Skip to main content

Graduate Portfolio

Page 1

ALEXANDER MEYER PORTFOLIO ARCHITECTURAL


This May 17th, I anticipate graduating from Kansas State University with a Master of Architecture degree. As such, I’m currently seeking an entry level position in an architectural design studio. My past work experiences and education in multidisciplinary settings have prepared me to make the leap into the professional world. From working with digital fabrication to acquiring a proficiency in a variety of computer programs, I have worked to develop skills that will be valuable in the workplace of today and tomorrow. It is in my philosophy as a designer that our work should strive to be beneficial catalysts for the urban environment, exemplifying well-thought out intentions to create sustainable and social architecture. Included here is a selection of my work from the past 2 years of my graduate studies and internship experiences. Please e-mail any questions you may have, and I hope you enjoy.

Sincerely,


CV Curriculum Vitae EXPERIENCE CONTACT Name: Alexander Paul Meyer

HTK Architects Internship (January 2013 - August 2013) Topeka, KS Main Duties: Building Information Modeling

Residence: 5012 W. 148th St., Leawood, KS 66224 Phone: 913.526.4414 E-mail: ameyer91@ksu.edu

EDUCATION Kansas State University College of Architecture, Planning, and Design Master of Architecture Manhattan, KS Graduation: May 2014

REFERENCES AVAILABLE UPON REQUEST


CV PROGRAM USE AutoCAD

TIMELINE

ACméxico IN-PROGRESS THESIS PROJECT Arena Renovation/Expanison Ciudad de México, Mexico

Revit Rhino 5.0 ::V-Ray ::Grasshopper

Sketch-Up In-Design Illustrator Photoshop ArcGlobe

Present

Flip-Bench Digital Fabrication Denver, CO

Delta 615 Urban Planning 2014 ULI Hines Competition Entry Nashville, TN

2014

SpitzFire Transportation Design Displayed at 2014 KC Auto Show

Shawnee Heights Bond Referendum UNDER CONSTRUCTION HTK Architects Topeka, KS

2013

Crossroads Market Organic Local Grocer Kansas City, MO

Carl Andre Museum Single-Artist Gallery New York, NY

Research Center Bamboo Construction Roatán, Honduras

2012


TC

Table of Contents

1-8

9-14

15-22

Crossroads Market

Research Center

ACmĂŠxico


TC

23-30

31-34

35-44

Delta 615

Academic Internship

Miscellaneous


1

Crossroads Market Kansas City, Missouri PROCESS The market is setback to provide room for parking and to widen pedestrian pathways.

1

The double-height storage space is allocated to the back of the site.

The folding form creates a diversity of spaces and is oriented to open up to the corner of 19th and Main Street.

2

STRUCTURE A heavy steel frame supports a majority of the structure. The long, 58’ span is supported by 2-1/2’ thick steel box beams.

Load bearing metal stud walls support the rest of the structure Open web steel joists support the roof deck over the storage space.

The form is subtracted to allow an outdoor seating area for the cafe, a green plaza, and a loading dock.

The roof load is distrbuted across the steel framing with corrugated steel roof decking.

Cantilevers are added to provide shade from the direct sunlight, prevent solar gain during the hot season, and furthur the form’s relationship to the street.

The rest of the structure consists of non-load bearing metal stud walls and curtain wall glazing.

3

4


The Crossroads Market is an urban supermarket designed for the Crossroads district. The market is understood as a covered plaza continuous with the public space surrounding it. The open design is accomplished with the use of large steel frame that create a large column-less volume. Modern and sustainable, the market creates an architectural precedent for a building type known for its big box form.

1819 MAIN STEET, KANSAS CITY, MO 66108

2


M

AI

N

ST

RE

ET

3

19 TH S

TREET


4

Ample use of grass and trees in the plaza and parking lot add much needed green space. The outdoor cafe seating works to encourage urban activity and usage. AMENITIES

An extensive green roof reduces the cooling loads, increases the roof’s life span, and reduces stormwater runoff. GREEN ROOF The building envelope opens on the North and South facade to allow for cross ventilation cooling during the hot season. VENTILATION

The louvres and cantilevers protect glazing from direct sun and solar gain while also providing plentiful amounts of daylighting. SHADE

NORTH ELEVATION

SOUTH ELEVATION


5

Crossroads Market A 1i

B 1i

NON-LOAD BEARING STUD WALL

D 1i

1i C

INSULATED LOAD BEARING STUD WALL

LOAD BEARING STUD WALL

C 1i

INTERIOR PARTITION

CURTAIN WALL

WALL TYPES 1 1/2" = 1' 0"

WALL TYPES

7 UP

LOADING DOCK LIFT

OFFICE ?

?

BATHROOMS

STORAGE

UNLOADING DRY-TYPE TRANSFORMER

BREAKROOM

CONCRETE FLOOR TRASH COMPACTOR

5/8" / 1'-0"

6

CHECKOUT

FROZEN FOOD

GRASS

CHECKOUT

5 MASONRY PAVERS

AIRLOCK

5/8" / 1'-0"

AIRLOCK

PRODUCE

5/8" / 1'-0"

GENERAL SALES

5/8" / 1'-0"

4

WODDEN SPRUNG FLOOR

DELI

WOODEN SPRUNG FLOOR

CAFE

BAKERY

5/8" / 1'-0"

3

2 SERVICE SPACE

1

GROUND FLOOR PLAN

N G

F

E

D

C

B

A

1

GROUND FLOOR PLAN 1/8" = 1'-0"


6


7 7

6

10

5

4

3

2

1

T.O. CANTILEVER 36' - 3" CORRUGATED STEEL DECKING

STEEL STRUCTURE STEEL BEAM OPEN WEB STEEL JOIST LOUVRES

T.O. ROOF 2 22' - 0"

1

1 A401

T.O. AIRLOCK 16' - 0" 1 A402

T.O. ROOF 1 14' - 0" AIRLOCK STEEL STRUCTURE

MECH. LEVEL 10' - 0"

2

2 A401

STEEL DECKING W/ CONCRETE SLAB LIGHT GAUGE STEEL JOIST

T.O. FLOOR SLAB 0' - 6"

SHORT SECTION


EXTERIOR

DETAIL

1

8

1

2 A501

4" RIGID INSULATION BOARD

STEEL DECKING

PLYWOOD SUPPORT VAPOR BARRIER

STEEL BOX BEAM

6" STEEL DECKING EIFS LOUVRES

2-1/2" RIGID INSULATION BOARD GYP SHEATHING

T.O. ROOF 2 22' - 0"

PAINT ALUMINUM COVERING

INTERIOR

EXTERIOR

1" RIGID INSULATION BOARD 2'4" X 10-3/4" STEEL BOX BEAM

CURTAIN WALL

LOUVRE SUPPORT LOUVRE T.O. AIRLOCK 16' - 0" STEEL DECKING

PARAPET

EXTERIOR

T.O. ROOF 1 14' - 0"

T.O. ROOF 1 14' - 0"

DETAIL

2

3

1 A501

2

4 A501

MECH. LEVEL 10' - 0"

MECH. LEVEL 10' - 0"

INSULATED GLASS ALUMINUM WINDOW FRAME

STEEL BOX BEAM

INTERIOR

INTERIOR

INTERIOR

4" x 1-1/2" STEEL BOX BEAM

EXTERIOR

METAL STUD WALL

ROUGH CARPENTRY BLOCK 2-1/2" RIGID INSULATION BOARD

CURTAIN WALL

WATER MEMBRANE 9" METAL STUD WALL CONCRETE FOOTING

DETAIL

T.O. FLOOR SLAB 0' - 6"

T.O. FLOOR SLAB 0' - 6"

3 GRASS

6 A501

STEEL CAP FLASHING CONCRETE CURB 3" GRAVEL

1

3

WALL SECTION 1 1/2" = 1'-0"

2" GROWING MEDIUM 2

FILTER SHEET

2

1

DRAINAGE LAYER WATER MEMBRANE

WALL SECTION

1

WALL SECTION

2

WALL SECTION 1/2" = 1'-0"


9

Marine Research Center Roatรกn, Honduras

DORMITORIES

CLASS

CAFETERIA


Roatรกn borders a precious barrier reef and is quickly becoming a burgeoning hotspot for ecotourism. Built mostly of locally abundant bamboo and Honduran pine, the design is harmonious with the topography and environment of the site. An organic trellis weaves in-between spaces, tying the complex together as a whole. Overall, The Marine Research Center aims to provide the impoverished native community with a low cost alternative to standard construction practices.

LABS

BOATHOUSE

10


11

FFLOOR LOOR P PLAN LAN

FLOOR PLAN


THATCH ROOF

12

BAMBOO FRAMING

BAMBO SCREEN

INTERIOR DRYWALL

HONDURAN PINE PIER

EXPLODED STRUCTURE

3D WALL SECTION


13


14


ACméxico

15

WON THE KANSAS STATE

KREMER COMPETITION

México City, México C

A

B

NORTH-SOUTH SECTION THROUGH PLAZA AND ARENA


Under Regnier Visting Chair and distinguished Mexican architect, Javier Sanchez, our in-progress studiowide thesis project has delved into solving social and urban issues in the Colonia Doctores neighborhood of México City using the theory of urban acupuncture. Our projects individually address observable problems with-in the urban environment with point-of-impact architecture. My intervention is the rehabilitation of the aged Arena México as the ACméxico to serve as a cultural hub and tourist destination.

16

RESOLVING ISSUES OF...

$

$

SOC I A L SE GR ATATI ON

P U BLI C SPACE

L OW DENSI T Y

CL OSE D GR OU N D F L OOR


17 LOUNGE BAR

CAFÉ

FITS A SEMI-

PREP.

TRUCK

SUPPORT/ LOADING

LUCHA LIBRE TRAINING SCHOOL

RESTAU A RANT

VENDOR VENDOR

VENDOR VENDOR

VENDOR STAGE

VENDOR

SIZE OF NBA COURT MUSEO DE LA HIST ORIA DE LA CIUDAD DE MÉXICO

VENDOR

VENDOR

VENDOR VENDOR

VENDOR VENDOR

MEN’S

WOMEN’’S

LUC LU CHA HA LIBR LIB E L MEMO OR ORABILI LIA A SECURITY

DR. LAVISTA

DR. RA FEAL LU CIO

DR. CARMONA Y VALLE

DR. RÍO DE LA LO ZA


P

E AS

O

DE

LA

F RE

O

A RM

METRICS

#

Program: 16,500-seat Arena México; Museo de la Historia; 340-suite Hotel Luchador; Centro Doctores Footprint Area: 19,985 m² Floor Area Ratio: 3.19 Footprint/ Site Ratio: 100%

18

Structure: Masonry Walls, Steel Supports, and Concrete Slabs Cladding: Concrete, Glass, and Louvres

C A T A LY T I C G R O W T H A R O U N D A R E N A

AC M É X ICO

DO C TO R E S


19 $

GENERATIVE A R ENA

Y

C E NT R O

Even with its amiable location to the historic city center and more prosperous neighborhoods, Doctores remains underdeveloped and impoverished. The neighborhood is with-in walking distance of other popular destinations such as the Zocalo and the Paseo de la Reforma, yet few people find reason to visit Doctores.

$

PROPOSAL M E X I CO

The 16,500-seat Arena México has the potential to attract crowds of spectators into the northwest region of Doctores. As is, the area has no accommodations for large crowds with fans ushered between informal vendors directly into Avenida Dr. Lavista. The lack of gathering space does little to calm concerns about crime.

A

RM

EO PAS

DE

LA

O REF

ZOCALO

$$ CENTRO

$$$$ JUÁREZ

$$$$ ROMA NORTE

$ DOCTORES

$ OBRERA

$ TRÁNSITO

R E STO R E S A V E N U E O F D I V E R S I T Y

P R O V I D E S A S A F E G AT H E R I N G S PA C E

Few venues bring together a more diverse array of demographics than arenas. Rehabilitated as a premier tourist destination, the Arena México will attract spectators and tourists from across the city. Located downtown, the arena is with-in a short commute for millions of people and has the immediate potential to attract large amounts of investment and spending that will spur future growth throughout the neighborhood.

Reorienting the arena’s main entry to north allows for a large plaza to be created. The block is split in half with a pedestrian alley and the northwest corner is opened to better accomodate public transit access from the Metro Cuauhtémoc. The new public space provides a formal destination for the gathering of people commuting to work during the day and the crowd of spectators attending arena events during the evening.


As home to the ever-popular cultural show of lucha libre and host of the 1968 Mexican Summer Olympics, the Arena Mexico has iconic potential. For such a theatrical venue, the current arena is shyly hidden away with-in the urban context. The AC México frees the arena from its prison, giving it a presence along Dr. Río de la Loz. The block is densified to exploit and supplement the arena: providing new revenue streams, increasing land values is based on reinvcenting the current Arena México into the ACméxico.

The block suffers from poor utilization. A parking garage occupies a large area of the site, only receiving significant use during events. The remainder of the site consists of low density developments, aging structures, and vacancy. Zoning regulations show potential to densify along Dr. Río de la Loza but, as is, it remains unrealized.

20

The existing context of the site limits interactions with-in the block to the periphery during the day. The arena acts as a semi-public space during bi-weekly events, but is unactive for a majority of the week. The remaining perimeter of the block lacks amenities on the ground floor resulting in street vendors filling the void.

EXISTING

DR. LAVISTA

DR. RÍO DE LA LOZA

FLOOR/AREA RATIO: 1.90

LEGEND

PROPOSED

DR. RÍO DE LA LOZA

PUBLIC PLAZA

DR. LAVISTA

FLOOR/AREA RATIO: 3.19

EXISTING

PROPOSED

R E A L I Z E S T H E S I T E ’ S F U L L P OT E N T I A L

C R E AT E S P E R M E A B I L I T Y A N D 2 4 / 7 U S A G E

The block is densified up to the height of the arena and split into two massings by the public plaza. The massing along Dr. Rio de la Loza becomes a community center and is densified further with a 10-story hotel addition, giving ACméxico a major presence along the arterial avenue. The southern massing is subtracted to create roof decks and reprogrammed with public and arena amenities, activating the entire site with usage.

The addition of the public plaza creates increased frontage and permeability on the site. The ground-level circulation concourse of the arena is proposed to be opened 24/7 to create an added dimension; providing vendors formalized spaces and the public with a variety of amenities. Entry to the arena, itself, is regulated at controllable access points along the interior of the concourse and at the points of vertical circulation.


VIEW A

21

VIEW B


C

22 A

B

VIEW C


23

Delta 615

.25 miles

Nashville, Tennessee Jefferson St.

rd Blvd.

Stockya

n St.

Harriso

ULI Hines Competition Entry Team 141125


Urban evolution has left the Sulphur Dell under-utilized, yet full of potential. Delta 615 proposes transforming the area into an active community of complete neighborhoods. The development is compartmentalized into three phases over the course of ten years. The three phases maximize existing investments, increase land values, and return the water shed to a flood resilient state.

PHASE 1

PHASE 2

PHASE 3

Create Value

Establish Place

Leverage Demand

TOTAL BUILDOUT: 3,200,000 sq. ft. Green space 1,300,000 sq.f t Rental Housing

For-Sale Housing

Retail

O ffice s / Co mme rc i a l

7 1 3 , 0 0 0 s q. f t

510,000 sq.f t

5 6 0 , 0 0 0 s q. f t

5 5 8 , 5 0 0 s q. f t

S ocial

Par k in g 1 80,000 sq.f t 660,000 sq.f t

Rental Housing

Rental Housing

Rental Housing

513,000 sq.f t

513,000 sq.f t

1 00 , 0 0 0 s q. f t

For- Sale Housing

For- Sale Housing

Fo r- S a l e H o u s i n g

233,000 sq.f t

233,000 sq.f t

1 77 , 0 0 0 s q. f t

Re t a i l

Retail

Retail

220,000 sq.f t

220,000 sq.f t

2 44 , 0 0 0 s q. f t

O ffice s / Commercial

O ffi ce s / Commercial

O ffi ces / Co mmercial

250,000 sq.f t

250,000 sq.f t

2 18 , 0 0 0 s q. f t

Par k i n g

Par k i n g

Par k in g

289,000 sq.f t

289,000 sq.f t

2 30 , 0 0 0 s q. f t

24


25 Res.

10’

Retail

Delta 615’s Ecological Systems: Ecological Resiliency Site sensitive architecture Linear parks condusive to healthy urban life

Existing Culvert

NET ZERO SUSTAINABLITITY STRATEGIES

Rehabilitated hydrological systems Natural habitats Erosion + Flood mitigation

Grey water sytems Rainwater harvesing Ecological restoration Optimized solar orientation Natural ventilation Green roofs (heat island relief) Socially active public spaces


Delta 615 Total Users:

26

D E LTA 6 1 5 C A PAC I T Y 3 0 , 0 0 0 p e o p l e

R E S I D E N TS 2 , 5 0 0 p e o p l e Existing and Proposed Parking New Parking Garage Remaining Surface Parking Existing Surface Parking

S TO C KYA R D 1 , 5 0 0 p e o p l e C A P I TA L AT H L E T I C S 2 , 5 0 0 p e o p l e VENDORS 1,000 people OFFICES 2,800 people H OT E L G U E S TS 7 0 0 p e o p l e LIVE MUSIC 9,000 people S O U N D S S TA D I U M 1 0 , 0 0 0 p e o p l e

Th e co n s t a n t e b b a n d f l ow o f a c t i v i t y w i t h i n t h e D e l t a d e ve l o p m e n t provides for a diverse range of ser vices. Amenities attrac t a large a s s o r t m e n t o f v i s i to r s a n d p e r m e n t re s i d e n t s to t h e a re a . Existing and Proposed Green Space New Green Space Existing Green Space

Delta 615 24-hour Use Breakdown: 5 am

12 pm Lunch

STOCKYARD 1 C A P I TA L ATH L E TI C S PIER VENDORS GROUND FLOOR R E TAIL SECOND FLOOR RE TAIL OFFICES Submergent Zones Proposed Building Footprints

6 pm

Group classes Breakfast Cafe

3 am

Le isure + Ente r tainment: Food, Beve rage, Events Open swim

Fa r m e r s M ar k e t

Workouts B e e r G arde n

M e rchandise + Restaurants Residential ser vices (gym, day care, health, etc.) Parkside meetings

Baseball with clients

The week ly ac tivities at the Delta 615 are abundent and dive rse. Amenities include a range of recreational oppor tunities, re tail, resturants, live music/nightlife events and to urist attrac tions.


ac

sk Ba

nis

et

C

ba

ou

lC

rts

ou

rt

Sp ble ta ap

Te n

O

Ad

e sit n-

hn Et

G

ing rk Pa

od ic

Fo

ck Tra

0m 40

ym

rt C

s om Ro Lo

ck

er

pic lym O

ou

ol Po ize -s

Su de

n

ity W oo

un m m Co

ck n

G

ar

De

de

ns

e

27

Capital Athletics Program Bicentential Capitol Mall State of Tennessee Museum

Nashville

Completion Date: 2025

Completion

3 Basketball Courts 2 Tennis Courts Olympic-sized Pool Organic Food Court Community Gardens

Court of Stars Plaza Tennessee’s Struggle Memorial Rivers of Tennessee Fountains 2,000-seat Amphitheatre 19-acre Linear Lawn

Exhibition Galleries Visiting Exhibtion Hall Formal Ballroom Military Museum

10,000-seat Capa Luxury Suites Kid’s Play Area Outfield Bar

Section 2 Facing Northwest

5th Ave

Completion Date: 1996

6th Ave

Completion Date: 2020

7th Ave

Rosa Parks Blvd.

Capitol Athletics


28 ce

ev . tD ve

rfr

Bu

Ri re tu Fu

ff

ar sp Re

-o op Dr

ian

Ve n le ab

nt Re

on

ffe

do

r

rS

Pa gs rin

Sp ur lph

Su

pa

rk

vil Pa ks or

nw Iro ric

sto

rta te

ion

za ez

t/ en Hi

St

En

oc

ky

ar

d

inm

O

ce pa

rM Ba

om Pr ne

m tS

ck

en Ev

Bl

ac

Private Owned

Do

k

Iro

Public and Private

/S

n

wi

M

m

icr

o-

ing

Br

ew

en

er

y

ad

e

nin

(.5

es

m

ile

s)

Stockyard One Program

Public Access

Cumberland

Flagship Development

Date: 2015

Sulphur Springs Park

Stockyard One

Completion Date: 2020

Black Iron Brewery River Pier Entertainment/Nightlife Farmer’s Market

1st Ave

2nd Ave

Reclaimed Watershed Flood Zone Buffer Music City Bikeway Node Event Space

3rd Ave

acity

Cross River Development Completion Date: 2030

Completion Date: 2025

Former Brownfield Site Riverfront Property Proximity to Downtown

Cumberland River

e Sounds Ballpark

Harr

Flagship Development

ison St.

Stockyard St.

First Avenue


29


30


31

Academic Internship HTK Architects

Mentored by...

Charles “Chuck” Smith, Partner

Keith Blackburn, Partner Principals of HTK

Horst, Terrill, & Karst Architects is a full service architectural design firm with areas of expertise in Educational Facilities, Recreation Center, Judicial & Detention Facilities, Healthcare, and Office Buildings. By keeping the focus on function, utility, and efficiency of design, the firm has been recognized for design excellence over 70 times since the company’s founding in 1958.


Working alongside HTK’s trained staff, professional engineers, and consultants; my role as an intern was primarily focused on [but not limited to] drafting and detailing projects using Building Information Modeling to produce construction document sets. Over my 30-weeks of academic internship, our project team worked through project delivery cycles, providing a range of work experiences.

Shawnee Heights USD #450 2012 Bond Improvements Budget: $17,500,000 Role: Schematic Design of Berryton Elementary under Project Architect Dennis Haugh

Modeling Context from Existing CD Sets Producing Design Proposals for School Board Meetings Rendering Facade and Interior Concepts for Clients Drafting Project Concept Sketches, Construction Document Red Lines, and Addendums Attending Client and Consultant Meetings

HTK AR

32


33 8

A201

6

A303

5

A301

2'-0" 3'-4" 1'-4"

24'-8"

3'-4" 1'-4" 3'-4" 8" 8"

6'-0"

6'-0"

6'-0"

2 A100

D.S.

15 A104 1

D.S.

D.S.

10 A502

430.1

F C

F C

M12

D.S.

COOR. 429

98'-3"

CORRIDOR 433

7'-10" 45'-4"

1

26'-9 3/4" 2 A104

2

A308

100'-0"

W4

A307

18 2 0"

420.1 433.1

UP

G4

R 79' -

W4

A201

96'-6" G4 W4

1'-4"

W4

W4 G4

4

UP

W4 G4

D.S.

G4 W4

3 A104

Sim

0"

3 A104

AUDITORIUM 420

4

3 W4

4

A303

1

A603

2'-0"

2

W4

10'-0 "

A303

432.4 432.3

Sim

17'-5"

1

G4

M12

1 A303

6'-7"

100'-0" 2 2

G4

3'-1 1/4"

18

G4

A301

UP

5

DN 96'-6"

1'-8 1/8"

3

D.S.

UP

LIFT

12'-3"

9 UP 18

0"

W4

Sim

1

W4

G4

2

O. PIT BELOW

UP W4

11'-9"

W4

1 A104

M12 (G) (R) 93'-0"

22'-10"

M12 (G) (R)

WOOD

M8 (G) (R)

W4

Sim

CPT

Sim

A308

M8 (G) (R)

FC

R 92' - 5"

27'-11 1/4"

M12 (G) (R)

8'-0"

4

M12(G) (R)

420.2

8'-0"

21'-0"

19'-6 1/8"

18

24'-0"

4

Sim 1'-4"

26'-8"

M8 M12

20'-8"

2" EJ

STAGE 422

6'-0"

UP

6'-4"

A301

1'-4"

7

11 5/8"

KITCHEN

8'-0"

3'-4"

7'-4"

KS

24'-7 5/8"

425 M8

1

WASH

4

1

CORR 423

429.3 FC

35

EXIST. WALK IN COOLER

A201

3'-4"

6'-2"

8'-2"

1'-0" 427 KS

1'-0"

3'-10"

CHANGING 425 12'-8"

9'-10"

3'-6"

F C

100'-0" M8

19

4 A302

433.2

433.3

M12

180

17'-6 1/4"

12'-0" 422.2

20 A104

423.2

426 RR 426 5'-2"

M8

M12

MAKEUP 424

424

CHANGING 427 17'-4" 1'-0"

M8 15'-8"

F C

M8 428.1

M8

3'-4"

A303

ST.

19 RR 428 6'-2"

422.3

7 5

3'-4"

6'-4"

42'-2 5/8"

4'-8"

422.1

429.2

429.1

KS

14'-0" 6'-0"

428.2

STAGE CRAFT 430

M8

A302

4'-4"

CONCESSION 030 19 15'-0" M8

B7a

19 12'-8"

1

30.1 B7a

B47a

423.1

3'-4"

431

8'-0"

6'-6"

D 19

8'-0"

32'-2"

17'-8"

W TOOL 431

RR 031 1'-6" 7'-2" 19

M8

RR 032

M8

M8

M8

UP

3'-2"

30.2

6'-4"

7'-4"

6'-10 3/8"

1'-4"

17'-0" UP

430.2

100'-0"

21'-4"

32

4'-7 1/2"

5'-6"

8 3/8"

23'-4 1/2"

1 A305 8'-8 3/4"

Sim

8"

31

UP

3

6'-0"

8" 98'-7"

11'-0"

8'-0"

B

A302

7 100'-4 3/8" 10'-2"

21'-0"

A

A303

87.2 5°

8 A104

G4

SERVERY G4

2

14'-5 1/2"

UP

22'-2 1/8" G4

9

M6 (G) (R)

1

6'-4 5/8"

9

4

4

ST. 523

22'-1 1/2"

9 2

105'-5" 11

8 10

CONTROL ROOM 421

M12

CPT VCT1

A305

18

10

73 .25 °

) (R) M8 (G

M12

CPT VCT1

OFF. 524

14 A502

4 EXIST.

VEST. N 419

432.1

A308

419.2

6.00°

9

M8 (G) (R)

418

417.1

M12

VEST. S 417

11

11 M8 (G) (R) 100'-0"

13

419.1

STAIR 418

10 M8 (G) (R)

° .25 73

M8 (G) (R)

11

8'-0"

8 A302

1

40'-0"

10

M8

1

M8 (G) (R) 417.2

4'-6 1/2"

1'-1 7/8" M8 (G ) (R)

432.2

5 FE101

1 9

3

PEDESTRIAN WALKWAY 432

UP

9

1

6'-4"

D.S.

UP

SC

M6 (G) (R)

M6 (G) (R)

1.88°

CPT

G4

CPT

M6 (G) (R)

A302

R 129'-5"

100'-0"

7 UP

FE201

1'-10 7/8"

6 A104 9

9

FE201

3'-4"

CPT SC 6'-0"

14'-0"

6'-0"

W4

M12

M12

R 121 ' - 0"

8'-8 3/4 "

14'-5 1/2"

W4

- 0"

W4

CPT SC

W4

8'-0 5/8"

D.S.

DN

Sim R 121'

6 A104

1'-4"

2 W4

EXIST.

FE201

STORAGE 521

97'-0 3/8" 99'-10"

3 A305

Sim

2

6 FE201

A201 COMMONS 522

DN

Concept Proposal

Construction Documentation

Shawnee Heights High School Auditorium Project Architect: Cory Dehn


003B

MB6'

T34a MB6'

G5b B25a F W2c

B25a W2c

T2a

T2a

B25a W2c F

RR 208

208

F

G5b

F

CLASSROOM 303

CLASSROOM 302

CLASSROOM 301

G7aMB6' TB4'

B7a

CONFR. 205

B7a B7c

INSTR. COACH / PSYCH. 207

207

M8a (1)

LCD TV

B7a

PRINC. 206

206 F

G5c

G5b

B39a W2c

B7a

B28a

T2a

T2a T34a TB4'

TB4' B7a W2c

L2a

T2a

MB8'

B7a

B7a W8c

L2a

T5a B7c B7a W10b W2c

B7a

B7a

L2a

F F

G5b B7d B7d

G5b

OFFICE 202

G5b

202A

205

F

204

G5c

G5b

202

ISS 204

ISS 203 203

201A

201B

F

W2b W2b

B7e B25a W2c

B7e

ENTRY 201

TYP.

TYP.

ABV. VEST. 003

G5c

ABV.

A101

B25a W2c

ABV.

34

003A

TYP.

M8a (1) CORR. 004 M8a

M6a T2a

T2a

211

T2a

L2d

M8a (1) 210B

KITCHEN 210

210

CLASSROOM 304

M8a

CLASSROOM 306

FREEZER/COOLER REF. SHEET FS100

008

M8a

M8c

CLASSROOM 305

CAFETERIA 211

M12a(1)

M22a

M22a

M22a

M4a

M22a

M20a

M22a

M22a

M4a PRAC. 220B

F

M22a

M22a

M22a

M22a

M22a M20a

F

M8c

220B

F

221A

M8c (1)

M8c

216

M8a (1)

B7a B7a B7a T2a W10b(2)W10b(2)W10b(2)

B7b W10a

T34a

B39a W2c

M8c (1)

TB3' PS

M8c (1)

TB3' F

M8a (1)

220C

M8c (1)

JAN./ MECH. 215 M8a (1)

READING 216

M8c

220A

L1

M8c (1)

L1

PRAC. 221B

TB3'

MB12'

M8a

L1

CORR. 008

B7a B7a B7a T2a W10b(2)W 10b(2)W 10b(2)

B7b W10a

T34a

M8c (1) 221

L1

CAFETERIA 212

M8c

STOR. 220A

TB10'

T2a

MB10'

L1

220

M8a (1)

L1

M8c (1)

T2a

M8c (1)

T2a

TB6'

F

221B

M8a (1) 215

M8c (1) TB8'

M8c

TRAVELING VOCAL/ ORCHESTRA 221

M8c

STOR. 221A

MB12'

M8a (1)

M12a

B 214

221C

M4a

VOCAL& BAND 220

PS

HD

M4b

F C

TB6'

MB12'

CORR. 005 M8a (1)

M8a (2)

M22a

F

M8c (1)

M8c (1)

M22a

TB3'

M4a

G 213

TB3'

212

HD

M12a

M12a

211B 212C

M4a CORR. 002

211D

210A

M8a

211C

B39a W2c

M8c (1)

T2a

WC1(4) W2a(2)

TB6'

DS

W2a(2) WC1(4)

009A

W2a(2) WC1(4) W2a(2) WC1(4)

W2a(2) WC1(4)

CLASSROOM 219

W2a(2) WC1(4) TB6'

DS

VEST. 009

TB3'

TB3'

TB3' TB6'

WC1(4) F W2a(2)

W2a(2) WC1(4)

T34a

M8a (1)009B

219

W10a B7b

PS

W2a(2) WC1(4)

CLASSROOM 218

B39a

M8a (1)

M8a

WC1(4) W2a(2)

M8a (1)

M8a (1) WC1(4) W2a(2)

W2a(2) WC1(4)

T2a

TB3'

T34a

W2a(2) WC1(4)

TB3' PS

MB12'

CLASSROOM 217

WC1(4) W2a(2) DS

W10a B7b

M8a (1)

M8a

WC1(4) W2a(2)

007A DS

M8a (1) W2c B39a F

MB12'

F

W2a(2) WC1(4)

B39a

TB3'

W10a B7b

PS

T34a

MB12'

T2a

M8a (1)

WC1(4) W2a(2)

WC1(4) W2a(2)

VEST. 007

WC1(4) W2a(2)

WC1(4) W2a(2)

217

M8a (1)

M8a (1)

M8a (1)

218 M8a (1)

CORR. 006 212A

WC1(4) W2a(2)

002

M6a 211A

OFFICE 209 M8a

CORR. 001

F

M8a (1)

F L2d

007B

209

) (1

M6a

M

8a

TB6'

TB4'

DS

TB6' DS

Berryton Elementary School Addition Project Architect: Dennis Haugh


35

Carl Andre Museum New York, New York


Famous for his linear and grid format sculptures and use of elemental materials, Carl Andre’s work inspired the design of this single-artist museum and its simple use of raw materiality. With a prime location in the historic SoHo district, the ground level is integrated into the urban fabric with an accessible retail and cafe space opening into a 40-foot tall atrium denoting the museum’s main entry.

36


D

37

UP

DN

UP

DN

A

B

TO DE

C

SK S TU

GROUND FLOOR PLAN

DE N TP R OD UC T


38

Section A-B

Section C-D


39

Flip-Bench Denver, Colorado

MASS-PRODUCIBLE

DIGITAL FABRICATION


This modern park furniture design is an adaptable bike rack-bench combination that changes function when installed flipped. In a studio collaboration with Norris Design, two Flip-Benches will be installed [one as a bike rack and the other as a bench to create juxtaposition] in the kids play area of the new Midtown development in Denver, Colorado. The design is low cost with efficient use of materials; components are digitally fabricated and allow an array of customization options.

40


41 BIKE RACK

“FLIP”

BENCH

CONCEPT


G1

42

D1

ASSEMBLY 4

ASSEMBLY 3 A1

TOP COMPONENT

G1 C1

ASSEMBLY 2 ASSEMBLY 1 G1 E1

FIN DETAIL

E2 B1 B2

PIECES ARE TO BE WELDED TOGE

FIN TYPE 1 H3

I1

F3

FIN TYPE 1

FIN TYPE 2

FIN TYPE 2 H3

(MIRRORED)

H3

F3

F3 I1

F3 F3

I1

F3 F2 x 2

BASE COMPONENT

BASE COMPONENT

F2 x 2 BASE COMPONENT

ASSEMBLY PROCESS


43

SPITF SP

SpitzFire Transportation Design

EXHIBITED DURING THE

2014 KC AUTO SHOW


Our skillset as designers is not limited to the built environment. We have the potential and tools to redesign nearly everything around us in efforts to make them more functional or aesthetically unqiue. As part of a graduate seminar, we were tasked with concepting an automobile design. The Spitzfire is a subcompact with attitude. The accentuated wheel base and humongous 26� rims give the design a sleek urban appeal with not-so-subtle callbacks to the classic lines and forms of 1930’s mobster cars.

44


Thank you. ALEXANDER MEYER 913.526.4414 ameyer91@ksu.edu


EXIT


Turn static files into dynamic content formats.

Create a flipbook
Graduate Portfolio by Alexander Meyer - Issuu