Skip to main content

Serio Portfolio 1/2020 Small

Page 1

ANNA SERIO D E S I G N

P O R T F O L I O


HUMANA

PARTNERS IN PRIMARY CARE OVERLAND PARK, KANSAS | IA PROFESSIONAL WORK: INTERIOR ARCHITECTURE COMMERCIAL


KAISER PERMANENTE

HESPERIA, CALIFORNIA | CANNONDESIGN PROFESSIONAL WORK: ARCHITECTURE HEALTHCARE


Con ce p t 1: Con tex tu al , Sop histicate d

THE CHANDLER CONDOMINIUMS

T/WALL 11'-0"

STREETERVILLE, CHICAGO | GARY LEE PARTNERS

1'-0"

EQ. EQ. VERIF. W/ SCHED. PLUMBING

(2) EQ.

1'-6"

EQ-2.3

PF-2

EQ.

1'-6"

MULTI-FAMILY HOUSING EQ-1.2

4

1

(3) EQ.

2'-0"

2'-6"

2'-6"

2 1/2"

2'-6"

4

CABINETRY BY OTHERS. GC/SUB TO INSTALL

2'-0"

35 NORTH ELEVATION @ RESTROOM 016 30 WEST ELEVATION @ RESTROOM 130 25 SOUTH ELEVATION @ RESTROOM 130 20 SOUTH ELEVATION @ GAME ROOM 126

2

30 SOUTH ELEVATION @ PANTRY 131

20 EAST ELEVATION @ PANTRY 131

15 WEST ELEVATION @ EXISTING VESTIBULE 134

T/STRUCTURAL LID 12'-9-1/2"

OPEN TO BEYOND

833 N Orleans Suite 400 Chicago IL 60610, USA 312 640 8300 Fax 640 8301

4

The Chandler Condominiums - Amenities Space

John Joyce Architects

(6) CH-05 (3) T-05

B/CEILING 22'-0"

833 N Orleans Suite 400 Chicago IL 60610, USA

Con ce p t 1: Con tex tu al , Sop histicate d B/CEILING 22'-0"

312 640 8300 Fax 640 8301

ED

9'-0"

T

PROVIDE IN WALL BLOCKING FOR GRAB BARS AS REQ'D. AC-3 PF-1

EQ-2.3

PF-2

EQ.

EQ.

1'-6"

450 E Waterside Drive Chicago IL, 60601

EQ.

4

1

2'-0"

2'-6"

2'-6"

2'-6"

SCHEDULED LIGHT FIXTURE

2

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

SCHEDULED LIGHT FIXTURE

9'-0"

OPEN TO BEYOND

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

2'-0"

29/A8-1

COOR'D/PROVIDE AS REQ'D.

RECESSED LED STRIP LIGHTS AT ALL DIRECTION ON BANQUETTES SHELVES. REFER TOTUFTING LIGHTING SCHEDULE ALIGN AT BASE BUILDING MULLIONS AND DETAILS FOR TO MORE INFO AS NOTED. WD-2 SHELVES AND BACK PANELS

17/A8.1

T ELEVATION @ CORRIDOR 135 1'-5"

EQ.-3.2

GL-1

CL

EQ. A

VIF

OPEN TO BEYOND

1

B/CEILING 11'-0"

04

ISSUE FOR REVISIONS

11 SEPTEMBER 2018

ISSUE FOR CONSTRUCTION

17 AUGUST 2018

ISSUE FOR ADDENDUM 2

17 AUGUST 2018

ISSUE FOR ADDENDUM 1

16 JULY 2018

ISSUE FOR BID AND PERMIT

25 JUNE 2018

Drawing Issue

Date

Project Number

17.057

Proj Manager/ Tech Coord

DC/TS

Drawn By

KM/MP

Scale

3/8"=1'-0"

124

CH-10

FEC

FOCUS ROOM T-13

CH-09

EX2

FE/ FHV

BUILT-IN FB-1

The Chandler Condominiums - Amenities Space

AT 19 February BANQUETTE 2018

WINDOW WALL

EX-1

D102

LOUNGE

D101-A

122

MEETING ROOM 121

FURNITURE NOT IN SCOPE

T-15 (2) CH-11

T-18

D102-A

RESTROOM

SCHEDULED PAINT AND WALL BASE

(5) CH-12

PUMP RM/NIC

R-02

118

JANITOR CLOSET

EX-1

FE/ FHV

016

T-16

CORRIDOR 115

135

EX-1

EX-1 ELEVATOR #6 E-06

ELEVATOR #5 E-05

(4) T-19 (10) CH-13

SCHEDULED WALLCOVERING AT FOCUS ROOMS 123 AND 124

18 EAST ELEVATION @ MULTIPURPOSE ROOM 129

EX-1

LIBRARY

03

-(4) CH-14

2

4

SCHEDULED PAINT AND WALL BASE.

MIN.

2 1

WALL MOUNTED TRACK PROVIDED BY MANUFACTURER TO SUPPORT DOOR SYSTEM

EXISTING CONCRETE SILL AT BASE BUILDING CURTAIN WALL.

FIXED WD-2 PANELS

(5) EQ. PANELS

VIF

GC/SUB TO VERIFY MIN. DIM. REQ'D. BY MANUFACTURER.

123

SCHEDULED PAINT AND WALL BASE

METAL HAND RAIL

12" MIN

QUIRK.

2'-0"

4

4 EQ. A

T/STRUCTURAL LID 12'-9-1/2"

3'-0"

PROVIDE 81"

4

2'-0"

BUILT FB-1 BANQUETTES W/ TUFTING PROVIDE GROMMETS ATIN NOTED ASTO NOTED. INTEGRATED POWER/USB AT LOCATIONS. POWER BE LOCATED IN CABINET BELOW. BASE.

EQ. EQ.

EQ.-3.2

ELEVATOR #4 E-04

9

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF ILLINOIS.

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

SCHEDULED METAL COIL DRAPERY. PROVIDE BLOCKING AS REQ'D. INSTALLATION TO BE STATIONARY WITH DOUBLE FOLD (2X) DRAPE.

27/A5.1

29/A8-1

ALIGN

John Joyce Architects 2101 W Evergreen Ave Storefront Chicago IL 60622, USA 773 772 8612

B/CEILING 11'-0"

TOP OF SHELF TO ALIGN WITH CENTER OF MULLION AS SHOWN.

10/A8.1

FOCUS ROOM C-02

EX-1

T-20

PACKAGE ROOM

SCHEDULED RAMP SHOWN BEYOND.

1

ATM -

EX-1

112

3'-0"

(4) EQ. SHELVES

SCHEDULED WALL PANELS. PROVIDE 41" REVEALS, TYP.

SCHDULE FOR MORE INFO AND NORTH ELEVATION @ MEDIA LOUNGE 125

T/DATUM LINE 11'-0"

3'-0"

B/CEILING 11'-0"

SCHEDULED FIXED DRAPERY AND TRACK AT CEILING. PROVIDE 2X FOLD. FIXED SCHEDULED WOOD PANEL

21/A8.1

EQ. A

312 640 8300 Fax 640 8301

FURNITURE NOT IN GC SCOPE SCHEDULED DRAPERY AND TRACK AT CEILING. PROVIDE 2X FOLD.

ADL DOORS PROVIDED/INSTALLEDT/STRUCTURAL LID 12'-9-1/2" BY MANUF. REFER TO DOOR

T/STRUCTURAL LID 12'-9-1/2"

17/A8.1

ELEVATOR #3 E-03

S-01

Statement of Compliance

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

10/A8.1

5'-5" (4) EQ. SHELVES

T/STRUCTURAL LID 12'-9-1/2" B/CEILING 11'-0"

OPEN TO BEYOND

833 N Orleans Suite 400 Chicago IL 60610, USA

SCHEDULED PAINT AND WALL BASE

VIF

10/A8.1

ALIGN

4

SPECIFIED LIGHT FIXTURE: F-16

SCHEDULED PRIVACY FILM. REFER TO A4-01 FOR MORE INFO.

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

ELEVATOR #2 E-02

EX-1

TV & SOUNDBAR TO BE PURCHASED AND COOR'D WITH OWNER

EQ-2.2 SCHEDULED PAINT AND WALL BASE

ELEVATOR #1 E-01

T-17

(4) CH-07

PROVIDE PLASTER FINISH AT NOTED WALLS TO 11'-0"/ BOTTOM OF BAFFLES

STRUCTURAL LID FOR MAINTENANCE. REFER TO A2-01 FOR MORE INFO/SCOPE. SCHE'D ACOUSTICAL CEILING TO BE SUSPENDED FROM STRUCTURAL CEILING

B/CEILING 22'-0"

EX-1

017

T-12

T-14

SPECIFIED LIGHT FIXTURE: F-5

B/CEILING 11'-0" B/CEILING TILE 10'-6"

OPEN

STORAGE

(3) T-11

(2) CH-08 (2) T-10

05

03

T/STRUCTURAL LID 12'-9-1/2"

B/CEILING 22'-0"

125

126

EX-1

133

FURNITURE NOT IN GC SCOPE

SLIDING DOOR SYSTEM TO BE PROVIDED AND INSTALLED BY MANUF. COOR'D/PROVIDE BLOCKING, ETC. AS REQ'D. REFER TO "ATTACHMENT DOORS" FOR MORE INFORMATION.

13 NORTH ELEVATION @ MEETING ROOM 121

OPEN

B/ACOUSTICAL BAFFLES 11'-0"

ALIGN

SCHEDULED LIGHT FIXTURE

SURFACE/CEILING MOUNTED TRACK FOR SCHED. DRAPERY. PROVIDE BLOCKING AS REQ'D.

10/A8.1

Office 312-729-0901 Fax 312-729-0903

SCHEDULED PAINT AND WALL BASE

INSTALL

2 1/2"

T-09

PANTRY

132

EX-1

ADA LIFT

AC-03

LOUNGE MEDIA

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER (2)STATE T-08OF ILLINOIS. THE LAWS OF THE

EQ-2.4

EQ-1.2

35 NORTH ELEVATION @ RESTROOM 016 30 WEST ELEVATION @ RESTROOM 130 25 SOUTH ELEVATION @ RESTROOM 130 20 SOUTH ELEVATION @ GAME ROOM 126 18 NORTH ELEVATION @ LOUNGE 122

NORTH ELEVATION @ MULTIPURPOSE ROOM 129

AC-02

STORAGE

131

135

GAME ROOM

SUSPENDED FELT BAFFLE SYSTEM

ELEVATOR #7 E-07

B-02

Statement of Compliance

SCHEDULED WALLCOVERING AT FOCUS ROOMS 123 AND 124

SS-1 DOUBLE HEIGHT WALL SCHEDULED EQUIP. W/ CONSTRUCTION TO INTEGRATED PANELS BE COOR'D WITH STRUCTURAL 4 CABINETRY BY ENGINEER/CONSULTANT. 2'-0" OTHERS. GC/SUB TO

PF-4

SCHEDULED PAINT AND WALL BASE.

N.I.C

C-01

130

1

1'-6"

PF-3

THE CHANDLER CONDOMINIUMS

OPEN TO BEYOND

WALL MOUNTED TRACK PROVIDED BY MANUFACTURER TO SUPPORT DOOR SYSTEM

BASE CABINET TO BE REMOVABLE AND/OR ACCESSIBLE PANEL FOR REQ'D ACCESS TO H/C VALVE, DRAIN AND COFFEE VALVE.

1'-8"

3'-3"

2'-10"

1'-6"

2'-2"

CL

SCHEDULED PAINT AND WALL BASE

SCHEDULED PAINT

OPEN OPEN TO TO BEYOND BEYOND

SCHEDULED WALL TILE

10'-0"

2'-0"

EQ.

1'-0"

SCHEDULED PAINT

SCHEDULED WALL SCONCE

312 640 83 Fax 640 83

EX-1

RESTROOM

T-07

2101 W Evergreen Ave Storefront Chicago IL 60622, USA CORRIDOR 773 772 8612

FULL HEIGHT CLEAR MIRROR

OPEN

T-07

John Joyce Architects

SCHEDULED PAINT

3'-0"

3'-6"

PF-4

1'-0"

B/CEILING 11'-0"

2'-10"

PF-15

2'-10"

3"

3'-3"

1'-6"

1'-6"

1'-6 1/16"

9'-0"

1'-6 1/16"

7" 7"

PF-2

PF-4

1'-6"

AC-3 PF-1

12" MIN.

PF-3

8"

PROVIDE IN WALL BLOCKING FOR 36" GRAB BAR.

PF-3

BUILT IN FB-1 BANQUETTES W/ TUFTING AS NOTED. INTEGRATED POWER/USB AT BASE.

CL

B/CEILINGB/CEILING 9'-0" 9'-0"

US

FULL HT. CLEAR MIRROR SCHEDULED WALL SCONCE AC-1 AC-2

3'-1" 12" MIN.

TUFTING DIRECTION ON BANQUETTES TO ALIGN AT BASE BUILDING MULLIONS AS NOTED.

B/CEILING 9'-0"

FULL HEIGHT CLEAR MIRROR SCHEDULED WALL SCONCE

AC-2

NO

9'-0"

AC-1

3'-3" 2'-10"

29/A8-1

B/CEILING 9'-0"

OPEN

(4) CH-02

T-03

19 February 2018

T/STRUCTURAL LID 12'-9-1/2"

29/A8-1

T-04

127

(2) CH-06

2101 W Evergreen Ave Storefront Chicago IL 60622, USA

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF ILLINOIS.

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

10/A8.1

SCHEDULED WALL TILE

9'-8"

SCHEDULED WALL TILE

COFFEE LOUNGE

T-06

R-01

04

B/CEILING 22'-0"

833 N Orlea Chicago IL 60654 USA

T-02

EX-3

FURNITURE NOT IN GC SCOPE SCHEDULED DRAPERY AND TRACK AT CEILING. PROVIDE 2X FOLD.

VIF

05

19 February 2018

Statement of Compliance

NORTH ELEVATION @ MEDIA LOUNGE 125

T/DATUM LINE 11'-0"

EX-1

129

B-01

773 772 8612

SCHEDULED PAINT AND WALL BASE

B/CEILING 22'-0"

(3) CH-01

PARTY/MULTIPURPOSE ROOM

8

TV & SOUNDBAR TO BE PURCHASED AND COOR'D WITH OWNER

EQ-2.2

8

The Chandler Condominiums - Amenities Space

B/CEILING 11'-0" B/CEILING TILE 10'-6"

STRUCTURAL LID FOR MAINTENANCE. REFER TO A2-01 FOR MORE INFO/SCOPE. SCHE'D ACOUSTICAL CEILING TO BE SUSPENDED FROM STRUCTURAL CEILING

B/CEILING 22'-0"

T-01

EX-5 AC-01

(2) CH-06

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

SURFACE/CEILING MOUNTED TRACK FOR SCHED. DRAPERY. PROVIDE BLOCKING AS REQ'D.

T-01

(3) CH-01

(10) CH-04

T-06

05

T-01

T-01

128

WOOD BASE TO MATCH ADJACENT/EXISTING

VERIF. WITH EQUIP.

(2) EQ.

FURNITURE NOT IN GC SCOPE

13 NORTH ELEVATION @ MEETING ROOM 121

COFFEE BAR

T-01

T-01

EX-4

Office 312-729-0901 Fax 312-729-0903

EXISTING WOOD BASE TO REMAIN

Office 312-729-0901 Fax 312-729-0903 EQ-1.3

SCHEDULED PAINT AND WALL BASE

SCHEDULED EQUIP. W/ INTEGRATED PANELS

2'-10"

EQ.

450 E Waterside Drive Chicago IL, 60601

EQ-2.4

SS-1

PF-4

PL-2 BASE CABINET WITH HEIGHT ADJ. SHELVES

B-01

B-01

450 E Waterside Drive Chicago IL, 60601

SS-X COUNTERTOP AND BACKSPLASH

26" 3'-0"

PF-3

BASE CABINET TO BE REMOVABLE AND/OR ACCESSIBLE PANEL FOR REQ'D ACCESS TO H/C VALVE, DRAIN AND COFFEE VALVE.

3'-0"

US

9'-0"

T

3'-3" 1'-6"

2'-2"

OPEN TO BEYOND

SCHEDULED WALL TILE

D101

1'-6"

1'-0"

PROVIDE IN WALL BLOCKING FOR GRAB BARS AS REQ'D. AC-3 PF-1

OPEN TO BEYOND

SCHEDULED PAINT

NO

3'-6"

SCHEDULED PAINT

CL

THE CHANDLER Co nce pt 2: High Co nt ra st , Arch iteCONDOMINIUMS c t ura l

FULL HEIGHT CLEAR MIRROR

SCHEDULED WALL SCONCE

THE CHANDLER CONDOMINIUMS

NEW WOOD DOOR AND FRAME TO MATCH ADJ. WD

5311

1'-6"

1'-6 1/16"

PF-4

2'-8"

PF-15

PF-4

SCHEDULED PAINT

CL

B/CEILINGB/CEILING 9'-0" 9'-0"

26"

3'-3" 2'-10"

1'-6"

12" MIN.

PF-3

PF-2

2'-10"

7" 7" 3"

3'-3"

AC-3 PF-1

VERIF. WITH EQUIP.

PF-3

2'-10"

EQ-1.1

12" MIN.

1'-6"

PROVIDE IN WALL BLOCKING FOR 36" GRAB BAR.

9'-0"

1'-6 1/16"

3'-1"

AC-2

1'-6"

FULL HT.

PL-2 BASE CABINET CLEAR MIRROR SCHEDULED WITH HEIGHT ADJ. WALL SCONCE SHELVES AC-1

8"

3'-0"

EQ-1.1

PROFESSIONAL WORK: ARCHITECTURE + INTERIOR DESIGN

B/CEILING 9'-0"

26"

AC-2

PROVIDE PLASTER FINISH TO MATCH EXISTING

B/CEILING 22'-0"

2'-8"

B/CEILING 9'-0"

ED

SS-X COUNTERTOP SCHEDULED WALL TILE AND BACKSPLASH

9'-8"

SCHEDULED WALL TILE

FULL HEIGHT CLEAR MIRROR SCHEDULED WALL SCONCE

AC-1

EXISTING PLASTER TO REMAIN B/CEILING 8'-6"

B/CEILING 22'-0"

TH ELEVATION @ PANTRY 131

17.035

ELEVATIONS

PROJECT NUMBE

SLIDING DOOR SYSTEM TO BE PROVIDED AND INSTALLED BY MANUF. COOR'D/PROVIDE BLOCKING, ETC. AS REQ'D. REFER TO "ATTACHMENT DOORS" FOR MORE INFORMATION.

NORTH ELEVATION @ MULTIPURPOSE ROOM 129 NORTH ELEVATION @ LIBRARY 120

18 NORTH ELEVATION @ LOUNGE 122

26 EAST ELEVATION @ LIBRARY 120

16 SOUTH ELEVATION @ LIBRARY 120

01

A7-2 03

8 The Chandler Condominiums - Amenities Space

copyright, GARY LEE PARTNERS, 2018.

N.I.C

19 February 2018

B/CEILING 22'-0"

CORRIDOR 115

B/CEILING 22'-0"

EX-5 SCHEDULED PRIVACY FILM. REFER TO A4-01 FOR MORE INFO. STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

10/A8.1

T/STRUCTURAL LID 12'-9-1/2"

T/STRUCTURAL LID 12'-9-1/2" B/CEILING 11'-0"

RECESSED LED STRIP LIGHTS AT ALL SHELVES. REFER TO LIGHTING SCHEDULE AND DETAILS FOR MORE INFO WD-2 SHELVES AND BACK PANELS

17/A8.1

12/A8-1

27/A5.1

OPEN TO BEYOND

EQ. EQ.

PROVIDE 81" QUIRK.

4

1'-5"

4 EQ. A

EQ. A

EQ.-3.2

VIF

GC/SUB TO PROVIDE RECOMMENDATION NORTH ELEVATION @ LIBRARY 120 FOR STAIR BUILD-OUT.

TH ELEVATION @ MULTIPURPOSE ROOM 129

GL-1

CL

EQ. A

VIF

GC/SUB TO VERIFY MIN. DIM. REQ'D. BY MANUFACTURER.

3'-0"

EQ.-3.2

ALIGN

PAINTED CLOSET DOORS. REFER TO DOOR SCHED. FOR MORE INFO.

12" MIN

EQ.- 2.1

26 EAST ELEVATION @ LIBRARY 120

(6) EQ. DOORS

17 AUGUST 2018

ISSUE FOR ADDENDUM 2

17 AUGUST 2018

ISSUE FOR ADDENDUM 1

16 JULY 2018

B/JOIST 12'-0" T/WALL 11'-0"

ISSUE FOR BID AND PERMIT

Date

METAL HAND RAIL

Project Number

17.057

Proj Manager/ Tech Coord

DC/TS

Drawn By

KM/MP

Scale

3/8"=1'-0"

SCHEDULED RAMP SHOWN BEYOND.

ELEVATIONS

ISSUE FOR REVISIONS

copyright, GARY LEE PARTNERS, 2018.

SCHEDULED LIGHT FIXTURE SCHEDULED LIGHT FIXTURE

OPEN TO BEYOND

EQ.- 2.1

01

A7-2 copyright, GARY LEE PARTNERS, 2018.

BUILT-IN FB-1 BANQUETTE AT WINDOW WALL FIXED WD-1 PANELS

(4) EQ.

VIF W/ PLUMB.

PULL-OUT TRASH

11 SEPTEMBER 2018

ISSUE FOR CONSTRUCTION

17 AUGUST 2018

ISSUE FOR ADDENDUM 2

17 AUGUST 2018

ISSUE FOR ADDENDUM 1

16 JULY 2018

ISSUE FOR BID AND PERMIT

25 JUNE 2018

Drawing Issue

Date

Project Number

17.057

Proj Manager/ Tech Coord

DC/TS

Drawn By

KM/MP

Scale

3/8"=1'-0"

T-1 TILE BACKSPLASH. PROVIDE STACKED INSTALLATION SS-1 COUNTERTOP

16 SOUTH ELEVATION @ LIBRARY 120

DRAWN BY

08-30-201 DATE

NTS

THE CHAN CONDOMI

T/WORK SURFACE 12'-9 1/2"

12/A8-1 25 JUNE 2018

Drawing Issue

SCHEDULED WALLCOVERING

OPEN TO BEYOND

1

11 SEPTEMBER 2018

ISSUE FOR CONSTRUCTION

SCHEDULED METAL COIL DRAPERY. PROVIDE BLOCKING AS REQ'D. INSTALLATION TO BE STATIONARY WITH DOUBLE FOLD (2X) DRAPE.

PROJ MANAGER/

M.P.

39/A8-1

ISSUE FOR REVISIONS

2

4

MIN.

1

ALIGN @ 11'-0"

EXISTING CONCRETE SILL AT BASE BUILDING CURTAIN WALL.

FIXED WD-2 PANELS

(5) EQ. PANELS

1

2

XX/A8-1

2'-0"

PROVIDE GROMMETS AT NOTED LOCATIONS. POWER TO BE LOCATED IN CABINET BELOW.

21/A8.1

3'-0"

(4) EQ. SHELVES

SCHEDULED WALL PANELS. PROVIDE 41" REVEALS, TYP.

4

TOP OF SHELF TO ALIGN WITH CENTER OF MULLION AS SHOWN.

5'-5" (4) EQ. SHELVES

SCHEDULED FIXED DRAPERY AND TRACK AT CEILING. PROVIDE 2X FOLD. FIXED SCHEDULED WOOD PANEL

17/A8.1

3'-0"

P:\THE CHANDLER 17.057\Drawings\4 Construction Documents\17.057_A7-2.dwg 9/21/2018 11:54 AM

B/CEILING 11'-0"

2'-0"

B/CEILING 11'-0" ALIGN

SCHEDULED LIGHT FIXTURES AND TRACK SYSTEM. OPEN TO PROVIDE UNISTRUT BEYOND AS REQ'D.

T/STRUCTURAL LID 12'-9-1/2"

D.C./T.S. EX-1

SCALE

EX-1 EX-1

STRUCTURAL LID FOR MAINTENANCE. REFER TO A2-01 FOR MORE INFO/SCOPE.

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

10/A8.1 VIF

STRUCTURAL LID THICKNESS TO BE VERIFIED WITH STRUCTURAL ENGINEER. PROVIDE SOFFIT AT FRONT OF STRUCTURE.

10/A8.1

2'-0"

P:\THE CHANDLER 17.057\Drawings\4 Construction Documents\17.057_A7-2.dwg 9/21/2018 11:54 AM

B/CEILING 22'-0"

B/CEILING 22'-0"

53100

B/CEILING 22'-0"

ADL DOORS PROVIDED/INSTALLED BY MANUF. REFER TO DOOR SCHDULE FOR MORE INFO AND COOR'D/PROVIDE AS REQ'D.

(4) EQ.

FURNITURE NOT IN GC SCOPE

ELEVATIONS

01

A7-1

Floor 1


NORWETA ROW PALETTE “A” - TYPICAL UNIT POWDER RM PALETTE

PROFESSIONAL WORK: INTERIOR DESIGN

OVN/ MICRO

OVN/ MICRO

MASTER BEDROOM 13'-0" x 12'-0"

MASTER BEDROOM 13'-0" x 12'-0"

DW

LIVING 16'-10" x 14'-4"

TRSH

DW

WALK-IN CLOSET

WALK-IN CLOSET

PNTY

MASTER BATH

MASTER BATH

D

LAUNDRY

BEDROOM 2 11'-0" x 11'-5" ENTRANCE

ENTRANCE

UTILITY

FURN

HW

UTILITY

HW

BATH

FURN

BEDROOM 3 11'-2" x 13'-4"

BEDROOM 3 11'-2" x 13'-4"

FLOOR + WALL TILE PALETTE “A” - TYPICAL UNIT MASTER BATH

BATH

WALK-IN CLOSET

WALK-IN CLOSET

MASTER BEDROOM 15'-10" x 13'-6"

W

D

D

LAUNDRY/ UTILITY

BEDROOM 2 10'-0" x 13'-8"

FURN

BEDROOM 2 10'-0" x 13'-8"

HW

OVN/ MICRO

BATH

BATH BEDROOM 3 10'-0" x 13'-8"

BEDROOM 3 10'-0" x 13'-8"

OVN/ MICRO

MASTER BEDROOM 13'-0" x 12'-0"

TRSH

LIVING 16'-10" x 14'-4"

MASTER BEDROOM 13'-0" x 12'-0"

DW

DW

ENTRANCE

KITCHEN 9'-0" x 13'-5"

REF FRZ

REF FRZ

WNE

REF FRZ

TRSH

DW

DW

TRSH

LIVING 24'-0" x 13'-8"

KITCHEN 8'-11" x 13'-0"

OVN/ MICRO

W

MASTER BATH

MASTER BATH

BATH

BATH

W

LAUNDRY

D

ENTRANCE

KITCHEN 8'-11" x 13'-0"

OVN/ MICRO

WNE

PNTY

D

BEDROOM 2 11'-1" x 13'-2"

UTILITY HW

UTILITY

FURN

FURN

HW

WALK-IN CLOSET

BATH OVN/ MICRO

PNTY

ENTRANCE

REF FRZ

FURN

KITCHEN 9'-0" x 14'-0"

REF FRZ

ENTRANCE

PNTY

W

DW

D

OVN/ MICRO

FURN

LAUNDRY/ UTILITY

ENTRANCE

W

DW

TRSH

BVG

PNTY

LAUNDRY/ UTILITY

HW

BATH

BEDROOM 3 11'-5" x 11'-2"

PNTY

KITCHEN 8'-10" x 14'-0"

HW

REF FRZ

DW

TRSH

D

ENTRANCE

ENTRANCE

BATH

UTILITY

FURN

W

LAUNDRY

D

MASTER BATH

D

BATH

LAUNDRY/ UTILITY

BATH

MASTER BATH

BEDROOM 2 11'-5" x 11'-0"

KITCHEN 8'-11" x 13'-0"

OVN/ MICRO

FURN

MASTER BATH

LIVING 16'-0" x 34'-9"

WALK-IN CLOSET

D

XX/ XX

PROJ MANAGER/ TECH COORD

W

DRAWN BY

WALK-IN CLOSET LIVING 14'-0" x 26'-0"

WALK-IN CLOSET

REF FRZ

KITCHEN 9'-0" x 16'-9"

MASTER BEDROOM 13'-0" x 12'-0"

VANITY STONE COUNTERTOP Morning Frost 2cm

DATE

XXXX

DW

MASTER BEDROOM 13'-0" x 12'-0"

FLOOR + WALL TILE Premium White 30” x 60” XXXX

WALK-IN CLOSET

BEDROOM 2 11'-3" x 11'-0"

BEDROOM 3 11'-11" x 11'-9"

BEDROOM 2 12'-0" x 11'-0"

SCALE

MASTER BEDROOM 13'-0" x 12'-0"

LIVING 24'-0" x 13'-8"

TRSH

OVN/ MICRO

OVN/ MICRO

NORWETA

RENTALS FIRST FLOOR

WOOD FLOOR Nautilus

copyright, GARY LEE PARTNERS, 2018.

LIVING 24'-0" x 13'-8"

FLOOR + WALL TILE Premium White 30” x 60”

BVG

BATH WALK-IN CLOSET

DW

REF FRZ

TRSH

BEDROOM 3 12'-4" x 14'-3"

REF FRZ

KITCHEN 26'-6" x 11'-4"

WALK-IN CLOSET

OVN

BATH

ENTRANCE

BATH

WALK-IN CLOSET

D

LAUNDRY/ UTILITY

HW

BATH WALK-IN CLOSET

W

FURN

BEDROOM 4 15'-5" x 11'-8"

BEDROOM 2 15'-5" x 11'-8"

EQ

VANITY STONE COUNTERTOP

ALTERNATE

SCHEDULED QUARTZ BACKSPLASH

3'-0"

WALK-IN CLOSET

WALK-IN CLOSET

WALK-IN CLOSET MASTER BATH

W

D

D

W

LAUNDRY/ UTILITY

LAUNDRY/ UTILITY

FURN

HW

FURN

BATH

MASTER BEDROOM 13'-0" x 12'-0"

TRSH

MASTER BEDROOM 13'-0" x 12'-0"

DW

LIVING 16'-10" x 14'-4"

LIVING 16'-10" x 14'-4"

DW

REF FRZ

WNE

PNTY

MASTER BATH

W

PALETTE “A” - TYPICAL UNIT SECONDARY BATH

WALK-IN CLOSET

PNTY

LAUNDRY

KITCHEN 9'-0" x 13'-5"

REF FRZ

REF FRZ

WALK-IN CLOSET

WNE

PNTY

MASTER BATH

WNE

W

D

HW

FLOOR + WALL TILE Bianco Alanur 12” x 24”

WALK-IN CLOSET

OVN/ MICRO

PNTY

ENTRANCE

FURN

KITCHEN 9'-0" x 14'-0"

REF FRZ

ENTRANCE

BATH

PNTY

OVN/ MICRO

FURN

ENTRANCE

PNTY

UTILITY

HW

LAUNDRY/ UTILITY

W

DW

TRSH

BVG

REF FRZ

DW

BEDROOM 3 11'-5" x 11'-2"

PNTY

KITCHEN 8'-10" x 14'-0"

HW

REF FRZ

DW

TRSH

D

ENTRANCE

BATH

BATH FURN

BATH

ENTRANCE

BVG

HW

UTILITY BEDROOM 3 11'-0" x 11'-6"

HW

FURN

HW

BEDROOM 2 11'-5" x 11'-0"

TRSH

W OVN/ MICRO

KITCHEN 8'-11" x 13'-0"

FURN

BATH

MASTER BATH

BATH

LAUNDRY/ UTILITY

D

MASTER BATH

MASTER BATH

LAUNDRY BATH

BVG

WALK-IN CLOSET

MASTER BATH

WALK-IN CLOSET

MASTER BATH

LIVING 16'-0" x 34'-9"

PNTY

WALK-IN CLOSET

WALK-IN CLOSET

BEDROOM 2 11'-3" x 11'-0"

MASTER BEDROOM 13'-0" x 12'-0"

XX/ XX

PROJ MANAGER/ TECH COORD KITCHEN 9'-0" x 16'-9"

REF FRZ

XXXX

DW

BEDROOM 2 12'-0" x 11'-0"

MASTER BEDROOM 13'-0" x 12'-0"

PROJECT NUMBER

BVG

WALK-IN CLOSET

WALK-IN CLOSET

BEDROOM 2 11'-3" x 11'-0"

BEDROOM 3 11'-11" x 11'-9"

TRSH

LIVING 14'-0" x 26'-0"

XXXX

W

PNTY

WALK-IN CLOSET

LIVING 14'-0" x 26'-0"

WALK-IN CLOSET

REF FRZ

D

MASTER BEDROOM 13'-10" x 12'-0"

MASTER BEDROOM 13'-0" x 12'-0"

MASTER BEDROOM 13'-0" x 12'-0"

LIVING 24'-0" x 13'-8"

XXXX

DATE

XXXX

OVN/ MICRO

SCALE

NORWETA RENTALS FIRST FLOOR

UNIT:

MASTER BEDROOM 13'-6" x 14'-0"

360 W Superior St Chicago IL 60654 USA

WET BAR

OWNER NAME:

BVG

BATH WALK-IN CLOSET

REF FRZ

TRSH

DW

BEDROOM 3 12'-4" x 14'-3"

REF FRZ

KITCHEN 26'-6" x 11'-4"

BATH

BATH

ENTRANCE

W

LAUNDRY/ UTILITY

WALK-IN CLOSET

FURN

WALK-IN CLOSET

MASTER BATH

W

BEDROOM 2 10'-0" x 13'-8"

D

D

FURN

BATH

BEDROOM 2 10'-0" x 13'-8"

HW

OVN/ MICRO

BATH BEDROOM 3 10'-0" x 13'-8"

KITCHEN COUNTERTOP + FULL HEIGHT BACKSPLASH NORWETA ROW UNIT FINISH PALETTE Calacatta Halo OVN/ MICRO

MASTER BEDROOM 13'-0" x 12'-0"

TRSH

LIVING 16'-10" x 14'-4"

MASTER BEDROOM 13'-0" x 12'-0"

DW

REF FRZ

REF FRZ

TRSH

KITCHEN 9'-0" x 13'-5"

REF FRZ

PROVIDE℄EDGE MATCHED, TILE/TUB SEQUENCED SLABS

LIVING 24'-0" x 13'-8"

OVN/ MICRO

LAUNDRY

FULL "SLAB" TILE

03

ENTRANCE

03

℄ TILE/TUB

MASTER BATH - PALETTE A

FURN

HW

WALK-IN CLOSET

REF FRZ

BVG

HW

KITCHEN 9'-0" x 14'-0" TRSH

HW

DW

REF FRZ

FURN

LAUNDRY/ UTILITY

PNTY

PNTY

FURN

ENTRANCE

W

W

DW

D

LAUNDRY/ UTILITY

D

HW

OVN/ MICRO

BEDROOM 3 11'-5" x 11'-2"

PNTY

KITCHEN 8'-10" x 14'-0" TRSH

DW

REF FRZ

ENTRANCE

ENTRANCE

BVG

BATH

BATH

FURN

UTILITY FURN

WALK-IN CLOSET

HW

W

WALK-IN CLOSET

TRSH

BATH

LAUNDRY/ UTILITY

OVN/ MICRO

D

KITCHEN 8'-11" x 13'-0"

FURN

MASTER BATH

HW

BEDROOM 2 11'-5" x 11'-0"

MASTER BATH

BVG

BATH

BATH

MASTER BATH

BATH

MASTER BATH

LAUNDRY

LAUNDRY PNTY

LIVING 16'-0" x 34'-9"

WALK-IN CLOSET

WALK-IN CLOSET

REF FRZ

LIVING 14'-0" x 26'-0" BEDROOM 2 11'-3" x 11'-0"

OVN/ MICRO

MASTER BEDROOM 13'-0" x 12'-0"

WALK-IN CLOSET

WALK-IN CLOSET

BEDROOM 2 12'-0" x 11'-0"

LIVING 14'-0" x 26'-0"

WALK-IN CLOSET

BEDROOM 2 11'-3" x 11'-0"

BEDROOM 3 11'-11" x 11'-9"

DW

MASTER BEDROOM 13'-0" x 12'-0"

XX/ XX

℄

LIVING/DINING 16'-5" x 18'-2"

XXXX

MASTER SUITE 13'-4" x 12'-6"

DATE

1 4"=1'-0" SCALE

B/CEILING 8'-2" to 8'-5"

[PROJECT TITLE]

MASTER BATH - PALETTE A

B/CEILING 8'-2" to 8'-5"

PROVIDE EDGE MATCHED, SEQUENCED SLABS

UTILITY

FURN

ENTRANCE

UTILITY

PROJECT NUMBER

DRAWN BY

PROVIDE EDGE MATCHED, SEQUENCED SLABS

copyright, GARY LEE PARTNERS, 2018.

BATH

BATH

UTILITY HW

OVN/ MICRO

PNTY

MASTER BATH

XXXX

MASTER BATH - PALETTE A

XXXX

FULL "SLAB" TILE

BEDROOM 2 11'-1" x 13'-2"

KITCHEN 8'-11" x 13'-0"

BATH

BEDROOM 3 11'-0" x 11'-6"

PROVIDE EDGE MATCHED, SEQUENCED SLABS

N

02

XXXX

PROJECT NUMBER

UNITS

XX/ XX

UNIT: WALK-IN CLOSET

W/D

PNTY

XXXX

REF FRZ

MASTER BEDROOM 13'-0" x 12'-0"

TRSH

MASTER BEDROOM 13'-0" x 12'-0"

XX/ XX

PROJ MANAGER/ TECH COORD

LIVING 24'-0" x 13'-8"

OWNER NAME: OVN/ MICRO

Premium White 1” x 4” Stacked Mosaic PROJECT NUMBER

KITCHEN 9'-0" x 16'-9" DW

MASTER BEDROOM 13'-10" x 12'-0"

SHOWER FLOOR TILE VANITY CABINET - MATTE LACQUER SHOWER FLOOR TILEPremium White VANITY CABINET - MATTE LACQUER Nimbus NimbusCABINET - MATTE LACQUER SHOWER Premium FLOOR White TILE ℄ 1” x 4” StackedVANITY Mosaic 1” x 4” Stacked Mosaic XXXX

Nimbus

XXXX

DATE

XXXX

SCALE

XXXX

ASK-001

N

XXXX

DRAWN BY

XXXX

DATE 1 4"=1'-0" SCALE

W

E

XX/ XX

PROJ MANAGER/ TECH COORD

FULL "SLAB" TILE

[PROJECT TITLE]

XXXX

DRAWN BY

XXXX

02

DATE

1 4"=1'-0" SCALE

copyright, GARY LEE PARTNERS, 2018.

FULL "SLAB" TILE

PH2

PROJECT NUMBER

MASTER BATH - PALETTE A

DRAWN BY

NORWETA

℄

[DRAWING TITLE]

PROJ MANAGER/ TECH COORD

W/D

BATH

ENTRANCE

CUSTOM WALK-IN CLOSET

SCHEDULED BASE

MASTER BATH

BEDROOM 2 11'-1" x 13'-2"

TRSH

OVN/ MICRO

MASTER BATH

360 W Superior St Chicago IL B/CEILING 60610 USA 8'-2" to 8'-5"

PNTY

MASTER BATH

LIVING 24'-0" x 13'-8"

ENTRANCE

KITCHEN 15'-11" x 8'-9"

12'-0" x 33'-0"

PROJ MANAGER/ TECH COORD

DW

KITCHEN 8'-11" x 13'-0"

360 W Superior St PRIVATE Chicago IL 60610 USA TERRACE 312 640 8300 Fax 640 8301

KITCHEN 9'-0" x 13'-5"

REF FRZ

LAUNDRY

PNTY

DW

PROVIDE EDGE MATCHED, SEQUENCED

MASTER BATH -SLABS PALETTE A

WALK-IN CLOSET

WALK-IN CLOSET

WNE

W/D PNTY

TRSH

TRSH

B/CEILING 8'-2" to 8'-5"

312 640 8300 Fax 640 8301

POWDER ROOM

09 AUGUST 2018

DW

LIVING 16'-10" x 14'-4"

ENTRANCE

ENTRANCE

LIVING 24'-0" x 13'-8"

EQ

SCHEDULED BASE

℄ UNIT FINISH PALETTE NORWETA ROW TILE/TUB 09 AUGUST 2018

W

LAUNDRY/ UTILITY

FURN

HW

KITCHEN 16'-9" x 9'-0"

W

D

FULL "SLAB" TILE

BEDROOM 3 10'-0" x 13'-8"

WNE

20'BEDROOM 25' 12'-1" x 10'-8"

MASTER BEDROOM 13'-0" x 16'-0"

MASTER BATH

LAUNDRY/ UTILITY

W/D

SCHEDULED QUARTZ SHELF AND APRON, ALL OUTSIDE CORNERS TO BE MITERED, TYP.

WALK-IN CLOSET

WALK-IN CLOSET

WALK-IN CLOSET

SCHEDULED QUARTZ SHELF AND APRON, ALL OUTSIDE CORNERS TO BE MITERED, TYP.

POWDER ROOM

BEDROOM 4 15'-5" x 11'-8"

BEDROOM 2 15'-5" x 11'-8"

MASTER BEDROOM 13'-0" x 16'-0"

15'

312 640 8300 Fax 640 8301

S

8'-2" to 8'-5"

SCHEDULED QUARTZ COUNTER (22"D) AND APRON, ALL OUTSIDE CORNERS TO BE MITERED, TYP.

SIGNATURE:

SIGNATURE:

BATH

WALK-IN CLOSET

D

SCHEDULED QUARTZ BACKSPLASH

SCHEDULED QUARTZ COUNTER (22"D) AND APRON, ALL OUTSIDE CORNERS TO BE MITERED, TYP.

OWNER NAME:

312 640 8300 Fax 640 8301

WALK-IN CLOSET

OVN

GEM JUNCTION BOX BEHIND MIRROR

VANITY STONE COUNTERTOP Archer Gray ℄ 2cm

UNIT:

ASK-001

VANITY CABINET - MATTE LACQUER BACKSPLASH

VANITYWhite STONE COUNTERTOP ℄ Bianco Alanur 2cm FULL HEIGHT CLEAR MIRROR

CERAMIC WALL TILE Ice White 4” x 12”

DRAWN BY

TRSH

FLOOR TILE Smoky Gray Pennyround

7'-6"

FURN

BATH

7" 7"

FURN

ENTRANCE

HW

℄ & FIXTURES

03 B/CEILING

3"

HW

UTILITY

3'-0"

BATH

8"

BEDROOM 2 11'-1" x 13'-2"

BATH

ENTRANCE

UTILITY

KITCHEN 8'-11" x 13'-0"

7" 7"

OVN/ MICRO

3"

OVN/ MICRO

7'-6"

BEDROOM 2 11'-1" x 13'-2"

TRSH

KITCHEN 8'-11" x 13'-0"

BEDROOM 2 11'-2" x 13'-4"

℄ FULL HEIGHT CLEAR TILE & FIXTURES MIRROR

D

3'-0"

DW

MASTER BATH

360 W Superior St Chicago IL 60610 USA

10'

FULL "SLAB" TILE

POWDER ROOM EQ EQ SCHEDULED QUARTZ

LAUNDRY

DW

LIVING 24'-0" x 13'-8"

DW

5'

TRSH

KITCHEN 9'-0" x 13'-5"

ENTRANCE

REF FRZ

PNTY

LIVING 24'-0" x 13'-8"

E

SCHEDULED BASE

TRSH

BVG

0'

BATH

ENTRANCE

KITCHEN 16'-9" x 9'-0"

W

GEM JUNCTION BOX BEHIND MIRROR

OVN/ MICRO

OVN/ MICRO

LIVING 24'-0" x 13'-8"

WALK-IN CLOSET

PROVIDE EDGE MATCHED, SEQUENCED SLABS

BEDROOM 2 10'-0" x 13'-8"

BEDROOM 3 10'-0" x 13'-8"

BATH

BEDROOM 2 11'-2" x 13'-4"

SCHEDULED QUARTZ TILE SHELF AND APRON, ALL OUTSIDE CORNERS TO BE MITERED, TYP. EQ

HW

BATH

BEDROOM 3 10'-0" x 13'-8"

WNE

SCHEDULED QUARTZ COUNTER (22"D) AND APRON, ALL OUTSIDE CORNERS TO BE MITERED, TYP.

4'-6"

BEDROOM 2 10'-0" x 13'-8"

MASTER BEDROOM 13'-0" x 16'-0"

MASTER BATH

℄

8"

MASTER BEDROOM 13'-0" x 16'-0"

B/CEILING 8'-2" to 8'-5"

N

FULL HEIGHT CLEAR MIRROR

405

2cm

EQ

GEM JUNCTION BOX BEHIND MIRROR

UNITS

PALETTE “A” - TYPICALMorning UNITFrost MASTER BATH

312 640 8300 Fax 640 8301

WET BAR

CABINET WOOD VENEER Silver Oak

℄ TILE & FIXTURES

8"

RTNERS, 2018.

ASK-001

360 W Superior St Chicago IL 60654 USA

MASTER BEDROOM 13'-6" x 14'-0"

MASTER BATH

BATH

XXXX

BVG

PNTY

WALK-IN CLOSET

BEDROOM 2 11'-3" x 11'-0"

MASTER BEDROOM 13'-0" x 12'-0"

MASTER BEDROOM 13'-0" x 12'-0"

MASTER BATH

MASTER BATH

LIVING 14'-0" x 26'-0"

WALK-IN CLOSET

REF FRZ

KITCHEN 16'-9" x 9'-0"

DW

PROJECT NUMBER

LAUNDRY BATH

BVG

WALK-IN CLOSET

PNTY

TRSH

LIVING 24'-0" x 13'-8"

XXXX

FURN

HW TRSH

W

BEDROOM 12'-1" x 11'-5"

HW

UTILITY

BVG

PALETTE “A” - TYPICAL UNIT MASTER BATH

BATH

BVG

HW

BEDROOM 3 11'-0" x 11'-6"

CUSTOM WALK-IN CLOSET

UNIT KITCHENStormy Sky

BEDROOM 2 11'-1" x 13'-2"

ENTRANCE

WALK-IN CLOSET

MASTER BATH

STONE VANITY

KITCHEN 9'-0" x 13'-5"

WALK-IN CLOSET

PNTY

WNE

PNTY

REF FRZ

WALK-IN CLOSET

LAUNDRY

BEDROOM 2 11'-2" x 13'-4"

VANITY STONE COUNTERTOP Morning Frost 2cm

TRSH

WOOD FLOOR Nautilus“A” - TYPICAL PALETTE

ENTRANCE

PNTY

LIVING 24'-0" x 13'-8"

LIVING 16'-10" x 14'-4"

MASTER SUITE 14'-2" x 13'-4"

LIVING/DINING 16'-3" x 13'-4"

BATH

BATH

WNE

VANITY STONE COUNTERTOP Archer Gray 2cm

CERAMIC WALL TILE Ice White 4” x 12”

Premium White 30” x 60”

W

LAUNDRY/ UTILITY

FURN

HW

MASTER BEDROOM 15'-10" x 13'-6"

MASTER BATH

MASTER BATH

KITCHEN 9'-0" x 11'-4"

4'-6"

BATH

312 640 8300 Fax 640 8301

MULTI-FAMILY HOUSING

W

LAUNDRY

BEDROOM 2 11'-0" x 11'-5"

PR

4'-6"

D

BVG

7" 7"

W

KITCHEN 13'-5" x 9'-0"

REF FRZ

REF FRZ

PNTY

BVG

3"

KITCHEN 13'-5" x 9'-0"

BATH

360 W Superior St Chicago IL 60654 USA

7'-6"

TRSH

W/D

BEDROOM 10'-10" x 11'-10"

PALETTE “A” - TYPICAL UNIT SECONDARY BATH

LINCOLN PARK, CHICAGO | GARY LEE PARTNERS LIVING 16'-10" x 14'-4"

CUSTOM WALK-IN CLOSET

“A” - TYPICAL UNIT MASTER BATH

[PROJECT TITLE]

N

[DRAWING TITLE]

ASK-001

S

0'

5'

10'

15'

20'

25'


NO MATTER HOW SMALL: A RETURN TO CHILDHOOD AND THE REIMAGINATION OF CHILD PLAY STRUCTURES GRADUATE THESIS An architectural system of children’s outlets for play and fun, demonstrated through a Chicagobased prototype.


TEACHER/PARENT SURVEY REGIONAL PLAYGROUND OPINIONS FROM PARENTS & TEACHERS Excellent 9 8

6.2/10

7 6 5 4

Average ratings parents & teachers give regional playgrounds

3 2

Poor

western

61%

The percentage of playgrounds in Chicago earning central scores consistent with American safety standards

chile

usa

northern

slide

THE THEORETICAL PROCESS: EARLY DESIGN & ANALYTICAL RESEARCH

climbing equipment

zip line/ swings

environmental play

other

FAVORITE PLAY EQUIPMENT

europe

asia

oceania

the americas

COUNTRIES/REGIONS WITH HIGHESTRATED PLAYSCAPES


FINAL DESIGN DELIVERABLES


THESIS EXHIBIT:

MAY 12-29, 2018 BLOCK 37 3RD FLOOR, CHICAGO, IL


HOTEL FERNWEH A wanderlust-driven escape to the Swiss Alps, spanning longitudinally across the steep mountains of Sils-Maria.


Turn static files into dynamic content formats.

Create a flipbook
Serio Portfolio 1/2020 Small by Anna Serio - Issuu