Skip to main content

DeBlase Portfolio 2021

Page 1

ANGELO DEBLASE Portfolio 2019-2021

contact (419) 217.3888 angelo.deblase@outlook.com


ANGELO DEBLASE

(419) 217.3888 | angelo.deblase@outlook.com | https://issuu.com/angelo.deblase

REFERENCES

RECENT EXPERIENCE

Amanda Petretti

Softwares Revit Adobe InDesign Adobe Photoshop Adobe Illustrator Bluebeam Revu Sketchup Rhino3D AutoCad Grasshopper Ladybug & Honeybee Maya Other Physical Model Making 3D Fabrication Hand Drawing / Sketching

Studio Petretti Architecture | Portland, OR | 2019 - 2021 Project Experience PDX International Airport, TCORE TR - Large-scale coordination of tenant relocations triggered by the construction of a new terminal (in collaboration with ZGF Architects) La Salle College Preparatory High School, Saalfeld Athletic Center - Renovation of and addition to the existing athletic facility La Salle College Preparatory High School, Gymnasium Graphics - Led the development of new graphics for the gymnasium flooring and acoustic wall panels La Salle College Preparatory High School, Athletic Center Phase 2 Planning & Design - New construction of an on-site practice facility completed through concept design documents used for pricing estimates Lake Cabin, Private Residence - Completion of a single family residence from schematic design to construction documents Private Developer, Mixed Use Project - Led the feasibility study for a new construction project located in Camas, WA Portland Public Schools, Terwilliger School - Building and finish upgrades to three existing buildings on site Portland Public Schools, Stephenson Elementary School - Documentation lead for upgrades to classroom finishes and floor structure Portland Public Schools, West Sylvan Middle School - Modifications to existing classroom spaces including finish upgrades Portland Public Schools, Holladay Center - Documentation lead for a door replacement to meet security standards Portland Public Schools, Applegate School - Documentation lead for a window replacement Residential Client, ADU - Completion of a large scale addition to a single-family residence from the schematic design to permitting Residential Client, ADU - Feasibility study for a new dwelling unit on a residential site in the greater Seattle area Additional Efforts RFP/RFQ Proposals - Led the graphic organization of information for submissions Graphics Standards - Collaborated to develop office templates and Revit standards

ACADEMIC ACHIEVEMENTS

PREVIOUS EXPERIENCE

University of Oregon Department of Architecture 2 year scholarship University of Cincinnati - DAAP Cares Award - Capstone Studio, Spring Semester 2017 Best in sustainability and community engagement

John Senhauser Architects | Cincinnati, OH | Internship 2018 Glaserworks | Cincinnati, OH | Internship 2017 Elkus Manfredi Architects | Boston, MA | Internship 2016 Gensler | Baltimore, MD | Internship 2015 RJTR Design | Atlanta, GA | Internship 2015

Studio Petretti Architecture Founding Principal amanda@studiopetretti.com

Hannah Allender Studio Petretti Architecture Project Manager/Project Architect hannah@studiopetretti.com

Lauren Hackett Studio Petretti Architecture Project Manager/Project Architect lauren@studiopetretti.com

PROFICIENCIES

EDUCATION M. Arch | University of Oregon | SAE PDX

Architectural Technology Specialization with a focus in Design Media Graduation Date: June 2019

B.S. Arch | University of Cincinnati | DAAP SAID Graduation Date: April 2017


TABLE OF CONTENTS Select Project Experience

NOTE: All drawings and images are owned by Studio Petretti Architecture and are not to be copied or used for construction 01

PDX International Airport TCORE Tenant Relocations

02

La Salle College Preparatory School Athletic Center Phase 2 Planning & Design

03

Lake Cabin Private Residence

04

Private Development Mixed Use Building


Construction Photo - Anticipated Completion, October 2021

01 PDX International Airport TCORE Tenant Relocations Tenant Improvements | Retail

Necessitated by the PDX International Airport TCORE expansion in collaboration with ZGF Architects, this project consisted of coordinating the relocation of 30 tenant spaces over phased permit groups. The scope of work for each ranged from relocating existing furniture and providing new utilities to fully designed spaces and finishes. With the program of the Timberline Lodge retail space remaining the same, the primary focus was coordinating the refurbishment and relocation of existing elements along with custom finishes and detailing. Throughout the design of this space, I led the coordination and relocation of existing items, the design of custom wall graphics, and the production of construction documents through the permit revision. Additional efforts included: collaborating to complete multiple permit groups, coordination and management of indices throughout multiple permit groups, coordinating with consultants to execute details and graphics, and preparing graphics and presentations for client meetings.


1" 1/2" 1/4"

3 ___________ A26.101

0

GRAPHIC SCALE-FOR REFERENCE

SCALE: IN FEET

SALVAGE EXIST. FURNITURE FOR REINSTALLATION

ELECTRICAL T1299 46 SF

DEMO EXIST. PERIMETER DISPLAY

DEMO EXIST. PERIMETER DISPLAY

DEMO EXIST. TIMBER POST SALVAGE EXIST. FURNITURE FOR REINSTALLATION

SALVAGE EXIST. DISPLAY STAND FOR REINSTALLATION DEMO EXIST. TIMBER POST

SALVAGE EXIST. DISPLAY STAND FOR REINSTALLATION

DEMO EXIST HEARTH

SALVAGE EXIST. LED SIGN FOR REINSTALLATION SALVAGE EXIST. FURNITURE FOR TENANT

A26.101

DEMO EXIST. FURNITURE

DEMO EXIST. PERIMETER DISPLAY DEMO EXIST TIMBER POST

SALVAGE EXIST. DISPLAY STAND FOR REINSTALLATION DEMO EXIST. PERIMETER DISPLAY DEMO EXIST. TIMBER POST

DEMO EXIST. POSTS

DEMO EXIST. TIM COLUMNS

4

A26.101

4'

8'

12'

DEMO ELEVATION DE SCALE: 1/4" = 1'-0"

Demolition Floor Plan- -EXISTING ExistingTENANT RetailSPACES Space,- TIMBERLINE NTS ENPLANING LEVEL 1 SCALE: 1/4" = 1'-0"

SCALE: IN FEET

LEGEND: 1 ___________ EXIST. COLUMN AND SURROUND EXIST. WALL TO REMAIN EXIST. WINDOWS DISPLAY

8' - 1"

1' - 6"

A26.906

AREA OF WORK

ELEC & STORAGE C22580 84 SF

DEMO

3' - 0" CLR

DEMO FINISH

RELOCATE DISPLAY TABLES

1 ___________

ELEC RACK REINSTALL DATA RACK, REF TECH

C22580

A00.605

DISPLAY

R

I1-C

0'

7"

I11-C1

NO.

DATE

BY

REVISIONS #

6 2 AP Sheet REVISED by CC#26.93 5 3 A26.501 A26.501 AP Set ADDED by CC#26.8 BY

REVISIONS #

R

APP'VD CK'D

4 BIM 360://P22711.next - PDXNext Terminal Core Redevelopment/PDX-XXXXXX-ARCH-Tenant Relocation.rvt

PORT OF PORTLAND

PORTLAND, OREGON ADA REQ'D CLEARANCE (3) TIER SHELVING, WD-3

° .00 60

light gray dark

04/26/21 RETAIL 01/22/21 C22560 SF APP'VD CK'D NO. 1096 DATE

black

2 1

12' - 10" CLR

BENCH

PRINTED: 5/10/2021 1:56:12 PM

1'

-0

"

1223 SW Washington Street, Suite 200 Portland, OR 97205 T 503 224 3860 - F 503 224 2482

2016D006

102191

DESIGN NUMBER

PROJECT NUMBER

REINSTALL CASEWORK

RELOCATE DISPLAY TABLES

4' - 10"

3' - 10"

20' - 1 5/8"

POS CASEWORK

RELOCATE DISPLAY TABLES DISPLAY

DISPLAY DISPLAY TABLES RELOCATE DISPLAY TABLES

I11-C1 TIMBER POST RESINTALL MODIFIED SECURITY GATE

5' - 6" CLR

I10-E

1 A26.501

CL CL

10 1/8"

C22560-01

7' - 1 1/8" CL

1 ___________ A26.901

I3-E

ALIGN THREE DIFFERENT LEVELS OF SHADING. OPTIMIZED WHEN ALL THREE PLANES ARE

2

SALVAGE EXIST. DISPLAY STAND FOR REINSTALLATION

4

gray

GRAPHIC SCALE-FOR REFERENCE ONLY

CAN YOU SEE THE AIRPLANES? THE ADJACENT SAMPLES SHOW THREE DIFFERENT LEVELS OF SHADING. 1/4" 1/2" ARE OPTIMIZED 1" 2" ALL THREE PLANES ARE SETTINGS FOR VIEWING AND PRINTING DRAWING0CONTENT WHEN VISIBLE. THIS GUIDANCE IS PROVIDED FOR REFERENCE ONLY.

SALVAGE EXIST. DISPLAY STAND FOR REINSTALLATION

2'

SCALE: 1/4" = 1'-0"

SALVAGE EXIST. FURNITURE FOR TENANT

RETAIL D2016 1062 SF

3 ___________

SALVAGE EXIST. DISPLAY STAND FOR REINSTALLATION

0'

DEMO ELEVATION DET

2

SALVAGE EXIST. FURNITURE FOR TENANT

ALIGN

1 ___________

I10-E

A26.904

CL

Floor Plan - New Retail Space, NTS

I10-E

3' - 3 7/8" CL

2 ___________ A26.901

3' - 1 1/4" CL

CL

WINDOW EXIST. COLUMN AND SURROUND


EXIST. LSTA24 STRAP WITH D10X1/2 NAILS

1/2" 0

1/4"

GRAPHIC SCALE-F

2

REMO FROM

EXIST. CEILING

ELECTRICAL T1299 46 SF

DEMO EXIST. LED LIGHTING AND COVE DEMO EXIST. CEILING STRUCTURE

SALVAGE EXIST. WOOD BEAM

A26.102 SALVAGE EXIST. PENDANT LIGHT FIXTURE FOR REINSTALLATION

3

DEMO EXIST. HEARTH DEMO EXIST. RECESSED LIGHTING

2

2 ___________ A26.102

DEMO SCALE:

RETAIL D2016 1062 SF 2

DEMO EXIST. LED LIGHTING AND COVE

APPR

CONFIRM EXT

DEMO PORTION OF SECURITY GATE

3

DEMO SCALE:

SALVAGE EXIST. BLADE SIGN FOR USE AT PEET'S/SOUNDBALANCE, SEE GROUP 4

A26.101

EXIST. HEADWALL ABOVE DEMO EXIST. ARCH BEAM

Demolition RCP - Existing Retail Space, NTS LEGEND: EXIST. WALL TO REMAIN AREA OF WORK

A26.901

DEMO EQ

2' - 6" CL

SLOT DIFFUSER, REF MECH TYP CAMERA, REF TECH TYP SOFFIT REINSTALL SPEAKER, REF TECH RECESSED LIGHT, REF ELEC

5 ___________

CL

CL

EQ

2' - 0"

7 3/8"

CL

EQ

EQ CL CL CL

1' - 9"

3' - 6"

WD 8' - 9" EQ

EQ

CL

CAMERA, REF TECH TYP

CL

EQ

OPEN TO STRUCTURE

CL

CL

LIGHT, CENTER IN ROOM REF ELEC

CL

RETAIL C22560 1096 SF

CL

CL

A26.901

COVE LIGHTING ALIGN ACCESS HATCH, CL 2 04/26/21 AP Sheet REVISED by FACES CC#26.93 FINISH REF MECH CL 1 01/22/21CL AP Set ADDED by CC#26.8 CL CL PROJECTOR CL NO. DATE BY REVISIONS # APP'VD CK'D NO. DATE C BY REVISIONS # OPENING L 1' - 9" 3' - 0"- PDXNext Terminal Core Redevelopment/PDX-XXXXXX-ARCH-Tenant Relocation.rvt PRINTED: 5/10/2021 1:56:21 PM BIM 360://P22711.next PROJECTOR, CL 1' - 7" REF ELEC C L

CL CL

1' - 9"

CL

RECESSED LIGHT, REF ELEC

3' - 6"

CL

CL

CL

CL

CL

CL

CL

GWB 10' - 0"

6"

CL

5 1/2"

CL

CL

WD 9' - 7"

CL

CL

CL

COVE LIGHTING

CAMERA, REF TECH TYP RESINTALL MODIFIED SECURITY GATE ARCH EXIST. HEAD WALL ABOVE

CL

CL

SLOT DIFFUSER, REF MECH TYP

CL

CL

5 ___________ A26.908

CL

CL

CL

6 ___________ A26.901

CL CL

1 A26.501

RCP - New Retail Space, NTS

1 ___________ A26.904

2' - 4"

CL

CL

2 A26.904

REINSTALL SPEAKER, REF TECH CAMERA, REF TECH TYP

A26.908

2

DETAIL ELE SCALE: 1 1/2" 102191

PROJECT NUMBER

REM FRO 4

PLAN DETA SCALE: 1 1/2"

EXIST. COLUMN AND SURROUND

NEW BLADE SIGN 6

PORTLAND, OREGON BOTTOM TO REF A26.602

1' - 1" TIMBER TRELLIS, REF A26.602 RECESSED LIGHT, REF ELEC SLOT DIFFUSER, REF MECH CAMERA, REF TECH

CL

2' - 0"

PORT OF PORTLAND TAPERED

RECESSED1223LIGHT, SW Washington Street, Suite 200 Portland, OR 97205 CENTER OVER T 503 224 3860 - F 503 224 2482 REF ELEC 2016D006 COVE LIGHTING DESIGN NUMBER CAMERA, REF TECH TYP REINSTALL SPEAKER, REF TECH REINSTALL LIGHT FIXTURE, CENTER OVER CASEWORK REF ELEC CAMERA, REF TECH

APP'VD CK'D

1' - 4"

CL

REINSTALL SPEAKER, REF TECH

3 ___________

CL

UNISTRUT W/ (2) NEW # 12-14 SELF DRILLING SCREWS TO EA. FLUTE. USE (1) NEW 3/8" DIA. HILTI KBTZ W/ 2" EMBED AT COMPOSITE DECK, REF STRUCT GWB CEILING, REF A00.604

ELEC & STORAGE C22580 84 SF

2' - 0"

CL

CL

OUTLET, REF ELEC REINSTALL SPEAKER, REF TECH P-11

CAMERA, REF TECH TYP

DEMO FINISH

3' - 0"

gray dark black

EXIST. CEILING DEMO PORTION OF EXIST BEAM END AS REQUIRED FOR EXTENSION ATTACHMENT SALVAGE EXIST WOOD BEAM

EXIST. COLUMN AND GWB SURROUND

4

light

gray

GRAPHIC SCALE-FOR REFERENCE ONLY

CAN YOU SEE THE AIRPLANES? THE ADJACENT SAMPLES SHOW THREE DIFFERENT LEVELS OF SHADING. 0 DRAWING 1/4" 1/2" 1" 2" SETTINGS FOR VIEWING AND PRINTING CONTENT ARE OPTIMIZED WHEN ALL THREE PLANES ARE VISIBLE. THIS GUIDANCE IS PROVIDED FOR REFERENCE ONLY.

3

DIFFERENT LEVELS OF SHADING. ZED WHEN ALL THREE PLANES ARE

REMO FROM

SALVAGE EXIST. SECURITY GATE FOR REINSTALLATION

A26.102

REM FRO

SOFFIT WALL

TIMBER BEAM INFILL REINSTALL TIMBER BEAM

WALL, REF PLAN

6

PLAN DETA SCALE: 1 1/2"


WALL COVERING - Forest

WINDOW & WALL COVERING

Scenario B: Wood displays as focal point, wood ceiling defines POS, specialty display

od

EAST WALL GRAPHIC Custom Wall Graphics - Precedent and Concept Imagery - An abstraction of the Mt. Hood National Forest leading up to the Timberline Lodge Ski Lift and Silcox Hut

WOOD TRIM

WOOD TRIM

WALL

WEST WALL GRAPHIC STUDIO PETRETTI ARCHITECTURE

TCORE TENANT RELOCATIONS - TIMBERLINE MTG 4 11|18|2020

CUSTOM WALL COVERING CUSTOM WALL COVERING

STUDIO PETRETTI ARCHITECTURE

TCORE TENANT RELOCATIONS - TIMBERLINE MTG 2 CUSTOM WALL 11|04|2020 COVERING

PROJECTION SURFACE

CUSTOM WALL COVERING

'LIFT' GRAPHIC

PROJECTION SURFACE

WALL

STUDIO PETRETTI ARCHITECTURE

'LIFT' GRAPHIC

Custom Wall Graphics - Elevation/Spatial Composition Studies

TCORE TENANT RELOCATIONS - TIMBERLINE MTG 5 12|17|2020 01| 29 | 21

TCORE TENANT RELOCATIONS - TIMBERLINE MTG 5 12|17|2020 01| 29 | 21 Custom Wall Graphics - Final Rendition of the Interior East Wall


Saalfeld Athletic Center - interior commons space

02 La Salle College Preparatory High School Saalfeld Athletic Center, Gymnasium Graphics, Athletic Center Phase 2 Planning & Design Education | Renovation

The work done for the school’s Athletic Center includes two phases of scope, the first being a large-scale renovation and addition to the existing Saalfeld Athletic Center; this included new locker rooms, offices, a fitness center, a multi-purpose classroom, and a commons area, as well as a new gymnasium floor and custom acoustical wall panels within the gym. The second phase will consist of a new Athletic Center that will be used for team practices and to host tournaments. My role consisted of collaborating with the team to complete the permit set of the first phase, leading the design and execution of the acoustical wall panels, and collaborating on the master planning and design of the phase two building. Additional efforts included: custom detailing, managing door and storefront schedules, completing renderings for client fundraising efforts, and preparing graphics and presentations for client meetings.


R

Q

P

14' - 0"

O

14' - 0"

N

14' - 0"

M

14' - 0"

L

14' - 0"

K

14' - 0"

J

14' - 0"

I

14' - 0"

H

14' - 0"

G

14' - 0"

F

14' - 0"

E

14' - 0"

D

14' - 0"

Courtyard

C

14' - 0"

14' - 0"

BB 11' - 0"

Theater Bldg

12 14' - 0"

11 A628

Exterior Canopy

11 14' - 0"

Existing door to be replaced, wall to remain, typ. this wall.

Existing door to be replaced, wall to remain, typ. this wall.

10

Courtyard

19

14' - 0"

Gymnasium

Corridor at Gym Entry

16

A502 18 1

17

AD301 2

9 14' - 0"

Remove existing trophy cases 14

Existing exterior walls to remain, TYP, UNO

4

8

AD300

14' - 0"

Remove (E) gym wood floor for reinstallation in commons. Contractor to assume refinishing of wood flooring for reinstallation. Salvage central La Salle logo for future mounting. Existing exterior walls to remain, TYP, UNO

7 14' - 0"

(E) Concessions

(E) Weight Room

6 Existing exterior walls to remain, TYP, UNO 14' - 0"

(E) Janitor's Closet

(E) Coach's Locker Room

14' - 0"

(E) Team Room

(E) Team Room

(E) Restroom

(E) Coach's Office

5

(E) Coach's Locker Room

(E) Equipment Storage

(E) Training Room

(E) Coach's Locker Room

(E) Restroom

(E) First Aid Office

Area of major interior demolition work. Remove all non-structural finishes and interior partitions

(E) Restroom

Existing exterior walls to remain, TYP, UNO AD300 2

(E) Coach's Office

Existing exterior walls to remain, TYP, UNO

(E) Boy's Locker Room

14' - 0"

31' - 2 1/2"

4

Existing shear walls to remain

(E) Girl's Locker Room

(E) Mechanical Room

(E) Team Room

(E) Storage

(E) Storage

(E) Showers

(E) Team Room

(E) Team Room

(E) Showers

14' - 0"

13' - 5 3/8"

(E) Shop

3

(E) Team Room

2

(E) Benches to be removed

AD300

Existing exterior walls to remain, TYP, UNO

GROUND FLOOR PLAN - DEMOLITION 1/8" = 1'-0"

Athletic Center Phase 1 - Demolition Floor Plan, NTS

Wall Phasing Legend

Demolition Legend

Existing roof and canopy structure to be removed

15) Contractor Shall Provide for Dust Control Throughout. Provide Temporary Measures to Ventilate Areas During all Phases of Demolition and Construction. Contractor Shall Eradicate Build-up of Fumes From Finish Materials and Construction Activities. Contractor to Maintain Six Air Exchanges Per Hour Unless More Stringent OSHA, State or Local Standards are to be Adhered to.

G

14' - 0"

2

Existing structure to remain

F

14' - 0"

E

14' - 0"

D

1 A400

A501

Retracted (E) Bleachers

WC

9) Remove or Cap Conduit and Piping from Abandoned Utilities.

14

1' - 8"

502

A501 16

15 Small Multipurpose 501

5' - 6 5/8"

03.42 x

FD

Mens Restroom 11' - 3 5/8"

11' - 10 3/8"

ALUM STOREFRONT SYS TYP

1

A501

3' - 10"

E03

504

504-1

14 A620

C1-2

14' - 0"

530-30

10

C

14' - 0"

BB

14' - 0"

17

501-1

Storage

FD

503

NEW SKYLIGHT ABOVE, TYP

11

14' - 0"

5 A610

4

16) Existing slab to be demolished in area of work as indicated.

14' - 0"

H A300

14' - 0"

(N) Bench, TYP (N) Walkway cover overhead

1 A640

Landscape area by others

Courtyard

DF

Large Multipurpose 507

C2-4

3 A640

3

A300

11' - 10 3/8"

4' - 5 1/2"

FOF

530-31

14' - 0"

5 A400

01.42 x

14' - 0"

7

3' - 10"

E03

507-1

14' - 0"

7

506

2' - 0 1/8" 11' - 8"

8

6

A501

Concessions

A501

19' - 0"

Landscape bench, brick to match (E) exterior walls to 1'-6" above grade, w/2" CIP conc topper

6

11 A615

8

506-1 5

A300

9

506B

500

3 A200

1

2 A610

Storage 506-2

Gymnasium

9

02.62 x

FD

C2-3

14' - 0"

FEC

C1

3' - 4 1/4" 3' - 4 1/4"

Womens Restroom 505

North Corridor

3' - 4 1/4" 1' - 11 7/8" 1' - 10 1/8"

505-1

FEC

2

ALUM STOREFRONT SYS

Entry/Commons

A501

C2

3

6 A400

C2-2 1 A200

0'-0" Entry Commons

4 A620

02.63 x

C2-1

8' - 5"

12 A615

ALIGN FOF

Sim

FEC

Open Office

4' - 8 3/8"

2

13 A610

5' - 2 1/2"

MTL LOCKERS

04

28 FD

03.4 4' - 10"

Girl Locker A503 34 Room 520 35

South Corridor C4

Align

FD

7' - 5 3/4"

4

1 A621

511-1

01.42 x Coach Office 513

01.42 x

FD

Coach Locker Room 512

Electrical 517

7

8

FD

5' - 9" CLR

FD

CIP CONC BENCH

2 A400

Boy Shower + Toilet Room 514A

FD

9 A503

1 A201

6' - 4" 511-2

CLR

01.42 x

Boys Locker Room FD MTL LOCKERS 514

6

STAMP

Boy Large Team Room 511

512-1

4' - 11"

514-1

4' - 6"

513-2

514-2

01.42 x 5' - 2 1/4"

515-2

01.42 x

4 A200

5' - 2 5/8"

510-1

508-3

508-2

MTL LOCKERS

01.42 x

Girl Toilet + Shower Room 520A

2' - 1 3/4"

C3

CIP CONC BENCH

01.42 x 516-1

01.42 x

513-1

C2-5 528-1 530-1

FD

12 A620

Boy SM Team Room 515 12' - 10"

CLR

CLR

530 530-2

5' - 6"

7'-0" MIN

516 7' - 2 5/8"

8' - 5 5/8"

x

CLR

x

East Corridor

2 08

4' - 8 3/4"

521-1 33

03.4

Coach Office

FEC

CIP CONC BENCH

4' - 6" CLR

5 A200

1' - 0 1/2"

CIP CONC BENCH

523 1' - 2" TYP

527-1

526-1 FD

A503

6 A630

Mechanical

08

MTL LOCKERS

Football Storage 510

Coach Meeting Room 509

4' - 6"

4' - 10"

Coach Locker Room 529

508B

01.42 x

13 A501 10

01.42 X 11 11' - 1 1/4"

A502 22

1' - 6" CLR

9' - 3 1/8"

9 A620

03.4

Training Room 3' - 6 3/4"

01.42 x

3 A610

526-2

526-4 9

FD

5

3

A502

3 A400

01.42 x

517-1

524A-1

Mechanical Closet 525A

2' - 4"

8

A504

08

4' - 8 3/4"

1

03.42 x 3 01.42 x

1' - 1 7/8" 1 CMU

520-1

4' - 10" CLR

Steel column, ref structural

01.42 x

10 10"

Align

6 A620

3 A632

12

509-2 23

21 Copy/Mail

508A 6' - 9 5/8"

01.42 x

4' - 9 1/4"

10' - 3"

525

A504

25

C4-1

Fitness Center

16

12

01.42 x

521-2

A504 13

11

5 Girl LG Team Room 522

4' - 6"

15

01.42 x

MTL LOCKERS Girl SM Team Room 2 518

6

A504

20 A502 24 AD Office

26

01.63 x

529-1

CLR MIN

524-3

3 2' - 3 5/8"

Coach Office 524

3' - 11 1/4"

14' - 0"

7 A610

01.42 x

08 7

28

Sim 01.42 x

01.42 X

A502 29

27

10 A620

DISPLAY CASE

01.42 x

4 A400

8' - 0"

08

4

523-1

01.42 x

14

Garage Door Above

C5 6' - 9 5/8"

2' - 0 5/8" 13 A620

A502

4

E01

5' - 11"

4

526-5

534-3

3 A621

4' - 11 1/2" 5' - 7 3/8"

8' - 10 3/8"

V.I.F.

525-1 2 A621

1

13 12 A631 508-1

Janitor Closet 528

5' - 7 1/2"

01.42 x

4' - 9 1/2"

8' - 0"

MIN

6' - 9 5/8"

08 08

1 A620

2 A620

8' - 10 3/8" West Corridor

8' - 6 5/8"

09

522-1

2 A620

x

524-1

3 A620

08

09

09

FOF

1 A610

x

12' - 11 3/8"

5' - 0"

7

08

FEC

1' - 4"

14' - 0"

525-3 A300

7' - 6"

DRINKING FOUNTAIN

Shared Storage

09

526

525-2

5

3' - 10"

C5-2

14' - 0"

C5-3

x

FD

01.6

Align

526-6

01.42 x E01

522-2

01.4

4' - 5 3/4"

10' - 3"

2 A632

(E) DF

6' - 8 3/4"

C5-1

6

3' - 6"

527

Retracted (E) Bleachers

509-1

IT Closet ICE MACHINE, OFCI

7' - 8 1/4"

ALIGN

14' - 0"

534

A300 5

3 A627

508

515-1

ALUM STOREFRONT SYS

Hydration Room

TRUE NORTH

studio petretti architecture

8) Coordinate with Owner and Schedule in Advance Interruptions of Electrical, Mechanical, Fire Protection, Plumbing, Communication and Other Services, Which May Affect Facility Operations or Other Buildings Nearby.

I

14' - 0"

Existing tectum gymnasium ceiling to remain 103' - 10"

STUDIOPETRETTI

12

Remove existing roofing system to top of sheathing. Roof structure to remain. 14' - 0" 14' - 0"

14' - 0"

14) All Existing Roof Pipe Vents to Remain UNO.

La Salle Catholic College Preparatory Academy,

6) Use Due Care to Minimize Damage to Existing Work Which is to Remain. Replace, Repair, Patch, and Repaint as Required for Work Damaged, Modified or Affected by Demolition Work. 7) Protect Interior of Existing Building From Construction Dust, Noise and Weather.

13) Cut Masonry & Concrete Edges Shall be Straight and as Smooth as Possible. Seal any Exposed 14'Rebars - 0" to Prevent Rusting. 14' - 0" 14' - 0"

J

Description

14' - 0" 5) Notify Architect in Advance of Cutting, Alteration or Excavation Which May Effect the Structural Stability of Any Portion of Existing Structures.

K

Date

4) Provide Temporary Shoring as Necessary to Protect Existing Structures During Demolition and Construction.

New Masonry Wall

MExisting slab to be demolished L

Revisions

N

3' - 4 1/4" 2' - 7 1/8" 1' - 2 7/8" 3' - 4 1/4"

O

12) Coordinate with Architect Demolition and Reconfiguration of Fire Sprinkler Lines and Heads.

3' - 4 1/4" 2' - 2 5/8"

P

New Framed Wall

Existing material to be salvaged

1' - 7 3/8"

Q

Existing Wall

13' - 0 7/8"

R

11) Carefully Remove Items to be Reused and Store Them Until Reinstallation. Replace Items Damaged During Removal or Storage with Similar or Comparable Items as Approved by the Architect. Architect to Review all Reused Items Prior to Reinstallation.

Existing wall to remain

6' - 0"

3) Refer to Structural, Mechanical, Plumbing, Electrical and Other Consultants' Documents for Additional Demolition Information.

Existing construction to be demolished

507-2

2) Coordinate Phasing of Demolition Work With Owner Prior To Commencing. Some work may be phased.

10) If Asbestos or Other Hazardous Materials are Observed or Suspected in the Building, Immediately Stop Work in That Area and Promptly Notify the Owner / Architect. The Owner Will Arrange Removal or Encapsulation of Hazardous Materials Under a Separate Contract.

C1-1

1) The Purpose of the Demolition Drawings is to Outline a General Direction of What Needs to be Removed to Accomplish the Work. Work Shown is Diagrammatic in Nature and not Intended to be All Inclusive. Verify Existing Conditions Before Bidding and Include all Work Evident by Site Inspection, Whether or Not Shown on Drawings, to Achieve Desired Results Indicated on Documents for Completed Work.

503-1

Notes - Demolition

14' - 0"

12 A610

2 A200

A300

GROUND FLOOR PLAN 1/8" = 1'-0"

Notes - General

Athletic Center Phase 1 - New Construction Floor Plan, NTS

1) Information Relating To The Existing Building Is Based on Owner Provided Documents And Field Measurements. Actual Conditions May Vary And Shall Be Field Verified by contractor. 2) Verify All Dimensions Before Proceeding With The Work. If a Discrepancy Exists Between Drawings And Specifications, Or Within The Specifications, Such Discrepancy Shall Be Brought To The Attention Of The Architect Prior To Installation Of The Work. Do Not Proceed With Affected Work Until The Variation or Discrepancy Is Resolved. 3) If Drawing Is Less Than 30x42, It Has Been Reduced From Original Size. 4) Do Not Scale Drawings. If Unable To Locate Dimensions For Any Item Of Work, Consult Architect For Direction Before Proceeding. 5) Systems And Conditions Hidden From View Are Based On Owner Provided Documents, Have Not Been Verified By The Architect, And Are Provided For Reference Purposes Only. All Systems Shall Be Verified By The Contractor.

Notes - Plan

1) Reference Civil Drawings for Grading & Horizontal Control Drawings. Reference Civil Drawings For Site Materials, Layout, Access Compliance for Pedestrian Paths and Vehicular Drives. 2) Reference typical assemblies sheet for all wall type details and firerated assemblies. If interior partition wall type is not noted in the plan then the wall type shall be 01. 3) Reference G series drawings for code summaries and plans. 4) See Door hardware Specification and Schedule for Access Controls. 5) Reference structural drawings for dimensions and elevations for

Wall Phasing Legend

Existing Wall New Framed Wall New Masonry Wall

round Floor Plan

1 A100

et Title:

1 AD100

3

Existing exterior walls to remain, TYP, UNO


ALL GRAPHICS PRECEDENTS WALL GRAPHICS PRECEDENTS

PHICS

URE

Custom Wall Graphics - Precedent Imagery

GYM WALL & HALLWAY GRAPHICS FEB. 12 2020

TEAMWORK

TRADITION

La Salle Athletics

D I O P E T SRTEUT D T II OA RPCEHT IRTEEC T TTI UARREC H I T EC T U R E

ON

Custom Wall Graphics - Concept Iterations

GYM WALL & HALLWAY GRAPHICS GYM WALL & HALLWAY GRAPH

Custom Wall Graphics - Final Iteration

hletics GYM WALL & HALLWAY GRAPHICS

T T I A R C H I T EC T U R E

FEB. 12 2020

GYM WALL & HALLWAY GRAPHICS FEB. 12 2020

Custom Wall Graphics - Final Installation

FEB. 12 2020

FEB. 12 2


Phase 1

Phase 2 Site

Courtyard

Entry Courtyard

Athletics

Existing Parking Proposed Additional Parking (approx. 30 spaces) SE Fuller Road

P R E S E N TAT I O N 1 R EC A P & TA K EAWAY S

Vehicle Traffic Flow Pedestrian & Visual Connections

Site Plan Diagram & Parking Proposal for Phase 2

N

Scale: 1/128” = 1’ 50’ 100’

PROGRAM

JUNE 14, 2021

Two full sized courts with spectator seating Flexible Training Space Public Restrooms

200’

LA SALLE ATHLETIC CENTER PHASE II SITE PLANNING AND PROGRAM CONFIR AREA

Approx. 15,781sqft

S T U D I1,900sqft O P E T R E T T I A R C H I T EC T U R E 200sqft x 2

Equipment Storage

1,000sqft

Entry Vestibule/Lobby

500sqft

Visiting Team Room

900sqft

Referee Space w/ Restroom

120sqft x 2

Total Net Square Footage

20,721sqft

Program Proposal

Program Relationship Sketch

The goal of the Phase 2 athletic center was to provide additional practice space to reduce scheduling conflicts between different sports PROJECT GOALS & PRIORITIES programs, to have the ability to host basketball tournaments, and to provide additional storage close to the track and football field. The proposed design includes a new gymnasium with two separate basketball courts, a team room to be used by visiting schools, • Courtsspaces are main dedicated forpriority referees, restrooms, storage and a flex space. •

Easy access from visitor bench at football field/track to team room

For 2 of the athletic center, the building’s location on the site was driven by its adjacencies. The location provides a central • Phase Easy access from fields to storage connection of the newly renovated Phase 1 athletic center, the track and football field, and the existing parking area. Proposed site • Allow for flexiblethese use ofconnections additional space andaavoid duplicating program work to strengthen include dedicated outdoor gathering space at the building’s entrance that connects to the from Phase 1 a path to the La Salle bleacher seating and sideline, a path to the visiting teams bleacher seating and sideline, and phase 1 building, additional parking. The program layout follows the same strategy of connecting to adjacencies. The flex space and team room are located at the front of the site for a closer connection to phase 1, and the gymnasium and storage are located at the back of the site creating two main volumes that are tied together by circulation.


(E) Tennis Courts

(E) Parking Lot (E) Saalfeld Athletic Center

(E) Plaza

(E) Parking Lot (E) Parking Lot (N) Raised Crosswalk

25' - 0" min

Relocate Security Fence & Gate

11' - 6"

Planting

11' - 6"

11' - 0"

(E) Spectator Seating

(N) Curb and planting

(N) Curb (N) Pavers Overhang above

(E) Planting

Planting

5 parking spaces

(N) Curb 5' - 0"

(E) Fence (E) Transformer

Overhang above

pa rkin gs pa ce s

Planting

10

(N) Curb and planting

6' - 0"

(E) Football Field

FU LL ER

RD

Planting

SE

(N) Curb

(E) Track

R

Da

(E) Grass

Property Line

Athletic Center Phase 2 - Proposed Site Plan, NTS Site Plan 3/64" = 1'-0"

Sh

1

2

EQ A

3

4

EQ A

5

EQ A

31' - 7"

6

TRUE NORTH

28' - 9"

A200

10' - 7"

4 Steel Column

Storage

Storage

Overhang above

475 SF

497 SF

Multi-slide doors

A

10' - 0"

Mech/Elec

A200

C

Flex Room 1204 SF ?

1928 SF 12' - 0" CLG

50' - 0"

20' - 0"

50' - 0"

15' - 0"

45' - 6 1/2"

Revisions

Benches

2

STAMP

24' - 3"

D

Lobby

E

Date

(N) Pavers Column Overhang above

A200

Athletic Center Phase 2 - Proposed Floor Plan Level 1 1/8" = 1'-0"

or Plan - Option 1

1

A100

Description

© 2018 studio petretti architecture, LLC ALL RIGHTS RESERVED These drawings are the property of studio petretti architecture, LLC and are not to be used or reproduced in any manner without prior written permission.

Concept Design October 7, 2021

1

1720.12

1112 SF 12' - 0" CLG

SP job number:

15708 SF 24' - 0" B.O.S.

24' - 6"

Gym

108' - 9 1/2"

3

26' - 6"

Restroom

A200

121' - 6"

Family

2335 SE 50th Ave. Suite B portland, or 97213 503.488.5700 www.studiopetretti.com

8' - 0"

B Janitor 57 SF 12'-0" CLG

11999 SE Fuller Rd, Milwaukie, OR 97222

Referee 152 SF 10'-0" CLG

La Salle Prep Practice Facility

935 SF 12' - 0" CLG

Referee 152 SF 10'-0" CLG

studio petretti architecture llc

35' - 8"

Team Room

8' - 0"

STUDIOPETRETTI

251 SF 12'-0" CLG

4' - 0"

G001

84' - 0"

1


MAX Height 35' - 0" Gymnasium Roof 32' - 1 1/4"

Vertical Cedar Rainscreen Siding System Vertical Metal Siding System

Low Roof 15' - 9 1/4"

Structurally Glazed Storefront System Steel Column

Level 1 0' - 0"

Low Roof 15' - 9 1/4"

Vertical Cedar Rainscreen Siding System

2335 SE 50th Ave. Suite B portland, or 97213 503.488.5700 www.studiopetretti.com

Vertical Metal Siding System

studio petretti architecture llc

MAX Height 35' - 0" Gymnasium Roof 32' - 1 1/4"

© 2018 studio petretti architecture, LLC ALL RIGHTS RESERVED

Elevation - North 1/8" = 1'-0"

STUDIOPETRETTI

1 A200

1720.12

Concept Design

MAX Height 35' - 0" Gymnasium Roof 32' - 1 1/4"

SP job number:

Elevation - East 1/8" = 1'-0"

11999 SE Fuller Rd, Milwaukie, OR 97222

Level 1 0' - 0" Steel Column

2 A200

La Salle Prep Practice Facility

Structurally Glazed Storefront System

STAMP

Vertical Metal Siding System

Low Roof 15' - 9 1/4"

Revisions Date

Description

Level 1 0' - 0" Vertical Cedar Rainscreen Siding System

3 A200

Structurally Glazed Storefront System

Elevation - South 1/8" = 1'-0"

MAX Height 35' - 0" Gymnasium Roof 32' - 1 1/4"

Multi-slide Door

4 A200

Level 1 0' - 0"

Elevation - West 1/8" = 1'-0"

Athletic Center Phase 2 - Proposed Elevations, NTS The exterior material palette was proposed with the idea of introducing modern materials onto a campus of traditional brick buildings. The low volume that contains the building’s entrance is cladded in wood to match the main entrance of the phase 1 athletic center and the main school building entrance that was recently renovated. The gym volume is cladded in black metal panel and is then extruded outwards to create covered outdoor space. The extruded gym volume, along with wrapping the wood panel underneath the metal cladding, breaks down the large gym volume and ties it together with the entrance.

Athletic Center Phase 2 - Massing and Material Study

1/8" = 1'-0"

Low Roof 15' - 9 1/4"

SCALE

Vertical Cedar Rainscreen Siding System

Sheet Title:

Steel Column

Exterior Elevations - Option 1

Vertical Metal Siding System

Sheet Number:

A20


Site Image - Proximity to Lake

03 Lake Cabin Private Residence

Single-family Residential Located outside of the Olympic National Forest, this cabin was built as a place to seek refuge from the city. It sits upon a sloped terrain that takes you from the forest road down to a lake. The client asked for a modern approach to a traditional cabin, which was executed through the use of materials and detailing. Additionally, we were working within a variety of site planning constraints including setbacks from the water, setbacks from the road, and Forest Service restrictions such as height limitations and the building footprint not exceeding the square footage of the existing cabin on site. I collaborated with the project team through the schematic design phase and led the production of the construction documents. Additional efforts included: custom detailing, material studies, coordinating with structural consultants, and preparing graphics and presentations for client meetings.


4

13' - 0"

DN

DN 3 TYP, UNO

413 South Shore Rd.

F.O. Exterior wall

Exist. shed (413 S. Shore)

Exist. shed (405 S. Shore)

DN

F.O. Exterior wall

25' - 11"

5

Building footprint below. Area= 1200SF

DN

2 G002

VICINITY MAP NTS

DN

DN

49' - 7"

1 G002

EXISTING SITE PLAN 1/16" = 1'-0"

Approximate edge of water. Approximate location of existing dock.

IMPERVIOUS AREA

(E) House

920SF

Conc walkway

651SF

(N) Structure or Addition

1200SF

PLAN Site Plan, NTS 3 SITE

10

2 P2

E1

P1

Post per struct, typ

3 A300

12 13

UP (1) R

Electrical Panel

S4

007 W2

E1

7' - 0"

E1

E1

9' - 1"

2' - 4" CL

14' - 6"

CL

DECK

E1

W1

DN

CL

4' - 4"

Roof Above

Railing

A200

3' - 9" 12' - 0"

25' - 8"

12' - 0"

Revisions

49' - 7"

Ground Floor Plan, NTS 1

A100

FIRST FLOOR PLAN 1/4" = 1'-0"

Notes - Plan

Notes - General

1) Reference Site Plans for Grading & Horizontal Control Drawings. Reference Drawings For Site Materials, Layout, Access Compliance for Pedestrian Paths and Vehicular Drives.

1) Information Relating To The Existing Building Is Based on Owner Provided Documents And Field Measurements. Actual Conditions May Vary And Shall Be Field Verified by contractor. 2) Verify All Dimensions Before Proceeding With The Work. If a Discrepancy Exists Between Drawings And

Revision Date

Revision Description

Post and footing per struct

4

These drawings are the property of studio petretti architectureand are not to be used or reproduced in any manner without prior written permission.

11.11.2020 Down spout

E1

CL

6' - 4"

STAMP

E1

008

4' - 7"

W5

E1

A200

BEDROOM

E1 E1

3

P1

P2

W2

© 2018 studio petretti architecture ALL RIGHTS RESERVED

DN (2) RISERS @ 6"

UP (6) R

3

E1

Down spout

studio petretti architecture

4' - 1"

3' - 7"

S2

DN

A500

Non-combustible material backing. Ref interior elevation for extent.

Utility meter

UP (8) R

P1

P1

4

LIVING ROOM

P2

A500 14

5' - 2"

10' - 5"

MASTER BEDROOM

A500

Wood flooring and stair treads: Flooring: Premium plain-sawn 10” wide, T&G white oak, stained. Stair treads: Premium plain-sawn white oak, stained.

Wood stove: 22" diameter Nectre Stove or sim

Built-in storage

N1

A500

P1

DN

Construction Set

1

E1

P1

Open wood shelving below

Loft Above

010

S1

2002

A200

MASTER BATHROOM

11

A500

25

SP job number:

9

26 1' - 5"

A500

411 South Shore Road Quinault, WA 98575

8

N2

009

CL

1 A300

KITCHEN / DINING ROOM

23 P1

BATHROOM

Lake Quinault Residence

Tile flooring

Tile flooring. Daltile Unity Colorbody porcelain 12 x 24 Field Tile, Color: Grigio or sim

CL

011

1' - 6"

P2

Hooks

A500

CL

7

Bench

1

CL

Shelving abv Stove Sink w/ drainboards, owner furnished contractor installed Counter: Caesarstone 1 ¼”, color to be selected by owner Wood casework

4' - 11"

A500

Down spout

P1

P1

3' - 2"

6

Slope 2%

STORAGE

Refr.

DN

E2

6' - 5"

P2

E2

E1

P2

5

N3

E1

2' - 7"

E2

E1

1' - 6"

004

P1 PANTRY

E3

005

Slope 2%

Gravel

E2

E2

Center in opening

006

Condensing Unit

E1

1' - 5"

E2

Stacked W/D

012

Down spout

Gravel Roof OH above

E1

Indoor AHU

ws

12" French Drain Concrete pad

CL

003

001

Concrete pad

002

12" French Drain

2 units

Hardware

2 A300

3' - 2"

13' - 0" VIF

2

E2

2 units 2 units Quantity: 2 (3 units each) 2 units

A200

Wood stair and landing

VIF

7' - 4"

4' - 6"

nish h ext ws h ext

4 A300

Plantings

2' - 6"

3' - 6" 5' - 9 3/8" 5' - 0" 5' - 0" 8" 2' - 10 1/8" 2' - 0" 7' - 2" 5 5/8" 1' - 6" 1' - 6" 1 7/8" 1 7/8" 6' - 8 1/2" 1' - 6"

Quantity: 2 ( Match window abv door) 2 units Quantity: 2. (3 units each) 2 units

Landing on grade with (E) road level

1' - 0"

Concrete landing and stairs

5' - 8"

8" 7' - 0"

Comments

2335 SE 50th Ave Suite B Portland, OR 97215 503.488.5700 www.studiopetretti.com

South Shore Road

Sill Height

STUDIOPETRETTI

1/8" = 1'-0"

CL

2"

Existing Road, Edge of Asphalt

7' - 7"

2" 2"

South Shore Road

VIF

25' - 11"

2"

32' - 11"


Slope Grade Away From Building @ Entire Perimeter

2 A300

Concrete Foundation System, Reference Structural. Lap interior GBD Over Stem Wall.

BUILDING SECTION - EAST/WEST 1 1/4" = 1'-0"

T.O. RIDGE 23' - 1 1/2"

/ 9"

3 Sim A701

0" 1'-

9"

/1

'-0 "

R1 3" / 1

T.O. EAST DORMER 18' - 1 5/8"

6 Sim A701

B.O. WEST DORMER 15' - 10 1/2"

B.O. EAST DORMER 14' - 6 3/8" T.O. Wall 12' - 5 7/8"

R2

9"

6 Sim A701

Open to beyond

F2

FF LOFT 9' - 4 1/8"

9"

/1

'-0 "

6" Tongue and Groove. Ref int elevs

Wood Railing

KITCHEN / DINING ROOM

R2

LIVING ROOM

AEP Span 'small box gutter', typ

Wood and metal railing

8' - 5"

9' - 4"

4 Sim A701

015

" '-0 /1

B.O. LOFT 8' - 5 5/8"

'-0"

Beams per struct, typ

LOFT

BUIL 1/4"

3 A300 5 Sim A701

'-0" 3" / 1

T.O. WEST DORMER 19' - 1 1/4"

Stained T&G paneling at underside of eave, typ

1 A300

1 A300

T.O. ROOF 20' - 11 1/4"

A700

(E) Grade F1 GROUND FLOOR 0"

6 Sim A700

5 Sim A700

Posts beyond per struct 2' - 2"

7' - 6"

3 Sim A700

4 Sim A700

BUILDING Building Section, NTS SECTION - EAST/WEST 2 A300 1/4" = 1'-0" 4

3

T.O. RIDGE 23' - 1 1/2"

R2

R1

W4

Stained T&G paneling at underside of eave, typ

W4

Wood paneling

LOFT

014

Solid wood cap

studio petretti architecture

4 A300

STUDIOPETRETTI

2 A300

R2

BUIL 1/4"

A300

013

FF LOFT 9' - 4 1/8"

F2

B.O. LOFT 8' - 5 5/8"

W2

007

KITCHEN / DINING ROOM

W3

009

MASTER BATHROOM

Open wood shelving

F2 GROUND FLOOR 0"

Lake Quinault Residence

006

STAMP

1 A300

BUILDING SECTION - NORTH/SOUTH 1 1/4" = 1'-0"

Building Section, NTS 2 A300

4 A300 T.O. RIDGE


Exterior Rendering - Main Entrance from Road

Interior Rendering - Living Room, View to Deck and Lake


Camas, WA - Aerial

04 Private Development Mixed-use

Feasibility Study The project consisted of proposing strategies for a mixed-use building for a private developer that were presented to the city of Camas, Washington. We proposed a 3-story apartment building with ground floor office space. I led the feasibility study, presenting multiple preliminary floor plans and parking diagrams, and completing research of the city’s zoning code and design standards. Additionally, I coordinated with the city of Camas’s building department to set up and prepare for a successful preapplication meeting.


Feasibility Study - Option 1 ‘L Layout’

Feasibility Study - Option 1 ‘Bar Layout’


Turn static files into dynamic content formats.

Create a flipbook
DeBlase Portfolio 2021 by Angelo DeBlase - Issuu