILDING SETBACK
ZONING SETBACK
9.50 m
11.4.3.1. 11.4.3.2. 11.4.3.3. 11.4.3.4. 11.4.3.5. 11.4.3.6.
DN
OUTLINE OF FLOOR 05 ABOVE
2B
82.2 m² 885 ft²
UP
1B
52.4 m² 564 ft²
FE
DN
3B BF
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
LOCKERS
FE
120.3 m² 1295 ft²
11.5.1.
2B BF
140.2 m² 1510 ft²
79 m² 851 ft²
1235.2 m² 13296 ft²
KENT SCHOOL (SECOND FL)
2B 88.3 m² 950 ft²
SLOPE 85 71 42 37 36 34 9 6 4 1 27
FE
LOCKERS DN
109.9 m² 1183 ft²
24.30 m
UP
ZONING SETBACK AT ST 3
FE
2B
1B
2B
92.2 m² 992 ft²
54.2 m² 583 ft²
91.4 m² 984 ft²
11.80 m
2024-06-21 2024-03-08 2023-09-29 2023-09-07 2023-09-07 2023-08-24 2022-09-27 2022-06-29 2022-06-28 2022-03-25 DATE
ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR OPA ISSUED FOR MINOR VARIANCE - BUILT FORM ISSUED FOR MINOR VARIANCE ISSUED FOR SITE PLAN APPROVAL #3 ISSUED FOR PPR ISSUED FOR PRICING #2 ISSUED FOR PPR ISSUED FOR SITE PLAN APPROVAL DESCRIPTION
PRECAST COPING
CCU CCU CCU CCU CCU CCU BOL CCU CCU CCU BY
SIDE MOUNTED RAILING PREFINISHED GLAZED ALUM. GUARDRAIL SYSTEM 1100mm HT MIN. (GLASS & FRAME TO MATCH WINDOW) DETAILS REFER TO SHOP DRAWINGS
SEALANT AND TERMINATION BAR
PROJECT
PROPOSED MIXED-USE DEVELOPMENT (BLOCK D)
ZONING SETBACK
DN
FFH
UP
TERRACE AT FLOOR 2
OUTLINE OF FLOOR 05 ABOVE
9.80 m
19.84 m
10.03 m
GREEN ROOF AT FLOOR 2 42.8m2
39.30 m ZONING SETBACK AT ST 7
ELEC CLOSET
3B
MIN. 1100 mm
CORRIDOR
2B
LOCKERS
6.30 m ZONING SETBACK AT ST 12
COMMECRCIAL / OFFICE
6.40 m
TERRACE AT FLOOR 2
5.60 m
92.9 m² 1000 ft²
5.78 m
17.78 m
Turner Fleischer Architects Inc.
11.4.3.7. 11.5.1.
ELEC CLOSET
FFH
UP
TERRACE AT FLOOR 2
GREEN ROOF AT FLOOR 2 42.8m2
10.05 m
19.83 m
9.78 m
1 ______ SPA401
3B
101.9 m² 1097 ft²
SPA601 1 : 10
11.4.2.1. 11.4.2.2. 11.4.2.3. 11.4.2.4. 11.4.2.5.
1.61 m
12.76 m
BUILDING SETBACK
Structural: ☒ No ☐ Yes By Increase in occupant load: ☒ No ☐ Yes By change of major occupancy: ☒ No ☐ Yes Plumbing: ☒ No ☐ Yes Sewage systems: ☒ No ☐ Yes Extension of combustible BLOCK C BLOCK C construction: ☒ No ☐ Yes NN 4.80 m 27.86 m 38.82 m __________________________________________ ☒ No ☐ Yes 11.34 m 6.11 m 22.16 m 16.66 m Structural: ☒ No 10.41 m ☐ Yes _______________ By Increase in occupant load: ☒ No ☐ Yes _______________ By change of major occupancy: ☒ No ☐ Yes _______________ TERRACE AT FLOOR 2 Plumbing: ☒ No ☐ Yes _______________ Sewage systems: ☒ No ☐ Yes _______________ Extension of combustible construction: ☒ No ☐ Yes _______________ __________________________________________ ☒ No ☐ Yes ___(list numbers and describe)__________________________________ ___(list numbers and describe)__________________________________ _______________________________________________________ _______________________________________________________ 3.20 m 12.13 m ZONING SETBACK AT ST 5 _______________________________________________________
evel:
PROJECT DATE
DRAWN BY
CHECKED BY
CCU SCALE
1 : 150 N
BD-FLOOR 03
SPA153 1 : 150
MECH
REV.
85
TOP OF FLOOR SLAB
BLOCK D - W-E Cross-section 67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
U/G 2 103.35
5.15 m
SHAFT
CORR.
KENT - ROOF (EXISTING) 128.64
PARKING
CANOPY
RETAIL 111.30
FUTURE TENANT FIT-OUT 111.98
COMMUNITY HUB
COMMUNITY HUB / INDOOR DAYCARE 111.20
5.01 m 4.37 m
17.20 m
COMMERCIAL / OFFICE
106.05
85 71 36 34 9 6 4 1 27
KENT - FLOOR 03 123.63
KENT - FLOOR 02 119.26 KENT - GROUND FL 114.87
2024-06-21 2024-03-08 2023-09-07 2023-08-24 2022-09-27 2022-06-29 2022-06-28 2022-03-25 DATE
ISSUED FOR SITE PLAN APPROVAL #5 ISSUED FOR SITE PLAN APPROVAL #4 ISSUED FOR MINOR VARIANCE ISSUED FOR SITE PLAN APPROVAL #3 ISSUED FOR PPR ISSUED FOR PRICING #2 ISSUED FOR PPR ISSUED FOR SITE PLAN APPROVAL DESCRIPTION
CCU CCU CCU CCU BOL CCU CCU CCU BY
residential units horizontal circulation, lobby vertical circulation, service areas, parking retail community hub office PROJECT
112.24
PROPOSED MIXED-USE DEVELOPMENT (BLOCK D)
1
DRAWING
BLOCK D - BUILDING SECTIONS
PROJECT NO.
PARKING
103.34
PARKING
SERV.
PARKING
103.15
21.081CS2
PROJECT DATE
JULY 2021 DRAWN BY
DVE
CHECKED BY
CCU
SCALE
1 : 150
1
SECTION A
SPA401 1 : 150
DRAWING NO.
SPA401
GUARD DETAIL AT PARAPET
SPA601 1 : 10
1141 Bloor Street West + 980 Dufferin Street, Toronto, ON
KENT - LOWER LEVEL 110.05
PARKING
105.96
FUTURE TENANT FIT-OUT
BUILDING HEIGHT
FUTURE TENANT FIT-OUT
COMMERCIAL / OFFICE
4.39 m
LOCKERS
4.82 m
6.80 m
PROPOSED PRIVATE ROAD
LOCKERS RESIDENTIAL
PRIVATE TERRACE HT: 6.15 m
111.30
2.80 m
U/G 1 106.15
STAIRS
ZONING SETBACK AT ST 5
BD-FLOOR 02 118.1
BD ESTABLISHED GRADE 112 BD-FLOOR 01 111.3
HT: 17.20 m
OUTDOOR AMENITY
2.92 m
4.70 m
BD-FLOOR 03 122.8
HT: 17.41 m
CORR.
BD-FLOOR 04 125.75
SUITE BLOCK D - Guard Detail at Parapet
PRIVATE TERRACE
PRIVATE TERRACE
ELEVATOR
BD-FLOOR 05 129.2
EXTERIOR
CORR.
BD-FLOOR 06 132.45
CORR.
BD-FLOOR 07 135.4
FOAM IN PLACE INSULATION(AIR SEAL) SEALANT SEAL WAPOUR BARRIER TO MULLION
RESIDENTIAL
RETAIL SERVICE
BD-FLOOR 08 138.35
3.35 m
BD-FLOOR 09 141.3
RESIDENTIAL
17.70 m
BD-FLOOR 10 144.25
EW2a
6.30 m
MAXIMUM ZONING HEIGHT
BD-FLOOR 11 147.2
SEALANT SEAL WAPOUR BARRIER TO CONCRETE
SEALANT
ZONING SETBACK AT ST 12
62.10 m
BD-FLOOR 13 153.4 BD-FLOOR 12 150.45
WATERPROOFING MEMBRANE
MAXIMUN ZONING HEIGHT
BD-FLOOR 14 156.35
61.86 m
BD-FLOOR 15 159.3
150
SEALANT AND BACKER ROD
RESIDENTIAL
RESIDENTIAL
BUILDING HEIGHT
BD-FLOOR 16 162.25
3.25 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 3.25 m 2.95 m 2.95 m 2.95 m 2.95 m 2.95 m 3.25 m
BD-FLOOR 17 165.2
DRIP EDGE
2.95 m 3.45 m
BD-FLOOR 18 168.45
FOR SLAB THICKNESS REFER TO STRUCTURAL DRAWINGS
125
U/S OF SLAB TO U/S OF PRECAST CONCRETE PANEL
Turner Fleischer Architects Inc.
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
4.98 m
BD-MPH 173.43
OUTDOOR GENERATOR
HT: 61.86 m
HT: 68.39 m
PROPERTY LINE
INTERNAL PROPERTY LINE
SPA153
6.50 m
BD-ROOF 179.93 BD-MPH MEZZANINE 177.13
DRAWING NO.
BUILDING D 19 STOREYS GREEN ROOF
295
125mm PRECAST CONCRETE PANEL
DVE
10
3.80 m
4.59 m
21.081CS2 JULY 2021
16.74 m
295
1
PROJECT NO.
ZONING SETBACK
BLOCK E
22.33 m
BUILDING SETBACK
9.93 m
6.10 m
27.71 m
TWO STAGE CAULKING REQUIRED AT ALL JOINTS AT PRECAST PANEL
BLOCK D - FLOOR 03
ZONING SETBACK
7.18 m
4.75 m
ZONING SETBACK
10.60 m
8.80 m
10.36 m
BUILDING SETBACK
TERRACE AT FLOOR 2
25
1.55 m
1141 Bloor Street West + 980 Dufferin Street, Toronto, ON DRAWING
REV.
85
25 HIGH-RISE
123 EDWARD ST Toronto, ON | 2024 | Mixed-use | Pre-construction Site: 0.83 acres | 102,690 m² residential | 430 m² retail Role: Senior Designer
Project Team: 4
Firm: Turner Fleischer
Located approximately 500 metres from Toronto City Hall, the project responds to the limitations of a constrained downtown site. The initial proposal featured two 72-storey residential towers separated by only 6 metres due to the compact site dimensions. Their architectural expression emphasized vertical articulation, with towers’ profiles conveying the impression of a mass broken into two slender volumes. While well-received by the client group, the minimal separation raised concerns from the City regarding building performance and spatial quality. Additionally, the towers’ prominence risked competing with the visual presence of City Hall when viewed from Nathan Phillips Square. The design evolved to address these challenges through a revised massing strategy. The latest proposal consolidates the towers into a unified composition connected by an intermediate volume, reducing their heights to 59 and 53 storeys. The façade articulation recalls the original concept, maintaining the perception of two distinct volumes, with the connection being expressed through a glazed intermediate link. This iteration responds to regulatory constraints while improving spatial relationships. Working closely with the Design Director, my role included developing the design concept, assisting with feasibility and massing studies, and View from Edward St Looking East (conceptual render)
contributing to the development of the project drawings for submissions.
26 HIGH-RISE
MASSING STUDY - VIEW FROM NATHAN PHILLIPS SQUARE
DESIGN CONCEPT
03
INITIAL MASSING
REVISED MASSING
INITIAL MASSING DESIGN CONCEPT DESIGN CONCEPT
city hall
INITIAL DESIGN
Site Context - Aerial View from North (conceptual render) 27 HIGH-RISE
DESIGN CONCEPT
180 DUNDAS STREET WEST
180 DUNDAS STREET 180 WEST DUNDAS STREET WEST
03 03 REVISED MASSING
REVISED DESIGN
2
THE HOSPITAL FOR THE HOSPITAL FOR SICK CHILDREN SICK CHILDREN
ELM
EET STR
ELM
EET STR
ELM
T T WES WES EET EET D STR D STR RAR RAR GER GER
EET D STR RAR GER
ELM
EET STR
ELM
EET STR
ELM
2024-01-31 5:24:24 PM EET D STR RAR GER
DAS DUN
EET STR
123 EDWARD STREET AND 65 CENTRE AVENUE
6.30 m
6.40 m
6.91 m
DRAWING NO.
SPA814
REV.
2
9.45 m
2B
1B
1B
2B
64.9 m² 698 ft²
46.7 m² 502 ft²
41.9 m² 451 ft²
63.1 m² 679 ft²
6.30 m
6.30 m
6.30 m
0.34 m
2 ______ SPA401
5.54 m
41.9 m² 451 ft²
9.45 m
35.8 m² 385 ft²
1.50 m
STUDIO
6.30 m
1.50 m
STUDIO
1800
9.80 m
53.5 m² 576 ft²
12.00 m
1800
1B+D
6.30 m
56.9 m² 613 ft²
1B+D
CHESTNUT STREET
59.2 m² 637 ft²
N18°04'50"W
1800
1B+D
7.56 m
EXISTING ENTRY COURT TO REMAIN 2000
1B+D
6.30 m
EXTENT OF FLOORS 1-3, 7
17.84 m
3B 80 m² 861 ft²
6.00 m
2B 63.1 m² 679 ft²
2.50 m
1B 44.2 m² 476 ft²
12.00 m
6.30 m
1B 43.6 m² 469 ft²
2B
42.8 m² 460 ft²
ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION
3B
MLE BY
3B
86.3 m² 928 ft²
46.6 m² 501 ft²
EXTENT OF
79.8 m² FLOORS 1-3,10 859 ft²
PROJECT
11.60 m 11.40 m 123 EDWARD STREET AND 65 CENTRE AVENUE
2
EXHAUST SHAFT
MIN. 12.5M SEPARATION FROM EXISTING BUILDING
N72°34'30"E
23.00 m
49.84 m
TORONTO, ON
1 ______ SPA401
TOWER B
30.75 m
180 DUNDAS ST W EXISTING BUILDING 25 STOREYS
0.30 m
1B
1.54 m
EXTENT OF FLOORS 1-3,10
1B
2024-01-31 # DATE
3.50 m
0.39 m
2
64.6 m² 696 ft²
6.30 m
61.3 m² 659 ft²
1.50 m
7.03 m
1B+D 2B
6.30 m
56.9 m² 613 ft²
6.00 m 6.08 m 5.52 m
1B
1.50 m
78.4 m² 843 ft²
67.9 m² 731 ft²
TOWER A DUNDAS STREET WEST
0.30 m
#
2024-01-31 DATE
PROJECT
TORONTO, ON
DRAWING
PROJECT NO.
22.012SPA
PROJECT DATE
PROJECT DATE
2023-09-20
DRAWN BY
DRAWN BY
HHK
MLE
CHECKED BY
CHECKED BY
RMM
NMC
HIGH-RISE 1:200
N
ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION
MLE BY
residential units horizontal circulation, lobby 123 EDWARD STREET AND 65 CENTRE AVENUE vertical circulation, parking, service areas amenity TYPICAL TOWER FLOORS 11-53 retail
2023-09-20
SCALE
1 : 200
SCALE
12.66 m
48.9 m² 527 ft²
8.30 m
6.10 m
1.50 m
2.56 m
28
FLOOR 11-53
6.50 m
1B
2B
2B
PROJECT NO.
1
6.50 m
46.6 m² 501 ft²
66.2 m² 712 ft²
2B
FLOOR 1
SPA160
6.50 m
1925
658 ft²
68.1 m² 734 ft²
66.3 m² 714 ft²
OUTLINE OF FLOOR 4-10, 11-56 ABOVE
30.75 m
TOWER A
6.50 m
1.50 m
5.06 m
2B
GAS/HYDRO METER
DRAWING
2-01 1:20:42 PM
6.50 m
EXTENT OF FLOORS 1-3,10
1B+D
FIRE ROUTE SIGN 68.1 m² 61.1 m²
0.08 m
OUTLINE OF EXISTING BUILDING TO BE DEMOLISHED
NMC 1 : 2500
N72° 23'10"E
2000
49.84 m
DRAWN BY
7.25 m
2
1B000.00 SPOT ELEVATION
6.30 m 6.30 m
53.96 m
CENTRE AVENUE
CHESNUT STREET
N18°04'50"W
CHESTNUT STREET
00 60
13.69 m
BW 93.25 TW 92.60
2023-09-20
N
MARCH 21 - 1618 PM
SPA814 1 : 2500
TRANSFORMER WITH CLEARANCES
N18° 02'00"W
1.10 m
6.00 m
1 ______ SPA402
4.0%
+93.25m
PROJECT DATE
CHECKED BY
SPA814 1 : 2500 REV.
2B+D
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
MLE
0.01 m 1
SIAMESE CONNECTION
50 m² 538M ft²
EET Y STR OUR ARM
45.16 m
6.00 m
6.64 m
2.84 m
2500
13.65 m
OUTLINE OF UG BELOW
INTAKE SHAFT
11.00 m
2.20 m
2.50 m
7.1 8
39.88 m
OFF LEASH DOG RUN 111.41 m² 1199 ft²
EXIT
1.4 % 2.0%
PROJECT
TORONTO, ON
TORONTO CITY HALL
MARCH 21 - 1618 PM
SPA823 EXIT
22.012SPA
200
N
WEST
WEST
EDWARD STREET
EET Y STR OUR ARM
5.00 m
FIRE HYDRANT
G
OUTLINE OF UG BELOW
1800 1800
2.20 m
2024-01-31 5:24:26 PM
2.0 %
2.0%
2.0%
2024-01-31 5:24:50 PM
2.6%
N18° 02'00"W
48.96 m
BC 93.88 TC 94.03 2.89 m
60 00
1.7%
6.00 m
6.00 m
14.23 m
MAIL ROOM
MAIL ROOM B.O.H
TYPE B LOADING (11.0m x 3.5m x 4m)
2.20 m
m
13.00 m
2.0%
1.0%
8.49 m
30 00
300 0
2.0%
MAIL ROOM
6.0M FIRE ROUTE
48.96 m
CENTRE AVENUE
1925
10169 9.14 m
2500
CENTRE AVENUE
EXIT 10.30 m
DUNDAS STREET WEST
LOOR 1 (BUILDING 2)
EET STR
SHADOW STUDIES
RETAIL ENTRANCE DRAWING NO.
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
PROJECT NO.
23.00 m 4
MLE BY
EET STR
TOWER B
N
ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION
BAY
2
SPA402
EET UT STR STN CHE
CITY OF TORONTO STANDARD BIKE ______ PARKING (10)
DAS DUN
EET TH STR ABE
2.0%
1 ______ SPA401
2024-01-31 DATE
22.012SPA
SECONDARY RESIDENTIAL ENTRANCE
733 ft²
SITE ACCESS TO BE CONSTRUCTED TO CITY DESIGN STANDARD T-310.050-01
N72°34'30"E
TC 93.50 BC 93.35
#
DRAWING
TORONTO CITY HALL
4.27 m
MIN. 12.5M SEPARATION 93.56 FROM EXISTING BUILDING
ELIZ
93.66
TC 93.68
EET STR
EET STR
NUE AVE
93.74
21.28 m
23.08 m BC 93.53
1 : 2500
A
93.52 2. 0% % 3.1 93.44 EXHAUST SHAFT
DAS DUN
TOWER A
ARD
TRE CEN
% 1.9
OUTLINE OF FLOORS 4-9, 11-57 ABOVE
2.0%
2.0%
TC 93.81 BC 93.66
2 ______ SPA401
10982
00 60
93.87 1.80 m
93.80
WEST
OUTLINE OF FLOOR 4-10, 11-56 ABOVE CONVEX MIRROR
% 2.0
TC 93.76 BC 93.71
93.87
2.5%
93.71 93.72 +93.50m 93.59
WEST
NUE AVE
93.50
94.64
EDW
SITY UNIVER
94.60
2.30 m
93.91
+93.23m
60 00
180 DUNDAS ST W EXISTING BUILDING 25 STOREYS
94.60
93.66
2.0%
2.0%
94.70
93.80
BIKE LOCKERS 27.19 m² 293 ft²
EET STR
31.58 m
94.20
3.1%
94.09
94.05
1.2% 93.77
TC 93.97 BC 93.82
24 BIKES
30 00
95.02
6.00 m
BAY
3.0% 93.80
94.11
94.15
SHORT TERM BIKE PARKING (36)
EET STR
EET TH STR ABE
2.0%
ELIZ
BW 91.95 TW 94.15
5%
94.39
2000
2.0%
BC 92.94 TC 93.09
2.0%
136 BIKES STORAGE
EET UT STR STN CHE
47.72 m
SEPTEMBER 21 - 1418 PM
SCALE
FH
3000
OUTLINE OF EXISTING BUILDING TO BE DEMOLISHED
94.29
1
SPA823 1 : 2500
BC 93.02 TC 93.07
TW 94.18
2000
93.21
8.10 m
PARKING (120)
DAS DUN
ELM
EET STR
PRIMARY RESIDENTIAL ENTRANCE
NMC
93.90
93.25
4.00 m
TWSHORT 94.44 TERM BIKE
93R .23
+0.00m EXIT OUTLINE OF FLOORS 4-6, 8-53 ABOVE
7.5% 91.95
10%
EET STR
NUE AVE
OVERHEAD DOOR
DRAWN BY
MLE CHECKED BY
FFE=93.50
2.0%
91.74
7.5%
EET STR
ARD
TRE CEN
-1.58m
+91.67m
EDW
NUE AVE
-2.39m
+90.86m
EET STR
Turner Fleischer Architects Inc.
SITY UNIVER
-2.69m
+90.56m
94.40
FFE=94.56
+93.92m
EET STR
2.1%
94.44
BIKE LOCKERS 159.03 m² 1712 ft²
RETAIL GARBAGE 33.08 m² 356 ft²
EET UT STR STN CHE
OVERHEAD DOOR
94.56
AMENITY 48.1 m² 518 ft²
2.14 m
MOVING
2023-09-20
+93.30m
93.28
PARCEL
2.50 m
FFE=92.50
+94.56m
FFE=94.00
2.0%
EET TH STR ABE
1800
3.50 m
STAGING 158.5 M2
FFE=92.20
BIKE ELEVATOR LOBBY
94.56
94.17
94.13
TC 94.05 BC 93.90
RETAIL 397.79 m² 4282 ft²
BAY
ELIZ
4.31 m
EXISTING ENTRY COURT TO REMAIN
2.0%
NUE AVE
FFE=94.00 RECEPTION
2000
TRE CEN
5.23 m
LOBBY (A) 231.48 m² 2492 ft² VEST
PARCEL
93.51
93.63
93.82 6.71 m
2. 0%
00 60
93.60
+93.65m
OUTLINE OF FLOORS 4-6, 8-53 ABOVE
93.99
94.00
FFE=94.25
PET WASH STATION
NUE AVE
93.96 1.0 % 2 .72 m
CACF
RECEPTION
SITY UNIVER
N72° 23'10"E
93.79
93.90
94.00
94.28
94.24
TC 94.16
BC 94.01
6.00 m
93.95
TC 93.38
2.44 m
BC 93.22 TC 93.37
93.98
2.0%
2
SPA812
ELM
2
67 EET Lesmill Road STR ELM Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
TOWER B LEGEND
PROJECT DATE
EET Y STR OUR ARM
00 60
BC 93.06 TC 93.21
SIAMESE CONNECTION
SPA823 1 : 2500 REV.
FH
BC 93.37 TC 93.52
42.72 m
BC
93.48
CACF
DRAWING NO.
BC 93.56 SEPTEMBER 21 - 1418 PM TC 93.71
93.33
+94.12m
4
+93.95m
OUTLINE OF FLOORS 4-9, 11-57 ABOVE
LOBBY (B) 292.55 m² 3149 ft²
EET Y STR OUR ARM
SCALE
: 2500 BC193.72 N TC 93.87
EET STR
MLE BY
DAS DUN
TORONTO CITY HALL
3000
94.30
VEST
8.98 m
EDWARD STREET
NMC
93.94EXIT
94.17
WEST
THE HOSPITAL FOR SICK CHILDREN
Turner Fleischer Architects Inc.
ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of PROJECT survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with65 the CENTRE work. Construction must conform to all 123 EDWARD STREET AND applicable codes and requirements of authorities having jurisdiction. The contractor working from AVENUE drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his ON work. TORONTO,
WEST
T WES
SHADOW STUDIES
2.0%
94.32
1.40 m
93.96
2.0%
3000
8296
m .96 37
94.11
2.8%
94.10
94.07
POPS
EET STR
EET STR
TORONTO CITY HALL
0 300
94.47
TC 94.35
BC 94.20
94.29
1.72 m
94.14
94.18
DAS DUN
DAS DUN
DRAWING
SIAMESE CONNECTION
CHECKED BY
BC 93.91 TC 94.06
POPS 140.4 m² 1511 ft² 94.16
+94.20m
2500
WEST
EET STR
PROJECT NO.
DRAWN BY
1500
2000
N
WEST
ARD
22.012SPA
MLE
3.0%
EDW
EDWARD STREET
2023-09-20
28.00 m
OUTLINE OF UG BELOW
EET STR
2024-01-31 DATE
#
150m
REV.
EET D STR RAR GER
ELM
Typical Floor Plan
100m
MARCH 21 - 1518 PM
T WES
EET STR
50m
SPA814 1 : 2500
THE HOSPITAL FOR SICK CHILDREN
EET STR
20m
2 15:18
SPA813
EET D STR RAR GER
SHADOW STUDIES
26.28 m
94.42
DAS DUN
ELM
2
DRAWING NO.
T WES
PROJECT NO.
PROJECT DATE
OUTLINE OF EXISTING BUILDING TO BE DEMOLISHED
3000 .8 m 92.0%
14:18
13:18
22.012SPA
2.0%
0 750
1050 0
2.0%
0 50 13
60 00
EET STR
N
MARCH 21 - 1418 21 - PM 1518 PM 3 MARCH
SPA813 1 : 2500 SPA814 1 : 2500
2
SPA812
EET STR
EET Y STR OUR ARM
MARCH 21 - 1218 PM
1
SEPTEMBER 21 - 1318 PM 2 SPA813 1 : 2500 SPA823 1 : 2500 REV.
EET TH STR ABE
DRAWING
2400
BC 94.14 TC 94.29
DAS DUN
TOWER A
TORONTO CITY HALL
0 00 R6
1
SCALE
MARCH 21 - 1418 PM
4
DRAWING NO.
BAY
ELIZ
TOWER B
EET UT STR STN CHE
TORONTO, ON
WEST
EET STR
NUE AVE
123 EDWARD STREET AND 65 CENTRE AVENUE
ARD
EET Y STR OUR ARM
1 : 2500
N
ELM
TRE CEN
PROJECT
WEST
NUE AVE
EET STR
SITY UNIVER
EET UT STR STN CHE
DAS DUN
1.72 m
SCALE
1 : 2500
2
EDW
TORONTO CITY HALL
DRAWN BY
MLE CHECKED BY
EET STR
EET STR
SCALE 1:2500
WEST
2023-09-20
NMC
MLE BY ELM
6.0M FIRE ROUTE
SPA812 1 : 2500
ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION
EET TH STR ABE
NUE AVE
NUE AVE
EET STR
EET STR
TRE CEN
SITY UNIVER
DAS DUN
ARD
2024-01-31 DATE
EET STR
ELIZ
EDW
#
EET STR
PROJECT DATE
TORONTO CITY HALL
EET EET Y STR Y STR OUR OUR ARM ARM
THE HOSPITAL FOR SICK CHILDREN
ELM
2 BAY
ELM
EET EET STR Y STR OURY OUR ARM ARM
EET D STR RAR GER
TYPE G LOADING (13.0m x 4.0m x 6.1m)
ELM
EASEMENT
EET STR
TORONTO CITY HALL
CHECKED BY
THE HOSPITAL FOR SICK CHILDREN
Ground Floor Plan
TORONTO CITY HALL
NMC
T WES
THE HOSPITAL FOR SICK CHILDREN
EET STR
T WES
EET UT STR STN CHE
EET D STR RAR GER
EET TH STR ABE
12:18
BAY
ELIZ
11:18
SHADOW CAST BY BUILDINGS UNDER CONSTRUCTION
WEST
SHADOW STUDIES
DRAWN BY
MARCH 21 - 1218 PM 3 SEPTEMBER 21 - 1318 PM
1
EET STR
PROJECT NO.
MLE
SPA812 1 : 2500 SPA823 1 : 2500
DAS DUN
SHADOW CAST BY SUBMITTED / NOT YET CONSTRUCTED BUILDINGS
22.012SPA TORONTO CITY HALL
2023-09-20
EET EET Y STR Y STR OUR OUR ARM ARM
NUE AVE
EET EET STR Y STR OURY OUR ARM ARM
SHADOW CAST BY PROPOSED DEVELOPMENT
DRAWING
PROJECT DATE
TORONTO CITY HALL
EET STR
0m
TORONTO, ON
WEST WEST EET STR
DAS DUN
ARD
TRE CEN
123 EDWARD STREET AND 65 CENTRE AVENUE
SHADOW STUDIES
TORONTO CITY HALL
NUE AVE
EET STR
SITY UNIVER
PROJECT
WEST WEST EET STR
DAS DUN
150m
DAS DUN
EET STR
EDW
PROJECT NO.
TORONTO CITY HALL
21 - AM 1218 PM 4 MARCH MARCH 21 - 1118
shadow cast by existing development shadow cast by proposed development shadow cast by submitted / not yet constructed developments shadow cast by developments under construction
MLE BY ELM
EET STR
EET STR
EET STR
NUE AVE DAS DUN
#
ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION
BAY
BAY
EET STR
2024-01-31 DATE
EET TH STR ABE
ARD
ELIZ
EDW
EET UT STR STN CHE
EET STR
TRE CEN
NUE AVE
NUE AVE
100m
TRE CEN
50m
NUE AVE
20m
SCALE 1:2500
ST WEST EET WE EET STR STR DAS DUN
SITY UNIVER
SHADOW CAST BY BUILDINGS UNDER CONSTRUCTION
ST WEST EET WE EET STR STR DAS DUN
ARD
EET TH STR ABE
EDW
EET UT STR STN CHE
SHADOW CAST BY SUBMITTED / NOT YET CONSTRUCTED BUILDINGS SITY UNIVER
DAS DUN
ELIZ
EET STR
EET STR
BAY
BAY
EET SHADOW CAST BY EET STR STR ELM ELM PROPOSED DEVELOPMENT
EET TH STR ABE
EET UT STR STN CHE
EET UT STR STN CHE
EET TH STR ABE
NUE AVE
NUE AVE DAS DUN
ELIZ
ELIZ
EET EET STR STR ARD EDW
0m
TORONTO, ON
WEST
TRE CEN
EET STR
ARD
TRE CEN
WEST
DAS DUN
NUE AVE
123 EDWARD STREET AND 65 CENTRE AVENUE
NUE AVE
EET STR
SITY UNIVER
PROJECT
WEST
SITY UNIVER
EET STR
EET EET STR STR ELM
22.012SPA
2
LEGEND
EET STR
SHADOW CAST BY EXISTING DEVELOPMENT
DRAWING
SPA812 SPA812 1 : 2500 1 : 2500
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
THE HOSPITAL FOR SICK CHILDREN
2
EDW
150m
DAS DUN
TORONTO CITY HALL
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
T WES
THE HOSPITAL FOR THE HOSPITAL FOR SICK CHILDREN SICK CHILDREN
LEGEND
EET EET STR STR ELM
MLE BY ELM
EET STR
NUE AVE
DAS DUN
EET STR
EET STR
TRE CEN WEST
DAS DUN
#
ISSUED FOR OPA/ZBA/SPA RESUBMISSION #1 DESCRIPTION
BAY
BAY
EET STR
2024-01-31 DATE
EET TH STR ABE
ARD
EET UT STR STN CHE
EDW
EET TH STR ABE
EET STR
EET UT STR STN CHE
NUE AVE
NUE AVE
100m
TRE CEN
NUE AVE
SITY UNIVER
50m
SITY UNIVER
NUE AVE
20m
SCALE 1:2500
ST WEST EET WE EET STR STR DAS DUN
ARD
ELIZ
ELIZ
EET STR
EET STR
BAY
BAY
EDW
SHADOW CAST BY BUILDINGS UNDER CONSTRUCTION
0m
DAS DUN
March 21st Turner Fleischer Architects Inc.
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
SHADOW CAST BY EXISTING DEVELOPMENT
SHADOW CAST BY SUBMITTED / NOT YET CONSTRUCTED BUILDINGS
ST WEST EET WE EET STR STR DAS DUN
150m
MARCH 21 - 1318 PM
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
THE HOSPITAL FOR THE HOSPITAL FOR SICK CHILDREN SICK CHILDREN
EET SHADOW CAST BY EET STR STR ELM ELM PROPOSED DEVELOPMENT
EET TH STR ABE
EET UT STR STN CHE
EET UT STR STN CHE
TRE CEN
NUE AVE
NUE AVE
NUE AVE
SITY UNIVER
SITY UNIVER
TRE CEN
EET TH STR ABE
EET EET STR STR ARD EDW
DAS DUN
ELIZ
ELIZ
ARD
100m
SPA813 1 : 2500
T T WES WES EET EET STR D STR RARD RAR GER GER
2
EDW
50m
Turner Fleischer Architects Inc. T T WES WES EET EET D STR D STR RAR RAR GER GER
LEGEND
EET EET STR STR ELM
20m
SCALE 1:2500
WEST
TORONTO CITY HALL
SHADOW CAST BY EXISTING DEVELOPMENT
ELM
EET STR
SHADOW STUDY
MARCH 21 - 1318 PM
3
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
EET EET STR STR ELM
SHADOW CAST BY BUILDINGS UNDER CONSTRUCTION
WEST
EET Y STR OUR ARM
Turner Fleischer Architects Inc.
ELM
ET
DAS DUN
SPA813 1 : 2500
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
THE HOSPITAL FOR THE HOSPITAL FOR SICK CHILDREN SICK CHILDREN
EET STR
TORONTO CITY HALL
SPA812 1 : 2500
T T WES WES EET EET STR D STR RARD RAR GER GER
DAS DUN
EET Y STR OUR ARM
MARCH 21 - 1118 AM
2
EET T STR
MARCH 21 - 1118 AM
NUE AVE
WEST
EET Y STR OUR ARM
SPA812 1 : 2500
TRE CEN
EET STR
TORONTO CITY HALL
EET Y STR OUR ARM
3
WEST
0m
DAS DUN
TORONTO CITY HALL
EET STR
150m
SCALE 1:2500
WEST
DAS DUN
NUE AVE
EET STR
100m
SITY UNIVER
DAS DUN
50m
ET
WEST
20m
EET T STR
EET STR
NUE AVE
NUE AVE
0m
DAS DUN
TRE CEN
SHADOW CAST BY BUILDINGS UNDER CONSTRUCTION
WEST
EET STR
SITY UNIVER
DAS DUN
T
NUE AVE
NUE AVE
WEST
EET T STR
TRE CEN
SITY UNIVER
NUE AVE
NUE AVE
EET STR
T
EET T STR
TRE CEN
SITY UNIVER
DAS DUN
SCALE
1 : 200 N
2079 YONG E ST Toronto, ON | 2023 | Mixed-use High-rise | Pre-construction Site: 1.24 acres | 33,662 m² residential | 1,893 m² retail Role: Senior Designer
Project Team: 5
Firm: Turner Fleischer
Situated on a prominent midtown block between Hillsdale Avenue and Manor Road, the proposed redevelopment introduces a 29-storey mixed-use building that thoughtfully integrates elements of the site’s heritage at the ground floor. The project reflects the challenges and opportunities of densifying a well-connected Yonge Street corridor while respecting its historical context. Ground-floor retail activates the public realm along Yonge Street and Hillsdale Avenue East. The streetscape design evolved through multiple iterations in collaboration with the heritage consultant to align with the vision for the site and its context. Clad in aluminumtoned metal panels, the tower presents a refined contemporary expression that enhances visual lightness, durability, and skyline presence. The design and material palette were carefully selected to complement the heritage character at the base without competing with it. I was responsible for developing the design concept and coordinating its translation into the drawing sets, working closely with the project documentation team, consultants, and city planners. One of the challenges was achieving a sensitive transition between the building and the adjacent low-rise neighbourhood to the east. The terraced podium mediates this change in scale, while four townhouses along Manor Road introduce a finer-grain residential frontage that further reinforces this interface.
View from Yonge St Looking North (conceptual render)
29 HIGH-RISE
MAN
OR
RD
MAN
OR
E
RD
E
MASSING CONCEPT
YONGE
ST
HILLSDALE AVE E
T
ES
NG
YO
HILL
HILL
SDA
T
ES
NG
YO
MAN
OR
MANOR RD E
RD
MAN
OR
E
SDA
LE A VE E
RD
LET A E S VE E
NG
YO
HILL
SDA
T
ES
NG
YO
MAN
OR
E
RD
MAN
OR
E
RD
LE A VE E
HILL
SDA LET E S AVE E NG
YO
HILL
SDA
T
ES
NG
YO
MAN
OR
E
RD
MAN
OR
E
RD
LE A VE E
HILL
SDA
LE A VE E
E
transition to low-rise neighbourhood Turner Fleischer Architects Inc.
03
HILLSDALE AVE E HILLSDALE AVE E
ST
TRANSFORMER WITH CLEARANCES FIRE ROUTE SIGN
A
SPOT ELEVATION "ADJACENT LANDS000.00 OWNED BY CSG YONGE-MANOR LIMITED M AND CSG HILLSDALE LIMITED" GAS/HYDRO METER
2100
000.00 SPOT ELEVATION M
GAS/HYDRO METER
G
13.00 m
N15°47'45"W
N15°47'30"W
93.65 m
N15°35'30"W
N15°34'10"W
N15°35'20"W
6.15 m
N15°47'45"W
81.65 m
20.65 m
2100
N15°47'30"W
4670
(P6&SET) 89°32'10"
(P6&SET) 89°32'10"
N73°03'45"E(P5) 7.62(P) N74°42'20"E N72°59'45"E (M)
7.601 (P5&M)
2.10 m
2100
15.24(P) 15.25(P5)
View from Manor Rd E - Townhouses (conceptual render)
CONVEX MIRROR
FIRE ROUTE SIGN
A
FIRE HYDRANT SIAMESE CONNECTION
03
TRANSFORMER WITH CLEARANCES
PART 7, PLAN 66R-14429 SUBJECT TO RIGHT-OF-WAY
PART 6, PLAN 66R-14429 SUBJECT TO RIGHT-OF-WAY
EXIT
03
2900 4500
4500
4540
OUTLINE ABOVE
15.254 (M)
FLOOR 2
42.878 (M)
6.30 m
41.05(P)
41.040 (M)
41.000 (M)
40.99(P)
PROP. SAN. CONTROL MH CONVEX MIRROR
23.20 m
EXIT
16.60 m
42.878 (M)
42.91(P6)
6900 (22' - 8")
12378 (40' - 7")
6.00 m
5570
EXIT
6000
4500
93.65 m
N15°35'30"W
N15°35'20"W
SIAMESE CONNECTION
6.720 (P6&SET) N74°40'20"E (M) N74°40'05"E(P6)
N77°06'00"E
N77°11'15"E N77°07'20"E
15.254 (M)
6.720 (P6&SET) N74°40'20"E (M)
15.24(P) 15.25(P5)
25206 (82' - 8")
2.10 m
8.10 m
C
B
8.70 m
39.745 (M)
39.72(P) 39.75(P5)
PART 3, PLAN 66R-31329 SUBJECT TO RIGHT-OF-WAY
10.50 m
36.30 m
EXIT 2.05 m 6.00 m
6.15 m
2.10 m
D M 6.20 m
7.10 m
7.70 m
1.15 m
6.65 m 26.70 m
CB
MANOR ROAD E. EX. 450∅ STORM SEWER EX. 300∅ COMB. SEWER EXISTING FIRE HYDRANT
6.75 m
1.50 m
1.07
N74°14'05"E
N74°13'45"E
FH
8.10 m
N15°49'30"W N15°52'30"W
1.07 6.55(P&SET)
PROJECT
7.620(P&M)
43.598 (M) 43.62(P)
REZONING RESUBMISSION REZONING RESUBMISSION ISSUED FOR REZONING DESCRIPTION
NMU NMU NMU BY
3 2 1
DRAWING
MANOR ROAD E. EX. 300∅ COMB. SEWER
CB
. DR
. DR
IS LL TU
IS LL TU
FH
2023-12-07 2023-11-08 2023-08-15 DATE
REZONING RESUBMISSION REZONING RESUBMISSION ISSUED FOR REZONING DESCRIPTION
NMU NMU NMU BY
PROJECT
Hillsdale Ave E + Yonge St + Manor Rd E Toronto, Ontario
DRAWING
FLOOR 01
PROJECT NO.
THW
#
Toronto, Ontario
7.70 m
EXISTING FIRE HYDRANT
EX. 300∅ WM
#
residential units horizontal circulation, lobby vertical circulation, service areas Hillsdale Ave E + Yonge St + Manor Rd E amenity retail garbage room FLOOR 01 bicycle parking
2023-12-07 2023-11-08 2023-08-15 DATE
N15°52'30"W
6170
13.393(P1) 13.41(P) 13.401 (M) (SET)
N8°27'35"W
N15°49'30"W N15°52'30"W
N15°52'30"W
N9°01'50"W N9°25'10"W
TH 59.6 m² 641 ft²
35.978(M) 36.00(P)
43.62(P)
EX. HYDRANT
CB
TH 66.1 m² 711 ft²
43.598 (M)
EXISTING FIRE HYDRANT
CB
TH 70.3 m² 756 ft²
3 2 1
5.80 m
26.70 m
TH 55.2 m² 594 ft²
7.25 m
6.75 m
6.55(P&SET)
17320
8.45 m
6.65 m
0.80 m
1.07
TYPE "B" LOADING SPACE 11.0 m X 3.5 m X 4.0 m
PROP.PART 150∅ FIRE CONNECTION 2, PLAN 66R-31329 SUBJECT TO RIGHT-OF-WAY PROP. 100∅ DOM CONNECTION
36.63(P) 36.637(P1)
7.620(P&M)
1.50 m
35.978(M) 36.00(P)
71.8 m² 773 ft²
36.661 (M)
2.10 m
D M
DOWN TO UG1 RETAIL SERVICE
39.745 (M)
39.72(P) 39.75(P5)
RESIDENTIAL BIKE PARKING (98 SHORT-TERM) (38 LONG-TERM)
285.4 m² 3072 ft²
11.60 m
TH EXISTING BUILDING 59.6 m² 641 ft²
11.55 m
AMENITY
2.70 m
TH 66.1 m² 711 ft²
10.50 m
TH
7.25 m
8.45 m
81.65 m
N15°34'10"W
N15°35'20"W
2.10 m 11.55 m
765.6 m² 8241 ft²
OUTLINE OF UG BELOW
70.3 m² 756 ft²
CB
4500
N77°06'00"E
N77°11'15"E N77°07'20"E
PROP. 150∅ FIRE CONNECTION
EX. 300∅ WM
CB
SIAMESE CONNECTION
29035 (95' - 3")
17320
N74°14'50"E
CB
4500
View from West (conceptual render)
EXIT
FH
G
SHORT TERM PARKING ONLY
4600
2.00 m
6170
N74°11'55"E
1.15 m
6700
VEST.
7.601 (P5&M)
PART 3, PLAN 66R-31329 SUBJECT TO RIGHT-OF-WAY
N8°38'20"W(P,P 2)
TYPE "B" LOADING SPACE 11.0 m X 3.5 m X 4.0 m
6.15 m
D
6.25 m
YONGE
YONGE
23.20 m 20.65 m
6.15 m
249.3 m² 2684 ft² FFE: 154.9 N72°59'45"E
36.30 m
FLOOR 2 OUTLINE ABOVE
0.05 m
15229 (50' - 0")
41.05(P)
41.040 (M)
41.000 (M)
16.60 m
40.99(P)
6900 (22' - 8") EXIT
13.00 m
2900
1.20
6.00 m
THW
G
FIRE HYDRANT
EXIT
N15°35'20"W
6.30 m
1.00 m
1.95 m
EXIT
3.50 m
LOBBY
RETAIL B
m DOWN TO UG1
THW
B
G
EXIT
EXIT
N74°40'05"E(P6)
285.4 m² 3072 ft²
CB
C
G
N73°03'45"E(P5) 7.62(P) N74°42'20"E (M)
AMENITY
7.10 m
1.15 m
G
G
33.9 m² 364 ft²
2.10 m
CB
CB
6.20 m
G
G
EX. 150∅ WM FH EX. 2300 x 2200 COMB. SEWER
N74°14'05"E
450∅ STORM SEWER
THW
10.9 m² 117 ft²
4540
0.15 m
THW
N74°13'45"E
EX. HYDRANT
THW
CACF
TYPE "G" LOADING SPACE
G
G
STAIR EXIT FROM FL02 / UG1
1.07
X. 150∅ WM WER MANOR RD. W.
1.95 m
2100 13.393(P1) 13.41(P)
N8°27'35"W
(SET)
55.2 m² 594 ft²
N9°01'50"W N9°25'10"W
2.70 m
THW
O O O O R R
2100
N74°50'20"E(P,P2)
TH
0.80 m
CB
CB
11.60 m
ONNECTION
FIRE RO
BELOW
13.401 (M)
36.661 (M) 36.63(P) 36.637(P1)
71.8 m² 773 ft²
2.00 m
95' - 3")
4670
VEST.
N74°15'50"E (M) 0.240 (P,P2&SET)
1.20 m
E
4500
1.65 m
EX. 2030.8 0∅0 mWM
RESIDENTIAL BIKE PARKING (98 SHORT-TERM) (38 LONG-TERM)
1 ______ SPA401
R
G
PROP.PART 150∅ FIRE CONNECTION 2, PLAN 66R-31329 SUBJECT TO RIGHT-OF-WAY PROP. 100∅ DOM CONNECTION
OUTLINE ABOVE FLOOR 2
CB
765.6 m² 8241 ft²
SIAMESE CONNECTION 6000
11.65 m
.1M - .2M YONGE STREET R.O.W. WIDENING
25206 (82' - 8")
RETAIL B
SIAMESE CONNECTION
VEST.
6.00 m 4500
EX. 1350 ∅ STORYONG M SEWER E STREET (27m R.O .W.) EX UTE RETAIL SERVICE. 750∅ C OMB. SE WER LAY-BY EX. 450∅ ST ORM SEWE R
LOBBY 249.3 m² 2684 ft² FFE: 154.9
4500
4500
SHORT TERM PARKING ONLY
4600
33.9 m² 364 ft²
N8°22'30"W
G
N8°23'30"W 4500
G
STAIR EXIT FROM FL02 / UG1
2100
G
161.8 m² 1741 ft²
RETAIL ENTRANCE
(P+P6&SET)
FH
13.0 m X 4.0 m X 6.1 m "ADJACENT LANDS OWNED BY GARBAGE CSG YONGE-MANOR LIMITED 4190 14930 R AND CSG HILLSDALE LIMITED"
R
R
(M)
G
6700
36.8 m² 396 ft²
R R R R R R R
R
27.017
G
28.3 m² 304 ft²
BULKY ITEMS
29.290
HILLSDALE AVE HILLSDALE E + YONGE AVE2.10 ST Em + YONGE ST RETAIL SERVICE
RES. MOVING STAIR TRANSFER ABOVE
13243 (43 ' - 5")
29675 (97' - 4")
G
7.60 m
7.620(P&SET)
MANOR RD E
SECONDARY RESIDENTIAL ENTRANCE
RESIDENTIAL ENTRANCE PROP. 250∅ CONNECTION TO EX. 29.30 m PROP. 150∅ CONNECTION TO EX. 525∅ COMB. SEWER RETAIL ENTRANCE 525∅ STORM SEWER
15.80 m 8.15 m
(P+P6&SET)
MANOR RD E
52923 (173' - 8")
26.99(P)
G
3.05 m
G
14930
CB
R
G G
EXIT
O O O O R R
R
4190
PART 7, PLAN 66R-14429 SUBJECT TO RIGHT-OF-WAY
161.8 m² 1741 ft²
2.10 m
6.00 m
GARBAGE
)
1017.7 m² 10955 ft²
.4M YONGE TYPE "G" LOADING SPACE STREET R.O.W. 13.0 m X 4.0 m X 6.1 m WIDENING
5570
R R R
29.290
62.48(P)
MH
PART 6, PLAN 66R-14429 SUBJECT TO RIGHT-OF-WAY
R R R R R R R
7.620(P&SET)
PROP. SAN. CONTROL 51648 (169' - 5")
0.40 m
27.70 m
BULKY ITEMS
41.91(P,P2)
2.20 m
RETAIL A
36.8 m² 396 ft²
STAIR TRANSFER ABOVE
N8°35'50"W
1.20 m
28.3 m² 304 ft²
41.914 (M)
OMB. SE WER
RES. MOVING
0.90 m
EXIT 2.05 m 6.00 m
B
0.80 m
1.30 m 6.15 m
RETAIL SERVICE MASSING CONCEPT MASSING CONCEPT PODIUM PODIUM
SECONDARY
54.30 m CONNECTION TO EX. PROP. 250∅ 29.30 m m PROP. 150∅ CONNECTION TO EX. 525∅ COMB. SEWER PROP.35.25 STORM CONTROL 525∅ STORM SEWER MH
7.60 m 1.65 m
LEGEND PRIMARY RESIDENTIAL ENTRANCE
RESIDENTIAL ENTRANCE
62.460 (M)
2.15 m
EX. 675∅ C
51648 (169' - 5")
CB
C
15229 (50' - 0")
HILLSDALE AVE. W.
Ground Floor Plan
12 SHORT TERM NONRESIDENTIAL BIKE PARKING SPACES
CB
15.80 m
62.48(P)
62.460 (M)
52923 (173' - 8")
A
8.15 m 17.40 m
5.80 m
CB
6.15 m 12378 (40' - 7")
1.00 m
CB
CB
CB
m PROP.35.25 STORM CONTROL 4.90MH m
1.65 m
6.25 m
6.25 m
54.30 m
7.40 m
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
LEGEND HILLSDALE AVENUE E. PRIMARY
EX. 400∅ STORM SEWER (ABANDONED)
1.20 m
CB
CB
12 SHORT TERM NONRESIDENTIAL BIKE PARKING SPACES
CB
CB
EX. 525∅ STORM SEWER EX. 525∅ COMB. SEWER HILLSDALE AVENUE E.
1 ______ SPA402
8.30 m
8.30 m CB
EX. 400∅ STORM SEWER (ABANDONED)
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
EXISTING FIRE HYDRANT
ST
CB
EX. 525∅ STORM SEWER EX. 525∅ COMB. SEWER
N
1 ______ SPA402
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
42.91(P6)
FH
EXISTING FIRE HYDRANT
HILLSDALE AVE E + YONGEEX.ST 150∅ WM
LAY-BY
FH
EX. 150∅ WM
Turner Fleischer Architects Inc.
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
PROJECT NO.
20.222P01
20.222P01
PROJECT DATE
PROJECT DATE
2023-03-10
2023-03-10
DRAWN BY
DRAWN BY
NMU CHECKED BY
RMM SCALE
1:250 N
DRAWING NO.
REV.
30
NMU
HIGH-RISE
1:250
CHECKED BY
RMM SCALE
N
DRAWING NO.
REV.
HERITAGE BUILDING RESTAURATION STUDY
roofline modillions dentilled cornice
original 2nd floor openings
chamfered entrance visual break between heritage and proposed new building 1917 photograph showing the original design of the primary elevation of 2111 Yonge Street (Source: City of Toronto Archive).
Proposed restoration of the North elevation of 2111 Yonge Street
View from Hillsdale Ave E and Yonge St - Retained Corner Heritage Building (conceptual render)
STREETSCAPE STUDY
View along Yonge St - Initial Iteration - New Corner Building (conceptual render)
View along Yonge St - Latest Iteration - Retained Corner Heritage Building (conceptual render) 31 HIGH-RISE
955 WEST ON RD Toronto, ON | 2023 | Residential | Pre-construction Site: 1.85 acres | 61,151 m² Role: Senior Designer
Project Team: 4
Firm: Turner Fleischer
Located in Toronto’s Mount Dennis neighbourhood, the project comprises two towers, 34 and 24 storeys high, rising above an eightstorey podium and delivering 1,003 residential units ranging from studio to three-bedroom layouts. A portion of the site is dedicated to a new public park, contributing to the neighbourhood’s public realm. The initial application proposed a larger building footprint occupying most of the site. The revised design reduces the site coverage while maintaining density by shifting mass vertically and setting the towers further back from the street. This strategy lowers the perceived scale at the streetscape, and introduces an internal courtyard that enhances light, openness, and shared outdoor space. A terraced podium establishes a pedestrian-scaled frontage. The façade combines metal and precast panels, with the podium finished in warm-toned materials that add richness to the streetscape. Rounded internal podium corners soften the massing and enhance the flow of the outdoor spaces. Working closely with the Design Director, I assisted in feasibility studies, developed the design for the revised massing, and View from West (conceptual render)
contributed to project documentation for submissions.
32 HIGH-RISE
MASSING CONCEPT ORIGINAL MASSING
3
1. INITIAL MASSING
2
02 DESIGN CONCEPT DIAGRAM
ORIGINAL MASSING
955-975 Weston Road
Aerial View from Southwest Latest Submission (conceptual render)
2. FLOW ORIGINAL MASSING
3 3
2
3. RECESSES
4. STREETVIEW BLOCKS
ORIGINAL MASSING
2
02
ONCEPT DIAGRAM
955-975 Weston Road
02
DESIGN CONCEPT DIAGRAM
955-975 Weston Road
3
3 3 2
2
2
Aerial View from East Latest Submission (conceptual render)
5. GRID
02 955-975 Weston Road
SIGN CONCEPT DIAGRAM
02 955-975 Weston Road
33 HIGH-RISE
N METROLINX RAILWAY ENTRANCES
TERRACE AT LEVEL 2
TERRACE AT LEVEL 6 BUILDING A 11 STOREYS ROOF OF LEVEL 12 MECHANICAL
TERRACE AT LEVEL 2
TERRACE AT LEVEL 11 TERRACE AT LEVEL 10 TERRACE AT LEVEL 9 TERRACE AT LEVEL 8 TERRACE AT LEVEL 7 TERRACE AT LEVEL 6 TERRACE AT LEVEL 5
ROOF OF LEVEL 12 MECHANICAL
LAMBTON AVE
BUILDING B 11 STOREYS
TERRACE AT LEVEL 2
TERRACE AT LEVEL 11 TERRACE AT LEVEL 10 TERRACE AT LEVEL 6 TERRACE AT LEVEL 2
D
NR
TERRACE AT LEVEL 9 TERRACE AT LEVEL 8 TERRACE AT LEVEL 7
STO WE
Site Plan - 1st Submission (larger footprint)
View Along Weston Rd Latest Submission (conceptual render)
Site Plan - Latest Submission (reduced footprint)
View from South Latest Submission (conceptual render)
N METROLINX RAILWAY
TERRACE AT LEVEL 5
TERRACE AT LEVEL 7
ENTRANCES
BUILDING A 34 STOREYS
GREEN ROOF AT LEVEL 9
BUILDING B 24 STOREYS
TERRACE AT LEVEL 3 GREEN ROOF AT LEVEL 3
LAMBTON AVE
OUTDOOR AMENITY AT LEVEL 1
OUTDOOR AMENITY AT LEVEL 8
PUBLIC PARK
VEL 7 E AT LE 6 TERRAC E AT LEVEL 5 L TERRAC E AT LEVE L 1 TERRAC E AT LEVE TERRAC
ROOF OF LEVEL 8 MECHANICAL
D
NR
STO
WE
34 HIGH-RISE
M
I
D
-
R
I
S
E
1230 T HE QUEENSWAY Toronto, ON | 2025 | Mixed-use | Pre-construction Site: 0.43 acres | 10,623 m² residential | 500 m² retail Role: Job Captain
Project Team: 4
Firm: Turner Fleischer
This is a proposed 11-storey development along The Queensway corridor in Toronto’s South Etobicoke area, located near Kipling Avenue. The project comprises 143 residential units above a four-level underground parking structure, with retail integrated at grade. An initial submission proposed a higher datum line along The Queensway, resulting in a street wall perceived by the City as overly tall in relation to its context and at the pedestrian scale. The massing was subsequently revised to reduce the building’s bulk along the street. A contemporary palette of light-colored panels and glazing emphasizes vertical modulation. The final façade design evolved through multiple iterations in close collaboration with the client. I led the design concept process, developing and advancing the architectural expression throughout these iterations. Accommodating the required parking within the constrained site presented a significant challenge. The site did not allow for a continuous 15% ramp across all levels; instead, 5% sloped drive aisles were integrated along the parking rows, enabling incremental level transitions while optimizing the layout. I was part of the team responsible for producing the drawing sets and coordinating with external stakeholders.
View from The Queensway Looking North (conceptual render)
36 MID-RISE
INITIAL DESIGN DESIGN EVOLUTION
OPTION 02a
OPTION 02c
OPTION 02d
03d 03d
OPTION OPTION03c 03c
INITIAL DESIGN VARIATIONS 1
OPTION 02
design Building 1230 The Queensway final - Residential
OPTION 02b INITIAL DESIGN INITIAL DESIGN
INITIAL DESIGN 1230 The Queensway - Residential Building
OPTION 02d OPTION OPTION03e 03e 03b
OPTION 03a
OPTION 02
01
03f 03f
1230 The Queensway - Residential Building
VARIATIONS 2
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
OPTION 02c
MASSING STUDY
This drawing, as Architects Inc. Th on site and must information. This survey, structural, appropriate consu applicable codes drawings not spec for any correction
EXTERIOR FINISHES LEGEND
OPTION 03c
03d
FINAL DESIGN
E
1
PRECAST/METAL PANEL/EIFS (LIGHT COLOUR)
1
P
2
BRICK/PRECAST/EIFS WITH BRICK PATTERN (LIGHT COLOUR)
2
B (L
3
METAL PANEL (DARK COLOUR)
3
M
4A
SPANDREL GLASS (LIGHT COLOUR)
4A
S
4B
SPANDREL GLASS (DARK COLOUR)
4B
S
5A
CLEAR GLAZING
5A
C
5B
CLEAR GLAZING WITH CERAMIC FRIT
5B
C
6
ALLUMINUM MULLION (DARK COLOUR)
6
A
7
METAL CORNICE (DARK COLOUR)
7
M
Revised Massing - Lower Datum Line
2
RZ302
LOBBY
WEST ELEVATION
2
RZ302
1 : 200
LOBBY ENTRANCE
RETAIL
WEST ELEVATION2 1 : 200
RZ302
LOBBY LOBBY ENTRANCE
RETAIL
LOBBY
SETBACK
FLOOR 1 111.50 111.59 111.85 THE QUEENSWAY
5A111.50
RETAIL RETAIL
3 2 1
FLOOR 2 116.35
2
CULNAN AVE. 1 FLOOR
5A
#
2025-05-02 2025-04-15 2024-09-20 DATE
ISSUED FOR REZONING SUBMISSION NO.2 ISSUED FOR SUBMISSION TO CITY ISSUED FOR REZONING SUBMISSION DESCRIPTION
2.00 m SETBACK
0.05 m SETBACK 111.50
111.59
TCH TCH TCH BY
111.85 RETAIL
RETAIL
WEST ELEVATION 1 SOUTH ELEVATION 1 : 200
RZ302
1 : 200
1
RZ302
SOUTH ELEVATION 1 1 : 200
RZ302
SOUTH ELEVATION 1 : 200
North Elevation 1
RZ302
PROPERTY LINE
FLOOR 4 123.4 FLOOR 3 120.45 FLOOR 2 0.05 m 116.35
02
SETBACK 111.50
FLOOR 1 111.85
4.10 m 2.95 m 3.25 m 3.25 m
FL
FL
DETAIL
1. FRITTE VISUAL M FIRST 16M
3.25 m
43.50 m
FLOOR 5 126.35
BUILDING HEIGHT
FLOOR 6 129.3
FLO
FL
3.25 m
FLOOR 7 132.55
FLO
FL
2.95 m
FLOOR 9 139.05 FLOOR 8 135.8
MPH
6.00 m
MPH
FLOOR 10 142.3
FL
FL
FL 3 2 1
2025-05-02 2025-04-15 2024-09-20 DATE
FL
#
FL
RETAIL PROJECT
2
FLOOR 11 145.25
2.95 m
4.10 m 2.95 m 3.25 m 3.25 m 3.25 m
43.50 m
2.95 m
6
MPH 149.35
REDUCT • REDUC LIGHTS • SELEC FIXTUR REDUC
2.95 m
FLOOR 3 120.45
1
ROOF 155.35
4.10 m
FLOOR 4 123.4
2.95 m
FLOOR 5 126.35
5A
2.95 m
FLOOR 6 129.3
1. FRITTED GLASS WILL BE TREATED WITH A DENSITY PATTERN OF VISUAL MARKERS NO MORE THAN 50mm X 50mm APART FOR THE FIRST 16M ABOVE GRADE. (TORONTO GREEN STANDARD EC4.1)
4A
4.10 m
FLOOR 7 132.55
DETAIL NOTES:
BUILDING HEIGHT
FLOOR 8 135.8
VISUAL MARKERS MUST HAVE A MINIMUM DIAMETER OF 5MM
3.25 m
FLOOR 9 139.05
THAN 50mm X 50mm APART (*1)
FLOOR 10 142.3
6.00 m
PROPERTY LINE
PROPERTY LINE
MPH
THAN 50mm X 50mm APART (*1)
16.01 m
3.25 m
3.25 m
3.25 m
2.95 m
4.10 m
6.00 m
FLOOR 2 0.05 m 116.35
3.25 m
43.50 m
FLOOR 3 120.45
2.95 m
BUILDING HEIGHT
FLOOR 4 123.4
2.95 m
FLOOR 5 126.35
2.95 m
FLOOR 6 129.3
DENSITY PATTERN BETWEEN NO MORE
DENSITY PATTERN BETWEEN NO MORE
PROPERTY LINE
PROPERTY LINE
MPH
6.00 m
2.00 m 2.00 m SETBACKSETBACK
FLOOR 7 132.55
7
GENERA FRIENDL METERS FEATUR PROVISI • VISUAL PROVID OF GLA IS ONE • APPLIC • MUTTIN USE OF GLASS 11 STOREY BUILDI • CANOP TO PRO IMAGES • USE CE VISION
4.50 m
CULNAN 111.59 AVE.
FLOOR 8 135.8
MPH 149.35
4.50 m
2.00 m SETBACK
4
2
FLOOR 9 139.05
REDUCTION OF LIGHT POLLUTION • REDUCTION OF LIGHT POLLUTION FROM INTERIOR LIGHTS, PARTICULARLY DURING MIGRATION PERIODS. • SELECTION OF APPROPRIATE EXTERNAL LIGHTING FIXTURES TO ELIMINATE DIRECT UPWARDS LIGHT. REDUCE SPILL LIGHT AND OPTIMIZE USEFUL LIGHT.
FLOOR 11 145.25
EXTENT OF 85% BIRD FIRENDLY GLAZING
2
FLOOR 2 2 116.35
6
FLOOR 10 142.3
4.10 m
5
16.01 m
FLOOR 3 120.45
1
MPH 149.35 FLOOR 11 145.25
BIRD
GENERAL NOTES IN ACCORDANCE WITH THE BIRDFRIENDLY DEVELOPMENT GUIDELINES (FIRST 16 METERS ABOVE GRADE AND 4 METERS ABOVE GREEN FEATURE): PROVISION OF VISUAL MARKERS • VISUAL MARKERS TO ALERT BIRDS WILL BE PROVIDED. INCREASING THE SOLID TO GLASS RATIO OF GLAZING BY PROVIDING A TIGHTER GLAZING GRID IS ONE METHOD CONSIDERED, OTHERS ARE: • APPLICATION OF FILM AND DECALS TO THE GLASS • MUTTING REFECTIONS IN THE GLASS THROUGH THE USE OF INTERNAL SCREENS PLACED CLOSE TO THE GLASS SURFACE. OUTDOOR OUTDOOR 11 STOREY BUILDING • CANOPIES LOCATED ALONG THE BUILDING FACADE MUTING OF REFLECTED AMENITY TO PROVIDE ADDITIONAL AMENITY IMAGES • USE CERAMIC FRIT PANEL GLASS FROM AGC FOR ALL VISION GLASS ON LEVEL 1 & 2
ROOF 155.35
4.50 m
111.50
4.10 m 2.95 m 2.95 m
1 1
FLOOR 4 123.4 6
2.95 m
FLOOR 5 126.35
3.25 m
3.25 m
5A
3.25 m
5A 4
2.95 m
FLOOR 6 129.3
03f
43.50 m
4A
BUILDING HEIGHT
3
FLOOR 7 4A 132.55
4.10 m
FLOOR 8 135.8
3.25 m
FLOOR 9 139.05
FLOOR FLOOR 1 5A CULNAN THE1 AVE. 111.85 111.85 THE QUEENSWAY QUEENSWAY THE QUEENSWAY
111.80 111.59
PROPERTY LINE
PROPERTY LINE
MPH
7
FLOOR 10 142.3
16.01 m
3.25 m
3.25 m
3.25 m
3.25 m
2.95 m
4.10 m
6.00 m
FLOOR 2 2.00 m 116.35 SETBACK
2.95 m
43.50 m
FLOOR 3 120.45
LOBBY ENTRANCE
RETAIL
BUILDING HEIGHT
FLOOR 4 123.4
2.95 m
FLOOR 5 126.35
2.95 m
FLOOR 6 129.3
4.10 m
3.25 m 3.25 m 2.95 m
2.00 m SETBACK
PRIVATE CULNAN 111.50 5A DRIVEWAY AVE.
RZ302
1 : 200
FLOOR 7 132.55
6
4.50 m
2
2 2.00 m SETBACK
West Elevation
WEST ELEVATION
MPH
6.00 m 2.95 m 3.25 m
6
FLOOR 2 116.35
6
4.10 m
16.01 m
FLOOR 3 120.45
1
2.95 m
1
FLOOR 4 123.4
FLOOR 8 135.8
2.95 m
FLOOR 5 126.35
5A
FLOOR 9 139.05
3.25 m
4A
5A
FLOOR 6 129.3
43.50 m
6
FLOOR 7 132.55
BUILDING HEIGHT
4A
FLOOR 8 135.8
LOBBY
FLOOR 10 142.3
MPH 149.35 7
11 STOREY BUILDING
ROOF 155.35
FLOOR 11 145.25
EXTENT OF 85% BIRD FIRENDLY GLAZING
PROPERTY LINE PROPERTY LINE
PROPERTY LINE BEYOND
PROPERTY LINE PROPERTY LINE
FLOOR 9 139.05
FLOOR 1 111.85 THE QUEENSWAY
111.80
1230 The Queensway - Residential Building LOBBY ENTRANCE
FLOOR 10 142.3
OUTDOOR AMENITY
OUTDOOR AMENITY
EXTENT OF 85% BIRD FIRENDLY GLAZING
PRIVATE 111.50 DRIVEWAY
MPH 149.35 FLOOR 11 145.25
11 STOREY BUILDING
ROOF 155.35
4.50 m
111.80
7
4.10 m
MPH
6.00 m 2.95 m 2.95 m
16.00 m
4.10 m
2.00 m 2SETBACK
2
PRIVATE DRIVEWAY
OUTDOOR AMENITY
4.50 m
2
111.80
5
6
7
EXTENT OF 85% BIRD FIRENDLY GLAZING
PRIVATE DRIVEWAY
1
1
MPH 149.35
11 STOREY BUILDING
ROOF 155.35
FLOOR 11 145.25
16.00 m
4
6
4.10 m 2.95 m 3.25 m
5A
3.25 m
5A
3.25 m
5
3.25 m
6
2.95 m
6
OUTDOOR AMENITY
EXTENT OF 85% BIRD FIRENDLY GLAZING
2
PROPERTY LINE
3
EXTENT OF 85% BIRD FIRENDLY GLAZING
16.00 m
6
PROJECT
PROPOSED MIXED-USE RESIDENTIAL DEVELOPMENT
PROP
1230 The Queensway, Etobicoke, ON
SOUTH ELEVATION 1 : 200
DRAWING
DRAWING
ELEVATIONS
37 02 AM
02 AM
MID-RISE 02 AM
Initial Massing - Higher Datum Line
4A
1
EXTENT OF 85% BIRD FIRENDLY GLAZING
16.00 m
OPTION 02
EXTENT OF 85% BIRD FIRENDLY GLAZING
1
4A
4.50 m
5A
6
7
11 STOREY BUILDING
ROOF 155.35
43.50 m
6
11 STOREY BUILDING
BUILDING HEIGHT
4A
1230 1230The TheQueensway Queensway- Residential - ResidentialBuilding Building
OUTDOOR AMENITY
7
OPTION 02d OPTION 03e
PROPERTY LINE BEYOND
1. Precast (light) 2. Precast with pattern (light) 3. Spandrel glass 4. Clear glass 5. Aluminum mullion 6. Metal cornice (dark)
PROPERTY LINE
11 STOREY BUILDING
7
INITIAL DESIGN
PROPERTY LINE
EXTERIOR FINISHES
PROPERTY LINE BEYOND
PROPERTY LINE
INITIAL DESIGN
OPTION OPTION0303
PROPERTY LINE BEYOND
BIRD FRIENDLY GUIDELINES
02 AM
The Queensway)
03b 03b
OPTION OPTION03a 03a
PROJECT NO.
PROJECT NO
22.278P01
22.278P01
PROJECT DATE
PROJECT DA
2024-05-29
2024-05-2
DRAWN BY
DRAWN BY
NGE
NGE
CHECKED BY
CHECKED BY
NMC
NMC
SCALE
SCALE
0.85 m
6.00 m 4.10 m 2.95 m 3.25 m 3.25 m 3.25 m 3.25 m 2.95 m 4.10 m 4.50 m 4.50 m 2.80 m 2.80 m
5600
1000 MAX.
6000
DRIVE AISLE
4.90 m
5600
EV
EV EV
5600
31.78
EV
EV
N17°13'10"W 24.55 m
EV EV
EV
EV SLOPE UP AT 5%
TRANSFOR
000.00 M
V
VISITOR PA ELECTRIC
PROPOSED EV P
WITH AN ENERG
6.00 m
3 2 1
#
2025-05-02 2025-04-15 2024-09-20 DATE
LOCKERS
42.85 m
PROPOSED MIXED-USE RESIDENTIAL DEVELOPMENT 0.80 m
N72°54'40"E
44.53
0.85 m
PROJECT
PROPOSED MIX DEV
1230 The Qu
DRAWING
DRAWN BY
NGE CHECKED BY
38 MID-RISE
NMC SCALE
1:100 N
REV.
3
UNDERGRO
1 ______ RZ401
PROJECT NO.
22.278P01
PROJECT NO.
22.278P01
PROJECT DATE
PROJECT DATE
2024-05-29
2024-05-29
DRAWN BY
DRAWN BY
NGE
NGE
CHECKED BY
025-05-09 10:05:51 AM
2024-05-29
ISSUED FOR ISSUED FOR ISSUED FOR
106.10
UNDERGROUND LEVEL 01
1 ______ RZ401
PROJECT DATE
SPOT ELEV
GAS/HYDR
G
25.4 m² 274 ft²
PROJECT
UNDERGROUND LEVEL 04
PROJECT NO.
150
CONVEX M
1230 The Queensway, Etobicoke, ON
22.278P01
RZ101
SLOPE UP AT 5%
EV EV SLOPE UP AT 5%
105.50
18.2 m² 196 ft²
0.85 m
3400
2 ______ RZ401
EV
EV
TCH TCH TCH BY
LOCKERS
2.85 m
MIN 3.4 x 5.6 x 2.1m H
0.80 m
44.53
8.2 m² 88 ft²
LEVEL 2 CHARG
1.50 m 0.35 m
ISSUED FOR REZONING SUBMISSION NO.2 ISSUED FOR SUBMISSION TO CITY ISSUED FOR REZONING SUBMISSION DESCRIPTION
300
VESTIBULE
DRAWING
DRAWING NO.
ELEV #2
0.80 m
N72°54'40"E
LOCKERS
6.00 m
EV 2025-05-02 2025-04-15 2024-09-20 DATE
1.25 m
TYPICAL B
EV
0.30 m SLOPE UP AT 5%
1.50 m
FIRE FIGHTER ELEV #1
WITH AN ENERGIZED OUTLET CAPABLE OF PROVIDING
108.90
DRAWING
025-05-09 10:05:51 AM
VESTIBULE DN
6.00 m
PROPOSED EV PARKING SPACES TO BE EQUIPPED
114.5 m² 1232 ft²
#
0.80 m
7.29
6.00 m
1.55 m
EV VISITOR PARKING
1230 The Queensway, Etobicoke, ON
1 ______ RZ401
2.60 m
5.60 m
SWM TANK
3 2 1
TYPICAL P
TYPICAL PARKING S MIN 2.6 x 5.6 x 2.0m H
104.10
EV
EV EV EV EV
31.78
V
1.20 m 40.00 m
PROPOSED MIXED-USE RESIDENTIAL DEVELOPMENT 0.80 m
0.80 m
6.00 m
1000 MAX.
OBSTRUCTION
EV 6000 EV
5600
1000 MAX.
6000
DRIVE AISLE
5600 5600
N17°10'20"W
39.25 m
1500
GAS/HYDRO METER
G
MINIMUM PE DI
AISLE WIDTH: MIN 6
UP
6.5 m² 70 ft²
SPOT ELEVATION
M
This drawing, as an instrument of servic Architects Inc. The contractor must verif on site and must notify Turner Fleischer information. This drawing is not to be sc survey, structural, mechanical, electrica appropriate consultant's drawings before applicable codes and requirements of au drawings not specifically marked 'For Co for any corrections or damages resulting
N72°51'00"E
UP
0.80 m
0.80 m
0.80 m
0.80 m
42.85 m
1.40 m
2025-05-09 10:06:03 AM
1.55 m 4.90 m
EV EV EV
EV EV
SLOPE UP AT 5%
108.30
PROJECT
UG 1 107.35 UG 2 104.55 UG 3 101.75 UG 4 98.95
2600
5.60 m
25.4 m² 274 ft²
44.53
FLOOR 2 116.35 FLOOR 1 111.85
300
LOCKERS
N72°54'40"E
SLOPE UP AT 5%
INTAKE SHAFT
40.86
EV
300
STORAGE VOLUME: 60m3
6.00 m
#
100.50
FLOOR 3 120.45
1.55 m
0.80 m
9.14 0.85 m N17°10'20"W 9.80 m
TYP
0.60 m
EV EV
7.5% SLOPE
EV EV
1.55 m
EV EV
300
LEVEL 2 CHARGING OR HIGHER.
TCH TCH TCH BY
FLOOR 4 123.4
2600
ELECTRIC VEHICLE PARKING
26.2 m² 282 ft²
EV
UG LEVEL 2 39 PARKING SPACES TOTAL 32 PARKING SPACES 7 TANDEM PARKNG SPACES
TRANSFORMER WITH CLEARANCES
000.00
EV
ISSUED FOR REZONING SUBMISSION NO.2 ISSUED FOR SUBMISSION TO CITY ISSUED FOR REZONING SUBMISSION DESCRIPTION
EV
13.2 m² 142 ft²
104.70
50.4 m² 543 ft²
1.45 m
6.00 m
0.35 m
SLOPE UP AT 5%
99.90
18.2 m² 196 ft²
2600
CONVEX MIRROR
6.00 m
MECH.
VESTIBULE
MECH. 2025-05-02 2025-04-15 2024-09-20 DATE
EV
EXHAUST SHAFT
LEGEND
2 ______ RZ401
WITH AN ENERGIZED OUTLET CAPABLE OF PROVIDING
1.55 m
EV
EV EV
LOCKERS
2600
3400
2 ______ RZ401
LEVEL 2 CHARGING OR HIGHER.
3 2 1
EV
0.30 m
2600
MIN 3.4 x 5.6 x 2.1m HIGH
PROPOSED EV PARKING SPACES TO BE EQUIPPED
EX. H&V
FLOOR 5 126.35
1.55 m
ELECTRIC VEHICLE PARKING
OPEN TO BELOW
EV
3.40 m
VISITOR PARKING
EV
VESTIBULE
EV
3.40 m
V
6.00 m
2600
N17°13'10"W 23.35 m
GAS/HYDRO METER
G
ELEV #2
EV
M
FIRE FIGHTER ELEV #1
EV
TYPICAL BARRIER FREE SPACE
EV UP
OPEN TO BELOW
SPOT ELEVATION
V
N17°13'10"W 24.55 m
000.00
EV
343 ft²
TYPICAL PARKING SPACE: MIN 2.6 x 5.6 x 2.0m HIGH
8.2 m² 88 ft²
EV
DN
LOCKERS
EV
6.00 m
1.25 m
UP
17.5 m² 188 ft²
RAMP UP TO LVL 1 15% SLOPE
V
31.78
VESTIBULE
5.60 m
0.80 m
7.29
6.00 m
DN
EV
SLOPE UP AT 5%
V
1500
CONVEX MIRROR
TYPICAL PARKING DIMENSIONS
N72°51'00"E
BIKE LOCKERS
6.5 m² 70 ft²
LEGEND
2 ______ RZ401
1.80 m TYP
INTAKE SHAFT
V
39.25 m
5600
EV EV EV
EV EV
EV
3400
2 ______ RZ401
FLOOR 6 129.3
0.80 m
37.23
AISLE WIDTH: MIN 6m
EV
300
1.80 m
106.90
RESIDENTIAL PARKING GATE
TRANSFORMER WITH CLEARANCES
EV
TANDEM PARKING SPACES
EV SLOPE UP AT 5%
EV
EV EV
ELEV #2
2600
40.86
300
SLOPE UP AT 5%
N72°51'00"E
LOCKERS MINIMUM PERMITTED PARKING DIMENSIONS 31.8 m²
16 LONG TERM RESIDENTIAL STACKED BIKE PARKING SPACES MIN. 2.4M VERTICAL CLEARANCE
SLOPE UP AT 5%
6000
4.90 m
300
107.50
MIN 3.4 x 5.6 x 2.1m HIGH
1.55 m SLOPE UP AT 5%
2.60 m 1.50 m
FIRE FIGHTER ELEV #1
3.40 m
EV
2600
5600
0.30 m
EV EV EV
VESTIBULE UP
5.60 m
2600
UG LEVEL 1 19 PARKING SPACES TOTAL 9 RESIDENT PARKING SPACES 9 VISITOR PARKING SPACES 1 TANDEM PARKING SPACE
TYPICAL BARRIER FREE SPACE
UNEXCAVATED
6.00 m
2600
V
6.00 m
OUTLINE OF BUILDING ABOVE
V
EV
0.80 m
6.8 m² 73 ft²
5.60 m
EV
13.2 m² 142 ft²
V
7.29
1.25 m
6000
6.00 m
6.00 m
1000 MAX.
2600
N72°51'00"E
UP
EV
40.86 N17°10'20"W
39.25 m
2 ______ RZ401
EV
0.30 m
1.40 m
TYPICAL PARKING SPACE: MIN 2.6 x 5.6 x 2.0m HIGH
98.50
INTAKE SHAFT
EV
35.60 m
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
EXHAUST SHAFT
31.8 m² 343 ft²
TYPICAL PARKING DIMENSIONS
EV
SLOPE UP AT 5%
EV
AISLE WIDTH: MIN 6m
1.55 m
1.40 m
EV
UG LEVEL 4 35 PARKING SPACES TOTAL 29 PARKING SPACES 6 TANDEM PARKING SPACES 99.10
EV
EV
V
13.2 m² 142 ft²
0.30 m
EV
37.23
TANDEM PARKING SPACES
0.80 m
N17°10'20"W 9.80 m
31.8 m² 343 ft²
MINIMUM PERMITTED PARKING DIMENSIONS
0.85 m
0.80 m
ELECTRICAL ROOM
EXHAUST SHAFT
V
EV
3.40 m
EV
FLOOR 7 132.55
1 ______ RZ401
1.50 m
EV
OBSTRUCTION
EV
N17°10'20"W
EV
5600
EV
1000 MAX.
EV
LOCKERS
N72°51'00"E
FLOOR 8 135.8
Underground Level 4
35.60 m
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
DRIVE AISLE
EV
37.23
9.14 0.85 m
0.80 m
N72°51'00"E
0.85 m
0.80 m
EV
35.60 m
FLOOR 9 139.05
R
1 ______ RZ401
0.85 m
FLOOR 10 142.3
1 : 200
Underground Levels 2 & 3 1 ______ RZ401
FLOOR 11 145.25
W-E Cross-section
SECTION B
EV
Underground Level 1
2.95 m 2.95 m
2
UG 4 PARKING
EV
Ground Floor
UG 3 PARKING
2.80 m
3
2.75 m
REV.
RZ151
2.80 m
UG 4 PARKING
N
DRAWING NO.
4.80 m
UG 3 PARKING
UG 2 PARKING
EV
1:100
UG 2 PARKING
EV
SCALE
VESTIBULE
EV
CHECKED BY
NMC
UG 1 PARKING
9.14 0.85 m
DRAWN BY
NGE
EXISTING 2 STOREY BUILDING 111.50
MPH 149.35
N17°10'20"W 9.80 m
PROJECT DATE
2024-05-29
TANDEM PARKING SPACES
PROJECT NO.
22.278P01
RAMP
CACF
FFE: 111.85
111.85
EV
10 1
1. THE RECONSTRUCTED SIDEWALKS ALONG THE QUEENSWAY AND CULNAN AVENUE FRONTAGES OF THE SITE WILL BE BUILT TO CITY STANDARDS AND AT NO COST TO THE MUNICIPALITY.
.9 6
GENERAL NOTES
CULNAN AVENUE
RETAIL FFE: 111.50
EV
SITE PLAN/GROUND FLOOR
AMENITY
LOADING
LOBBY
2.90 m
.1 5
.1 3 1
1
11
11 1
11
.1 9
1230 The Queensway, Etobicoke, ON
DRAWING
AMENITY
EV
1
.2 3 11 1
1 .1 9
11
HAZARDOUS WASTE
PROPOSED MIXED-USE RESIDENTIAL DEVELOPMENT
PIN 07528-0451 (LT)
STAIR
1.45 m
.4 2 11
11
.2 7 11
PROJECT
EXISTING MUNICIPAL SIDEWALK
RESIDENTIAL
TCH TCH TCH BY
2.80 m
.6 7
ISSUED FOR REZONING SUBMISSION NO.2 ISSUED FOR SUBMISSION TO CITY ISSUED FOR REZONING SUBMISSION DESCRIPTION
RZ401
025-05-09 10:05:50 AM
6.00 m 43.50 m 37.50 m
.7 6 11 1
.4 0
#
2025-05-02 2025-04-15 2024-09-20 DATE
PART 14, EXPROPRIATION PLAN 7901
EXISTING DRIVEWAY ACCESS AND DROPPED CURB TO BE REMOVED AND RESTORED WITH CONCRETE CURB, SIDEWALK, AND SOD ACCORDING TO CITY STANDARDS.
THE QUEENSWAY
3 2 1
MET
CORRIDOR
residential units amenities horizontal circulation, lobby vertical circulation, service areas, parking
DS
1
6.00 m
FIRE ROUTE
3.00 m 3.00 m
EXISTING DROPPED CURB
SAN MH. REFER TO CIIVL WVDWGS. WV
0.15 m
2.10 m
EXISTING BUS SHELTER
1 ______ RZ401
PROPERTY LINE
17 Ro .7 of 4 11 1 .6 1
11 1 .8 3
11
1 .7 8
11 11 1
OGS & SWM MH. REFER TO CIIVL DWGS. SIAMESE CONNECTION
2.10 m
12 .0 0
2.10 m
42.40 m
PROPOSED NEW PROPERTY LINE
GV
44.53
1
2.00 m SETBACK
.2 7
RETAIL ENTRANCE
N72°54'40"E EXISTING DRIVE WAY
m
.6 7
1.55 m SETBACK 5.40 m .5 0 11 1 .7 7
TYP.
0.60 m
11 1 1 11 1
2.00 m SETBACK
6. 00
RETAIL ENTRANCE
8. 00
DS
DS
.6 5
DS
m
6.00 m
EXISTING 2 STOREY BUILDING
FFE: 111.5
2.10 m
6.00 m
1
6485.00 m (21' - 3")
12464.50 m (40' - 11")
476 m² 5124 ft²
GAS/HYDRO METER
STAIR
OUTLINE OF FLOOR 3-9 ABOVE
EX. ROAD PAINTED LINE
EXISTING TACTILE INDICATOR TO REMAIN
RETAIL
FFE: 111.5
2.00 m SETBACK
CORNER ROUNDING TO BE CONVEYED TO CITY SIGN
TYP.
31.78
FFE: 111.85
FFE: 111.50
PRIVATE TERRACE AT FLOOR 9
2 ______ RZ401
11
10.8 m² 116 ft²
PRIVATE TERRACE AT FLOOR 9
TYP.
1
12.9 m² 139 ft²
M
UP
.8 0
RETAIL SERVICE
FIRE ROUTE SIGN
SPOT ELEVATION
G
11
RETAIL WASTE
6.15 m
3.00 m
0.60 m
TYP.
TYP.
0.60 m
0.60 m
TYP.
1.80 m
1
1.85 m
ELEVATOR LOBBY
TYP.
2.00 m
STAIR
82 LONG TERM RESIDENTIAL STACKED BIKE PARKING SPACES
.6 7
16.65
9082.00 m (29' - 10")
1.80 m
RESIDENTIAL
DS
DS
11
STAGING 15.00m2 VERTICAL CLEARANCE MIN. 6.1m AT STAGING AREA
ELEV #2
TYP.
1.80 m
A
000.00
PIN 07528-0238 (LT)
17 PARKING SPACES EQUIPPED WITH ENERGIZED OUTLET (120 V )
1
8.7 m² 94 ft²
FIRE FIGHTER ELEV #1
4.00 m
1.95 m
STAIR
SIAMESE CONNECTION
CONVEX MIRROR
TRANSFORMER WITH CLEARANCES
.7 4
DN
UP
2.00 m
1.80 m
CORRIDOR
FIRE HYDRANT
LOT 104
1 18 N17°13'10"W P .01 ar a 22.85pem t
MOVING
9.15 m
9.14 N17°10'20"W TYP
0.60 m
7.5% SLOPE
6.00 m
± 10 S.M.
HAZARDOUS WASTE 2.00m 2
TYP
FH
12 SHORT TERM RESIDENTIAL STACKED BIKE PARKING SPACES
PIN 075280237 (LT)
0.60 m
MIN. 2.4M VERTICAL CLEARANCE
EXIT
EXIT
15982.00 m (52' - 5")
BULK WASTE STORAGE RM
117.3 m² 1262 ft²
RAMP UP FROM UG 1 15% SLOPE
MGMT
CACF
BIKE REPAIR
BIKE LOCKERS 13.00 m
TYPE "G" LOADING (13.00m x 4.00m x 6.10m H)
PARCEL ROOM
GARBAGE ROOM TOTAL FLOOR AREA
AD
DN
111.45
WASTE COMPACTOR (TRI-SORTER)
± 48 S.M.
CONCIERGE
SIAME SE CO NNEC TION
N17°10'20"W
DIST ANCE FROM 20.55 FIRE m HYDR ANT TO
22.10 m
EXTENT OF NEW CURB AND SOD
CULNAN AVENUE
EXISTING EDGE OF ASPHALT
152 m² 1636 ft²
2.10 m
.5 0 11
LOBBY
4.40 m
6.00 m
7.29
2.00 m
40.86
2.10 m
2.10 m
FIRE ROUTE
1
6.1 m² 66 ft²
54.2 m² 584 ft²
FH
3.00 m
.5 9
N72°51'00"E
11
2.60 m
WASTE STORAGE
MAIL ROOM
TYPE G LOADING SPACE AND STAGING PAD TO BE CONSTRUCTED OF MIN. 200mm REINFORCED CONCRETE AT +/2% SLOPE
UP
INDOOR AMENITY
ROOF 155.35
RETAIL ENTRANCE EXIT
111.75
6.30 m
INTAKE SHAFT
ROOF OF MPH
OUTDOOR AMENITY AT MPH
PRIMARY RESIDENTIAL ENTRANCE
m
EXIT
OVERHEAD DOOR
OVERHEAD DOOR
MAIL B.O.H.
EX. H&V 8.00 m
APPROX. WIDTH OF EXISTING ON-STREET PARKING
11
WALL MOUNTED FLASH WARNING LIGHT SYSTEM
LEGEND
1
PRIMARY RESIDENTIAL ENTRANCE
EXTENT OF DROPPED CURB
EXIT
GAS METER
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
SECONDARY RESIDENTIAL ENTRANCE
109.17
3.00 m
2025-05-09 10:05:52 AM
.7 9
1
11
6.00 m
m
FFE: 111.85
EXISTING FIRE HYDRANT
1. 50
G
VESTIBULE
SIAMESE CONNECTION AT GROUND FLOOR
2 ______ RZ401
13.2 m² 142 ft²
FLUSH CURB
FLUSH CURB
1.50 m
00 5.
PUDO SPACE
DISTANCE FROM PRINCIPAL ENTRANCE TO FIRE ROUTE
NEW CONCRETE CURB AND SOD TO BE CONSTRUCTED ACCORDING TO CITY STANDARDS AND AT NO COST TO THE MUNICIPALITY
EXHAUST SHAFT
6.70 m
9.15 m
FIRE ROUTE
NEW CONCRETE PAD FOR TTC WHEELS-TRANS SERVICE
1
LOT 149
.7 4
10.60 m SETBACK
m
CONVEX MIRROR
PRIVATE DRIVEWAY
OUTLINE OF FLOORS 03-06 ABOVE
75 0.
6.00 m
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
PIN 07528-0242 (LT) OUTLINE OF UG LEVEL BELOW
3.00 m
0.05 m SETBACK
2.00 m WP
1
11
38.95 m 37.23
2.80 m
12
1
12 1
1 ______ RZ401 N72°51'00"E
VEHICLE ENTRANCE ACCESS DESIGN PER CITY OF TORONTO T-310.050-1
3.00 m
N
EXISTING 1 STOREY BUILDING
2.80 m
.2 9
.0 8
1
DS
MET
3.50 m
5:1 TRANSITION TO MATCH EXISTING SIDEWALK
PROPERTY LINE
.1 0 12
.7 6 11 1
EXISTING MUNICIPAL SIDEWALK
CHECKED BY
NMC
NMC
SCALE
SCALE
1:100
1:100 N
N
DRAWING NO.
RZ103
REV.
3
DRAWIN
R
84 NANCY ST Bolton, ON | 2023 | Residential | Pre-construction Site: 1.90 acres | 15,160 m² residential Role: Senior Designer
Project Team: 4
Firm: Turner Fleischer
This proposal demonstrates a contextually responsive architectural approach to a sensitive sloping site adjacent to established neighbourhoods and protected natural landscapes. With an elevation difference of approximately 12 metres between the southeast and northwest edges, the building steps along the slope, allowing it to integrate naturally with its surroundings. The 6-storey, 123-unit building is shaped by a modulated massing strategy that reduces perceived scale and responds to the site’s topography. Its architectural expression draws on the site’s natural character, using a refined material palette that complements Bolton’s evolving urban fabric while maintaining a strong relationship to the southern landscape edge. A material transition at the corner visually divides the building into two masses, reducing its apparent bulk. An alternative scheme explored a more fluid expression with continuous, undulating balconies. Durable, low-maintenance materials, and thoughtful site planning contribute to long-term environmental performance while preserving adjacent green space. The project reflects a coordinated design effort from concept through development, including cross-disciplinary collaboration to address site constraints, refine the building envelope, View from North (conceptual render)
and support planning submissions.
39 MID-RISE
outdoor amenity uses.
recreation will be provided in these locations, details of which are to be provided in future stages of the design.
The west and south sides of the development will inc significant landscaped amenity areas for activities.
P P
P
3$5.,1* /(9(/ 3$5.,1* /(9(/
5(6,'(17,$/
5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/
5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ $0(1,7<
3 $0(1,7< $0(1,7< $0(1,7< $0(1,7< $0(1,7< 3 $0(1,7< 3 $0(1,7< 3 3 3 3 3 3 3 3 $0(1,7< $0(1,7< 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
S-N Cross-section
3$5.,1* /(9(/
3 3
5(6,'(17,$/ 5(6,'(17,$/ /2&.(56
/2&.(56 /2&.(56
+/- 238.70
/2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56
PARKING
/2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56
PARKING
/2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56
/2&.(56 /2&.(56
P
5(6,'(17,$/ 5(6,'(17,$/
+/- 236.10
3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1(
P P P P P P P P
5(6,'(17,$/
P P
5(6,'(17,$/
P P P P P P P P
)/225 +/- 252.00 )/225 +/- 250.00 )/225 )/225 )/225 )/225 )/225 )/225
5(6,'(17,$/
P
P
0(&+ 3 +
P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P
522)
P P
horizontal circulation, lobby service areas, parking
P P
P
3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1(
3$5.,1* /(9(/
18: S i te cross section looki ng west prepared by Turner Fleisc he r A rchite40ct s Inc. MID-RISE 1 8 : S i te cross section looki ng west prepared by Turner Fleische r A rchite ct s Inc.
3$5.,1* /(9(/ 3$5.,1* /(9(/
QUEEN ST SOUTH
P
17: S i te cross section looki ng no rth prepared by Turner Fleische r A rchite ct s Inc. East 1 7 :View S i from te cross section looki ng no rth prepared by Turner Fleische r A rchite ct s Inc. 17: S i te cross no rth prepared by Turner Fleische ct ss Inc. Site cross section secti on looki ng north Fleis che r A rchite 17: 17: S S ii te te cross section section looki looki ng ng no no rth rth prepared prepared by by Turner Turner Fleische Fleische rr A A rchite rchite ct ct s Inc. Inc. units 17:InSciresidential te cross section looki ng no rth prepared by Turner Fleische r A rchite ct s Inc. cts . amenities 3 3
84 Nancy Street, Bolton, Town of Caledon TED HOUSTON MEMORIAL PARK
Urban Design Brief PERGOLA AMENITY FEATURE
BBQ PIT
ALBION-BOLTON The floor plan below (Figure 15) shows how the units are COMMUNITY CENTRE arranged along a central corridor facilitating the units to face the surrounding landscaped areas and the central courtyard. Balconies are provided with each unit as amenity andpe to improve exterior F igprivate ure 23: L aspace n ds ca P la n . interior S o urce : MH BC. connections.
Site Plan 5=
522) 0(&+ 3 + 522) 522) 522) 522) 522) 0(&+ 3 + )/225 0(&+ 3 + 0(&+ 3 + 0(&+ 3 + )/225 522) 0(&+ 3 + 522) 0(&+ 3 + )/225 )/225 )/225 )/225 )/225 )/225 0(&+ 3 + )/225 0(&+ 3 + )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 3$5.,1* /(9(/ )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ )/225 )/225 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/
N
522)
(; (;
(;
(;
P P
P
(;
(;
P
ϯ
ϵϮ ŵϸ ϵϵϬ Ĩƚϸ
Ϯ н ϴϱ͘ϭ ŵϸ ϵϭϲ Ĩƚϸ
(;7(17 2) )/225 $%29(
ϭ н Ϯ н
ϲϱ͘ϲ ŵϸ ϳϬϲ Ĩƚϸ
(;
ϴϮ͘ϱ ŵϸ ϴϴϴ Ĩƚϸ
Ϯ
(;
ϴϱ͘ϭ ŵϸ ϵϭϳ Ĩƚϸ
ϯ н
ϭϬϮ͘ϱ ŵϸ ϭϭϬϯ Ĩƚϸ
P
P
ϭ
ϭ н
ϭ н
P
P
P
Ϯ
ϴϳ ŵϸ ϵϯϲ Ĩƚϸ
>K < Z^ (;
P
ϭϯϬ͘ϳ ŵϸ ϭϰϬϲ Ĩƚϸ
ϲϮ͘ϯ ŵϸ ϲϳϭ Ĩƚϸ
ϭ н
ϲϱ͘ϲ ŵϸ ϳϬϲ Ĩƚϸ
ϭ
ϭ
ϲϱ͘ϲ ŵϸ ϳϬϲ Ĩƚϸ
ϲϭ͘ϰ ŵϸ ϲϲϭ Ĩƚϸ
ϱϳ͘ϵ ŵϸ ϲϮϯ Ĩƚϸ
ϭ н
ϭ н
Ϯ н
ϯ н
ϭϬϵ͘ϱ ŵϸ ϭϭϳϴ Ĩƚϸ
P
$0(1,7< $0(1,7<
ϲϱ͘ϯ ŵϸ ϳϬϯ Ĩƚϸ
5=
P
:& :&
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
6-STOREY BUILDING
RETAINING
)/225 ))(
(;
ϯ н
ϯ
ϭϮϳ͘ϴ ŵϸ ϭϯϳϲ Ĩƚϸ
ϵϲ͘ϭ ŵϸ ϭϬϯϱ Ĩƚϸ
P
P
ϭ н ϲϱ͘ϰ ŵϸ ϳϬϰ Ĩƚϸ
ϭ н ϲϱ͘ϰ ŵϸ ϳϬϰ Ĩƚϸ
ϭ н ϲϱ͘ϰ ŵϸ ϳϬϰ Ĩƚϸ
ϲϱ͘ϰ ŵϸ ϳϬϰ Ĩƚϸ
ϲϱ͘ϰ ŵϸ ϳϬϰ Ĩƚϸ
ϴϬ͘ϯ ŵϸ ϴϲϱ Ĩƚϸ
ϯ
ϵϵ͘Ϯ ŵϸ ϭϬϲϴ Ĩƚϸ
P
$0(1,7< $0(1,7<
3 3 3 3 3 3 3 3
$0(1,7< $0(1,7< $0(1,7< $0(1,7< $0(1,7< $0(1,7<
P
:& :&
3
$0(1,7<
P
3
:& :& :& :& :& :&
P
:&
:& :& :& :& :& :&
(;
(;
P
P
:&
P
3
$0(1,7< $0(1,7< $0(1,7< $0(1,7< $0(1,7< $0(1,7<
P
$0(1,7<
$0(1,7< 5(6,'(17,$/ 5(6,'(17,$/
P P P P P P P P
67$,56 :&
P
3$5.,1* /(9(/
:& 5(6,'(17,$/ 5(6,'(17,$/
5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/
PROPERTY LINE ENTRY SIGNAGE
P
3$5.,1* /(9(/
$0(1,7<
5(6,'(17,$/
ART FEATURE EXISTING RESIDENTIAL
P
5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/
0(&+ 3 + 522) 522) 522) 522) 522) )/225 0(&+ 3 + 522) 0(&+ 3 + 0(&+ 3 + )/225 0(&+ 3 + 0(&+ 3 + 522) )/225 0(&+ 3 + 522) )/225 )/225 )/225 )/225 )/225 )/225 0(&+ 3 + )/225 0(&+ 3 + )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 3$5.,1* /(9(/ )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 )/225 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ )/225 )/225 )/225 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ )/225 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/ 3$5.,1* /(9(/
P
5(6,'(17,$/
P P
5(6,'(17,$/
67$,56 67$,56 67$,56 67$,56 67$,56 67$,56 67$,56 67$,56
P
5(6,'(17,$/
67$,56 67$,56
(/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7 (/(9$725 6+$)7
/2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56 /2&.(56
P
P
)/225 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ )/225 5(6,'(17,$/ 5(6,'(17,$/ 5(6,'(17,$/ )/225 $0(1,7< 5(6,'(17,$/ 5(6,'(17,$/ )/225 $0(1,7< )/225 $0(1,7< $0(1,7< $0(1,7< $0(1,7< )/225 $0(1,7< $0(1,7< )/225 $0(1,7< $0(1,7< )/225
P P P P
0(&+ 3 + 0(&+ 3 +
0(&+ 3 +5(6,'(17,$/
/2&.(56
P
522)
P P P
0(&+ 3 + 0(&+ 3 + 0(&+ 3 + 0(&+ 3 + 0(&+ 3 + 0(&+ 3 +
P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P
0(&+ 3 +
N
522)
P
3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1(
0(&+ 3 +
P
3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1( 3523(57< /,1(
Landscaping will also be used to screen the development from its neighbours.
P
P
P
P
(; P
P
P
P
(; (;
)/225
5=
F i g ure 1 5: F l o o r pl a n 1 -6 prepa red by Tur n er F l ei sh e r Ac h i te c t s .
(;
Typical Floor Plan 19
DESIGN OPTION 2 - FLUIDITY
DESIGN OPTION 1 - MODULATION
View from North (conceptual render)
View from North (conceptual render)
View from Northwest (conceptual render)
View from Northwest (conceptual render) 41 MID-RISE
L
O
W
-
R
I
S
E
G UST O 501 Toronto, ON | 2018 | Commercial | Built 630 m² Role: Designer
Project Team: 6
Firm: Partisans
Gusto 501 is a restaurant project located along the eastern edge of Toronto’s downtown, realized as a purpose-built two-storey building with a rooftop at the intersection of Queen Street East and Broadview Avenue. The design features a refined industrial aesthetic, articulated through a Corten steel façade, terracotta brick, dark metal accents, and warm wood elements, creating a layered and inviting atmosphere. I contributed to the development of the interior material strategy, particularly in the articulation of the terracotta brick. By incorporating a range of brick types and subtle variations, the design achieves a more organic and textured surface, introducing a sense of movement while enhancing the tactile quality of the space and avoiding a repetitive or overly rigid expression. Integrated lighting within the brick further emphasizes its depth and material richness, highlighting its natural variation. Careful consideration was given to the development of construction details that allow HVAC grilles to be seamlessly integrated within the brickwork, ensuring they remain visually concealed and do not disrupt the continuity and clarity of the design. In parallel, I worked on producing construction drawings and developing millwork details for interior areas, including the secondfloor bar. The furniture and millwork were custom-designed, requiring View from King St E Looking Southeast (completed project - 2020)
a high level of coordination and precision.
43 LOW-RISE
1. Rooftop Patio 2. Cocktail Bar 3. Chef’s Kitchen / Attico 4. Mezzanine Wine Bar 5. Exit Stair 6. Street Level Patio
8. Mechanical 9. Office 10. Liquor Cage 11. Fridge 12. Prep Kitchen 13. Dishwash
7. Kitchen
Perspective Cross-section
View from 2nd Floor (completed project - 2020) 44 LOW-RISE
DIAGRAMS - INTERIOR WALLS TERRACOTA BRICKS TYPES
LOCATION
View from Mezzanine (completed project - 2020) 45 LOW-RISE
TERRACOTA GRILL CONSTRUCTION DRAWINGS
WORKING DRAWINGS DETAILS WORKING DRAWINGS DETAILS
Terracota Grille Floor Plan Detail
Terracota Grille Elevation Detail
78
Terracota Grille Floor Plan Detail Terracota Grille Floor Plan Detail Terracota Grille Floor Plan Detail
Terracota Grille Section Detail
Terracota Grille Elevation Detail
78Terracota Grille Elevation Terracota Grille ElevationDetail Detail 78
Terracota Grille Section Detail 46 LOW-RISE
79
MILLWORK CONSTRUCTION DRAWINGS
2nd Floor Bar (completed project - 2020)
Second Floor Bar Isometric View
2nd Floor Bar - Floor Plan
Second Floor Bar and Waitstation Floor Plan Second Floor Bar and Waitstation Floor Plan
Second Floor Bar Front Elevation Second Bar Front Elevation 2nd Floor Bar - Floor Elevation
Waitstation Front Elevation Waitstation - Front Elevation 47 LOW-RISE
80
Section Waitstation Waitstation - Cross-section
T HE MOORING S ON C A M E R O N L A K E Site: 3.95 acres | Fenelon Falls, ON | 2021 | Residential | Built 8,680 m² Role: Senior Designer
Project Team: 5
Firm: Turner Fleischer
Situated at 99 Louisa Street in Fenelon Falls, the building is a threestorey, 57-unit condominium that integrates contemporary lodge architecture with prairie influences and its lakeside setting. The project highlights materiality and form through a façade that pairs two tones of stone for depth and texture, wood-clad elements that add warmth and a resort character, and expansive glazing that enhances transparency and views. The initial massing featured a symmetrical composition with a central entrance element, informed by historical references from the site. The final design evolved through iterative refinement, optimizing the form for greater program efficiency. Terraces and articulated rooflines reduce visual mass and strengthen the connection between indoor and outdoor spaces. Prairie influences are expressed through a strong horizontal emphasis, a layered façade with projecting elements, and a close connection to the landscape. I led the development of the design concept in close collaboration with the Design Director and client, supported the creation of efficient unit layouts, and contributed to design refinements with the construction drawings team to ensure constructability, long-term View from Northwest (completed project - 2024)
durability, and alignment with the project budget.
48 LOW-RISE
INITIAL DESIGN CONCEPT
DESIGNDESIGN CONCEPT CONCEPT
DESIGN CONCEPT
MASS STUDY MASS STUDY
OVERALL SHAPE
MASSING
FINAL DESIGN
MATERIALITY
DESIGN CONCEPT
OVERALL SHAPE
glass
GLAS SS SEXTANT
Sextant: artifact related to David Thompson (1770–1857), the renowned surveyor and explorer who mapped the region between Hudson Bay and the Pacific Ocean CANOE DETAIL
SEXTANT
WOOD CANOE DETAIL
GLAS SS
SHAPE APPLIED TO THE BUILDING
SHAPE APPLIED TO THE BUILDING
SHAPE APPLIED TO THE BUILDING
DESIGN CONCEPT
SCHEMATIC SECTION
CONCEPTUAL CROSS-SECTION
GLASS
GLASS
DEFINING THE DEFINING VOLUMES THE VOLUMES
OVERALL SHAPE OVERALL SHAPE
BALCONIESBALCONIES / TERRACES/ TERRACES
FOR DIFFERENT FOR DIFFERENT FACADE FACADE
SHAPE APPLIED TO THE BUILDING
TREATMENTS TREATMENTS
mechanical room
ME ECHANICAL ROOM
amenity amenity
AMENITY
AMENITY
amenity A AMENITY
LOBBY
lobby View from East (completed project - 2024)
View from West - Initial Design (conceptual render)
View from West - Final Design (conceptual render)
49 LOW-RISE
N
N
FIREPIT
VISITOR PARKING
PROPOSED 3-STOREY RESIDENTIAL BUILDING RO
TE
OF
RR
AC
EA T2 nd FL PA OO TIO R AT GR OU ND
Secondary residential entrance
BASKETBALL COURT
Exit MECH. PENTHOUSE ROOF
Fire hydrant TENNIS COURT
JACUZZI
Siamese connection
AC
TIO PA
OF R RO OO FL nd ND T2 OU EA GR AT
RR
TE
CAMERON LAKE
Report PLAN2024-061 Condominium Description Exemption Application for 99 Louisa Street, Fenelon Falls – The Moorings on Cameron Limited 7 of 8
PLAYGROUND
Primary residential entrance
Schedule ‘B’ – Site Plan
Site Plan
LOUISA STREET
2-bedroom Unit - 2nd Floor
N TERRACE
PRIMARY BEDROOM
KITCHEN LIVING
BEDROOM 2
DINING
W.I.C. W.I.C.
OPT. FIREPLACE
W/D
2-bedroom + den Unit - 3rd Floor
N BALCONY
PRIMARY BEDROOM
KITCHEN
BEDROOM 2
DINING W.I.C. W.I.C.
TERRACE
LIVING PANTRY
DEN W/D
2-bedroom Unit - 3rd Floor
N OPT. FIREPLACE
PANTRY
W/D
LIVING
BEDROOM 2 DINING
View from Southwest (completed project - 2024)
KITCHEN
TERRACE
50 LOW-RISE
W.I.C.
PRIMARY BEDROOM
View from Southwest (conceptual render)
View from Southwest (project under construction - 2023)
View from Southwest (completed project - 2024)
View from West (completed project - 2024) 51 LOW-RISE
O T H E R
S E L E C T E D
W O R K
CONCEPTUAL RENDERS
MASTERPLAN GREEN SPACES DIAGRAM N
B1
A2
B2 C
A3
D1 A1
BRAM R OS E SQ U A R E
E1
F PARK
Brampton, ON | 2024 | Mixed-use | Pre-construction
PARK
525,152 m² residential | 3,328 m² retail |7,265 m² office
E2
D2
Role: Senior Designer Project Team: 8
G1
Firm: Turner Fleischer
H2 H1
G2 PARK
POPS
53 OTHER SELECTED WORKS
GROUND FLOOR AND TYPICAL FLOOR PLANS
1.05 m
G
1000 MAX.
7.06 m 8.80 m 5.75 m 6.04 m
36.37 m
FFE = 112.10 46.9 m² 505 ft²
6.40 m 2 1
#
2023-12-08 2022-02-23 DATE
ELECTRICAL CLOSET 2600
300 MIN.
6.76 m
1000 MAX.
PEMBROKE ST.
2600
RE-ISSUED FOR RZ & SPA ISSUED FOR RZ & SPA DESCRIPTION
HHK HHK BY
#
10.80 m
3B
75.2 m² 809 ft²
1B+D
1B+D
45.9 m² 494 ft²
48.1 m² 518 ft²
PROJECT
PROPOSED MIXED-USE DEVELOPMENT
DRAWING
6.00 m FIRE ROUTE
88.41
OT EC TION
TC 88.20
2023-12-11 4:57:52 PM
5850
ZO NE
Toronto, ON | 2023 | Mixed-use | Pre-construction 36,750 m² residential | 149 m² retail Role: Senior Designer Project Team: 5 Firm: Turner Fleischer
54 OTHER SELECTED WORKS
BY
PROJECT
PROPOSED MIXED-USE DEVELOPMENT
DRAWING
FLOOR 01
6.0m FIRE ROUTE
PR
BC 88.05
TR EE
DESCRIPTION
239-255 DUNDAS ST. E, TORONTO, ON
9.30 m
0.57 m
0.58 m
PROJECT NO.
21.272SPA
6.40 m
4.80 m
4.80 m 22.22 m
FLOOR 07-20
6.22 m 0.28 m
PROJECT NO.
21.272SPA
PROJECT DATE
PROJECT DATE
2022-01-04
2022-01-04
DRAWN BY
DRAWN BY
HHK
Author
CHECKED BY
CHECKED BY
RMM
Checker
SCALE
SCALE
1:100
1 : 100
N
DRAWING NO.
SPA151
REV.
2
1 ______ SPA401
CONCEPTUAL RENDER - HERITAGE BUILDING INTEGRATION
23 5 D U ND A S ST E
DATE
2B
62.2 m² 669 ft²
9.02 m
GAS METER
N17°04'45"W (57.400)
6.64 m
6.30 m
37.43 m
43.50 m
CACF
ELEV-1
1B+D
NE
EXHAUST SHAFT
Y LI RT
TYP.
OPE PR
5.60 m
G IN
15.64 m
3B
79.2 m² 853 ft²
2600
OUR
88.17
88.30
EXISTING 2 STOREY BUILDING 48-50 PEMBROKE ST
1 ______ SPA401
PIPE SPACE
2600
5m 6.4
88.41
2600
8m 1.8
N73°27'15"W (27.737)
m .65
88.62
2600
239-255 DUNDAS ST. E, TORONTO, ON
88.65 4 88.8
2 ______ SPA401
52.8 m² 568 ft²
17
87) "W (11.7 N18°41'45
88.35
4m 3.3
NE
88.40
CONVEX MIRROR
TURN TABLE
27.9 m² 300 ft²
1B+D (FLEX)
OUTLINE OF UNDERGROUND LEVEL
EV
3 VISITOR PARKING SPACES (2 EV)
x 4.0m)
HB IG
Y LI RT
6
88.50
V
V
TYP
LOADING 88.65(11.0mEx'B'3.5m
NE
OPE PR
88.8
1.50 m
8m 1.8
G IN
2.60 m
E LIN
OUR
E LIN
11.68 m
INTAKE SHAFT
STUDIO
OUTLINE OF MPH. ABOVE
TYPICAL PARKING SPACE: MIN 2.6 x 5.6 x 2.1m HIGH
RTY
HB IG
RTY
2.28 m
EVSE PARKING
AISLE WIDTH: MIN 6m
OPE PR
NE
OPE PR
STAGING AREA = 51 m2
VISITOR PARKING
TYPICAL PARKING DIMENSIONS:
6.30 m
ELEV-3 ELEV-2
CANOPY ABOVE
BC 88.25 TC 88.40
V EV
2 ______ SPA401
G RIN OU
1800 (5' - 11")
m .57
B GH NEI
BC 88.28 TC 88.43 0m 4.1
6.3 m² 67 ft²
88.75
13
BC 88.32 2 ______ TC 88.47 SPA401
88.60
G RIN OU
.80 88
7) 97
B GH NEI
MOVE RM.
PULL RM
54.7 m² 589 ft²
OUTLINE OF RELOCATED HERITAGE FACADE
5600
ELEV-4
FIRE ROUTE
13.71 m
(16. RETAIL GARBAGE
88.91
FIRE ROUTE TO ENTRANCE
VEST.
FFE = 88.90
1B+D (FLEX)
OUTLINE OF EXISTING HERITAGE FACADE OUTLINE OF EXISTING RETAIL FACADE
6.00 m
88.62
"W 3'55
88.90
15.48 m
m GAS/HYDRO .09METER 10
>1000
9.58 m
2.3m
EXIT
1100
FF
ELEV-5
BIKE ELEV.
°4
GARBAGE ELEV.
N48
96.1 m² 1034 ft²
UP
2B
58.1 m² 625 ft²
000.00 SPOT ELEVATION M
0m 0.0
5.79 m
RES. LOBBY
BULK GARBAGE 10m2
1B
40.6 m² 437 ft²
FIRE ROUTE SIGN
A
OUTLINE OF EXISTING 255 DUDAS HERITAGE FACADE
BC 88.43 TC 88.58
88.70
2m 4.4
70.5 m² 759 ft²
2023-12-11 11:21:04 AM
TRANSFORMER WITH CLEARANCES
26.7 m² 287 ft²
HAZARDOUS WASTE 6.5m2
GARBAGE
EXISTING 219 DUNDAS STREET E 21 STOREY (60.95M)
1B
41.4 m² 445 ft²
CONVEX MIRROR
SIAMESE CONNECTION
LOUNGE 1.34 m
9.66 m
M
PARCEL
EXISTING 237 DUNDAS STREET E 4 STOREY (12.4M)
BC 88.49 TC 88.64
(3' - 7")
6.56 m
LOW HEADROOM ABOVE
2 ______ SPA401
FIRE HYDRANT
m
B
3.89 m
4.51
3.3m
Z
FFE = 88.90
6.35 m
SIAMESE CONNECTION 3.31 m
88.75
130 m² 1399 ft²
UP
FH
7.22 m
101 - RENTAL REPLACEMENT 65.1 m² 701 ft²
6.31 m
m .10 36
EXIT
EXIT
5.65 m
102 - RENTAL REPLACEMENT 62.1 m² 668 ft²
.00 89
BC 88.62 TC 88.77
3B MULTI LEVEL UNIT
RETAIL
5.67 m
RETAIL ENTRANCE
EXISTING FIRE HYDRANT
88.75
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
22.22 m
SECONDARY RESIDENTIAL ENTRANCE
FH
OUTLINE OF FLOOR 6 ABOVE
2B
88.97 AD T/G 88.94
88.90
EXISTING 235 DUNDAS STREET E 4 STOREY (12.4M)
3.06 m
Z
LEGEND PRIMARY RESIDENTIAL ENTRANCE
OUTLINE OF EXISTING HERITAGE FACADE
1.80 m
50 00 RO UN DIN G R
OUTLINE OF FLOORS 7-52 ABOVE
OUTLINE OF RELOCATED PORTION OF 255 DUNDAS HERITAGE FACADE
2.08 m
8.67 m
89.00
E .00 89
Turner Fleischer Architects Inc.
11.19 m
m
.00 89
88.95 AD T/G 88.89
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
2.47
644) (36.
BC 88.73 OUTLINE OF EXISTING RETAIL FACADE TC 88.88
88.90
.00 89
3m 6.5
"E 06'05 N47°
.00 89
Y TR EN
.02 89
6.75 8 m 88.9 5 88.9
SIAMESE CONNECTION
EXIT
XIT
3m 19.6 9m 9.0
.81 88 6 BC 88.9 TC
.80 88 .95 BC 88 TC
8 88.7 BC 88.93 TC
0m
0 36.1 88.8 BC 88.95 TC
CO RN E
17.31 m
.E ST AS ND DU
residential units rental replacement units horizontal circulation, lobby vertical circulation, service areas retail garbage room
1 ______ SPA401
Turner Fleischer Architects Inc.
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com
.99 88
m 1.6
3.92 m
7 88.7 BC 88.92
TC 0.9m
6 88.7 BC 8.916.75 m 8 TC
30.81 m
N
BC 88 .8 TC 88 0 .95
OBSTRUCTION
1 ______ SPA401
3.9m
N
DRAWING NO.
SPA158
REV.
CONCEPTUAL RENDERINGS
TYPICAL FLOOR PLAN
BEDROOM ± 8 S.M. ± 82 S.F.
BEDROOM ± 9 S.M. ± 102 S.F.
BEDROOM ± 8 S.M. ± 88 S.F.
N75o28'40"E
2008
2009
4B+2BATH 73.84 m² 795 ft²
BEDROOM ± 9 S.M. ± 97 S.F.
BEDROOM ± 8 S.M. ± 87 S.F.
4B+2BATH 76.52 m² 824 ft²
BEDROOM ± 8 S.M. ± 89 S.F.
2004 (E)
COMMON 248 ft² ± 14 S.M. ± 151 S.F.
± 20 S.M. ± 212 S.F.
CHUTE ± 2 S.M. ± 26 S.F.
ELEVATOR ± 13 S.M. ± 135 S.F.
12.907
2010
BEDROOM ± 7 S.M. ± 76 S.F.
0.48 m
N
1 ______ SPA401
55 OTHER SELECTED WORKS
2007
2B+1BATH COMMON 35.02 m² ± 11 S.M. ± 114 S.F. 377 ft²
± 13 S.M. ± 144 S.F.
± 2 S.M. ± 23 S.F.
ELECTRICAL CLOSET ± 2 S.M. ± 25 S.F.
N17o04'10"W
ELEVATOR ± 14 S.M. ± 150 S.F.
PIPE SHAFT ± 2 S.M. ± 25 S.F.
13.457
5.02 m
BEDROOM ± 8 S.M. ± 86 S.F. COMMON ± 18 S.M. ± 199 S.F.
BEDROOM ± 9 S.M. ± 100 S.F.
BEDROOM ± 8 S.M. ± 86 S.F.
BEDROOM ± 8 S.M. ± 86 S.F.
± 91 S.M. ± 975 S.F.
47.340 45.49 m
2005
2B+2BATH 48.83 m² 526 ft²
COMMON
2B+1BATH 37.58 m² 405 ft² AIR SHAFT
COMMON ± 17 S.M. ± 182 S.F.
2006
3B+2BATH 63.28 m² 681 ft²
1 ______ SPA401
BEDROOM ± 8 S.M. ± 86 S.F.
0.30 m
14.035 10.08 m
BEDROOM ± 7 S.M. ± 74 S.F.
STAIR
BEDROOM ± 8 S.M. ± 91 S.F.
INDOOR AMENITY
BEDROOM ± 9 S.M. ± 96 S.F.
BEDROOM ± 8 S.M. ± 88 S.F.
BEDROOM ± 8 S.M. ± 90 S.F.
2B+1BATH 23.06 m²
COMMON ± 14 S.M. ± 152 S.F.
25.34 m
TELECOM
2001 (E)
2B+2BATH 25.22 m² 271 ft²
N73o46'20"E
BEDROOM ± 8 S.M. ± 87 S.F.
± 3 S.M. ± 29 S.F.
12.776
2.51 m
BEDROOM ± 8 S.M. ± 89 S.F.
BEDROOM ± 9 S.M. ± 93 S.F.
5.02 m
BEDROOM ± 8 S.M. ± 89 S.F.
2.88 m
N16o38'45"W
BEDROOM ± 9 S.M. ± 102 S.F.
AIR SHAFT
BEDROOM ± 10 S.M. ± 107 S.F.
1.01 m
Role: Job Captain
ROOF AT FLOOR 19
± 16 S.M. ± 171 S.F.
5.02 m
10.32 m
BEDROOM ± 8 S.M. ± 82 S.F.
COMMON ± 19 S.M. ± 202 S.F.
COMMON
BEDROOM ± 8 S.M. ± 89 S.F.
5.17 m
5.12 m
COMMON ± 21 S.M. ± 228 S.F.
4B+3BATH 78.84 m² 849 ft²
PLUMBING CLOSET
0.28 m
11.48 m
2002
2003
4B+3BATH 77.44 m² 834 ft²
N73o46'20"E
5.10 m
± 13 S.M. ± 144 S.F.
± 1 S.M. ± 11 S.F.
5.10 m
22.10 m
21.370
5.02 m
16.16 m
BEDROOM ± 8 S.M. ± 81 S.F.
2.51 m
9.70 m
Firm: Turner Fleischer
BEDROOM ± 10 S.M. ± 109 S.F.
STAIR
BEDROOM ± 10 S.M. ± 103 S.F.
N73o44'30"E
27,727 m² residential | 220 m² retail
Project Team: 3
N16o43'00"W 0.64 m
39.624
BEDROOM ± 8 S.M. ± 81 S.F.
13.408
Toronto, ON | 2025 | Student Housing | Pre-construction
10.30 m
18.43 m 0.39 m
20 8- 210 B L O O R ST W
10.44 m
± 2 S.M. ± 21 S.F.
residential units horizontal circulation, lobby vertical circulation, service areas amenity
N16o40'10"W 5.35 m
FAÇADE CONCEPT
BREWERY BARRELS BREWERY BARRELS
HUETHER HOTEL
PODIUM RHYTHM
DESIGN CONCEPT DESIGN CONCEPT BUILDING FRAMES BUILDING INSPIRED FRAMES BY BREWERY INSPIREDBARRELS BY BREWERY BARRELS
DESIGN CONCEPT HOTEL PROPORTIONS x PODIUM DESIGN
59 King Street N
05
CONCEPTUAL RENDERS
59 K ING S T N Waterloo, ON | 2024 | Mixed-use | Pre-construction 56,200 m² residential |490 m² retail Role: Senior Designer Project Team: 4 Firm: Turner Fleischer 56 OTHER SELECTED WORKS
BUILDING FRAMES BUILDING FRAMES
BREWERY BARRELS
FAÇADE MODULES 59 King Street N59 King Street N
03
03
2
DESIGN CONCEPT
1
2 1
3 ANGLED BALCONIES RESPONDING TO ANGLED PROPERTY LINES
2 TRANSITIONAL FLOORS (GLASS)
ANGLED BALCONIES RESPONDING TO ANGLED PROPERTY LINES
1 RETAIL + 6 STOREY RESIDENTIAL PODIUM
TRANSITIONAL FLOORS (GLASS)
1. +RETAIL + 6 STOREY + 33 STOREY 33 STOREY RESIDENTIAL TOWERS
3
2. TRANSITIONAL FLOORS
ANGLED BALCONIES RESPONDING TO ANGLED PROPERTY LINES
3. ANGLED BALCONIES 02
DESIGN CONCEPT DIAGRAMS
8127-8149 Yonge Street
RETAIL + 6 STOREY RESIDENTIAL PODIUM + 33 STOREY RESIDENTIAL TOWERS
TRANSITIONAL FLOORS (GLASS)
CROSS-SECTION
DESIGN CONCEPT DIAGRAMS
289 FLOOR 33 285.75 FLOOR 32 282.8 FLOOR 31 279.85 FLOOR 30 276.9 FLOOR 29 273.95 FLOOR 28 271 FLOOR 27 268.05 FLOOR 26 265.1 FLOOR 25 262.15 FLOOR 24 259.2 FLOOR 23 256.25 FLOOR 22 253 FLOOR 21 250.05 FLOOR 20 247.1 FLOOR 19 244.15 FLOOR 18 241.2 FLOOR 17 238.25 FLOOR 16 235.3 FLOOR 15
81 27 YONG E ST
232.35 FLOOR 14 229.4 FLOOR 13 226.15 FLOOR 12 223.2 FLOOR 11
Markham, ON | 2022 | Mixed-use| Pre-construction
220.25 FLOOR 10 217.3 FLOOR 09 214.35 FLOOR 08
69,656 m² residential | 1,192 m² retail
211.4 FLOOR 07 208.45 FLOOR 06 205.5 FLOOR 05 202.55 FLOOR 04 199.6 FLOOR 03
Role: Senior Designer
196.65 FLOOR 02
DESIGNRESIDENTIAL CONCEPT DIAGRAMS RESIDENTIAL
GRADE
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
30.0 m OUTDOOR AMENITY
RESIDENTIAL
185.45 U/G 1
Firm: Turner Fleischer
183.05 U/G 2
2022-08-03 5:56:00 PM
180.25 U/G 3 177.45 U/G 4 174.65
6.8 m
7000
AMENITY FFE = 186.55
2800 2800 2800 3000
FLOOR 01
Project Team: 4
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
0.8 m
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
8.5 m
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
16.8 m
B
A
PROPERTY LINE
C
MECH PENTHOUSE
02 8127-8149 Yonge Street
Turner Fleischer Architects Inc.
67 Lesmill Road Toronto, ON, M3B 2T8 T 416 425 2222 turnerfleischer.com This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
A #
July 29, 2022 DATE
Issued for RZ/OPA
DESCRIPTION
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
MOVE
RESIDENTIAL LOBBYY
DRIVEWAY 185.59
6.3 m
LOADING
RETAIL FFE = 186.05
PARKING
LOCKER
PARKING
PARKING
LOCKER
PARKING
PARKING
LOCKER
PARKING
PARKING
LOCKER
PARKING
residential units horizontal circulation, lobby vertical circulation, parking retail garbage room amenity
PROJECT
PROPOSED CONDOMINIUM 8127-8149 Yonge Street Markham, ON
DRAWING
Cross-Section
PROJECT NO.
21.158P01 PROJECT DATE
DRAWN BY
Author CHECKED BY
Checker SCALE
1 : 300
DRAWING NO.
57 OTHER SELECTED WORKS
BY
13.4 m
RESIDENTIAL
193.05 186.05
D T2 40 = STOREY
6.8 m
291.95 FLOOR 34
E
6.8 m CLEAR HEIGHT
294.9 FLOOR 35
F
RESIDENTIAL
ELEVATOR
297.85 FLOOR 36
G
RESIDENTIAL
ELEVATOR
300.8 FLOOR 37
H T1 40 = STOREY
ELEVATOR LOOBY
7000 303.75 FLOOR 38
3600 2950 2950 2950 2950 2950 2950 2950 2950 2950 2950 3250 2950 2950 2950 2950 2950 2950 2950 2950 3250 2950 2950 2950 2950 2950 2950 2950 2950 2950 2950 3250 2950 2950 2950 2950 2950 2950
FLOOR 40 306.7 FLOOR 39
J
8127-8149 Yonge Street
RETAIL + 6 STOREY RESIDENTIAL PODIUM MECH PENTHOUSE + 33 STOREY RESIDENTIAL TOWERS
4150
MPH 310.85
K
PROPERTY LINE
L T/O ROOF 317.85
CONCEPTUAL RENDERS 02
A3.1
REV.
A
GROUND AND TYPICAL FLOOR PLANS EGLINTON AVENUE EAST
2 ______
SPA401
AND LOT 1, CONCESSION 1, EAST OF YONGE STREET PIN 10364-0190(LT)
N
EGLINTON AVENUE EAST
PIN 10364-0190(LT)
4.00 m
Toronto, ON | 2022 | Mixed-use| Pre-construction 20,970 m² residential | 710 m² retail Role: Senior Designer Project Team: 4 Firm: Turner Fleischer
58 OTHER SELECTED WORKS
1.88 m
4.00 m
2B
58.2 m² 627 ft²
55.5 m² 598 ft²
55.5 m² 598 ft²
64.4 m² 693 ft²
6.10 m
6.10 m
1B 47.2 m² 508 ft²
1B+D
2B
53.8 m² 579 ft²
65.5 m² 706 ft²
N15°42'45''W 24.689m
24.40 m
6.10 m
1B 48 m² 516 ft²
E BALCONY
BALCONY
BALCONY 6.18 m
BALCONY
ROOF AT LEVEL 8
#
2022-09-02 DATE
F
w)
ISSUED FOR RZ AND SPA DESCRIPTION
HHK BY
8.55 m
5.75 m
6.45 m
16.38 m
20.093 (P4&M)
12.80 (BR)(P1,P2&S)
9.41 m
30.16 m
Skale Developments
V
33 7. 15
No. 55 HOYLE AVENUE 3 STOREY STUCCO DWELLING
CRW CORNER 0.04S
78 6. 15
82 6. 16 OF RO
6
5
4
CONCRETE RETAINING WALL
WOOD DECK
35 6. 15
BOARD FENCE
BF END 0.27S
3
BF 0.29S
90 93 w) 5. 5. (T 15 15 5.93 15 05 6. 15
73 5. 73 15 155.
85 5. 15 CRW CORNER 0.11E BF END 0.12E
BF
2022-09-15 10:47:14 AM
0.20S (STU)(M)
0.20S (STU)(M)
6.22E (FDN)(P3&S)
7
0.26S/6.15E (STU)(M)
35 7. 15
0.77S (STU)
5.24 (STU) 12 7. 15 RETAINING WALL
1
2
1 : 100
N15°42'45''W 15.826m
N15°38'10''W 15.826m
G
FLOOR 1 N74°13'25''E 45.69 m
BOARD FENCE PROJECT NO.
CONCRETE RETAINING WALL 0.4∅
0.6∅
22.184P01 PROJECT DATE
DRAWN BY
HHK
Floor 9-25SSIB(WIT)
BOARD FENCE
SPA156 BF 0.32S
DRAWING
BF CORNER 1.02E
02 6. 15
4
1.000W BF CORNER 0.27S/0.21W
1
CHECKED BY
RMM SCALE
As indicated N
21128-0129(LT)
N15°38'10''W 15.826m
N74°13'25''E 45.69 m
28 4. 15
LOT 4 BLOCK R STERED PLAN 722
DG E
OUTLINE OF U/G BELOW
537-547 Eglinton Avenue E. and 59 & 61 Hoyle Ave, Toronto, ON
32 4. 15
BOARD FENCE
BF CORNER 0.95E
80 5. 15155.81 (Tw)
0.13E 2.21N
GASMETER
A/C
5 WOOD
39 4. 15
BP
EXHAUST SHAFT/GRILLE
62 6. 6.63 15 15 62 6. 15
56CONCRETE WALKWAY 6. 15
HEDGE
PROPOSED MIXED-USE DEVELOPMENT
G
0.06 m 10.20 m
27.60 m
N15°42'45''W (M)
15.27 m
N15°42'45''W 15.826m
2.67 m
15.826 (D2,P4&M)
PROJECT
50 6. 15
24.40 m
BALCONY
BALCONY
2B 57.2 m² 616 ft²
E
1
(T
1B 46 m² 495 ft²
UP
D
28 4. 15
78 5. 15
6.10 m
OUTDOOR AMENITY AT LEVEL 8
UP
32.71 m
6.10 m
PIN 21128-0130(LT)
SUBJECT TO EASEMENT AS IN INST. CA681827
HOYLE AVENUE
52.8 m² 568 ft²
BALCONY
24.40 m
GAS/HYDRO METER
92 3. 15
F
RETAINING WALL
BIKE REPAIR STATION
BALCONY
6.10 m
OUTDOOR AMENITY AT LEVEL 8
M
6.10 m
LOT 1, BLOCK R,REGISTERED PLAN 722
32.71 m
CONCRETE RETAINING WALL
D
1B+D
10.20 m
V
SPOT ELEVATION
16.38 m
OUTLINE OF BUILDING ABOVE V
E 24 E 0. 35 N/ 0. 04 N/ 0. 02 0.
1B 46.1 m² 497 ft²
FIRE ROUTE SIGN
6.10 m
INTAKE SHAFT 7.56 m² 81 ft²
24.689 (P5&M)
N15°42'45''W
N15°42'45''W (M) CONCRETE RETAINING WALL
RAMP UP FROM U/G 1 @ 15% 13.34 m
EXIT
TRANSFORMER WITH CLEARANCES
residential units horizontal circulation, lobby vertical circulation, service areas DRAWING NO.
SPA151
REV.
CONCEPTUAL RENDERS
54 5 EGLINT O N AVE E
1B+D
24 4. 15
IT BETWEEN REGISTERED PLANS 694 AND 722
WV
BALCONY
1B+D
FIRE HYDRANT
000.00
C
77 3. 15
R
CONCRETE
N15°38'10''W (M)
0.30 m 0.30 m
CAR SHARE
20 00
3.85 m
0.30 m
2.60 m
-30 SHORT TERM RESIDENTIAL -2 LONG TERM RETAIL
RAMP UP FROM U/G 1 @ 7.5%
SI GN
0.30 m
C
CRW CORNER 0.36E CRW CORNER 0.34E
UP
12 7. 15
1 : 100
2.13 m
1.73 2.10
SIGN
CONCRETE LANDING
2.19 m
OUTLINE OF U/G BELOW
CC(OU)
1.50 m
1 ______
w) (T w) 66 (T 4. 78 15 5. 15
HE
10.20 m
TYPE 'G' LOADING 13.0m X 4.0m X 6.1m
A
SPA401
w) NE R (T OR NE 28 C COR 4. w) 15 CRWRW (T C 60 4. 15 08 4. 15 CC(R&C) 0.07E 0.02S
61.6 m² 663 ft²
156.7 m² 1687 ft²
0.38S (FDN)(P3,P4&S)
w) (T 81 65 6. 6. 15 15 66 6. 15
EXIT
G
BIKE LOCKER
LOBBY
3.40 m
43 6. 15
STONES
100.7 m² 1084 ft²
FFE = 156.28
02 6. 15
WRW 0.35N 3.14W
CC(WIT) 4.000W ON PRODUCTION c) (B 56 c) 6. (T 15 62 6. 15
BALCONY
2B
SIAMESE CONNECTION
B
4.11 m
00 20
CONCRETE CURB
BULKY STORAGE (10m2)
55 6. 15
Floor 1
BALCONY
SECONDARY RESIDENTIAL ENTRANCE
EXIT
24.689m LIMIT BETWEEN REGISTERED PLANS 694 AND 722
24.689m
44.782 (P4&M) N15°38'10''W
3.49 m
0.42S (FDN)(P3&S) 0.35S (STU)(M)
CONCRETE WALKWAY
86 c) 5. 15 (B(Tc) 84 5. 89 15 5. 15
52 6. 15
58 6. 15
9.41 m
N74°13'25''E 26.936m
BALCONY
A
B
82 3. w) 15 (T 05 4. 15
GARBAGE 9
RECEPTION
14.41 m
15 5.7
38 6. 15
55 6. 15
6.10 m
LEGEND PRIMARY RESIDENTIAL ENTRANCE
N15°38'10''W 24.689m
14.45 m
EXIT EXIT
BF END 1.10W
BOARD FENCE
BF CORNER 0.89W
6.76 m
CONCRETE CURB CURB CUT
CONCRETE SIDEWALK
PIN 21128-0038(LT)
(VICTORIA STREET BY REGISTERED PLAN 694)
(BY UNREGISTERED BY-LAW No. 6402)
STAGING AREA
VEST.
69 5. 15
WV
71
RETAIL BIKE PARKING (6)
UP
CACF
07 6. 15
30 6. 15 33 6. 15 33 6. 15
6.10 m
RETAIL ENTRANCE
RETAIL GARBAGE
52 5. 15
0.1∅
356.3
STREET LINE
FH
PARCEL
CP
06 6. 15
N
1
PIN 10364-0190(LT)
A
UP
IB(OU) 0.01N ON LINE E/W
99 5. 15
8.55 m
WIDENED BY BY-LAW No. 12395, INST. EN26301
0.610 (D5,D6,P5,P7&M)
25.9 m² 279 ft²
77 5. 15
88 5. 15
G
1 152.3
N74°13'25''E (M) CC(KBN)
EXIT
16.8 m² 181 ft²
68 5. 15
17'21' 'E
4 152.4
0.09 m 9.054 (M)
MOVING
0.2∅
HOYLE AVENUE
HOYLE AVENUE
155.33
GM
33 36 5. 5. 39 15 15 5. 36 15 GATE 5. 15
65 5. 15 66 5. 15
2
30.16 m
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work.
LOT 1
45.630 (P1,P2,P5&M)
CANOPY
7.96 m FIRE ACCESS
HCM 02019781014
CONCRETE SIDEWALK
CONVEX MIRROR
0.3∅
46 5. 15
c) (B c) 23 (T 6. 29 15 6. 15
95 2. 15
684.1 m² 7364 ft²
0.3∅
6.00 m FIRE ROUTE
85 5. c) 15 (T 94 5. 15
WV
73 3. 15 77 3. 9.030 (D7,P7&M) 15
75 3. 15
RETAIL
155.30
66 5. 15
c) (T 62 5. 56 15 5. 15
10 3. 15 3.64 15
12 3. 15
46 67 3. 3. 50 15 15 3. 15
3
turnerfleischer.com
1 152.2 4 152.2
LOT 6
00 5. 15 08 5. 15
CONCRETE WALKWAY
5. 15 5.20 15
61 6. 15
20 3. 15 32 3. 15
4
Inc.
67 Lesmill Road Toronto, ON, M3B 2T8
HP\LS
2 3.0 15
Architects
5
T 416 425 2222
CONCRETE SIDEWALK
9 3.0 15
2
Turner Fleischer
1
A/C
c) (B c) 14 (T 5. 20 15 5. 15
C
19 3. (Tc) c) 15 26 (B 3. 21 15 3. 15 83 c) 3. (T c) 15 68 (B 3. 52 15 3. 15
2
c) (B c) 77 (T 2. 90 15 2. 15
CONCRETE CURB
FFE = 156.28
17 5. 15 31 5. 15
33 5. 15
2.10 19
1 ______
SPA401
28 6. 15
45.54 m
3
GRASS
FH
17 5. 15
F
35 30 3. 3. 15 15 32 36 3. 3. 15 15 68 CONCRETE 3. 15 3.83 STEPS 65 15 3. 79 WV 15 3. 15 CONCRETE LANDING WV N74°13'25''E 9.021 (M)
04 5. 15
CONCRETE SIDEWALK
CO NN 17.20 EC TIO m 97 4. ND 15 IST AN B CE TO
E
60 3. 15
26.936m
CANOPY
0.3∅
79 5. 15
CRW 1.97N
w)
w) (T w) 60 (T 3. 80 15 3. 15
(T
153.47 84 3. 15
SHRUB
CRW
88 3. 15
8.976 (M)
c)
CONCRETE STEPS
LOT 5
153.47
3. 99
153.79(Tw)
CONCRETE RETAINING WALL SHRUB
68 4. 15
94 (T 2. 03 15 3. 15
CURB CUT
SOUTH LIMIT OF ORIGINAL ROAD ALLOWANCE
CRW 2.38N
15
CONCRETE WALKWAY
86 CONCRETE 3. WALKWAY 15
N74°13'25''E (M) 153 03 154 .98 .18
4.87 m154.
c)
OUTLINE OF U/G BELOW
81 4. 15
SIAMESE CONNECTION
2022-09-15 10:47:11 AM
08 98 WOOD 4. 3. 03 4. 15 15 RETAINING 15 14 WALL 4. 15 4.34 0.25∅ 15 53 4. 15 IB(H&J) (D10,P6&M) 4.596
09 (T 3. 16 15 3. 15
CONCRETE CURB
6
86 4. 15
HP\LS
c) (B c) 71 (T 4. 78 15 4. 15
1
8
4
c)
UBOX
CONCRETE SIDEWALK
CRW 2.36N 153.83 (Tw)
153.79 153.94(Tw)
(T
3.30 m
FH
D
22 3. 3.30 15 15
CURB CUT
CONCRETE CURB
FH
SPA151
154.15 15 4.3
(D10,D11,P6&M) 57 4. 4.343 15
TL
) op 56 HMH (T 3. 15
WRW 2.43N LOT 4
153.88
2.10
C UT
LK
UR B C
SI TE ON C
64 4. 15
) op 57 (T 4. 15 CB
A
N85°
5
c) c) (T (T 45 45 56 3. 3. 3.35 3. 15 15 CONCRETE CURB 15 15
c) 53 (T 3. 61 15 3. CURB CUT 15
1.88 m
154.60(Tc) ) op 54 (T 4. 15 CB
WV
154.02(Tw)
3 4.4 15
1
21.38 m IB(KBN) SIAMESE CONNECTION DISTANCE TO FH 154.50(Bc)
HW
154.01
06 4. 15 154.18 154.19 CONCRETE STEPS
39 4. 15
C RE
36 4. c) (T
15 43 4. 15
63 4. 15
WV
22 4. 15
ING CK Y LO ER WA LK INT WA
EGLINTON AVENUE EAST AS WIDENED BY BY-LAW No. 12395, INST. EN26301
SIA ME SE
NORTHWEST CORNER OF LOT 4, IN BLOCK Q REGISTERED PLAN 694
DE W A
MH
PIN 10364-0190(LT)
6
HP\LS 154.26(Tc) 154.22
) op 52 (T 4. 15
(VICTORIA STREET BY REGISTERED PLAN 694)
7 CONCRETE CURB
SIGN
c) (B c) 90 (T 3. 01 15 4. 15
0
) op 36 (T 4. 15 MH
CONCRETE CURB
22.77
41 4. 15
7
1.88 m
2 ______
SPA401 WIDENED BY BY-LAW No. 12395, INST. EN26301
1
retail garbage room bicycle locker
GLENAVY TYPICAL FLOOR AVENUEPLAN
1 ______ RZ402
N
ROEHAMPTON AVENUE
OUTLINE OF FLOOR 14 - 15 ABOVE
1B
1B
43 S.M. 462 S.F.
42 S.M. 453 S.F.
44 S.M. 477 S.F.
45 S.M. 487 S.F.
46 S.M. 493 S.F.
BALC. TYP
BALC. TYP
BALC. TYP
BALC. TYP
BALC. TYP
BALC. TYP
TERRACE AT FLOOR 02
6.50 m
6.50 m
127.95 6.50 m
6.50 m
7.00 m
residential units 1 FLOOR 6 - 13 horizontal circulation vertical circulation, service areas
RZ157
2025-01-17 3:16:37 PM
CONCEPTUAL RENDER
Toronto, ON | 2025 | Residential | Pre-construction 15,285 m² Role: Job Captain Project Team: 4 Firm: Turner Fleischer
59 OTHER SELECTED WORKS
7.34 m
BALC. TYP
BALC. TYP
TERRACE AT FLOOR 02
10.00 m
16.46 m 26.02 m
19.09
15.68 m
AIR SHAFT
3B 104 S.M. 1,122 S.F.
1 ______ RZ402
1 : 200
60 9 R OEH A M PTO N AVE
UP
DN
0.00 m SETBACK
6.50 m
0.00 m SETBACK
N74O25'30"E 8.96 m
DN UP
2B 88 S.M. 945 S.F.
0"W
70 S.M. 759 S.F.
ELEVATOR LOBBY
N7 O07'5
1B
66 S.M. 708 S.F.
1 ______ RZ401
E1
8.33 m
1B
3.00 m
3.00 m
7.02 m
2B 1B
96 S.M. 1,029 S.F.
E2 | FIRE FIGHTER ELEV
1.80 m
DN
2B
BALC. TYP
2B
ELEC.
AIR SHAFT
19.82 m SETBAC K
3.00 m
18.58 m
ELEC.
1B 68 S.M. 734 S.F.
15.68 m
ELEVATOR LOBBY
15.49 m
UP
10.92 m
E1
PIPE SPACE
2B 73 S.M. 788 S.F.
28.71 m 13.23 m
4.75 m
1B 50 S.M. 542 S.F.
E2 | FIRE FIGHTER ELEV
3.00 m
43 S.M. 459 S.F.
5.52 m
1B
34 S.M. 371 S.F.
UP
18.58 m
STUDIO
130.78
10.07 m
3B 91 S.M. 981 S.F.
18.87 N15O39'00"W
13.50 m
N74O25'10"E
PIPE SPACE
9.75 m
DN
14.94 m SETBACK
18.50 m
6.50 m
1.80 m
8.56 m
1 ______ RZ401
6.50 m
0.00 m SETBACK
0.00 m SETBACK
48.46 m 12.21 m
CONCEPTUAL RENDERS
20 65 F INC H AVE W Toronto, ON | 2023 |Mixed-use | Pre-construction 28,540 m² residential | 980 m² retail| 5,810 m² office Role: Senior Designer Project Team: 4 Firm: Turner Fleischer
60 OTHER SELECTED WORKS
This drawing, as an in Architects Inc. The co on site and must notify information. This draw survey, structural, mec appropriate consultant applicable codes and drawings not specifica for any corrections or
6.00 m
6.00 m 4.10 m
2.95 m
2.95 m
8.5 m
3.25 m
3.25 m
8.5 m
PROPERTY LINE
167.5
MPH
MPH
MPH
161.5
161.5
161.5
Floor 12
Floor 12
Floor 12
157.4
157.4
157.4
Floor 11
Floor 11
Floor 11
154.45
154.45
154.45
Floor 10
Floor 10
8.5 m
151.2
151.2
151.2
Floor 9
Floor 9
Floor 9
148.25
148.25
148.25
Floor 8
Floor 8
Floor 8
145.3
145.3
145.3
Floor 7
Floor 7
Floor 7
4.8 m
2.95 m 2.95 m 3.55 m
2 STOREY TOWNHOME
PARKING
4.50 m
FFE : 121.00 FFE : 121.00 120.90
2 LOADING STOREY MOV. LOADING TOWNHOME FFE : 121.00 FFE : 121.00
FFE : 121.00
MOV. LOADING GARBAGE MOV.
GARBAGE RETAIL
GARBAGE RETAIL
Floor 6 139.1
Floor 5 136.15
FFE : 120.40
FFE : 120.40
120.00 FFE : 120.40
4.0 m
PARKING
PARKING
PARKING
142.05
142.05
Floor 6
Floor 6
139.1
Floor 5 136.15
Floor 4
139.1
Floor 5 136.15
Floor 4
132.9
132.9
132.9
Floor 3
Floor 3
Floor 3
129.95
129.95
129.95
4.0 m127
4.0 m127
Floor 2
Floor 2
MEZZANINE
MEZZANINE
MEZZANINE
124.05
124.05
124.05
Floor 2
RETAIL
4.8 m
142.05
33.6 m
RESIDENTIAL
CORRIDOR
33.6 m
CORRIDOR
LOCKERS RESIDENTIAL
RESIDENTIAL
LOCKERS RESIDENTIAL
ELEVATOR CORRIDOR
LOCKERS
RESIDENTIAL
RESIDENTIAL
ELEVATOR
RESIDENTIAL STAIRS
ELEVATOR
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL STAIRS
2.95 m 2.95 m 47.00 m
BUILDING HEIGHT
3.25 m 2.95 m
RESIDENTIAL
2.95 m 3.25 m
4.8 m
4.0 m
2.95 m
2.95 m 2.95 m 3.55 m 4.50 m
4.50 m
STAIRS
2.95 m 2.95 m 47.00 m
BUILDING HEIGHT
3.25 m 2.95 m 2.95 m 2.95 m
2.95 m
2.95 m 2.95 m RESIDENTIAL
2 STOREY TOWNHOME
121.85 FFE : 121.95 121.85 121.00 120.90 FFE 121.00 : 121.00 120.90
PARKING
T.O. OF MPH
167.5
4.10 m
MPH
Floor 4
3.55 m
RESIDENTIAL
RESIDENTIAL
BUILDING HEIGHT
RESIDENTIAL
9.15 m RESIDENTIAL
3.25 m
2.95 m 47.00 m
3.25 m 2.95 m
BUILDING HEIGHT
2.95 m
AN G D EG R EE 45
2.95 m 3.25 m
35.0 m
T.O. OF MPH
33.6 m
6.00 m 4.10 m 2.95 m 3.25 m
PL AN E U LA R
PL AN E U LA R AN G D EG R EE 45 3.25 m 2.95 m
9.15 m
EASTABLSHED GRADE 120.35
2.95 m
BUILDING HEIGHT
RESIDENTIAL
2.95 m 2.95 m
9.15 m
2.95 m
EASTABLSHED GRADE 120.35
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE PL AN E
U LA R
AN G
D EG R EE 45 3.25 m
3.25 m
BUILDING HEIGHT
2.95 m
EASTABLSHED GRADE 120.35
167.5
E AN PL
35.0 m
FFE :FFE 121.95 : 121.95 121.85121.85 FFE : FFE 121.95 : 121.95 121.00
R LA U
121.85 FFE : 121.95 121.85 DUNDIX ROAD
3.6 m
G AN
DUNDIX ROAD
3.6 m
FLOOR 2 (TOWNHOME)
124.95
E AN PL
DUNDIX ROAD
124.95
EE R EG D
124.95
45
FLOOR 3 (TOWNHOME) 127.9
3.6 m
FLOOR 2 (TOWNHOME)
R LA U
FLOOR 3 (TOWNHOME) 127.9
FLOOR 2 (TOWNHOME)
E AN PL
FLOOR 3 (TOWNHOME) 127.9
G AN
R LA U
T.O. OF TOWNHOME 131.15
EE R EG D
G AN
38.3 m
RESIDENTIAL TOWNHOMES RESIDENTIAL TOWNHOMES RESIDENTIAL TOWNHOMES 3 STOREY 3 STOREY 3 STOREY
T.O. OF TOWNHOME 131.15
MPH
T.O. OF MPH
Floor 10
38.3 m
35.0 m
T.O. OF TOWNHOME
1 ______ SPA401
EE R EG D
MPH
38.3 m
131.15
1 ______ SPA401 45
PROPERTY LINE
1 ______ SPA401 RESIDENTIAL BUILDING RESIDENTIAL BUILDING RESIDENTIAL BUILDING 12 STOREY 12 STOREY 12 STOREY
45
residential units horizontal circulation vertical circulation, service areas, parking retail garbage room
PROPERTY LINE
N-S CROSS-SECTION
127
1
#
July 08, 2022 DATE
DUNDAS STREET DUNDAS STREET DUNDAS STREET
120.00
Floor 1
120.00
Floor 1
Floor 1
120.5
120.5
120.5
120.35
120.35
120.35
3.0 mEASTABLSHED 4.0GRADE m 3.0 mEASTABLSHED 4.0GRADE m 3.0 mEASTABLSHED GRADE
PARKING
U/G 1
U/G 1
U/G 1
U/G 1
U/G 1
U/G 1
116
116
116
116
116
116 PROJECT
PROPOS
1225
DRAWING
PROJECT NO.
22.117P01 PROJECT DATE
DRAWN BY
WJB
2022-07-07 3:59:33 PM
2022-07-07 3:59:33 PM
2022-07-07 3:59:33 PM
CHECKED BY
12 25 D U N D A S ST E Mississauga, ON | 2022 |Mixed-use | Pre-construction 26,112 m² residential | 676 m² retail Role: Senior Designer Project Team: 5 Firm: Turner Fleischer
61 OTHER SELECTED WORKS
Checker SCALE
TOWNHOUSES CONCEPTUAL RENDER
1 : 200
mass 2 SITE CONTEXT
terracing
CONCEPT DIAGRAMS
DESIGN CONCEPT 04 projecting balconies
CONCEPT DIAGRAMS
mech. penthouse
mech. penthouse
04
SCARBOROUGH BLUFFS
Kin gst on
Rd
SUBJECT SITE
Brim
ley
bluffs outline brick x glass
22 storey tower
Rd
bluffs outline brick x glass
terracing
SITE CONTEXT
projecting balconies
SCARBOROUGH BLUFFS
04
mass 2 bluffs outline brick x glass
terracing
Scarborough, ON
projecting balconies
mass 1
22 storey tower 9 storey podium
CONCEPT DIAGRAMS
Scarborough Bluffs
mass 1
mech. penthouse
park mech. penthouse
CONCEPT DIAGRAMS
04
mass 2
9 storey podium
S
park
mech. penthouse
projecting balconies
mass 1
mass 2
mech. penthouse terracing
22 storey tower
1. INITIAL MASSING mech. park penthouse
bluffs outline brick x glass
Scarborough Bluffs mass 1
2. TERRACES
3. OUTLINE
4. BALCONIES
9 storey mech. podium penthouse
mass 2
terracing
Scarborough Bluffs
22 storey tower
CONCEPTUAL RENDER park mech. penthouse
9 storey podium
mech. penthouse
Scarborough Bluffs
22 storey tower 9 storey podium park Scarborough Bluffs
28 00 KINGST O N R D Scarborough, ON | 2021 |Residential | Pre-construction 34,597 m² Role: Intermediate Designer Project Team: 4 Firm: Turner Fleischer
62 OTHER SELECTED WORKS
ROOF PLAN
Driveway Access
ATE
Mechanical Penthouse Roof
RO AD
THULE STREET
WESTON
o
N
NAKUMARA G
Mechanical Penthouse Roof
Swimming Pool
LE
ISELER GATE
Floor 9 Roof Outdoor Amenity Terrace
TENNANT CIRC
Fire Route
Building A
RM2
RM2
Building B
P.O.P.S. Private Driveway
P.O.P.S.
P.O.P.S.
Extent of Heat Traced Walkway
Zoning By-Law 1-88 RM2, Multiple Residential
Patios at Floor 1
Floor 7 Roof Green Roof
Roof of Floor 9 Garden Roof
Zoning By-Law 001-2021
CONCEPTUAL RENDER
RM2, Multiple Unit Residential Zone
Site Plan and Proposed Zoning
10 069 WE STO N R D
Document Path: N:\GIS_Archive\Attachments\OP\2020-2024\OP.23.003_Z.23.005\OP.23.003_Z.23.005_C_3_SitePlan.mxd
Role: Senior Designer Project Team: 4 Firm: Turner Fleischer
63 OTHER SELECTED WORKS
Metres 50
25
FILES: OP.23.003 and Z.23.005
APPLICANT: Ikore (Major Weston) Ltd.
28,878 m²
12.5
Attachment
LOCATION: 10069 Weston Road and Part 15, Plan 65R-37024 Part of Lot 21, Concession 5
Vaughan, ON | 2022 |Residential | Pre-construction
0
DATE: September 12, 2023 Author: AD
3
Created on: 8/24/2023