Storey
Volume
SA CO M P N L ST E PE R . N U O RM C T T F I IT O O IN N R G. O R
Material name Gravel or crushed stone, 4'' minimum thickness
Ground floor
34.0
Insulation
Ground floor
120.2
Roof
122.9
Reinforced concrete
Foundation
84.2
Reinforced concrete
Ground floor
34.0
Insulation
B01 -
Design Architect
Bill of quantities 1/2 | cubic feet
Cubic feet materials 1' = 1'-0"
Bill of quantities 2/2 | square feet Storey
Surface
1/2'' Gypsum board
Ground floor
640.4
1/2'' Gypsum board
Roof
552.5
Exterior wooden siding
Ground floor
339.9
Interior wall paint
Ground floor
280.6
Polyethylene moisture barrier
Ground floor
197.2
Roof
190.7
Vapour barrier
Ground floor
292.7
Vapour barrier
Roof
170.9
Ground floor
95.2
Wooden parquet
B02 -
Square feet materials 1' = 1'-0"
SITE PLAN NOTES:
FLOOR PLAND AND ROOF PLAN NOTES:
01. PLANS ARE DESIGNED TO 2015 INTERNATIONAL BUILDING CODES. CONTRACTOR TO VERIFY PLANS CONFORM TO LOCAL BUILDING STANDARDS PRIOR TO CONSTRUCTION.
GENERAL NOTES: 01. PLANS ARE DESIGNED TO 2015 INTERNATIONAL BUILDING CODES. CONTRACTOR TO VERIFY PLANS CONFORM TO LOCAL BUILDING STANDARDS PRIOR CONSTRUCTION.
WALL AND PARTITION NOTES: 01. INSTALL ALL 'ZIP' SHEATING ON WALLS IN HORIZONTAL ORIENTATION, RUNNING PERPENDICULAR TO THE WOOD STUD WALLS.
02. GENERAL CONTRACTOR SHALL VERIFY ALL EXISITNG CONDITIONS IN FIELDD AND NOTIFY OWNER AND ARCHITECT OF ANY DISCREPANCIES IN THE PLANS.
02. INSTALL ALL PEEL AND STICK MEMBRANE OVER ALL JOINTS, HORIZONTAL AND VERTICAL, BETWEEM 'ZIP' SHEATING PANELS. INSTALL PEEL AND STICK MEMBRANE OVER ALL 'ZIP' SHEATING AT WINDOW SILLS AND JAMBS.
02. GENERAL CONTRACTOR SHALL VERIFY ALL EXISITNG CONDITIONS IN FIELD AND NOTIFY OWNER AND ARCHITECT OF ANY DISCREPANCIES IN THE PLANS.
03. GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT AND OWNER OF ANY DISCREPANCIES BETWEEN THE DRAWINGS AND OTHER TRADES 04. GENERAL CONTRACTOR SHALL VERIFY ROOF OVERHANG ALLOWANCES WITH THE CITY PRIOR TO CONSTRUCTION. 05. ALL DESIGN WORK BEYOND THE PROPERTY LINE OF THE PROJECT, INLCUDING ANY CIVIL ENGINEERING WORK, SHALL BE BY OTHERS.
06. GENERAL CONTRACTOR SHAALL VERIFY POSITIVE DRAINAGE, AT LEAST THREE INCHES EVERY TEN FEET, AWAY FROM BUILDING LINE IN ALL DIRECTIONS. 07. GENERAL CONTRACTOR SHALL REFERENCE CIVIL ENGINEERING DRAWINGS FOR ALL CIVIL AND SITE UTILITY WORK.
03. GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT AND OWNER OF ANY DISCREPANCIES BETWEEN THE DRAWINGS AND OTHER TRADES 04. GENERAL CONTRACTOR SHALL COORDINATE INSTALLATION OF APPLIANCES AND FIXTURES WITH SUB-CONTRACTOR TRADES BASED ON SELECTIONS. INSTALL ALL FIXTURES AND APPLIANCES PER MANUFACTURER'S RECOMMENDATIONS. CONTACT ARCHITECT PRIOR TO INSTALLATION IF OWNER SUBSTITUTIONS AFFECT DESIGN. 05. INSTALL INWALL BLOCKING AS REQUIRED FOR ALL FIXTURES, APPLIANCES AND ACCESSORIES AS REQUIRED TO SUPPORT SAID ITEMS. 06. DO NOT SCALE DRAWINGS. IF REQUIRED DIMENSIONS ARE NOT INDICATED, GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT FOR RESOLUTION.
The original of this drawing is 17''x22''. If thish copy is any other size it has either been reduced or enlarged. Take appropriate precautions accodringly.
GSPublisherVersion 0.0.100.99
GENERAL NOTES:
03. ALL INTERIOR PARTITIONS ARE 2X4s EXCEPT FOR PLUMBING WALLS AND POCKET DOOR WALLS WHICH SHALL BE 2X6s, UNLESS NOTED OTHERWISE.
01. FOUNDATION DEPTH, DESIGN, REINFORCEMENT TYPE AND AMOUNT, AS WELL AS ALL FOUNDATION RELATED DESIGN WORK WILL BE HANDLED BY A LICENSED PROFESSIONAL 02. ALL SUPPORT TRUSSES USED IN THE DESIGN WILL EITHER BE COMERCIALLY BOUGHT OR DESIGNED BY A LICENSED PROFESSIONAL. 03. GENERAL CONTRACTOR SHALL VERIFY THE BILL OF QUANTITY PRIOR TO STARTING CONSTRUCTION. 04. THE BILL OF QUANTITY PROVIDED IS GENERAL AND CONTAINS ALL THE MAJOR MATERIALS. GENERAL CONTRACTOR IS RESPONSIBLE FOR SUPPLEMENTING IT WITH ANY REQUIRED ADDITIONS.
Work Cabin 1.0 ProjectInformation
Roof tiles
FINISH NOTES: 01. ALL INTERIOR WALLS AND CEILINGS SHALL BE GYPSUM BOARD IN ACCORDANCE WITH FIRE RATING REQUIRED BY APPLICABLE CODE.
Author: Arch. Andrei Vasilief
Cover Drawing Information
Material name
_G101 1'
=
1'-0"