AMBER TROUTMAN DESIGN PORTFOLIO
ABOUT ME
AMBER TROUTMAN ambertroutman.91@gmail.com 515.985.8398 EDUCATION Bachelor of Fine Arts, Interior Design, 2023 Iowa State University – Ames, Iowa Rome, Italy – College of Design Rome Study Abroad Program Iowa State University, 2021 WORK EXPERIENCE 10Fold Architecture, Ames, IA Interior Designer 11/2022 - Current ETHOS Design Group, Ankeny, IA Interior Design Intern, 10/2018- 08/2022 PROFESSIONAL AFFILIATIONS
SKILLS* 3D Modeling AutoCAD Revit Rendering Enscape Lumion Sketch Up Adobe Creative InDesign Photoshop Lightroom Illustrator Microsoft Office Bluebeam
IIDA, International Interior Design Association * The listed skills above come from my own professional and educational experience. As a designer, I firmly believe that we are never done learning or completely experts in the software that we use. Therefore, you will find that there is an empty column under each skills to represent my continuing education and development of these skills as I continue to grow as a designer.
CONTENTS
03
Northwestern College Bultman Center Phase II
29
Nurturing Growth Inclusive Care Community New Construction
Addition & Renovation
07
15
21
Sioux Center Christian
K-12 Education Addition & Renovation
IKM-Manning CSD K-12 Education Addition & Renovation
Natural Habitat
Youth Shelter Services Renovation & New Construction
Highland Rise
33
Continuing Care Retirement Community Renovation
41
Additional Experience
46
Creative Work
Interior Design Internship
Northwestern College Bultman Center - Phase II Addition & Renovation PROJECT ABSTRACT As the athletic department grows and the existing space allocated for the athletic teams is not meeting for the demand, Northwestern College in Orange City, Iowa reached out to 10Fold to renovate and update the existing locker rooms in the current Bultman Center along with designing an addition to the existing building for their NAIA Championship winning football team. As a part of this addition, there will be a new team room for team meetings and film reviews, a new office suite for the football coaches, a large conference room for meetings, an expansive football locker room with customized lockers, and areas dedicated to displaying football paraphernalia. As a part of this project, I have had the incredible opportunity of working as the primary interior designer and collaborating with architects and structural engineers to solve complex design problems and create an energetic and inviting space for athletes, coaches, and future Raiders.
Project by 04
Main Entrance
Parti Diagram
Mannequin Display/ Immersive Experience Entrance 05
Office & Conference Room Suite
Football Locker Room Entrance
New Football Locker Room 06
Sioux Center Christian
K-12 Education Addition & Renovation PROJECT ABSTRACT After many years of continued work with the Sioux Center Christian School District, the next large project for their existing building is to renovate small portions of their existing space including their art classrooms and provide more fire protection/ apply safe design solutions to give their space an update. Along with this minor renovation, there is a large added to the South of their current school. This addition will house a new commons space for all students to enjoy, many classrooms for science, math, and other courses, and a new gymnasium connected to the existing stage. As this project has been ongoing since 2019, I was able to join the project team right away and assist with interior wall graphic options, interior details, and developing construction documents for the bidding phase. F
E
9'-0"
G
50'-0"
5
4
14'-6"
Project by NOTE: COLORED COURT LINE VIEW FOR COMMUNICATING PAINT COLORS AND LOGO DESIGN ONLY. REFER TO OTHER PLANS FOR DIMENSIONS.
08 RENDERED GYM FLOOR PLAN
ELEC. CLO. 231E
FULL COURT
COURT L
G
F
E
D
C
B
A
FLOOR PLAN NOTES
3
(1)
4
4'-6"
7'-8"
3'-6"
15'-6"
B2 A9.1
5
6"
231-1 3
8'-10 1/8"
11'-8"
1'-7"
JANITOR 84 SF 226J
30'-4"
227-1
3
28'-4"
ELECTRICAL 79 SF 226E
E4
B1
M2.3
1
1
2
A13.1 E5
2
E5
MIRG4
G4
2
A13.1 E4
M2.3
B5 3 M1.4
M2.4
W2
W2
W2
F3
G1 A6.1
A5.1
15'-8" (1)
2
3
A5.1
230-1
6'-4"
6'-0"
4'-0"
6'-0"
14'-0"
15'-8"
6'-0"
4'-0"
14'-0 5/8" 8'-3 3/8"
Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238
B
28'-0"
1'-0"
3
2 CLASSROOM 912 SF 230
Wynn O. Jones & Associates, Inc. 754 Alderson Street Schofield, WI 54476 Phone: 402.690.3411 Fax:
1
MIRG5
E5 2 2
A13.5 D5 21 TEAM 181 SF C5 229
E5
W2
A13.1 C5
MIRG4
M1.4
SIM E1 A7.1
PROJECT ISSUE DATE PROJECT NUMBER REVISIONS:
A
A5.1
W2
REV
W2
DATE
09/21/2023 21094 ©2023 DESCRIPTION
E1 A7.1
6'-0"
5'-8"
3'-0"
58'-0"
2'-8"
6'-0"
2'-8" 2'-5"
5'-7"
6'-0"
4'-0"
16'-9"
4
2
G1
21
M2.4
8"
M2.2
F1
9
C
6'-2"
SIM G1 A7.1
1'-7"
18
SF7
3'-0"
W2 W2
10'-4"
12
C.
REFER TO ENLARGED PLANS FOR FURTHER NOTES AND DIMENSIONS WITHIN CALLOUTS VERIFY DIMENSIONS IN-FIELD TO APPROPRIATELY ALIGN NEW CONSTRUCTION WITH WITH EXISTING CONDITIONS. EXISTING GRIDLINES ARE INDICATED WITH PARENTHESIS; I.E. (1) ALL CORNER GUARDS TO BE 48"H, U.N.O.
3
FEC
3'-4"
A13.4 D1
WH
1'-7"
M2.1 15'-10"
6"
M2.3
MIRG5
SF8
3'-4"
M2.2
12'-8"
2 CLASSROOM 922 SF 228
G5 2
STUDENT LOUNGE 299 SF 221D
8"
3
CLASSROOM 922 SF 227
1
3
21
M2.4
8" 2'-0" 3'-4"
16'-0"
6'-0"
5
6
1
GRID LEGEND
8'-0" GRID TO OUTSIDE FACE OF PRECAST, TYP. AT EXTERIOR WALLS
29'-7"
160'-8" 1
SCIENCE LAB CONSULTANT
60'-4" G2
M2.1
228-1
8"
VESTIBULE 190 SF 221E
18
C1 A7.1
A13.4
TYP
36
1'-7"
7
23'-4"
B.
630 FIRST AVENUE S.E., SIOUX CENTER, IA 51250
M2.4
28'-4" 2
226E-1
CORRIDOR 226
226J-1
VESTIBULE 77 SF 221S 221S-2
6'-2"
G3
1
8"
A/V CART STOR. 30 SF 231C
M2.3 M1.5
GENERAL NOTES A.
D
231-4 36 M1.5
B1 A7.1
SIOUX CENTER CHRISTIAN SCHOOL
RESTROOM 59 SF 226M
226M-1
226W-1
22'-4" 6'-0"
3'-4"
FEC 8"
THE BLAZER CENTER
21
6'-0"
12'-8"
4'-0" M2.2
G1 A7.1
1'-0"
1
3'-4"
M2.1
18
W4
8"
6" 6" 5'-4" 231C-1
4"
23'-4"
4"
21'-0"
3
TYP
SF7
A
CORRIDOR 905 SF 221B
8
TYP
6'-8"
6'-0"
7
10'-0" 6'-0" 6'-0"
12
30'-0"
L1.2
FEC
SF8 221S-1
8" 3'-4" 6"6" 4" 231D-1
M2.3
A7.2
RESTROOM 59 SF 226W
9'-3" STOR. CLO. 18 SF 231D
37
CG
W4
W4
16'-9"
8'-0"
53'-4"
8"
4'-0"
35'-0"
8" 8" M2.3
F3
ELEC. CLO. CG 40 SF 231E G1
CG
7
3'-0"
FEC
9'-8"
CG STUDENT LOUNGE 207 SF 221C
LOFT B
B3 ABOVE A14.2
4" 4'-8"
221E-2
8'-3 3/8"
L1.2
LAB 721 SF
3'-0"
LOFT A
C3 ABOVE A14.2
A14.2
36
9
E 4
221E-1
FEC
10 7/8"
109'-5 1/8"
MIR
225A-1
SCIENCE CLASSROOM 225A 803 SF
A5.1
5
6'-8"
W2
W2
13'-6"
3
MIR
2'-1 1/2" 1'-2 1/2" 1'-0"
10'-0 5/8"
225B-1
3'-0"
G2
20'-1"
1'-3" 11 1/8" 7'-10 1/8"
4'-0" G5 A13.4 G4
9'-8"
4'-0"
9'-8"
16'-0"
45'-2" 15'-2"
MIR
M2.3
TEAM 116 SF 224
25
30'-0"
85'-0" 10 7/8"
9'-8" FEC
MIR
32'-6"
MIR
1'-0" 3'-0"
8"
15
3'-0"
B
4
4
M2.1
4'-8"
224-1
3'-0"
2
W2
4'-11 3/8"
14'-0 5/8"
1'-0 5/8" 3'-0" 6'-0"
G1 A2.1
25 3'-0"
19'-0" MULTIPURPOSE 10076 SF 231
25
CORRIDOR 1234 SF 221A
2'-8"
C
2
9
3'-4"
8'-3 3/8"
D
1
SCIENCE STOR. 138 SF 225B
3'-0"
1
A13.1 G3
24'-8"
25
30'-0" 3'-0"
4'-0 3/8"
6'-0" 4'-0" 6'-0" 9'-0"
2
A13.2 G1
G4
25
TYP
CLASSROOM 927 SF 223
MIRC3
1'-0"
G1 A13.3
C1 A7.1 7
3
E
25
69'-8"
1'-8" 8" 3'-4"
SIM
21
MIRC4
36 37 38
G4
A13.4
G1
223-1
231-5
16'-0"
1'-8" 4'-0"
3
E3
AREA A
F.F.
0' - 0"
MIRG1
M2.4
W2
231B-1
231-2
8
222-1
8"
2
8"
3
W2
F4
231A-1
4'-0"
33 34 35
3'-8 5/8"
2
M2.2
A5.1
F
0' - 0"
21
F3 A6.1
3
1'-0"
AREA B
48'-0"
TYP
M2.4
M2.4
4'-0"
F.F.
C3
SIM E1 A7.1
23'-0"
59'-1 3/4"
32'-6"
6'-0"
W2
7
A13.1 G3
28 29 30
7
10" 8'-4"
6
M2.1
21'-6"
6'-0" 4'-0"
C4 E3
9"
31 32
221A-1
CLASSROOM 927 SF 222
W2
11 1/2" 8'-4"
3'-0"
2
9 1/2"
28'-11"
6
FEC
1
8"
2
CG
231E-1 7'-3 3/8"
AREA A
CG
4'-8"
F
6'-6 1/4"
1'-0"
AREA B
9" 3'-4"
4'-6"
E1 A7.2
28'-10"
4
6
1'-0"
57'-9"
B1 A7.2
Wenger Corporation 555 Park Drive Owatonna, MN 55060 Phone: 315.883.2418 Fax:
1'-0" 7'-4"
B1 A7.4
Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238
1'-0"
1'-0" D1 A7.4
3'-4"
2
30'-4"
229-1
1
21 25 26 27
(2)
G1 A6.1
231-3
F3 A6.1
THEATRICAL CONSULTANT
18 20
ELECTRICAL ENGINEER
16 17
MECHANICAL ENGINEER
15
ARCHITECT
14
5
10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008
9 10 12 13
10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008
8
5
STRUCTURAL ENGINEER
3 4 5 6 7
CIVIL ENGINEER
AV LOCATION, OFOI. MARKERBOARD WITH 12" TACK BOARD ABOVE. REFER TO INTERIOR ELEVATIONS FOR SIZE / PLACEMENT. TACK BOARD. REFER TO INTERIOR ELEVATIONS FOR SIZE / PLACEMENT. STATIONARY BLEACHERS. TELESCOPIC BLEACHER STAGE CURTAIN, BY OTHERS WALL MOUNTED TACKABLE FELT PANELS. REFER TO INTERIOR ELEVATIONS FOR SIZE & PLACEMENT. SEE MATERIAL FINISH SCHEDULE FOR MORE INFORMATION. METAL LOCKERS ON 4" CONCRETE BASE. COORDINATE FINAL CONCRETE BASE DIMENSION WITH LOCKER MANUFACTURER. ROOF DRAIN AND/OR OVERFLOW. COORDINATE WITH PLUMBING. CURTAIN TIE-BACK HOOK. SURFACE-MOUNTED CABINET UNIT HEATER. SEE MECHANICAL ADJUSTABLE SHELVING AND HANGAR RODS THROUGHOUT THIS AREA PER INTERIOR ELEVATIONS. COORDINATE INSTALLATION HEIGHTS WITH OWNER. G.C. TO REINSTALL UTILITY SINK SALVAGED FROM CLASSROOM 158. PROVIDE A NEW FAUCET AND CLAY TRAP. COORDINATE WITH PLUMBING. RESIDENTIAL SIZE REFRIGERATOR/FREEZER COMBO WITH REVERSE-OSMOSIS FILTERED ICEMAKER. COORDINATE WITH MEP INFILL EXISTING DOOR OPENING TO MATCH EXISTING. NEW UTILITY SINK. PROVIDE A NEW FAUCET AND CLAY TRAP. COORDINATE WITH PLUMBING. CARD ACCESS CONTROL LOCATION. COORDINATE WITH ELECTRICAL. 4" CONCRETE SLAB OVER 15 MIL VAPOR BARRIER OVER 4" GRANULAR FILL. REINFORCE WITH WWF 6X6-1.4X1.4. CASEWORK. FLOOR SLEEVE, INTEGRAL WITH WOOD GYM FLOOR SYSTEM. CONCRETE BLOCK RETAINING WALL; SEE CIVIL PATCH MASONRY WALL WHERE ADJOINING WALL WAS DEMOLISHED. INFILL SUCH THAT SURFACE IS CONSISTENT WITH ADJACENT COURSING AND TEXTURE. STEEL HANDRAIL INFILL OPENING WITH CMU. LAY IN 15 MIL VAPOR BARRIER AND INFILL FLOOR CAVITY WITH CONCRETE TO BE FLUSH WITH ADJACENT WHERE CMU WALL WAS DEMOLISHED STORM DRAIN PIPING. HOLD DOWN FLOOR SLAB AT RAMP PORTION OF CONCRETE STEPS IN ORDER TO POUR RAMP AS AN INTEGRAL, ONE-PIECE SLAB. CUT FLOOR AS REQUIRED IN AREAS THAT ACCOMMODATE NEW PIPE WORK. ADA COMPLIANT HI-LOW DRINKING FOUNTAIN. SEE PLUMBING. LAY IN 15 MIL VAPOR BARRIER AND INFILL RECESSED AREA OF FLOOR WITH CONCRETE TO BE FLUSH WITH ADJACENT. CONCRETE SLAB IN THIS AREA AT 0'-0" CONCRETE SLAB IN THIS AREA AT -0'-3". COORD. W/ STRUCT. AFTER COODINATING EXISTING FOUNDATION CONDITIONS WITH ARCHITECT & STRUCTURAL ENGINEER, GRIND DOWN VERTICAL FACES OF FOOTING TO CREATE FLUSH SURFACE PLUMB WITH DEEPEST POINT OF FACE. ADD 4" OF CONCRETE TO TOP OF EXPOSED FOOTING TO ALIGN WITH EXISTING SLAB AT HIGH END OF RAMP.
DGR Engineering 6115 Whispering Creek Drive Sioux City, IA 51106 Phone: 712.266.1554 Fax:
1 2
(#)
#
CONSTRUCTION DOCUMENTS
7 (X)
EXISTING
FLOOR PLAN - LOWER LEVEL - AREA A
LOWER LEVEL
PLAN - AREA A G1 FLOOR SCALE: 1/8" = 1'-0"
X
TRUE
G
NEW EXISTING NEW
F
E
D
C
B
A
A1.1
NOT FOR CONSTRUCTION
09
G
F
E
D
C
B
A
FLOOR PLAN NOTES
(1)
4
5
6
7
31 32 33 34 35 36 37 38
4
EQ
27
Wynn O. Jones & Associates, Inc. 754 Alderson Street Schofield, WI 54476 Phone: 402.690.3411 Fax:
200A-1
LOCKER CHANGING
Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238
1'-4" 5'-0"
7'-4"
8"
1'-4"
4
Wenger Corporation 555 Park Drive Owatonna, MN 55060 Phone: 315.883.2418 Fax:
3
Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238
2
SCIENCE LAB CONSULTANT
28 29 30
(2) 1
THEATRICAL CONSULTANT
21 25 26 27
ELECTRICAL ENGINEER
18 20
MECHANICAL ENGINEER
16 17
ARCHITECT
15
10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008
14
5
10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008
9 10 12 13
STRUCTURAL ENGINEER
8 5
AV LOCATION, OFOI. MARKERBOARD WITH 12" TACK BOARD ABOVE. REFER TO INTERIOR ELEVATIONS FOR SIZE / PLACEMENT. TACK BOARD. REFER TO INTERIOR ELEVATIONS FOR SIZE / PLACEMENT. STATIONARY BLEACHERS. TELESCOPIC BLEACHER STAGE CURTAIN, BY OTHERS WALL MOUNTED TACKABLE FELT PANELS. REFER TO INTERIOR ELEVATIONS FOR SIZE & PLACEMENT. SEE MATERIAL FINISH SCHEDULE FOR MORE INFORMATION. METAL LOCKERS ON 4" CONCRETE BASE. COORDINATE FINAL CONCRETE BASE DIMENSION WITH LOCKER MANUFACTURER. ROOF DRAIN AND/OR OVERFLOW. COORDINATE WITH PLUMBING. CURTAIN TIE-BACK HOOK. SURFACE-MOUNTED CABINET UNIT HEATER. SEE MECHANICAL ADJUSTABLE SHELVING AND HANGAR RODS THROUGHOUT THIS AREA PER INTERIOR ELEVATIONS. COORDINATE INSTALLATION HEIGHTS WITH OWNER. G.C. TO REINSTALL UTILITY SINK SALVAGED FROM CLASSROOM 158. PROVIDE A NEW FAUCET AND CLAY TRAP. COORDINATE WITH PLUMBING. RESIDENTIAL SIZE REFRIGERATOR/FREEZER COMBO WITH REVERSE-OSMOSIS FILTERED ICEMAKER. COORDINATE WITH MEP INFILL EXISTING DOOR OPENING TO MATCH EXISTING. NEW UTILITY SINK. PROVIDE A NEW FAUCET AND CLAY TRAP. COORDINATE WITH PLUMBING. CARD ACCESS CONTROL LOCATION. COORDINATE WITH ELECTRICAL. 4" CONCRETE SLAB OVER 15 MIL VAPOR BARRIER OVER 4" GRANULAR FILL. REINFORCE WITH WWF 6X6-1.4X1.4. CASEWORK. FLOOR SLEEVE, INTEGRAL WITH WOOD GYM FLOOR SYSTEM. CONCRETE BLOCK RETAINING WALL; SEE CIVIL PATCH MASONRY WALL WHERE ADJOINING WALL WAS DEMOLISHED. INFILL SUCH THAT SURFACE IS CONSISTENT WITH ADJACENT COURSING AND TEXTURE. STEEL HANDRAIL INFILL OPENING WITH CMU. LAY IN 15 MIL VAPOR BARRIER AND INFILL FLOOR CAVITY WITH CONCRETE TO BE FLUSH WITH ADJACENT WHERE CMU WALL WAS DEMOLISHED STORM DRAIN PIPING. HOLD DOWN FLOOR SLAB AT RAMP PORTION OF CONCRETE STEPS IN ORDER TO POUR RAMP AS AN INTEGRAL, ONE-PIECE SLAB. CUT FLOOR AS REQUIRED IN AREAS THAT ACCOMMODATE NEW PIPE WORK. ADA COMPLIANT HI-LOW DRINKING FOUNTAIN. SEE PLUMBING. LAY IN 15 MIL VAPOR BARRIER AND INFILL RECESSED AREA OF FLOOR WITH CONCRETE TO BE FLUSH WITH ADJACENT. CONCRETE SLAB IN THIS AREA AT 0'-0" CONCRETE SLAB IN THIS AREA AT -0'-3". COORD. W/ STRUCT. AFTER COODINATING EXISTING FOUNDATION CONDITIONS WITH ARCHITECT & STRUCTURAL ENGINEER, GRIND DOWN VERTICAL FACES OF FOOTING TO CREATE FLUSH SURFACE PLUMB WITH DEEPEST POINT OF FACE. ADD 4" OF CONCRETE TO TOP OF EXPOSED FOOTING TO ALIGN WITH EXISTING SLAB AT HIGH END OF RAMP.
CIVIL ENGINEER
3 4 5 6 7
DGR Engineering 6115 Whispering Creek Drive Sioux City, IA 51106 Phone: 712.266.1554 Fax:
1 2
30
M1
35
STOR.
35
(E) LVL 1
STOR. & MECH.
1' - 5" 30
CHANGING
27
?
OFFICE
LOCKER
UP
CONF.
EQ
STOR.
3
3
1' - 5" 34
2'-5 1/4"
220A-1
6
D1 A7.3
6
6
6
6
6
231A-2 F4
8"
2'-1" 11 3/4"
29'-4 1/4"
10"
221A-1 1'-4" 1'-0" 7'-4"
8"
30'-4"
1'-0" 5'-0 1/2" 8'-0" 1'-8" 13
LVL 1S
231B-2
GYM STOR 276 SF 231B
0' - 0"
F.4
PROJECT ISSUE DATE PROJECT NUMBER REVISIONS:
AREA B F
231A-1
FEC
D1 A7.4
A13.5
CG
231-1 F3 A6.1
6'-11 1/2"
4'-7 1/2"
G5 G4 A13.5 F5
G4 A6.1
B1 A7.3
A5.1
F.8 SIM E1 A7.1
4'-6"
10'-4"
G1 A6.1
7'-8"
77'-9"
15'-8"
231-2
PE OFFICE 93 SF 231A
E1 A7.2
6"
58'-0"
16'-3"
7'-10"
231B-1 231-3
1'-0"
CG
G2
6'-0"
B1 A7.4
7
F
AREA A
1
13'-0"
ELECT. 154 SF 235E
6
F1 A7.3 1
1'-0"
FEC
CW5
G2 A9.1
9'-11"
9"
9 1/2"
6"
8'-4"
11 1/2"
9"
8'-4"
REV
1
2
3
(1)
(#)
29'-7"
1
# CONSTRUCTION DOCUMENTS
4
5
6 (2)
PLAN - AREA B G1 FLOOR SCALE: 1/8" = 1'-0"
SIM B1 A7.3
7
(X)
EXISTING
X
TRUE
NEW EXISTING NEW
G
F
E
09/21/2023 21094 ©2023 DESCRIPTION
1'-0"
160'-8"
LOWER LEVEL
DATE
AREA A GRID LEGEND
10"
630 FIRST AVENUE S.E., SIOUX CENTER, IA 51250
32
LOBBY/COMMONS 2839 SF 220
G3
STAGE 2141 SF 235
6
8"
SIOUX CENTER CHRISTIAN SCHOOL
G2 A14.2
UP
CORRIDOR F4 533 SF A8.1 232
6
8'-11"
2
(A) G
6"
1' - 5" 6
10
A13.6 C5
3'-4"
201-1
(E) LVL 1
10
1
234-1 3'-4" 8" 6"
5'-1"
THE BLAZER CENTER
44'-1 3/4"
C3
2'-9"
C.
6"
M2.3
235-2 8'-8"
FEC
27'-9 1/2"
35'-0"
H
REFER TO ENLARGED PLANS FOR FURTHER NOTES AND DIMENSIONS WITHIN CALLOUTS VERIFY DIMENSIONS IN-FIELD TO APPROPRIATELY ALIGN NEW CONSTRUCTION WITH WITH EXISTING CONDITIONS. EXISTING GRIDLINES ARE INDICATED WITH PARENTHESIS; I.E. (1) ALL CORNER GUARDS TO BE 48"H, U.N.O.
(B)
STORAGE 215 SF 31 233
1' - 5"
9'-11 1/2"
235-3 8'-8"
232-1
(E) LVL 1
1'-0"
2'-8"
GENERAL NOTES
1'-0"
LVL 1S
0' - 0"
1'-0"
A.
16'-8 1/2"
LVL 1S
CW1
AREA B
1'-0" B1 1'-0 3/8" A7.6 CG
9'-11"
1'-2"
220A-2
220A-4
18
CG
OFFICE 99 SF 234
1'-3 1/2"
F.4
G1 A6.1
G5
CW3
G1 A7.4
220A-3
G4 A6.1
CW2
D1 L2.1 A7.6
8"
UP
1'-0" 10 7/8" 6'-2 1/4"
9 3/4" 6'-2 1/4"
CW4
F4
7
E4 A14.1
M3
27
3"
E1
18
3'-4"
1' - 5"
0' - 0"
F.8
A5.1
N1
235-1
CW1
D2 A7.5
G2 A7.5
VEST 143 SF 220A
8'-4"
B.
235E-1
9'-9 5/8"
B2 A7.5
11 3/4"
N1
29 AT EXHAUST FAN
5'-6 5/8"
2'-1"
1'-6" 4"
W2
38
G 26
7
20
29
1' - 5"
A13.6 C1
7
17'-3 1/2"
WH
27
(E) LVL 1
34
12" MIN.
214-1
1'-1" FD
E1
SLOPE
17'-3 1/2"
14
220-1
G1 A7.6
A1
7 3/8"
SLOPE
(E) LVL 1
1'-0"
220M-1
220W-1
9 1/4"
8'-0 1/4"
G4 A14.1
A5.1
27
220J-1
6'-0 1/2"
CG; 96" H
20
MAINT. 348 SF 214
6'-0"
A5.1
UP
CG; 96" H
0' - 3 1/2"
FS
SLOPE
(E) LVL 1W
G3
(A)
STOR. 13 SF 220J
MEN'S RR 267 SF 220M
30'-1" 2'-1"
28
SLOPE
5'-0" H
(B)
F2 A8.1
C1 A2.1
CLASSROOM
2
WOMEN'S RR 506 SF 220W
LVL 1S
0' - 0"
CORRIDOR 1107 SF 200A
2'-6"
C4 A14.2 20
RECREATION 5062 SF 201
(E) LVL 1
20
233-1
CORRIDOR
5'-3"
0' - 3 1/2"
MIN. 60" CLR
(E) LVL 1W
F3 A6.1
D
C
B
A
FLOOR PLAN - LOWER LEVEL - AREA B
A1.2
NOT FOR CONSTRUCTION
10
G
F
E
D
C
B
A
SYMBOLS LEGEND
WALL FINISH MATERIAL, LEADERS ANNOTATE EXTENTS OF NAMED FINISH
SUBFLOOR ENGINEERED SLEEPER
THRESHOLD FASTENER
T.O. FINISHED FLOOR 0'-0"
SUBFLOOR ENGINEERED SLEEPER
PLYRON PANEL FLOORING
CONCRETE SLAB
T.O. FINISHED FLOOR 0'-0"
SUBFLOOR ENGINEERED SLEEPER ANCHOR
CONCRETE SLAB
RECESSED SLAB AT GYM, SEE STRUCTURAL
CONCRETE SLAB
RECESSED SLAB AT STAGE, SEE STRUCTURAL
6 7 8 9 10 11 12 13 14 15 16 17
FLOOR TRANSITION DETAIL
4
FLOOR TRANSITION DETAIL
- WALKOFF G4 VCT SCALE: 3" = 1'-0"
FLOOR TRANSITION DETAIL
- VCT F4 PLYRON SCALE: 3" = 1'-0"
FLOOR TRANSITION DETAIL
GYM WOOD - WALKOFF CARPET E4 SCALE: 3" = 1'-0"
CG
CG
FLOOR TRANSITION DETAIL
CARPET - WALKOFF D4 SCALE: 3" = 1'-0"
SEALED CONCRETE - PLYRON PANELS C4 SCALE: 3" = 1'-0"
4
10
9
8
10
4
F-7
E5 / A12.1 F5 / A12.1
F-8
18 19 21 22 23 24
F-1
F-9
E5 / A12.1
F-2
7
G5 / A12.1
4
C5 / A12.1
CERAMIC TILE ON MORTAR BED, PER FINISH SCHED.
F-5
SCHLUTER COVE BASE GLAZED PORCELAIN TILE ON MORTAR BED, PER FLOOR FINISH SCHED.
GYPSUM 1
T.O. FINISHED FLOOR 0-0"
CLASSROOM 222
CONCRETE SLAB
1
6
5 5
F-1
5
C5 / A12.1
F-5
50'-0"
METAL COVE BASE- FLOOR TILE TO WALL TILE G3 SCALE: 3" = 1'-0"
C5 / A12.1
3
CONCRETE STAIR RAMP - CARPET TILE B4 SCALE: 3" = 1'-0"
ARCHITECT
METAL TRANSITION STRIP CARPET TILE
CONCRETE SLAB RAMP
THRESHOLD COVER PLATE
T.O. FINISHED FLOOR 0-0" THRESHOLD FASTENER
ANCHOR
CONCRETE SLAB
RECESSED SLAB AT STAGE, SEE STRUCTURAL
SEALED CONCRETE
WALK-OFF CARPET
GYM MAPLE FLOORING
ANCHOR
CONCRETE SLAB
METAL TRANSITION STRIP
CARPET TILE
THRESHOLD COVER PLATE
2"
T.O. FINISHED FLOOR 0-0"
STRUCTURAL ENGINEER
PLYRON PANEL FLOORING
2 7/8"
THRESHOLD FASTENER CONCRETE SLAB
WALK-OFF CARPET TILE
THRESHOLD COVER PLATE
T.O. FINISHED FLOOR 0-0"
CIVIL ENGINEER
VINYL COMPOSITION TILE
2 7/8"
WALK-OFF CARPET
T.O. FINISHED FLOOR 0'-0"
2 7/8"
METAL TRANSITION STRIP
VINYL COMPOSITE TILE
FOLDING BASKETBALL BACKSTOP OVERHEAD. FLOOR BOX. SOLID PAINT FILL. FIELD-PAINTED/STAINED LOGO/GRAPHIC. SEE SHEET A12.3 FOR ILLUSTRATION OF DESIGN INTENT. FLOOR SLEEVE, INTEGRAL WITH WOOD GYM FLOOR SYSTEM. BASKETBALL COURT STRIPING. BASKETBALL PRACTICE COURT STRIPING (2) RECTANGLES. VOLLEYBALL COURT STRIPING. VOLLEYBALL PRACTICE COURT STRIPING (2) RECTANGLES. START FULL TILE AT EDGE OF WALL AND AT ROOM THRESHOLD. MAIN COMPETITION BASKETBALL COURT. LINES 2" THICK. PAINT COLOR - BLUE. MAIN COMPETITION VOLLEYBALL COURT. LINES 2" THICK. PAINT COLOR - WHITE. PRACTICE BASKETBALL CROSS-COURT. LINES 2" THICK. PAINT COLOR - BROWN. PRACTICE VOLLEYBALL CROSS-COURT. LINES 2" THICK. PAINT COLOR - YELLOW. PAINTED CUSTOM LETTERING & GRAPHICS, BY GYM FLOOR INSTALLER. ARCHITECT TO PROVIDE GRAPHIC FILE. PAINTED CUSTOM CENTER COURT LOGO, BY GYM FLOOR INSTALLER. ARCHITECT TO PROVIDE LOGO GRAPHIC FILE. TRANSPARENT STAIN COLOR - YELLOW. PAINT COLOR - BLUE. START FULL LENGTH OF TILE HERE. START FULL WIDTH OF TILE HERE. APPLY SELF-LEVELING UNDERLAYMENT AT FLOOR DRAIN SLOPE AND ANY UNEVEN SURFACES PRIOR TO INSTALLATION OF FLOOR FINISH MATERIAL. MAPLE ATHLETIC FLOORING SYSTEM WITH CLEAR COAT FINISH.
10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008
FINISH FLOOR PLAN NOTES 1 3 4 5
Wynn O. Jones & Associates, Inc. 754 Alderson Street Schofield, WI 54476 Phone: 402.690.3411 Fax:
- VCT B5 PORCELAIN SCALE: 3" = 1'-0"
- VCT C5 CARPET SCALE: 3" = 1'-0"
CONCRETE - VCT D5 SCALE: 3" = 1'-0"
5
FLOOR TRANSITION DETAIL
FLOOR TRANSITION DETAIL
FLOOR TRANSITION DETAIL
GYM WOOD - CARPET E5 SCALE: 3" = 1'-0"
CORNER GUARDS, TYP. 48"H U.N.O.
Wenger Corporation 555 Park Drive Owatonna, MN 55060 Phone: 315.883.2418 Fax:
CG
Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238
1/8"
RECESSED SLAB AT GYM, SEE STRUCTURAL
FLOOR TRANSITION DETAIL
GYM WOOD - VCT F5 SCALE: 3" = 1'-0"
FLOORING FINISH TRANSITION
CONCRETE SLAB
Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238
FLOOR TRANSITION DETAIL
FLOOR TRANSITION DETAIL
SEALED CONCRETE - GYM WOOD G5 SCALE: 3" = 1'-0"
FLOORING MATERIAL TRANSITION, REQUIRES TRANSITION STRIP, SEE A10.1
VINYL COMPOSITE TILE
SCIENCE LAB CONSULTANT
CONCRETE SLAB
RECESSED SLAB AT GYM, SEE STRUCTURAL
T.O. FINISHED FLOOR 0-0"
CONCRETE SLAB
CONCRETE SLAB
ANCHOR
VINYL COMPOSITE TILE
T.O. FINISHED FLOOR 0-0"
ALUMINUM TILE TRANSITION
THEATRICAL CONSULTANT
CONCRETE SLAB
RECESSED SLAB AT GYM, SEE STRUCTURAL
THRESHOLD FASTENER
ANCHOR
T.O. FINISHED FLOOR 0-0"
SUBFLOOR ENGINEERED SLEEPER
CARPET TILE
ELECTRICAL ENGINEER
CONCRETE SLAB
SEALED CONCRETE
GYM MAPLE FLOORING
T.O. FINISHED FLOOR 0-0"
SUBFLOOR ENGINEERED SLEEPER
VINYL COMPOSITE TILE
MECHANICAL ENGINEER
THRESHOLD FASTENER
ANCHOR
CARPET TILE
GYM MAPLE FLOORING
GLAZED PORCELAIN TILE ON MORTAR BED, PER FLOOR FINISH SCHED.
METAL TRANSITION STRIP
METAL TRANSITION STRIP
THRESHOLD COVER PLATE
2"
10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008
2 7/8"
2"
T.O. FINISHED FLOOR 0-0"
SUBFLOOR ENGINEERED SLEEPER
THRESHOLD COVER PLATE
DGR Engineering 6115 Whispering Creek Drive Sioux City, IA 51106 Phone: 712.266.1554 Fax:
5
GYM MAPLE FLOORING
VINYL COMPOSITION TILE
2 7/8"
2"
T.O. FINISHED FLOOR 0-0" THRESHOLD FASTENER
THRESHOLD COVER PLATE
2 7/8"
SEALED CONCRETE
1
3
5
1
5
6
CLASSROOM 223
6
6
6
5
F-3
5 6
CERAMIC TILE ON MORTAR BED, PER FINISH SCHED. SCHLUTER COVE BASE VINYL COMPOSITION TILE
F-3 ELEC. CLO. 231E
2 F-5
C5 / A12.1
WALL PROFILE- 2 T.O. FINISHED FLOOR 0-0"
CORRIDOR 221A
CG
CG
CG
CONCRETE SLAB F-6
F-5
SCALE: 3" = 1'-0"
G4 / A12.1
C5 / A12.1
C5 / A12.1
F-3
F-2
F-4
JANITOR 226J
ELECTRICAL 226E
F-7
F-7
CLASSROOM 228
CLASSROOM 227 F-3
VESTIBULE 221S
1
A/V CART STOR. 231C
SLAB F.F. 0'-0"
VESTIBULE 221E F-4
ETR, EXISTING TO REMAIN
TILE
C5 / A12.1
MAPLE
PLYRON
F-1
11
D5 / A12.1 D5 / A12.1
G5 / A12.1 F-7
CONCRETE, SEALED
STUDENT LOUNGE 221D
B5 / A12.1
CORRIDOR 226
2
E4 / A12.1
C5 / A12.1
F-6
B5 / A12.1 11
F-5
RESTROOM 226M
RESTROOM 226W
C5 / A12.1
CORRIDOR 221B
F-5
C5 / A12.1
STUDENT LOUNGE 221C
F-8
F-7
F-5
F-1
F-5
STOR. CLO. G5 / A12.1 231D
F-8
F5 / A12.1
CG
VINYL COMPOSITION TILE
G1 METAL TRIM- VCT CORNER DETAIL
SLAB F.F. -0'-3"
F-7 G5 / A12.1 SLAB F.F. 0'-0"
SCIENCE CLASSROOM 225A
VINYL COMPOSITION TILE
1
MULTIPURPOSE 231
PROJECT ISSUE DATE PROJECT NUMBER REVISIONS:
VCT F-2 TEAM 229
F-1
F-1
SIOUX CENTER CHRISTIAN SCHOOL
F-5
3 1 F-5
THE BLAZER CENTER
SCALE: 3" = 1'-0"
TEAM 224
G4 / A12.1
G2 METAL COVE BASE- VCT FLOOR TO WALL TILE
SCIENCE STOR. 225B
C5 / A12.1
F-2
CONCRETE SLAB
630 FIRST AVENUE S.E., SIOUX CENTER, IA 51250
GYPSUM
T.O. FINISHED FLOOR 0-0"
CLASSROOM 230
F-2
REV
CARPET, WALK-OFF
DATE
09/21/2023 21094 ©2023 DESCRIPTION
F-3
CARPET, F-1
1
CARPET, F-2
WH
CONSTRUCTION DOCUMENTS CARPET, F-3
FLOOR FINISH PLAN LOWER LEVEL - AREA A
LOWER LEVEL
E1 FLOOR FINISH PLAN - AREA A
FLOOR FINISH LEGEND
SCALE: 1/8" = 1'-0"
SCALE: 1/8" = 1'-0"
TRUE
G
F
E
D
C
B
A
A12.1
NOT FOR CONSTRUCTION
11
G
F
E
D
C
B
A
SYMBOLS LEGEND FLOORING MATERIAL TRANSITION, REQUIRES TRANSITION STRIP, SEE A10.1 FLOORING FINISH TRANSITION WALL FINISH MATERIAL, LEADERS ANNOTATE EXTENTS OF NAMED FINISH
5
5
Wynn O. Jones & Associates, Inc. 754 Alderson Street Schofield, WI 54476 Phone: 402.690.3411 Fax:
Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238
4
Wenger Corporation 555 Park Drive Owatonna, MN 55060 Phone: 315.883.2418 Fax:
THEATRICAL CONSULTANT
ARCHITECT STRUCTURAL ENGINEER
ELECTRICAL ENGINEER
24
10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008
18 19 21 22 23
CIVIL ENGINEER
17 4
DGR Engineering 6115 Whispering Creek Drive Sioux City, IA 51106 Phone: 712.266.1554 Fax:
6 7 8 9 10 11 12 13 14 15 16
FOLDING BASKETBALL BACKSTOP OVERHEAD. FLOOR BOX. SOLID PAINT FILL. FIELD-PAINTED/STAINED LOGO/GRAPHIC. SEE SHEET A12.3 FOR ILLUSTRATION OF DESIGN INTENT. FLOOR SLEEVE, INTEGRAL WITH WOOD GYM FLOOR SYSTEM. BASKETBALL COURT STRIPING. BASKETBALL PRACTICE COURT STRIPING (2) RECTANGLES. VOLLEYBALL COURT STRIPING. VOLLEYBALL PRACTICE COURT STRIPING (2) RECTANGLES. START FULL TILE AT EDGE OF WALL AND AT ROOM THRESHOLD. MAIN COMPETITION BASKETBALL COURT. LINES 2" THICK. PAINT COLOR - BLUE. MAIN COMPETITION VOLLEYBALL COURT. LINES 2" THICK. PAINT COLOR - WHITE. PRACTICE BASKETBALL CROSS-COURT. LINES 2" THICK. PAINT COLOR - BROWN. PRACTICE VOLLEYBALL CROSS-COURT. LINES 2" THICK. PAINT COLOR - YELLOW. PAINTED CUSTOM LETTERING & GRAPHICS, BY GYM FLOOR INSTALLER. ARCHITECT TO PROVIDE GRAPHIC FILE. PAINTED CUSTOM CENTER COURT LOGO, BY GYM FLOOR INSTALLER. ARCHITECT TO PROVIDE LOGO GRAPHIC FILE. TRANSPARENT STAIN COLOR - YELLOW. PAINT COLOR - BLUE. START FULL LENGTH OF TILE HERE. START FULL WIDTH OF TILE HERE. APPLY SELF-LEVELING UNDERLAYMENT AT FLOOR DRAIN SLOPE AND ANY UNEVEN SURFACES PRIOR TO INSTALLATION OF FLOOR FINISH MATERIAL. MAPLE ATHLETIC FLOORING SYSTEM WITH CLEAR COAT FINISH.
10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008
FINISH FLOOR PLAN NOTES 1 3 4 5
SCIENCE LAB CONSULTANT
MECHANICAL ENGINEER
Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238
CORNER GUARDS, TYP. 48"H U.N.O.
CG
LOCKER 203A
23
23 F-5
F-5
23 LOCKER 204A
23
3
3
CORRIDOR 200A
F-5
C4 A14.2 WOMEN'S RR 220W
F-6
D5 / A12.1
MAINT. 214
CG; 96" H
42'-7"
/A .1 12
D4 / A12.1
B4
2'-10 1/4"
VEST 143 SF 220A
F4 / A12.1
CG
UP
F-1
STAGE 235
F-4
F-2
F-7
C5 / A12.1 F-5
2
D5 / A12.1
F4 / A12.1
CG
C5 / A12.1
F-7
ETR, EXISTING TO REMAIN
ELECT. 235E
TILE GYM STOR 231B
F-9
CONCRETE, SEALED
THE BLAZER CENTER
C5 / A12.1
F4 / A12.1
2
F-3
OFFICE 234
G1 G1 A12.1 A12.1
F-5
SIOUX CENTER CHRISTIAN SCHOOL
F-7
UP
CG; 96" H
A3 A11.1
F-5
F-5
STOR. 13 SF 220J
B5 / A12.1 B5 / A12.1
630 FIRST AVENUE S.E., SIOUX CENTER, IA 51250
22
21
11
C4 / A12.1
MEN'S RR 220M
UP
F-6
F-3
6'-10"
1° 40.0
F-1 PE OFFICE 231A
CG
CG
F-7
PLYRON
E5 / A12.1
PROJECT ISSUE DATE PROJECT NUMBER REVISIONS:
VCT
E5 / A12.1 F5 / A12.1 C5 / A12.1
1
MAPLE
D5 / A12.1
16'-5"
C5 / A12.1
F-7
F-8
G5 / A12.1 F-8
G2 A14.2
REV
CARPET, WALK-OFF
CARPET, F-1
LOWER LEVEL
FINISH PLAN - AREA B G1 FLOOR SCALE: 1/8" = 1'-0"
DATE
09/21/2023 21094 ©2023 DESCRIPTION
1
CARPET, F-2
TRUE
CONSTRUCTION DOCUMENTS CARPET, F-3
FLOOR FINISH PLAN -LOWER LEVEL - AREA B
FLOOR FINISH LEGEND SCALE: 1/8" = 1'-0"
G
F
E
D
C
B
A
A12.2
NOT FOR CONSTRUCTION
12
G
F
E
D
C
B
A
INTERIOR ELEVATION NOTES
48 PT-1
E4 A14.1
3 6
11
11
G4 A14.1 ° .89 67
74
2'-6 1/4"
11'-3" PT-1
7"
6
PT-1
CJ
PT-3
220M-1
TYP
6
220W-1
75
3
11
39
G2 A13.6
CJ
COMMONS 220 G5 SCALE: 1/4" = 1'-0"
EQ
EQ
PT-1 65" TV
65" TV
7'-7" 61
FIELD PAINT MECH. GRILL PT-3
35
11
26'-5 3/4"
LOOKING NORTH
EQ
E4 A14.1
61
220-1
EQ 46
PT-1
PT-1
75
39
EQ
6
3
6 6
PT-1
11
EQ
3
PT-1
PT-3
8'-11 1/2"
11'-4" 5'-0" F.O.
6
47
SOLID SURFACE-2
55
6
4'-7 1/2"
3 PT-3
39 CJ
LOOKING EAST
COMMONS 220 C5 SCALE: 1/4" = 1'-0"
4
13
PAINT TOP OF THIS ELEMENT, AT PLYWOOD SURFACE ONLY, PT-15
13
49 55 58 59 61 62
23
10
PAINT TOP OF CANOPY, AT PLYWOOD SURFACE ONLY, PT-15
CW6
CW1
2
G4 A9.1
PT-1
3'-8" PT-1
13
13
13
6 1/8"
CW1
CW3
72 73
PT-1
74 75 76
CW1
RETURN; PT-3
2
2
23
PT-1
8 3/8"
2
PT-3
2
2
3
PT-3
71
METAL PANEL-1
13 3
3
67 68 70
CW1
PT-1
PT-1
63 64 65 66
10
NOTCH PRECAST TO ACCOMMODATE MEP WORK
1'-6"
2
2
2
1'-10"
77
PT-1
PT-1
3
3
G2 A9.1
221A-1
231-1
35
220A-1
INTERIOR ELEVATION INFORMATION
220A-2
2'-2"
61 61
LOOKING SOUTH
COMMONS 220 G3 SCALE: 1/4" = 1'-0"
1'-10"
2" 10" 2"
1'-10"
2" 10" 2" 10" 2" 10" 2" 10" 2" 10" 2"
1'-10"
9"
1'-10"
2" 10" 2"
1'-10"
2" 10" 2" 10" 2" 10" 2" 10" 2" 10" 2"
1'-10"
2" 10" 2" 10"
9"
10" 2" 10" 2"
1'-10"
2" 10" 2"
4'-10"
20
2"
6'-10"
21
1'-10"
2"
2"
21
19
21
1'-10"
21
1'-10"
20
3'-10"
2"
2
4'-10"
20
3'-2"
21
20
1'-10"
10" 2" 10"
1'-10"
20
21
65
2" 4.68°
1'-4 1/8"
39 77
77
B3 A8.1
09/21/2023 21094 ©2023 DESCRIPTION
G1 A12.1
26
1
26
39 CONSTRUCTION DOCUMENTS
LOOKING WEST
E
DATE
63 LOOKING EAST
CORRIDOR 200A E1 SCALE: 1/4" = 1'-0"
F
REV
7'-2"
F2 A8.1 39
G1 A12.1 LOOKING WEST
CORRIDOR 200A - ACOUSTIC PANELS G1 SCALE: 1/2" = 1'-0"
PROJECT ISSUE DATE PROJECT NUMBER REVISIONS:
T-1
21 19
1 FULL TILE TO START AT TOP LEFT CORNER OF NEW INFILLED PORTION OF THE WALL.
MIR G1 A13.6
3'-11 7/8"
19
2"
2"
20
21
21
G
2'-10"
20 19
4'-10"
2"
3'-10"
3'-6"
21
6'-10" 19
2"
4'-10" 3'-6"
21
1'-10"
1'-10" 3'-2"
2" 3'-6"
3'-10"
21
19
21
2'-2"
20
3'-6"
20
3'-6"
19
21
2" 20
19
1'-10"
SCALE: 1/2" = 1'-0"
1'-10"
2'-2"
2'-2" 2"
20
21
3'-0"
5'-4" 2"
21
1'-8"
1
19
2" 10" 2"
D2 COMMONS 220 - ACOUSTIC PANELS
20
3'-6"
20
21
PAINT ALL EXPOSED MEP WORK (DUCTWORK, CONDUITS, PIPES, ETC). REFER TO ROOM FINISH SCHEDULE FOR PAINT.
21
2'-10"
3'-2"
20
21
2"
20
6'-10"
20
2" 2"
20
19
2"
1'-10" 6'-10"
3'-2"
1'-10" 2"
3'-6"
2"
21
G1 A13.6 20
REFER TO STANDARD MOUNTING HEIGHTS ON SHEET A2.1 FOR FIXTURES CALLED OUT IN ELEVATION AND THEIR COMPLIANCES.
C.
LOOKING SOUTH
SCALE: 1/2" = 1'-0"
2" 10" 2"
21
20 21
10" 2" 10"
G2 COMMONS 220 - ACOUSTIC PANELS 1'-10"
2" 10" 2" 10" 2" 10" 2" 10" 2" 10" 2"
1'-10"
19
19
1'-10"
3'-2"
2"
21
10" 2" 10"
LOOKING NORTH
10" 2" 10" 2"
21 21
2" 10" 2" 10" 2" 10" 2" 10" 2" 10" 2"
LOOKING WEST
COMMONS 220 C3 SCALE: 1/4" = 1'-0"
21
21
4'-10"
4'-10" 2"
6'-10"
4'-10"
2" 3'-2"
3'-10"
3'-2"
21 21
1'-10"
21
19
1'-2"
1'-2"
20
2"
3'-10"
19
1'-10"
19
10" 2" 10"
21
19 20
21
20
6'-10"
2"
6'-10" 2"
21
2"
19
19 19
1'-10"
19
21
2'-10"
20 20
2
1'-10"
2'-10"
3'-8"
20
20
1'-10"
4'-10"
2'-10"
21 20
REFER TO ROOM FINISH SCHEDULE & MATERIAL FINISH SCHEDULES ON SHEET A11.1 FOR FINISHES CALLED OUT IN ELEVATION & ADDITIONAL FINISHES NOT CALLED OUT IN ELEVATION.
B.
1'-10"
3'-10"
2" 10" 2"
2"
1'-10"
2"
5'-2"
4'-10"
1'-10"
2'-10"
2" 10" 2"
4'-10"
1'-10"
A.
39
D2 A13.6
4
Wynn O. Jones & Associates, Inc. 754 Alderson Street Schofield, WI 54476 Phone: 402.690.3411 Fax:
A3 A11.1
47 6
48
630 FIRST AVENUE S.E., SIOUX CENTER, IA 51250
48
PT-1
13
5
SIOUX CENTER CHRISTIAN SCHOOL
48
13
5'-5"
48
PT-1 PT-3 ON RETURN WALLS
5'-6"
48
2
PT-3
W6
PT-1
3
23'-3 5/8" 48
W6
5'-5"
PT-1
5'-9"
8'-0"
W5
CJ (LOCATE AT BOTH CORNERS AT THE TOP OF BOTH OF THESE DOORS)
3'-7" F.O.
6
W5
2'-2"
W5
5'-5"
G4 A14.1
PT-3
10
28
SIM
4 5 6 7 10 10E 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28 29 30 32 34 35 36 39 40 41 42 43 44 46 47 48
Wenger Corporation 555 Park Drive Owatonna, MN 55060 Phone: 315.883.2418 Fax:
10
Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238
CJ
Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238
CJ
CJ
SCIENCE LAB CONSULTANT
CJ
THEATRICAL CONSULTANT
CJ
THE BLAZER CENTER
CJ
ELECTRICAL ENGINEER
CJ CJ CJ
MECHANICAL ENGINEER
SEE REFERENCED DETAIL FOR CONTINUOUS FIRE-RATED CHASE CONSTRUCTION
5
I-CMU WALL EPOXY PAINT I-CMU WALL, EXISTING PRECAST CONCRETE PANEL. PRIME AND PAINT AS CALLED OUT ON ROOM FINISH SCHEDULE AND/OR INTERIOR ELEVATIONS. METAL STUD AND GWB BULKHEAD. APPLY ACCENT PAINT PT-3 ON ALL VISIBLE BULKHEAD SURFACES. LIGHT COLORED THIN BRICK DARK COLORED THIN BRICK GWB DRINKING FOUNTAIN STEEL JOIST STEEL JOIST, EXISTING ELECTRICAL RECEPTACLE; REFER TO ELECTRICAL WALL A/V RECEPTACLE; SEE ELECTRICAL PRECAST PANEL JOINT TROFFER LAMPS GYM DRAPER DIVIDER WALL MOUNTED TECTUM ACOUSTIC PANEL, TECTUM PANEL-1 (MEDIUM BLUE) WALL MOUNTED TECTUM ACOUSTIC PANEL, TECTUM PANEL-2 (DARK BLUE) WALL MOUNTED TECTUM ACOUSTIC PANEL, TECTUM PANEL-3 (WHITE) WALL MOUNTED ACOUSTIC PANEL (GREY) WALL MOUNTED ACOUSTIC PANEL (DARK BLUE) WALL MOUNTED ACOUSTIC PANEL (WHITE) CEILING LINE ARRAY SPEAKERS STEEL COLUMN BLEACHERS WALL GRAPHIC-2, VINYL WALL GRAPHIC APPLIED TO MDO SUBSTRATE. SINK STEEL BEAM PLUMBING WALL LIGHTING FIXTURE MIRROR MOP SINK FIXED SEATING ADJUSTABLE SHELVING WITH CONTINUOUS MOUNTING RAILS RESILIENT WALL BASE. REFER TO ROOM FINISH SCHED. CEILING MOUNTED PROJECTOR BACKSTAGE CURTAIN STAGE CURTAINS LARGE HANGAR DOOR REAR-FOLD-UP BASKETBALL HOOP WALL GRAPHIC-1 WALL PROTECTION-1, PROTECTIVE WALL COVERING WITH CUSTOM GRAPHIC. PROTECTIVE WALL COVERING JOINT. ARCHITECT TO APPROVE WALL PROTECTION PANEL JOINT MAP PRIOR TO INSTALLATION. COLOR MATCH CAULK TO GRAPHIC AT SEAMS. EXPOSED DUCTWORK. PAINT TO MATCH FIELD COLOR. COORDINATE WITH ROOM FINISH SCHEDULE MOUNTED COUNTERTOP WALL MOUNTED ACOUSTIC PANEL (YELLOW) CORK-1 48"H MECHANICALLY FASTENED CORNER GUARD METAL STUD AND GWB BULKHEAD. APPLY ACCENT PAINT PT-4 ON ALL VISIBLE BULKHEAD SURFACES. METAL COVE BASE AT TILE WALLS; SEE METAL COVE BASE DETAILS MOP SINK BACKSPLASH WALL PROFILE-1 4" CONCRETE LOCKER CURB. COVER FACES OF CURB WITH WALL BASE TO MATCH ADJACENT WALLS. ROOF HATCH ACCESS LADDER FIXED STEEL CURTAIN ROD AND SHELF OPENING IN PRECAST WALL FOR MULTIPLE MEP PENETRATIONS. PATCH OPENING AROUND MEP WORK WITH METAL STUD AND MDF AND PAINT. COORDINATE WITH MEP LIGHT-REFLECTIVE WHITE PROJECTOR PAINT APPLIED TO MDO. MUD ALL SEAMS PRIOR TO PAINTING FOR LEVEL 5 FINISH. KEEP THIS AREA OF WALL COMPLETELY CLEAR OF ALL OBSTRUCTIONS. PT-1 APPLIED TO MDO GAS LINE. PLACE BETWEEN ACOUSTIC WALL PANELS. COORDINATE WITH MECHANICAL. COUNTERTOP BRACKET. 96"H MECHANICALLY FASTENED CORNER GUARD 5/8" GWB OVER 2 1/2" ZEE FURRING CHANNELS. FILL CHANNELS WITH 2 1/2" RIGID INSULATION. FURR OUT OVER MDO WALL ONLY, TO B.O. DECK WALL PROFILE-2
ARCHITECT
3
10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008
1 1E 2
10'-10 5/8" CJ
10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008
10'-11"
STRUCTURAL ENGINEER
10'-11"
CIVIL ENGINEER
4'-1 1/2"
DGR Engineering 6115 Whispering Creek Drive Sioux City, IA 51106 Phone: 712.266.1554 Fax:
6'-11 3/8"
LOOKING WEST
CORRIDOR 200A C1 SCALE: 1/4" = 1'-0"
D
INT ELEV - LOBBY / COMMONS
CLASSROOM 154 B1 SCALE: 1/4" = 1'-0"
C
B
A
A13.6
NOT FOR CONSTRUCTION
13
221C 221D
STUDENT LOUNGE STUDENT LOUNGE
CARPET TILE CARPET TILE
WB-1 WB-1
GWB-AR, CMU CMU, GWB -
SEE ELEV. -
WALL CMU CMU
221E
VESTIBULE
CMU, PRECAST
PT-1
VESTIBULE
WB-1
CURTAIN WALL
-
222 223 224 225A
CLASSROOM CLASSROOM TEAM SCIENCE CLASSROOM
WALK-OFF CARPET TILE WALK-OFF CARPET TILE CARPET TILE CARPET TILE CARPET TILE CARPET, VCT
WB-1
221S
-
PRECAST CMU CMU CMU, PRECAST
225B 226 226E 226J
SCIENCE STOR. CORRIDOR ELECTRICAL JANITOR
VCT VCT CONCRETE CONCRETE
WB-1 -
226M
RESTROOM
PORCELAIN TILE
226W
RESTROOM
227 228 229 230 231 231A 231B 231C 231D 231E 232 233 234 235
CMU CMU
SEE ELEV. PT-1
CMU CMU
CURTAIN WALL
SEE ELEV. PT-1, PT-2, SEE ELEV. -
CMU, PRECAST
PT-1
CURTAIN WALL
-
CMU
PT-1
CURTAIN WALL
-
CMU
PT-1
PT-2 PT-1 PT-1 PT-3
CMU CMU CMU CMU, PRECAST
PT-1 PT-1 PT-1 PT-1
CMU CMU, PRECAST CMU PRECAST
PT-1 PT-2 PT-11 PT-1
PRECAST PRECAST CMU PRECAST, GWB
CMU CMU CMU CMU
PT-1 PT-1 PT-1 PT-1
CMU CMU CMU CMU
PT-1 PT-1 PT-1 PT-1
CMU CMU PRECAST PRECAST
PT-1 PT-1 PT-1 PT-1
WB-2
CMU, CBB
T-1, PT-1
CMU, CBB
T-1, PT-1
CMU, CBB
T-1, PT-1
PORCELAIN TILE
WB-2
CMU, CBB
T-1, PT-1
CBB
T-3
CMU, CBB
T-1, PT-1
CLASSROOM CLASSROOM TEAM CLASSROOM MULTIPURPOSE
CARPET TILE CARPET TILE CARPET TILE CARPET TILE WOOD
WB-4
CMU CMU CMU CMU, PRECAST PRECAST
PT-1 PT-1 PT-1 PT-1 PT-1
PT-1 PT-3 PT-1 PT-2 PT-1
CARPET TILE CONCRETE CONCRETE CONCRETE CONCRETE VCT CONCRETE CARPET TILE PLYRON PANELS CONCRETE
WB-4 WB-4
CMU CMU CMU CMU CMU CMU, PRECAST PRECAST PRECAST CMU
PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-14
PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-14
PRECAST PRECAST CMU, PRECAST PRECAST PRECAST, CMU, GWB PRECAST PRECAST PRECAST PRECAST PRECAST CMU, PRECAST CMU CMU PRECAST
PT-1 PT-1 PT-1 PT-1 PT-1
PE OFFICE GYM STOR A/V CART STOR. STOR. CLO. ELEC. CLO. CORRIDOR STORAGE OFFICE STAGE
CMU CMU CMU PRECAST PRECAST, CMU, GWB CMU PRECAST PRECAST CMU CMU CMU PRECAST CMU PRECAST
PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-14
CMU
PT-1
CMU
PT-1
235E ELECT. CMU PT-1 Commons Countertop Graphic Design
SEE ELEV. PT-2
SEE INTERIOR ELEVATIONS FOR PAINT LOCATIONS. SEE INTERIOR ELEVATIONS FOR PAINT LOCATIONS.
PT-1 PT-1 PT-1 PT-1 (PIPES ABOVE CABINETS AND WALL PRECAST PT-1 CMU PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. CMU, PRECAST PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. ALL WALL & CEILING PAINT TO BE EPOXY. CBB T-3 3'-4"' HIGH TILE + CBB OVER WALL MATERIAL ON ALL WALLS EXCEPT PLUMBING WALL. SEE INTERIOR ELEVATIONS. STACKED TILE PER ELEVATIONS. ALL WALL & CEILING PAINT TO BE EPOXY. PLUMBING WALL TO HAVE TILE FROM FLOOR TO CEILING. CMU, CBB T-1, PT-1 3'-4"' HIGH TILE + CBB OVER WALL MATERIAL ON ALL WALLS EXCEPT PLUMBING WALL. SEE INTERIOR ELEVATIONS. STACKED TILE PER ELEVATIONS. ALL WALL & CEILING PAINT TO BE EPOXY. PLUMBING WALL TO HAVE TILE FROM FLOOR TO CEILING. CMU PT-3 CMU PT-1 CMU PT-5 CMU PT-1 PRECAST, CMU, PT-1 PAINT ALL EXPOSED MEP WORK. PAINT TO MATCH WALL COLOR FINISH. GWB PRECAST PT-1 CMU PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. CMU PT-1 CMU PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. GWB PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. CMU, PRECAST PT-1 PAINT HANDRAIL PT-14 CMU PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. CMU PT-1 PRECAST PT-14 PAINT EXPOSED DUCTWORK, CONDUIT, AND PLUMBING WITH PT-14. PRECAST
PT-1
SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS.
WALL PROTECTION-1
PRECAST SEALANT JOINT WITH BACKER ROD
PRECAST SEALANT JOINT WITH BACKER ROD
PRECAST CONCRETE PANEL RESILIENT WALL BASE
FLOOR FINISH, REFER TO ROOM FINISH SCHEDULE
FLOOR FINISH, REFER TO ROOM FINISH SCHEDULE
SCALE: 3" = 1'-0"
WALL PROTECTION-1
PRECAST CONCRETE PANEL
GROUT VOID.
PRECAST JOINT WITH FLOOR FINISH AND C3 WALL BASE, TYP. DETAIL
INSIDE CORNER TRIM
OUTSIDE CORNER TRIM WALL PROTECTION-1
PRECAST JOINT WITH FLOOR FINISH, TYP. B3 DETAIL SCALE: 3" = 1'-0"
PROTECTIVE WALL GRAPHIC CORNER TRIM A3 SCALE: 3" = 1'-0"
NOT FOR CONSTRUCTION
Interior Details 14
IKM-Manning CSD
K-12 Education Addition & Renovation PROJECT ABSTRACT With three schools in three separate towns, IKM-Manning reached out to 10Fold Architecture + Engineering to assist with designing an addition to their current junior high school that could assist the school to transitioning to one building for all academic levels. This addition included a new gymnasium, locker rooms, commons space for students to us and flexible teaching spaces, and two new classrooms focused in STEM. This project overcame many design challenges through teamwork and determination. As a part of this project, I was able to assist with designing the gym flooring, specifying finishes, finding acoustic solutions, creating interior graphics, completing interior renderings, interior details, and working alongside the project team to complete construction documents.
Project by 16
NOT FOR CONSTRUCTION
17
NOT FOR CONSTRUCTION
18
Spark Classroom
Fire Classroom
NOT FOR CONSTRUCTION
19
NOT FOR CONSTRUCTION
20
Natural Habitat
Youth Shelter Services Renovation & New Construction PROJECT ABSTRACT Homelessness has been a systematic problem that has been a part of our society for a very long time. For this project, we will be addressing the homeless youth population (18 and under) and how we can use evidence-based design and environmental theories to design non-congregate housing for these individuals. Our goal for this project was to immerse these young individuals in shelters that are inconspicuous and provide a sense of normalcy and for all of their many needs.
Group Project with Aditi Vaidya, Alex Marquez, Amber Troutman, Elly Smith 22
DEFINITION OF HOMELESSNESS:
Homelessness for youth is much more than just living on the streets or in shelters. In fact,many homeless shelters won’t accept unaccompanied minors, unless they are a Family and Youth Services Bureau funded shelter. The definition of homelessness also includes couch surfing or doubling up with friends or relatives. -RHY National Clearinghouse
Polk County-
In 2023, Des Moines Public Schools made a statement that they currently have 1,027 homeless students that have been identified. “We’ve had an additional 140 students identified since January 1, 2023.” - Who13 In 2019 in Polk county there were 53 homeless youth, 7 of those 53 were unsheltered.
NON - CONGREGATE HOUSING
When designing for youth and minors that struggle with housing insecurity, we want to provide an established home environment that they can feel comfortable and secure in. As a team, we have selected 2-3 homes that will be adapted to provide for the needs of all users and give them as place to call “home”. This is the ideal option for our specific demographic, as these individuals will be dealing with other life changes and will not have their needs met in a congregate shelter. Exterior Garden View 23
MAP OF DES MOINES HOUSES
PARKS
SCHOOLS
MEDICAL CENTERS
LIBRARIES
AFTER SCHOOL YOUTH RESOURCES
SITE REQUIREMENTS: • Nearby Public Parks & Green Spaces • No major roads easily accessible • Nearby Public Amenities • Libraries • Medical Centers • Childcare Facilities/ Safe Spaces • Easy access to education 24
THE GROVE - 1534 9th St, Des Moines, IA 50314 Middle School Students
4 Single Rooms
4 Double Rooms
Designated spaces for various services Exterior View BEDROOMS
KITCHEN / LIVING
SERVICES WORK / MULTIPURPOSE UP
DN
DN
BATHROOMS UP
25
“Recent estimates indicate that 1 in 10 young adults age 18 to 25 and at least one in 30 adolescents age 13 to 17 experience some form of homelessness unaccompanied by a parent or guardian over the course of a year. There are at least 700,000 homeless young people in the United States, affecting about 3 percent of households with 13- to 17-year-olds. Many of these young people don’t match the traditional idea of what “homelessness” looks like. Many of them go to school or work, participate in community activities, and enjoy social lives with friends who have safe, dependable places to sleep every night.”
In-House Medical Care
- National Clearing on Homeless Youth & Families
Hand Sketch of ‘Homeless Jesus’ statue in Seattle, WA
Shared Bedroom 26
THE COTTAGE - 2801 Cottage Grove Ave, Des Moines, Iowa 50311 High School Students
4 Single Rooms
4 Double Rooms
Designated spaces for various services Shared Bedroom OUTDOOR SPACE
BEDROOMS
LIVING/OFFICE
UP DN
KITCHEN/DINING
BATHROOMS
27
Exterior View
Site Plan Biophilic design is a concept used within the building industry to increase occupant connectivity to the natural environment through the use of direct nature, indirect nature, and space and place conditions. Studies have shown evidence of positive benefits of human interaction with nature, such as improved productivity, lower levels of stress, enhanced learning and even improved recovery rates following illness. - Planteria Group
Living Room 28
Nurturing Growth
New Inclusive Care Community New Construction PROJECT ABSTRACT For this project, our goal was to design a safe and inviting environment for individuals with Autism Spectrum Disorder (ASD). The spaces we designed emphasize harmony through engagement with the environment and users. We wanted the users to unite with their spaces and be comfortable to be themselves without judgment. Our design is also immersive, allowing the users to be completely connected with the environment. Our other goal we had for this environment was to create a place users could be autonomous and independent. Overall, we wanted to ensure that the users of the space could always feel comfortable and have a space to call their own.
Immersive Harmonious Private Transition
Public
Autonomous
Group Project with Laura Sauceda 30
CONCEPT For this project, we will be designing a safe and inviting environment for individuals with Autism Spectrum Disorder (ASD). The spaces we design will emphasize harmony through engagement with the environment and users. We want the users to unite with their spaces and be comfortable to be themselves without judgment. Our design will also be immersive allowing the users to be completely connected with the environment. Our other goal we have for this environment is to create a place users can be autonomous and independent. Overall, we want to ensure that the users of the space can feel comfortable and have a space to call their own.
Common Living Area
Floor plan 31
MATERIALITY
Single Bedroom 32
Highland Rise
Continuing Care Retirement Community Renovation PROJECT ABSTRACT The goal for this project is to design a Continuing Care Retirement Community (CCRC) that meets the needs of independent living, assisted living, long-term care residents, and care providers. As designers, we strive to provide a comfortable and inviting place for all users while promoting independence and an exciting new chapter of their lives.
TIMELESS
MOVEMENT
The community everyone wants to be a part of; not has to be a part of.
CLASSIC
ADVENTURE
Group Project with Reece Suter & Patrick Curry 34
Fourth Level
The goal for this project is to create a CCRC that satisfies the needs of the residents, staff, and guests. We strive to provide a comfortable and inviting place while promoting independence and an active lifestyle. We draw inspiration from our keywords: timeless, movement, classic, and adventure to present an exciting new chapter for residents. The spaces will be bright with vibrant colors that emphasize color contrast. While focusing on inclusivity and accessibility, we will incorporate appropriate furniture to fulfill everyone’s needs while still keeping a familiar sense of home.
UP
UP
Third Level
CONCEPT
UP
UP
Assisted Living Independent Living Wellness Common Spaces
Second Level
UP
UP
UP
Support/ Back of House
UP
Administration
UP
First Level
UP
UP
Lower Level
UP
DECEASED STORAGE 4121 632 SF
UP
UP
Vertical Diagram 35
Site Plan
Lobby & Reception Perspective View
Bar Perspective View 36
First Level- Common Area Floor Plan
8
9 11
7
13 6
1 Vestibule 2 Lobby/ Reception 3 Community Room 4 Community Room Storage 5 Unisex Bathroom 6 Mother’s Room 7 Mail room 8 Salon 9 Store 10 Coffee Bar 11 Bistro Kitchen & Storage 12 Bistro/ Cafe 13 Gathering Lounge
12
10
15
5
3
14
21
16
w. Fireplace
17 20
20
17
UP
UP
UP
2
14 Movie Theater 15 Hobby Room 16 Covid Visiting Room 17 Prayer Rooms 18 Chapel 19 Mech & Storage 20 Public Restrooms 21 Cart Storage
19 18
4
UP
UP
UP
UP
1
UP
UP
UP
UP
UP
DECEASED STORAGE 4121 632 SF
UP
37
Second Level- Common Area Floor Plan Open to Below
22 Restaurant 23 Main Kitchen 24 Warming Kitchen 25 Independent Living Dining 26 Meeting Space/ Classroom 27 Open Lounge 28 Private Dining 29 Greenhouse 30 Bar 31 Hobby Room 32 Activity Room 33 Library 34 Billiards/ Game Room 35 Guest Suite(s) 36 Mechanical/ Storage 37 Public Restrooms
Open to Below
27
27 29
26
28
32
31 30 33
25
34
24
22 23
37
36
37
34 35
35
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
38
Horizon Apartment Floor plan
Dawn Apartment Floor plan
40
Additional Experience Interior Design Internship
Over the summer of 2021, I completed an interior design internship with the architectural firm, ETHOS Design Group. Previously, I had interned with ETHOS in high school and was familiar with their people and processes which allowed for me to grow as a stronger designer this summer. During my internship, I worked with both interior designers and architects assisting on many different projects from worship centers to government buildings. During my internship I was also able to attend client meetings, create project renderings, select interior finishes as well as assist with finish schedules/plans and picking up red lines on construction documents within Revit. After returning from my study abroad in Rome for Fall of 2021, I continued my internship with ETHOS until August 2022 and was able to expand my experience and work on finish plans, schedules, and many other documents for real projects and clients.
Waukee United Methodist Church
Project by ETHOS Design Group 42
Pleasant Hill City Hall Renovations
NOT FOR CONSTRUCTION
43
NOT FOR CONSTRUCTION
Project by ETHOS Design Group
44
Creative Work
46
47
48
THANK YOU ambertroutman.91@gmail.com 515.985.8398