Skip to main content

ATroutman Design Portfolio

Page 1

AMBER TROUTMAN DESIGN PORTFOLIO


ABOUT ME

AMBER TROUTMAN ambertroutman.91@gmail.com 515.985.8398 EDUCATION Bachelor of Fine Arts, Interior Design, 2023 Iowa State University – Ames, Iowa Rome, Italy – College of Design Rome Study Abroad Program Iowa State University, 2021 WORK EXPERIENCE 10Fold Architecture, Ames, IA Interior Designer 11/2022 - Current ETHOS Design Group, Ankeny, IA Interior Design Intern, 10/2018- 08/2022 PROFESSIONAL AFFILIATIONS

SKILLS* 3D Modeling AutoCAD Revit Rendering Enscape Lumion Sketch Up Adobe Creative InDesign Photoshop Lightroom Illustrator Microsoft Office Bluebeam

IIDA, International Interior Design Association * The listed skills above come from my own professional and educational experience. As a designer, I firmly believe that we are never done learning or completely experts in the software that we use. Therefore, you will find that there is an empty column under each skills to represent my continuing education and development of these skills as I continue to grow as a designer.


CONTENTS

03

Northwestern College Bultman Center Phase II

29

Nurturing Growth Inclusive Care Community New Construction

Addition & Renovation

07

15

21

Sioux Center Christian

K-12 Education Addition & Renovation

IKM-Manning CSD K-12 Education Addition & Renovation

Natural Habitat

Youth Shelter Services Renovation & New Construction

Highland Rise

33

Continuing Care Retirement Community Renovation

41

Additional Experience

46

Creative Work

Interior Design Internship


Northwestern College Bultman Center - Phase II Addition & Renovation PROJECT ABSTRACT As the athletic department grows and the existing space allocated for the athletic teams is not meeting for the demand, Northwestern College in Orange City, Iowa reached out to 10Fold to renovate and update the existing locker rooms in the current Bultman Center along with designing an addition to the existing building for their NAIA Championship winning football team. As a part of this addition, there will be a new team room for team meetings and film reviews, a new office suite for the football coaches, a large conference room for meetings, an expansive football locker room with customized lockers, and areas dedicated to displaying football paraphernalia. As a part of this project, I have had the incredible opportunity of working as the primary interior designer and collaborating with architects and structural engineers to solve complex design problems and create an energetic and inviting space for athletes, coaches, and future Raiders.

Project by 04


Main Entrance

Parti Diagram

Mannequin Display/ Immersive Experience Entrance 05


Office & Conference Room Suite

Football Locker Room Entrance

New Football Locker Room 06


Sioux Center Christian

K-12 Education Addition & Renovation PROJECT ABSTRACT After many years of continued work with the Sioux Center Christian School District, the next large project for their existing building is to renovate small portions of their existing space including their art classrooms and provide more fire protection/ apply safe design solutions to give their space an update. Along with this minor renovation, there is a large added to the South of their current school. This addition will house a new commons space for all students to enjoy, many classrooms for science, math, and other courses, and a new gymnasium connected to the existing stage. As this project has been ongoing since 2019, I was able to join the project team right away and assist with interior wall graphic options, interior details, and developing construction documents for the bidding phase. F

E

9'-0"

G

50'-0"

5

4

14'-6"

Project by NOTE: COLORED COURT LINE VIEW FOR COMMUNICATING PAINT COLORS AND LOGO DESIGN ONLY. REFER TO OTHER PLANS FOR DIMENSIONS.

08 RENDERED GYM FLOOR PLAN

ELEC. CLO. 231E

FULL COURT

COURT L


G

F

E

D

C

B

A

FLOOR PLAN NOTES

3

(1)

4

4'-6"

7'-8"

3'-6"

15'-6"

B2 A9.1

5

6"

231-1 3

8'-10 1/8"

11'-8"

1'-7"

JANITOR 84 SF 226J

30'-4"

227-1

3

28'-4"

ELECTRICAL 79 SF 226E

E4

B1

M2.3

1

1

2

A13.1 E5

2

E5

MIRG4

G4

2

A13.1 E4

M2.3

B5 3 M1.4

M2.4

W2

W2

W2

F3

G1 A6.1

A5.1

15'-8" (1)

2

3

A5.1

230-1

6'-4"

6'-0"

4'-0"

6'-0"

14'-0"

15'-8"

6'-0"

4'-0"

14'-0 5/8" 8'-3 3/8"

Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238

B

28'-0"

1'-0"

3

2 CLASSROOM 912 SF 230

Wynn O. Jones & Associates, Inc. 754 Alderson Street Schofield, WI 54476 Phone: 402.690.3411 Fax:

1

MIRG5

E5 2 2

A13.5 D5 21 TEAM 181 SF C5 229

E5

W2

A13.1 C5

MIRG4

M1.4

SIM E1 A7.1

PROJECT ISSUE DATE PROJECT NUMBER REVISIONS:

A

A5.1

W2

REV

W2

DATE

09/21/2023 21094 ©2023 DESCRIPTION

E1 A7.1

6'-0"

5'-8"

3'-0"

58'-0"

2'-8"

6'-0"

2'-8" 2'-5"

5'-7"

6'-0"

4'-0"

16'-9"

4

2

G1

21

M2.4

8"

M2.2

F1

9

C

6'-2"

SIM G1 A7.1

1'-7"

18

SF7

3'-0"

W2 W2

10'-4"

12

C.

REFER TO ENLARGED PLANS FOR FURTHER NOTES AND DIMENSIONS WITHIN CALLOUTS VERIFY DIMENSIONS IN-FIELD TO APPROPRIATELY ALIGN NEW CONSTRUCTION WITH WITH EXISTING CONDITIONS. EXISTING GRIDLINES ARE INDICATED WITH PARENTHESIS; I.E. (1) ALL CORNER GUARDS TO BE 48"H, U.N.O.

3

FEC

3'-4"

A13.4 D1

WH

1'-7"

M2.1 15'-10"

6"

M2.3

MIRG5

SF8

3'-4"

M2.2

12'-8"

2 CLASSROOM 922 SF 228

G5 2

STUDENT LOUNGE 299 SF 221D

8"

3

CLASSROOM 922 SF 227

1

3

21

M2.4

8" 2'-0" 3'-4"

16'-0"

6'-0"

5

6

1

GRID LEGEND

8'-0" GRID TO OUTSIDE FACE OF PRECAST, TYP. AT EXTERIOR WALLS

29'-7"

160'-8" 1

SCIENCE LAB CONSULTANT

60'-4" G2

M2.1

228-1

8"

VESTIBULE 190 SF 221E

18

C1 A7.1

A13.4

TYP

36

1'-7"

7

23'-4"

B.

630 FIRST AVENUE S.E., SIOUX CENTER, IA 51250

M2.4

28'-4" 2

226E-1

CORRIDOR 226

226J-1

VESTIBULE 77 SF 221S 221S-2

6'-2"

G3

1

8"

A/V CART STOR. 30 SF 231C

M2.3 M1.5

GENERAL NOTES A.

D

231-4 36 M1.5

B1 A7.1

SIOUX CENTER CHRISTIAN SCHOOL

RESTROOM 59 SF 226M

226M-1

226W-1

22'-4" 6'-0"

3'-4"

FEC 8"

THE BLAZER CENTER

21

6'-0"

12'-8"

4'-0" M2.2

G1 A7.1

1'-0"

1

3'-4"

M2.1

18

W4

8"

6" 6" 5'-4" 231C-1

4"

23'-4"

4"

21'-0"

3

TYP

SF7

A

CORRIDOR 905 SF 221B

8

TYP

6'-8"

6'-0"

7

10'-0" 6'-0" 6'-0"

12

30'-0"

L1.2

FEC

SF8 221S-1

8" 3'-4" 6"6" 4" 231D-1

M2.3

A7.2

RESTROOM 59 SF 226W

9'-3" STOR. CLO. 18 SF 231D

37

CG

W4

W4

16'-9"

8'-0"

53'-4"

8"

4'-0"

35'-0"

8" 8" M2.3

F3

ELEC. CLO. CG 40 SF 231E G1

CG

7

3'-0"

FEC

9'-8"

CG STUDENT LOUNGE 207 SF 221C

LOFT B

B3 ABOVE A14.2

4" 4'-8"

221E-2

8'-3 3/8"

L1.2

LAB 721 SF

3'-0"

LOFT A

C3 ABOVE A14.2

A14.2

36

9

E 4

221E-1

FEC

10 7/8"

109'-5 1/8"

MIR

225A-1

SCIENCE CLASSROOM 225A 803 SF

A5.1

5

6'-8"

W2

W2

13'-6"

3

MIR

2'-1 1/2" 1'-2 1/2" 1'-0"

10'-0 5/8"

225B-1

3'-0"

G2

20'-1"

1'-3" 11 1/8" 7'-10 1/8"

4'-0" G5 A13.4 G4

9'-8"

4'-0"

9'-8"

16'-0"

45'-2" 15'-2"

MIR

M2.3

TEAM 116 SF 224

25

30'-0"

85'-0" 10 7/8"

9'-8" FEC

MIR

32'-6"

MIR

1'-0" 3'-0"

8"

15

3'-0"

B

4

4

M2.1

4'-8"

224-1

3'-0"

2

W2

4'-11 3/8"

14'-0 5/8"

1'-0 5/8" 3'-0" 6'-0"

G1 A2.1

25 3'-0"

19'-0" MULTIPURPOSE 10076 SF 231

25

CORRIDOR 1234 SF 221A

2'-8"

C

2

9

3'-4"

8'-3 3/8"

D

1

SCIENCE STOR. 138 SF 225B

3'-0"

1

A13.1 G3

24'-8"

25

30'-0" 3'-0"

4'-0 3/8"

6'-0" 4'-0" 6'-0" 9'-0"

2

A13.2 G1

G4

25

TYP

CLASSROOM 927 SF 223

MIRC3

1'-0"

G1 A13.3

C1 A7.1 7

3

E

25

69'-8"

1'-8" 8" 3'-4"

SIM

21

MIRC4

36 37 38

G4

A13.4

G1

223-1

231-5

16'-0"

1'-8" 4'-0"

3

E3

AREA A

F.F.

0' - 0"

MIRG1

M2.4

W2

231B-1

231-2

8

222-1

8"

2

8"

3

W2

F4

231A-1

4'-0"

33 34 35

3'-8 5/8"

2

M2.2

A5.1

F

0' - 0"

21

F3 A6.1

3

1'-0"

AREA B

48'-0"

TYP

M2.4

M2.4

4'-0"

F.F.

C3

SIM E1 A7.1

23'-0"

59'-1 3/4"

32'-6"

6'-0"

W2

7

A13.1 G3

28 29 30

7

10" 8'-4"

6

M2.1

21'-6"

6'-0" 4'-0"

C4 E3

9"

31 32

221A-1

CLASSROOM 927 SF 222

W2

11 1/2" 8'-4"

3'-0"

2

9 1/2"

28'-11"

6

FEC

1

8"

2

CG

231E-1 7'-3 3/8"

AREA A

CG

4'-8"

F

6'-6 1/4"

1'-0"

AREA B

9" 3'-4"

4'-6"

E1 A7.2

28'-10"

4

6

1'-0"

57'-9"

B1 A7.2

Wenger Corporation 555 Park Drive Owatonna, MN 55060 Phone: 315.883.2418 Fax:

1'-0" 7'-4"

B1 A7.4

Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238

1'-0"

1'-0" D1 A7.4

3'-4"

2

30'-4"

229-1

1

21 25 26 27

(2)

G1 A6.1

231-3

F3 A6.1

THEATRICAL CONSULTANT

18 20

ELECTRICAL ENGINEER

16 17

MECHANICAL ENGINEER

15

ARCHITECT

14

5

10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008

9 10 12 13

10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008

8

5

STRUCTURAL ENGINEER

3 4 5 6 7

CIVIL ENGINEER

AV LOCATION, OFOI. MARKERBOARD WITH 12" TACK BOARD ABOVE. REFER TO INTERIOR ELEVATIONS FOR SIZE / PLACEMENT. TACK BOARD. REFER TO INTERIOR ELEVATIONS FOR SIZE / PLACEMENT. STATIONARY BLEACHERS. TELESCOPIC BLEACHER STAGE CURTAIN, BY OTHERS WALL MOUNTED TACKABLE FELT PANELS. REFER TO INTERIOR ELEVATIONS FOR SIZE & PLACEMENT. SEE MATERIAL FINISH SCHEDULE FOR MORE INFORMATION. METAL LOCKERS ON 4" CONCRETE BASE. COORDINATE FINAL CONCRETE BASE DIMENSION WITH LOCKER MANUFACTURER. ROOF DRAIN AND/OR OVERFLOW. COORDINATE WITH PLUMBING. CURTAIN TIE-BACK HOOK. SURFACE-MOUNTED CABINET UNIT HEATER. SEE MECHANICAL ADJUSTABLE SHELVING AND HANGAR RODS THROUGHOUT THIS AREA PER INTERIOR ELEVATIONS. COORDINATE INSTALLATION HEIGHTS WITH OWNER. G.C. TO REINSTALL UTILITY SINK SALVAGED FROM CLASSROOM 158. PROVIDE A NEW FAUCET AND CLAY TRAP. COORDINATE WITH PLUMBING. RESIDENTIAL SIZE REFRIGERATOR/FREEZER COMBO WITH REVERSE-OSMOSIS FILTERED ICEMAKER. COORDINATE WITH MEP INFILL EXISTING DOOR OPENING TO MATCH EXISTING. NEW UTILITY SINK. PROVIDE A NEW FAUCET AND CLAY TRAP. COORDINATE WITH PLUMBING. CARD ACCESS CONTROL LOCATION. COORDINATE WITH ELECTRICAL. 4" CONCRETE SLAB OVER 15 MIL VAPOR BARRIER OVER 4" GRANULAR FILL. REINFORCE WITH WWF 6X6-1.4X1.4. CASEWORK. FLOOR SLEEVE, INTEGRAL WITH WOOD GYM FLOOR SYSTEM. CONCRETE BLOCK RETAINING WALL; SEE CIVIL PATCH MASONRY WALL WHERE ADJOINING WALL WAS DEMOLISHED. INFILL SUCH THAT SURFACE IS CONSISTENT WITH ADJACENT COURSING AND TEXTURE. STEEL HANDRAIL INFILL OPENING WITH CMU. LAY IN 15 MIL VAPOR BARRIER AND INFILL FLOOR CAVITY WITH CONCRETE TO BE FLUSH WITH ADJACENT WHERE CMU WALL WAS DEMOLISHED STORM DRAIN PIPING. HOLD DOWN FLOOR SLAB AT RAMP PORTION OF CONCRETE STEPS IN ORDER TO POUR RAMP AS AN INTEGRAL, ONE-PIECE SLAB. CUT FLOOR AS REQUIRED IN AREAS THAT ACCOMMODATE NEW PIPE WORK. ADA COMPLIANT HI-LOW DRINKING FOUNTAIN. SEE PLUMBING. LAY IN 15 MIL VAPOR BARRIER AND INFILL RECESSED AREA OF FLOOR WITH CONCRETE TO BE FLUSH WITH ADJACENT. CONCRETE SLAB IN THIS AREA AT 0'-0" CONCRETE SLAB IN THIS AREA AT -0'-3". COORD. W/ STRUCT. AFTER COODINATING EXISTING FOUNDATION CONDITIONS WITH ARCHITECT & STRUCTURAL ENGINEER, GRIND DOWN VERTICAL FACES OF FOOTING TO CREATE FLUSH SURFACE PLUMB WITH DEEPEST POINT OF FACE. ADD 4" OF CONCRETE TO TOP OF EXPOSED FOOTING TO ALIGN WITH EXISTING SLAB AT HIGH END OF RAMP.

DGR Engineering 6115 Whispering Creek Drive Sioux City, IA 51106 Phone: 712.266.1554 Fax:

1 2

(#)

#

CONSTRUCTION DOCUMENTS

7 (X)

EXISTING

FLOOR PLAN - LOWER LEVEL - AREA A

LOWER LEVEL

PLAN - AREA A G1 FLOOR SCALE: 1/8" = 1'-0"

X

TRUE

G

NEW EXISTING NEW

F

E

D

C

B

A

A1.1

NOT FOR CONSTRUCTION

09


G

F

E

D

C

B

A

FLOOR PLAN NOTES

(1)

4

5

6

7

31 32 33 34 35 36 37 38

4

EQ

27

Wynn O. Jones & Associates, Inc. 754 Alderson Street Schofield, WI 54476 Phone: 402.690.3411 Fax:

200A-1

LOCKER CHANGING

Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238

1'-4" 5'-0"

7'-4"

8"

1'-4"

4

Wenger Corporation 555 Park Drive Owatonna, MN 55060 Phone: 315.883.2418 Fax:

3

Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238

2

SCIENCE LAB CONSULTANT

28 29 30

(2) 1

THEATRICAL CONSULTANT

21 25 26 27

ELECTRICAL ENGINEER

18 20

MECHANICAL ENGINEER

16 17

ARCHITECT

15

10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008

14

5

10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008

9 10 12 13

STRUCTURAL ENGINEER

8 5

AV LOCATION, OFOI. MARKERBOARD WITH 12" TACK BOARD ABOVE. REFER TO INTERIOR ELEVATIONS FOR SIZE / PLACEMENT. TACK BOARD. REFER TO INTERIOR ELEVATIONS FOR SIZE / PLACEMENT. STATIONARY BLEACHERS. TELESCOPIC BLEACHER STAGE CURTAIN, BY OTHERS WALL MOUNTED TACKABLE FELT PANELS. REFER TO INTERIOR ELEVATIONS FOR SIZE & PLACEMENT. SEE MATERIAL FINISH SCHEDULE FOR MORE INFORMATION. METAL LOCKERS ON 4" CONCRETE BASE. COORDINATE FINAL CONCRETE BASE DIMENSION WITH LOCKER MANUFACTURER. ROOF DRAIN AND/OR OVERFLOW. COORDINATE WITH PLUMBING. CURTAIN TIE-BACK HOOK. SURFACE-MOUNTED CABINET UNIT HEATER. SEE MECHANICAL ADJUSTABLE SHELVING AND HANGAR RODS THROUGHOUT THIS AREA PER INTERIOR ELEVATIONS. COORDINATE INSTALLATION HEIGHTS WITH OWNER. G.C. TO REINSTALL UTILITY SINK SALVAGED FROM CLASSROOM 158. PROVIDE A NEW FAUCET AND CLAY TRAP. COORDINATE WITH PLUMBING. RESIDENTIAL SIZE REFRIGERATOR/FREEZER COMBO WITH REVERSE-OSMOSIS FILTERED ICEMAKER. COORDINATE WITH MEP INFILL EXISTING DOOR OPENING TO MATCH EXISTING. NEW UTILITY SINK. PROVIDE A NEW FAUCET AND CLAY TRAP. COORDINATE WITH PLUMBING. CARD ACCESS CONTROL LOCATION. COORDINATE WITH ELECTRICAL. 4" CONCRETE SLAB OVER 15 MIL VAPOR BARRIER OVER 4" GRANULAR FILL. REINFORCE WITH WWF 6X6-1.4X1.4. CASEWORK. FLOOR SLEEVE, INTEGRAL WITH WOOD GYM FLOOR SYSTEM. CONCRETE BLOCK RETAINING WALL; SEE CIVIL PATCH MASONRY WALL WHERE ADJOINING WALL WAS DEMOLISHED. INFILL SUCH THAT SURFACE IS CONSISTENT WITH ADJACENT COURSING AND TEXTURE. STEEL HANDRAIL INFILL OPENING WITH CMU. LAY IN 15 MIL VAPOR BARRIER AND INFILL FLOOR CAVITY WITH CONCRETE TO BE FLUSH WITH ADJACENT WHERE CMU WALL WAS DEMOLISHED STORM DRAIN PIPING. HOLD DOWN FLOOR SLAB AT RAMP PORTION OF CONCRETE STEPS IN ORDER TO POUR RAMP AS AN INTEGRAL, ONE-PIECE SLAB. CUT FLOOR AS REQUIRED IN AREAS THAT ACCOMMODATE NEW PIPE WORK. ADA COMPLIANT HI-LOW DRINKING FOUNTAIN. SEE PLUMBING. LAY IN 15 MIL VAPOR BARRIER AND INFILL RECESSED AREA OF FLOOR WITH CONCRETE TO BE FLUSH WITH ADJACENT. CONCRETE SLAB IN THIS AREA AT 0'-0" CONCRETE SLAB IN THIS AREA AT -0'-3". COORD. W/ STRUCT. AFTER COODINATING EXISTING FOUNDATION CONDITIONS WITH ARCHITECT & STRUCTURAL ENGINEER, GRIND DOWN VERTICAL FACES OF FOOTING TO CREATE FLUSH SURFACE PLUMB WITH DEEPEST POINT OF FACE. ADD 4" OF CONCRETE TO TOP OF EXPOSED FOOTING TO ALIGN WITH EXISTING SLAB AT HIGH END OF RAMP.

CIVIL ENGINEER

3 4 5 6 7

DGR Engineering 6115 Whispering Creek Drive Sioux City, IA 51106 Phone: 712.266.1554 Fax:

1 2

30

M1

35

STOR.

35

(E) LVL 1

STOR. & MECH.

1' - 5" 30

CHANGING

27

?

OFFICE

LOCKER

UP

CONF.

EQ

STOR.

3

3

1' - 5" 34

2'-5 1/4"

220A-1

6

D1 A7.3

6

6

6

6

6

231A-2 F4

8"

2'-1" 11 3/4"

29'-4 1/4"

10"

221A-1 1'-4" 1'-0" 7'-4"

8"

30'-4"

1'-0" 5'-0 1/2" 8'-0" 1'-8" 13

LVL 1S

231B-2

GYM STOR 276 SF 231B

0' - 0"

F.4

PROJECT ISSUE DATE PROJECT NUMBER REVISIONS:

AREA B F

231A-1

FEC

D1 A7.4

A13.5

CG

231-1 F3 A6.1

6'-11 1/2"

4'-7 1/2"

G5 G4 A13.5 F5

G4 A6.1

B1 A7.3

A5.1

F.8 SIM E1 A7.1

4'-6"

10'-4"

G1 A6.1

7'-8"

77'-9"

15'-8"

231-2

PE OFFICE 93 SF 231A

E1 A7.2

6"

58'-0"

16'-3"

7'-10"

231B-1 231-3

1'-0"

CG

G2

6'-0"

B1 A7.4

7

F

AREA A

1

13'-0"

ELECT. 154 SF 235E

6

F1 A7.3 1

1'-0"

FEC

CW5

G2 A9.1

9'-11"

9"

9 1/2"

6"

8'-4"

11 1/2"

9"

8'-4"

REV

1

2

3

(1)

(#)

29'-7"

1

# CONSTRUCTION DOCUMENTS

4

5

6 (2)

PLAN - AREA B G1 FLOOR SCALE: 1/8" = 1'-0"

SIM B1 A7.3

7

(X)

EXISTING

X

TRUE

NEW EXISTING NEW

G

F

E

09/21/2023 21094 ©2023 DESCRIPTION

1'-0"

160'-8"

LOWER LEVEL

DATE

AREA A GRID LEGEND

10"

630 FIRST AVENUE S.E., SIOUX CENTER, IA 51250

32

LOBBY/COMMONS 2839 SF 220

G3

STAGE 2141 SF 235

6

8"

SIOUX CENTER CHRISTIAN SCHOOL

G2 A14.2

UP

CORRIDOR F4 533 SF A8.1 232

6

8'-11"

2

(A) G

6"

1' - 5" 6

10

A13.6 C5

3'-4"

201-1

(E) LVL 1

10

1

234-1 3'-4" 8" 6"

5'-1"

THE BLAZER CENTER

44'-1 3/4"

C3

2'-9"

C.

6"

M2.3

235-2 8'-8"

FEC

27'-9 1/2"

35'-0"

H

REFER TO ENLARGED PLANS FOR FURTHER NOTES AND DIMENSIONS WITHIN CALLOUTS VERIFY DIMENSIONS IN-FIELD TO APPROPRIATELY ALIGN NEW CONSTRUCTION WITH WITH EXISTING CONDITIONS. EXISTING GRIDLINES ARE INDICATED WITH PARENTHESIS; I.E. (1) ALL CORNER GUARDS TO BE 48"H, U.N.O.

(B)

STORAGE 215 SF 31 233

1' - 5"

9'-11 1/2"

235-3 8'-8"

232-1

(E) LVL 1

1'-0"

2'-8"

GENERAL NOTES

1'-0"

LVL 1S

0' - 0"

1'-0"

A.

16'-8 1/2"

LVL 1S

CW1

AREA B

1'-0" B1 1'-0 3/8" A7.6 CG

9'-11"

1'-2"

220A-2

220A-4

18

CG

OFFICE 99 SF 234

1'-3 1/2"

F.4

G1 A6.1

G5

CW3

G1 A7.4

220A-3

G4 A6.1

CW2

D1 L2.1 A7.6

8"

UP

1'-0" 10 7/8" 6'-2 1/4"

9 3/4" 6'-2 1/4"

CW4

F4

7

E4 A14.1

M3

27

3"

E1

18

3'-4"

1' - 5"

0' - 0"

F.8

A5.1

N1

235-1

CW1

D2 A7.5

G2 A7.5

VEST 143 SF 220A

8'-4"

B.

235E-1

9'-9 5/8"

B2 A7.5

11 3/4"

N1

29 AT EXHAUST FAN

5'-6 5/8"

2'-1"

1'-6" 4"

W2

38

G 26

7

20

29

1' - 5"

A13.6 C1

7

17'-3 1/2"

WH

27

(E) LVL 1

34

12" MIN.

214-1

1'-1" FD

E1

SLOPE

17'-3 1/2"

14

220-1

G1 A7.6

A1

7 3/8"

SLOPE

(E) LVL 1

1'-0"

220M-1

220W-1

9 1/4"

8'-0 1/4"

G4 A14.1

A5.1

27

220J-1

6'-0 1/2"

CG; 96" H

20

MAINT. 348 SF 214

6'-0"

A5.1

UP

CG; 96" H

0' - 3 1/2"

FS

SLOPE

(E) LVL 1W

G3

(A)

STOR. 13 SF 220J

MEN'S RR 267 SF 220M

30'-1" 2'-1"

28

SLOPE

5'-0" H

(B)

F2 A8.1

C1 A2.1

CLASSROOM

2

WOMEN'S RR 506 SF 220W

LVL 1S

0' - 0"

CORRIDOR 1107 SF 200A

2'-6"

C4 A14.2 20

RECREATION 5062 SF 201

(E) LVL 1

20

233-1

CORRIDOR

5'-3"

0' - 3 1/2"

MIN. 60" CLR

(E) LVL 1W

F3 A6.1

D

C

B

A

FLOOR PLAN - LOWER LEVEL - AREA B

A1.2

NOT FOR CONSTRUCTION

10


G

F

E

D

C

B

A

SYMBOLS LEGEND

WALL FINISH MATERIAL, LEADERS ANNOTATE EXTENTS OF NAMED FINISH

SUBFLOOR ENGINEERED SLEEPER

THRESHOLD FASTENER

T.O. FINISHED FLOOR 0'-0"

SUBFLOOR ENGINEERED SLEEPER

PLYRON PANEL FLOORING

CONCRETE SLAB

T.O. FINISHED FLOOR 0'-0"

SUBFLOOR ENGINEERED SLEEPER ANCHOR

CONCRETE SLAB

RECESSED SLAB AT GYM, SEE STRUCTURAL

CONCRETE SLAB

RECESSED SLAB AT STAGE, SEE STRUCTURAL

6 7 8 9 10 11 12 13 14 15 16 17

FLOOR TRANSITION DETAIL

4

FLOOR TRANSITION DETAIL

- WALKOFF G4 VCT SCALE: 3" = 1'-0"

FLOOR TRANSITION DETAIL

- VCT F4 PLYRON SCALE: 3" = 1'-0"

FLOOR TRANSITION DETAIL

GYM WOOD - WALKOFF CARPET E4 SCALE: 3" = 1'-0"

CG

CG

FLOOR TRANSITION DETAIL

CARPET - WALKOFF D4 SCALE: 3" = 1'-0"

SEALED CONCRETE - PLYRON PANELS C4 SCALE: 3" = 1'-0"

4

10

9

8

10

4

F-7

E5 / A12.1 F5 / A12.1

F-8

18 19 21 22 23 24

F-1

F-9

E5 / A12.1

F-2

7

G5 / A12.1

4

C5 / A12.1

CERAMIC TILE ON MORTAR BED, PER FINISH SCHED.

F-5

SCHLUTER COVE BASE GLAZED PORCELAIN TILE ON MORTAR BED, PER FLOOR FINISH SCHED.

GYPSUM 1

T.O. FINISHED FLOOR 0-0"

CLASSROOM 222

CONCRETE SLAB

1

6

5 5

F-1

5

C5 / A12.1

F-5

50'-0"

METAL COVE BASE- FLOOR TILE TO WALL TILE G3 SCALE: 3" = 1'-0"

C5 / A12.1

3

CONCRETE STAIR RAMP - CARPET TILE B4 SCALE: 3" = 1'-0"

ARCHITECT

METAL TRANSITION STRIP CARPET TILE

CONCRETE SLAB RAMP

THRESHOLD COVER PLATE

T.O. FINISHED FLOOR 0-0" THRESHOLD FASTENER

ANCHOR

CONCRETE SLAB

RECESSED SLAB AT STAGE, SEE STRUCTURAL

SEALED CONCRETE

WALK-OFF CARPET

GYM MAPLE FLOORING

ANCHOR

CONCRETE SLAB

METAL TRANSITION STRIP

CARPET TILE

THRESHOLD COVER PLATE

2"

T.O. FINISHED FLOOR 0-0"

STRUCTURAL ENGINEER

PLYRON PANEL FLOORING

2 7/8"

THRESHOLD FASTENER CONCRETE SLAB

WALK-OFF CARPET TILE

THRESHOLD COVER PLATE

T.O. FINISHED FLOOR 0-0"

CIVIL ENGINEER

VINYL COMPOSITION TILE

2 7/8"

WALK-OFF CARPET

T.O. FINISHED FLOOR 0'-0"

2 7/8"

METAL TRANSITION STRIP

VINYL COMPOSITE TILE

FOLDING BASKETBALL BACKSTOP OVERHEAD. FLOOR BOX. SOLID PAINT FILL. FIELD-PAINTED/STAINED LOGO/GRAPHIC. SEE SHEET A12.3 FOR ILLUSTRATION OF DESIGN INTENT. FLOOR SLEEVE, INTEGRAL WITH WOOD GYM FLOOR SYSTEM. BASKETBALL COURT STRIPING. BASKETBALL PRACTICE COURT STRIPING (2) RECTANGLES. VOLLEYBALL COURT STRIPING. VOLLEYBALL PRACTICE COURT STRIPING (2) RECTANGLES. START FULL TILE AT EDGE OF WALL AND AT ROOM THRESHOLD. MAIN COMPETITION BASKETBALL COURT. LINES 2" THICK. PAINT COLOR - BLUE. MAIN COMPETITION VOLLEYBALL COURT. LINES 2" THICK. PAINT COLOR - WHITE. PRACTICE BASKETBALL CROSS-COURT. LINES 2" THICK. PAINT COLOR - BROWN. PRACTICE VOLLEYBALL CROSS-COURT. LINES 2" THICK. PAINT COLOR - YELLOW. PAINTED CUSTOM LETTERING & GRAPHICS, BY GYM FLOOR INSTALLER. ARCHITECT TO PROVIDE GRAPHIC FILE. PAINTED CUSTOM CENTER COURT LOGO, BY GYM FLOOR INSTALLER. ARCHITECT TO PROVIDE LOGO GRAPHIC FILE. TRANSPARENT STAIN COLOR - YELLOW. PAINT COLOR - BLUE. START FULL LENGTH OF TILE HERE. START FULL WIDTH OF TILE HERE. APPLY SELF-LEVELING UNDERLAYMENT AT FLOOR DRAIN SLOPE AND ANY UNEVEN SURFACES PRIOR TO INSTALLATION OF FLOOR FINISH MATERIAL. MAPLE ATHLETIC FLOORING SYSTEM WITH CLEAR COAT FINISH.

10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008

FINISH FLOOR PLAN NOTES 1 3 4 5

Wynn O. Jones & Associates, Inc. 754 Alderson Street Schofield, WI 54476 Phone: 402.690.3411 Fax:

- VCT B5 PORCELAIN SCALE: 3" = 1'-0"

- VCT C5 CARPET SCALE: 3" = 1'-0"

CONCRETE - VCT D5 SCALE: 3" = 1'-0"

5

FLOOR TRANSITION DETAIL

FLOOR TRANSITION DETAIL

FLOOR TRANSITION DETAIL

GYM WOOD - CARPET E5 SCALE: 3" = 1'-0"

CORNER GUARDS, TYP. 48"H U.N.O.

Wenger Corporation 555 Park Drive Owatonna, MN 55060 Phone: 315.883.2418 Fax:

CG

Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238

1/8"

RECESSED SLAB AT GYM, SEE STRUCTURAL

FLOOR TRANSITION DETAIL

GYM WOOD - VCT F5 SCALE: 3" = 1'-0"

FLOORING FINISH TRANSITION

CONCRETE SLAB

Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238

FLOOR TRANSITION DETAIL

FLOOR TRANSITION DETAIL

SEALED CONCRETE - GYM WOOD G5 SCALE: 3" = 1'-0"

FLOORING MATERIAL TRANSITION, REQUIRES TRANSITION STRIP, SEE A10.1

VINYL COMPOSITE TILE

SCIENCE LAB CONSULTANT

CONCRETE SLAB

RECESSED SLAB AT GYM, SEE STRUCTURAL

T.O. FINISHED FLOOR 0-0"

CONCRETE SLAB

CONCRETE SLAB

ANCHOR

VINYL COMPOSITE TILE

T.O. FINISHED FLOOR 0-0"

ALUMINUM TILE TRANSITION

THEATRICAL CONSULTANT

CONCRETE SLAB

RECESSED SLAB AT GYM, SEE STRUCTURAL

THRESHOLD FASTENER

ANCHOR

T.O. FINISHED FLOOR 0-0"

SUBFLOOR ENGINEERED SLEEPER

CARPET TILE

ELECTRICAL ENGINEER

CONCRETE SLAB

SEALED CONCRETE

GYM MAPLE FLOORING

T.O. FINISHED FLOOR 0-0"

SUBFLOOR ENGINEERED SLEEPER

VINYL COMPOSITE TILE

MECHANICAL ENGINEER

THRESHOLD FASTENER

ANCHOR

CARPET TILE

GYM MAPLE FLOORING

GLAZED PORCELAIN TILE ON MORTAR BED, PER FLOOR FINISH SCHED.

METAL TRANSITION STRIP

METAL TRANSITION STRIP

THRESHOLD COVER PLATE

2"

10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008

2 7/8"

2"

T.O. FINISHED FLOOR 0-0"

SUBFLOOR ENGINEERED SLEEPER

THRESHOLD COVER PLATE

DGR Engineering 6115 Whispering Creek Drive Sioux City, IA 51106 Phone: 712.266.1554 Fax:

5

GYM MAPLE FLOORING

VINYL COMPOSITION TILE

2 7/8"

2"

T.O. FINISHED FLOOR 0-0" THRESHOLD FASTENER

THRESHOLD COVER PLATE

2 7/8"

SEALED CONCRETE

1

3

5

1

5

6

CLASSROOM 223

6

6

6

5

F-3

5 6

CERAMIC TILE ON MORTAR BED, PER FINISH SCHED. SCHLUTER COVE BASE VINYL COMPOSITION TILE

F-3 ELEC. CLO. 231E

2 F-5

C5 / A12.1

WALL PROFILE- 2 T.O. FINISHED FLOOR 0-0"

CORRIDOR 221A

CG

CG

CG

CONCRETE SLAB F-6

F-5

SCALE: 3" = 1'-0"

G4 / A12.1

C5 / A12.1

C5 / A12.1

F-3

F-2

F-4

JANITOR 226J

ELECTRICAL 226E

F-7

F-7

CLASSROOM 228

CLASSROOM 227 F-3

VESTIBULE 221S

1

A/V CART STOR. 231C

SLAB F.F. 0'-0"

VESTIBULE 221E F-4

ETR, EXISTING TO REMAIN

TILE

C5 / A12.1

MAPLE

PLYRON

F-1

11

D5 / A12.1 D5 / A12.1

G5 / A12.1 F-7

CONCRETE, SEALED

STUDENT LOUNGE 221D

B5 / A12.1

CORRIDOR 226

2

E4 / A12.1

C5 / A12.1

F-6

B5 / A12.1 11

F-5

RESTROOM 226M

RESTROOM 226W

C5 / A12.1

CORRIDOR 221B

F-5

C5 / A12.1

STUDENT LOUNGE 221C

F-8

F-7

F-5

F-1

F-5

STOR. CLO. G5 / A12.1 231D

F-8

F5 / A12.1

CG

VINYL COMPOSITION TILE

G1 METAL TRIM- VCT CORNER DETAIL

SLAB F.F. -0'-3"

F-7 G5 / A12.1 SLAB F.F. 0'-0"

SCIENCE CLASSROOM 225A

VINYL COMPOSITION TILE

1

MULTIPURPOSE 231

PROJECT ISSUE DATE PROJECT NUMBER REVISIONS:

VCT F-2 TEAM 229

F-1

F-1

SIOUX CENTER CHRISTIAN SCHOOL

F-5

3 1 F-5

THE BLAZER CENTER

SCALE: 3" = 1'-0"

TEAM 224

G4 / A12.1

G2 METAL COVE BASE- VCT FLOOR TO WALL TILE

SCIENCE STOR. 225B

C5 / A12.1

F-2

CONCRETE SLAB

630 FIRST AVENUE S.E., SIOUX CENTER, IA 51250

GYPSUM

T.O. FINISHED FLOOR 0-0"

CLASSROOM 230

F-2

REV

CARPET, WALK-OFF

DATE

09/21/2023 21094 ©2023 DESCRIPTION

F-3

CARPET, F-1

1

CARPET, F-2

WH

CONSTRUCTION DOCUMENTS CARPET, F-3

FLOOR FINISH PLAN LOWER LEVEL - AREA A

LOWER LEVEL

E1 FLOOR FINISH PLAN - AREA A

FLOOR FINISH LEGEND

SCALE: 1/8" = 1'-0"

SCALE: 1/8" = 1'-0"

TRUE

G

F

E

D

C

B

A

A12.1

NOT FOR CONSTRUCTION

11


G

F

E

D

C

B

A

SYMBOLS LEGEND FLOORING MATERIAL TRANSITION, REQUIRES TRANSITION STRIP, SEE A10.1 FLOORING FINISH TRANSITION WALL FINISH MATERIAL, LEADERS ANNOTATE EXTENTS OF NAMED FINISH

5

5

Wynn O. Jones & Associates, Inc. 754 Alderson Street Schofield, WI 54476 Phone: 402.690.3411 Fax:

Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238

4

Wenger Corporation 555 Park Drive Owatonna, MN 55060 Phone: 315.883.2418 Fax:

THEATRICAL CONSULTANT

ARCHITECT STRUCTURAL ENGINEER

ELECTRICAL ENGINEER

24

10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008

18 19 21 22 23

CIVIL ENGINEER

17 4

DGR Engineering 6115 Whispering Creek Drive Sioux City, IA 51106 Phone: 712.266.1554 Fax:

6 7 8 9 10 11 12 13 14 15 16

FOLDING BASKETBALL BACKSTOP OVERHEAD. FLOOR BOX. SOLID PAINT FILL. FIELD-PAINTED/STAINED LOGO/GRAPHIC. SEE SHEET A12.3 FOR ILLUSTRATION OF DESIGN INTENT. FLOOR SLEEVE, INTEGRAL WITH WOOD GYM FLOOR SYSTEM. BASKETBALL COURT STRIPING. BASKETBALL PRACTICE COURT STRIPING (2) RECTANGLES. VOLLEYBALL COURT STRIPING. VOLLEYBALL PRACTICE COURT STRIPING (2) RECTANGLES. START FULL TILE AT EDGE OF WALL AND AT ROOM THRESHOLD. MAIN COMPETITION BASKETBALL COURT. LINES 2" THICK. PAINT COLOR - BLUE. MAIN COMPETITION VOLLEYBALL COURT. LINES 2" THICK. PAINT COLOR - WHITE. PRACTICE BASKETBALL CROSS-COURT. LINES 2" THICK. PAINT COLOR - BROWN. PRACTICE VOLLEYBALL CROSS-COURT. LINES 2" THICK. PAINT COLOR - YELLOW. PAINTED CUSTOM LETTERING & GRAPHICS, BY GYM FLOOR INSTALLER. ARCHITECT TO PROVIDE GRAPHIC FILE. PAINTED CUSTOM CENTER COURT LOGO, BY GYM FLOOR INSTALLER. ARCHITECT TO PROVIDE LOGO GRAPHIC FILE. TRANSPARENT STAIN COLOR - YELLOW. PAINT COLOR - BLUE. START FULL LENGTH OF TILE HERE. START FULL WIDTH OF TILE HERE. APPLY SELF-LEVELING UNDERLAYMENT AT FLOOR DRAIN SLOPE AND ANY UNEVEN SURFACES PRIOR TO INSTALLATION OF FLOOR FINISH MATERIAL. MAPLE ATHLETIC FLOORING SYSTEM WITH CLEAR COAT FINISH.

10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008

FINISH FLOOR PLAN NOTES 1 3 4 5

SCIENCE LAB CONSULTANT

MECHANICAL ENGINEER

Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238

CORNER GUARDS, TYP. 48"H U.N.O.

CG

LOCKER 203A

23

23 F-5

F-5

23 LOCKER 204A

23

3

3

CORRIDOR 200A

F-5

C4 A14.2 WOMEN'S RR 220W

F-6

D5 / A12.1

MAINT. 214

CG; 96" H

42'-7"

/A .1 12

D4 / A12.1

B4

2'-10 1/4"

VEST 143 SF 220A

F4 / A12.1

CG

UP

F-1

STAGE 235

F-4

F-2

F-7

C5 / A12.1 F-5

2

D5 / A12.1

F4 / A12.1

CG

C5 / A12.1

F-7

ETR, EXISTING TO REMAIN

ELECT. 235E

TILE GYM STOR 231B

F-9

CONCRETE, SEALED

THE BLAZER CENTER

C5 / A12.1

F4 / A12.1

2

F-3

OFFICE 234

G1 G1 A12.1 A12.1

F-5

SIOUX CENTER CHRISTIAN SCHOOL

F-7

UP

CG; 96" H

A3 A11.1

F-5

F-5

STOR. 13 SF 220J

B5 / A12.1 B5 / A12.1

630 FIRST AVENUE S.E., SIOUX CENTER, IA 51250

22

21

11

C4 / A12.1

MEN'S RR 220M

UP

F-6

F-3

6'-10"

1° 40.0

F-1 PE OFFICE 231A

CG

CG

F-7

PLYRON

E5 / A12.1

PROJECT ISSUE DATE PROJECT NUMBER REVISIONS:

VCT

E5 / A12.1 F5 / A12.1 C5 / A12.1

1

MAPLE

D5 / A12.1

16'-5"

C5 / A12.1

F-7

F-8

G5 / A12.1 F-8

G2 A14.2

REV

CARPET, WALK-OFF

CARPET, F-1

LOWER LEVEL

FINISH PLAN - AREA B G1 FLOOR SCALE: 1/8" = 1'-0"

DATE

09/21/2023 21094 ©2023 DESCRIPTION

1

CARPET, F-2

TRUE

CONSTRUCTION DOCUMENTS CARPET, F-3

FLOOR FINISH PLAN -LOWER LEVEL - AREA B

FLOOR FINISH LEGEND SCALE: 1/8" = 1'-0"

G

F

E

D

C

B

A

A12.2

NOT FOR CONSTRUCTION

12


G

F

E

D

C

B

A

INTERIOR ELEVATION NOTES

48 PT-1

E4 A14.1

3 6

11

11

G4 A14.1 ° .89 67

74

2'-6 1/4"

11'-3" PT-1

7"

6

PT-1

CJ

PT-3

220M-1

TYP

6

220W-1

75

3

11

39

G2 A13.6

CJ

COMMONS 220 G5 SCALE: 1/4" = 1'-0"

EQ

EQ

PT-1 65" TV

65" TV

7'-7" 61

FIELD PAINT MECH. GRILL PT-3

35

11

26'-5 3/4"

LOOKING NORTH

EQ

E4 A14.1

61

220-1

EQ 46

PT-1

PT-1

75

39

EQ

6

3

6 6

PT-1

11

EQ

3

PT-1

PT-3

8'-11 1/2"

11'-4" 5'-0" F.O.

6

47

SOLID SURFACE-2

55

6

4'-7 1/2"

3 PT-3

39 CJ

LOOKING EAST

COMMONS 220 C5 SCALE: 1/4" = 1'-0"

4

13

PAINT TOP OF THIS ELEMENT, AT PLYWOOD SURFACE ONLY, PT-15

13

49 55 58 59 61 62

23

10

PAINT TOP OF CANOPY, AT PLYWOOD SURFACE ONLY, PT-15

CW6

CW1

2

G4 A9.1

PT-1

3'-8" PT-1

13

13

13

6 1/8"

CW1

CW3

72 73

PT-1

74 75 76

CW1

RETURN; PT-3

2

2

23

PT-1

8 3/8"

2

PT-3

2

2

3

PT-3

71

METAL PANEL-1

13 3

3

67 68 70

CW1

PT-1

PT-1

63 64 65 66

10

NOTCH PRECAST TO ACCOMMODATE MEP WORK

1'-6"

2

2

2

1'-10"

77

PT-1

PT-1

3

3

G2 A9.1

221A-1

231-1

35

220A-1

INTERIOR ELEVATION INFORMATION

220A-2

2'-2"

61 61

LOOKING SOUTH

COMMONS 220 G3 SCALE: 1/4" = 1'-0"

1'-10"

2" 10" 2"

1'-10"

2" 10" 2" 10" 2" 10" 2" 10" 2" 10" 2"

1'-10"

9"

1'-10"

2" 10" 2"

1'-10"

2" 10" 2" 10" 2" 10" 2" 10" 2" 10" 2"

1'-10"

2" 10" 2" 10"

9"

10" 2" 10" 2"

1'-10"

2" 10" 2"

4'-10"

20

2"

6'-10"

21

1'-10"

2"

2"

21

19

21

1'-10"

21

1'-10"

20

3'-10"

2"

2

4'-10"

20

3'-2"

21

20

1'-10"

10" 2" 10"

1'-10"

20

21

65

2" 4.68°

1'-4 1/8"

39 77

77

B3 A8.1

09/21/2023 21094 ©2023 DESCRIPTION

G1 A12.1

26

1

26

39 CONSTRUCTION DOCUMENTS

LOOKING WEST

E

DATE

63 LOOKING EAST

CORRIDOR 200A E1 SCALE: 1/4" = 1'-0"

F

REV

7'-2"

F2 A8.1 39

G1 A12.1 LOOKING WEST

CORRIDOR 200A - ACOUSTIC PANELS G1 SCALE: 1/2" = 1'-0"

PROJECT ISSUE DATE PROJECT NUMBER REVISIONS:

T-1

21 19

1 FULL TILE TO START AT TOP LEFT CORNER OF NEW INFILLED PORTION OF THE WALL.

MIR G1 A13.6

3'-11 7/8"

19

2"

2"

20

21

21

G

2'-10"

20 19

4'-10"

2"

3'-10"

3'-6"

21

6'-10" 19

2"

4'-10" 3'-6"

21

1'-10"

1'-10" 3'-2"

2" 3'-6"

3'-10"

21

19

21

2'-2"

20

3'-6"

20

3'-6"

19

21

2" 20

19

1'-10"

SCALE: 1/2" = 1'-0"

1'-10"

2'-2"

2'-2" 2"

20

21

3'-0"

5'-4" 2"

21

1'-8"

1

19

2" 10" 2"

D2 COMMONS 220 - ACOUSTIC PANELS

20

3'-6"

20

21

PAINT ALL EXPOSED MEP WORK (DUCTWORK, CONDUITS, PIPES, ETC). REFER TO ROOM FINISH SCHEDULE FOR PAINT.

21

2'-10"

3'-2"

20

21

2"

20

6'-10"

20

2" 2"

20

19

2"

1'-10" 6'-10"

3'-2"

1'-10" 2"

3'-6"

2"

21

G1 A13.6 20

REFER TO STANDARD MOUNTING HEIGHTS ON SHEET A2.1 FOR FIXTURES CALLED OUT IN ELEVATION AND THEIR COMPLIANCES.

C.

LOOKING SOUTH

SCALE: 1/2" = 1'-0"

2" 10" 2"

21

20 21

10" 2" 10"

G2 COMMONS 220 - ACOUSTIC PANELS 1'-10"

2" 10" 2" 10" 2" 10" 2" 10" 2" 10" 2"

1'-10"

19

19

1'-10"

3'-2"

2"

21

10" 2" 10"

LOOKING NORTH

10" 2" 10" 2"

21 21

2" 10" 2" 10" 2" 10" 2" 10" 2" 10" 2"

LOOKING WEST

COMMONS 220 C3 SCALE: 1/4" = 1'-0"

21

21

4'-10"

4'-10" 2"

6'-10"

4'-10"

2" 3'-2"

3'-10"

3'-2"

21 21

1'-10"

21

19

1'-2"

1'-2"

20

2"

3'-10"

19

1'-10"

19

10" 2" 10"

21

19 20

21

20

6'-10"

2"

6'-10" 2"

21

2"

19

19 19

1'-10"

19

21

2'-10"

20 20

2

1'-10"

2'-10"

3'-8"

20

20

1'-10"

4'-10"

2'-10"

21 20

REFER TO ROOM FINISH SCHEDULE & MATERIAL FINISH SCHEDULES ON SHEET A11.1 FOR FINISHES CALLED OUT IN ELEVATION & ADDITIONAL FINISHES NOT CALLED OUT IN ELEVATION.

B.

1'-10"

3'-10"

2" 10" 2"

2"

1'-10"

2"

5'-2"

4'-10"

1'-10"

2'-10"

2" 10" 2"

4'-10"

1'-10"

A.

39

D2 A13.6

4

Wynn O. Jones & Associates, Inc. 754 Alderson Street Schofield, WI 54476 Phone: 402.690.3411 Fax:

A3 A11.1

47 6

48

630 FIRST AVENUE S.E., SIOUX CENTER, IA 51250

48

PT-1

13

5

SIOUX CENTER CHRISTIAN SCHOOL

48

13

5'-5"

48

PT-1 PT-3 ON RETURN WALLS

5'-6"

48

2

PT-3

W6

PT-1

3

23'-3 5/8" 48

W6

5'-5"

PT-1

5'-9"

8'-0"

W5

CJ (LOCATE AT BOTH CORNERS AT THE TOP OF BOTH OF THESE DOORS)

3'-7" F.O.

6

W5

2'-2"

W5

5'-5"

G4 A14.1

PT-3

10

28

SIM

4 5 6 7 10 10E 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28 29 30 32 34 35 36 39 40 41 42 43 44 46 47 48

Wenger Corporation 555 Park Drive Owatonna, MN 55060 Phone: 315.883.2418 Fax:

10

Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238

CJ

Engineering Design Associates Inc. 385 12th Street NE Sioux Center, IA 51250 Phone: 712.722.0228 Fax: 712.722.0238

CJ

CJ

SCIENCE LAB CONSULTANT

CJ

THEATRICAL CONSULTANT

CJ

THE BLAZER CENTER

CJ

ELECTRICAL ENGINEER

CJ CJ CJ

MECHANICAL ENGINEER

SEE REFERENCED DETAIL FOR CONTINUOUS FIRE-RATED CHASE CONSTRUCTION

5

I-CMU WALL EPOXY PAINT I-CMU WALL, EXISTING PRECAST CONCRETE PANEL. PRIME AND PAINT AS CALLED OUT ON ROOM FINISH SCHEDULE AND/OR INTERIOR ELEVATIONS. METAL STUD AND GWB BULKHEAD. APPLY ACCENT PAINT PT-3 ON ALL VISIBLE BULKHEAD SURFACES. LIGHT COLORED THIN BRICK DARK COLORED THIN BRICK GWB DRINKING FOUNTAIN STEEL JOIST STEEL JOIST, EXISTING ELECTRICAL RECEPTACLE; REFER TO ELECTRICAL WALL A/V RECEPTACLE; SEE ELECTRICAL PRECAST PANEL JOINT TROFFER LAMPS GYM DRAPER DIVIDER WALL MOUNTED TECTUM ACOUSTIC PANEL, TECTUM PANEL-1 (MEDIUM BLUE) WALL MOUNTED TECTUM ACOUSTIC PANEL, TECTUM PANEL-2 (DARK BLUE) WALL MOUNTED TECTUM ACOUSTIC PANEL, TECTUM PANEL-3 (WHITE) WALL MOUNTED ACOUSTIC PANEL (GREY) WALL MOUNTED ACOUSTIC PANEL (DARK BLUE) WALL MOUNTED ACOUSTIC PANEL (WHITE) CEILING LINE ARRAY SPEAKERS STEEL COLUMN BLEACHERS WALL GRAPHIC-2, VINYL WALL GRAPHIC APPLIED TO MDO SUBSTRATE. SINK STEEL BEAM PLUMBING WALL LIGHTING FIXTURE MIRROR MOP SINK FIXED SEATING ADJUSTABLE SHELVING WITH CONTINUOUS MOUNTING RAILS RESILIENT WALL BASE. REFER TO ROOM FINISH SCHED. CEILING MOUNTED PROJECTOR BACKSTAGE CURTAIN STAGE CURTAINS LARGE HANGAR DOOR REAR-FOLD-UP BASKETBALL HOOP WALL GRAPHIC-1 WALL PROTECTION-1, PROTECTIVE WALL COVERING WITH CUSTOM GRAPHIC. PROTECTIVE WALL COVERING JOINT. ARCHITECT TO APPROVE WALL PROTECTION PANEL JOINT MAP PRIOR TO INSTALLATION. COLOR MATCH CAULK TO GRAPHIC AT SEAMS. EXPOSED DUCTWORK. PAINT TO MATCH FIELD COLOR. COORDINATE WITH ROOM FINISH SCHEDULE MOUNTED COUNTERTOP WALL MOUNTED ACOUSTIC PANEL (YELLOW) CORK-1 48"H MECHANICALLY FASTENED CORNER GUARD METAL STUD AND GWB BULKHEAD. APPLY ACCENT PAINT PT-4 ON ALL VISIBLE BULKHEAD SURFACES. METAL COVE BASE AT TILE WALLS; SEE METAL COVE BASE DETAILS MOP SINK BACKSPLASH WALL PROFILE-1 4" CONCRETE LOCKER CURB. COVER FACES OF CURB WITH WALL BASE TO MATCH ADJACENT WALLS. ROOF HATCH ACCESS LADDER FIXED STEEL CURTAIN ROD AND SHELF OPENING IN PRECAST WALL FOR MULTIPLE MEP PENETRATIONS. PATCH OPENING AROUND MEP WORK WITH METAL STUD AND MDF AND PAINT. COORDINATE WITH MEP LIGHT-REFLECTIVE WHITE PROJECTOR PAINT APPLIED TO MDO. MUD ALL SEAMS PRIOR TO PAINTING FOR LEVEL 5 FINISH. KEEP THIS AREA OF WALL COMPLETELY CLEAR OF ALL OBSTRUCTIONS. PT-1 APPLIED TO MDO GAS LINE. PLACE BETWEEN ACOUSTIC WALL PANELS. COORDINATE WITH MECHANICAL. COUNTERTOP BRACKET. 96"H MECHANICALLY FASTENED CORNER GUARD 5/8" GWB OVER 2 1/2" ZEE FURRING CHANNELS. FILL CHANNELS WITH 2 1/2" RIGID INSULATION. FURR OUT OVER MDO WALL ONLY, TO B.O. DECK WALL PROFILE-2

ARCHITECT

3

10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008

1 1E 2

10'-10 5/8" CJ

10FOLD 413 Kellogg Ave Ames, IA 50010 Phone: 515.292.0007 Fax: 515.292.0008

10'-11"

STRUCTURAL ENGINEER

10'-11"

CIVIL ENGINEER

4'-1 1/2"

DGR Engineering 6115 Whispering Creek Drive Sioux City, IA 51106 Phone: 712.266.1554 Fax:

6'-11 3/8"

LOOKING WEST

CORRIDOR 200A C1 SCALE: 1/4" = 1'-0"

D

INT ELEV - LOBBY / COMMONS

CLASSROOM 154 B1 SCALE: 1/4" = 1'-0"

C

B

A

A13.6

NOT FOR CONSTRUCTION

13


221C 221D

STUDENT LOUNGE STUDENT LOUNGE

CARPET TILE CARPET TILE

WB-1 WB-1

GWB-AR, CMU CMU, GWB -

SEE ELEV. -

WALL CMU CMU

221E

VESTIBULE

CMU, PRECAST

PT-1

VESTIBULE

WB-1

CURTAIN WALL

-

222 223 224 225A

CLASSROOM CLASSROOM TEAM SCIENCE CLASSROOM

WALK-OFF CARPET TILE WALK-OFF CARPET TILE CARPET TILE CARPET TILE CARPET TILE CARPET, VCT

WB-1

221S

-

PRECAST CMU CMU CMU, PRECAST

225B 226 226E 226J

SCIENCE STOR. CORRIDOR ELECTRICAL JANITOR

VCT VCT CONCRETE CONCRETE

WB-1 -

226M

RESTROOM

PORCELAIN TILE

226W

RESTROOM

227 228 229 230 231 231A 231B 231C 231D 231E 232 233 234 235

CMU CMU

SEE ELEV. PT-1

CMU CMU

CURTAIN WALL

SEE ELEV. PT-1, PT-2, SEE ELEV. -

CMU, PRECAST

PT-1

CURTAIN WALL

-

CMU

PT-1

CURTAIN WALL

-

CMU

PT-1

PT-2 PT-1 PT-1 PT-3

CMU CMU CMU CMU, PRECAST

PT-1 PT-1 PT-1 PT-1

CMU CMU, PRECAST CMU PRECAST

PT-1 PT-2 PT-11 PT-1

PRECAST PRECAST CMU PRECAST, GWB

CMU CMU CMU CMU

PT-1 PT-1 PT-1 PT-1

CMU CMU CMU CMU

PT-1 PT-1 PT-1 PT-1

CMU CMU PRECAST PRECAST

PT-1 PT-1 PT-1 PT-1

WB-2

CMU, CBB

T-1, PT-1

CMU, CBB

T-1, PT-1

CMU, CBB

T-1, PT-1

PORCELAIN TILE

WB-2

CMU, CBB

T-1, PT-1

CBB

T-3

CMU, CBB

T-1, PT-1

CLASSROOM CLASSROOM TEAM CLASSROOM MULTIPURPOSE

CARPET TILE CARPET TILE CARPET TILE CARPET TILE WOOD

WB-4

CMU CMU CMU CMU, PRECAST PRECAST

PT-1 PT-1 PT-1 PT-1 PT-1

PT-1 PT-3 PT-1 PT-2 PT-1

CARPET TILE CONCRETE CONCRETE CONCRETE CONCRETE VCT CONCRETE CARPET TILE PLYRON PANELS CONCRETE

WB-4 WB-4

CMU CMU CMU CMU CMU CMU, PRECAST PRECAST PRECAST CMU

PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-14

PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-14

PRECAST PRECAST CMU, PRECAST PRECAST PRECAST, CMU, GWB PRECAST PRECAST PRECAST PRECAST PRECAST CMU, PRECAST CMU CMU PRECAST

PT-1 PT-1 PT-1 PT-1 PT-1

PE OFFICE GYM STOR A/V CART STOR. STOR. CLO. ELEC. CLO. CORRIDOR STORAGE OFFICE STAGE

CMU CMU CMU PRECAST PRECAST, CMU, GWB CMU PRECAST PRECAST CMU CMU CMU PRECAST CMU PRECAST

PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-14

CMU

PT-1

CMU

PT-1

235E ELECT. CMU PT-1 Commons Countertop Graphic Design

SEE ELEV. PT-2

SEE INTERIOR ELEVATIONS FOR PAINT LOCATIONS. SEE INTERIOR ELEVATIONS FOR PAINT LOCATIONS.

PT-1 PT-1 PT-1 PT-1 (PIPES ABOVE CABINETS AND WALL PRECAST PT-1 CMU PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. CMU, PRECAST PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. ALL WALL & CEILING PAINT TO BE EPOXY. CBB T-3 3'-4"' HIGH TILE + CBB OVER WALL MATERIAL ON ALL WALLS EXCEPT PLUMBING WALL. SEE INTERIOR ELEVATIONS. STACKED TILE PER ELEVATIONS. ALL WALL & CEILING PAINT TO BE EPOXY. PLUMBING WALL TO HAVE TILE FROM FLOOR TO CEILING. CMU, CBB T-1, PT-1 3'-4"' HIGH TILE + CBB OVER WALL MATERIAL ON ALL WALLS EXCEPT PLUMBING WALL. SEE INTERIOR ELEVATIONS. STACKED TILE PER ELEVATIONS. ALL WALL & CEILING PAINT TO BE EPOXY. PLUMBING WALL TO HAVE TILE FROM FLOOR TO CEILING. CMU PT-3 CMU PT-1 CMU PT-5 CMU PT-1 PRECAST, CMU, PT-1 PAINT ALL EXPOSED MEP WORK. PAINT TO MATCH WALL COLOR FINISH. GWB PRECAST PT-1 CMU PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. CMU PT-1 CMU PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. GWB PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. CMU, PRECAST PT-1 PAINT HANDRAIL PT-14 CMU PT-1 SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS. CMU PT-1 PRECAST PT-14 PAINT EXPOSED DUCTWORK, CONDUIT, AND PLUMBING WITH PT-14. PRECAST

PT-1

SEE SPECIFICATIONS FOR FLOOR HARDENER/DENSIFIERS AND SEALERS.

WALL PROTECTION-1

PRECAST SEALANT JOINT WITH BACKER ROD

PRECAST SEALANT JOINT WITH BACKER ROD

PRECAST CONCRETE PANEL RESILIENT WALL BASE

FLOOR FINISH, REFER TO ROOM FINISH SCHEDULE

FLOOR FINISH, REFER TO ROOM FINISH SCHEDULE

SCALE: 3" = 1'-0"

WALL PROTECTION-1

PRECAST CONCRETE PANEL

GROUT VOID.

PRECAST JOINT WITH FLOOR FINISH AND C3 WALL BASE, TYP. DETAIL

INSIDE CORNER TRIM

OUTSIDE CORNER TRIM WALL PROTECTION-1

PRECAST JOINT WITH FLOOR FINISH, TYP. B3 DETAIL SCALE: 3" = 1'-0"

PROTECTIVE WALL GRAPHIC CORNER TRIM A3 SCALE: 3" = 1'-0"

NOT FOR CONSTRUCTION

Interior Details 14


IKM-Manning CSD

K-12 Education Addition & Renovation PROJECT ABSTRACT With three schools in three separate towns, IKM-Manning reached out to 10Fold Architecture + Engineering to assist with designing an addition to their current junior high school that could assist the school to transitioning to one building for all academic levels. This addition included a new gymnasium, locker rooms, commons space for students to us and flexible teaching spaces, and two new classrooms focused in STEM. This project overcame many design challenges through teamwork and determination. As a part of this project, I was able to assist with designing the gym flooring, specifying finishes, finding acoustic solutions, creating interior graphics, completing interior renderings, interior details, and working alongside the project team to complete construction documents.

Project by 16


NOT FOR CONSTRUCTION

17


NOT FOR CONSTRUCTION

18


Spark Classroom

Fire Classroom

NOT FOR CONSTRUCTION

19


NOT FOR CONSTRUCTION

20


Natural Habitat

Youth Shelter Services Renovation & New Construction PROJECT ABSTRACT Homelessness has been a systematic problem that has been a part of our society for a very long time. For this project, we will be addressing the homeless youth population (18 and under) and how we can use evidence-based design and environmental theories to design non-congregate housing for these individuals. Our goal for this project was to immerse these young individuals in shelters that are inconspicuous and provide a sense of normalcy and for all of their many needs.

Group Project with Aditi Vaidya, Alex Marquez, Amber Troutman, Elly Smith 22


DEFINITION OF HOMELESSNESS:

Homelessness for youth is much more than just living on the streets or in shelters. In fact,many homeless shelters won’t accept unaccompanied minors, unless they are a Family and Youth Services Bureau funded shelter. The definition of homelessness also includes couch surfing or doubling up with friends or relatives. -RHY National Clearinghouse

Polk County-

In 2023, Des Moines Public Schools made a statement that they currently have 1,027 homeless students that have been identified. “We’ve had an additional 140 students identified since January 1, 2023.” - Who13 In 2019 in Polk county there were 53 homeless youth, 7 of those 53 were unsheltered.

NON - CONGREGATE HOUSING

When designing for youth and minors that struggle with housing insecurity, we want to provide an established home environment that they can feel comfortable and secure in. As a team, we have selected 2-3 homes that will be adapted to provide for the needs of all users and give them as place to call “home”. This is the ideal option for our specific demographic, as these individuals will be dealing with other life changes and will not have their needs met in a congregate shelter. Exterior Garden View 23


MAP OF DES MOINES HOUSES

PARKS

SCHOOLS

MEDICAL CENTERS

LIBRARIES

AFTER SCHOOL YOUTH RESOURCES

SITE REQUIREMENTS: • Nearby Public Parks & Green Spaces • No major roads easily accessible • Nearby Public Amenities • Libraries • Medical Centers • Childcare Facilities/ Safe Spaces • Easy access to education 24


THE GROVE - 1534 9th St, Des Moines, IA 50314 Middle School Students

4 Single Rooms

4 Double Rooms

Designated spaces for various services Exterior View BEDROOMS

KITCHEN / LIVING

SERVICES WORK / MULTIPURPOSE UP

DN

DN

BATHROOMS UP

25


“Recent estimates indicate that 1 in 10 young adults age 18 to 25 and at least one in 30 adolescents age 13 to 17 experience some form of homelessness unaccompanied by a parent or guardian over the course of a year. There are at least 700,000 homeless young people in the United States, affecting about 3 percent of households with 13- to 17-year-olds. Many of these young people don’t match the traditional idea of what “homelessness” looks like. Many of them go to school or work, participate in community activities, and enjoy social lives with friends who have safe, dependable places to sleep every night.”

In-House Medical Care

- National Clearing on Homeless Youth & Families

Hand Sketch of ‘Homeless Jesus’ statue in Seattle, WA

Shared Bedroom 26


THE COTTAGE - 2801 Cottage Grove Ave, Des Moines, Iowa 50311 High School Students

4 Single Rooms

4 Double Rooms

Designated spaces for various services Shared Bedroom OUTDOOR SPACE

BEDROOMS

LIVING/OFFICE

UP DN

KITCHEN/DINING

BATHROOMS

27


Exterior View

Site Plan Biophilic design is a concept used within the building industry to increase occupant connectivity to the natural environment through the use of direct nature, indirect nature, and space and place conditions. Studies have shown evidence of positive benefits of human interaction with nature, such as improved productivity, lower levels of stress, enhanced learning and even improved recovery rates following illness. - Planteria Group

Living Room 28


Nurturing Growth

New Inclusive Care Community New Construction PROJECT ABSTRACT For this project, our goal was to design a safe and inviting environment for individuals with Autism Spectrum Disorder (ASD). The spaces we designed emphasize harmony through engagement with the environment and users. We wanted the users to unite with their spaces and be comfortable to be themselves without judgment. Our design is also immersive, allowing the users to be completely connected with the environment. Our other goal we had for this environment was to create a place users could be autonomous and independent. Overall, we wanted to ensure that the users of the space could always feel comfortable and have a space to call their own.

Immersive Harmonious Private Transition

Public

Autonomous

Group Project with Laura Sauceda 30


CONCEPT For this project, we will be designing a safe and inviting environment for individuals with Autism Spectrum Disorder (ASD). The spaces we design will emphasize harmony through engagement with the environment and users. We want the users to unite with their spaces and be comfortable to be themselves without judgment. Our design will also be immersive allowing the users to be completely connected with the environment. Our other goal we have for this environment is to create a place users can be autonomous and independent. Overall, we want to ensure that the users of the space can feel comfortable and have a space to call their own.

Common Living Area

Floor plan 31


MATERIALITY

Single Bedroom 32


Highland Rise

Continuing Care Retirement Community Renovation PROJECT ABSTRACT The goal for this project is to design a Continuing Care Retirement Community (CCRC) that meets the needs of independent living, assisted living, long-term care residents, and care providers. As designers, we strive to provide a comfortable and inviting place for all users while promoting independence and an exciting new chapter of their lives.

TIMELESS

MOVEMENT

The community everyone wants to be a part of; not has to be a part of.

CLASSIC

ADVENTURE

Group Project with Reece Suter & Patrick Curry 34


Fourth Level

The goal for this project is to create a CCRC that satisfies the needs of the residents, staff, and guests. We strive to provide a comfortable and inviting place while promoting independence and an active lifestyle. We draw inspiration from our keywords: timeless, movement, classic, and adventure to present an exciting new chapter for residents. The spaces will be bright with vibrant colors that emphasize color contrast. While focusing on inclusivity and accessibility, we will incorporate appropriate furniture to fulfill everyone’s needs while still keeping a familiar sense of home.

UP

UP

Third Level

CONCEPT

UP

UP

Assisted Living Independent Living Wellness Common Spaces

Second Level

UP

UP

UP

Support/ Back of House

UP

Administration

UP

First Level

UP

UP

Lower Level

UP

DECEASED STORAGE 4121 632 SF

UP

UP

Vertical Diagram 35


Site Plan

Lobby & Reception Perspective View

Bar Perspective View 36


First Level- Common Area Floor Plan

8

9 11

7

13 6

1 Vestibule 2 Lobby/ Reception 3 Community Room 4 Community Room Storage 5 Unisex Bathroom 6 Mother’s Room 7 Mail room 8 Salon 9 Store 10 Coffee Bar 11 Bistro Kitchen & Storage 12 Bistro/ Cafe 13 Gathering Lounge

12

10

15

5

3

14

21

16

w. Fireplace

17 20

20

17

UP

UP

UP

2

14 Movie Theater 15 Hobby Room 16 Covid Visiting Room 17 Prayer Rooms 18 Chapel 19 Mech & Storage 20 Public Restrooms 21 Cart Storage

19 18

4

UP

UP

UP

UP

1

UP

UP

UP

UP

UP

DECEASED STORAGE 4121 632 SF

UP

37


Second Level- Common Area Floor Plan Open to Below

22 Restaurant 23 Main Kitchen 24 Warming Kitchen 25 Independent Living Dining 26 Meeting Space/ Classroom 27 Open Lounge 28 Private Dining 29 Greenhouse 30 Bar 31 Hobby Room 32 Activity Room 33 Library 34 Billiards/ Game Room 35 Guest Suite(s) 36 Mechanical/ Storage 37 Public Restrooms

Open to Below

27

27 29

26

28

32

31 30 33

25

34

24

22 23

37

36

37

34 35

35

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

38


Horizon Apartment Floor plan

Dawn Apartment Floor plan


40


Additional Experience Interior Design Internship

Over the summer of 2021, I completed an interior design internship with the architectural firm, ETHOS Design Group. Previously, I had interned with ETHOS in high school and was familiar with their people and processes which allowed for me to grow as a stronger designer this summer. During my internship, I worked with both interior designers and architects assisting on many different projects from worship centers to government buildings. During my internship I was also able to attend client meetings, create project renderings, select interior finishes as well as assist with finish schedules/plans and picking up red lines on construction documents within Revit. After returning from my study abroad in Rome for Fall of 2021, I continued my internship with ETHOS until August 2022 and was able to expand my experience and work on finish plans, schedules, and many other documents for real projects and clients.

Waukee United Methodist Church

Project by ETHOS Design Group 42


Pleasant Hill City Hall Renovations

NOT FOR CONSTRUCTION

43


NOT FOR CONSTRUCTION

Project by ETHOS Design Group

44


Creative Work

46


47


48


THANK YOU ambertroutman.91@gmail.com 515.985.8398


Turn static files into dynamic content formats.