Skip to main content

Architectural portfolio 2016-2021

Page 1

CURRI CULUM V I TA E

Anjali Chettiar Junior Architect

Hi, I am Anjali Chettiar, I am passionate, highly enthusiastic and a creative person driven by the purpose of architecture and its unique abilities to translate intangibles to tangibles. I graduated recently and during my journey I had the opportunity to work, collaborate with an architectural firm and a platform to be a freelance architect of some residential projects. These experiences allowed me to become a good player at teamwork, as well as it made me good at problem-solving and working in deadline-driven environments. It has taught me to be responsible and sensitive through every process leading towards an outcome to be delivered. I have a strong interest in design development, landscape design, urban planning, interior design and detailing. I am a fast learner, always seeking the best solution for the project.

This portfolio is a compilation of the selected works of my architectural endeavours over the years. It is a reflection of all the principles I hold as an Architect.


Contact me: Dombivli, Thane dist. Maharashtra, India. anjali.c0409@gmail.com

Education: 2016-2021

Bachelor of architecture Vishwaniketan College of architecture, arts and design. (VCAAD) Mumbai University, Maharashtra.

2014-2016

Junior college Holy Angels’ Jr. College. HSC (science), Maharashtra State Board.

2014

School St. Therese Convent High School. SSC, Maharashtra State Board.

+91 9004275145 September 4, 1998

Social:

anjali_48 Anjali Chettiar Anjali Chettiar

Languages: English, Hindi, Marathi Tamil, Telugu, Malayalam

Experience: 2019-2020

Workshops: • Business Modelling workshop

- Specialty Restaurant at ORB Mall,Mumbai. - Highend Residential at Cuff parade, Mumbai. - NBL, Forum Mall - Retail interiors. - Five Star Hotel at Vijayawada, Andhra Pradesh. - Qottage Restaurant at Nashik. - Five Star Hotel at Udaipur, Rajasthan.

(nov 2020)

• Glass in architecture (oct 2020 organised by Glass academy)

• QGIS training program

• Coordination with contractor, site coordinator, vendors and client. • Site supervision, Executed detail drawings and Delineation.

(aug 2020 organised by Geotech GIS)

• Bamboo workshop • Pottery workshop

Competition: • Master studio

2020-2021

(aug 2020 organised by Archmello)

Personal skills:

Architecture design Landscape design Interior design Graphic design Product design Urban planning

Freelance Architect (July 2020 – Present) • Live projects under start-up studio “Unbuilt Design Studio”

- Ransai Farmhouse | 2500 sq.ft. | Completion stage - Swarna valley resort, khopoli | 2 acres site | Complete - Compact house-3bhk bungalow | 1600 sq.ft | ongoing - 3bhk villa, Mahabaleshwar | 1500 sq.ft.| conceptual

• Presentation & Public speaking • Active Listening • Perseverance • Teamwork & Leadership • Written & Oral communication • Creativity & Problem solving

Hard skills:

Architectural intern K studio, Thane (4 months Nov - Feb) •Produced technical drawings for various hospitality projects, retail, residential interior projects including,

• Consulted with clients to help with their design requirements, Produced proposal & working drawings • Excecuted Design from scratch to construction stage.

Software skills: Tools


02 Shopping Mall

01 A Social Space

CONTENTS

04 Internship Projects

Academic Projects:

A SOCIAL SPACE City Center -Combating Social Isolation Through Design

06

SHOPPING MALL Urban entertainment and commercial hub- Ulwe, Navi mumbai

16

HOUSING COMPLEX Mass housing project- kamothe, Navi mumbai

26

5th year Design Dissertation project - Semester 9 & 10

5th year Design studio - Semester 9

4th year Design studio - Semester 7

Professional Projects: K Studio - Internship Projects HIGH-END RESIDENTIAL INTERIOR PROJECT Cuff parade, Mumbai.

35

HOSPITALITY PROJECT 5 star- Hotel Grand hyatt, Vijaywada.

42

2020 - completed

2020 - ongoing


03 Housing Complex

05Freelance Projects

06 Competition

Professional Projects: Freelance Projects COURTYARD HOUSE - RESIDENTIAL PROJECT weekend house at vavoshi.

46

COMPACT HOUSE (3BHK Bungalow) - RESIDENTIAL PROJECT Redevelopment of retail store to 3bhk bunglow at khopoli.

48

2020-21 - completion statge

2020-21 - ongoing

Competition: PROJECT ATHENA Master studio- Community of architecture & design at Bangalore, India.

50

Miscellaneous

54


ACADEMIC PROJECTS A SOCIAL SPACE Navi Mumbai, India

City Center -Combating Social Isolation Through Design Indian Architectural History had a great importance to the public gathering spaces where people congrete, celebrate and interact. Today, the nature of these kind of social space is lost due to technology, change of life style and the way people use a public Space. Thus this project is drawn out from the Research and study of the current developments of the city, which are now alienating and monochromatic and more privatised. This set up have taken the importance of public squares and public building aback. The Project Social Space acts as an breathing space that provides various platforms for the social gathering, interaction and economy of the city. The concept of Social Space is to design an active public realm, with a major focus to the Linking spaces that leads to different typology of built forms. These Linking Space called Urban Square consists of various type of activity centered spaces that brings about life and interactive environment.

Project Social Space (Entrance plaza view)

6

Academic Projects


01

Urban square acting as a breathing space and activity-centered landscape space interlinking Hotel, Office and Retail (public building) with each other.

City Center- Combating Social Isolation Through Design

7


A SOCIAL SPACE

City Center -Combating Social Isolation Through Design kharghar, Navi Mumbai.

CONCEPT spaces which can be clubbed together as per their function Analysis of Noise/Quiet zones & public/private zones as per site analysis Emerging from the idea of creating Built and Unbuilt spaces:

DESIGN STRATERGIES

• The orientation of northeast-southwest has been adopted to minimize heat gain within the building. • Connecting spaces and pathways designed as a street view and style • Fragmented green terraces and open spaces. • Strategic placement of waterbody as per wind flow direction -cooling effect. • Building height at south is reduced gradually creating self shading masses

Interlinked and feeding into eachother, The first response was to develop a meandering, informal complex-space around central square/ plaza.

The project intends to appraise and accept the effect of technological growth on the urban fabric of city. Due to fast paced & privatised life style,the public spaces and social life are lost, this proposal is an approach combating this issue through design with contextual program as per selected city (kharghar). The project is to be a hub of social infrastructure of the city with aims to facilitate the upliftment of social life of the city, by providing the right environment and injecting the needed design program.

8

Academic Projects


Site Area = 22,648 Sq.M. location= sector 2, kharghar.

Site Plan with Neighbourhood Context Total Ground Coverage of the Site=5147 Sq.M.

City Center- Combating Social Isolation Through Design

9


Site Area = 22,648 Sq.M. location= sector 2, kharghar.

Site Plan at Cill Level Total Ground Coverage of the Site=5147 Sq.M.

Built mass in site are dividing the site with various pockets which are developed into landscape spaces for social interaction & activities. Office block, Retail and Hotel space are connected through large central square/plaza acting as a gathering space. Whole landscape plaza is purposely planed out in centre & the roads in the periperry of the site, such that street walk experience in lanscape plaza is not disturbed.

Section AA’ showing Hotel and office block with entrance plaza

10 Academic Projects

Highlighted portion in yellow is the Atrium spaces in Office and Hotel


A

c

B A) View of office building from main entrance road

B) View from the retail block viewing central square & Office

D C) Connecting brigde from breakout space to Retail block

D) View from central-square viewing Retail block

City Center- Combating Social Isolation Through Design

11


• Public spaces - i.e. Swimming pool, Multipurpose hall, waiting lounge, recreation etc are strategically placed in 1st floor for easy accessiblity in Hotel

First Floor Plan with Site Context

Denotion of various spaces in First Floor Plan

Section AA’ through central urban plaza viewing office block

12 Academic Projects

View from outdoor Parking Space (Office & Hotel)


• Hotel block has a service floor at this level, where all the pipes coming from the vertical ducts of rooms above becomes horizontal at this floor and gets transferred to the external ducts. The height of this floor is 2.7 m in Hotel block • Whereas Retail block has shops, restaurant and a Public library connecting the office building via bridge to terrace /break out areas • The exhibition stairway ends at 2nd floor.This stair way also act as a informal seating space for the Readers.

Connecting bridge - Office to Retail & Library spaces Second Floor Plan with Site Context

Detailed plans of office block -Ground Floor Plan

Legend for Office Block

Division & Planning of Spaces in Office Block

Office block is designed in a such a way that all the services and vertical circulation elements like lifts, toilets and stairway is placed at the periphery & open atrium at centre providing visual connections within each floor levels. Main ideology was to design the indoor spaces in harmony with the outdoor landscape and activity spaces. Thus, Fragmented terrace spaces - acting as break out area for the employees in large as well as small offices are planned out. Coworking area is designed at ground floor merging with landscape plaza. Total ground built up area of office block is 1338 sq.m. City Center- Combating Social Isolation Through Design

13


Detailed plans of Hotel Block - Ground Floor Plan

The hotel block is designed in such a way that all the common spaces and recreational zones are planed in ground, first and fifth floor where as the 2nd 3rd nd 4th floor has overall 50 no.s of guest rooms Retail spaces being a public space, has shops and restaurants at the periphery of block with interactive corners connecting landscape space on all sides of the site and a common gathering atriums at the center. view from breakout spaces of Office Building

Detailed plans of Retail Block - Ground Floor Plan

14 Academic Projects

Front Elevation: City Centre at Kharghar


Section BB’ through central Urban Plaza viewing Hotel & Retail Block

The third floor of retail block consists of all the entertainment spaces - restaurants, foodcourt, indoor recreational spaces. Visual connect is kept with the designed landscape spaces and outdoor from each floor of the city center. circulation within the floors & site are divided and designed along with specific activities promoting interactions.

Third Floor Plan with Site Context

City Center- Combating Social Isolation Through Design

15


ACADEMIC PROJECTS SHOPPING MALL

Ulwe, Navimumbai, India Urban entertainment and commercial hub This project was proposed after the study of Urban planning and Development of Ulwe node, Navi Mumbai. Analysis and conclusion of study suggested few of the combinations of spaces that are required in this developing node. Creating a combination of Urban Entertainmnet + Urban Recreation + Urban Commercial, The proposed project was to design a Entertainment and commercial hub/ Shopping Mall which houses different Retails, Recreational Spaces, Multiplex, Gaming Zones, offices and Exhibition spaces. The concept of the Project shopping mall was based on the context of the surrounding and zonning the varied typology of the spaces with respect to the end users perception of space and environment for leisure. Circulation spaces inside and outside of the builtform and within site is stratergically designed in harmony with each other

Project Shopping Mall (Entrance plaza view)

16 Academic Projects


02

Entrance plaza to Urban Entertainment And Commercial Hub

Shopping Mall At Ulwe - Urban Entertainment and Commercial Hub

17


SHOPPING MALL

Urban Entertainment and Commercial Hub Ulwe, Navi Mumbai. The project was to design “Urban Entertainment and Commercial Hub” located at Bamandongri, sector 6 Ulwe. The total site area is about 9.16 acre, which is 37,093 sq.m.

DESIGN APPROACH

Interlinking of zones/spaces

CONCEPT

Axonometric view of the shopping mall

18 Academic Projects

Shopping Mall - Design stratergies of the spaces at the different levels from analysis of site and program


Analysis as per immediate surrounding and landuse pattern Into noise zones (with maximum disturbance from surrounding )and quiet zones. Further division of private zone (office) and public zone.This analysis helped to finalize zoning of buffer and other spaces

View from Pedestrian Entrance towards the Shopping Mall

Shopping Mall At Ulwe - Urban Entertainment and Commercial Hub

19


A

B

C

Site plan of shopping mall at ulwe with neighbourhood context

A) View of Cantilevered Restaurant above Landscape plaza from pedestrian entance B) View of landscape spaces from Amphitheatre C) Entrance plaza to the Urban Entertainment & Commercial Hub D) View of Office Building from Recretional Space

D

20 Academic Projects


SITE PLAN The site is surrounded by high rise residential zone to the east, newly constructed bamandongri railway station to south, and areas marked under NMSEZ to the North. Thus the site is situated in the prime location of future commercial developments at Ulwe. Considering the site context, The Shopping Mall has main vehicular entrance from the North-East side and Pedestrian entrance from the edge of the node. The main entrance has 2 drop off points- one connecting to the pedestrian entrance and other connecting to the main entrance (vehicular ) of the built form. Along the South side of the site, There is a Recreational Belt with spaces like green lawns, stepped water body at the pedestrian entrance with various elevated seating areas, amphitheatres, kids play area, gardens, outdoor event plaza, and outdoor game zone and a Green recreational ramp that connects landscape areas to the top floor having Multiplex and recreational zones Shopping Mall At Ulwe - Urban Entertainment and Commercial Hub

21


Site Plan at Sill Level Ground Floor Area = 13761 sq.m.

East side Elevation of Urban Entertainment & Commercial Hub

22 Academic Projects


First Floor Plan of Urban Entertainment & Commercial Hub

The Overall Shopping mall is designed as a one mass, But the internal planning divides the mass into 3 spaces - office spaces, retail shop areas and recreational & entertainment areas. All 3 spaces are connected to each other by exhibition area that is wide spread from office space to retail areas with common walkway that evokes intrest and attention to spaces and activities accompanied by that space. There are Two double height artriums with interacting spaces.This atriums connects to the outdoor event plaza and landscape areas bringing inside out . All the entrances leads to the central indoor event atrium overlooked by the above floors.

West side Elevation of Urban Entertainment & Commercial Hub

Shopping Mall At Ulwe - Urban Entertainment and Commercial Hub

23


Second Floor Plan of Urban Entertainment & Commercial Hub

view showing the connectivity of landscape areas at site to the recreational Ramp that leads to 3rd floor

Third Floor Plan of Urban Entertainment & Commercial Hub

24 Academic Projects

South side Elevation of Urban Entertainment & Commercial Hub


Basement level 1 Plan of Urban Entertainment & Commercial Hub

Basement level 2 Plan of Urban Entertainment & Commercial Hub

Shopping Mall At Ulwe - Urban Entertainment and Commercial Hub

25


ACADEMIC PROJECTS HOUSING COMPLEX

Kamothe, Navimumbai, India mass housing - residential project Kamothe being the developing Node of Navi Mumbai, the residents of kamothe had developed over the years having each kind of residents from low to mid and mid to high Class family and has a exponential growth. After the study of the developing node Kamothe in Allied Design -Town planning, concluded the need for the housing and the commercial sector of the reigion.Thus continuing this conclusion into the project or a Design Problem - Mass Housing. The project was to design a Multi family Housing project having a criteria of affordable 1 BHK to 3 BHK flats with amenities. The project features semi luxury housing units. The amenities to be provided with the housing are clubhouse, a gymnasium, a swimming pool, spa, gaming space and a multi purpose hall. Besides these amentites, the project also includes outdoor activities like basketball court, badminton courts, futsal court and a children’s play zone.

Housing Complex View from 1BHK & 2BHK cluster .

26 Academic Projects


03

Mass Housing Project at Kamothe

Housing Complex at Kamothe ,Navi Mumbai

27


HOUSING COMPLEX

kamothe, Navi Mumbai. The main aim was to design a Multi-family Housing project with context to site, site background, climate, culture, existing type of settlement and its surroundings. The base idea was to design a space that brings about Interaction and Social life naturally within the Housing Complex. Design of Interactive spaces at various levels connecting different clusters, open spaces, recreational spaces both vertically and horizontally of the built structure contributing to social life within the community. SITE The site is located at kamothe, Navimumbai. Near flat site with a negligible slope towards south west.

DESIGN APPROACH IDEAS ON SPACE, MOVEMENT AND VOLUME Considering the present scenerio in urban life where every individual is so involved in routine that there is no social life .various buffer spaces and recreational spaces involving different activities willl give the opportunity to people to atleast initiate an communication. Green zones at each level of the structure, horizontal as well as vertical garden plays a role as a buffer spaces. ZONNING WITH CONTEXT TO PRIVACY, FUNCTION AND CIRCULATION ENTRANCE The entrance to the Housing Complex is purposely designed from the West side of the site i.e.From 9 metres wide road so that There is no disturbance on the 20 m wide road. Also Maintains Privacy.

28 Academic Projects

CLUSTERS Clusters are arranged in a such a manner that there is defined circulation and seperated units according to living standards. 2 clusters of 1BHK and 2 BHK 1 cluster of 2BHK and 3 BHK.


Site Area = 13,026 Sq.M. Location = Kamothe, Navi Mumbai.

Site Plan Of Housing Complex Total Built Up Area = 12,920 Sq.M.

The Housing complex was designed with context to the Neighbourhood and the plan was designed ensuring the best circulation and zonning of spaces as per Enduser and Site Analysis. The Housing complex consist of 2 podium levels connecting eachother as well as ensuring division between typology of building clusters. CLUBHOUSE The Clubhouse is centrally placed such that it connects all the clusters and amenities space in Podium Level. It connects vertically to the Podium Level 2 as well. It consist of various amenities like Exhibition Hall, Sales Office, Restaurant, Multipurpose Hall, Indoor Games Room, Gym etc.

PODIUM The podium is designed in 2 levels such that the level 1 have the Softscapes where 1 BHK and 2 BHK cluster housing starts with amenities such as Swimming Pool, Meditation Platform, Waterbody, Library etc. Podium Level 2 has landscape areas for 2 BHK & 3 BHK cluster with various amenities.

Housing Complex at Kamothe ,Navi Mumbai

29


Parking Calculations

Ground Floor Plan of Housing Complex, Kamothe . (stilt Parking )

As per Navi Mumbai DCR Parking Norms, For house < 60 sq.m = 1spot per houses No of parking that should be provided as per rule is 201 spots. No of parking provided = 220 car parking & 123 Two-wheeler parking

Section BB’ of Housing Complex at Kamothe.

30 Academic Projects


Podium and Landscape Plan at level 1&2 of the Housing Complex at Kamothe

The main aim behind division of podium spaces was to provide softscape for the overview from the upper floors and thus providing privacy to different designed spaces.

Vehicular circulation around the site also for the fire fighting or any large service vehicles.

Service entry connects to the internal roads from backside and various services such as dg set,garbage collection ,STP are placed on the vicinity of service entry

Pedestrian Entry & circulation such that it connects the entrance lobby and parking. Spots to the main entry.

Housing Complex at Kamothe ,Navi Mumbai

31


CLUSTER DIVISION Type 1 - 1bhk & 2bhk Type 2 - 2 bhk & 3 bhk 2 nos.of Type 1 and 1 cluster of Type 2 WING A- 1BHK & 2BHK No.of flats in per floor = 6 flats No.of 1 BHK flats in each floor = 4 No of 2 bhk = 2 No of floors =12 Recreational space at 5th and 6th floor therefore No - 2 bhk in 5th and 6th floor. No of 1 bhk= 47 & No of 2 bhk = 20 Total No of flats in Wing A = 67

Individual Cluster Plans

Section AA’ showing Podium levels of Housing Complex at Kamothe.

32 Academic Projects


WING B - 1BHK & 2BHK No of 2 bhk= 47 & No of 1 bhk = 20 Total No of flats in Wing B = 67 Recreational space at 5th and 6th floor WING C - 2BHK & 3BHK No of 3 bhk= 47 & No of 2 bhk = 20 Total No of flats in Wing C = 67 Recreational space at 5th and 6th floor

Individual Cluster PlansRecreational Floor and Typical Floor Plan of Wing C

The Recreational spaces in the complex other than in the podium allows a breathing environment and a extended space to celebrate, play and interact. Thus bringing about intrest in volume of built form as well as social life.

North Elevation of Housing Complex at Kamothe.

Housing Complex at Kamothe ,Navi Mumbai

33


PROFESSIONAL PROJECTS K STUDIO - INTERNSHIP PROJECTS

Thane, india

( 4 months nov - feb ) Year -2020 “If Design is Contextual and Functional with an Eye for Detail, then the people that inhabit the space will likely feel a Sense of Belonging there as wel.” Dealing with different projects in the Internship Period at different execution stages, helped me understand the processes from design to presentation drawing to pitch to tender drawings to BOQ to dealing with consultants and ofcourse client. Was part of various Hospitality and High-end residential interior projects including: - Stand-alone Specialty Restaurant at ORB Mall,Mumbai. - Highend residential at Cuff parade, Mumbai. - NBL, Forum Mall - Retail interiors. - Five star hotel at Vijayawada, Andhra Pradesh. - Qottage Restaurant at Nashik. - Five star hotel at Udaipur, Rajasthan. Few of selected works of Internship showing my capablities of design and drawing levels can be viewed through these projects. HIGH-END RESIDENTIAL INTERIOR PROJECT Cuff parade, Mumbai. 2020 - completed

HOSPITALITY PROJECT 5 star- Hotel Grand hyatt, Vijaywada. 2020 - ongoing

Project Qottage Restaurant (Elevation Render)

34 Professional Projects


04

Internship Project - Qottage Restaurant at nashik Rendering with materials and colours.

K Studio - Internship Projects 35


HIGH-END RESIDENTIAL Cuff Parade, Mumbai.

Interior Design Project, 2020 - complete Project Name : Goel’s Residence Client : Private Investor - Mr. Anil Goel My Role : Working Drawing, Detailed drawing, Releasing of drawing to Site co-ordinator and contractor, Client interaction, Vendor and Material supplier coordination.

745

300

740

BOOK RACK 75

365

365

SHOE RACK

50

300

The High-End interior project for Mr Goel at cuff parade, Mumbai is End product with one of a kind look where every aspect perfectly fits together to create a dream space for client and his visions.

3

Produced the Detailed sets of drawings for the design excecution and released the details as well as working drawing of the project to the site and made sure the smooth coordination between the firm, client, vendors, contractor and site coordinator.

655

BOOK RACKS 1038

570

570

745

TRAP DOOR 285 BR-A

700

STUDY TABLE

75

CHAIR

1350

992 300

767

278

2106

40

63

41

125

573

981

839

750

578

VANITY BACKLITT MIRROR

1186

1727

F

767

378

WC

824

3232

150

540

445

CREDENZA

511 378

150

1766

814 3082

360

PARTITION STONE

C'

63

SEMI RECESSED WASH BASIN

285 BR-B

992

655 BOOK RACKS

75

C

2106

300

W4

1082

W5

1220

767

767

A

126

NOTE:

75

324

150

WARDROBE

150

2 ALIGN

10

20

12 MM THK PLASTER 12 MM THK WALL FINISH

577

DETAIL AT C SCALE 1:10

FLOOR FINISH LEVEL

24

2 MM THK UNDERLAY EXISTING LEVELED FINISH

DETAIL AT D SCALE 1:10

8MM THK WOODEN FLOORING 2MM THK BASE FOAM

NOTE :

18MM THK STONE THRESHOLD ( 3MM INSIDE FLOORING ) 18

186 3

1922

FLOOR FINISH LEVEL

1343

1588 1200

133

113

75

4495

20

K STU

DETAIL AT C SCALE 1:10

6

DETAIL AT D

5 SCALE 1:10

ADDRESS AZZIANONASIK RO

PROJECT

STRUCT: NOTE

1. PLEASE I ONCE DEM 2. MARBLE 3. LAMINAT

550

MEP CO

18

3306

K STUDIO

18

Mr. AN

PRINCIP

577

6

12

50

40 2 8

375

2 MM THK UNDERLAY EXISTING LEVELED FINISH

ADDRESS FOR CORRESPONDENCE-2004, AZZIANO-B,RUSTOMJEE URBANIA, NASIK ROAD ,THANE WEST-400606.

SECTIONCC'

5MM THK METAL STRIP FOR TERMINATION OF WOODEN FLOORING AND MARBLE FLOORING

LIGHTIN SCALE

2MM THK BASE FOAM 18MM THK MARBLE FLOORING

MEP CONSULTANT

EXISITING TILE FLOORING

SCREEDING TO FLUSH WOODEN FLOORING LEVEL

24

5MM THK METAL STRIP FOR TERMINATION OF WOODEN FLOORING AND MARBLE FLOORING

5060 1921

388

388

577

18 20

8

150

1161

Mr. ANIL GOEL

SITE: CLIENT:

BRICK FILLING

8 MM THK FLOORING TILES

PRINCIPAL DESIGN CONSULTANT

LIGHTING CONSULTANT

TEND

SECTION BB' SCALE18MM 1:4THK MARBLE FLOORING

DRAWIN

FLOORING

SECTION AA' SCALE 1:2

EXISITING TILE INFORM THE SOCIETY MANAGER OFFICE FOR SLAB REPAIR, 1. PLEASE SCREEDING TO FLUSH FLOORING ONCE DEMOLITION OF FLOORING IS COMPLETED. WOODEN FLOORING LEVEL

2. MARBLE THICKNESS : 18MM 3. LAMINATED WOODEN FLOORING THICKNESS : 8MM

DRAWN

DATE OF

DRAWIN

KS0

TENDER

SECTION BB'

1200

577

180

50 2 8 40

5248

75 6 18

D

CLIENT:

PROJECT:

995

REFER TO WARDROBE DETAIL DRAWING

2 MM THK GROOVE

2

DETAIL AT C FLUSHES WITH DOOR FRAME1:10 SCALE

72

313

265

1200

774

30 79

2257

180

1687

10

577

3500

318 180

5248

4495

75

3213

FLUSHES WITH DOOR FRAME

30

532

12 MM THK PLASTER 12 MM THK WALL FINISH

SITE:

18

Rev.

123

883

126

874

552

388 1588 1200

1200

600

1200

600

30

936

79

577

SKIRTING

2 ALIGN

1219

3306

5060

330

400

300

140

1009

874

135

33

161 774 25 388

313

123

600 265

35

600 600

330

300

964 883 774

5060

5

85

2540

2874

1650

1420

400

754 126

135

2 MM THK UNDERLAY

129

DOOR JAMP WIDTH 90 18

6 18

133

D

18MM THK STONE THRESHOLD

18

72

1388 MM THK FLOORING TILES

532

All dim All lev This d to be for an 4. This d 5. ALL D START TO TH 6. The C dimen Any d 7. This d archit 7 discre consu prior t 8. All the servic 9. Drawi intent from fitnes 10. Const within7 coord be de drawi carrie

2061

WARDROBE 1219 23

PROJECT MANAGER/ FLOORING STRUCTURAL CONSULTANT

D'

577

DOOR JAMP WIDTH

30

600

1161

18 113

BRICK FILLING3213

20

3

36 Professional Projects 18

318

129

( 3MM INSIDE FLOORING ) 818MM THK90FLOORING 18 TILES

50

40 2 8

BRICK FILLING

4 MM THK VENEER FINISH

487

1. 2. 3.

2061

STARTING POINT

600

STARTING POINT

D'

18

900

936

18 MM THK PLY

EXISTING LEVELED FINISH 102

117

REFER TO WARDROBE DETAIL DRAWING

2 MM THK GROOVE

2

75

20

8 SKIRTING

2 ALIGN

1160

259 2266

1836

Date

REGISTER ADDRESS-1803,BLOCK-4, PARAMO,VASANT LOWNS NEAR JUPITER HOSPITAL POKHRAN NO-2, THANE WEST-400601

12 MM THK WALL FINISH

REFER TO WARDROBE DETAIL DRAWING

133

50 2 8 40

8 MM THK FLOORING TILES 2 MM THK UNDERLAY EXISTING LEVELED FINISH

23

113

4 MM THK VENEER FINISH

18

18 MM THK PLY

DROP STARTING POINT

1219

900

750

768 2025

10

20 MM THK PLASTER Purpose

117 PROJECT:

20

8 SKIRTING

600

75 141 TILE

198

8MM THK WOODEN

Flooring Plan and Drawing Details of12Goel’s Residence MM THK PLASTER

20 MM THK PLASTER

600

STARTING POINT

3500

318

1343

50 2 8 40

2061

75

SCALE 1:50

150

129

2061

18 MM THK PLY

23

1653

PLAN - FLOORING

Rev.

102

WARDROBE

4 MM THK VENEER FINISH

936

1687

1160

600

TILE DROP

2257 180

600

TILE DROP

C'

138

2061

600

5060

75

20 MM THK PLASTER

PLAN - FLOORING

1085 635 489

30 696

1872

1343

964

1219

STARTING POINT

900

2061 8 MM THK FLOORING TILES 2 MM THK UNDERLAY EXISTING LEVELED FINISH

902

126 28

129

936

1921

SCALE 1:50

5

85

33 552

877

5MM THK METAL STRIP 900

2368

B'

150

PLAN - FLOORING

5060

1836

140

874

1085

600

874

1009 161

1921

35

600 600

30

70

20

C'

B

5MM THK METAL STRIP

35

600

2649

126 75

487

2324 2368

B' 774

1420

1922

96 30 774

C 44

B

STARTING POINT

2324

198

75

912

5 85

874

5060

1836

1160

750

768

757

600

TILE DROP

471

126 1922

2649

1030

96 30

2025

774 750

5950

500

900

487

50

C 44

1278

1653

900 STARTING POINT

1717

STARTING POINT

674

1160 158

25

874

674

757

500 324

6

STARTING POINT

1524

756

85 600

874

70

768

126

5

999 716

1146 546

1700

262

TILE DROP

767

471

5MM THK METAL STRIP

687

6

756

STARTING POINT

1082

1220

85 600 1524

2106

716

1146 546

A'

1225

1082

1220 5

999 824

814 3082

3232

1225

687

1727

5MM THK A' METAL STRIP STARTING POINT

300

2263

5950 1727

2263

767

A

767

1727

1186

1727 767

471

All dimensions are in millimeters. All levels are in millimeters 28 912 and property of the PDC, is not This drawing is a copyright STARTING to be produced, copied, handed over to third party or used POINT 696 for any other 262 50 purpose other than for which it is intended. 5MM 4. This drawing is to be THK read and not to be scaled. 635 METAL 5. ALL DIMENSIONS SHALLSTRIP BE VERIFIED ON SITE PRIOR TO START OF WORK ANY DISCREPANCY SHALL489 BE BROUGHT TO THE NOTICE OF THE PDC. TILE DROP 1717 5 6. The Contractor / Project Manager must check all dimensions 85 and details and be responsible for the same. Any discrepancy shall be notice of the PDC. 874 7. This drawing shall be read in conjunction with all relevant architectural, structural and services drawings. Any discrepancy noticed shall be brought to the attention of the600 600 259 consultants and resolved as soon as possible, but always STARTING 141 prior to procurement / execution of works. 35 POINT 2266 8. All the services ducts / cut-outs are toSTARTING be covered after POINT 318 877 services provisions. 9. Drawing approval is for the conformity with outline design intent and does not relieve the contractor/ subcontractor SCALE 1:50 from full responsibility for the accuracy, integration and 20 902 5MM THK fitness for purpose of design. METAL STRIP 10. Construction Manager/Project Manager to revert back within 7 working days of receiving the drawings on coordination and buildability issues. If otherwise it would be deemed that they have understood and accepted the drawing/design and own full responsibility for the works 1872 carried out accordingly.

2106

A

2106

75

278

2025

6643

754

1030

824

814 3082

3232 75 992

300

767

1278

NOTE:

767

992

981

839

9706

41

125

674

70

TILE DROP

158

1. 2. 3.

500

96 30

85

774

2540

600

STARTING POINT

300

874

6

1700

546

2874

716

1727

1524

1727

1727

1186

1727 767

1650

2106

75

2025

1225 1146

2649

6643

278

756

300

767

687

5MM THK A' METAL STRIP STARTING POINT

999

992

992

981

839

41

125

5

2263

9706

DRAWING TITLE:

ADVANCE COPY

GFC


NOTE: NOTE:

1. All dimensions are in millimeters. 2. All levels are in millimeters All dimensions are in millimeters. 3. This drawing is a copyright and property of the PDC, is not All levels are in millimeters to be produced, copied, handed over to third party or used This drawing is a copyright and property of the PDC, is not for any other purpose other than for which it is intended. to be produced, copied, handed over to third party or used 4. This drawing is to be read and not to be scaled. for any other purpose other than for which it isSHALL intended. 5. ALL DIMENSIONS BE VERIFIED ON SITE PRIOR TO 4. This drawing is to be read andSTART not toOF beWORK scaled.ANY DISCREPANCY SHALL BE BROUGHT 5. ALL DIMENSIONS SHALL BE VERIFIED ON SITEOF PRIOR TO TO THE NOTICE THE PDC. START OF WORK ANY DISCREPANCY SHALL BE BROUGHT 6. The Contractor / Project Manager must check all TO THE NOTICE OF THE PDC. dimensions and details and be responsible for the same. 6. The Contractor / Project Manager must check all Any discrepancy shall be notice of the PDC. dimensions and details and be responsible for the same. 355 7. This drawing shall be read in conjunction with all relevant Any discrepancy shall be notice of the PDC. architectural, structural and services drawings. Any 7. This drawing shall be read in conjunction with all relevant discrepancy noticed shall be brought to the attention of th architectural, structural and services drawings. Any consultants and resolved as soon as possible, but always discrepancy noticed shall be brought to the attention of the prior to procurement / execution of works. consultants and resolved as soon as possible, but always 8. All the services ducts / cut-outs are to be covered after prior to procurement / execution of works. services provisions. 8. All the services ducts / cut-outs are toapproval be covered after 9. Drawing is for the conformity with outline design services provisions. intent and does not relieve the contractor/ subcontractor 9. Drawing approvalW1 is for the conformity with outline design from full responsibility for the accuracy, integration and intent and does not relieve the contractor/ subcontractor fitness for purpose of design. from full responsibility for the accuracy, integration and CONSOLE 10. Construction Manager/Project Manager to revert back fitness for purpose of design. within 7 working days of receiving the drawings on 10. Construction Manager/Project Manager to revert back 1020 coordination and buildability issues. If otherwise it would within 7 working days of receiving the drawings on be deemed that they have understood and accepted the coordination and buildability issues. If otherwise it would drawing/design and own full responsibility for the works BOUGHT be deemed that they have OUT understood and accepted the 745 300 carried out accordingly. ITEMS 198 drawing/design and own full responsibility for the works 900 carried out accordingly. 740

W2

774

30

E 1:12

18MM THK STONE THRESHOLD ( 3MM INSIDE FLOORING ) 18

72

3

30

FLOOR FINISH LEVEL

NOTE :

EXISITING TILE FLOORING

1. PLEASE INFORM THE SOCIETY MANAGER OFFICE FOR SLAB REPAIR, ONCE DEMOLITION OF FLOORING IS COMPLETED. 2. MARBLE THICKNESS : 18MM 3. LAMINATED WOODEN FLOORING THICKNESS : 8MM

75

360

968

600

540 75 833

481

150

1200 365

800

650

1082

770

1400

1108

1350

710

HOB

2910

2390

1150 GAS

1630

445

1092

400

500

1321

1100

750

560

62

GLASS PARTITION 600

750

600

882

WASHING MACHINE

DISHWASHER BELOW COUNTER

625

LIGHTING CONSULTANT LIGHTING CONSULTANT W2

CLOTHE DRYER

75

552

124 75DRAWING TITLE:

REGISTER ADDRESS-1803,BLOCK-4, PARAMO,VASANT LOWNS NEAR JUPITER HOSPITAL POKHRAN NO-2, THANE WEST-400601

PENCIL MOULDING FURNITURE PLAN LAYOUT N ON EDGE FURNITURE PLAN LAYOUT

PROJECT MANAGER/ STRUCTURAL CONSULTANT

SCALE 1:10

375

18

MEP CONSULTANT

TENDER ADVANCE COPY ADVANCE COPY GFC 477 DRAWING TITLE:

DETAIL F

SCALE 1:10 DRAWN BY : ANJALI 550

KS025_R_ID_101.01

LIGHTING CONSULTANT

SECTIONCC'

6MM THK MDF WITH

KS025_R_ID_101.01 1:50@A3 PAINT FINISH

GFC

N

CHECKED BY : KRISHNA 60 SCALE:

CHECKED BY :08/01/2020 KRISHNA 5REV NO : DATE OF ISSUE: 12MM THK MARINE PLY DATE OF ISSUE: 08/01/2020 REV NONO : : SCALE: DRAWING DRAWN BY : ANJALI 5

DRAWING NO : 5MM THK METAL STRIP FOR TERMINATION OF WOODEN FLOORING AND MARBLE FLOORING

18

50

PENCIL MOULDING ON EDGE

995

TENDER

ADDRESS FOR CORRESPONDENCE-2004, AZZIANO-B,RUSTOMJEE URBANIA, NASIK ROAD ,THANE WEST-400606.

6

23

K STUDIO

4MM THK GLUE 18MM THK STONE

631

25

CLIENT:

477

PENCIL MOULDING ON EDGE

50

4MMPROJECT: THK GLUE 18MMSITE: THK STONE

1:50@A3

SCALE 1:12

Furniture Plan and Drawing Details of Goel’s Residence

18MM THK MARBLE FLOORING SCREEDING TO FLUSH WOODEN FLOORING LEVEL

TENDER

SECTION BB' SCALE 1:4

GLASS PARTITION 687

1322

SCALE 1:50

2MM THK BASE FOAM

24

15

MEP CONSULTANT MEP CONSULTANT

Date

Mr. ANIL GOEL

DETAIL F SCALE 1:10 DETAIL E SCALE 1:12

8MM THK WOODEN FLOORING

DOOR JAMP WIDTH 90 18

750

600 1181 402

500 750 40

378 378

150

E

D'

18

2050

PRINCIPAL DESIGN CONSULTANT

124 75 477

250

3306

FLUSHES WITH DOOR FRAME

QUEEN BED

SINK WITH DRAIN BOARD

1588 1200

HARDWOOD FRAMING

6

1161

D

COD 1

W4

W3

4MM THK GLUE 552STONE 18MM THK

DETAIL F

6 18

3213

Purpose

GAS HOB

882

577

250

5248

4MM THK VENEER 552 FINISH

1687

23 50 SCALE 1:12

2061

1200

1200

126

2257

180

25

LED COVE LIGHT

117

2061

PROJECT MANAGER/ PROJECT MANAGER/ STRUCTURAL CONSULTANT STRUCTURAL CONSULTANT

532

18MM THK MARINE PLY 1219

129

6MM THK MDFDETAIL WITH E AILPAINT E FINISH SCALE 1:12

CREDENZA

PARAMO,VASANT LOWNS NEAR JUPITER REGISTER ADDRESS-1803,BLOCK-4, HOSPITAL POKHRAN NO-2, THANE WEST-400601 PARAMO,VASANT LOWNS NEAR JUPITER HOSPITAL POKHRAN NO-2, THANE WEST-400601

STARTING POINT

600

1872

124 75

50

60 5

25 50

12MM THK MARINE PLY

318

WORKING

79

35 180

102

3500

318

250

259

2266

138

HARDWOOD FRAMING

5023

50 18

129 1219

600

577

161

600

1160

600

STARTING POINT

23 50

POINT

TILE DROP

600

936

250

600

4MM THK VENEER FINISH STARTING

141

150

LED COVE LIGHT

250

AT D 1:10

902

5MM THK METAL STRIP

25

964

5060

1921

250

HARDWOOD FRAMING

AT C 1:10

35

30 18MM THK MARINE PLY

1085

4MM THK VENEER 5075 FINISH

1343

20

C'

B'

126

631

LED COVE LIGHT

552

600

B

75

2324 2368

STARTING POINT

877

774

23 50 487

600

1922

1420

44

18MM THK MARINE PLY

900

135

33

85

126

1160

900

C

K STUDIO COOKING

1766

to be produced, copied, handed over to third party or used for any other purpose other than for which it is intended. 4. This drawing is to be read and not to be scaled. 5. ALL DIMENSIONS SHALL BE VERIFIED ON SITE PRIOR TO START OF WORK ANY DISCREPANCY SHALL BE BROUGHT 117 OF THE PDC. TO THE NOTICE 6. The Contractor / Project Manager must check all dimensions and details and be responsible for the same. Any discrepancy shall be notice of the PDC. 7. This drawing shall be read in conjunction with all relevant architectural, structural and services drawings. Any discrepancy noticed shall be brought to the attention of the consultants and resolved as soon as possible, but always prior to procurement / execution of works. 8. All the services ducts / cut-outs are to be covered after 400 services provisions. 9. Drawing approval is forSIDE the conformity with outline design TABLE COD 2 intent and does not relieve the contractor/ subcontractor from full responsibility for the accuracy, integration and 50 fitness for purpose of design. 23 to revert back 10. Construction Manager/Project Manager within 7 working days of receiving the drawings on coordination and buildability issues. If otherwise it would be deemed that they have understood and accepted the drawing/design and own full responsibility for the works carried out accordingly.

Rev.

W2

STATION STATION ADDRESS FOR CORRESPONDENCE-2004, AZZIANO-B,RUSTOMJEE URBANIA, 800 550 ADDRESS FOR CORRESPONDENCE-2004, 687 NASIK ROAD ,THANE WEST-400606. AZZIANO-B,RUSTOMJEE URBANIA, REGISTER ADDRESS-1803,BLOCK-4, NASIK ROAD ,THANE WEST-400606.

200

W2

4495

874

874

757

Mr. ANIL GOEL

K STUDIO

511 540

750

PRINCIPAL DESIGN CONSULTANT PRINCIPAL DESIGN CONSULTANT CHAIR

TILE DROP

5

5950

500

770

Mr. ANIL GOEL

700

STUDY TABLE

63 578 63

2390 360

910 472

936

388

313

696

W2

500 786

REFFRIGERATOR

All dimensions are in millimeters.

PLAN - FURNITURE SCALE 1:50 N - FURNITURE SCALE 1:50 PLAN - FURNITURE 874

WC

1321

420

1100 710

560

E

28

5 85

1717

1150

1630 2780 1150

1150

400

500

200

755

635 489

CLIENT:

W5

1322

198

912 5MM THK METAL STRIP

C'

12

874

1009

23

265

50

262

1322

330

300

E

LOUNGE CHAIR

2874

510 2540

400

1650

1100 440

560

140

2025

W2W3

1278

1653

STARTING POINT

W2

50

355

158

23

200

472

75

50

755

755

400 SIDE TABLE

400

COD 2

472

440 SINK WITH DRAIN BOARD

500

COD 2 400 324 SIDE TABLE

355 CLOTHE DRYER

1700

883

710

1727

COD 1 QUEEN BED

2050

QUEEN BED

2050

910

420

1727

1727

754

420

510

LOUNGE CHAIR

F

882

123

LOUNGE CHAIR

882 2025

625

117

WASHING MACHINE

453

CLIENT:

573

1.

910

6643

BR-A

102

NOTE:

1321

600

906

745

2. All COD 1levels are in millimeters and property of the PDC, is not 3. This drawing is a copyright COD 1

882

W5 117

DISHWASHER BELOW COUNTER

2390

1630

3060

445

COD 1

SEMI RECESSED WASH BASIN

SITE:

1912 WARDROBE

SITE: 570

W2

285 BR-B

138

150

COD 1

9706

750

62

70

GLASS PARTITION 600

750

PARTITION STONE

KING BED

388

GLASS PARTITION 687

400 285

VANITY BACKLITT MIRROR

2780 1150 900 430

150

150

690

SEMI RECESSED WASH BASIN

455

455 2780 1150

445

3060 1092

70

C

BOOK RACKS 1038

570

150

655 BOOK RACKS

910

402

1400

400

500

2020

VANITY BACKLITT MIRROR

PROJECT:

TRAP DOORSIDE TABLE

W2

1400

1523

1181

1322

141 655

ADVANCE COPY

GFC

DRAWING TITLE: FLOORING LAYOUT

SECTION AA' SCALE 1:2

N DRAWN BY : ANJALI DATE OF ISSUE: 08/1/2020 DRAWING NO :

KS025_R_ID_301.01

451

40

200

600

600

288 510

1181

SIDE TABLE

SIDE TABLE 400

650

KING BED

KING BED

348

30

73 350 COD 2

Date

DINING WC TABLE

50

PROJECT:

1912 WARDROBE

102

500

102

1912 WARDROBE

138

500

910

1240

500

910

2910

138

GAS HOB

710

150 355

1124

900

455

141

402

1523

342

150 1049 SIDE TABLE 400

400

445

73 350 COD 2

690 690

710

GAS HOB

141

2020

2020

650

1322 350 COD 2

550

348

50

73

400

510

800 1322

60

28

797

23

600

600

660

845

500

50

300

453

500 2334

50

150

600

453

73

23

1030

400

1240

687

WORKING STATION

350

288 1523

1108

SIDE TABLE

355

775

453

50

COOKING STATION

750

906

410

450

WC 578

28

453

Purpose Date

430

575

650

453

75

300 600

40 700

Rev. Purpose W5

BOOK RACK

SEMI RECESSED WASH BASIN

SEMI RECESSED WASH BASIN

906

797

VANITY BACKLITT MIRROR WC

VANITY BACKLITT MIRROR WC

650

40

150

700

348

SHOE RACK

Rev. 128

852 540150

833

833

481

750

348

900

60

481

775

540

60

797 845

23

348

750 73

578 200

815

348

28

410

200

73 845

28

750

640

464

113

119

484 462

2334 2334

660

575

224

343

770

575

464 REFFRIGERATOR

272

128 700

775

900 700

900

1082

700

578

28

578

28 444

430

WC

WC

3971

750

W5

430 410 SIDE TABLE 150

770

1278 400

300 128

272

852 272

SOFA

700

640

158

W5

SIDE TABLE

3971 786

198 CHAIRS

BOUGHT OUT ITEMS

300

852

400

198

BOUGHT OUT ITEMS

150

1278

400

1278

800

158

SIDE TABLE

30

480

370

370

CHAIRS

SIDE TABLE

360

CHAIRS CENTRE TABLE 158

CHAIRS

370

DINING TABLE CHAIRS

600

360

CHAIRS 360

CENTRE TABLE CHAIRS

596

W1 W1

600

1200 450

745

60

2000

1650

596 745

CHAIRS

600

451

1650

596

600

745

SIDE BAR 925

355 873

873

745

2000

FA

355

873

75

2000

ABLE 50

COD -04

365

COD-02 COD-03 SIDE BAR CHEST OF DRAWERS 355 925 3048 SIDE BAR 925 355

355 900

455

480

360

480

762 COD-O1

COD -04

750

COD-03

1650

968

DRAWERS 3048

COD-02 COD-03 CHEST OF DRAWERS 1020 COD 3048 -04

455

CONSOLE

762 COD-O1

455

75

1. 2. 3.

CHECKED BY : KRISHNA SCALE: REV NO : 1:50@A3

K Studio - Internship Projects 37


5.

ALL DIM START TO THE The Co dimens Any dis 7. This dr archite discrep consult prior to 8. All the service 9. Drawin intent a from fu fitness 10. Constru within coordin be deem drawin carried

LH 2077

A

FCH 2635

1208

CH 2710

1432

SB-06

5713

450

SB-11

817

BH 2030 1762

746

R6 0

DISTRIBUTION BOX

3150

454

799

1056

908

909

1034

1007

CEILING FAN : 4FT DIA.

FCH 2635

158 171

CEILING FAN : 4FT DIA.

1278 1254

198 210

SB-05

300

180

400

1617

SB-10

Rev.

0

R600

1001

373

FCH 2638 1650

160

75

SPILT A.C.

SB-01

712

75

SB-04

3391

A'

450

SB-03

FALSE CEILING PROFILE

713

150

SB-02

1425

3621

392

660

352

450

496

130 24

75

6.

1609

LH 2077

1108

343 200

450

433

64

1537

12 2 50

538 990

2898

732

R600

1500

990

2030

433

600

SB-15

450

450

1641

73

200

200

WINDOW A.C.

WINDOW A.C.

73

150 73

927

810

1641

SB-03

104

2236

956

1205

1641 450

450

LIGHTING

235

429

SB-14

1594

Rev.

SB-16

200

2097

600

600

B'

WINDOW

SB-17

1118

925

1458

519 685

710

706

483 2170

B

SB-24

SB-25

1595

CEILING FAN : 4FT DIA. 1432 SIDE BAR

All dimensions are All levels are in mi This drawing is a c to be PRINCIPA produced, co for any other purp 4. This drawing is to 5. ALL DIMENSIONS START OF WORKFA ADDRESS TO THE NOTICE O AZZIANO-B 6. The Contractor / P NASIKand ROA dimensions de Any discrepancy s 7. This drawing shall architectural, stru discrepancy notice consultants and re PROJECT prior to procurem STRUCTU 8. All the services du services provision 9. Drawing approval intent and does no from full responsi fitness for purpos 10. Construction Man within 7 working d coordination and be deemed that th MEP CON drawing/design an carried out accord

K STUD

FCH 2635

1635

1118 SB-04

200

SB-02

360

1030 1030

1222

SB-26

969

817

750

853 102

117

1145

3048 CHEST OF DRAWERS

SB-42

268

555

BOSE SPEAKERS

1145

990

75

C

3391

BOSE SPEAKERS

CH 2710

CLIENT:

Mr. AN

1. 2. 3. 423

FLOOR LAMP SB-22 1208

1145

NOTE:

1254

FCH 2635

450 SB-13 138

SB-23

FCH 2727

SB-41

3573

1416

CEILING FAN : 4FT DIA. 1145

258

1019 CONSOLE

SB-40

519

913 1222

R600

2635

122

1127 1414

740

FCH 2490

983

FALSE CEILING PROFILE

BOSE SPEAKERS

1488

SB-30

FCH 2080

2077

2077

2635

2635

BOSE SPEAKERS

1488

169 169

SB-39

SITE: FCH 2490

150

SB-21

2545

868

FCH 2490

600

SB-38

300

359

PROJECT:

1916

575

1148

450

1634

1819

591

690 BOSE SPEAKERS

2784

321

450

SB-27/28

CEILING FAN : 2FT DIA. GAS HOB

ENTRANCE DOOR

745

2289

CH 2710

SB-37 OVAL SHAPED MIRROR

SB-33

SB-18

797

260

75

R300

SB-36

450 300

FCH 2490

925

196

BH 2085

SB-20

450

591 1112

FCH 2727

2710

FALSE CEILING PROFILE

853 1513

325

150 150 70 40 15

14 48 5 7 75

1564

25 LOFT HEIGHT 2077 558

558

891

75

12 13 50

549

1138

1129

373

SB-35

2077

C'

537 1200

985

50

350

CEILING FAN : 3FT DIA.

FCH 2490

371

SB-43

R4

307

778

SB-32

SB-34

725 200

346

868

558

473

497

SB-12

FCH 2635

SB-29

SB-31

FCH 2635

BH 2077

366

845

150

SB-44

385

LOFT WITH TRAP DOOR HEIGHT 2077

503

503

537

120

LH 2077

375

344

1028

SB-07a SB-07

3020

FCH 2050

SB-08a SB-08

792

LH 2077

559

66

SB-19 196

544

FCH 2085(FLUSH WITH BEAM BOTTOM)

2152

1647

450

SB-09

205

FCH 2516

360

LH 2077

LH 2157

POINT ON CEILING FOR CHANDELIER OR LAMP

PROJECT:

ELEVATION AA' SCALE 1:35

Electrical, Lighting and Reflected TENDE GOE Ceiling Plan of Goel’s ResidenceMr. ANIL DRAWING SITE:

PLAN

CLIENT:

ELECTRICA PRINCIPAL DESIGN

450

ADDRESS FOR CORRE AZZIANO-B,RUSTOMJE NASIK ROAD ,THANE B W DRAWN

75

75

12 13 50

150 150 70 40 15 450

RCP LAYOU

LIGHTING K STUDIO

14 48 5 7

25

538

64

2 12 50

SCALE 1:50

DATE OF I

DRAWING

PROJECT MANAGE KS02 STRUCTURAL CON

1635

CEILING MOUNTED LAMP

750 KITCHEN

SB-09

DINING TABLE

250

2030

451 3020

2635 2710

EXISTING ARTWORK

757

450

205

2077

EXISTING ARTWORK

2077

EXISTING ARTWORK

2635

EXISTING ARTWORK

2077

MASTER BEDROOM

650

1500

MEP CONSULTANT EXISTING ARTWORK

SHOE RACK

LIGHTING CONSUL

SOFA SET SB-08a

SIDE TABLE

1250

SB-07a

SIDE TABLE

150

SB-08

300

200

SB-07 SB-05

300

600

210

NOTE: 1. 2. 3.

All d All l This to b for A 4. This 5. ALL DRAWING TITLE: STA TO LIVING ROOM ELEVAT 6. The dim Any 7. This arch DRAWN BY : ANJAL disc DATE OF ISSUE: con 08/ prio DRAWING NO 8. : All t serv KS025_R_ID_70 9. Dra inte from fitn 10. Con with coo be d dra carr

ELEVATION BB' SCALE 1:35

TENDER

25

450

150 150 70 40 15 450

624

450

450

75

75

3282

1586 12MM THK GYPSUM CEILING

200

1200

200

4071

PORTALS 18MM THK MARINE PLY WITH VENEER FINISH

EXISTING ARTWORK

EXISTING ARTWORK

EXISTING ARTWORK

WINDOW AC

776

790 SB-14

776

SB-13

200

SB-15

50

1641

STORAGE DRAWER UNDER BED

500

500

850

140

500

875

965

COD-01 EXISTING BED WITH SIDE TABLES

SB-12

2097 1561

1630

2077

2170 880

1250

SHEER CURTAIN OVERLAYED WITH BLACKOUT CURTAIN

920

2055

2165

PAINT FINISH

170

2710

2085

2710 2635

Rev. 55 INCH TV

2635

150 150 70 40 15

14 48 5 8

25

14 48 5 8

Elevation - Living Room of Goel’s Residence

WOODEN SKIRTING

PROJEC

ELEVATION BB'

ELEVATION AA'

SITE:

SCALE 1:35

SCALE 1:35

CLIENT

Sectional Elevation - Guest Bed Room of Goel’s Residence 1586

450

550

640

38 Professional Projects

450

200

450

500

Mr. A

PRINC

K STU

ADDRES AZZIAN NASIK R

4398 12MM THK GYPSUM CEILING

PROJE STRUC


NOTE:

25

450

150 150 70 40 15 450

All dimensions are in millimet All levels are in millimeters This drawing is a copyright an to be produced, copied, hand for any other purpose other th 4. This drawing is to be read and 5. ALL DIMENSIONS SHALL BE V START OF WORK ANY DISCRE TO THE NOTICE OF THE PDC. 6. The Contractor / Project Mana dimensions and details and be Any discrepancy shall be notic 7. This drawing shall be read in c architectural, structural and se discrepancy noticed shall be b consultants and resolved as so prior to procurement / execut 8. All the services ducts / cut-ou services provisions. 9. Drawing approval is for the co intent and does not relieve th from full responsibility for the fitness for purpose of design. 10. Construction Manager/Projec within 7 working days of recei coordination and buildability i be deemed that they have und drawing/design and own full r carried out accordingly.

75

75

1. 2. 3.

150 150 70 450 40 15

25

UPPER CABINET OF WARDROBE

600

450

1576

2990

482

SHEER CURTAIN OVERLAYED WITH BLACKOUT CURTAIN

875

935

Purpose

SB-21

600

600

480

913

1250

1250

SB-19

SIDE TABLE (EXS) STORAGE DRAWER UNDER BED

200

SB-22

Rev.

2225

117

COD-02

657

875

1594

927

1030

SB-20

912

CHAIR (EXS) COD-01

690

J-BOX

1030

2077

2225

DOOR KING BED (EXS) WITH UPHOLSTERED HEADBOARD WINDOW AC

350

913 SB-18

2635 2710

1149 TV

200 25

2710 2635

PANELLING

ELEVATION AA'

ELEVATION BB'

SCALE 1:30

SCALE 1:30

PROJECT: SITE: CLIENT:

Mr. ANIL GOEL 75

75

PRINCIPAL DESIGN CONSULT

450

150 150 70 40 15 450

25 VEENER

K STUDIO

450

ADDRESS FOR CORRESPONDENC AZZIANO-B,RUSTOMJEE URBANIA NASIK ROAD ,THANE WEST-40060

P HOSPITA

EXISTING ARTWORK

260

575

MEP CONSULTANT

50

600

657

1000

SB-24

1250

LIGHTING CONSULTANT

1022

965

480

657 505

SIDE TABLE (EXS) STORAGE DRAWER UNDER BED

DOOR TO TOILET

SB-25

SB-23

KING BED (EXISTING)

660

EXISTING ARTWORK

2545

2207

2085

685

COD 1

690

EXISTING ARTWORK

2636

PAINT FINISH

2635 2710

1242

SHEER CURTAIN (FB-01) OVERLAYED WITH BLACKOUT CURTAIN (FB-02) WARDROBE IN WD-01

2635

2710 2635

179

2727

PROJECT MANAGER/ STRUCTURAL CONSULTANT

18

ELEVATION DD'

ELEVATION CC'

SCALE 1:30

SCALE 1:30

TENDER

ADVANCE

DRAWING TITLE:

Sectional Elevation - Master Bed Room of Goel’s Residence

MASTER BEDROOM ELEVATIONS

DRAWN BY : ANJALI

K Studio - Internship Projects 39

CH

DATE OF ISSUE: 08/01/2020 R DRAWING NO :

KS025_R_ID_701.03


NOTE:

D

1. 2. 3.

64 18

462

2195

260

5 75 18 200 18 5

18 MM THK STONE FOR STORAGE SHELF

88

3MM THK FROSTED ACRYLIC SHEET

88 18

1130

495 18 1

SCALE 1:8

SCALE 1:15

150 168

18 100

DETAIL AT 'C'

TENDE

DRAWING

88

SCALE 1:15

557 20 300 20 300 MARBLE FINISH

172

A

940

168

940

446

50

STORAGE SHELF

D

244

WALL HUNG W.C. (KOHLER) 360X490MM

159

C

320

1553

1650

484

18 260 18 150

50

ACCESSORIES DRAWERS

150

18 200

F

KOHLER SEMI RECESSED WASH BASIN

139

181

315

SECTION AA'

169 62 1124

578

SECTION BB'

SCALE 1:25

SCALE 1:25

Master Bedroom - Toilet details of Goel’s Residence FALSE LEVEL -2490 MM FROM FFL

465

660

2165

557

75 MM THK LEDGE WALL WITH WOODLIKE TILES

690

SHOWER HEAD (KOHLER)

50

25

40 Professional Projects

LIGHTING

5MM GROOVE WOODLOOK TILES ALASKA GOLD 400MM X 75MM

18

EXISTING LOUVERED WINDOW WITH EXHAUST FANS

320

20

1600

1700

448

300

1054

6MM THK MIRROR WITH 12MM THK MARINE PLY BACKING WITH HARDWOOD FRAMING AND COVE LIGHING

STORAGE SHELF

278 740

1200

88

MEP CON

MASTER BE TOILET -DET

DRAWN B

NICHE IN MARBLE FINISH

50

200

110

450 410

555

800 600

1050

1050

PAPER HOLDER

WC

400

12MM THK GLASS WITH STAINLESS FINISH FRAME FINISH TO MATCH ALL 88 SANITARY FIXTURES. 18 MARBLE STONE FINISH NICHE IN MARBLE FINISH

WOOD LOOK TILES

SOAP DISPENSER

JET SPRAY

139

PRINCIPAL

DATE OF IS

CABINET SHELF

THERMOSTATIC & DIVERTER

410

SITE:

Mr. AN

PROJECT M STRUCTUR

6

12MM THK GLASS WITH STAINLESS FINISH FRAME FINISH TO MATCH ALL SANITARY FIXTURES.

FLUSH

360

400

88

FALSE LEVEL -2490 MM FROM FFL

153

18 18 200

2490

2490

18

939

SOAP DISH

88

200

1390

975

815

1000

18

690

PROJECT:

ADDRESS FO AZZIANO-B,R NASIK ROAD

18

50 422 25

HARDWOOD FRAMING

DETAIL AT 'F' SCALE 1:8

SHOWER 900

400

12MM THK MARINE PLY

LED STRIP

12

400

6MM THK MIRROR

42

DETAIL AT 'E'

939

88

495

1

3 50 35

18MM THK MARBLE STONE VANITY COUNTER

12

4 314 4 314 12MM MARINE 8X 50 MM 18MM MARINE PLY PLY WITH WITH LAMINATE FINISH LEVELLERS LAMINATE FINISH

4

400

LED STRIP

8 12

400

5 5 5 5 5 5 5 5 75 75 75 5 5 75 75 75 75 75 75 18

SCALE 1:8

614

448 18 12MM MARINE PLY WITH LAMINATE FINISH

400

200

60

DETAIL AT 'D'

12 1 106 1

1

400

18 MM THK KADAPPA CEMENT FILLING

8 127

18

18 5

18

5 5 5 5 18 75 75 75 5 5 75 75 14

18

5

244

652 592 149

327

5 50

50

EXISTING LOUVERED WINDOW WITH EXHAUST FANS

1 12

SPOUT TAP

ACCESSORIES DRAWERS

CHAMFERED EDGE

18

315

D'

12 8X 50 MM LEVELLERS

18MM THK KADAPPA 18MM THK MARINE PLY WITH LAMINATE FINISH

12 8 20

DRAWER DETAIL

PLAN

18

464

18MM THK MARBLE STONE VANITY CONTER

CLIENT:

SCALE 1:20

A

SCALE 1:10 484

35 50 3

30

25

DETAIL AT 'A'

TOWEL ROD

314

W5

12

K STUD

454 900

496

SCALE 1:8

50

12MM THK GLASS WITH STAINLESS FINISH FRAME FINISH TO MATCH ALL SANITARY FIXTURES.

446 314

Rev.

DETAIL AT 'B'

TAP SPOUT

1124

75

18 MM THK STONE FOR STORAGE SHELF

169

484

75 MM THK LEDGE WALL WITH WOODLIKE TILES

650

18 MM THK KADAPPA STONE

75MM THK BRICK ON LEDGE WALL

18

1394 1049

HARDWOOD BLOCK TO SUPPORT

18

376 360

START POINT FLOORING

407

315

WALL HUNG W.C. (KOHLER) 360X490MM

C

18MM THK KADAPPA

CEMENT FILLING

WOODLOOK TILES 400MM X 75MM

C'

18MM THK MARBLE STONE VANITY CONTER

50

STORAGE SHELF &ACCESSORIES DRAWERS BELOW

490

MARBLE STONE FINISH

18MM THK MARINE PLY WITH LAMINATE FINISH

50

366

484

156 139

25

NICHE

KOHLER SEMI RECESSED WASH BASIN

5 75

25

660

590

560

50

5MM GROOVE

5 75

50

462

50

35 15

155

84

BACKING WITH HARDWOOD FRAMING AND COVE LIGHING

18 18 172

600

464

B' 12MM THK MARINE PLY

50 91 59

578

815

KOHLER SEMI RECESSED WASH BASIN 6MM THK MIRROR WITH

B

84 60

6MM THK MIRROR WITH 12MM THK MARINE PLY BACKING WITH HARDWOOD FRAMING AND COVE LIGHING KOHLER BASIN MIXER

CABINET SHELF

E

658 342

514

All dime All level This dra to be pr for any o 4. This dra 5. ALL DIM START O TO THE 6. The Con dimensi Any disc 7. This dra architec discrepa consulta prior to 8. All the s services 9. Drawing intent an from ful fitness f 10. Constru within 7 coordina be deem drawing carried o

5 75

WOODLOOK TILES

790

A'

DRAWING

KS025_R_


N

1 2 3

4 5

6

7

8

9

1

DETAIL @A SCALE=1:20

D

D

K Studio - Internship Projects 41


HOSPITALITY PROJECT

Vijaywada, Andhra Pradesh. 5 Star Hotel Grand Hyatt Interior Design Project, 2020 - ongoing Project Name : Hyatt Place Vijaywada Client : RVS.Convention Pvt.Ltd. My Role : Working Drawings, Detailed drawings of Non standard Room - k7 with furniture layouts, Revision drawings, toilet details, wardrobe details, artwork, doors & furniture details, preparation of specification sheets and coordination with team members responsible for other Mockup Rooms drawings.

K7- RCP LAYOUT

NOTE: 1. 2. 3.

All dimensi All levels ar This drawin to be produ for any oth 4. This drawin 5. ALL DIMEN START OF W TO THE NO 6. The Contra dimensions Any discrep 7. This drawin architectur discrepancy consultants prior to pro 8. All the serv services pro 9. Drawing ap intent and d from full re fitness for p 10. Constructio within 7 wo coordinatio be deemed drawing/de carried out

Rev.

PROJECT:

HYATT PL SITE:

CLIENT: RVS CONVETIO

PRINCIPAL D

K STUDIO

ADDRESS FOR C AZZIANO-B,RUS NASIK ROAD ,T

PROJECT MA STRUCTURAL

MEP CONSU

LIGHTING CO

TENDER

DRAWING TI

NON STANDARD REFLECTED CEIL KS033_GRI_MR

DRAWN BY : ASSUMPTIONS: FINISHED FLOOR LEVEL OF GUESTROOM ± 0.00 ALL CEILING HEIGHT WOULD BE FROM ±0.00 NOTE- EXHAUST FAN LOCATION TO BE CO-ORDINATED WITH MEP DRAWINGS.

Reflected ceiling plan and its details - k7 room, HPV

42 Professional Projects

DATE OF ISSU

DRAWING NO

KS033_GRI_MR


START OF WORK ANY TO THE NOTICE OF TH The Contractor / Proje dimensions and detail Any discrepancy shall 7. This drawing shall be r architectural, structur discrepancy noticed sh consultants and resolv prior to procurement / 8. All the services ducts / services provisions. 9. Drawing approval is fo intent and does not re from full responsibility fitness for purpose of 10. Construction Manager within 7 working days coordination and build be deemed that they h drawing/design and ow carried out accordingly 6.

154

1146

309

3425

356

75

1700

MRK-TB-02

329

317

142 194 329

52

744 277

3

EQ

1000

839

1106

50 3 508

EQ

796 732

796

PROJECT MANAGER/ STRUCTURAL CONSUL

MEP CONSULTANT

398

220 MRK-WS-01

2376

EQ

57

154

734

304

T1 5

K1 6

T1 7

Room 3.55 X 7.50M

Room 3.55 X 7.50M

K1 8

T1 9

K1 10

T1 11

K1 12

T1 13

LIGHTING CONSULTAN

3

MR-GL-04

437

1141

2765

MRK7-TB-01

EQ

661

505

SAFE

551

3

75 100 690

MR-PU-02

250

1796

1304

83

750

650

210 206 135 285 EQ 300

STUDY TABLE

MR-ST-01

462

1106

200

SHOWER AREA

MINI BAR DOMETIC HIPRO 4000 VISION (405X464X559MM)

EQ

EQ

MR-FB-07

K STUDIO

550

310

PRINCIPAL DESIGN CO

ADDRESS FOR CORRESPO AZZIANO-B,RUSTOMJEE UR NASIK ROAD ,THANE WES

549 260

MRK-CH-01

690

CLIENT: RVS CONVETIONS PVT. LT

577 538

338

MRK7-D-03

1800

1250

MR-LM-01

555

459

397

T.V. (55") 1217X 125 MM)

548

1139

32

06

ELEV C

534

145 200 75 EQ

11

EQ

ELEV B

SITE:

WARDROBE

533

248

ELEV A

EQ

ELEV D

STUDY CHAIR (470 X 532 MM)

MRK7-D-02

361

1149

724

ELEV U

661

1393

MR-LM-04

75

PROJECT:

HYATT PLACE VIJ MRK7-WR-01A &MRK7-WR-01B

FOOT STOOL (1250 X 350 MM)

C LEDGE (500 X 305 MM)

1100

1496

1500

MRK-TOI-01, 02&03

550

50

1084

REFER DETAIL DRAWINGS

SS STRIPS

2091

RUG (1550 X1550 MM)

MR-FB-18

Pu

LUGGAGE RACK

K7 AREA OF ROOM = 33.3 SQ.M.

MRK-OT-01

1375

404

MR-FB-17

600 50

18

MIRROR

OTTOMAN (450 X 700 MM)

MRK-SF-04

Rev.

1030

556

SOFA (1500 X2125 MM)

WASH BASIN

750

774

513

750 250

200

2123

ELEV P

MR-CR-05

MIRROR UNIT

841

18

50

18 9

25

259 598

283

725

ELEV Q

1199

50 MM THK LEDGE BELOW

20 42

50

MRK7-D-01

MRK-BD-01

ELEV S

125

75

20

710 668

931 801

50

112

BED (1864 X2052 MM)

ELEV R

NAHANI TRAP

MR-LM-04

1180

380

1200

W.C.

100MM THK LEDGE WALL

MRK-TB-01B

MR-LM-04

245

316

SIDE TABLE (445 X445 MM)

SIDE TABLE (445 X445 MM) MRK-TB-01A

1350

602

153

106

25 350

50 18

487

1158

75 89

MRK7-HB-01

315

5

3

LIFT 1.75x2.50 13ppl

LIFT 1.75x2.50 13ppl

SERVICE AREA 3.74m X3.43m

DN

Room 3.55 X 7.50M

Room 3.55 X 7.50M

Room 3.55 X 7.50M

Room 3.55 X 7.50M

Room 3.55 X 7.50M

2400

Room 3.55 X 7.50M

Room 3.55 X 7.50M

1200

1200

UP

DN

UP

+12.30 LVL

HOUSE KEEPING 3.74m X1.50m

S1 18

1.8 M WIDE CORRIDOR

ELEC. ROOM 1.50 X 2.60M

2246

1462

( X ) BEAM

( X ) BEAM

1600

1.8 M WIDE CORRIDOR

Room 3.55 X 6.40M EXISTING BEAM

Room 3.55 X 6.40M

S1 14

EXISTING BEAM

3 1680

Room 3.55 X 5.90M

K-7

Room 7.50 X 5.00M

Room 3.16 X 6.00M

OPEN TO SKY CUT-OUT

3000

3000

OPEN TO SKY CUT-OUT

TENDER

2733

EXISTING SLAB TO BE REMOVED

1700

S2 19

PK1 21

JS3 24,25(NB)

THIRD FLOOR PLAN @ LVL +12.30

REFER - MOCKUP ROOMS BRICK MARKING LAYOUT

6

S2 20

JS2 22,23(NB)

6

2400

Room 3.16 X 6.30M

Room 7.50 X 4.90M

4

NOTE: TV HAS NOT BEEN FINALIZED . 1250 MM CRITICAL DIMENSION FOR TV TO FIT.

1.8 M WIDE CORRIDOR

Room 7.50 X 3.55M

OPEN TO SKY CUT-OUT

600

K1 1

CUT-OUT EXISTING SLAB TO BE REMOVED

3554

750

Toi 2.98 X1.70M

Toi 2.98 X1.70M

K1 2

FIRE EXIT DOOR

RWP EXISTING BEAM

750

Room 7.50 X 3.55M

1.8 M WIDE CORRIDOR

SCALE- 1:30

Room 3.55 X 6.40M EXISTING BEAM

18.65 sqmt

FURNITURE PLAN

Room 3.55 X 6.40M

( X ) BEAM

Room 3.55 X 6.40M

2550

LIFT

16 pax

( X ) BEAM

2550

LIFT

16 pax

( X ) BEAM

Room 7.50 X 3.55M

K1 3

S1 15

1.8 M WIDE CORRIDOR

1800

6.18mX3.00m

Furniture Layout of k7 Room and key Plan of HPV

S1 16

+12.30 LVL

2150

K1 4

S1 17

LIFT LOBBY 6.71X2.83m

DN

UP

2150

REFER - MOCKUP ROOMS BRICK MARKING LAYOUT

EXISTING BEAM

1826

NO. OF ROOMS = 23

KEY PLAN SC : 1:500

MR-PT-03

MR-PT-03 GRILL

CALCIUM SILICATE FALSE CEILING

MR-PT-02 50X50 MM WOODEN FRAME

MRK7_901-D-02

MR-LM-01

MR-LM-01

MRK_801-DET-01

ENTRANCE DOOR

MR-PT-07 REFER DETAIL DRAWINGS MRK7_801-TOI-01,O2,03

ADV

DRAWING TITLE:

NON STANDARD ROOM- K FURNITURE PLAN KS033_GRI_MRK7_101.01

DRAWN BY : ANJALI NOTE:

DATE OF ISSUE: 26/02/2

DRAWING NO1. : All dim 2. All lev

KS033_GRI_MRK7_101.01 3. This d to be for an 4. This d 5. ALL D START TO TH 6. The C dimen Any d 7. This d archit discre consu prior t 8. All the servic 9. Drawi intent from fitnes 10. Const within coord be de drawi carrie

Rev. D-01

SB 04

MR-FB-06

MRK7_901-D-01

D-01

MR-FB-06

MRK7_801-HB-01

SB 05

MRK_801-TB-01A

MRK_801-TB-01B

MRK_801-SF-04

R-08

ELEVATION A

MRK_801-BD-01

PROJECT:

SCALE=1:35

NOTE:

HYATT

SITE: All dimensions a All levels are in m This drawing CLIENT:is a to be produced, RVS CON for any other pu 4. This drawing is t 5. ALL DIMENSION PRINCIP START OF WORK TO THE NOTICE K STU 6. The Contractor / ADDRESS dimensions and AZZIANOAny discrepancy NASIK RO 7. This drawing sha architectural, str discrepancy not consultants and prior to procure PROJECT 8. All the services d STRUCT services provisio 9. Drawing approv intent and does from full respon fitness for purpo 10. Construction Ma within 7 working coordination an be deemed MEPthat CO drawing/design carried out acco

1. 2. 3.

CEILING LEVEL 2930

MR-PT-03

CEILING LEVEL 2550

MR-PT-02 MRK7_801-WR-01

SP

(SPRINKLER)

CEILING LEVEL 2750

CEILING LEVEL 2930

GRILL

MR-PT-01

PORTAL

MR-PT-01

MR-PT-02

AC GRILL MR-PT-02

MR-PT-02

MRK7_901WS-01

CEILING LEVEL 2750

MRK7_901-D-03

SAFE 50 X 50 MM HARDWOOD FRAME

EL SAFE SENTINEL II 25 (260X 206X437MM)

MRK7_801-WR-01 MR-LM-01

MR-PT-02

MR-PT-02 REFER DETAIL DRAWINGS MRK7_801-TOI-01,O2,03

SB-14

TV (55")

THERMOSTAT

SAFE

MR-GL-04

J-BOX

SB 02

TV( 55 ") (AS PER OWNER'S INSTRUCTIONS)

MR-PT-02

SB- 08

MR-LM-01

DRAWER

MRK-GL-04

EL SAFE SENTINEL II 25 (260X 206X437MM)

Rev.

LIGHTIN

MRK_801-TB-03

MR-LM-01

MRK7_801-HB-01

MRK_801-CH-01

DRAWER

SB- 09

MR-FB-07

MINI BAR

DOMETIC HIPRO 4000 VISION (405X464X559MM)

LUGGAGE RACK

DRAWER

MRK_801-BD-01

MRK-TB-04

HSKP

ELEVATION C

SCALE=1:35

PROJECT:

SB 03

SITE:

Sectional elevations - K7 Room, HPV

ELEVATION B

TEND

HYATT PLACE

DRAWIN

NON STAN CLIENT: ELEVATIO ELEVATIO RVS CONVETIONS P KS033_GR

SCALE=1:25

MR-PT-03 K Studio - Internship Projects 43

DRAWN PRINCIPAL DESIG DATE OF

K STUDIO

ADDRESS DRAWIN FOR COR AZZIANO-B,RUSTOM KS033_GR NASIK ROAD ,THAN

CEILING LEVEL


PROFESSIONAL PROJECTS FREELANCE PROJECTS

Live projects under self-startup studio “unbuilt design studio” Along with my undergraduate studies, i’ve had the oppurtunity to be part of some residential projects - From design stage to construction and excecution. Dealing with site drawing requirements, material selection, client meetings, BOQ, Estimation, design helped me to gain different perspective of project management. Projects with this self-startup studio included several interior projects as well as residential projects from scratch including: - Ransai Farmhouse | 2500 sq.ft. | Completion stage - Swarna valley resort, khopoli | 2 acres site | Completed - Compact house (3bhk bungalow) | 1800 sq.ft | ongoing - 3bhk villa, Mahabaleshwar | 1500 sq.ft.| conceptual stage Few of selected works of Freelance projects which shows my capablities of design and project handling , design concepts and knowledge can be viewed through these projects. FARMHOUSE - RESIDENTIAL PROJECT Weekend House at Vavoshi. 2020-21 - completion statge

2BHK Bungalow - RESIDENTIAL PROJECT Redevelopment of Retail store to 2bhk bunglow at khopoli. 2020-21 - ongoing

Project Courtyard House (Landscape spaces Infront of house)

44 Professional Projects


05

Courtyard House at Vavoshi, Ransai village, Maharashtra Farmhouse - Residential project .

Freelance Projects 45


THE COURTYARD HOUSE Vavoshi, Ransai Village, Maharashtra. Weekend House - Residential Project Ongoing - Completion Stage The farmhouse at vavoshi is designed for the group of friends investing together in a place where there can be weekend Meets and peaceful as well as getaway space from the hustle and bustle of city. The design tries to build a soulful dialogue between the ‘built’ and ‘unbuilt’ through verandahs and courtyards. The main aim of the design was to bring inside out and provide spaces which be moulded into various chill out areas for the client. Courtyard space being the focal point of the design, invites in light and ventilation. All the spaces Inside the house is connected by verandahs sky lit through semi - open courtyard at the centre. Landscape spaces and amenities added to the site are strategically placed and designed as per client’s desire and vision.

Section of Courtyard House at vavoshi, Ransai Village

LEGENDS

Live site photos of Farmhouse at Vavoshi at construction stage

46 Professional Projects

1. Main Entrance - Site 2. Landscape Areas 3. Swimming Pool 4. Common Toilet 5. Pump Room 6. Fire Place 7. Multipurpose Court 8. Secondary Entrance 9. Outdoor Dinning Space 10. Landscaped Walkways 11. Entrance Foyer - House 12. Verandahs 13. Courtyard 14. Bedrooms 15. Kitchen 16. Dinning Area 17. Living Area 18. Stairs to Terrace


Front View of the Courtyard House

view from the Landscape spaces of Courtyard House

2 6 2

7

3

8

4

11

14

14

5 14

14

12

10 13

18

2

15

17

2

16 9

10 1

Site & Floor Plan of Farmhouse at Vavoshi

Built up area = 2500 sq.ft.

Freelance Projects 47


THE COMPACT HOUSE Khopoli, Raigad.

3 BHK Bungalow - Residential Project Ongoing - 2020 Area - 1600 Sq.ft. Client: Bhakti Sathelkar The Compact House at Khopoli, Raigad is the redevelopment of retail shop to an house. The client desired to fit in an extended house for them with affordable budget and maximum utilization of space. Thus the design concept was to make the compact footprint of the house a postive element and work out of flow for spaces and its standard areas. Plan follows a linear geometry with three spaces one after other.

The compact House

Terrace space at the first floor

The ground floor is designed as an open plan, thus optimising the space. The upper rooms strike a dialogue with the outside by way of a terrace and sit out window.

LEGENDS 1. Main Entrance 2. Living Area 3. Open Kitchen 4. Common Toilet 5. Bedroom 6. Toilet 7. Stairs to upper floor 8. Terrace

Front Elevation of Compact House

48 Professional Projects


5

5

6

6

4

6

3

7 5

2

8

1

GROUND FLOOR PLAN

FIRST FLOOR PLAN Floor plans of Bhakti bunglow/ compact house. Area of the House = 1600 sq.ft.

Freelance Projects 49


COMPETITION

PROJECT ATHENA

Bangalore, india

The master studio- community of architecture &design Organisers- archmello Year -2020 The architectural student culture and work culture differs. Architecture students are unknown & unfamiliar to the actual working fields and lead to dependency solely on what the university’s professors has to offer. This has led to graduates stepping into the building industry for first time- a difficult task, more often perceived as ‘the next university’ for the large learning curve that comes after.so bringing the two ends under the same roof was the major intent of the competition i.e. To design a co-working commercial space for freelancing architects, studios for established firms and a learning center for architecture students The project Athena aims to create a facility which bridges the gap between students & professionals- a facility where the design students & professionals can work together encouraging design dialogue, interactive sessions, workshops & a new generation of architects. The concept of Athena is to design an interactive environment, and creative spaces, corners and pockets within the building where individual can get privacy as well as get inspiration from. Zoning of the spaces such that the end-users get the most benefits from each other thus making a learn & work platform.

Project Athena (Front view)

50 Competition


06

Master studio - co-working commercial space for freelancing architects,studios for established firms and a learning center for architecture students.

Master Studio- Project Athena 51


MISCELLANEOUS

54 Miscellaneous


07

Documentations 55


Turn static files into dynamic content formats.

Create a flipbook
Architectural portfolio 2016-2021 by Anjali Chettiar - Issuu