Selected Works Carlos (Alex) Gomez
Cal Poly Pomona, B.Arch, Class of 2025
Contents Little Tokyo Museum of Japanese Contemporary Art
3-7
House Husaro Case Study and Drawing Set
8-10
College of Environmental Design Library Proposal
11-15
Little Tokyo Japanese Contemporary Art Museum Second Year Design Studio/Fall 2021 Instructor: Noam Saragosti For this project, I was tasked with designing a museum for Japanese contemporary art in the site of Little Tokyo in Downtown Los Angeles. Special considerations were made to integrate the museum into the context of Little Tokyo, and to accommodate the wide variety of art styles seen in Japanese art. Materially, the museum makes use of more neutrally colored concrete and metal, to highlight the shadows produced by the façade and draw focus to the art. Finally, the museum encourages visitors to explore through its wide distribution of public spaces and its gallery arrangements.
Exterior Rendered View 03
Outdoor Sculpture Gallery Render
Top Floor Gallery Space Render
Entry Level Model Photograph
Exterior Model Photograph
04 04
2 1
A
3
B
C
UP
5 DN
2
B
C
FIRST FLOOR PLAN LEGEND: 1. LOBBY 4 2. EXHIBITION 3. BOOKSTORE 4. RESTROOMS 5. CIRCULATION CORE
5
A
B A
DN
UP
2 1
A
B B
A
C
5
A
3
4
UP
5
DN
2
DN
UP B
C
0
FIRST FLOOR PLAN
5
10
20
SCALE: 0’-1/8”=1’ LEGEND: 1. LOBBY 2. EXHIBITION A A
2
3. BOOKSTORE
1
4. RESTROOMS 5. CIRCULATION CORE
3
B
C
SECOND FLOOR PLAN B LEGEND: 1. LOBBY 4 2. EXHIBITION 3. RESTROOMS 4. CIRCULATION CORE
5
UP
A
4
2
B
C
0
FIRST FLOOR PLAN
SCALE: 0’-1/8”=1’ LEGEND: 1. LOBBY
A
5
10
20
DN
2
2. EXHIBITION
A
UP
3. BOOKSTORE
B
1
4. RESTROOMS 5. CIRCULATION CORE
A
4
B
UP
C
FIRST FLOOR PLAN
SCALE: 0’-1/8”=1’ LEGEND:
3
0
5
10
20
05
2
2
6
2
2
2 9
6 2
9
6
5 6
1
2
5 1
3
2
4
1
3 4
1 7
7
6
8
6
8
SECTION A A SECTION
LEGEND: SCALE: 0’-1/8”=1’ 1. LOBBY LEGEND: 2. EXHIBITION 1. LOBBY 2. EXHIBITION 3. BOOKSTORE 3. BOOKSTORE 4. RESTROOMS 4. RESTROOMS 5. CIRCULATION 5. CIRCULATIONCORE CORE SECTION A 6. STAFF/MECHANICAL 6. STAFF/MECHANICAL SCALE: 0’-1/8”=1’ 7. CAFE 7. CAFE LEGEND: 8. AUDITORIUM 8.LOBBY AUDITORIUM 1. 9. CLASSROOM 2. 9.EXHIBITION CLASSROOM 3. BOOKSTORE 4. RESTROOMS
0
0
5
5
10
10
20
20
06
ELEVATION B
ELEVATION B
0
5
10
20
SCALE: 0’-1/8”=1’
ELEVATIONA A ELEVATION
0
5
10
20
SCALE: 0’-1/8”=1’
07
AXONOMETRIC
HOUSE HUSARO CASE STUDY AND DRAWING SET ALEX GOMEZ 61 KELLOG DRIVE POMONA, CA
Building Construction 1/Fall 2021 Instructor: Maria Sviridova
SKYLIGHT
FIXED WINDOW
This project was a case study on the cabin, House Husaro, in Sweden by the architects Tham & Videgård. It served to develop my Revit and model making skills, as I was tasked with creating an architectural drawing set as well as a partial framing model of the cabin. Without access to the cabin’s actual construction diagrams, I conducted research and thoroughly inspected photos to accurately model the house in Revit and create my own set of drawings. HOUSE HUSARO NO. DESCRIPTION DATE 1 MIDTERM SUBMISSION 10/08/2 021 2 FINAL SUBMISSION 11/29/2 021
185 99 VAXHOLM, SWEDEN
PROJECT NUMBER DATE
FINAL 11/29/21
DRAWN BY
A.G.
SCALE
SHEET NAME
AXONOMETRIC VIEW STEEL CLADDING PIER FOUNDATION
SHEET NUMBER
STOREFRONT WINDOWS HARDWOOD FLOORING
G101 08
1
2
ALEX GOMEZ 61 KELLOG DRIVE POMONA, CA
3
4
5
6
7
8 1
45' - 0" 15' - 0"
15' - 0"
9' - 0"
9' - 0"
2
3
4
9' - 0"
5
6
7
8
45' - 0"
15' - 0"
9' - 0"
15' - 0"
9' - 0"
15' - 0"
9' - 0"
A
9' - 0"
15' - 0"
9' - 0"
9' - 0"
9' - 0"
A KITCHEN/DINING
9' - 0"
9' - 0"
101 SLIDING GLASS DOORS
KITCHEN/DINING
101
B
LIGHTS
B
BATHROOM
BATHROOM
UP
1
102
OPEN TO ABOVE
A202
HOUSE HUSARO
D
A202
D LIVING
185 99 VAXHOLM, SWEDEN
102
9' - 0"
9' - 0"
VAULTED CEILING
1
WOODEN STAIRS HARDWOOD FLOORING THROUGHOUT
PLYWOOD FINISH
C 45' - 0"
LIVING
9' - 0"
45' - 0"
C
1
9' - 0"
4' - 7"
9' - 0"
A311
NO. DESCRIPTION DATE 1 MIDTERM SUBMISSION 10/08/2 021 2 FINAL SUBMISSION 11/29/2 021
9' - 0"
103
1
A311
103
1-
1A211 ---
E 9' - 0"
E
FINAL
PROJECT NUMBER STOREFRONT WINDOWS
11/29/21
DATE
9' - 0"
A211 ---
A.G.
DRAWN BY 3/16"
SCALE
1'-0"
F
F 1
SHEET NAME
1
FLOOR PLAN- LEVEL 1
A201
A201
SHEET NUMBER 1 A212
A101: FIRST FLOOR PLAN
ALEX GOMEZ 61 KELLOG DRIVE POMONA, CA
11/29/2021 8:27:55 PM
A101 A103: LEVEL 1 REFLECTED CEILING PLAN
FLOOR PLAN- LEVEL 1 3/16" 1'-0"
REFLECTED CEILING PLAN- LEVEL 1 3/16" 1'-0"
1
1A211 ---
1A211 ---
A
B
C
9' - 0"
9' - 0"
45' - 0"
D
E
9' - 0"
9' - 0"
F
F
9' - 0"
E
D
C
B
A
45' - 0" 9' - 0"
T.O. ROOF 31' - 0 3/4"
SKYLIGHT
9' - 0"
9' - 0"
9' - 0"
9' - 0"
T.O. ROOF 31' - 0 3/4"
STEEL CLADDING ORIENTED STRAND BOARD CEILING FINISH
BEDROOM
202
201
STEEL CLADDING
15' - 6"
15' - 6"
SKYLIGHT
MASTER BEDROOM
2' - 6 3/4"
CEILING VAULTS PLYWOOD SHEATHING
GLASS SLIDING DOOR
LEVEL 2 15' - 6 3/4" EAVE 13' - 0"
NO. DESCRIPTION DATE 1 MIDTERM SUBMISSION 10/08/2 021 2 FINAL SUBMISSION 11/29/2 021
2' - 6 3/4"
GLASS SLIDING DOOR
LEVEL 2 15' - 6 3/4" EAVE 13' - 0"
BATHROOM
LIVING
101
102
HOUSE HUSARO
13' - 0"
103 KITCHEN/DINING
13' - 0"
1
1 A212
185 99 VAXHOLM, SWEDEN
LEVEL 1 0' - 0"
LEVEL 1 0' - 0"
FINAL
PROJECT NUMBER
11/29/21
DATE
A.G.
DRAWN BY SCALE
3/16"
1'-0"
SHEET NAME
SECTION W-E
A202: WEST ELEVATION
A212: WEST-EAST SECTION SHEET NUMBER
09
1
VENTING GAP
EAVE 13' - 0"
ROOF UNDERLAMENT
2X10 RIM BOARD
DOUBLE 2X6 TOP PLATE 2X6 HEADER
EXTERIOR PLYWOOD SHEATHING INTERIOR PLYWOOD SHEATHING BATT INSULATION WEATHER BARRIER FURRING STRIP STEEL PANELING 2X6 BOTTOM PLATE
LEVEL 1 0' - 0"
FLOOR FINISH PLYWOOD SUBFLOOR 2X10 DOUBLE RIM BOARD
T.O. FOUNDATION -1' - 0" VAPOR RETARDER
2X6 SILL PLATE FLASHING
INSECT SCREEN
1/29/2021 8:30:40 PM
ANCHOR BOLT
1/16” SCALE PARTIAL FRAMING MODEL PHOTOGRAPH
B.O. FOUNDATION -4' - 7 3/16"
A401: DETAILED WALL SECTION 1
DETAILED WALL SECTION 1" 1'-0"
10
COLLEGE OF ENVIRONMENTAL DESIGN LIBRARY PROPOSAL
ALEX GOMEZ 61 KELLOG DRIVE POMONA, CA
First Year Design Studio/Spring 2021 Instructor: Alexander Pang
NO. DESCRIPTION 2 FINAL SUBMISSION
DATE 11/29/2 021
HOUSE HUSARO
This project was a proposal for a library on the site of Cal Poly Pomona’s College of Environmental Design. In keeping with Cal Poly’s campus, concrete, glass, and brick were the main materials used. The building’s organization of program draws focus to publicly accessible areas, while affording privacy to archive spaces and offices. Finally, the project reconciles the elevation change between its two entrances with an outdoor ramp, also creating a through condition so as to not disrupt the campus’s existing circulation.
185 99 VAXHOLM, SWEDEN
FINAL
PROJECT NUMBER DATE
11/29/21 A.G.
DRAWN BY SCALE
1"
1'-0"
SHEET NAME
DETAILED WALL SECTION SHEET NUMBER
A401
Exterior Rendered View 11
SITE PLAN
0
45
75
12
C
C
A
A B
B
FIRST FLOOR PLAN
0
or Plan
0
35
Feet 70
10
35
SECOND FLOOR PLAN
0
10
35
Second Floor Plan 1/8”=1’
10
35
Feet 70
13
SECTION A
0
10
25
0
10
25
A
10
25
SOUTH ELEVATION
Feet 50
14
PROGRAM DIAGRAM
Ramps Stairs Elevator
AXONOMETRIC RENDER
CIRCULATION DIAGRAM
Circulation Diagram
15
THANK YOU Carlos (Alex) Gomez 2021-2022 Portfolio
carlosgomez1@cpp.edu https://www.linkedin.com/in/alex-gomez-49769521a