Skip to main content

Urban Planning/Design portfolio

Page 1

Urban Planning + Sustainability portfolio

A compilation of select works from 2016 - present

Ankita Nalavade 2019937208 ankita.a.nalavade@gmail.com 1


Summary

I have graduated with Masters of Sustainable Environmental Systems from Pratt Institute in Brooklyn, New York and have a background in architecture. My resume is a combination of strong design background and understanding of sustainable urban systems

Education

Pratt Institute, New York Master of Science (MS), Sustainable Environmental Systems Aug 2016 – May 2018 -Climate change and Cities -Environmental Law - NEPA, CEQRA, ULURP -Environmental Economics - Cost Benefit Analysis -Sustainable and Resiliency Planning -Science of Sustainability -Community Engagement

Kamla Raheja Institute of Architecture, Mumbai Bachelor of Architecture (B.Arch.) Aug 2009 - Aug 2014 -Architectural Design and Urban Planning - Construction Drawings - HVAC, Electrical and Structural

Skills

3d Modeling/Rendering Sketch up, Revit, Rhino, Vray, Lumion Graphics In Design, Photoshop, Illustrator Drafting Auto Cad

2

Mapping Arc GIS, Carto, Q - GIS

Work Experience

Waterfront Alliance New York City Waterfront Edge Design Intern June 2018 – Present Billie Cohen Landscape Design Studio, New York City Landscape Designer June 2018 – Present

Gowanus Canal Conservancy (GCC), New York City Green Infrastructure Fellow Dec 2017 – June 2018

New York City Department of Parks and Recreation, New York City Urban Ecology Intern May 2017 - July 2017

NYC - Environmental Justice Alliance for El Puente, New York City Urban Planning Fellow Jan 2017 - Dec 2017

Water Environs Mumbai, India Urban Sustainability Intern April 2016 – June 2016

Sanjay Puri Architects Mumbai, India Junior Architect Jan 2015 - March 2016

Ind + Architects Mumbai, India Junior Architect


Contents

ANALYSIS REPORT WRITING OUTREACH DESIGN

3

Analysis and Reports Bronx River - Water Quality Analysis Fort Greene Park - Solid Waste Analysis Global - Urban Water Infrastructure

5 6 7

Analysis, Report and Community Outreach Network for Urban Field Stations in the City of New York Air Quality in Parks, South Williamsburg SIMIC Green Infrastructure Curriculum

9 10 11 12

Design(Landscape and Urban Planning) Douglaston Playground Linden Residency Archer Green ULI Hines - Clybourn waterfront, Chicago. Green Infrastructure for Brooklyn Public Library River Revitalization, Mumbai, India

14 15 16 17 18 19


ANALYSIS + REPORT

4


7.987.99

Bronx River Water Quality Analysis

Internship project May - July 2017 NYC Department of Parks and Recreation Bronx River Alliance

Project Context: Bronx River Alliance is beneficiary of NYCDPR (New York City Department of parks and recreation). Aim of this organization is to improve and restore the Bronx River corridor so that it can be a healthy ecological, recreational, educational and economic resource for the communities through which the river flows. BxRA maintains a water database, where results of water testing are showcased.

5.79

Water_Sampling_points River_Mile 0.000000 - 1.050000 Images of-the sampling locations. 1.050001 5.790000

5.790001 - 11.080000 11.080001 - 17.150000

Task: Conducting water quality lab tests, Analysis of the water quality data Visualization of the water quality data. Skills: Water quality lab testing Analysis - Microsoft Excel and Arc GIS Info graphics - Arc Map, Photoshop, InDesign

17.150001 - 23.410000

2.96

Bronx_River_CSO

LOCATION 2.1

1.05

0.11

5

Water sampling spots and CSO locations of Bronx river.

0

0.5

Miles 1

´


Fort Greene Park Solid Waste Analysis

Graduate project May - July 2017 NYC Department of Parks and Recreation Bronx River Alliance

Project Context: Parks are unique entities; they do not generate waste (except yard waste), but are responsible for the waste generated by their patrons. In this report we study and analyze a non-traditional source of waste and suggest systems that are capable of reducing waste. Task: Collecting waste stream samples, Analysis of the type of waste Create a list of recommendations . Skills: Analysis - Microsoft Excel Info graphics - Hand Drawings, Microsoft word, and Photoshop

6


Urban Water Infrastructure United Nations SDGs Project Pitch August 2017 UNLEASH lab, Copenhagen

Project Context: UNLEASH LAB was conducted in Copenhagen,Denmark. It is an innovative lab where 1,000 SDG Talents from 129 countries gathered in month of August 2017 to work on solutions to the Sustainable Development Goals. It’s been an credible journey to work with talents from different cultural and professional background. Task: Collaborated with financial analyst, infrastructure asset manager, sustainable energy technology engineer and a water policy specialist. Research about water scarcity in developing urban areas (pilot project: Johannesburg, South africa and Mumbai, India.Water scarcity will increasingly threaten urban productivity and well-being as a result of climate change and migration to cities. Skills: Research Photoshop, InDesign

7


ANALYSIS + REPORT + COMMUNITY OUTREACH

8


䈀刀伀一堀 刀䤀嘀䔀刀 䄀䰀䰀䤀䄀一䌀䔀

吀䠀䔀 匀䌀䤀䔀一䌀䔀 䈀䄀刀䜀䔀

䔀砀椀猀琀椀渀最 一攀琀眀漀爀欀 䈀攀琀眀攀攀渀 唀爀戀愀渀 䘀椀攀氀搀 匀琀愀琀椀漀渀猀

Graduate Capstone project Dec 2017 - Ongoing Pratt Institute

9

䴀椀挀爀漀 漀爀最愀渀椀猀洀

㄀

吀爀攀攀猀

㄀

䴀愀爀猀栀

㄀

漀渀渀 攀挀琀椀 漀渀

㄀

攀爀 挀

圀愀琀攀爀

匀圀䄀䰀䔀

椀猀洀

愀渀

最  漀爀 挀爀漀 洀椀 搀礀 猀琀甀

猀甀瀀 瀀 愀眀愀 漀爀琀 瀀甀 昀漀漀 爀攀渀攀猀猀 戀氀椀挀  搀  漀昀  挀氀攀愀 渀

一伀刀吀䠀䔀刀一 刀䔀匀䔀䄀刀䌀䠀  匀吀䄀吀䤀伀一

䔀䐀唀䌀䄀吀䤀伀一 䌀䔀一吀䔀刀

䤀渀瘀椀琀攀搀 昀漀爀  愀渀 攀瘀攀渀琀

䠀䄀刀䈀伀刀 匀䌀䠀伀伀䰀

䰀愀戀 猀瀀愀挀攀

漀昀

挀攀 愀渀 氀攀瘀 爀欀  爀攀 瀀愀 椀愀氀 椀氀氀猀  挀 猀漀 猀栀欀 昀爀攀

猀

Skills: Power point presentation, Photoshop, InDesign, Website design, Event brite invitations, Arc Map, Auto Cad, Community Outreach

㘀

一䔀圀 䨀䔀刀匀䔀夀

攀渀

Task: Conducting research and interviews Understanding nature of the network

䰀愀渀搀昀椀氀氀

椀洀

Outcome: The project is in the implementation phase. A meeting is organized to understand feasibility of the network.

㄀

攀挀

Goal of the project: The Goal of this project is to create a network of field stations and labs such that they serve dual purpose of creating urban ecosystem awareness and accumulating data sets that function as urban ecology indicators for the City of New York.

㈀

唀爀戀愀渀 䘀愀爀洀猀

䈀䤀伀䈀唀匀

吀䠀䔀 刀䤀嘀䔀刀 倀刀伀䨀䔀䌀吀 ⴀ  圀䔀吀 䰀䄀䈀

猀瀀

Project Context: How do we pave our path from ecologically unaware to ecologically aware citizens and create urban ecology indicators that inform our progress.

䄀氀琀攀爀渀愀琀攀 䰀漀挀愀琀椀漀渀 漀昀 唀爀戀愀渀  昀椀攀氀搀 猀琀愀琀椀漀渀

䠀甀搀 猀漀渀  爀椀瘀

Network for Urban Field Stations

㔀

圀愀 洀漀 琀攀爀  渀椀琀 儀甀 漀爀 愀氀椀 椀渀最 琀礀

㄀㌀

夀伀一䬀䔀刀匀

䰀漀挀愀琀椀漀渀 漀昀 唀爀戀愀渀 䘀椀攀氀搀 猀琀愀琀椀漀渀

䈀刀伀伀䬀䰀夀一 䈀伀吀䄀一䤀䌀  䜀䄀刀䐀䔀一

倀伀刀吀匀䤀䐀䔀 一䔀圀 夀伀刀䬀

䌀漀洀洀甀渀椀琀礀

䜀

甀搀

琀 爀 猀

琀攀

礀猀

伀

礀

漀

砀瀀

猀 䔀

渀甀

愀 漀眀

䨀䄀䴀䤀䄀䌀䄀 䈀䄀夀 匀䌀䤀䔀一䌀䔀 䄀一䐀  刀䔀匀䤀䰀䤀䔀一䌀䔀 䤀一匀吀䤀吀唀吀䔀

䘀刀䔀匀䠀䬀䤀䰀䰀䄀 䄀䰀䰀䤀䄀一䌀䔀 ⴀ  䴀伀䈀䤀䰀䔀 匀䌀䤀䔀一䌀䔀 䰀䄀䈀 䜀伀圀䄀一唀匀 䌀䄀一䄀䰀  䌀伀一匀䔀刀嘀䄀一䌀夀

唀刀䈀䄀一 䘀䤀䔀䰀䐀  匀吀䄀吀䤀伀一匀  匀吀唀䐀夀䤀一䜀  圀䄀吀䔀刀 䈀伀䐀䤀䔀匀

䰀伀一䜀 䤀匀䰀䄀一䐀


Air Quality in Parks, South Williamsbur

Fellowship project Jan - December 2017 El Puente and NYC Environmental Justice Alliance

Project Context: The report provides an analysis and evaluation of air quality in parks in Southside Williamsburg. The study area includes La Guardia Park, Jaime Champiz Park, Rodney Park and Marcy Green Park. The method of investigation included air monitoring, truck counts and park user survey. The information was collected by youth data collectors and mother volunteers.The study revealed some striking trends and facts. In terms of air quality, all parks indicated readings above standard EPA recommendations of PM 2.5. Task: Guiding community members for collecting air quality data, Conducting surveys, Analyzing data and putting together a report. Skills: Research, Community outreach, presentations, Analyzing data in Microsoft excel, creating info-graphics using Photoshop, InDesign and Illustrator.

10


吀礀瀀椀挀愀氀 匀椀琀甀愀琀椀漀渀 椀渀 匀琀愀琀攀渀 䤀猀氀愀渀搀 匀䴀䤀䄀㨀 嘀椀攀眀猀 眀栀椀氀攀 眀愀氀欀椀渀最 琀栀爀漀甀最栀 刀椀挀栀洀漀渀搀 吀攀爀爀愀挀攀

SIMIC

Staten Island Maritime Industry Coalition Resiliency Studio, Pratt Institute

Project Context: The SMIA of Staten Island have most of the industries that look outwards towards the water and have no interaction with the community in which they are located. Industries have tall fences that create a barrie.The entire Staten Island SMIA is in the 100-year flood zone. All industries located in SMIA are vulnerable to flooding and sea level rise due to climate change. These industries are extremely important for smooth functioning of the New York City. Yet, they not only lack sustainability agenda but also do not have any formal protocol in case of emergency. The first step towards achieving resiliency is creating consenses amongst multiple stake holders. the project proposes an entity called SIMIC that will spearhead the coalition of industrires working in SMIA zones. Skills: Research regarding resiliency projects, Compiling a report

11

挀

甀爀椀

匀攀

䌀 琀礀

攀 愀洀

倀爀椀瘀愀琀攀 倀爀漀瀀攀爀琀礀

猀漀甀爀挀攀㨀  䘀䔀䴀䄀✀猀 倀爀攀氀椀洀椀渀愀爀礀 圀漀爀欀 䴀愀瀀 搀愀琀愀

Existing conditions in Staten Island SMIA (Significant Maritime Industrial Area).

Legend NJ_boundry Richmond_Terrace_road City Street MetroWater SI_BUILDING_FOOTPRINT Parking_lots Bckground SI_PAWS SI_PARKS SI_SMIA Staten_Island

Possible Networks within SMIA areas in the city of New York.

攀

唀猀

椀渀 爀愀猀

䐀漀 一漀琀 䔀渀琀攀爀

吀爀 攀

猀瀀

愀猀

猀攀

爀猀

吀礀瀀攀猀 漀昀 䘀攀渀挀攀猀

䈀

攀 倀

爀漀

猀攀

挀甀

琀攀

搀


RAPELYE STREET (40' WIDE ROAD)

BASKET BALL COURT

PLAY GROUND

Green Infrastructure STEM curriculum

School shed 0+16'

Gowanus Canal Conservancy & Thread Collective

Project Context: The primary aim of this project is to incorporate storm-water management design practices into middle school STEM curriculum and advocate for more green infrastructure to be constructed on school properties. Teachers were provided the support necessary to engage their students in a rich experience of green infrastructure design through math and science classes. The project involved creating teaching materials, base drawings and graphic material which will be used in class. Task: Collecting waste stream samples, Analysis of the type of waste Create a list of recommendations . Skills: Analysis - Microsoft Excel Info graphics - Hand Drawings, Microsoft word, and Photoshop

v.s.

COLES STREET

Internship Project

SEC A

0+23'

0+16'

0+65'

v.s.

v.s. v.s.

0+65'

0+65'

SEC A'

HENRY STREET (40' WIDE ROAD)

G.L. 22'

G.L. 24'

G.L. 26'

G.L. 28'

G.L. 30'

G.L. 32'

G.L. 36'

G.L. 34'

SITE PLAN

Step 01

Define your School’s needs

0+65' 0+52' 0+39'

23'

16'

Create Design Concept

G.L. 28' G.L. 22'

0+26'

Step 02

SITE SECTION AA'

Step 03

Choose Design Elements + Green Infrastructure Strategies

Step 04

Layout + Bubble diagram

Step 05

Design Development

Step 06

Added Challenges

12

0+16'

0+13'

G.L. 34'

0 2 5

10 15

0+13'


LANDSCAPE DESIGN + URBAN DESIGN

13


Douglaston Memorial Playground Queens, NY Ongoing project Billie Cohen Landscape Design Studio

MainMain entrance Main entrance : entrance worn : worn grass : worn grass path grass path path

Mulch Mulch difficult Mulch difficult to difficult maintain to maintain to maintain

hŶĚĞƌƵƟůŝnjĞĚ ŚŽŽƉƐ hŶĚĞƌƵƟůŝnjĞĚ ŚŽŽƉƐ hŶĚĞƌƵƟůŝnjĞĚ ŚŽŽƉƐ

MainMain entrance Main entrance : entrance worn : worn grass : worn grass path grass path path

Mulch Mulch difficult Mulch difficult to difficult maintain to maintain to maintain

hŶĚĞƌƵƟůŝnjĞĚ ŚŽŽƉƐ hŶĚĞƌƵƟůŝnjĞĚ ŚŽŽƉƐ hŶĚĞƌƵƟůŝnjĞĚ ŚŽŽƉƐ

Project Context: The Alley Creek Watershed - Li le Neck bay watershed is an important ecological system. This 645 acre park includes forest, a riparian cor- ridor, ponds and freshwater wetlands, and a Main play equipment Main play equipment play equipment to beto replaced be to replaced be replaced WƵĚĚůĞƐ ĂŌĞƌ ŚĞĂǀLJ ƌĂŝŶ WƵĚĚůĞƐ ĂŌĞƌ ŚĞĂǀLJ ƌĂŝŶ WƵĚĚůĞƐ ĂŌĞƌ ŚĞĂǀLJ ƌĂŝŶ džŝƐƟŶŐ ďĂĐŬƐƚŽƉ ŶĞĞĚ ƚŽ ďĞ ƌĞƉůĂĐĞĚ džŝƐƟŶŐ ďĂĐŬƐƚŽƉ ŶĞĞĚ ƚŽ ďĞ ƌĞƉůĂĐĞĚ džŝƐƟŶŐ ďĂĐŬƐƚŽƉ ŶĞĞĚ ƚŽ ďĞ ƌĞƉůĂĐĞĚ dal wetland and salt marsh complex at the conMainSCHEMATIC MASTER PLAN - PLAYGROUND MainMain play equipment Main play equipment play equipment to beto replaced be to replaced be replaced WƵĚĚůĞƐ ĂŌĞƌ ŚĞĂǀLJ ƌĂŝŶ WƵĚĚůĞƐ ĂŌĞƌ ŚĞĂǀLJ ƌĂŝŶ WƵĚĚůĞƐ ĂŌĞƌ ŚĞĂǀLJ ƌĂŝŶ džŝƐƟŶŐ ďĂĐŬƐƚŽƉ ŶĞĞĚ ƚŽ ďĞ ƌĞƉůĂĐĞĚ džŝƐƟŶŐ ďĂĐŬƐƚŽƉ ŶĞĞĚ ƚŽ ďĞ ƌĞƉůĂĐĞĚ džŝƐƟŶŐ ďĂĐŬƐƚŽƉ ŶĞĞĚ ƚŽ ďĞ ƌĞƉůĂĐĞĚ uence of Alley Creek and Li le Neck Bay at western end of Long Island Sound Estuary. Douglas Douglas Douglas Manor Manor Manor Association Association Association MEMORIAL MEMORIAL MEMORIAL FIELD FIELD •FIELD SCHEMATIC • SCHEMATIC • SCHEMATIC MASTER MASTER MASTER PLAN PLAN PLAN The Alley creek Watershed is an ecologically Align Driveway Curb Douglas Douglas Manor Manor Association Association Association healthy urban system where clean water,Douglas wetToManor Create Cross Walk & Sidewalk MEMORIAL MEMORIAL MEMORIAL FIELD FIELD •FIELD SCHEMATIC • SCHEMATIC • SCHEMATIC MASTER MASTER MASTER PLAN PLAN PLAN Entry Per DOT Standards lands, sh, waterbirds and other na ve species Relocate Large Radius Curve are valued and protected from the headwaters For Boat Trailers to the bay.

BillieBillie Cohen C B

BillieBillie Cohen C B

Toddler + All Age Swings

Task: Research regarding the site Coordinate project with NYCDEC and provide wetland flagging map, 10’contour map on 1977 Landscape Design Skills: AutoCAD, Photoshop, Landscape design, material research

Create ADA Accessible Entry To Playground Artificial Grass Safety Surface (ADA Accessible) Enhance Trail connection Henderson Play Equipment Natural Sandbox On Higher Grade Formed With Boulders Remove 3 Basketball Hoops Painted Asphalt Scooter Track Potential To Make Larger Loop Relocate New Back Stop To Create Space for the “Enchanted Forest” Birch Grove and Picnic Area

14

Billie Cohe


MOWED PATH. TO BE MOWED ONCE A WEEK

DO

AREA TO BE MOWED TWICE A YEAR (MEADOW)

P R

NEW AND RELOCATED BACK STOP ALUMINUM BLEACHER

STEEL SPIKES

NATURAL STONES SET IN SAND UNDER BENCHES/TABLES

SLOPE POURED IN PLACE

RUBBER BORDER FILTER FABRIC

GRAVEL

73

GROUND LEVEL

sq

.ft

6'

11

4' 1/2"

EXISTING FOUNTAIN AND NEW HOSEBIB WITH SHUT OFF FOR WINTER

1' 1/2"

RUBBER MULCH

PLAY AREA LAWN -CONDITIONAL ALONG THE FRONT

EXISTING PRIVET TO REMAIN

267.6 sq.ft

MAPLE TREE REMOVED DUE TO SEVERELY GIRDLED ROOTS. EXPECTED LIFE SPAN IS 6 YEARS.

CYCLING LOOP

BASKET BALL GROUND

EXISTING CONCRETE COURT 3768 sq.ft

NEW HEDGE MAPLE TREE REMOVED DUE TO SEVERELY GIRDLED ROOTS, TREE IN DECLINE

1326 sq.ft

MULCH AND/OR PLANTED GROUND COVER AROUND BASE OF TREES

1784 sq.ft

S P

EXISTING PRIVET TO REMAIN

262.6 sq.ft

POTENTIAL PLANTING AREA IF WATER HOOKUP AVAILABLE

21.15 sq.ft

6" RUBBER MULCH TO GRADE (4" BELOW GRADE) WITH NON-WOVEN FILTER FABRIC

Entry to the Park

NEW FENCE

USE EXISTING BOULDERS TO CREATE SANDBOX

GARBAGE CAN PHONE POLL

SCAL

15

 

3/32


Linden

New York, NY Ongoing project Billie Cohen Landscape Design Studio

Project Context: It is a backyard project for a private house at 40 Riverside drive in New York. The existing fence is in a deteriorated condition. The challenge of this project was to create a good design with space constraints. Task: Site survey, Design, material selection, co ordinating with vendors Skills: Site Survey, research, landscape design

16


Archer Green

Jamaica, NY Ongoing project Billie Cohen Landscape Design Studio

Project Context: Archer Green is a residential building complex located in Jamaica, New York. The roof is developed in such a way that it encourages interaction and develops a sense of community within the residents. Task Design, co ordinating with architects, material research Skills: Auto CAD, Sketch up, Photoshop

17




NOTES: 1. 2. 3.

SEE L-103.00 FOR PLANTING DETAILS & SCHEDULE SEE L-104.00 FOR IRRIGATION DETAILS SEE L-505.00 FOR LIGHTING DETAILS

LEGEND LS 192 LED - 2LED DOUBLE GREVILLEA BY LUMASCAPE CYLINDER CY1-AD-2 BY LUCIFER LIGHTING LED RECESSED LIGHTING 33055 BY BEGA NON FREEZE HOSE BIB W/ BACKFLOW PREVENTER IRRIGATION TIMER/CONTROOLER

(4) PLAY PANELS IN FRONT OF PLANTERS T.B.D

MIRROR + PLAY PANEL ON WALL T.B.D

ELECTRICAL OUTLET FOR TIMER

WALL TREATMENT

12 L 505 (13) LA-LED RECESSED LIGHTING

LIGHTING TRANSFORMERS IN MECHANICAL ROOM 1/2 L 504 DOUBLE STAINLESS STEEL SINK

BY SUNSTONE HD, TYP.

1/2 L 504 BUILT-IN AOG GRILL 30 1-5

IRRIGATION CONTROLLER, L 104 & ELECTRICAL OUTLET, NON FREEZE HOSE BIB

13

ON 8mm SHOCK PAD INSTALLED BY ANLO PROPERTY SERVICES. / 516-659-2702

33055 BY BEGA, TYP.

1/2 L 504 BRUSHED STAINLESS STEEL

L 502 BLEACHER SEATING,

FAUX WOOD T.B.D

OUTDOOR KITCHEN 'A' W/ GRANITE TOP,TYP. FINISH TBD

BRUSHED STAINLESS STEEL GRANITE COUNTER TOP OUTDOOR KITCHEN

4 L 500 2'x2'x2" CONCRETE PAVERS BY WAUSAU

TO CONTINUE BELOW ARTIFICIAL TURF

2/3 L 500 DECKING

14 L 505 (25)LC- STAKE LIGHTING

FAUX WOOD T.B.D

LS 192 LED - 2LED DOUBLE GREVILLEA BY LUMASCAPE, TYP.

4/5 L 500 HALF CORRUGATED STEEL

CULVART PIPE COVERED W/ TURF, 30"H x 4' L

WATER COLLECTION TANK FROM MECHANICAL ROOM ROOF T.B.D

10/11 L 505 ROLLING BENCH W/O BACK

@ PLAY AREA

'

N 'A

OR

DO OUT

HE KITC

2/3 L 503 ALUM. ARBOR 'A'

BLEACHER SEATING

FENCE W/ GATE FOR PLAY AREA FINISH TBD

6 L 506 (2) TIMBERFORM FLAT TOP LITTER

4/5 POWDER COATED ALUMINUM L 503

CONTAINER 1'11" X 2'11" H

ARBOR 'D'

(6)

        

6-9 L 500 42"HT POWDER COATED STEEL

REF.

(36) LB- ARBOR LIGHTING L 505 MOUNTED TO ARBOR CYLINDER CY1-AD-2 BY LUCIFER LIGHTING , TYP.

NON FREEZE HOSE BIB 4 L 500 S BLADE 66 GLOBAL SYN-TURF

ROOF DRAINS SEE ENGINEER DWG

#





4

COUNTRY CASUAL L 506 WINDSOR BENCH W/ BACK 6' L

1-3 L 500 2' x 2' x 2" CONCRETE PAVER ON

   

5 L 501 (6) CYLINDER FIBER CEMENT PLANTER,

   

PEDESTALS BY WAUSAU TILE, FINISH TBD



TYP. 30"D x 24"H DELTA BY GREENFORM 310-331-1665

7/8

BUILT IN BENCHES L 505 FAUX WOOD SLATS T.B.D



2/3 L 503 ALUM. ARBOR 'B'

   

1 L 506 (7) COUNTRY CASUAL TEAK

   

7/8 L 504 (3) GRILL STATIONS 'B'

   



CALYPSO - SQUARE TABLE + (28) STACKING ARMCHAIR

5

(20) CONCRETE SEATS L 506 FROM WAUSAU. 26" X 18"H

W/ GRANITE COUNTER TOP





3 (8)CYLINDER FIBERGLASS PLANTER L 501

3 L 501 (11)CYLINDER FIBERGLASS PLANTER

No bottoms, 30"D x 30" HT, TYP. BY DAWN ENTERPRISES 800 262 3296 x118 -

36"D x 30" HT, TYP. W/bottoms BY DAWN ENTERPRISES 800 262 3296 x118

   



6

4mm SS VINE CABLE ATTACHED TO L 503 BRICK WALL ON COLUMNS BEHIND PLANTERS, TYP. ALL HARDWARE AS PER CARL STAHL DECORCABLE 312-474-1100

24"D x 30" HT, TYP. W/bottoms BY DAWN ENTERPRISES 800 262 3296 x118

OUTDOOR KITCHEN 'B'

9'

W/ 4mm SS CARL STAHL CABLES MOUNTED TO BLDG & POSTS TO ROOF - SEE ARCH DWG FOR DETAILS

OUTDOOR KITCHEN 'B'

4/5 POWDER COATED ALUMINUM ARBOR 'C' L 503

OUTDOOR KITCHEN 'B'

3 L 501 (3)CYLINDER FIBERGLASS PLANTER

2/4 L 501 CUSTOM FIBERGLASS PLANTERS, TYP.

BY DAWN ENTERPRISES 800-262-3296 x118

14 L505

2/3 L 506 (5) COUNTRY CASUAL TEAK



  

CALYPSO - EXTENSION TABLE + (44) STACKING ARMCHAIR

WELDED WIRE FENCE T.B.D

4

S BLADE 66 BY GLOBAL SYN-TURF L 500 ON 8mm SHOCK PAD ON CONC. PAVER BY ANLO PROPERTY SERVICES 516-659-2702

4

2'x2'x2" CONCRETE PAVERS BY WAUSAU L 500 TO CONTINUE BELOW ARTIFICIAL TURF

1-4

CUSTOM BENCHES L 505 W/ TILTED BACK

(6) NON FREEZE HOSE BIB & ELECTRICAL OUTLET UNDER SINK, TYP.

12" OVERHANG UNDER LIP

SEE L-103 FOR PLANTING PLAN & SCHEDULE 

SEE MEP ENGINEER DWS FOR SINKS DETAIL

SCALE: 3/16" = 1'-0"

18


Eco Node

Competition project December 2017 ULI Hines

Project Context: This Proposal was a competition entry for ULI Hines Competition, 2016.The challege was to revive the Clybourn waterfront in Chicago that was neglected and isolated due to industrial development. The first step to this is bringing change in the urban resolution of the site, by adding feasible uses from the surrounding neighborhood. This way the large disconnect between the site and city is beginning to blur. A sustainable community thrives with a balance in economy and ecology. This proposal is about developing a node that opens a corridor of opportunities that comprises of different typologies ranging from affordable live-work-sell spaces to research institution for river revitalization. Task: Understanding zoning change from industrial to residential, Design, Renderings and Panel design Skills: Zoning research, Auto CAD, Rhino, V ray

19

Figure ground before and after.


River Revitalization in Mumbai, India Internship project Summer 2016 Water Environs

Project Context: Mumbai is India’s most populous city. It comprises of four rivers which originate from the central forest area called the Sanjay Gandhi National Park. These rivers were highly exploited and neglected in various ways by disposing waste, reclaiming wet lands, etc. As a result of that, they are reduced down to drains. Residents and communities realized the importance of revitalization of rivers only after they experienced flash flood in the year 2006. River- march is a movement started by a group of citizens who have taken the initiative to rejuvenate rivers in the urban context of Mumbai, as first step in reviving the natural ecosystem. Inhaf provides materials, and technical expertise to the movement. Task: Geo referencing historical maps to see changes in the course of river, understanding land use, creating materials for exhibition. Skills: Site Analysis, Auto CAD, Photoshop, Rhino, Q-GIS 20


Turn static files into dynamic content formats.

Create a flipbook
Urban Planning/Design portfolio by Ankita Nalavade - Issuu