Skip to main content

darch portfolio (19'-22')

Page 1

MAR 2019 - FEB 2022

ARCHITECTURE PORTFOLIO

ANGELINE ONG

20 22


4


CONTENTS 01 A SPACE OF REFLECTION

02 A PRIVATE DWELLING

YEAR 1

03 VERTICAL VILLAGE @ LAVENDER

04 TEMBELING ROAD

CASE STUDY: 05 BAUHAUS DESSAU

YEAR 2

YEAR 3

06 CASE STUDY: LEUTSCHENBACH SCHOOL

07 CurAte: SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

5


AY 19/20 | INTEGRATED PROJECT STUDIO I

01

A REFLECTIVE SPACE AUG 2019

PRIMER I The Brief: The brief was to design a structure which would address the needs and concerns of students in school. Both the programme and the site were to be determined, based on what we thought was most important to improve students’ wellbeing.

The Intervention: There are barely any spaces in school specifically designed for students to carry out the act of reflection, when they feel troubled, or stressed out from their hectic lives. Most of the existing seating spaces are shared spaces - where students usually gather to study or to hang out in between classes. Hence, “A Reflective Space” aims to provide a safe and tranquil space for students to carry out the act of reflection as an individual. WALKING TOWARDS THE SPACE

Proposed Site:

SITE / SITE AREA: SINGAPORE POLYTECHNIC, EMPTY PLOT OPPOSITE W4 DEVELOPMENT TYPE: MINI STRUCTURE PERSPECTIVE VIEW OF THE SPACE AND WATER FEATURE

6


AY 19/20 | INTEGRATED PROJECT STUDIO I

HAND-SKETCHED PLANS AND PERSPECTIVES

7


AY 19/20 | A PRIVATE DWELLING

8


AY 19/20 | INTEGRATED PROJECT STUDIO I

02

A PRIVATE DWELLING SEP 2019 - FEB 2020

PRIVATE DWELLING FOR A FAMILY OF FOUR The given brief was rather simple - to design a private residential dwelling for a family of 4. Each family member was described with their own set of traits and personal interests. Thus, the design of the dwelling should cater to the needs of each individual member, as well as provide for the needs of the family as a whole.

Interests of each family member

DESIGN INTENT

SITE / SITE AREA HOLLAND GROVE VIEW

Given the fact that the family members are constantly pre-occupied with work or their own personal interests and hobbies, chances for family interaction becomes rare as they carry out their lives separately. Thus, the creation and exploration of voids and levels in the design of the house, eventually aims to raise visual awareness between the family members - so as to increase opportunities for interactions to occur even as they engage in their separate activities.

DEVELOPMENT TYPE: 2-STOREY LANDED RESIDENTIAL HOUSING

9


AY 20/21 | A PRIVATE DWELLING

INTERIOR PERSPECTIVES

LIVING ROOM

0

0.5m

3m

5m

1ST STOREY PLAN READING CORNER

10

FRONT ELEVATION


DINING ROOM

0

0.5m

3m

5m

2ND STOREY PLAN

STUDY AREA IN FRONT OF KIDS’ BEDROOM

SIDE ELEVATION

11


AY 19/20 | A PRIVATE DWELLING

MATERIAL PALETTE

SECTIONAL DETAIL

12


FINAL MODEL

AY 19/20 | A PRIVATE DWELLING

1313


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

14


AY 20/21 | INTEGRATED PROJECT STUDIO II

03

VERTICAL VILLAGE @ LAVENDER SEP 2020 - FEB 2021

FUTURE HOUSING FOR THE AGEING POPULATION

It is estimated that 1 in 4 Singaporeans will be aged 65 years and above by 2030 - this proves Singapore’s growing concerns of an ageing population. Based on research and surveys carried out, it was found that one of the primary concerns of the ageing population is the ability to age-in-place - defined as the ability to stay within their communities while keping a degree of independence. Additionally, it was found that seniors who lived along tended to rely more on their friends or neighbours for support, to avoid falling into the risk of social isolation. Vertical Village @ Lavender aims to redefine housing for senior citizens by addressing their needs, concerns and aspirations , to enable them to age-in-place independently but healthily within the community. The project explores how intergenerational programmes - common programmes aimed at bringing people of different age groups together, could be integrated into high-rise living, given the diverse demographic of Jalan Besar.

SITE / SITE AREA: PETAIN RD, KITCHENER LINK (KALLANG, LAVENDER PLANNING AREA) / 4880.97 SQM DEVELOPMENT TYPE: 10-STOREY HIGH-RISE RESIDENTIAL CUM COMMERCIAL DEVELOPMENT

15


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

INTERGENERATIONAL PROGRAMMES The introduction of intergenerational programmes within the residence aims to reduce the chances of social isolation for senior citizens who live alone, while fulfilling their aspirations. It also aims to remove the stigma that surround the programmes which are typically carried out in ‘senior activity centres’ within the neighbourhood, encouraging participation in these activities.

Intergenerational programmes are introduced at different intimacy levels

16

PROCESS DIAGRAMS


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

0

0.5m

3m

5m

1ST STOREY PLAN

17


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

2ND STOREY PLAN

TYPICAL STOREY PLAN 0

18

0.5m

3m

5m


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

6TH STOREY PLAN

SIDE ELEVATION

FRONT ELEVATION

7TH STOREY PLAN

19


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

Intergenerational programmes are common programmes in which people of different age groups could partake in together. The types of intergenerational programmes introduced are decided based on the aspirations of the ageing population. Eventually, it was decided that these programmes would be located at different levels within the development based on their level of intimacy. By determining the different levels of intimacy for each programme, it encourages participation in these programmes as people are able to choose to participate at scales that they are comfortable with.

Alongside the 3 main intimacy levels established - programmes amongst neighbours, programmes amongst residents and programmes with the community - there are also spaces for individuals like the reading nook. Thus, people are not being forced to engage in activities they would otherwise be uncomfortable with.

20

INTERGENERATIONAL PROGRAMMES SHOWN ON SECTION CUT


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

SECTIONAL PERSPECTIVE OF COMMUNAL SPACES

2121


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

PERSPECTIVE OF COMMUNAL AREAS

22 22

PUBLIC SQUARE WITH THROUGH-BLOCK LINK


CAFE @ 1ST STOREY

SENSORY GARDEN @ 2ND STOREY

COMMUNAL KITCHEN @ 7TH STOREY

INTERIOR PERSPECTIVE; LIVING ROOM OF A 5-ROOM INTERGENERATIONAL, ADJOINING UNIT

2323


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

B

A

PART PLAN OF COMMUNAL SPACE @ 6TH STOREY

24


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

ACOMMUNAL WORK SPACE & ROCK CLIMBING AREA @ 6TH STOREY PERSPECTIVES OF COMMUNAL SPACES

BCOMMUNAL GARDEN @ 7TH STOREY

25


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

PART SECTION

26

SECTIONAL PERSPECTIVE

PART SECTION


AY 20/21 | VERTICAL VILLAGE @ LAVENDER

FINAL MODEL | BACK

FINAL MODEL | FRONT

2727


04

AY 20/21 | ARCHITECTURAL VISUAL COMMUNICATIONS II

TEMBELING ROAD & BP SUBMISSIONS

AUG 2019 *Plans and a base model were provided for this Assignment As part of the Architectural Visual Communications II (AVC II) Module, We were tasked with an Architecture Visualization practice using Revit’s in-built 3D rendering system - The assignment involved the production of a Sectional Perspective cut of the mock development @ Tembeling Road, along with Interior Perspective of the Bathroom and Living Room of a Unit. As part of the Materials and Architectural Technology (MAT II) Module , we were also tasked to create an Exploded Axonometric to show the details and connections of the PPVC Module system of the units within the same building.

SITE / SITE AREA: 340 TEMBELING ROAD / 1680 SQM DEVELOPMENT TYPE: 6-STOREY HIGH RISE RESIDENTIAL DEVELOPMENT

28


AY 20/21 | TEMBELING ROAD

BATHROOM DETAILS Upon stepping into the bathroom, one may notice the Dark-grey stone textured porcelain tile wall which runs along the length of the shower area. The dark-grey wall forms a contrast with the light-coloured walls and floors of the bathroom and acts as a backdrop. The concept of “Contrast” was also applied in other areas of the bathroom. In order to maintain the idea of contrasting colours within the bathroom, dark colours, namely black and walnut brown were chosen as accent colours. This can be observed on the matte-black fittings of the showerhead, water faucet and flush buttons, as well as the black frames for the window, shower curtain, mirror and the surface of the shower recess. When placed against the light Nepal Gray-coloured tiled wall, it creates a stark contrast, similar to the effects of the backdrop and its surrounding walls. Walnut-coloured Wood plank tiles are used for the shower area to highlight the distinguishment between the shower area and the water closet area by similarly, creating a contrast with the significantly lighter coloured tiles. The ceiling was designed such that it terminates before touching the surface of the wall, leaving a small gap for Cove lighting to light up the sink, shower and WC area. The cove lighting works together with the warm colour scheme of the walls and floor to create a warm ambience in the bathroom.

INTERIOR RENDER OF LIVING ROOM

INTERIOR RENDER OF BATHROOM

MATERIAL PALETTE

29


AY 20/21 | TEMBELING ROAD PPVC MODULES

150MM THK RC ROOF SLAB

150MM THK RC ROOF SLAB

A A

B 3250

C

B

C

3400

3250

D

3400

6-SIDED PPVC MODULE

D

3250

6-SIDED PPVC MODULE

3250

Balcony 4 m²

500 X 2100MM HIGH ALUMINIUM FRAMED 2-PANEL GLASS BIFOLD DOOR

Balcony

1

2100 X 1400 MM ALUMINIUM FRAME SLIDING WINDOW WITH 10MM THK LAMINATE GLASS

4 m²

1

Master Bedroom 14 m² Master Bedroom

Bedroom 1 12 m²

Bedroom 1 3850

300MM THK RC LOAD BEARING WALL

14 m²

12 m²

2100 X 1400 MM ALUMINIUM FRAME SLIDING WINDOW WITH 150X300MM RC JOINT COLUMN 10MM THK LAMINATE GLASS 100MM THK PPVC JOINT WALL 150X300MM RC JOINT BEAM

150X300MM RC JOINT COLUMN 100MM THK PPVC JOINT WALL

34 00

Living / Dining 36 m² Living / Dining

300 X 300MM RC BEAM

1000 X 1200MM ALUMINIUM FRAME 3-PANEL SIDE HUNG CASEMENT WINDOW WITH 10MM THK LAMINATE GLASS

36 m²

Common Bath 4 m² Common Bath

H.S. 2 m²

3300

2 m²

1000 X 400 MM ALUMINIUM FRAME FIXED GLASS WINDOW WITH 10MM THK LAMINATE GLASS

Ensuite

1000 X 400MM ALUMNIUM FRAME TOP HUNG VENTLIGHT WINDOW WITH 10MM THK LAMINATE GLASS 300XX1680MM 300MM RC BEAM ALUMNIUM FRAME SIDE HUNG 1000 3-PANEL CASEMENT WINDOW WITH 10MM THK LAMINATE GLASS 1000 X 400MM ALUMNIUM FRAME TOP HUNG VENTLIGHT WINDOW WITH 10MM THK LAMINATE GLASS 120MM THK RC WALL 1000 X 1680MM 3-PANEL ALUMNIUM FRAME SIDE HUNG CASEMENT WINDOW WITH 10MM THK LAMINATE GLASS 300 X 300MM RC COLUMN

0 70 10

1000 X 400 MM ALUMINIUM FRAME FIXED GLASS WINDOW WITH 10MM THK LAMINATE GLASS 1000 X 1200MM ALUMINIUM FRAME 3-PANEL SIDE HUNG CASEMENT WINDOW WITH 10MM GLASS 120MM THKTHK RC LAMINATE FACADE WALL

H.S.

0 70 10

34 00

1510MM X 2110M HIGH DOUBLE LEAF LAMINATE SWING DOOR 120MM THK RC WALL

120MM THK RC FACADE WALL

4 m²

300 X 300MM RC COLUMN 200MM THK RC FLOOR SLAB 1510MM X 2110M HIGH DOUBLE LEAF LAMINATE SWING DOOR

34 00

Ensuite 4 m²

200MM THK RC FLOOR SLAB

3300

4 m²

34 00

0 70 10

5-SIDED PPVC MODULE 5-SIDED PPVC MODULE

900MM HIGH STEEL RAILINGS

5 m²

11 m²

4

THK RC FLOOR4-PANEL SLAB 640 X 2200MM HIGH150MM ALUMINIUM FRAMED GLASS BIFOLD DOOR

Yard

Kitchen

4

900MM HIGH STEEL RAILINGS

5 m²

11 m²

0 70 10

640 X 2200MM HIGH ALUMINIUM FRAMED 4-PANEL GLASS BIFOLD DOOR

Yard

Kitchen

150MM THK RC FLOOR SLAB

34 00

Typical Storey Plan

0.5m Typical 0m Storey Plan 3m

5m 0 8 5 8 3 5 9 7 0

1

0 3

1 : 50

2 3 4

FLOOR PLAN OF UNIT

3 A 0 5 2 B 3 0 C3 4 0 D 5 2 B ²lc m 4 y n o a ro ²1 B d e B m 2 1 M1 m ro d e ra ² te s m 4 L in D m 6 3 ²v / in g g

mB 2 .S H o C m 4 th a ² ²m n n o E 4 ite u s ² K ²c m 2 1 n e h it m 5 rd a Y ²

0 7 5 8 3 8 3 0 5 9

SCALE 1: 50

30

150X300MM RC JOINT 300MM THK RC LOADBEAM BEARING WALL

00 96

34 00

3

N

2100 X 1400 MM ALUMINIUM FRAME SLIDING WINDOW WITH 10MM THK LAMINATE GLASS

00 96

3850

7950

800

2

800

3

7950

2

500 X 2100MM HIGH ALUMINIUM FRAMED 2-PANEL GLASS BIFOLD DOOR

2100 X 1400 MM ALUMINIUM FRAME SLIDING WINDOW WITH 10MM THK LAMINATE GLASS

0

0.5m

3m

5m

A 3 0 5 2 3 B C 0 4 D 0 5 2 3 B 1 m 4 1 y M n lc ²a ro d e B m 2 4 1 m ro d e B ² a r te ²s L n 2 D m 6 3 4 v / n ig .S ²H K m 2 1 tiY g o C B E 4 e h c m 5 rd a ² ²n o m ite u s

EXPLODED AXONOMETRIC OF PPV MODULES


AY 20/21 | MOCK BP SUBMISSIONS

1 5 ________sheet of ________ URA_Planning Data Site Area (m2) 1680.00 m²

Permissible Plot Ratio 1.4

Proposed Plot Permissible Ratio Gross Floor Area 1.926387 2352.00 m²

Proposed Gross Floor Area 3236.33 m²

Proposed Site Coverage (%) AMSL (m) 45.96 27.1

Required Number of Car Parks (Lower-Bound) 15

BUILDING AND CONSTRUCTION AUTHORITY

Proposed Number of Car Parks (Lower-Bound) 15

APPROVED UNDER SECTION 5/ SECTION 5A OF THE BUILDING CONTROL ACT (CAP29)

URA_Summary of Gross Floor Area (GFA) GFA (sqm)

Residential

Other Areas GFA

1 1 1 1 1 1

420.40 m² 698.34 m² 698.34 m² 698.34 m² 698.34 m² 22.58 m² 3236.33 m²

420.40 m² 698.34 m² 698.34 m² 698.34 m² 698.34 m² 14.76 m² 3228.50 m²

0.00 m² 0.00 m² 0.00 m² 0.00 m² 0.00 m² 7.82 m² 7.82 m²

Project Ref No:

m be lin

Building Plans Complying with Acceptable Solutions in Approved Document

g Ro ad

m

26 k-

-0

32

I, ______Angeline Ong_______, hereby certify, subject to any waiver/ modification granted under section 6A of the Building Control Act (Cap 29), that -

C 28

Ca te

m

2 k-

8 03 6-

59

26 k-

go

m

-

(a) the preparation of these building plans are in accordance with the Building Control Regulations; and

P

8 03

ry

m

60

26 k-

3 -0

5

m

(b) the buildings/ building works shown on these plans are in accordance with the provisions of the provisions of the Building Control Regulations and the acceptable solutions in the Approved Document.

W 86

2 k-

03 6-

m 26 k00

40 01

IN

P ICA ND

6500

FF BU ER

26 k-

4W

7 -0

00

5V

26 k-

7 -0

00

6P

TB

P

3

99 0V

-0 89

-0

26 m k-

26 k-

69

m

5 ry go

C ate

d oa R u

6 -0

T

d

Ca

M

D uk

40

6 -0

26 k-

oa

5 ne

2V

84

26 km

tR

ry La

N

44

-0

m

W

P

ia

88

go all

67

8 -0

31

69

26 k-

66

T

-0

89

26

69

V

Ch

m

V

ate C sh

1A

85

N

km

-0

90

26

69

M

-0

km

40

d M ar

36

-0

67

84

W

-9

o

A

85

-0

42

26 k-

L

61

84

26 k-

72

93

m

T

03

-0

m

15

-1

-0

26 km

31

26 km

66

5

oa

98 8P

Ca te go

k Du

u

T

2L

M

37

42

26 k-

E LIN

9 -0

ING ILD

66

Jo

-9

26 km

RY

m

BU CK ED) M 3.3 BA OS SET OP (PR

26 km

-0

-9

ry

26 km

go

26 km

26 km

26 km

ate C

-1 26 k- A m 96 03

DA UN BO

00

00

20

00 ING 33 ILD BU CK ED) M 3.3 BA OS SET OP (PR

V 30 66 -9 m2 26 80 k16 m

33

26 k-

00

00

00

DARCH

15

75

13

-0 C

13 20

0 -1

26 km 41 79

23

RIP ST

66

G TIN AN PL

26 k-

N

m

m k26 -0 m 70 k26 01 m -0 kL 70 26 m -0 02 k70 26 C m 03 -0 k70 M 26 04 -0 70 W 05 V 70 06 P

SE

EE GR

-9

99

2M

m

m k26 -0 32 28 m kC 26 m -0 k38 26 m 59 -0 kP 38 26 m -0 60 k38 26 W 61 -0 38 V 62 -0 P 38 63 T

6

RIP ST

32

26 k-

33

K AC

ING ILD BU

Ro

Landowner/ Developer: 500 Dover Road S139651

m

TB

G TIN AN PL

SE

N

m k26

00

650 0

AD RO

75

EE GR

ING ILD BU

83

M 3.3

K AC

Description

M

07

N/V

0

-0

d

R

5

2400

M 7.5

32

SC

2M

5

26 km

oa tR

n

ry

26 k-

m

M 3.3

ry

hia C

na

go

03

m

ER

00

C.

L VE LE OF 123.5 RO FFL REED

J

70

FF BU

33

M

go

-1 26 km 96A 3

ate C

o

O

C ate

105 00

d

-0

N

.90

00

Y WA IVE DR

103

33

EE GR

PL

ED

E GIN AD EN RO SS

3M

OS

E FIR CE AC

OP PR

00

00

V

40

I

L VE LE

60

33

H

AD

INT PO

53

F

0 210

Date

2C

m

RO

00

.60 ING 103 R IST ERL LA ) AD ICU VEH ESS RO ED EGR ING POS S& BEL PRO RES TEM ING OM (FR

Y

BIN INT PO

103

WA

-OF OP DR .90

PL

SS

ED

R oa

26 k-

EX

2400

0 210

OS

CE AC

ng

00

13

G

30 66 2 6-9 80m k-2 16

Se

T LO

E GIN EN

24

F

00

m

on

00

0

E FIR

00

20

Rev.

7 -0

m

54

15

ING ILD

Ko

26 k-

02

00

00

33

BU CK ED) M 3.3 BA OS SET OP (PR

5

1L

T LO

58

67

17

d

ry

00

m

HA

5

T LO

ry

P

go

ICA ND

00

HA

48

OP PR

00

00

M

7 -0

RIP RA ST Y/D G TIN WA LK AN PL WA

33

E

13

42

ING IST EX

00

00

E LIN

26 k-

M 1.2

M 1.2

60

D

00

C ate

M 0 3.9 10

12 00 T LO 36

C

ING ILD BU

oa R

go

(b) I/ We have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232, 1998Ed).

m

B

RIP ST G TIN K AN AC PL TB SE

33

N

00

M 3.3

E LIN

g

C ate

T

00

11

20

RY

12

L

0

00

50

EE GR

RY

lin

d

63

FF

T LO

33

2M

DA UN BO

be

oa

38

T AN DR

00

43

95 34 00

50

10

A

00

00

43

T LO

2 3

32

34

12

09

1

4 5

0

00

T LO

1C

33

-0

4 79

6 95

DA UN BO

R

-0

DARCH_______, hereby declare that -

(a) I/ We am/ are not the owner(s) of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and

E LIN

24

9P 26 k-

8

m Te

an

26 k-

P

HY

RY

39 48

7

Jo

m

I/ We, ___

2 86

E FIR

30

00

DA UN BO

8 -0

75

Owner's Consent

1V

m

m

D un

A2353-00001-2019

Te

1st Storey 2nd Storey 3rd Storey 4th Storey 5th Storey LMR

No. of Floors

10500

Level

g te

or

y

5

ad

Author: AA Architects Angeline Ong

Project Description: PROPOSED NEW ERECTION OF A 5-STOREY RESIDENTIAL DEVELOPMENT COMPRISING OF 16 UNITS AT 340 TEMBELING ROAD ON LOT MK26-96630

ry 5

Drawing Title:

N

N

Location Plan 0m 20.0m

100m

Site Plan 0m 5.0m

200m

25m

BCA Site & Location Plan

50m

SCALE 1: 500

SCALE 1: 2000

Project No.:

Drawing No.:

A2353-00001-2019

DRAINAGE INTERPRETATION I, Angeline Ong signing the file, confirm that the drainage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Department, NEA.

The standard certification is submitted in the form of an electronic record which is signed with a digital signature.

QP’S CERTIFICATION BASED ON DECLARATION AS STATED IN FORM 1 OF FSSD APPLICATION FOR APPROVAL OF FIRE SAFETY PLANS I,____Angeline Ong____, NRIC No./Passport No. __T0226107Z__ being a qualified person under the Fire Safety Act, hereby certify that: (a)the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act.

SEWERAGE INTERPRETATION I,_________Angeline Ong_________ signing the file, confirm that the sewerage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Department, NEA.

ROAD LINE I, ________Angeline Ong_________, confirm that the road reserve lines, the category of the proposed and existing roads and other related road information as shown in the layout plan is in accordance with the current information provided by the LTA.

A01

Project Code:

Scale :

As indicated

Rev.:

Date: 08/05/20

Drawn: Author

Checked: Checker

31


AY 20/21 | MOCK BP SUBMISSIONS

2 5 ________sheet of ________

APPROVED UNDER SECTION 5/ SECTION 5A OF THE BUILDING CONTROL ACT (CAP29)

mk-26-07006P

mk-26-07005V

mk-26-07004W

mk-26-07003M

mk-26-07002C

mk-26-07001L

mk-26-03863T

mk-26-03862P

mk-26-03861V

mk-26-03860W

mk-26-03859P

mk-26-03228C

BUILDING AND CONSTRUCTION AUTHORITY

Project Ref No:

A2353-00001-2019

Building Plans Complying with Acceptable Solutions in Approved Document I, ______Angeline Ong_______, hereby certify, subject to any waiver/ modification granted under section 6A of the Building Control Act (Cap 29), that -

Category 5

1

A05

A04

EXISTING ROAD LEVEL ERL 103.60

24 00

2100

LOT 12

LOT 11

LOT 10

2400

HANDICAP LOT 2

LOT 13

3600

HANDICAP LOT 1

3M GREEN BUFFER

PROPOSED DRIVEWAY

Owner's Consent I/ We, ___

mk-26-96615T

(b) I/ We have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232, 1998Ed).

7.5M ROAD BUFFER

6000

FIRE ENGINE ACCESS ROAD

Rev.

FIRE ENGINE ACCESSWAY

7000

DARCH_______, hereby declare that -

(a) I/ We am/ are not the owner(s) of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and

PL 103.90

15000

10500

LOT 09

4800

BIN POINT

5400

6500

7500

FFL 103.90

2100

3000

6000

4800

BOUNDARY LINE 42M

1200

PROPOSED VEHICULAR INGRESS & EGRESS (FROM TEMBELING ROAD)

24 00

1200

1.2M PLANTING STRIP 1.2M EXISTING WALKWAY / DRIVEWAY

2400

(b) the buildings/ building works shown on these plans are in accordance with the provisions of the provisions of the Building Control Regulations and the acceptable solutions in the Approved Document.

6500

1

FIRE HYDRANT

BOUNDARY LINE 40M

(a) the preparation of these building plans are in accordance with the Building Control Regulations; and

0 50 10

Tembeling Road

Date

Description

mk-26-10372L

PROPOSED DROP-OFF POINT PL 103.90

G

H

I

J

3300

3300

3300

3275

LOT 08

F 6753

LOT 07

E 3300

LOT 06

D 3300

LOT 05

C 3300

1758

B 3300

2000

A

SAFE DISCHARGE TO OPEN SPACE

BI

2000

FFL 104.10

HOMO. TILES N/V

mk-26-08442V

3050

VOID DECK FFL 104.10

FFL 104.10 N/V

3000

3300

HOMO. TILES N/V

1300 3300

3.3M BUILDING SETBACK 3.3M BUILDING SETBACK (PROPOSED)

3.3M BUILDING SETBACK (PROPOSED)

300 X 500 MM RC COLUMN

300MM THK LOADBEARING WALL

mk-26-08440M

2M GREEN PLANTING STRIP

BOUNDARY LINE 40M 33376

N

mk-26-06990V

1st Storey 0m 2.0m

SCALE 1: 200

10m

20m

Legend

Notes

BI - Breeching Inlet DR - Dry Riser HR - Hosereel WTR - Water TEL - Telecommunication riser ELEC - Electrical Service Duct SCV - Singapore Cable Vision SPR - Spare REF - Refuse Chute REC - Recycling Chute

- Fire Lift is not required in building as habitable height is < 24m

500 Dover Road S139651 DARCH

Author: AA Architects

REC

REFUSE CHAMBER

3390

2000

BOUNDARY LINE 42M

3300 3.3M BUILDING SETBACK (PROPOSED)

FFL 104.10

4750

3450

4300

8

VOID DECK

1300

NON-HS

6478

REF

2000

Duku Road

2950

1801

LIFT LOBBY HOMO. TILES N/V

NON-HS

7

2500

3450

2250

2654

950

6

LIFT 2

1000

1200

5

Landowner/ Developer:

mk-26-08567N 23806

1400

1000

LIFT 1

1300

2M WIDE GAP

2000

2M WIDE GAP

2M GREEN PLANTING STRIP

FFL 103.90 HOMO. TILES N/V

3.3M BUILDING SETBACK

CARPARK LOBBY

2000

Category 5

700

NON-HS

FFL 103.90 HOMO. TILES N/V

mk-26-09361A

700 700 700

2000

6953

C. SCREED N/V

NON-HS

3.3M BUILDING SETBACK

2M GREEN PLANTING STRIP

4

mk-26-96630V

CARPARK LOBBY

3200

mk-26-08399P

3450

3

mk-26 -0794 1C

950

2

1300

SCV

NO. OF RISERS = 29 T = 275mm R = 175mm

1000 100 0

0

ELEC

100

HR / DR

800

TEL

1000

GAS

700

SPR

LOT 04

LOT 03

1300

4300

LOT 02

LOT 01

1

WTR

1000

2000

EXIT 1000

mk-26-06989T

Angeline Ong

Project Description: PROPOSED NEW ERECTION OF A 5-STOREY RESIDENTIAL DEVELOPMENT COMPRISING OF 16 UNITS AT 340 TEMBELING ROAD ON LOT MK26-96630

Drawing Title:

BCA 1st Storey Plan mk-26-06988P Project No.:

Drawing No.:

A2353-00001-2019

DRAINAGE INTERPRETATION I, Angeline Ong signing the file, confirm that the drainage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Department, NEA.

The standard certification is submitted in the form of an electronic record which is signed with a digital signature.

32

QP’S CERTIFICATION BASED ON DECLARATION AS STATED IN FORM 1 OF FSSD APPLICATION FOR APPROVAL OF FIRE SAFETY PLANS I,____Angeline Ong____, NRIC No./Passport No. __T0226107Z__ being a qualified person under the Fire Safety Act, hereby certify that: (a)the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act.

SEWERAGE INTERPRETATION I,_________Angeline Ong_________ signing the file, confirm that the sewerage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Department, NEA.

ROAD LINE I, ________Angeline Ong_________, confirm that the road reserve lines, the category of the proposed and existing roads and other related road information as shown in the layout plan is in accordance with the current information provided by the LTA.

A02

Project Code:

Scale : 1 : 200

Rev.:

Date: 08/05/20

Drawn: Author

Checked: Checker


AY 20/21 | MOCK BP SUBMISSIONS

3 5 ________sheet of ________

BUILDING AND CONSTRUCTION AUTHORITY APPROVED UNDER SECTION 5/ SECTION 5A OF THE BUILDING CONTROL ACT (CAP29)

Project Ref No:

1

A2353-00001-2019

A05

A04 A06

1 Building Plans Complying with Acceptable Solutions in Approved Document

BOUNDARY LINE 40M BOUNDARY LINE 42M

I, ______Angeline Ong_______, hereby certify, subject to any waiver/ modification granted under section 6A of the Building Control Act (Cap 29), that (a) the preparation of these building plans are in accordance with the Building Control Regulations; and (b) the buildings/ building works shown on these plans are in accordance with the provisions of the provisions of the Building Control Regulations and the acceptable solutions in the Approved Document.

7.5M ROAD BUFFER

Owner's Consent I/ We, ___

1000MM HIGH STEEL RAILINGS

E

TD

00

2400

24

BEDROOM 2

900

FD 1H

50

FFL 109.15

MASTER BEDROOM

YARD FFL 109.10

TIMBER STRIP N/V

2400

FFL 109.15

FFL 109.15

TIMBER STRIP N/V

TIMBER STRIP N/V

BATH 2

BATH 1

FFL 109.15

FFL 109.125

FFL 109.125

HOMO. TILES

HOMO. TILES N/V

HOMO. TILES N/V

HS

2000

N/V

1500MM WIDE 1200MM HIGH ALUMINIUM FRAME SIDE HUNG CASEMENT WINDOW

25

REF

LIVING/DINING

REC

CORRIDOR

FFL 109.15 TIMBER STRIP N/V

24

00

24

BEDROOM 3 50

50

FFL 109.10

3.3M BUILDING SETBACK (PROPOSED)

500 Dover Road S139651 DARCH

25

BALCONY TIMBER STRIP N/V

Landowner/ Developer:

FFL 109.15

TIMBER STRIP N/V

HOMO. TILES N/V

2400

BEDROOM 3

FFL 109.15

3.3M BUILDING SETBACK

1400MM WIDE 1000MM HIGH ALUMINIUM FRAME SLIDING WINDOW

2260

TIMBER STRIP N/V

Description

23760

1100

50

900

30 FD 1H

FFL 109.15 TIMBER STRIP N/V

1000MM HIGH STEEL RAILINGS

AC LEDGE

50

mm

FFL 109.15

TIMBER STRIP N/V

3300

4300

BOUNDARY LINE 42M

BEDROOM 1

02

LIVING/DINING TD = 5360mm 00

FFL 109.15

=

62

Date

1801

2400

HOMO. TILES N/V

24

3300 3.3M BUILDING SETBACK (PROPOSED)

2400

C. SCREED N/V

700 700 700 700

No. of Riser = 21 T = 275mm R = 175mm

SCV ELEC

TEL

0mm DOO R: 1092 EXIT

900

1000

HS FFL 109.15

HOMO. TILES N/V

TIMBER STRIP N/V

MASTER BEDROOM

1000MM HIGH RC PARAPET WALL

FFL 109.10

1450

950

m 5m

BATH 2 FFL 109.125

HOMO. TILES N/V

FFL 109.15

25

YARD FFL 109.10 TIMBER STRIP N/V

1067MM WIDE 3300MM HIGH ALUMINIUM FRAME FULL HEIGHT GLASS WITH CASEMENT WINDOW

HOMO. TILES N/V

2000

= 647

BATH 1

HOMO. TILES N/V

N/V

2400

1200

FFL 109.125

CORRIDOR

STORAGE

HOMO. TILES

N/V

50

LIFT 2

1100

TD 25

BATH 1 FFL 109.125

HOMO. TILES

N/V

1200

AC LEDGE

LIFT LOBBY

2400

FFL 109.15 HOMO. TILES N/V

FFL 109.125

HOMO. TILES

1200

25

8

50

900

FD 1H

HOMO. TILES N/V

FFL 109.15 TIMBER STRIP N/V

BATH 2

HS

FFL 109.15

FFL 109.15 HOMO. TILES N/V

KITCHEN

30

FFL 109.15

50

3050

KITCHEN

Rev.

STORAGE

CORRIDOR

KITCHEN

50 30

50

3450

30

50

FFL 109.15 TIMBER STRIP N/V

2400

2677

FFL 109.10 TIMBER STRIP N/V

FFL 109.15 TIMBER STRIP N/V

00

1100

1067

AC LEDGE

YARD

FFL 109.15 TIMBER STRIP N/V

2400

7

LIVING/DINING

50

1500

MASTER BEDROOM

BEDROOM 1

24

25

1700

1067

00

TIMBER STRIP N/V

LIFT 1

1067

2M WIDE GAP

5

6

GAS

SPR

800 1200

700 FD 1H

1075

BEDROOM 2

FFL 109.15 TIMBER STRIP N/V

24

1300

DOO R TO

TD OF MOST REMOTE

30

50

1400

2000

1100

1075

POINT TO HR/DR: 29336mm

800

50 1450 1350

AC LEDGE

870

EXIT

600

BEDROOM 3

50

FFL 109.15

50

830

3200

1800

FD 1H

50

870

1400

3275

30

930

FFL 109.15 HOMO. TILES N/V

(b) I/ We have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232, 1998Ed).

J

3300

BALCONY

1000 10 00

00

FFL 109.15 TIMBER STRIP N/V

1200

KITCHEN

FFL 109.10 TIMBER STRIP N/V

10

FRO M ENT RAN CE

HOMO. TILES N/V

2000

HS FFL 109.15

HOMO. TILES N/V

YARD

FFL 109.15 TIMBER STRIP N/V

I

3300

TIMBER STRIP N/V

1000

TD

1200

BATH 2 FFL 109.125

HOMO. TILES N/V

25

1366

LIVING/DINING

BATH 1 FFL 109.125

MASTER BEDROOM

HR / DR

2400

3050

2600

TIMBER STRIP N/V 2400

1000

1450

0 240

50

3.3M BUILDING SETBACK

HOMO. TILES N/V

2400

1800

4300 950

10

00

WTR

50

FFL 109.15 TIMBER STRIP N/V

24 00

FFL 109.15

30

3450

00

FFL 109.10

TIMBER STRIP N/V

BEDROOM 3

FFL 109.15 TIMBER STRIP N/V

CORRIDOR

H

3300

1100MM HIGH STEEL RAILINGS 10

FFL 109.10

BEDROOM 2

FFL 109.15 TIMBER STRIP N/V

4

G

6753

3300

2000

800

F

1000MM HIGH RC PARAPET WALL

3300

1800

BALCONY

BEDROOM 1

STORAGE FFL 109.15

3

1500

2200

1

2

D 3300

1800

50

1650

30

C 3300

1800

3050

B 3300

800

3050

A

DARCH_______, hereby declare that -

(a) I/ We am/ are not the owner(s) of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and

33378

00

FFL 109.15 HOMO. TILES N/V

BEDROOM 2

3.3M BUILDING SETBACK

3300

BEDROOM 1

FFL 109.15

FFL 109.15

FFL 109.15

TIMBER STRIP N/V

TIMBER STRIP N/V

TIMBER STRIP N/V

BALCONY

1000MM HIGH RC PARAPET WALL

STORAGE

FFL 109.15 TIMBER STRIP N/V

3.3M BUILDING SETBACK (PROPOSED)

FFL 109.10

300 X 500 MM RC COLUMN

TIMBER STRIP N/V

600MM WIDE 2500MM HIGH 4-PANEL FOLDING DOOR 1000MM HIGH STEEL RAILINGS

1800MM WIDE 1200MM HIGH ALUMINIUM FRAME SIDE HUNG CASEMENT WINDOW 300MM THK RC LOAD BEARING WALL

Author: AA Architects

BOUNDARY LINE 40M

N

Angeline Ong

2nd to 5th Storey (Typical Storey) Plan 0m 2.0m

10m

20m

SCALE 1: 200

Legend BI - Breeching Inlet DR - Dry Riser HR - Hosereel WTR - Water TEL - Telecommunication riser ELEC - Electrical Service Duct SCV - Singapore Cable Vision SPR - Spare REF - Refuse Chute REC - Recycling Chute

Proposed FFL @ Lift Lobby of 3rd to 5th Storey: - 3rd Storey: 112.7 - 4th Storey: 116.3 - 5th Storey: 119.9 - Roof Level: 123.5 - Lift Motor Room Level: 127.1

Project Description: PROPOSED NEW ERECTION OF A 5-STOREY RESIDENTIAL DEVELOPMENT COMPRISING OF 16 UNITS AT 340 TEMBELING ROAD ON LOT MK26-96630

Drawing Title:

BCA 2nd to 5th Storey (Typical Storey) Plan Project No.:

Drawing No.:

A2353-00001-2019

DRAINAGE INTERPRETATION I, Angeline Ong signing the file, confirm that the drainage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Department, NEA.

The standard certification is submitted in the form of an electronic record which is signed with a digital signature.

QP’S CERTIFICATION BASED ON DECLARATION AS STATED IN FORM 1 OF FSSD APPLICATION FOR APPROVAL OF FIRE SAFETY PLANS I,____Angeline Ong____, NRIC No./Passport No. __T0226107Z__ being a qualified person under the Fire Safety Act, hereby certify that: (a)the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act.

SEWERAGE INTERPRETATION I,_________Angeline Ong_________ signing the file, confirm that the sewerage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Department, NEA.

ROAD LINE I, ________Angeline Ong_________, confirm that the road reserve lines, the category of the proposed and existing roads and other related road information as shown in the layout plan is in accordance with the current information provided by the LTA.

A03

Project Code:

Scale : 1 : 200

Rev.:

Date: 08/05/20

Drawn: Author

Checked: Checker

33


AY 20/21 | MOCK BP SUBMISSIONS

4 5 ________sheet of ________

BUILDING AND CONSTRUCTION AUTHORITY APPROVED UNDER SECTION 5/ SECTION 5A OF THE BUILDING CONTROL ACT (CAP29)

Project Ref No:

A2353-00001-2019

Building Plans Complying with Acceptable Solutions in Approved Document I, ______Angeline Ong_______, hereby certify, subject to any waiver/ modification granted under section 6A of the Building Control Act (Cap 29), that (a) the preparation of these building plans are in accordance with the Building Control Regulations; and (b) the buildings/ building works shown on these plans are in accordance with the provisions of the provisions of the Building Control Regulations and the acceptable solutions in the Approved Document. Owner's Consent I/ We, ___

DARCH_______, hereby declare that -

3

4 3450

5 3200

6 3450

7

8

950

4300

(b) I/ We have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232, 1998Ed).

Rev.

Date

Description

3400

950

BOUNDARY LINE

2 4300

3.3M COMMON SETBACK

7.5M ROAD BUFFER

1

3600

AMSL: 23.50

3M GREEN BUFFER

BOUNDARY LINE

(a) I/ We am/ are not the owner(s) of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and

1067MM W IDE 3300MM HIGH ALUMINIUM FRAME FULL HEIGHT GLASS WITH CASEMENT WINDOW

ROOF

ROOF FFL 123.50 N/V

FFL 109.10

LIVING/DINING

LIVING/DINING

3300

BALCONY

3400

3600

FFL 123500 mm

FFL 109.15

FFL 109.15

BALCONY FFL 109.10

N/V

N/V

N/V

N/V

BALCONY

LIVING/DINING

LIVING/DINING

BALCONY

5TH STOREY

3400

3600

FFL 119900 mm

FFL 109.10

FFL 109.15

N/V

N/V

BALCONY

LIVING/DINING

FFL 109.10

FFL 109.15

FFL 109.15 N/V

FFL 109.10 N/V

900MM WIDE 2100MM HIGH FIRE-RATED DOOR

4TH STOREY

3RD STOREY

3400

600MM WIDE 2500MM HIGH 4-PANEL FOLDING DOOR

3600

19400

FFL 116300 mm LIVING/DINING FFL 109.15

BALCONY FFL 109.10

N/V

N/V

N/V

N/V

BALCONY

LIVING/DINING

LIVING/DINING

BALCONY

FFL 109.15

FFL 109.15

FFL 109.10

N/V

N/V

Landowner/ Developer:

300 X 400 MM RC BEAM

N/V

2ND STOREY

2400

500 Dover Road S139651 DARCH

400

FFL 109100 mm

1000MM HIGH STEEL RAILINGS

1000

N/V

2100

2400

1450 FFL 109.10

1000

1000MM HIGH STEEL RAILINGS

3400

3600

FFL 112700 mm

300 X 500MM RC COLUMN

4800

1800

CAT 5

BIN POINT

PROPOSED DRIVEWAY

1800MM HIGH RC BOUNDARY W ALL

PROPOSED DROP-OFF POINT

LIFT LOBBY

VOID DECK

PL 103.90

FFL 104.10

FFL 104.10

N/V

N/V

PL 103.90

1800

5000

1000MM HIGH RC PARAPET WALL 2100

TEMBELING ROAD 1ST STOREY

mk-26-96631W

FFL 104100 mm

Author: AA Architects

Section 1 0m 2.0m

Angeline Ong 10m

20m

Project Description: PROPOSED NEW ERECTION OF A 5-STOREY RESIDENTIAL DEVELOPMENT COMPRISING OF 16 UNITS AT 340 TEMBELING ROAD ON LOT MK26-96630

SCALE 1: 200

Drawing Title:

BCA Section Plan

Project No.:

Drawing No.:

A2353-00001-2019

DRAINAGE INTERPRETATION I, Angeline Ong signing the file, confirm that the drainage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Department, NEA.

The standard certification is submitted in the form of an electronic record which is signed with a digital signature.

34

QP’S CERTIFICATION BASED ON DECLARATION AS STATED IN FORM 1 OF FSSD APPLICATION FOR APPROVAL OF FIRE SAFETY PLANS I,____Angeline Ong____, NRIC No./Passport No. __T0226107Z__ being a qualified person under the Fire Safety Act, hereby certify that: (a)the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act.

SEWERAGE INTERPRETATION I,_________Angeline Ong_________ signing the file, confirm that the sewerage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Department, NEA.

ROAD LINE I, ________Angeline Ong_________, confirm that the road reserve lines, the category of the proposed and existing roads and other related road information as shown in the layout plan is in accordance with the current information provided by the LTA.

A04

Project Code:

Scale : 1 : 200

Rev.:

Date: 08/05/20

Drawn: Author

Checked: Checker


AY 20/21 | MOCK BP SUBMISSIONS

5 5 ________sheet of ________

BUILDING AND CONSTRUCTION AUTHORITY APPROVED UNDER SECTION 5/ SECTION 5A OF THE BUILDING CONTROL ACT (CAP29)

Project Ref No:

A2353-00001-2019

Building Plans Complying with Acceptable Solutions in Approved Document I, ______Angeline Ong_______, hereby certify, subject to any waiver/ modification granted under section 6A of the Building Control Act (Cap 29), that (a) the preparation of these building plans are in accordance with the Building Control Regulations; and (b) the buildings/ building works shown on these plans are in accordance with the provisions of the provisions of the Building Control Regulations and the acceptable solutions in the Approved Document. Owner's Consent I/ We, ___

DARCH_______, hereby declare that -

(a) I/ We am/ are not the owner(s) of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and E 6753

D 3300

C 3300

B

A

3300

300MM THK RC LOAD-BEARING W ALL 900MM W IDE 2100MM HIGH FIRE-RATED DOOR

900

1000MM HIGH STEEL RAILINGS 1000

(b) I/ We have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232, 1998Ed).

3300

1000MM HIGH RC PARAPET W ALL 600MM W IDE 2500MM HIGH 4PANEL FOLDING DOOR 1000MM HIGH STEEL RAILINGS

FFL 123500 mm

BOUNDARY LINE

F 3300

2275

2.0M PLANTING STRIP

BOUNDARY LINE

ROOF

G 3300

3.3M COMMON SETBACK

3600

AMSL: 23.50

H 3300

2.0M PLANTING STRIP

I 3275

3.3M COMMON SETBACK

J

Rev.

Date

Description

3300

1000

3600

2000

5TH STOREY

3600

FFL 119900 mm

4TH STOREY

3600

Landowner/ Developer:

FFL 112700 mm

1800 900

1000

1200

2500

3600

2400

2520

2ND STOREY

2648

3RD STOREY

19400

FFL 116300 mm

PL 103.90

500 Dover Road S139651

300 X 400 MM RC BEAM

DARCH

300 X 500MM RC COLUMN

1800MM HIGH BOUNDARY W ALL

1800

6000MM WIDE 1800MM HIGH BOUNDARY GATE

5000

1ST STOREY

1058

FFL 109100 mm

1800MM WIDE 1200MM HIGH ALUMINIUM FRAME SIDE HUNG CASEMENT WINDOW

mk-26-96615T

mk-26-07941C

FFL 104100 mm

Author: AA Architects

Elevation 1 0m 2.0m

Angeline Ong 10m

20m

Project Description: PROPOSED NEW ERECTION OF A 5-STOREY RESIDENTIAL DEVELOPMENT COMPRISING OF 16 UNITS AT 340 TEMBELING ROAD ON LOT MK26-96630

SCALE 1: 200

Drawing Title:

BCA Elevation Plan

Project No.:

Drawing No.:

A2353-00001-2019

DRAINAGE INTERPRETATION I, Angeline Ong signing the file, confirm that the drainage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Department, NEA.

The standard certification is submitted in the form of an electronic record which is signed with a digital signature.

QP’S CERTIFICATION BASED ON DECLARATION AS STATED IN FORM 1 OF FSSD APPLICATION FOR APPROVAL OF FIRE SAFETY PLANS I,____Angeline Ong____, NRIC No./Passport No. __T0226107Z__ being a qualified person under the Fire Safety Act, hereby certify that: (a)the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act.

SEWERAGE INTERPRETATION I,_________Angeline Ong_________ signing the file, confirm that the sewerage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Department, NEA.

ROAD LINE I, ________Angeline Ong_________, confirm that the road reserve lines, the category of the proposed and existing roads and other related road information as shown in the layout plan is in accordance with the current information provided by the LTA.

A05

Project Code:

Scale : 1 : 200

Rev.:

Date: 08/05/20

Drawn: Author

Checked: Checker

35


05

/ AY 20/21 HISTORY & THEORY OF ARCHITECTURE II

CASE STUDY: BAUHAUS, DESSAU AUG 2020

ARCHITECT + FOUNDER: WALTER GROPIUS

36

A study of Bauhaus, Dessau by Walter Gropius was done, using the ‘7 Lines of Inquiry’ - Massing, Structure, Interior vs Exterior, Public vs Private, Programmatic Distribution, Circulation, Facade.

LOCATION: DESSAU, GERMANY

A Revit Model of the Bauhaus Building was completed in groups, and eventually used for diagrams within the report.

CONSTRUCTION YEAR: 1925 - 1926


The diagram below shows how programmes within the Bauhaus are organised vertically and are separated into blocks. It is observed that the classrooms within the technical school block and the workshop rooms within the workshop block would inhabit the same areas on each floor. This makes it easier to distinguish and locate the various programmes.

EXPLODED AXONOMETRY

PROGRAMME DISTRIBUTION

37


AY 20/21 | BAUHAUS DESSAU

STUDIO ACCOMMODATION (DORMITORIES)

Black aluminium framed windows with white concrete walls

STUDIO ACCOMMODATION BLOCK ELEVATION

EXPLODED VIEW OF FACADE

Columns are painted dark grey / black since it forms part of the structure of the building and gives off a feeling of “strength”. Basement walls are painted in grey as it supports the load from the upper storeys

SOUTH ELEVATION

38

PUBLIC & PRIVATE ZONES

FACADE - EXPLODED VIEW

White walls form most parts of the building


AY 20/21 | BAUHAUS DESSAU

FACADE - EXPLODED VIEW & ELEVATIONS

STRUCTURE & ELEVATION

39


06

/ AY 21/22 TECHNICAL STUDIES III

CASE STUDY: LEUTSCHENBACH SCHOOL Flat roof trusses

AUG 2021 6th storey: upper truss girders

As part of the Technical Studies III (TS III) module, a case study on Leutschenbach School by Christian Kerez was done to analyse the building’s concept, system, and structure. The final report contains drawings and details on the various parts of the school.

5th storey: partly suspended truss

A Revit model of the structural system of the school was also done as a group, which was used to help analyse the building in the report.

2nd-4th storeys: lower truss girders

Ground Floor: ‘Tripod Columns’

ARCHITECT + FOUNDER: CHRISTIAN KEREZ LOCATION: ZURICH, SWITZERLAND

AXONOMETRIC VIEW OF LEUTSCHENBACH SCHOOL’S STRUCTURE

40

PROJECT YEAR: 2009


/ AY 21/22 CASE STUDY: LEUTSCHENBACH SCHOOL

U PP ER TR U

SS G IR D ER

S

U SS LO W ER TR G IR D ER S

LOADING PATH OF STRUCTURAL TRUSSES

EXPLODED AXONOMETRIC VIEW OF LEUTSCHENBACH SCHOOL’S STRUCTURE

DETAILED DRAWING OF STRUCTURAL COLUMN

41


/ AY 21/22 CASE STUDY: LEUTSCHENBACH SCHOOL

DETAIL A-A STRUCTURAL GLAZING - ROOF CONNECTION DETAIL

ROOF AND SUSPENDED CEILING DETAILS

LONG SPAN TRUSS

SECTION VIEW OF LONG SPAN TRUSS

42


/ AY 21/22 CASE STUDY: LEUTSCHENBACH SCHOOL ROOF SKYLIGHT DETAILS (PROPOSED)

RAISED FLOOR CONSTRUCTION DETAILS

STRUCTURAL GLAZING DETAILS

43


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

44


07

/ AY 21/22 INTEGRATED PROJECT STUDIO III

CURATE: SCHOOL OF ARTISANAL & CONTEMPORARY CRAFTS SEP 2021 - FEB 2022

SCHOOLS OF THE FUTURE The site sits within an intersection of cultures and commercial activity. Commercial activity, and especially craft-related trade played a pivotal and significant role in the early beginnings of the district.

BASKETWEAVING

FURNITURE

JEWELLERY

METALWORK

TEXTILE

This is evident by the number of artisanal craft-related stores found around the site. However, along with many other countries, the practice of artisanal crafts have been seeing a decline in interest and relevancy over the years, especially in an age where the demands of consumerism are met through the convenience of mass production. Thus, in view of the declining relevancy of artisanal crafts, the school aims to safeguard the practice of artisanal crafts by providing a platform for the passing of craft skill/knowledge & to explore the fusion of contemporary craft practices so as to increase its relevancy. The school embraces the crossovers and fusion between the old and the new - traditional and contemporary practices which may otherwise be perceived to supersede the practice of artisanal crafts. On a neighbourhood scale, the school also becomes a form of interconnected public space for the neighbourhood to learn and appreciate artisanal crafts.

SITE / SITE AREA : BEACH ROAD, CRAWFORD PLANNING AREA / 3957.13 SQM DEVELOPMENT TYPE: 6-STOREY EDUCATIONAL INSTITUTION WITH BASEMENT CARPARK

45


MASSING EXPLORATION - INTERWEAVING OF MASSINGS

46 46


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

HOW CAN ARCHITECTURE PLAY A ROLE IN SAFEGUARDING & INCREASING THE RELEVANCY OF ARTISANAL CRAFT PRACTICES? The School of Artisanal and Contemporary Crafts aims to; 1. Raise the Relevancy of Artisanal crafts by exploring the fusion of contemporary craft practices. (e.g. digital fabrication) 2. Provide a platform for the passing of artisanal craft knowledge and skills from craftsmen to the community. 3. To strengthen the identity of the site through artisanal crafts (which used to populate the area). 4. Provide local/aspiring artisanal craftsmen access to new markets and networks.

Proposed Curriculum

DESIGN METHODOLOGY - OMA, BLOX With reference to OMA BLOX, a key aspect of the methodology is the interconnectivity of the different program spaces via physical connections (circulation), which draws and allows the public to explore the different programmes within the building. Craft/Art schools are conventionally regarded as private institutions, in which most of the learning spaces are secluded away from the public eye. ​ imilar to OMA BLOX, the project also aims to challenge the conventions of a school S as a private institution, whereas learning is not exclusive to students who enroll, and extends to the public in an attempt to pass on knowledge about such crafts. As such on a neighbourhood scale, the school becomes an interconnected public space for the learning and passing of craft skills and knowledge.

47


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

PROCESS DIAGRAMS

PROGRAMMATIC ZONES

INNOVATION HUB

ARTISANAL CRAFT WORKSHOPS

3 Main Programmatic Zone established and are connected with bridges

- DIGITAL FABRICATION LAB - LARGE 3D PRINTING - MATERIAL RESEARCH LAB - PROJECT ROOMS, DISCUSSION SPACES - FLEXIBLE WORKSHOP/SEMINAR ROOMS - LIBRARY

- WOOD WORKSHOP & STUDIO - METAL WORKSHOP & STUDIO - TEXTILE WEAVING WORKSHOP & STUDIO - CERAMICS WORKSHOP & STUDIO

‘Bridges’ wrapped around building based on sequence & planned circulation

SANDBOX - FOR THE INDUSTRY & COMMUNITY - EXHIBITION SPACE/FORUM - MAKERSPACE - AMPHITHEATRE SEATS WITH PROJECTOR - ONE-STOP CENTRE

Expression of 3 different volumes to represent the 3 main programmatic zones

48


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

EXTERIOR PERSPECTIVE VIEW OF SCHOOL’S ENTRANCE FROM THE MOSQUE

49


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

1ST STOREY PLAN

2ND STOREY PLAN

50

0

0.5m

3m

5m


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

3RD STOREY PLAN

4TH STOREY PLAN

5TH STOREY PLAN

6TH STOREY PLAN

0

0.5m

3m

5m

51


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

SECTIONAL PERSPECTIVE 1:50

52


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

PART SECTION DETAIL 1:10

53


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

A.

54

B.

SIDE ELEVATION

FRONT ELEVATION


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

C.

D.

E.

INTERIOR PERSPECTIVES; A. 2ND STOREY AMPHITHEATRE SEATS, B. 5TH STOREY NETWORKING SPACE, C. 3RD STOREY ECG CENTRE D. 3RD STOREY VIEW FROM ABOVE AMPHITHEATRE SEATS E. 2ND STOREY WOOD WORKSHOP CORRIDOR

55


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

PART PLAN OF NETWORKING SPACE @ 5TH STOREY

56


/ AY 21/22 SCHOOL OF ARTISANAL AND CONTEMPORARY CRAFTS

FINAL SECTIONAL MODEL | FRONT

FINAL SECTIONAL MODEL | BACK

5757


Turn static files into dynamic content formats.

Create a flipbook
darch portfolio (19'-22') by Angeline Ong - Issuu