Chandelier Ceiling

CUM TERRACE FLOOR PLAN.

GENERAL NOTES:

HEADROOM ROOF SLAB LAYOUT S1 - 0.13M
BEAM)
1.ALL SLAB THK-5"
2.CONCRETE MIX FOR SLAB AND BEAM TO BE M20(1:1.5:3)
3.CLEAR COVER FOR BEAM(CLEAR TO STIRRUPS)-30MM,SLAB-20MM
4.LAP-50X DIAMETER
5.USE VIBRATORS FOR ALL CONCRETE WORKS
6.SLAB BAR SHOULD BE CRANK 1 5 OF THE SPAN & EXTEND BY 1 4 OF THE SPAN BEYOND THE SUPPORT
HEADROOM DETAIL















BEAMSFORTHE PERGOLAWITH21" DEPTH
VIEWOFTHEWAIST
SLABBEFOREPOURING
CONCRETEINTHE TERRACEFLOORMID LANDING






VIEWOFTHE PERGOLABEAM INTHETERRACE FLOORBEFORE POURING CONCRETE CONCRETEMIX TOBE1:1.5:3

VIEWFROM THEROAD AFTER20 DAYS


VIEWFROM THEENTRANCE TOTHELIVING ROOM

WINDOWINTHELIVINGROOMTHATISEXTENDED OUTWITH2'SMALLWINDOWONEITHERSIDES

LINTELBEAMOF6" THK@7'HTFROM THEFINISHED FLOORLEVEL

VIEWOFTHETERRACE AFTER20DAYSOFCURING








ALUMINIUM CHANNELSFOR FALSECEILING ANDWIRESFOR ELECTRICLINES PROVIDEDINTHE ROOFFORTHE CAFETERIA
THEVIEW OFTHE CAFETERIA FROMTHE ITPARK AFTERA MONTH




AFTERTHE CONSTRUCTION OFBRICKWALL ALLAROUND THETREEIS COVEREDWITH SHEETANDTHE RAINTHATFALLS WILLBEDIRECTED TOTHEGROUND ANDITISTAKEN OUTTHROUGH PIPELINESUNDER THEGROUND