1. Which of the following is NOT one of the principles of user­centered design? A) Evaluate design to ensure usability. B) Focus early on the users and their work. C) Use iterative development. D) Business requirements drive development. Points Earned:

4.0/4.0

Correct Answer(s): D

2. What type of stakeholders are those that do not use the system on day to day tasks, but use information, such as reports, from the system. A) Business stakeholders B) Client stakeholders C) Executive stakeholders D) External stakeholders Points Earned:

4.0/4.0

Correct Answer(s): C

3. Which of the following items is NOT a part of the application architecture? A) programming languages and development tools B) software C) virtual private networks D) user­interface technology Points Earned:

3.0/3.0

Correct Answer(s): C

4. A person that functions as an architect to plan, capture the vision, and understand the needs for a new system is often called a ____________________. A) software engineer B) programmer analyst

http://gwinnetttech.angellearning.com/Section/Assessment/Question/GradeDelivery.aspx?entryId=7EF87AABA0E247AFA98A0CA9A4DC1F73&response_Id=…

1/19


4/30/2015

Final Exam

C) software developer D) systems analyst Points Earned:

4.0/4.0

Correct Answer(s): D

5. A big part of designing the environment is identifying and defining all the types of computing devices that will be required. A) True B) False Points Earned:

5.0/5.0

Correct Answer(s): True

6. Clients play what role in the development of the new system? A) Fund the project B) Lead the project team C) Define business processes D) Develop the project plan Points Earned:

3.0/3.0

Correct Answer(s): A

7. Persons who regularly interact with the system as part of their jobs are called _______. A) operational stakeholders B) client stakeholders C) user stakeholders D) executive stakeholders Points Earned:

4.0/4.0

Correct Answer(s): A

8. Performing in­depth fact finding to understand details is done as part of which Core Process? A) 1 B) 3 C) 2 D) 6 E) 4

http://gwinnetttech.angellearning.com/Section/Assessment/Question/GradeDelivery.aspx?entryId=7EF87AABA0E247AFA98A0CA9A4DC1F73&response_Id=…

2/19


4/30/2015

Final Exam

F) 5 Points Earned:

4.0/4.0

Correct Answer(s): B

9. requirements are based on the procedures and rules that the organization uses to run its business. A) System B) Logical C) Physical D) Functional Points Earned:

0.0/3.0

Correct Answer(s): D

10. Which one of the six core process can be considered as a “bridge” process. A) Design system components. B) Discover and understand the details. C) Build, test and integrate system components. D) Identify the problem and obtain approval. Points Earned:

5.0/5.0

Correct Answer(s): A

11. The term _______ refers to all the people who have an interest in the successful implementation of the system. A) clients B) managers C) users D) stakeholders Points Earned:

4.0/4.0

Correct Answer(s): D

12. When a system is partitioned into pieces, each piece is referred to as a _________________. A) program B) application C) subsystem

http://gwinnetttech.angellearning.com/Section/Assessment/Question/GradeDelivery.aspx?entryId=7EF87AABA0E247AFA98A0CA9A4DC1F73&response_Id=…

3/19


4/30/2015

Final Exam

D) package Points Earned:

4.0/4.0

Correct Answer(s): C

13. Which is not one of the six core processes of the SDLC? A) Plan and monitor the project­ what to do, how to do it, and who does it. B) Build, test, and integrate system components. C) Provide consistent feedback to stakeholders regarding progress in the context of project deliverables. D) Identify the problem or need and obtain approval to proceed. E) Identify the problem or need and obtain approval to proceed. Points Earned:

25.0/25.0

Correct Answer(s): C

14. The purpose of a use case is to _______. A) Identify a user and describe one user procedure B) Identify a useful objective for the new system C) Identify a business event that requires system action D) Identify a sequence of steps to process a user function Points Earned:

4.0/4.0

Correct Answer(s): C

15. Clients play what role in the development of the new system? A) Lead the project team B) Define business processes C) Develop the project plan D) Fund the project Points Earned:

3.0/3.0

Correct Answer(s): D

16. What is scrum? A) A method for managing knowledge work with an emphasis on just­in­time delivery while not overloading the team members. In this approach, the process, from definition of a task to its delivery to the customer, is displayed for participants to see.

http://gwinnetttech.angellearning.com/Section/Assessment/Question/GradeDelivery.aspx?entryId=7EF87AABA0E247AFA98A0CA9A4DC1F73&response_Id=…

4/19


4/30/2015

Final Exam

B) A software tool support model based on some mathematical formalism includes model checking, process algebras, and Petri nets. The Box Structure Method might be one such means of specifying and designing a software product C) A sequential design process, used in software development processes, in which progress is seen as flowing steadily downwards through the phases of Conception, Initiation, Analysis, Design, Construction, Testing, Production/Implementation and Maintenance D) A management framework for incremental product development using one or more cross­ functional, self­organizing teams of about seven people each. Points Earned:

10.0/10.0

Correct Answer(s): D

17. Performing in­depth fact finding to understand details is done as part of which Core Process? A) 5 B) 4 C) 6 D) 2 E) 3 F) 1 Points Earned:

4.0/4.0

Correct Answer(s): E

18. The purpose of a use case is to _______. A) Identify a user and describe one user procedure B) Identify a sequence of steps to process a user function C) Identify a useful objective for the new system D) Identify a business event that requires system action Points Earned:

4.0/4.0

Correct Answer(s): D

19. Those activities that enable a person to describe in the detail the system that solves the need is called __________________. A) high­level design B) systems design C) architectural design D) systems analysis Points Earned:

4.0/4.0

Correct Answer(s): B

http://gwinnetttech.angellearning.com/Section/Assessment/Question/GradeDelivery.aspx?entryId=7EF87AABA0E247AFA98A0CA9A4DC1F73&response_Id=…