Skip to main content

Serio Portfolio 1/2020 Full

Page 1

ANNA SERIO D E S I G N

P O R T F O L I O


HUMANA

PARTNERS IN PRIMARY CARE OVERLAND PARK, KANSAS | IA

RCP LEGEND CEILING MOUNTED SPECIALTY PENDENT

1|2

1|2

GE163066W T

4

A

1|2

GE163066W T

8

GE163066WT

1

RECESSED SQUARE DOWNLIGHT

CEILING HEIGHT @ 9'-5" AFF

3'

1|2

2X2 FLUORESCENT TROFFER FIXTURE GE162566WT RECESSED DOWNLIGHT

35"X26' RXWC

2X4 FLUORESCENT TROFFER FIXTURE

G16113666WT

G11113666WT

LINEAR FLUORESCENT

3F

G16113666WT

CEILING MOUNTED TWO SIDED EXIT SIGN WALL MOUNTED EXIT SIGN

LINEAR FLUORESCENT WALL WASHER

4

G16113666WT

CEILING MOUNTED ONE SIDED EXIT SIGN

F

14"

RECESSED WALL WASHER

3'

3

CEILING MOUNTED PENDANT WALL MOUNTED SCONCE

LT-3

LT-3

LT-3

LT-3

LT-3

1 1

38

LT-1

8' - 0" AFF

17

A-7.0

INDICATES MOUNTING HEIGHT A.F.F. INDICATES USE FOR PROJECTION SCREEN INDICATES THREE WAY SWITCH

9'-2"

103C

A-7.0

G22113666WT

D-1

D-1

CH E CK I N / C HE CK O UT 101 D-1

D-1

LT-1

LT-3

MANUFACTURER

RECESSED 2X4 LED EM RECESSED 2X4 LED

LT-2 LT-2E LT-3

NOT USED NOT USED RECESSED LED DOWNLIGHT

LT-3E

EM RECESSED LED DOWNLIGHT

C ON SU L T 111

LT-1

DESCRIPTION

LT-1 LT-1E

19

PHILIPS - DAY BRIGHT #P6RD15NZ10UVBEM - P6RD835 - P6RDW- EMLED

LT-4

DECORATIVE PENDANT

LT-5 X1

NOT USED SINGLE AND DOUBLE FACED EXIT SIGN

LIGHTING DIRECT

VAXCEL LIGHTING PD57111

NOT USED PHILIPS

3500K 3500K

-

WHITE

101A LED

3500K

0-10V

WHITE

LED

SATIN NICKEL

LED

-

LED

4'-11"

DIMMING

LED LED

NOT USED 100A CE-10500 CALIDBER SERIES EDGE LIT LED CN6RCA IC

NIC

COMMENTS 109

REFER TO ENGINEERING DRAWINGS FOR EM LIGHT LOCATIONS

03 A-7.0 04 3500K 0-10V CH E CK 2700KIN /C HECK O UT 101 -

ISSUE FOR BID & PERMIT

14 1 A-7.0

Issue

Description

LT-1

CO483534

LT-3

LT-3

LT-1

LT-1

J A N I T OR 115

LT-3

01 02

115

05

A-7.0

RE C E P T I ON 100

RESET WIC PCD PPC 344236 344236

8' - 0"AFF

RE ST RO OM 113

114

101

114

J A N I T OR 115

RE ST RO OM 114

7/17/2019 3:02:49 PM

Checker

Check

As indicated

4 _______ _______

EQ.

EQ.

EQ.

ALIGN

SS-23 COUNTER AND BACKSPLASH WITH TRASH DROP

A-8.1

WB-23

06

1'-3"

07

4'-8"

1'-3"

4'-8"

RA-5

2'-10"

2'-10"

PLASTIC LAMINATE SKIRT PANEL AND APRON, PL-23

1 _______ _______ A-8.1

10

1'-4"

EQ.

EQ.

EQ.

PL-4, SHELVING

3'-8"

4 _______ _______ SS-1 COUNTER TOP

11

EAST ELEVATION @ COMMUNITY ROOM 3/8" = 1'-0"

CL

TL-1

EQ.

1'-6"

3'-8"

ISSUE FOR BID & PERMIT ISSUE FOR 50% REVIEW, ENGINEERING

07/22/2019 07/02/2019

Delta

A-8.1

Issue

Description

Date

WEST ELEVATION @ TYP. CONSULT 3/8" = 1'-0"

14

15

EAST ELEVATION @ TYP. CONSULT 3/8" = 1'-0"

7'-7"

PT-44 CL

EAST ELEVATION @ RESTROOM 3/8" = 1'-0"

16

3'-3"

SOUTH ELEVATION @ RESTROOM 3/8" = 1'-0"

22

NORTH ELEVATION @ TEAM WORK EXTERIOR 3/8" = 1'-0"

35"X26' RXWC

3' 3'

RF-23

PT-44

C ON SU L T 110

FP3536

FP3536

FP3236

CO483534

104 S. MICHIGAN AVENUE, STE 1200 CHICAGO, IL 60603 TEL 312-488-5200 FAX 888-292-8361

7'-7"

9'-11"

EQ.

3'-8"

3'-11" 9'-0"

Author

Checker

Drawn

Check

Owner Approval 3/8" = 1'-0"

2019HUMX210

Job No.

3'-3"

WEST ELEVATION @ IDF 3/8" = 1'-0"

20

EAST ELEVATION @ IDF 3/8" = 1'-0"

21

SOUTH ELEVATION @ IDF 3/8" = 1'-0"

23

Scale

INTERIOR ELEVATIONS

WEST ELEVATION @ TEAM WORK EXTERIOR 3/8" = 1'-0"

Title

7/17/2019 3:02:54 PM

19

C ON SU L T 111

PVC-1

C

PT-41

PT-42 RF-23

W ORK 112

RE C E P T I ON 100

RF-23

RESET PT-42

FRONT

EPSON 7890

PT-41 PVC-1

J A N I T OR 115

RF-24

PT-45

PT-45

TL-1

TL-1

RE ST RO OM 114

TL-2 TL-1

RE ST RO OM 113

TL-2 TL-1

E

EQ.

12'-8"

NORTH ELEVATION @ IDF 3/8" = 1'-0"

PT-44

RF-23

RF-23

FP3336

#41

9'-11"

18

3' 3'

4' OVER CNTR SH RF-23 C ON SU L T 109

PT-41

CHICAGO

© 2019INTERIOR ARCHITECTS, P.C., IL LICENSE #184-004385. A NEW YORK PROFESSIONAL SERVICES CORPORATION. ALL DRAWINGS AND WRITTEN MATERIAL HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, AND THE SAME MAY NOT BE DUPLICATED, USED, OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT.

EQ.

EAST ELEVATION @ MEETING ROOM 3/8" = 1'-0"

3'

B

PT-44

36"Wx36"H GATE

E

13

FE 1

FE CH E CK I N / C HE CK O UT 101

PT-41

PCD PPC 344236 344236

7/17/2019 3:02:56 PM

PT-41

8'-5"

RESET WIC

17

PT-42 PVC-1

FP2136

SOUTH ELEVATION @ TYP. CONSULT 3/8" = 1'-0"

EQ.

3'

G22223666WT

2 1

WB-23

12

NIC

4" 3"

7'-0"

1'-0"

14 _______ _______

2'-0"

5'-0"

PL-25 MILLWORK VITAL RAIL, MA-3 TO BE INSTALLED ON RAIL, ON SIDE CLOSEST TO SINK, POSITION DUPLEX OUTLET HORIZONTAL AND PLACE DIRECTLY UNDER THE OTOSCOPE

3'-8"

EQ. 6"

FURNITURE PROVIDED BY OTHERS, PROVIDE BLOCKING AS REQUIRED. SCHEDULED PLUMING FIXTURE TO BE INSTALLED ON FURNITURE BY GC.

EQ. 6" RA-7

3'-0"

EQ.

TL-1

3'-5"

RF-23 BI O 108

FE

GE162566WT

19 3'-11"

EQ. 6'-0"

RF-23

1|2

E

A-8.1

EQ.

FURNITURE PROVIDED BY OTHERS, PROVIDE BLOCKING AS REQUIRED. AFFIX SPECIFIED ACCESSORIES TO FURNITURE RAIL.

3'-0"

FURNITURE PROVIDED BY OTHERS, PROVIDE BLOCKING AS REQUIRED 5 _______ _______

D

BG

GE163666WT

PT-45

PT-45

PT-44

1'-7"

RF-23

1|2

PT-42

PT-44 C ON SU L T 107

BG

A-8.1

SOUTH ELEVATION @ WORK 3/8" = 1'-0"

T E AM W ORK A REA 102

PT-44

5'-6"

PLASTIC LAMINATE BASE CABINET WITH ADJUSTABLE SHELF AND DRAWER, PL-23

WEST ELEVATION @ WORK 3/8" = 1'-0"

3'-2"

PLASTIC LAMINATE COUNTERTOP AND BACKSPLASH, PL-22

RA-7

PF-13

RF-2

EQ.

G11113666WT

4"

PF-12

3'-0"

09

ID F 106

CPT-20 EQ.

5'-2" PLASTIC LAMINATE CABINET, PL-23 WITH KEYED LOCK FOR ALL CABINETS

RA-1

SCHEDULED BASE

NORTH ELEVATION @ TEAM WORK AREA 3/8" = 1'-0"

C L OSE T 105

CL

PT-3

3 _______ _______ A-8.1

NIC TECH EQUIPMENT CABINET

EQ.

PLASTIC LAMINATE UPPER CABINETS, PL-23 (KEYED LOCKS?)

PLASTIC LAMINATE BASE CABINET WITH ADJUSTABLE SHELF AND DRAWER, PL-21

C

19 4884

9

PT-44

EQ.

PT-42

SOLID SURFACE COUNTERTOP AND BACKSPLASH, SS-23 COORDINATE GROMET LOCATIONS WITH OUTLETS BELOW

#15 C

6

PT-44

RF-23

WALLCOVERING, WC-4

A-8.1

PLASTIC LAMINATE CABINET, PL-23 WITH KEYED LOCK FOR ALL CABINETS

GE162566WT

GE163666WT

1'-3"

EAST ELEVATION @ TEAM WORK AREA 3/8" = 1'-0"

10 _______ _______

EQ.

8' OVER #15 B CNTR SHLV 1 1

1

PT-42

PT-42

08

4"

SOUTH ELEVATION @ TEAM WORK AREA 3/8" = 1'-0"

A-8.1

PT-42

3'-0"

1'-6"

7 _______ _______

A-8.1

FE

PLASTIC LAMINATE B/B/F BASE CABINET, PL-23 (TYP), KEYED LOCK ON MIDDLE DRAWER ONLY

WB-23

EAST ELEVATION @ RECEPTION 3/8" = 1'-0" 8 _______ _______

A-8.2

14"

30"X10' RXWC

C OM M UN I T Y RO OM 103

PLASTIC LAMINATE COUNTERTOP AND BACKSPLASH, PL-22

3 _______ _______

A-8.2

14"

RESET

5

E

NIC

G22113666WT

2'-6"

3 _______ _______

A-8.2

RESET

6

1'-7"

2'-6"

3 _______ _______

1 1

38

PROVIDE IN WALL SUPPORT AS REQUIRED FOR COUNTERTOP

EQ.

PT-44

8

PT-42

3'-0" 1'-6"

7500 METCALF OVERLAND PARK, KS 66204

CPT-20

8 2

FROM CENTER OF DRAIN

PL-23 SCRIBE BASE

#15 A

ME E T IN G 104

WS193684WT

PT-42

PL-23 BASE CABINET WITH DRAWER AND ADJUSTABLE SHELF, (ONLY) DOORS TO BE LOCKING

05

4"

A-8.1

BG BG

TRASH

5

BG

38

7 _______ _______

A-8.1

1

1|2

2'-5"

A-8.1

8 _______ _______

3'-11"

3 _______ _______

A-8.2

OVERLAND PARK WALGREENS PIPC

3'-0"

PROVIDE SINGLE GLAZED WINDOW WITH ALUMINUM FRAME. GC TO PRICE ALTERNATE WITH DOUBLE GLAZING IN LIEU OF SINGLE GLAZING AND COORDINATE FINAL DECISION WITH OWNER

3'-3"

OPEN TO BEYOND _______ 8 _______ A-8.2 1 _______ _______

PL-23

3'-0"

3'-11"

PROVIDE SINGLE GLAZED WINDOW WITH ALUM. FRAME GC TO PRICE ALTERNATE WITH DOUBLE GLAZING IN LIEU OF SINGLE GLAZING AND COORDINATE DECISION WITH OWNER

PT-42

WB-23

2'-0"

EAST ELEVATION @ RECEPTION MILLWORK 04 3/8" = 1'-0"

WS223666WT

PLASTIC LAMIANTE CABINET, PL-23 WITH KEYED LOCK FOR ALL CABINETS

PT-42

PVC-1

1'-6"

WEST ELEVATION @ CHECK IN/CHECK OUT 03 3/8" = 1'-0"

PT-41

PL-23 CABINETS WITH ADJUSTABLE SHELF AND DRAWER

WS223666WT

1'-7"

1

4" 6"

2'-0"

3'-0" EXTENT OF SCHEDULED WALL FINISH

PL-23 BASE CABINET WITH ADJUSTABLE SHELF AND DRAWER, KEYED LOCK ON MIDDLE DRAWER ONLY

PVC-1

PL-22 COUNTERTOP & BACKSPLASH

A-8.1

SPEED SHELF

3 _______ _______

A-8.2

2'-10"

2'-1"

2'-5" 2'-4"

3'-5"

SS-23

14"

3

3 _______ _______

B

2'-4"

WEST ELEVATION @ RECEPTION 02 3/8" = 1'-0"

MITRED CORNERS WITH PENCIL EDGES

CEILING HEIGHT @ 9'-5" AFF

1

5'-2"

1 _______ _______

WS193684WT

A-8.2

PL-22 COUNTERTOP AND BACKSPLASH

PL-23

1/4" x 1/4" REVEAL PAINT TO MATCH PLAM, TYP

G16113666WT

1

OPEN TO BEYOND

A-8.2

PVC-1

8

GE163066WT

8 _______ _______

SS-23

PL-22

PL-23

NORTH ELEVATION @ RECEPTION 01 3/8" = 1'-0"

4

A

1|2

GE163066W T

2" WC-3

PROVIDE SIZE OF THE MONITOR TO LOCATE JB

2'-4"

1|2

GE163066W T

ELECTRICAL EQUIPMENT ON WALL

3'-0" MONITOR

1|2

GE162566WT

PT-42

2"

Title

A-3.0

G16113666WT

1|2

PT-42

EE

NIC

Owner Approval Scale

REFLECTED CEILING PLAN

01 PARTITION PLAN 1/4" = 1'-0"

3F

G16113666WT

WC-2 PT-42

15

16

Sheet

G11113666WT

7/17/2019 3:02:52 PM

Sim

10'-10" 10

© 2019INTERIOR ARCHITECTS, P.C., IL LICENSE #184-004385. A NEW YORK PROFESSIONAL SERVICES CORPORATION. ALL DRAWINGS AND WRITTEN MATERIAL HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, AND THE SAME MAY NOT BE DUPLICATED, USED, OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT.

Author

Drawn Job No.

1

A-7.0

A-7.0

09

F06

FRONT

EPSON 7890 100B

01 RCP 1/4" = 1'-0"

RE ST RO OM 113

K03

W ORK 112

113

104 S. MICHIGAN AVENUE, STE 1200 CHICAGO, IL 60603 7'-10" 8'-4" TEL 312-488-5200 FAX 888-292-8361

6'-7"

J05

F06

CHICAGO

115

RESET

LT-1 RE ST RO OM 114

FIRE TYPE RATING UL # A02 1 U423 U425 C03 NR NR

A-7.0 Sheet

1

01 FINISH PLAN 1/4" = 1'-0"

NIC

1-H

NR

2

NR

TWO LAYE

112

5'-4"

FP3336

#41 C

W ORK 112

2019HUMX210

PT-42

103

3'

LT-3

E

A-8.2

104 106 114 115

101 103

F06

NIC

8 _______ _______

103

101

7'-6"

LT-3

FP3536

LT-3

FP3536

LT-3

101

C ON SU L T 111

Date

101

106

E LT-3

LT-3

LT-3

301

OPEN TO BEYOND

F06

07/22/2019 07/02/2019

ISSUE FOR 50% REVIEW, 13 C ON SU L T ENGINEERING 110 C ON SU L T 109

12

Delta

100C

E

LT-3

A-8.2

9'-6"

NO

2

REFER TO ENGINEERING DRAWINGS FOR EM LIGHT LOCATIONS AT RECEPTION. BOTTOM OF FXITURE TO BE MOUNTED AT 6'-8" A.F.F.

LT-1

1

111

9'-7"

104

FP3236

LT-3

RE C E P T I ON 100

SS-23

3'

110

9'-7"

FP2136

LT-3

DD

BI O 108

108

101B

103

36"Wx36"H GATE

NIC

COLOR TEMP

WHITE WHITE

FINISH LAMP

HLS24GLR37L35ULAG HLS24GLR37L35ULAG- EMLED

NOT USED NOT USED NOT USED NOT USED PHILIPS - DAY BRIGHT #P6RD15NZ10UVB - P6RD835 - P6RDW

LT-1

D-1

MODEL

PHILIPS DAY BRIGHT PHILIPS DAY BRIGHT

8' - 0"AFF D-1

LIGHT FIXTURE SCHEDULE FE GE162566WT

GE163666WT

TYPE MARK

4'-1"

BIO LT-3 108

LT-1

C ON SU L T 110

LT-1

LT-3

LT-3

LT-1

C ON SU L T 109

D-1

LT-3

A-7.0

102

5'-5"

LT-3

107

22

FIXTURE SCHEDULE

1|2

12'-0"

D-1

C ON SU L T 107 A-7.0

23

K03

EXISTING COLUMN

BG

1|2

LT-3

9'-11"

103

101

BG

12'-3"

D

LT-1

G11113666WT

C ON SU L T 107 LT-3

LT-3

K03

5'-0" 07

06

LT-3

LT-3

T E AM W ORK A REA 102

20

21

11'-3"

08

LT-1

LT-3

18 A-7.0

19 106

LT-1

LT-3

ID F 106

114

T E AM W ORK A REA 102

LT-1

LT-3

C L OSE T 105 105

LT-3

LT-1

LT-3

TECH EQUIPMENT CABINET

DESCRIPTION NEW EXTERIOR LIGHTING FIXTURE

301 LT-1

ELECTRICAL EQUIPMENT ON WALL

NO.

ID F 106 LT-1

LT-3

LT-1

6 _______ _______

1. SEE A 2. ALL P 3. PART FROM FIELD 4. USE 5. USE PLAN 6. SEE A 7. WHE 8. FIRE 9. MAIN 10. PROV TOILE 11. REFE 12. PROV LOCA 13. LARG WRIT 14. ALL E 15. DIME DIME 16. CONT STRU NO A 17. PATC ELEC 18. WHE RATIN FIND 19. PATC NOTE 20. ALL L SIZE COM TRUE REDU PERM 21. REQU SPAC PROT CONC NOT 3 INC WOR PART

19 4884

9

NIC 103B

KEY NOTES

LT-3 CLLT-3 OSE T 105

8'-0"

6

101

B

GE163666WT

NIC

LT-3

LT-1

Sim

#15 C

8' OVER #15 B CNTR SHLV 1 1

1

1'-7"

LT-3

LT-1

A-8.2

CC

30"X10' RXWC

FROM CENTER OF DRAIN

LT-3

PL-23, NOTCH AS REQUIRED TO SIT FLUSH ON PVC-1 BELOW

14"

5

E

1

LT-1

?

7 _______ _______

RESET

3'

+80 PS 3 -

SHEET NOTES

WS193684WT

COMMERCIAL

2'-3"

3'

SPEED SHELF

FE 1

B

9'-6"

ANNOTATIONS AND DEFINITIONS

DENOTES DEMOLITION DENOTES EXISTING TO REMAIN DENOTES RELOCATED

2

7500 METCALF 6 RESET OVERLAND PARK, KS 14" 66204 8

3'

D E R -

1. SEE AN-SHEET SERIES FOR ADDITIONAL NOTES AND ABBREVIATIONS. 2. ALL CEILING TO BE AT 9'-0" U.N.O. 3. VERIFY AS-BUILT FIELD CONDITIONS AND LOCATIONS FOR EXISTING AND NEW PLUMBING, AUDIO VISUAL, HVAC DUCTWORK AND PIPING, STRUCTURAL FRAMING, ELECTRICAL BUS DUCT AND CONDUIT BANKS, ELECTRICAL PULL BOXES, FIRE PROTECTION LINES AND RELATED WORK TO DETERMINE AND COORDINATE BEST CEILING FRAMING, POINTS OF ACCESS AND CLEARANCES AS REQUIRED FOR NEW WORK. 4. PROVIDE ACCESS PANELS WHERE REQUIRED IN GYP.BD. CEILING INCLUDING, BUT NOT LIMITED TO FIRE SMOKE DAMPERS, FIRE LIFE SAFETY J-BOXES, FAN COILS AND VAV BOXES PER MANUFACTURER'S WRITTEN RECOMMENDATIONS, CONDUIT BANK PULL BOXES AND CONTROL C OM M UN I T Y AND SHUTOFF VALVES. OOMNON RATED LOCATIONS. 5. UNLESS OTHERWISE SHOWN PROVIDE FLUSH DRYWALL TYPE ACCESS PANELS W/ CONCEALED FRAME ATRALL 103 6. ALL CEILING MOUNTED ELECTRICAL DEVICES SHALL BEAR UL LABEL AND FREE OF DEFECTS. 7. WHERE EXISTING ACOUSTICAL CEILING TILE IS SCHEDULED TO REMAIN, REPLACE DAMAGED ACOUSTICAL CEILING TILE WITH NEW TO MATCH EXISTING. IF PRODUCT IS NOT AVAILABLE FROM BUILDING INVENTORY ATTIC STOCK OR MANUFACTURER, NOTIFY ARCHITECT PRIOR FE TO START OF WORK. 8. LIGHTING CONTROL COVER PLATES SHALL BE WHITE AT GYP BD CEILINGS, SOFFITS AND CEILING MOUNTED FABRIC WRAPPED PANEL LOCATIONS, UNLESS NOTED OTHERWISE. A-7.0 11 9. AT EXPOSED STRUCTURE AREAS IN STEEL BUILDINGS WITH EXPOSED SPRAY FIREPROOFING, PROVIDE PROTECTIVE OVERSPRAY AT SPRAYFIREPROOFING TO PREVENT DUSTING WHERE PAINT IS SCHEDULED AT EXPOSED CONSTRUCTION PROVIDE PRIMER/SEALER UNDERCOAT PER MANUFACTURER'S WRITTEN RECOMMENDATIONS. 10. CONTRACTOR TO COORDINATE FIRE SPRINKLER AND FIRE ALARM DEVICE LOCATIONS WITH ARCHITECT PRIOR TO SUBMITTING FOR PERMIT. WHERE APPLICABLE CENTER SPRINKLER HEADS IN CEILING TIME. ALIGN SPEAKERS, SMOKE DETECTORS, MOTION SENSORS AND RELATED CEILING MOUNTED DEVICES WITH LIGHTING FIXTURE CENTERLINES AND CENTER OF CEILING TILE. LOCATE HVAC DIFFUSERS IN GYP BD GE162566WT CEILINGS AS SHOW ON ARCHITECTURAL R.C.P. 11. LOCATE EXIT SIGNS VERTICALLY ABOVE THE FINISH FLOOR TO INSURE SIGHT LINES ARE NOT BLOCKED BY LIGHT FIXTURES, BEAMS, SOFFITS, DROPPED CEILINGS, DUCTWORK, CONDUIT BANKS, PIPING AND RELATED OVERHEAD WORK.

8

#15 A

ME E T IN G 104

4' OVER CNTR SH

LT-3

104

NIC

BG BG

LT-3

FE

G22223666WT

WS223666WT

C

LT-3

AREA N.I.C.

103A

38

LT-1

LT-3

LT-3

GWB CEILING / SOFFIT

RECESSED PROJECTION SCREEN

1|2

WS223666WT

NIC

WS193684WT

PROFESSIONAL WORK: INTERIOR ARCHITECTURE

1 OVERLAND PARK WALGREENS PIPC 5

WALL MOUNTED SINGLE LIGHT SWITCH

TYP. CEILING GRID AND LIGHT FIXTURE

3'

1

WALL MOUNTED SINGLE LIGHT SWITCH

BG

LT-1 ME E T IN G 104 LT-3

NR

1 3/4


HOURS: 8:30AM - 5PM

FINISH LEGEND PT-1

FINISH MATERIAL FLOOR FINISH TRANSITION FLOOR FINISH DIRECTION

START TILE ALIGN

1 A101

PATTERN START TILE ALIGNMENT GUIDE

AXONOMETRIC / PERSPECTIVE VIEW REFERENCE

OVERLAND PARK WALGREENS PIPC

7500 METCALF OVERLAND PARK, KS 66204

SHEET NOTES 1. SEE AN-SHEET SERIES FOR ADDITIONAL NOTES AND ABBREVIATIONS. 2. FOLLOW ALL MANUFACTURER'S INSTALLATION INSTRUCTIONS INCLUDING BUT NOT LIMITED TO: SUBFLOOR PREP AND TESTING, SEAMING, AND PROVIDE MANUFACTURER'S REQUIRED ADHESIVE. 3. PROVIDE WARRANTY INFORMATION AND FLOORING CARE GUIDE OF ALL FLOORING MATERIALS TO END USER PRIOR TO FURNITURE AND EQUIPMENT INSTALLATION. 4. TEST FLOOR SLAB FOR RELATIVE HUMIDITY AND PH. PROVIDE MOISTURE REMEDIATION AS REQUIRED PER FLOORING AND ADHESIVE REQUIREMENTS. 5. SEAL VCT WITH REQUIRED NUMBER OF COATS PER MANUFACTURER'S INSTRUCTIONS. 6. C.G. (2" SURFACE MOUNTED CORNER GUARDS). BY KOROSEAL, KOROGUARD. MODEL #G100. LENGTH OF ALL CORNER GUARDS WILL BE FULL HIGHT. FINISH: PUMICE ON ALL WALLS PAINTED PT-42, BEIGE ON ALL WALLS PAINTED PT-43. BOTTOM OF CORNER GUARD TO BE INSTALLED AT TOP OF BASE. 7. GENERAL WALL PAINT IS PT-42 U.N.0. 8. REFER TO ELEVATIONS FOR WALL PROTECTION LOCATIONS IN EXAM ROOMS, INFUSION ROOM, AND VENDOR WORK AREA 9. SEMI-GLOSS PAINT FINISH TO BE USED IN EXAM ROOMS, VENDOR WORK AREA, MA WORK AREA, RESTROOMS, JANITORS CLOSET AND BIO SUPPLY. 10. ROLLER SHADED TO BE PROVIDED AT ALL EXTERIOR WINDOWS. SEE RS-1 11. ALL EXAM ROOMS TO RECEIVE WP-2 ON VITAL WALL. 12. ALL MILLWORK TO HAVE PVC EDGE BANDING. SEE FINISH SCHEDULE FOR SPECIFICATION. 13. ALL EXTERIOR WINDOWS TO RECIEVE RS-1. SEE DETAIL 10/A-8.0. 14. ALL WALLS TO RECEIVE WB-23, U.O.N. 15. ALL WALLS IN COMMUNITY ROOM AND MEETING ROOM TO RECEIVE PT-3, U.O.N. 16. ALL OUTSIDE CORNERS TO RECEIVE CG-2, U.O.N.

KEYNOTES

NO.

P B PL CPT WD ST SDT

DESCRIPTION

= PAINT = BASE = PLASTIC LAMINATE = CARPET = WOOD = STONE = STATIC DISSIPATIVE TILE

FT T G RF GL MTL SSM

= FLOOR TRANSITION = TILE = GROUT = RESILIENT FLOORING = GLASS = METAL = SOLID SURFACE

WT FAB WC ACP CON

= WINDOW TREATMENT = FABRIC = WALL COVERING = ACOUSTICAL CEILING PANEL = CONCRETE

Delta

2 1

ISSUE FOR BID & PERMIT ISSUE FOR 50% REVIEW, ENGINEERING

07/22/2019 07/02/2019

Issue

Description

Date

CHICAGO

104 S. MICHIGAN AVENUE, STE 1200 CHICAGO, IL 60603 TEL 312-488-5200 FAX 888-292-8361

© 2019INTERIOR ARCHITECTS, P.C., IL LICENSE #184-004385. A NEW YORK PROFESSIONAL SERVICES CORPORATION. ALL DRAWINGS AND WRITTEN MATERIAL HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, AND THE SAME MAY NOT BE DUPLICATED, USED, OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT.

Author

Checker

Drawn

Check

2019HUMX210

Job No.

FINISH PLAN Title

A-4.0 Sheet

Owner Approval As indicated

Scale


3

1 4 5

1/16/2019 12:51:21 PM

© 2017 The Cannon Corporation All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by The Cannon Corporation. C:\Revit Local Files\KPHESP_AR_FO_aserioB3TFW.rvt 1/16/2019 12:49:05 PM

1

© 2017 The Cannon Corporation All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by The Cannon Corporation.

C:\Revit Local Files\KPHESP_AR_FO_aserioB3TFW.rvt

KAISER PERMANENTE

HESPERIA, CALIFORNIA | CANNONDESIGN

6

LEVEL 01 PLAN

1/8" = 1'-0"

E

PROFESSIONAL WORK: ARCHITECTURE

HEALTHCARE D

2

I C

H UP

UP

1

1

UP

3

UP UP

7 3 LEVEL 03

1/8" = 1'-0"

B

G A

LEVEL 02 1/8" = 1'-0"

4

4

5

5

6

6

7

F

E

1 / A0101D

1 / A0101B

E

D

D

C

C

B

UP DN UP

B

A A

7


Con ce p t 1: Con tex tu al , Sop histicate d

THE CHANDLER CONDOMINIUMS B/CEILING 22'-0"

T/WALL 11'-0"

STREETERVILLE, CHICAGO | GARY LEE PARTNERS B/CEILING 22'-0"

1'-0"

1'-0"

EQ. EQ. VERIF. W/ SCHED. PLUMBING

(2) EQ.

EQ-2.3

PF-2

MULTI-FAMILY HOUSING EQ-1.2

4

1

(3) EQ.

2'-0"

2'-6"

2'-6"

2 1/2"

2'-6"

4

CABINETRY BY OTHERS. GC/SUB TO INSTALL

2'-0"

35 NORTH ELEVATION @ RESTROOM 016 30 WEST ELEVATION @ RESTROOM 130 25 SOUTH ELEVATION @ RESTROOM 130 20 SOUTH ELEVATION @ GAME ROOM 126

VERIF. WITH EQUIP.

(2) EQ.

FURNITURE NOT IN GC SCOPE

13 NORTH ELEVATION @ MEETING ROOM 121 2

Office 312-729-0901 Fax 312-729-0903 EQ-1.3

SCHEDULED PAINT AND WALL BASE

SCHEDULED EQUIP. W/ INTEGRATED PANELS

2'-10"

EQ.

1'-6"

PL-2 BASE CABINET WITH HEIGHT ADJ. SHELVES

450 E Waterside Drive Chicago IL, 60601

EQ-2.4

SS-1

PF-4

EQ.

SS-X COUNTERTOP AND BACKSPLASH

26"

05

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

30 SOUTH ELEVATION @ PANTRY 131

20 EAST ELEVATION @ PANTRY 131

SURFACE/CEILING MOUNTED TRACK FOR SCHED. DRAPERY. PROVIDE BLOCKING AS REQ'D.

15 WEST ELEVATION @ EXISTING VESTIBULE 134

T/STRUCTURAL LID 12'-9-1/2"

OPEN TO BEYOND

833 N Orleans Suite 400 Chicago IL 60610, USA 312 640 8300 Fax 640 8301

19 February 2018

B/CEILING 22'-0"

Statement of Compliance

VIF

FURNITURE NOT IN GC SCOPE SCHEDULED DRAPERY AND TRACK AT CEILING. PROVIDE 2X FOLD.

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF ILLINOIS.

NORTH ELEVATION @ MEDIA LOUNGE 125

T/DATUM LINE 11'-0"

The Chandler Condominiums - Amenities Space

John Joyce Architects 2101 W Evergreen Ave Storefront Chicago IL 60622, USA 773 772 8612

SCHEDULED PAINT AND WALL BASE

B/CEILING 22'-0"

19 February 2018 8

TV & SOUNDBAR TO BE PURCHASED AND COOR'D WITH OWNER

EQ-2.2

8

The Chandler Condominiums - Amenities Space

B/CEILING 11'-0" B/CEILING TILE 10'-6"

STRUCTURAL LID FOR MAINTENANCE. REFER TO A2-01 FOR MORE INFO/SCOPE. SCHE'D ACOUSTICAL CEILING TO BE SUSPENDED FROM STRUCTURAL CEILING

B/CEILING 22'-0"

3'-0"

PF-3

BASE CABINET TO BE REMOVABLE AND/OR ACCESSIBLE PANEL FOR REQ'D ACCESS TO H/C VALVE, DRAIN AND COFFEE VALVE.

3'-0"

US

9'-0"

1'-6"

OPEN TO BEYOND

SCHEDULED PAINT

OPEN TO BEYOND

SCHEDULED WALL TILE

T

1'-6"

2'-2"

CL

THE CHANDLER Co nce pt 2: High Co nt ra st , Arch iteCONDOMINIUMS c t ura l

FULL HEIGHT CLEAR MIRROR

SCHEDULED WALL SCONCE

NO

PROVIDE IN WALL BLOCKING FOR GRAB BARS AS REQ'D. AC-3 PF-1

3'-3"

PF-4

2'-10"

1'-6"

1'-6"

1'-6 1/16"

2'-8"

3'-6"

CL

B/CEILINGB/CEILING 9'-0" 9'-0"

26"

3'-3" 2'-10"

1'-6"

9'-0"

1'-6 1/16"

7" 7"

PF-15

2'-10"

3"

12" MIN.

PF-3

PF-2

PF-4

3'-3"

AC-3 PF-1

VERIF. WITH EQUIP.

PF-3

1'-6"

PROVIDE IN WALL BLOCKING FOR 36" GRAB BAR.

EQ-1.1

12" MIN.

AC-2

8"

3'-0"

EQ-1.1

PL-2 BASE CABINET CLEAR MIRROR SCHEDULED WITH HEIGHT ADJ. WALL SCONCE SHELVES AC-1

SCHEDULED PAINT

1'-6"

FULL HT.

3'-1"

B/CEILING 22'-0"

PROFESSIONAL WORK: ARCHITECTURE + INTERIOR DESIGN

B/CEILING 9'-0"

26"

AC-2

SCHEDULED PAINT

2'-8"

B/CEILING 9'-0"

FULL HEIGHT CLEAR MIRROR SCHEDULED WALL SCONCE

AC-1

ED

SS-X COUNTERTOP SCHEDULED WALL TILE AND BACKSPLASH

9'-8"

SCHEDULED WALL TILE

TH ELEVATION @ PANTRY 131

04

Con ce p t 1: Con tex tu al , Sop histicate d

B/CEILING 22'-0"

4

B/CEILING 22'-0"

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

10/A8.1

1'-6"

SCHEDULED PAINT

9'-0" PROVIDE IN WALL BLOCKING FOR GRAB BARS AS REQ'D. AC-3 PF-1

OPEN OPEN TO TO BEYOND BEYOND

SCHEDULED WALL TILE PF-3

EQ-2.3

PF-2

EQ.

EQ.

4

1

2'-0"

2'-6"

2'-6"

2'-6"

SCHEDULED LIGHT FIXTURE

13 NORTH ELEVATION @ MEETING ROOM 121 2

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

SCHEDULED LIGHT FIXTURE

9'-0"

OPEN TO BEYOND

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

B/CEILING 11'-0"

VIF

RECESSED LED STRIP LIGHTS AT ALL DIRECTION ON BANQUETTES SHELVES. REFER TOTUFTING LIGHTING SCHEDULE ALIGN AT BASE BUILDING MULLIONS AND DETAILS FOR TO MORE INFO AS NOTED. WD-2 SHELVES AND BACK PANELS

17/A8.1

PROVIDE 81"

T ELEVATION @ CORRIDOR 135

GL-1

1'-5"

CL

OPEN TO BEYOND

1

11 SEPTEMBER 2018

ISSUE FOR CONSTRUCTION

17 AUGUST 2018

ISSUE FOR ADDENDUM 2

17 AUGUST 2018

ISSUE FOR ADDENDUM 1

16 JULY 2018

ISSUE FOR BID AND PERMIT

SCHEDULED PAINT AND WALL BASE

25 JUNE 2018

Drawing Issue

Date

Project Number

17.057

Proj Manager/ Tech Coord

DC/TS

SCHEDULED WALLCOVERING AT FOCUS ROOMS 123 AND 124

Drawn By

KM/MP

Scale

3/8"=1'-0"

18 EAST ELEVATION @ MULTIPURPOSE ROOM 129

2

4

SCHEDULED PAINT AND WALL BASE.

MIN.

1

B/CEILING 11'-0"

WALL MOUNTED TRACK PROVIDED BY MANUFACTURER TO SUPPORT DOOR SYSTEM

EXISTING CONCRETE SILL AT BASE BUILDING CURTAIN WALL.

FIXED WD-2 PANELS

(5) EQ. PANELS

VIF

GC/SUB TO VERIFY MIN. DIM. REQ'D. BY MANUFACTURER.

QUIRK.

2'-0"

4

EQ.-3.2

EQ. A

3'-0"

EQ. EQ.

EQ.-3.2

ALIGN

VIF

T/STRUCTURAL LID 12'-9-1/2"

2

04

ISSUE FOR REVISIONS

SCHEDULED PAINT AND WALL BASE

METAL HAND RAIL

12" MIN

2'-0"

21/A8.1

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

SCHEDULED METAL COIL DRAPERY. PROVIDE BLOCKING AS REQ'D. INSTALLATION TO BE STATIONARY WITH DOUBLE FOLD (2X) DRAPE.

27/A5.1 BUILT FB-1 BANQUETTES W/ TUFTING PROVIDE GROMMETS ATIN NOTED ASTO NOTED. INTEGRATED POWER/USB AT LOCATIONS. POWER BE LOCATED IN CABINET BELOW. BASE.

WINDOW WALL

FURNITURE NOT IN SCOPE

SCHEDULED RAMP SHOWN BEYOND.

3'-0"

29/A8-1

5'-5" (4) EQ. SHELVES

SCHEDULED WALL PANELS. PROVIDE 41" REVEALS, TYP.

29/A8-1

AT 19 February BANQUETTE 2018

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF ILLINOIS. 4

TOP OF SHELF TO ALIGN WITH CENTER OF MULLION AS SHOWN.

10/A8.1

SCHEDULED FIXED DRAPERY AND TRACK AT CEILING. PROVIDE 2X FOLD. FIXED SCHEDULED WOOD PANEL

17/A8.1

FURNITURE NOT IN GC SCOPE SCHEDULED DRAPERY AND TRACK AT CEILING. PROVIDE 2X FOLD.

ADL DOORS PROVIDED/INSTALLEDT/STRUCTURAL LID 12'-9-1/2" BY MANUF. REFER TO DOOR SCHDULE FOR MORE INFO AND B/CEILING NORTH ELEVATION @ MEDIA LOUNGE 125 11'-0" COOR'D/PROVIDE AS REQ'D.

T/DATUM LINE 11'-0"

2'-0"

ALIGN

9

BUILT-IN FB-1

The Chandler Condominiums - Amenities Space

Statement of Compliance

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

10/A8.1

T/STRUCTURAL LID 12'-9-1/2"

John Joyce Architects 2101 W Evergreen Ave Storefront Chicago IL 60622, USA 773 772 8612

SCHEDULED PAINT AND WALL BASE

3'-0"

10/A8.1

B/CEILING 11'-0"

4

312 640 8300 Fax 640 8301

SCHEDULED PRIVACY FILM. REFER TO A4-01 FOR MORE INFO.

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE. T/STRUCTURAL LID 12'-9-1/2"

EQ. A

833 N Orleans Suite 400 Chicago IL 60610, USA

TV & SOUNDBAR TO BE PURCHASED AND COOR'D WITH OWNER

EQ-2.2 SCHEDULED PAINT AND WALL BASE

EQ. A

PROVIDE PLASTER FINISH AT NOTED WALLS TO 11'-0"/ BOTTOM OF BAFFLES

SPECIFIED LIGHT FIXTURE: F-16

STRUCTURAL LID FOR MAINTENANCE. REFER TO A2-01 FOR MORE INFO/SCOPE. SCHE'D ACOUSTICAL CEILING TO BE SUSPENDED FROM STRUCTURAL CEILING

B/CEILING 22'-0"

OPEN

OPEN TO BEYOND

SPECIFIED LIGHT FIXTURE: F-5

B/CEILING 11'-0" B/CEILING TILE 10'-6"

B/CEILING 22'-0"

05

03

T/STRUCTURAL LID 12'-9-1/2"

SCHEDULED LIGHT FIXTURE

OPEN

B/ACOUSTICAL BAFFLES 11'-0"

ALIGN FURNITURE NOT IN GC SCOPE

SLIDING DOOR SYSTEM TO BE PROVIDED AND INSTALLED BY MANUF. COOR'D/PROVIDE BLOCKING, ETC. AS REQ'D. REFER TO "ATTACHMENT DOORS" FOR MORE INFORMATION.

INSTALL

SURFACE/CEILING MOUNTED TRACK FOR SCHED. DRAPERY. PROVIDE BLOCKING AS REQ'D.

4

Office 312-729-0901 Fax 312-729-0903

SCHEDULED PAINT AND WALL BASE

EQ-1.2

2 1/2"

10/A8.1

SUSPENDED FELT BAFFLE SYSTEM

450 E Waterside Drive Chicago IL, 60601 EQ-2.4

SS-1 DOUBLE HEIGHT WALL SCHEDULED EQUIP. W/ CONSTRUCTION TO INTEGRATED PANELS BE COOR'D WITH STRUCTURAL 4 CABINETRY BY ENGINEER/CONSULTANT. 2'-0" OTHERS. GC/SUB TO

EQ.

1'-6"

35 NORTH ELEVATION @ RESTROOM 016 30 WEST ELEVATION @ RESTROOM 130 25 SOUTH ELEVATION @ RESTROOM 130 20 SOUTH ELEVATION @ GAME ROOM 126 18 NORTH ELEVATION @ LOUNGE 122

NORTH ELEVATION @ MULTIPURPOSE ROOM 129

SCHEDULED WALLCOVERING AT FOCUS ROOMS 123 AND 124

BASE CABINET TO BE REMOVABLE AND/OR ACCESSIBLE PANEL FOR REQ'D ACCESS TO H/C VALVE, DRAIN AND COFFEE VALVE.

PF-4

SCHEDULED PAINT AND WALL BASE.

THE CHANDLER CONDOMINIUMS

OPEN TO BEYOND

WALL MOUNTED TRACK PROVIDED BY MANUFACTURER TO SUPPORT DOOR SYSTEM

SCHEDULED WALL SCONCE

1'-8"

3'-3"

2'-10"

1'-6"

2'-2"

CL

SCHEDULED PAINT AND WALL BASE

FULL HEIGHT CLEAR MIRROR

OPEN

10'-0"

2'-0"

EQ.

1'-0"

SCHEDULED PAINT

SCHEDULED PAINT

3'-0"

3'-6"

PF-4

1'-0"

B/CEILING 11'-0"

2'-10"

PF-15

2'-10"

3"

3'-3"

1'-6"

1'-6"

1'-6 1/16"

9'-0"

1'-6 1/16"

7" 7"

PF-2

PF-4

1'-6"

AC-3 PF-1

12" MIN.

PF-3

8"

PROVIDE IN WALL BLOCKING FOR 36" GRAB BAR.

PF-3

BUILT IN FB-1 BANQUETTES W/ TUFTING AS NOTED. INTEGRATED POWER/USB AT BASE.

CL

B/CEILINGB/CEILING 9'-0" 9'-0"

US

FULL HT. CLEAR MIRROR SCHEDULED WALL SCONCE AC-1 AC-2

3'-1" 12" MIN.

TUFTING DIRECTION ON BANQUETTES TO ALIGN AT BASE BUILDING MULLIONS AS NOTED.

B/CEILING 9'-0"

FULL HEIGHT CLEAR MIRROR SCHEDULED WALL SCONCE

AC-2

T

AC-1

NO

9'-0"

OPEN

3'-3" 2'-10"

29/A8-1

B/CEILING 9'-0"

29/A8-1

ED

T/STRUCTURAL LID 12'-9-1/2"

SCHEDULED WALL TILE

9'-8"

SCHEDULED WALL TILE

(4) EQ. SHELVES

1

ELEVATIONS SLIDING DOOR SYSTEM TO BE PROVIDED AND INSTALLED BY MANUF. COOR'D/PROVIDE BLOCKING, ETC. AS REQ'D. REFER TO "ATTACHMENT DOORS" FOR MORE INFORMATION.

NORTH ELEVATION @ MULTIPURPOSE ROOM 129 NORTH ELEVATION @ LIBRARY 120

18 NORTH ELEVATION @ LOUNGE 122 16 SOUTH ELEVATION @ LIBRARY 120

26 EAST ELEVATION @ LIBRARY 120

01

03 A7-2

The Chandler Condominiums - A

copyright, GARY LEE PARTNERS, 2018.

B/CEILING 22'-0"

B/CEILING 22'-0"

SCHEDULED PRIVACY FILM. REFER TO A4-01 FOR MORE INFO. STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

10/A8.1

T/STRUCTURAL LID 12'-9-1/2"

T/STRUCTURAL LID 12'-9-1/2"

B/CEILING 11'-0"

B/CEILING 11'-0"

5'-5" (4) EQ. SHELVES

27/A5.1

PROVIDE 81" QUIRK.

4 EQ. A

EQ. A

EQ.-3.2

VIF

GC/SUB TO PROVIDE RECOMMENDATION NORTH ELEVATION @ LIBRARY 120 FOR STAIR BUILD-OUT.

TH ELEVATION @ MULTIPURPOSE ROOM 129

CL

EQ. A

VIF

GC/SUB TO VERIFY MIN. DIM. REQ'D. BY MANUFACTURER.

12" MIN

GL-1

3'-0"

PROVIDE GROMMETS AT NOTED LOCATIONS. POWER TO BE LOCATED IN CABINET BELOW.

4

1'-5"

OPEN TO BEYOND

EQ. EQ.

(6) EQ. DOORS

T/WORK SURFACE 12'-9 1/2"

17 AUGUST 2018 17 AUGUST 2018

B/JOIST 12'-0"

Date

T/WALL 11'-0"

METAL HAND RAIL

Project Number

17.057

Proj Manager/ Tech Coord

DC/TS

Drawn By

KM/MP

Scale

3/8"=1'-0"

ISSUE FOR ADDENDUM 1 ISSUE FOR BID AND PERMIT

12/A8-1 25 JUNE 2018

SCHEDULED LIGHT FIXTURE SCHEDULED LIGHT FIXTURE SCHEDULED WALLCOVERING

SCHEDULED RAMP SHOWN BEYOND.

OPEN TO BEYOND

1

EQ.- 2.1

26 EAST ELEVATION @ LIBRARY 120

11 SEPTEMBER 2018

ISSUE FOR ADDENDUM 2

16 JULY 2018

1

ALIGN @ 11'-0"

2

4

(5) EQ. PANELS MIN.

ISSUE FOR REVISIONS

Drawing Issue

XX/A8-1

EXISTING CONCRETE SILL AT BASE BUILDING CURTAIN WALL.

FIXED WD-2 PANELS

1

2

39/A8-1

SCHEDULED METAL COIL DRAPERY. PROVIDE BLOCKING AS REQ'D. INSTALLATION TO BE STATIONARY WITH DOUBLE FOLD (2X) DRAPE.

2'-0"

EQ.-3.2

ALIGN

3'-0"

(4) EQ. SHELVES

17/A8.1

TOP OF SHELF TO ALIGN WITH CENTER OF MULLION AS SHOWN.

12/A8-1

ELEVATIONS

OPEN TO BEYOND

T-1 TILE BACKSPLASH. PROVIDE STACKED INSTALLATION SS-1 COUNTERTOP

EQ.- 2.1

16 SOUTH ELEVATION @ LIBRARY 120

01

A7-2 copyright, GARY LEE PARTNERS, 2018.

3'-0"

P:\THE CHANDLER 17.057\Drawings\4 Construction Documents\17.057_A7-2.dwg 9/21/2018 11:54 AM

RECESSED LED STRIP LIGHTS AT ALL SHELVES. REFER TO LIGHTING SCHEDULE AND DETAILS FOR MORE INFO WD-2 SHELVES AND BACK PANELS

21/A8.1

PAINTED CLOSET DOORS. REFER TO DOOR SCHED. FOR MORE INFO.

4

ISSUE FOR CONSTRUCTION

SCHEDULED FIXED DRAPERY AND TRACK AT CEILING. PROVIDE 2X FOLD. FIXED SCHEDULED WOOD PANEL

17/A8.1

SCHEDULED WALL PANELS. PROVIDE 41" REVEALS, TYP.

T/STRUCTURAL LID 12'-9-1/2" B/CEILING 11'-0"

2'-0"

ALIGN

SCHEDULED LIGHT FIXTURES AND TRACK SYSTEM. OPEN TO PROVIDE UNISTRUT BEYOND AS REQ'D.

STRUCTURAL LID FOR MAINTENANCE. REFER TO A2-01 FOR MORE INFO/SCOPE.

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

10/A8.1 VIF

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

10/A8.1

2'-0"

P:\THE CHANDLER 17.057\Drawings\4 Construction Documents\17.057_A7-2.dwg 9/21/2018 11:54 AM

B/CEILING 22'-0"

B/CEILING 22'-0"

BUILT-IN FB-1 BANQUETTE AT WINDOW WALL FIXED WD-1 PANELS

(4) EQ.

VIF W/ PLUMB.

PULL-OUT TRASH

ADL DOORS PROVIDED/INSTALLED BY MANUF. REFER TO DOOR SCHDULE FOR MORE INFO AND COOR'D/PROVIDE AS REQ'D.

(4) EQ.

FURNITURE NOT IN GC SCOPE


B-01

B-01

COFFEE BAR

T-01

T-01

EX-4

T-01

T-01

EX-5 (3) CH-01

AC-01

128

(3) CH-01

EX-1

PARTY/MULTIPURPOSE ROOM

833 N Orlea Chicago IL 60654 USA

129

B-01

(10) CH-04

T-06

T-01

T-01

(2) CH-06 T-02

COFFEE LOUNGE

T-06

T-04

127

(2) CH-06

(4) CH-02

T-03

312 640 83 Fax 640 83

EX-1

R-01

(6) CH-05 (3) T-05

N.I.C

C-01

EX-3 T-07

RESTROOM

T-07

130

ELEVATOR #7 E-07

B-02

STORAGE

PANTRY

132

135

AC-03

LOUNGE MEDIA 125

GAME ROOM AC-02

T-09

126

STORAGE

EX-1

017

(3) T-11

(2) CH-08 (2) T-10 T-12

ELEVATOR #1 E-01

T-17 (2) T-08 (4) CH-07

EX-1

133

131

CORRIDOR

EX-1

ADA LIFT

ELEVATOR #2 E-02

ELEVATOR #3 E-03

ELEVATOR #4 E-04

S-01

EX-1 T-14

1

5311

FOCUS ROOM 123

C-02

124

53100

CH-10

FEC

FOCUS ROOM T-13

CH-09

EX2

FE/ FHV

EX-1

D102

LOUNGE

D101-A

122

MEETING ROOM 121

T-15 (2) CH-11

T-18

D102-A

RESTROOM

T-16

PUMP RM/NIC

R-02

118

JANITOR CLOSET

CORRIDOR 115

135

EX-1

D101

(5) CH-12

EX-1

FE/ FHV

016

EX-1 ELEVATOR #6 E-06

ELEVATOR #5 E-05

(4) T-19 (10) CH-13

EX-1

LIBRARY

-(4) CH-14

EX-1

T-20

PACKAGE ROOM

ATM -

EX-1

112

17.035

PROJECT NUMBE

N.I.C

CORRIDOR 115

EX-5

PROJ MANAGER/

M.P.

DRAWN BY

08-30-201 DATE

NTS

SCALE

EX-1 EX-1

copyright, GARY LEE PARTNERS, 2018.

D.C./T.S. EX-1

THE CHAN CONDOMI

Floor 1


NORWETA ROW PALETTE “A” - TYPICAL UNIT POWDER RM PALETTE

“A” - TYPICAL UNIT MASTER BATH PALETTE “A” - TYPICAL UNIT SECONDARY BATH

LINCOLN PARK, CHICAGO | GARY LEE PARTNERS PROFESSIONAL WORK: INTERIOR DESIGN

OVN/ MICRO

OVN/ MICRO

MASTER BEDROOM 13'-0" x 12'-0"

TRSH

LIVING 16'-10" x 14'-4"

MASTER BEDROOM 13'-0" x 12'-0"

DW

LIVING 16'-10" x 14'-4"

TRSH

DW

KITCHEN 13'-5" x 9'-0"

WALK-IN CLOSET

WALK-IN CLOSET

W

KITCHEN 13'-5" x 9'-0"

REF FRZ

REF FRZ

PNTY

BVG

PNTY

MASTER BATH

MASTER BATH

D

D

LAUNDRY

W

LAUNDRY

BEDROOM 2 11'-0" x 11'-5" ENTRANCE

BATH

ENTRANCE

UTILITY

FURN

HW

UTILITY

HW

BATH

FURN

BEDROOM 3 11'-2" x 13'-4"

BEDROOM 3 11'-2" x 13'-4"

FLOOR + WALL TILE PALETTE “A” - TYPICAL UNIT MASTER BATH

BATH

WALK-IN CLOSET

WALK-IN CLOSET

MASTER BEDROOM 15'-10" x 13'-6"

W

D

D

LAUNDRY/ UTILITY

BEDROOM 2 10'-0" x 13'-8"

FURN

BEDROOM 2 10'-0" x 13'-8"

HW

OVN/ MICRO

BATH

BATH BEDROOM 3 10'-0" x 13'-8"

BEDROOM 3 10'-0" x 13'-8"

OVN/ MICRO

MASTER BEDROOM 13'-0" x 12'-0"

TRSH

LIVING 16'-10" x 14'-4"

MASTER BEDROOM 13'-0" x 12'-0"

DW

DW

ENTRANCE

KITCHEN 9'-0" x 13'-5"

REF FRZ

REF FRZ

WNE

REF FRZ

TRSH

DW

DW

TRSH

LIVING 24'-0" x 13'-8"

KITCHEN 8'-11" x 13'-0"

OVN/ MICRO

W

MASTER BATH

MASTER BATH

BATH

BATH

W

LAUNDRY

D

ENTRANCE

KITCHEN 8'-11" x 13'-0"

OVN/ MICRO

WNE

PNTY

D

BEDROOM 2 11'-1" x 13'-2"

UTILITY HW

UTILITY

FURN

FURN

HW

WALK-IN CLOSET

BATH OVN/ MICRO

PNTY

ENTRANCE

REF FRZ

FURN

KITCHEN 9'-0" x 14'-0"

REF FRZ

ENTRANCE

PNTY

W

DW

D

OVN/ MICRO

FURN

LAUNDRY/ UTILITY

ENTRANCE

W

DW

TRSH

BVG

PNTY

LAUNDRY/ UTILITY

HW

BATH

BEDROOM 3 11'-5" x 11'-2"

PNTY

KITCHEN 8'-10" x 14'-0"

HW

REF FRZ

DW

TRSH

D

ENTRANCE

ENTRANCE

HW

BATH

UTILITY

UTILITY

FURN

W

LAUNDRY W

D

MASTER BATH

D

BATH

LAUNDRY/ UTILITY

BATH

BEDROOM 2 11'-5" x 11'-0"

MASTER BATH

MASTER BATH

BATH

BVG

WALK-IN CLOSET LIVING 16'-0" x 34'-9"

XX/ XX

PROJ MANAGER/ TECH COORD

W

XXXX

BVG

DRAWN BY

WALK-IN CLOSET

REF FRZ

KITCHEN 9'-0" x 16'-9"

MASTER BEDROOM 13'-0" x 12'-0"

MASTER BEDROOM 13'-0" x 12'-0"

VANITY STONE COUNTERTOP Morning Frost 2cm

DATE

XXXX

DW

BEDROOM 2 12'-0" x 11'-0"

FLOOR + WALL TILE Premium White 30” x 60” XXXX

WALK-IN CLOSET

BEDROOM 2 11'-3" x 11'-0"

BEDROOM 3 11'-11" x 11'-9"

MASTER BEDROOM 13'-0" x 12'-0"

MASTER BEDROOM 13'-0" x 12'-0"

DW

D

PNTY

WALK-IN CLOSET

BEDROOM 2 11'-3" x 11'-0"

MASTER BATH

MASTER BATH

WALK-IN CLOSET LIVING 14'-0" x 26'-0"

REF FRZ

KITCHEN 16'-9" x 9'-0"

PROJECT NUMBER

LAUNDRY

LIVING 14'-0" x 26'-0"

WALK-IN CLOSET

TRSH

LIVING 24'-0" x 13'-8"

KITCHEN 8'-11" x 13'-0"

OVN/ MICRO

FURN

PNTY

WALK-IN CLOSET

XXXX

FURN

HW TRSH

BVG

PALETTE “A” - TYPICAL UNIT MASTER BATH

BATH

BVG

HW

BEDROOM 3 11'-0" x 11'-6"

UNIT KITCHENStormy Sky

BEDROOM 2 11'-1" x 13'-2"

ENTRANCE

WALK-IN CLOSET

STONE VANITY

KITCHEN 9'-0" x 13'-5"

WALK-IN CLOSET

PNTY

WNE

PNTY

REF FRZ

WALK-IN CLOSET

LAUNDRY

BEDROOM 2 11'-2" x 13'-4"

SCALE

MASTER BEDROOM 13'-0" x 12'-0"

LIVING 24'-0" x 13'-8"

TRSH

OVN/ MICRO

OVN/ MICRO

NORWETA

RENTALS FIRST FLOOR

WOOD FLOOR Nautilus

copyright, GARY LEE PARTNERS, 2018.

RTNERS, 2018.

ASK-001

LIVING 24'-0" x 13'-8"

BATH DW

REF FRZ

TRSH

BEDROOM 3 12'-4" x 14'-3"

REF FRZ

KITCHEN 26'-6" x 11'-4"

WALK-IN CLOSET

OVN

BATH

ENTRANCE

2cm

ALTERNATE

BATH

WALK-IN CLOSET

D

LAUNDRY/ UTILITY

HW

BATH WALK-IN CLOSET

W

FURN

BEDROOM 4 15'-5" x 11'-8"

BEDROOM 2 15'-5" x 11'-8"

VANITY STONE COUNTERTOP

PALETTE “A” - TYPICALMorning UNITFrost MASTER BATH

312 640 8300 Fax 640 8301

WET BAR

BVG

WALK-IN CLOSET

CABINET WOOD VENEER Silver Oak

FLOOR + WALL TILE Premium White 30” x 60”

360 W Superior St Chicago IL 60654 USA

MASTER BEDROOM 13'-6" x 14'-0"

MASTER BATH

VANITY STONE COU Morning Frost 2cm

TRSH

WOOD FLOOR Nautilus“A” - TYPICAL PALETTE

ENTRANCE

PNTY

LIVING 24'-0" x 13'-8"

LIVING 16'-10" x 14'-4"

VANITY STONE Archer Gray 2cm

BATH

BATH

WNE

CERAMIC WALL TILE Ice White 4” x 12”

Premium White 30” x 60”

W

LAUNDRY/ UTILITY

FURN

HW

MASTER BEDROOM 15'-10" x 13'-6"

MASTER BATH

MASTER BATH

312 640 8300 Fax 640 8301

MULTI-FAMILY HOUSING

BVG

BEDROOM 2 11'-0" x 11'-5"

360 W Superior St Chicago IL 60654 USA

WALK-IN CLOSET

WALK-IN CLOSET

WALK-IN CLOSET MASTER BEDROOM 13'-0" x 16'-0"

MASTER BATH

MASTER BATH

W

D

D

W

LAUNDRY/ UTILITY

BEDROOM 2 10'-0" x 13'-8"

LAUNDRY/ UTILITY

FURN

HW

MASTER BEDROOM 13'-0" x 16'-0"

FURN

BEDROOM 2 10'-0" x 13'-8"

HW

BATH

BATH

BATH

BATH

OVN/ MICRO

OVN/ MICRO

BEDROOM 3 10'-0" x 13'-8"

BEDROOM 3 10'-0" x 13'-8"

MASTER BEDROOM 13'-0" x 12'-0"

TRSH

MASTER BEDROOM 13'-0" x 12'-0"

DW

LIVING 16'-10" x 14'-4"

LIVING 16'-10" x 14'-4"

DW

REF FRZ

WNE

REF FRZ

PNTY

TRSH

KITCHEN 9'-0" x 13'-5"

ENTRANCE

ENTRANCE

WALK-IN CLOSET

WNE

WNE

TRSH

PNTY

MASTER BATH

W

PALETTE “A” - TYPICAL UNIT SECONDARY BATH

WALK-IN CLOSET

PNTY

PNTY

LAUNDRY

KITCHEN 9'-0" x 13'-5"

REF FRZ

REF FRZ

MASTER BATH

WNE

W

LAUNDRY

DW

D

LIVING 24'-0" x 13'-8"

D

LIVING 24'-0" x 13'-8" DW

BEDROOM 2 11'-1" x 13'-2"

TRSH

KITCHEN 8'-11" x 13'-0"

OVN/ MICRO

OVN/ MICRO

BEDROOM 2 11'-1" x 13'-2"

BATH

ENTRANCE

BATH

UTILITY

KITCHEN 8'-11" x 13'-0"

HW

UTILITY

FURN

FURN

HW

FLOOR + WALL TILE Bianco Alanur 12” x 24”

ENTRANCE

WALK-IN CLOSET

BEDROOM 2 11'-2" x 13'-4"

WALK-IN CLOSET

BATH OVN/ MICRO

PNTY

ENTRANCE

PNTY

OVN/ MICRO

FURN

ENTRANCE

PNTY

UTILITY

HW

LAUNDRY/ UTILITY

W

DW

TRSH

BVG

REF FRZ

FURN

KITCHEN 9'-0" x 14'-0"

REF FRZ

ENTRANCE

BATH

DW

BEDROOM 3 11'-5" x 11'-2"

PNTY

KITCHEN 8'-10" x 14'-0"

HW

REF FRZ

DW

TRSH

D

ENTRANCE

BATH

BATH UTILITY BEDROOM 3 11'-0" x 11'-6"

FURN

BATH

ENTRANCE

BVG

HW

HW

FURN

HW

BEDROOM 2 11'-5" x 11'-0"

TRSH

W OVN/ MICRO

MASTER BATH

LAUNDRY BATH

BVG

WALK-IN CLOSET

MASTER BATH

WALK-IN CLOSET

MASTER BATH

LIVING 16'-0" x 34'-9"

WALK-IN CLOSET

WALK-IN CLOSET

BEDROOM 2 11'-3" x 11'-0"

DW

MASTER BEDROOM 13'-0" x 12'-0"

LIVING 14'-0" x 26'-0"

BEDROOM 3 11'-11" x 11'-9"

XXXX

W

PROJECT NUMBER

BVG

XX/ XX

WALK-IN CLOSET

WALK-IN CLOSET

PROJ MANAGER/ TECH COORD KITCHEN 9'-0" x 16'-9"

REF FRZ

BEDROOM 2 11'-3" x 11'-0"

XXXX

DW

BEDROOM 2 12'-0" x 11'-0"

MASTER BEDROOM 13'-0" x 12'-0"

D

PNTY

WALK-IN CLOSET

LIVING 14'-0" x 26'-0"

WALK-IN CLOSET

REF FRZ

TRSH

LIVING 24'-0" x 13'-8"

KITCHEN 8'-11" x 13'-0"

FURN

BATH

MASTER BATH

BATH

LAUNDRY/ UTILITY

D

MASTER BATH PNTY

BVG

KITCHEN 16'-9" x 9'-0"

MASTER BEDROOM 13'-10" x 12'-0"

MASTER BEDROOM 13'-0" x 12'-0"

MASTER BEDROOM 13'-0" x 12'-0"

XXXX

DATE

XXXX

OVN/ MICRO

SCALE

NORWETA RENTALS FIRST FLOOR

UNIT:

MASTER BEDROOM 13'-6" x 14'-0"

360 W Superior St Chicago IL 60654 USA

OWNER NAME:

BVG

BATH MASTER BATH

WALK-IN CLOSET

REF FRZ

TRSH

DW

BEDROOM 3 12'-4" x 14'-3"

REF FRZ

KITCHEN 26'-6" x 11'-4"

BATH

ENTRANCE

W HW

LAUNDRY/ UTILITY

SIGNATURE:

SIGNATURE:

BATH

WALK-IN CLOSET

OWNER NAME:

312 640 8300 Fax 640 8301

WALK-IN CLOSET

OVN

BATH

UNIT:

ASK-001

WET BAR

WALK-IN CLOSET

D

FURN

VANITY CABIN

VANITYWhite STONE Bianco Alanur 2cm

VANITY STONE COUNTERTOP Archer Gray 2cm

CERAMIC WALL TILE Ice White 4” x 12”

DRAWN BY LIVING 24'-0" x 13'-8"

TRSH

FLOOR TILE Smoky Gray Pennyround

BEDROOM 4 15'-5" x 11'-8"

BEDROOM 2 15'-5" x 11'-8"

WALK-IN CLOSET

WALK-IN CLOSET

WALK-IN CLOSET MASTER BEDROOM 13'-0" x 16'-0"

MASTER BATH

D

D

FURN

BATH

BEDROOM 2 10'-0" x 13'-8"

HW

OVN/ MICRO

BATH

BEDROOM 3 10'-0" x 13'-8"

BEDROOM 3 10'-0" x 13'-8"

KITCHEN COUNTERTOP + FULL HEIGHT BACKSPLASH NORWETA ROW UNIT FINISH PALETTE Calacatta Halo OVN/ MICRO

MASTER BEDROOM 13'-0" x 12'-0"

TRSH

LIVING 16'-10" x 14'-4"

MASTER BEDROOM 13'-0" x 12'-0"

LIVING 16'-10" x 14'-4"

REF FRZ

REF FRZ

REF FRZ

PNTY

LAUNDRY

LAUNDRY

PNTY

MASTER BATH

TRSH

KITCHEN 9'-0" x 13'-5"

REF FRZ

WALK-IN CLOSET

WALK-IN CLOSET

WNE

W/D PNTY

TRSH

KITCHEN 9'-0" x 13'-5"

ENTRANCE

ENTRANCE

09 AUGUST 2018

DW

DW

WNE

W/D

MASTER BATH

DW

LIVING 24'-0" x 13'-8"

LIVING 24'-0" x 13'-8"

BEDROOM 2 11'-1" x 13'-2"

BEDROOM 2 11'-1" x 13'-2"

TRSH

DW

KITCHEN 8'-11" x 13'-0"

OVN/ MICRO

OVN/ MICRO

ENTRANCE

BATH

BATH

UTILITY

KITCHEN 8'-11" x 13'-0"

HW

UTILITY

FURN

FURN

SHOWER FLOOR TILE

HW

ENTRANCE

BEDROOM 2 11'-2" x 13'-4"

WALK-IN CLOSET

WALK-IN CLOSET

BATH OVN/ MICRO

PNTY

ENTRANCE

ENTRANCE

REF FRZ

BATH BVG

UTILITY HW

BEDROOM 3 11'-0" x 11'-6"

KITCHEN 9'-0" x 14'-0" TRSH

HW

DW

REF FRZ

FURN

LAUNDRY/ UTILITY

PNTY

FURN

ENTRANCE

W

W

DW

D

LAUNDRY/ UTILITY

D

HW

OVN/ MICRO

BEDROOM 3 11'-5" x 11'-2"

PNTY

KITCHEN 8'-10" x 14'-0" TRSH

DW

REF FRZ

ENTRANCE

OVN/ MICRO

KITCHEN 8'-11" x 13'-0"

FURN

MASTER BATH

WALK-IN CLOSET

TRSH

BATH

HW

BEDROOM 2 11'-5" x 11'-0"

MASTER BATH

BVG

BATH

BATH

UTILITY FURN

HW

LAUNDRY/ UTILITY

D

MASTER BATH

ENTRANCE

BVG

BATH WALK-IN CLOSET

MASTER BATH

BATH

MASTER BATH

LAUNDRY

LAUNDRY PNTY

LIVING 16'-0" x 34'-9"

WALK-IN CLOSET KITCHEN 16'-9" x 9'-0"

WALK-IN CLOSET

REF FRZ

LIVING 14'-0" x 26'-0" BEDROOM 2 11'-3" x 11'-0"

MASTER BEDROOM 13'-0" x 12'-0"

TRSH

OVN/ MICRO

MASTER BEDROOM 13'-0" x 12'-0"

WALK-IN CLOSET

WALK-IN CLOSET

BEDROOM 2 12'-0" x 11'-0"

LIVING 14'-0" x 26'-0"

WALK-IN CLOSET

BEDROOM 2 11'-3" x 11'-0"

BEDROOM 3 11'-11" x 11'-9"

DW

LIVING 24'-0" x 13'-8"

PNTY

BATH

FURN

W

W/D

NORWETA ROW

W

LAUNDRY/ UTILITY

FURN

HW

MASTER BEDROOM 13'-0" x 16'-0"

MASTER BATH

W

LAUNDRY/ UTILITY

BEDROOM 2 10'-0" x 13'-8"

UNIT: WALK-IN CLOSET

W/D

PNTY

XXXX

REF FRZ

XX/ XX

DW

MASTER BEDROOM 13'-10" x 12'-0"

MASTER BEDROOM 13'-0" x 12'-0"

TRSH

MASTER BEDROOM 13'-0" x 12'-0"

PROJ MANAGER/ TECH COORD

LIVING 24'-0" x 13'-8"

OWNER NAME: OVN/ MICRO

Premium White 1” x 4” Stacked Mosaic PROJECT NUMBER

KITCHEN 9'-0" x 16'-9"

VANITY CABINET -

SHOWER FLOOR TILEPremium White VANITY CABINET - MATTE LACQUER Nimbus NimbusCABINET - MATTE LACQUER SHOWER Premium FLOOR White TILE 1” x 4” StackedVANITY Mosaic 1” x 4” Stacked Mosaic XXXX

DRAWN BY

XXXX

DATE

XXXX

SCALE

NORWETA

Nimbus


CUSTOM WALK-IN CLOSET

W/D

BEDROOM 10'-10" x 11'-10"

BATH

PR

KITCHEN 9'-0" x 11'-4" MASTER SUITE 14'-2" x 13'-4"

LIVING/DINING 16'-3" x 13'-4"

MASTER BATH

CUSTOM WALK-IN CLOSET

BEDROOM 12'-1" x 11'-5" BATH

℄ TILE & FIXTURES EQ

EQ

B/CEILING 8'-2" to 8'-5"

GEM JUNCTION BOX BEHIND MIRROR

N

FULL HEIGHT CLEAR MIRROR

3"

SCHEDULED QUARTZ TILE SHELF AND APRON, ALL OUTSIDE CORNERS TO BE MITERED, TYP. EQ

8"

3'-0"

SCHEDULED QUARTZ COUNTER (22"D) AND APRON, ALL OUTSIDE CORNERS TO BE MITERED, TYP.

W

0'

E

℄ & FIXTURES EQ

℄ FULL HEIGHT CLEAR TILE & FIXTURES MIRROR

PROVIDE EDGE MATCHED, SEQUENCED

360 W Superior St PRIVATE Chicago IL 60610 USA TERRACE

SCHEDULED QUARTZ COUNTER (22"D) AND APRON, ALL OUTSIDE CORNERS TO BE MITERED, TYP.

MASTER BATH

312 640 8300 Fax 640 8301

PROVIDE℄EDGE MATCHED, TILE/TUB SEQUENCED SLABS

SCHEDULED QUARTZ SHELF AND APRON, ALL OUTSIDE CORNERS TO BE MITERED, TYP.

KITCHEN 15'-11" x 8'-9"

12'-0" x 33'-0"

8'-2" to 8'-5"

4'-6"

7'-6"

7" 7"

W

D

MASTER BATH -SLABS PALETTE A

03 B/CEILING

BACKSPLASH

3"

20'BEDROOM 25' 12'-1" x 10'-8"

FULL "SLAB" TILE

POWDER ROOM EQ EQ SCHEDULED QUARTZ

3'-0"

15'

312 640 8300 Fax 640 8301

B/CEILING 8'-2" to 8'-5"

SCHEDULED BASE

8"

360 W Superior St Chicago IL 60610 USA

10'

S

GEM JUNCTION BOX BEHIND MIRROR

℄

5'

4'-6"

℄

7" 7"

7'-6"

SCHEDULED QUARTZ BACKSPLASH

PROVIDE EDGE MATCHED, SEQUENCED SLABS

360 W Superior St Chicago IL B/CEILING 60610 USA 8'-2" to 8'-5"

CUSTOM WALK-IN CLOSET

312 640 8300 Fax 640 8301

SCHEDULED BASE

FULL "SLAB" TILE

PROVIDE EDGE MATCHED, SEQUENCED SLABS

4'-6"

ON, ALL

ROOM

03

TSIDE TYP.

XXXX

MASTER BATH - PALETTE A

PROJECT NUMBER

XX/ XX

PROJ MANAGER/ TECH COORD

03

℄ TILE/TUB

MASTER BATH - PALETTE A

DRAWN BY

℄

XXXX

1 4"=1'-0" SCALE

B/CEILING 8'-2" to 8'-5"

[PROJECT TITLE]

PROVIDE EDGE MATCHED, SEQUENCED SLABS

℄ /TUB

MASTER BATH - PALETTE A

B/CEILING 8'-2" to 8'-5"

PROVIDE EDGE MATCHED, SEQUENCED SLABS

N

02

XXXX

PROJECT NUMBER

UNITS ℄ XXXX

XX/ XX

[DRAWING TITLE]

ASK-001

N

PROJ MANAGER/ TECH COORD

PH2

PROJECT NUMBER

XXXX

DRAWN BY

XXXX

DATE 1 4"=1'-0" SCALE

W

E

XX/ XX

PROJ MANAGER/ TECH COORD

FULL "SLAB" TILE

[PROJECT TITLE]

XXXX

DRAWN BY

XXXX

MASTER BATH - PALETTE A

02

DATE

1 4"=1'-0" SCALE

2018.

"SLAB" TILE

MASTER SUITE 13'-4" x 12'-6"

DATE

FULL "SLAB" TILE

copyright, GARY LEE PARTNERS, 2018.

LIVING/DINING 16'-5" x 18'-2"

XXXX

FULL "SLAB" TILE

[PROJECT TITLE]

N

[DRAWING TITLE]

ASK-001

S

0'

5'

10'

15'

20'

25'


NO MATTER HOW SMALL: A RETURN TO CHILDHOOD AND THE REIMAGINATION OF CHILD PLAY STRUCTURES GRADUATE THESIS An architectural system of children’s outlets for play and fun, demonstrated through a Chicagobased prototype.

Graduate School Thesis | Professors: Linda Keane, Carl Ray Miller, Tristan Sterk


THE THEORETICAL PROCESS: EARLY DESIGN & ANALYTICAL RESEARCH


TEACHER/PARENT SURVEY REGIONAL PLAYGROUND OPINIONS FROM PARENTS & TEACHERS Excellent 9 8

6.2/10

7 6 5 4

Average ratings parents & teachers give regional playgrounds

3 2

Poor

western

61%

The percentage of playgrounds in Chicago earning central scores consistent with American safety standards

chile

usa

northern

slide

climbing equipment

zip line/ swings

environmental play

other

FAVORITE PLAY EQUIPMENT

europe

asia

oceania

the americas

COUNTRIES/REGIONS WITH HIGHESTRATED PLAYSCAPES


FINAL DESIGN DELIVERABLES


THESIS EXHIBIT:

MAY 12-29, 2018 BLOCK 37 3RD FLOOR, CHICAGO, IL


HOTEL FERNWEH A wanderlust-driven escape to the Swiss Alps, spanning longitudinally across the steep mountains of Sils-Maria.

Graduate School Semester 3 | Professors: Anders Nereim, Carl Ray Miller


CHICAGO TRANSPORT HUB A proposal for an inter-transport hub intended to connect the Metra, the bus, and the community in the South Side of Chicago.

Graduate School Semester 2 | Professor: Neil Frankel

Graduate School Semester 2 | Professor: Neil Frankel


HONG KONG COLUMBARIUM An unconventional proposed solution to Hong Kong’s lack of space for the remains of their departed.

Graduate School Semester 1 | Professor: Ann Lui


M I D T E R M


Turn static files into dynamic content formats.

Create a flipbook
Serio Portfolio 1/2020 Full by Anna Serio - Issuu