Skip to main content

Solution Manual For Principles and Practices of Commercial Construction, 11th Edition by Cameron K.

Page 1

Solution Manual For PRINCIPLES AND PRACTICES

OF COMMERCIAL CONSTRUCTION 11th edition

W. Ronald Woods, P.E. Cameron K. Andres Ronald C. Smith


Table of Contents Chapter 1 – The Practice of Commercial Construction

2

Chapter 2 – Site Evaluation and Layout

5

Chapter 3 – Site Development and Services

10

Chapter 4 – Material Movement, Excavations, and Equipment

13

Chapter 5 – Foundations

16

Chapter 6 – Formwork

20

Chapter 7 – Concrete Work

25

Chapter 8 – Reinforced Concrete Frame

28

Chapter 9 – Masonry Construction

32

Chapter 10 – Structural Timber Frame

36

Chapter 11 – Structural Steel Frame

39

Chapter 12 – Floor Systems

43

Chapter 13 – Curtain Wall Construction

46

Chapter 14 – Thermal, Sound and Moisture Control

49

Chapter 15 – Roof Framing and Coverings

52

Chapter 16 – Building Envelope, Finishes and Appurtenances

57

1 Copyright © 2024 Pearson Education, Inc.


Chapter 1 – The Practice of Commercial Construction Learning Objectives In this chapter, the reader will learn how to: 1. Define and understand the practice of commercial construction 2. Identify the construction or “project delivery” team 3. Define the project delivery process 4. Assess the proper contract for construction 5. Understand contract mechanisms and their necessary review 6. Understand the relevance and need for project plans and specifications 7. Assess the application of building codes and standards 8. Understand the development of building codes and standards 9. Understand the differences between inspections and tests and the need for both 10. Be familiar with the licensing, registration and certification processes to practice

construction in a particular locale Key Points 1. The project delivery team consists of:

the owner

the architect

the engineer(s)

the general contractor

subcontractors

2. The project delivery process starts with the concept of the project and ends with final

acceptance, payment and, ultimately, successful performance of the constructed product. 3. Two items that an owner must provide to ensure a reasonable chance for the successful completion of a building are: 

sufficient funds to cover the cost of construction

a suitable site

4. The three most common forms of contract documents are:

the AIA documents

the EJCDC documents

the consensus documents

5. Contracts can be in any form acceptable to the parties of the contract. Standard forms

are widely accepted and bear lower legal expense during the contract negotiation as 2 Copyright © 2024 Pearson Education, Inc.


they have been reviewed numerous times and have been legally tested in the court system for validity. 6. Contracts may be fixed price, cost plus a percentage, cost plus a fixed fee with a maximum price, and cost plus a fixed fee without a maximum price. 7. Bids may be competitively procured or they may be non-competitive, meaning that there could be one contractor or many contractors providing bids. 8. The most commonly used contract documents are the AIA documents, since most projects are designed by Architects. 9. Bonds are a form of insurance for projects. The three common types of bonds are bid bonds (a guarantee that the bid will be honored by the contractor and if not, the bond will cover the cost of rebidding), a payment bond (a guarantee that the contractor has paid the subcontractors) and a performance bond (a guarantee that the contractor will perform to the terms of the contract). 10. Plans and specifications are used in a supplementary and complementary role to convey the design and achieve the expected construction result. There are sometimes conflicts between the plans and specifications. 11. If there is a conflict or disparity between plans and specifications, neither prevails. This becomes an opportunity and obligation to seek clarification by the design professional of the intent of the plans and specifications. Get such clarifications in writing! Conflicts require a “Request for Information” (RFI) back to the Architect or Engineer to clarify the intent and resolve the conflict. 12. Codes and standards are the legal documents, in addition to the contract documents, that set forth the minimum material, process or performance standards expected for the construction. 13. Codes and code-referenced standards overrule contract considerations when there is a conflict between the two. As an example, a subcontractor is not allowed to enter into a contract that requires violating the building code. In most jurisdictions, the contract becomes invalid if deemed illegal. 14. Industry standards carry less impact and validity than code-referenced standards, but can be used to judge compliance with a “standard of care” by the contractor or design professional. 15. Codes and standards are usually developed by volunteers with experience in the respective industry or profession. 16. A construction contract is a legally binding document that obligates the contractor and the owner to follow its provisions. Failure to follow the contract, by either party puts that party in “breach of contract”, a legal term that can have significant consequences to the offending party. 17. A construction contract should be reviewed by an attorney, each representing separately one of the parties to the contract. Even standard forms of contractual agreements such as the AIA documents or the EJCDC documents should be reviewed for applicability to the nuances of the party’s business operation. For contracts “one size does not fit all!” 3 Copyright © 2024 Pearson Education, Inc.


Turn static files into dynamic content formats.

Create a flipbook
Solution Manual For Principles and Practices of Commercial Construction, 11th Edition by Cameron K. by AnswerDone - Issuu