Skip to main content

AMANDA BONETTI | PORTFOLIO

Page 1

PORTFOLIO AMANDA BONETTI


CONTENTS

INTERIORS

SPORTS

OTHER FACILITIES


INTERIORS AMANDA BONETTI


INTERIORS Name Zen Type Profissional Year 2019 Location Florianรณpolis, Brazil

First concept model |Render Images

Final concept model | Sketchup model

Executive project


INTERIORS Name Matertris Type Contest Year 2018 Location Florianรณpolis, Brazil Colaboration with Manuela F. Bueno Mayara Klein

AMC Construtora a well known engeneeing firm in the big Floriannรณpolis area, promoted a contest for young architects and interior designers. The finilists had their projects exposed on the opening showroom hosted by AMC.

Balcony

Dinning

Home Office

Kitchen


Render imagines

INTERIORS Name Roof Top Type Professional Year 2018 Location Florianรณpolis, Brazil Colaboration with Marchetti Bonetti+

Brain storm


SPORTS

AMANDA BONETTI


SPORTS

roof revested with solar panels and rainwater harvest

wood structure | sustainable timber

Project Swimming complex university project

tribune| capacity 3.000 people

precast tribune structure

Year 2015

olympic pools| swimming and ornamental jump

Location Florianรณpolis, Brazil

ORNAMENTAL JUMP TOWER

OLYMPIC POOL 3.000 TRIBUNE

FACILITY OPEN TO COMUNITY USES

0

5 10

SERVICES

15


SPORTS Project Training and Rehab Center Final thesis Year 2017 swimming pool section

swimming pool

simming pool south facade

recovery center

gym

Location plan

administration building

Location Florianópolis, Brazil

Since the 1920’s the area was being used as a runway for the Air France Company airmail. The intention was to preserve the neighborhood’s history, keeping the important historical elements and also transform an abandoned area in a facility which could be used for all. To that end, the main trails were arranged in the same positions of the old runways wich the planes used to land. The project area of 320.000 m² included a green park with native trees and plants, Administration, Gym, Rehab and Swimming buildings, in addition to 5 sports fields for outside activities and trainning, as well as 4 covered sports courts. Because the area has an important history, and classified as comunity and institutional zone, the buildings couldn’t overtake the high of six meters. Therefore the biggest challenge was the swimming pool facility,which as a solution it was “burried“ to respect such regulations. As a standard for the buildings, all had a similar construction metohd, rainwater harvest, solar panels when possible, greenroof and approches to drecrease the ambiental impact caused during construction and use of the area.


OTHER FACILITIES AMANDA BONETTI


restaurant terrace coworking spaces food court gym coworking spaces circulation cafe

OTHER FACILITIES Name Coworking Type Academic Year 2015 Location Florianรณpolis, Brazil

stores

Special features Fotovoltaic solar panels Rain water harvest for secondary uses and gardening Steelframe constuction sytem


OTHER FACILITIES As part of the final thesis project, these three buildings, the Administration, the Gym and the Rehabilitation Center were designed folowing a standard construction method, sustainable resources and historical details. The metalic portals which highlights the entrance of the buildngs, it brings the memory of the old hangars used by Air France in 1920. To reduce energy consume the facilites were projected with ample windows and mobile birses for natural light and also different roof hights for natual ventilation. Since the buildings elevations couldn’t overtake 6 meters height, the area for meetings in the Administration building and the exercises area in the Rehab Center where projected one and a half meters under the ground level.

rehabilitation center gym administration

Administration

Rehabiltation Center

Rehabiltation Center


PROJECT WORK MASTER IN DESIGN, CONSTRUCTION AND MANAGEMENT OF SPORTS INFRASTRUCTURE POLITECNICO DI MILANO AMANDA BONETTI


GREEN STADIUM

Sustainable Examples

Name Green Stadium: Guide Lines for a Sustainable Stadium Type Research

Johan Cuijff Arena

New Camp Nou

Ecopark Stadium

Alianz Arena Riviera

Bankwest Stadium

Aviva Stadium

Mineirão Stadium

Mercedes Benz Stadium

New National Stadium

Nationa Stadium Kaohsiung

Year 2019/2020 Location Milan, Italy Colaboration with Sacha Rafa The project work’s objecive was to create guide lines for the construction and adaptation of sports buildings, with a focus on stadiums that host national and international competitions. The project takes place with research based on norms, practices, certifications and analysis of existing examples. LEED The most updated American LEED evaluation system is in version 4.1, which evaluates the impact in the 69 criteria divided among 11 categories: integrative thinking, energy, water, waste, materials, location and transport, sustainable site, health and human experience , innovation and global context | regional | local. DGNB The German system evaluates each project goes through the same planning, construction, operation, investment / storage / renovation and end of life phases. The project can be evaluated in a specific phase. There are 37 criteria divided into 6 groups: social / cultural, environmental, economic, techniques, processes and place (site), then they are divided between direct and indirect impacts. BREAM The English method includes 9 assessment categories: energy, health and well-being, innovation, land use, materials, management, pollution, transport, waste and water. This strategy includes a series of principles and requirements that characterize an integrated approach to the design, construction, management, certification and assessment of environmental, social and cultural impacts during the life cycle of the built environment.

San Mamés Stadium


Turn static files into dynamic content formats.

Create a flipbook
AMANDA BONETTI | PORTFOLIO by Amanda Bonetti Ricci - Issuu