SUMMARY OF ESTIMATES
NB:ALLWORKSSHALLBECARRIEDOUTASPER ARCHITECT'SSPECIFICATIONS ALLWORKSSHALLBECARRIEDOUTASPERAPPROVEDDRAWINGSONLY
NB:ALLWORKSSHALLBECARRIEDOUTASPER ARCHITECT'SSPECIFICATIONS ALLWORKSSHALLBECARRIEDOUTASPERAPPROVEDDRAWINGSONLY
ForallItemsinallSections:Rateshallincludetransportation,loading/unloading,providing/supplying/laying/fixing/installing/ fabricating/testing/commissioning etconsite RateshallalsoincludealltaxessuchasVAT,excise,salestax,octroi,etc
SECTION-I: SitePreparation&Cleaning
Cleaningandclearingthesiteofallrocks,boulders,brick-bats,stone,bushes, shrubs,etccomplete,asdirectedbythearchitectforstartofconstructionactivity
Note:
1)TheitemsgivenbelowshallbeasperSectionA""Earthwork,MetalPacking& SubsurfaceDrainage"ofthespecifications
2)Rateforexcavationshallincludedewateringduringtheexcavationincluding shoring,struttingetcandkeepingitdryduringexcavationandconstruction
3)AllearthworkshallbecarriedoutasperArchitect'sinstructionsandsafety normsasperrelevantIScode Therateshallincludeallscaffoldingandmeasures forcordoningoffareasduringdismantling,providingsignboardsetc
4)Alldebrisandscrapmaterialsfromearthworkshallbecontractorspropertyother thanthatwhichisreusedforback-fillingetc andthisdebrisandscrapmaterials shallberemovedawayfromsiteimmediatelyonhisown Thecontractortogive rebateinratesagainstmaterialsandscrap/debrisfromsuchdismantledwork whichshallbecontractor'sproperty
5)Forallearthworkitems,thecontractorshouldcarefullystackallexcavated materialatsiteaspertheinstructionsoftheConservationArchitect Alldebris associatedwiththeearthworkshouldhoweverbedisposedoffbytheContractor
6)Themeasurementofexcavationshallbetakenincum asperrectangular trenchofbottomwidthofconcretemultipliedbyverticaldepthoffoundationfrom groundeventhoughcontractormighthaveexcavatedwithslopingside/fulllength trenchforhisconviency
Surfaceexcavationandexcavationforretainingwalls,basement,watertanks, effluenttreatmenttanks,etc includingbackfillingofapprovedexcavatedmaterials infoundations, &behindretainingwallsaftercompletionofwaterproofingetc wateringandconsolidating,cartingawaysurplusearth, includingpreparingthe surface (Note:Allbackfilling&spreadingofearthshallbecarriedoutinlayersnot exceeding200mmandcompactedto90%ordinaryproctordrydensity)
Fillinginplinthandinotherplaceswithapprovedmurumbroughtfromoutside, includingwateringconsolidatinginlayersnotexceeding200mmby8-10tonnes
Anti-termitePreconstructionTreatment:(AsperIS:6313Part-III)(Note: Anti-termitetreatmentshallbecarriedoutthroughspecialisedagencyreputedin PestControltreatmentandapprovedbytheArchitect Thecontractortogive10
Providingpost-constructionalanti-termitetreatmentbydrillinginholesatthe junctionsofwallsandflooringandinjectingchemicalemulsion,wallsprayanddoor framestobedrilledandsprayedcompleteusingapprovedchemicalsattherateof 5litersofemulsionconcentrateofonepercentconcentrationofCHLORPYRIFOC 20%EC,ISIapprovedconforming(IS8944),Includingtreatmentofwoodfor
Providingpost-constructionalanti-termitetreatmentbydrillinginholesatthe junctionsofwallsandflooringandinjectingchemicalemulsion,wallsprayanddoor framestobedrilledandsprayedcompleteusingapprovedchemicalsattherateof 5litersofemulsionconcentrateofonepercentconcentrationofCHLORPYRIFOC
ProvidingexhaustiveAntiTermitetreatmenttothewoodenframesbydrilling6mm holesatthefourcornersorasdirectedononesideatdownwardangleof45 degreeatthejunctionofwoodworkandmasonryandinbetweenasinstructedby theengineerattherateof60millimeterofchlorpyrifos20%ECandfillingwith puttyetc
Providing,chasing,inserting/layingDampproofcourse50mmthickM-20cement concretelayerandbitumenusingcementwithapprovedwaterproofingcompound attherateof1Kgper50kgofcementetc
Note:
1)TheitemsgivenbelowshallbeasperSectionB"Concrete-Plain&Reinforced" ofthespecifications
2)ForsmallconcreteonapprovalofConservationArchitect,weighbatched concreteasperdesignmix,inmanuallyormechanicaltypeoperatedweigh batcherdialtypeormechanicaltypeofminimumcapacity650Kgsshallbeused Weighbatchershallbecalibratedregularly
3)Forallmajorconcretepours,Contractorshallusereadymixedconcrete(RMC) ofUnitechPrefabLtd orM/s Larsen&ToubroLtd approvedAgencies Only53 gradecementshallbeusedinRMC Aggregatepropertiesandgradingdesign mix,quantityofsuperplasticiser,settingtime,amountofslumpatthepouringsite shallbegotapprovedbeforeitsuseineachmajorconcreting
4)Concretemixproportionwillbebasedon50kg weightofcementbags deliveredatthemixer
5)TheContractorisentirelyresponsibleforthedesignofconcretemixes The designishowever tobeapprovedbytheArchitect
6)ConcreteM-20/20meansconcretemixM-20gradeusingmaximumsizeof coarseaggregates20mm
7)Shuttering,formwork,centeringshallnotbepaidseparatelyandshallconform toSection-C
8)Curingcompoundmaybepermittedonlyforinaccessiblelocations
9)OnlyRiverSandshouldbeused Washingofsandinrotaryscrewtypewashing machinesisamust
10)RatesshallbeinclusiveofcostofSuperplasticiserofapprovedqualityandof approveddosage
11)Ratesshallbeinclusiveofprovidingpockets,holes,inserts,pipes,etc
12)Mechanicalvibrators,internaland/orexternaltobeused
13)AlldefectiveconcreteifapprovedbyArchitect,shallberepairedbythe contractorathisowncost,usingapprovedepoxymortarorPolymermodified mortarasperManufacturer'sspecifications
14)Therateshallincludethecostofapplying2coatsofpolymerbondingagenton allsurfaceofoldornewconcreteatconstructionjointpriortoconcretingagainst thesame
15)Useoffinesandwithpropergradingisamust
16)Screeningofmetal-IandIIforremovingexcessiveflakyunderandoversize material,stonedustetc isamust
17)Onlyapprovedmouldreleasingagentshouldbeused
18)Cleaningofshutteringplatesbymechanicalbuffingaftereveryuseisamust
19)Allconcretesurfacesshallbeformfinished
20)Whereplasteringisspecified,concretesurfacesarerequiredtobehacked immediatelyaftertheremovalofformworkasdirectedbytheArchitectwherever required Additionalrateshallnotbepaidtocontractorforhacking
21)Contractorshouldmakearrangementfortablevibratorforcastingthecover blocksofrequiredsizeandgrade
22)Rateshallbeinclusiveofprovidingcoverblocks Coverblocksshallbemade ofthesamegradeofconcreteofstructuralmemberinwhichtheblocksaretobe used
23)Alljointsinshutteringshallbesealedbyuseof5mmthickcompressible materialgasketsandfixingagent
24)Constructionjointshallbeminimuminnumbersandtheirlocationshallbe approvedbytheConsultant Constructionjointsshallbetreatedproperlywith bondingcoatofapprovedmaterialtobeappliedattheoldconcretebefore commencingthefreshconcretingoperations
25)Informfinishsurfacesthepatternstobeprovidedfortheformworkshallbeas perarchitectssuggestions
26)Allsack-rubbedsurfaceshallbesackrubbedwithwhitecementofsuggested proportionasperArchitectsapproval
27)Allconcealeditemslikeconduits,junctionboxes,fixturesetc shallbelocated asperdetailsandlocationstobeapprovedbeforecasting
NotesforFormwork:
Note:1)TheitemsgivenbelowshallbeasperSectionC:'Formwork'ofthe specifications
2)ContractorshouldsubmitfortheConsultant'sapprovaldesignanddrawingfor allformworkshowingsizesofmemberincludingpropsanditsfoundation consideringRMCbypumping
3)Amockupofformworkforcolumns,typicalcolumn-beamjunction,beams shouldbemadeandonlyafterobtainingapprovalofthemockup thecontractor willbeallowedtoproceedwiththework
4)Allsurfacesofconcreteelementsshallnotbetreatedinanywayunless otherwiseinstructed
5)Allconcretesurfacesshallhavesmoothandevenfinishoriginallybythemselves withoutanyfinishingorrendering IncasetheArchitectisnotsatisfiedwiththe finishobtained,remedialmeasuresforimprovingthemshallbecarriedoutbythe Contractorathiscost
6)Ratesquotedshallbeinclusiveofallformworkatalllevels
7)Rateshallincludeuseof5mmthickcompressiblegasketmaterials,fixingagent, adhesivetapeandmechanicalbuffingofshutteringplates
8)Onlyapprovedmouldreleaseagentshouldbeused
9)Manual/mechanicalcleaningofshutterplatesaftereveryuseisamust
10)Therateshallincludehackingofconcretesurfacerequiredtobeplastered immediatelyafterremovalofformwork
11)Onlynewsteelandplywoodshutteringshallbepermittedforitsfirstuseatsite anditsnumberofuseswillbesolelywithdiscretionofArchitect
12)Providingcutouts,holes,slits,depressionetc forelectricalfixturesshallnotbe paidseparately
13)Sizeofthepanelsusedforexposedconcretefinishareasshallbeapprovedby theArchitect
14)Thesupportingsystemforplatformdoorshallbehavingselfalignmentdevices toensureperfectlineandlevel,andverticalityoftheshuttering,stagingtoachieve requireddegreeofperfection
15)Forquickerectionofshutteringandstagingthesystemshouldhavesuitable arrangementformovingentiresetintransverseaswellasinlongitudinaldirections andrails/wheelsonanysuitablearrangementwhichwillbeapprovedbythe consultant
ProvidingandlayingConcreteM20/40usingRMCforall ,plinthbeams,foundations,etc includingsideformsifrequired Therateshall beinclusiveofalltaxes,towardsplants&machinery,labour,allleads&lifts,all floorsallchargesrequiredincludingtransportation,centering,formwork, compacting,rougheningthesurfaceifspecialfinishistobeprovidedandcuring
ProvidingandlayingconcreteM25/20usingRMCforfloorslabongradeincluding finishingthesurfacesmoothetccomplete Therateshallbeinclusiveofalltaxes towardsplant&machinery,labour,allleads&lifts,allfloorsallchargesrequired includingtransportation,shuttering,centering,formworkasperconditionbelow, etc
Providing&layingM30/20,usingRMCforRCCincludingpumpingforfoundation, pilecaps,raftslab,column,walls,shearwalls,boxcolumn,retainingwalls,plinth beams floorbeams invertedbeams slabs staircase droppardis chajja parapets,pergolas,trenchslabandbeamsinstructuralfloors,loftslabsatall levels,lintelbeams/verticalstiffenersetcincludingRCCundergroundwatertanks, septictanks,effluenttreatmenttanks,overheadwatertanksetccomplete Therate shallbeinclusiveofalltaxes,towardsplants&machinery,labour,allleads&lifts, allfloorsallchargesrequiredincludingtransportation,shuttering,centering, formworkasperconditionsbelowetc
Providing&layingConcreteM20/40,usingRMC,inalternatebaysfor75MM plinthprotectionandpavingincludingcompacting,vibrating,curing,finishingto correctline&levelwiththeuseofwoodenbottomandsurfacefinallyfinishedwith broomsasdirectedbyArchitect Jointsofandasprovidedinalternatebaysshall befilledwithbitumenetc
ProvidingandconstructingRCCundergroundwatertankincludingexcavationinall typesofsoil,refillinginsidesoftank,trimming,dressing,leveling,stackingand disposalofsurplussoilandincluding:
i)Rubblesoling230thk
ii)PCC,M20/30belowraft
iii)M-25/20RCCworkinraftslabs,sumpbase,beams,RCCwalls,columns,top slabsetc includingunwrotshutteringtoRCwallsatalllevels
iv)TMTreinforcement
v)Waterproofcementplastertoinsideofwatertanks
vi)BoxtypewaterproofingtreatmentforraftandwallsofUGtank
vii)Patentedcementbasedwaterproofingtreatmenttotopofslabs
viii)50mm thk IPStoraftslab
ix)Providingandfixingcastironmanholecovers2nos 600mmdia withlocking arrangements
x)PVCwaterstop150mmdia;embeddedintakeandoutletpipesetc
UGtankcapacity
Providing,erecting,fixingandcommissioningSintexorapprovedequivalent doublelayeredtanksonoverheadelevatedpedestalasdirectedincluding scaffoldingallalliedplumbing,valves,stopcocks,MCGMcertifiedwatertankcap, includingcleaningetc
ThisitemisworkedoutbytheStructuralConsultant
Notes:
Forthepurposeofthiscourseanapproximateamountisbudgeted
1)TheitemsgivenbelowshallbeasperSectionD:'Reinforcement'ofthe specifications
2)CoverblocksshallbeofgoodqualityconcreteM30/10andshallbevibratedon atablevibratortoreducethepermeability
3)Whereverweldingofreinforcementisspecified,thesameshallbecarriedout conformingtoIS:9417orIS:2751 Weldingshallbecarriedoutbyapproved qualifiedweldersonly Onepercenttestingofweldsshallbecarriedforalltypesof welds
4)Overweightofthesteelshallnotbeconsideredforcalculatingconsumptionand paymentpurpose,IS constantforweightofdifferentdia ofbarsshallbe consideredforpaymentaswellasconsumptionpurpose
5)Columnreinforcementbarsarerequiredtobelappedinthemiddleportionof columnsasperIS13920 Properarrangementshallbemadetosupport reinforcementprojectingabovefloorlevel Similarlylapswithinadistanceof2D (depthofbeam)or1/4spanfromthefaceofthecolumnarenotallowed The overhangingbarsshouldbeproperlysupported Thecostoftheseworksis deemedtohavebeenincludedintherate
ProvidingandfixinginpositionmildsteelreinforcementofTATA/Vizag/SailSteel ofvariousdiametersforRCC piles,pilecaps,footings,foundations,slabs,beams, columns,canopies,staircases,dowels,chajjas,lintels,pardis,copings,fins,arches etc asperthedetaileddesigns,drawingsandschedulesincludingcutting,
ThisitemisworkedoutbytheStructuralConsultant
Forthepurposeofthiscourseanapproximateamountisbudgeted
Providing,fabricating,erectingandfixingatalllevelsstructuralsteelofTATA/ Vizag/SailSteelinalltypesofmembersforColumns,Beams,TrussRafter, Canopies,roofcovers,purlinforroofs,lofts,mezzanines,storageracksforparaffin boxes,portals,braces,underpinning,shoring,frames,workforallstructuraland otherpurposes includingcuttingedgestotherequiredprofile bolting welding anchorfastening,riveting,groutingetc completeinallrespects,includingepoxy
Supplyingpaintingandothermaterialsandlabourrequiredforpaintingofstructural steelasdetailedbelow:
i) Surfacepreparation:
Mechanicalcleaning,removinglooserust/scaleusinghardtools,powertools,use ofaromaticsolventstoremovesoil/greasepresentandtoensureacleananddry surfacebeforepriming
ii) Primer:
SinglecoatofEpoxyresinandzincphosphateoftotaldryfilmthicknessof25 microns
iii) Finish-Coat1:
Singlecoatofhighbuildchlorinatedrubbermediumwithmicaceousironoxideof totaldryfilmthickness of75microns
iv)FinishCoat2&3:
Twocoatsofplasticchlorinatedrubbermediumsuitablypigmentedof25microns dryfilmthickeach TotalDFTofpaintsystemshallnotbelessthan200micron
Providing,fabricating&fixinginpositionRSandCRsteelsectionscompoundgate asperdesignwithMSquadranttracksandguidewheelsandallotherfixing accessoriesasspecified&directed,weighing50kgpersqm andpaintedwithtwo coatsofEpoxypaintandtwocoatsofEnamelpaintandcompletewithpivot aldropsetc
Providingfabricating,erectingandfixingSquareHollowor Sections/Round HolloworsolidSections,foranysizeandshaperailings,withorwithoutperforated sheets,asperdetaileddrawingsanddesignincludingnecessaryanchoring, includingcleaning,sandblasting,threeormorecoatsofepoxypaintetc complete
Note:
Measurementshallbetakenforcompletelaidroofinsquaremeter Overlapswill notbepaidextra Therateshallincludeallthematerial,labourbolts,nut,washers andtoolsandplantsetc complete
ProvidingandfixingPUFpanelbyKoreaPuffPUFPanelSolutionsforroofing inclusive offixingtostructuralsteelsupportsystemasperdesignand manufacturer'sspecification Thecostshallbeinclusiveofalltaxes Allnecessary scaffolding,craneandaccessoryworktobeusedincarryingouttheworksistobe includedinthecost Thecontractorshallhavetotakeduecareofthesurrounding buildingandseetoitthatthefacadeskinanditselementsarenotdamagedinthe
ThisitemisworkedoutbytheConsultant
Forthepurposeofthiscourseanapproximateamountisbudgeted
Note:
1)Theitemsgivenbelowshallbeasper'MasonryWork'ofthespecifications
2)Rateshouldbeinclusiveofscaffolding,curingandalsodewatering&keeping surfacedryduringconstruction
3)CementformanufacturingconcreteblockstobeprovidedbyContractor
4)Onlyselfsupportingscaffoldingwillbeallowed,noholesinmasonrywouldbe permitted
5)Contractorwillberesponsibleformakinggoodallthesurfacesofbrick/block masonrywallinitsoriginalformwhereverinchasingthewallisdoneforproviding servicelineslikeelectrical,telecommunicationandwatersupplyandplumbingetc
6)Factoryincludingblockmakingmachineformanufacturingofconcreteblocks shallbeapprovedby Architect-in-charge
7)Thecementforblockmasonryshallconfirmtotherequirementofminimum cementrequirementforPCC ofconcretespecifications
8)Requiredquantityofconcreteblocksaretobemanufacturedwithgroovesto accommodatetheconduitpipes/waterpipesetc Thegroovesshouldbestaggered onbothsides
9)Therateforconcreteblockmasonrywallsshallbeinclusiveofproducinghalf blocksandoddsizedblockstosuittheconstruction
10)Mortarsforallmasonryworkshallbemixedinanapprovedmortarmixeror concretemixer
11)Handmixingofmortarwillnotbeallowed
12)Onlyriversandand43gradecementshallbeused
13)Washingofsandinrotaryscrewtypewashingmachinesisamust
14)Bricksusedshallbeoffirstclassandshallbeofregularinshapeandtheir edgesshouldbesharpandshallbefreefromcrack Brickshallbefullysoakedin cleanwaterbysubmerginginatankforaperiodof12hoursimmediatelybefore use
15)Contractorwillberesponsibleformakinggoodallthesurfacesofbrick/block masonrywallinitsoriginalformwhereverinchasingthewallisdoneforproviding servicelineslikeelectrical,telecommunicationandwatersupplyandplumbingetc
200mmx200mmhighx600mmlongsolid concreteAACblocksmasonrywalls
Providingandlaying1:6C:M atalllevelsforexternalwallsincluding makinggroovesforconcealingelectricalconduitsofdiaupto32mmincluding scaffolding,curingetc
Providingandlaying in1:6
C:M aboveplinthoratalllevelsincludingforoddshapedwalls brickfins columns,etc includingstrikingjoints,rakingoutjoints,scaffolding,curingetc complete (Min cementcontent15Bag/cum)
ProvidingandlayingrandomrubblemasonryofbasaltstoneinC:M1:6inretaining walls,foundation,inplinth&superstructure,includingrakingoutjointswhen plasteringtobedone/strikingoutjoints,wateringandscaffoldingetc complete
ProvidingandlayingcoursedrubblemasonryofbasaltstoneinC:M1:6inplinth& superstructure,includingrakingoutjoints,approvedpointing,wateringand scaffoldingetc complete
Providingandfixing stonecopingoverterraceparapethavingdimensions450mm wide100mm thicknessinpiecesof600mmlengthoveramortarbeddingofCM
Notes:
1)Theitemsgivenbelowshallbeasper'Plasteringofthespecifications
2)Scaffoldingforplasteringshallbeofselfsupportingtype Holeswillnotbe allowed,tobemadeinthemasonryorRCCworkforanchoringthescaffolding
3)OnlyRiverSandshouldbeused Howeverwashingofsandinrotaryscrewtype washingmachinesisamust
4)Mortarforplasteringworkshallbemachinemixedinamortarmixerorconcrete mixer Handmixingofmortarwillnotbeallowed
5)Therateforplasteringshallalsoincludeprovidingandmixing/applyingan approvedbondingagentasperdirectionofArchitect-in-charge,andalsoapplying approvedhack-aidonsurfacereceivingplaster
6)Only43gradecementshallbeused
7)Rateshouldbeinclusiveofscaffoldingandcuringshallbestartedassoonas theplasterhashardenedsufficientlynottobedamagedwhenwatered Theplaster shallbekeptwetforatleast10days
Providing12mmthickInternalcementplasterintwocoatsincementmortar1:4 with/withoutneeru,finished smoothforallRCC/brickblockmasonrywork
Providingandapplying18mmthickcementplasterincementmortar1:4 without/withneerufinishedsmooth forRCC/brick/blockmasonrycompleteinall
Providing&applyingacontinuouscementplasterdripmouldofsize50mmwide and15mmthickunderRCCpardi chajjaandaroundwindowopeningsatalllevels
Notes:
1)Theitemsgivenbelowshallbeasper'Paintingofthespecifications
2)ScaffoldingforPaintingshallbeofselfsupportingtype Holeswillnotbe allowed,tobemadeinthemasonryorRCCworkforanchoringthescaffolding
3)ThebrandsofthePaintshallbespecifiedandreadymadepaintofrequired shadeshouldbeused
4)Thesurfaceshallbemadeperfectlysmoothbyrubbingwithsandpaperof differentgrades
5)Allholesandopenjointsshouldbefilledwithstrongputtyorwithamixtureof glueandplasterofparisandsmoothenedbyrubbingwithsandpaper
6)Insteelwork,allscales,dirt,suppliersdeliverymark,oil,greaseetcshallbe removedwithsandpaperbeforepainting Specialcareshallbetakenforcleaning thecorners
7)Eachcoatsshallbeallowedtodryupperfectlybeforethesucceedingcoatis laidoverit
8)Rateshouldbeinclusiveofscaffolding,curingandalsodewatering&keeping surfacedryduringconstruction
Providingandapplying3coatsoveracoatofprimer,ofoilbounddistemperof approvedshadeandofapprovedmakeoverconcrete/plasteredsurfaces includingpreparingofthesurfaces,scaffoldingetc completeinallrespects
Providingandapplyingacrylicemulsionpaintofapprovedquality,finish,colourand shadetooldandnewsurfacesinthreecoatsincludingpreparingthesurfaces, applyingprimer,putty,etc complete
Notes:
1)Theitemsgivenbelowshallbeasper'Flooring'ofthespecifications
2)Atleast6samplesforallfinishingitemsofwork,fromdifferentapproved sourcesshallbesubmittedbeforestartingtheworkforapproval Architectin chargedecisionregardingtheshade,qualityandthesourceisfinal Alllike materialsofflooring,cladding,etctobefromsamebatchasperapprovedsample
3)Rateshallbeinclusiveofallexposedstone/tileedgestobechamfered,hand polishedandmouldedasdirected
4)Ratesforverticalcladdinginstoneofthicknessfrom6mmto25mmshallinclude exposedrightangularcornerjointsfinishedandedgespolishedandmouldedas perArchitect'sinstruction,withcutting6mmgroovesandalsoedgepreparationto suitcornerangles
5)Skirting/dado/cladding,becauseofvaryingheightwillbemeasuredandpaidon squaremetrebasisinsteadofonrunningmetrebasis
6)Therateforflooring/claddingshouldbeinclusiveofbedding/backcoatas specified Thethicknessofmortarbeddingorbackcoatspecifiedisminimum Thisthicknesswillvaryaccordingtothethicknessofflooringorcladdingmaterial soastosuitthespecifiedlevelorline TheContractorshallberesponsiblefor properbondingbetweenbackingcoat&masonryworkorRCCworkandhisrate shallbeinclusiveofprovidingandapplyingapprovedbondingagent
7)Forallverticalcladding,anapprovedchemicaladhesivefortilesasper manufacturer'sinstructionsshallbeusedandtheratesquotedshallbeinclusiveof thecostofthisadhesive,forathickness3mmto4mm
8)Unlessotherwisespecified,allsizestobeinmetricsystem
9)Scaffoldingforexternalcladdingshallbeofselfsupportingtype Holeswillnot beallowedtobemadeinthemasonryorRCCworkforanchoringthescaffolding
10)Therateforverticalcladdingshouldalsoincludetheworkonisolatedcolumns, chamfers,etc
11)Noseparatepaymentwillbemadeforprovidingandfixing,oddsizedtilesof anyshapeandsizetosuitconsultantrequirement
12)White/ColouredcementwithmatchingpigmentsorJohnsonBALgroutwith appropriatecolourshallbeprovidedbyContractorathiscost
13)TheContractorshallprovidesuitablesupportsforsupportingthecladdingtiles andremoveitonlyafterthetileshavefirmlyadheredtoitslocation
14)Edgesofcladdingtilesfixedonthecornersofthecolumnsandwallsshouldbe polishedasperdirectiveofArchitect,orasindicatedinthedrawings
15)Themaximumthicknessofthepastepreparedbyusingtileadhesiveand appliedonthewallandcolumnsurfacesshouldnotbemorethan3mm Contractorshallhavenoextraclaimsonaccountofincreaseinthethicknessofthe pastebeyondmaximumthicknessasspecifiedaboveduetofaultyworkmanshipor anyotherreason
16)Mortarrequiredforbedding/backcoatshallbemixedmechanicallyinmortar mill Onlyriversandshallbeusedinthemortar
17)Allfixtures,electricalpoints,lightsetctobealightedwithtiling,groovesand pattern,flushwiththewallfaceasperdetailsanddrawings Amockupforthe sameshallbegotapprovedfromArchitect
18)Thecontractorsarerequiredtostudydrawingscarefullytounderstandfixing detailsofflooring,skirting,claddingetc,tokeeprequiredgroovesbetweendifferent finishesatdoorandwindowlocationsflooringandskirtingjunction,wallandceiling junctionetctomatchflushlinei e verticalplaneofwallandskirtingetc
19)Rateshallbeinclusiveofcostofscaffolding,grouting,curing,finalpolishingby non-slipwaxpolishandcleaningofsurfacesandalsodewatering&keeping surfacedryduringconstruction
20)Asample/mockupofflooring,cladding,etctobegotapprovedfrom,Architect
21)Alladditionalgroovestobeprovidedinvertical,horizontalanddirectionas shownindetaileddrawingsorasdirected
22)Tomakewallcladdingsurfaceandskirtingsurfaceflush,wallatskirtinglevel shallberequiredtorecessinsideasperfixingdetails Thenecessaryrecessesin RCCwalletcshallbetakenatthetimeofconstructionitself
23)Only43gradecementshallbeused
Providingandlaying40mmthickIndianPatentedStoneflooringincementmortar, includingprovidingjointsandgroovesasdirected,inpatchesorinlargerareas withpropercuringetc
kotah stoneflooring forclassroomand coridoor
Providingandlaying25thickhandcutandmirrormachinepolishedgreen square600mmx600mmfinishedsize andofapprovedcolourandshadeinsmallerpatchesforrepairorin largerareasincluding20mmthick1:2limemortarbeddingor1:6cementmortar bedding,tobecompactedproperlybysuitablemethodasapprovedbythe Architect beforelayingKotahstoneinposition Jointsfinishedwithneatcement slurry,widthofjointshallbebetween10mmto150mmlayingasperdesign, including3coatsofmachinepolishingafterlaying,curing,cleaningcompleteas directed
Sameasitemk2abovebutforrisersandtreadswithmouldingfornosing,antiskid groovesetc
k5
-Do-sameasinitemNok2abovebutforskirting/dadoofheightbetween100mm to2000mm,mirrorpolishedandmachinecut20mmthickkotahstone,andsizeto matchthejointsinflooring,etccomplete
k6* anti-skidvitrifiedtilesof300mmx300mm toiletblocks
Providinganffixing and10mm thickness(Santron)greycolourfor asdirectedincluding15mmthick backingcoatplastering1:4cementmortar,fixingwithadhesivesasspecified,joints filledwithwhitecementpasteorofapprovedcolourgroutingmaterialsincluding curing,scaffoldingetc complete (Overalltilevariationallowance+10mm)(Base
CobblestonePaving
Providing&layinggranitecobblestonefloor(BasantBetonorequivalentapproved make)withstonesizevaryingfrom100x100mmto150mmx150mmlaidasper approvedfan,circularorotherpatternandcolour,onA75mmthkPCCbedM:10, layingblockstotherequiredslope,leveling,filling,cleaningthesurfaceetcwithall labourandtransportationtositeandasperdirectionsoftheSite Architect
50mmthkforpedestrianwalkways:
i)Singlelinedressed
ii)Threelinedressed75mmthkfortreesurrounds(Areaofcentralcutouttobe excluded):
TOTALOFSUBSECTION-K M DOORS,WINDOWSANDPARTITIONS
Notes:
1)CarpentryandJoinery,Timber,Steelcasement,AluminumDoorsWindows, skylightsopenable,slidingwindows,rollingshuttersandpolycarbonatesheet, curtainwalls,etc
2)Forallaluminumworks,thecontractorshallsubmitshopdrawingforeachitem ofworkindicatingthesectionofaluminum,itsweightandjoinerydetailandtotal weightofwindow/door/partitionwallsetc Whereverpossiblerivetingshallbe resortedtoforconnection Alternativelyhotdippedgalvanizedpinheadedsheet metal/brass,screwscouldbeused Nomildsteelwithouthotdippedgalvanizing shallbeusedforanyfastenings,etc
3)TheratesshallnotbepaidseparatelyforAluminumsectionsusedonweight basis
4) Therateshallbeinclusiveofproviding&fixingglasspanelsincludescostofall typesoffixturesandfasteningsmadeofanymaterials,neoprenerubbergaskets, screws,etc
5)Contractorshallsubmitsamplesofassemblysectionsfromdifferent manufacturer'sforapproval Architectdecisionshallbefinal
6)Alljointsbetweencivilworkandaluminumframesshallbesealedandmadeair tightbyapplyingSiliconesealantorequivalentasapprovedatContractor'scost
7)Ratesforrepairsaswellasprovidingandfixingofnewdoors,windows,sky light,rollingshutters,etc inthissectionshallbeinclusiveofalltheitemsof hardware/fittingsandnoextrashallbepaidtothecontractortowardsthecostof hardware/fittings
8)AllHardwareshouldbeaspersamplesapprovedbyArchitect Providingand fixingfollowinghardwareitemsinoxidizedbrass(unlessotherwisestated) including,fixingwithappropriatescrewsandfastenersinbrass/stainlesssteel metalscrews(Nettlefoldorequivalent)whereverspecifiedetcofapprovedmake typeandthickness:
9)Providingandfixingthehardwarecompleteinallrespectswithnecessarypins, plates,screwsetc(Allfittings&fixturesshallbeofHeavydutybrassoffirstquality)
10)Allhardwareandhingesshallbeofpalladiumorapprovedequivalentbrand,all otherhardwareshallbeofDormaorapprovedequivalentbrand
11)Hinges:Railwaytypeheavydutyhingesinbrassoxidizedwithstainlesssteel pinsofdiameternotlessthan4mmandleafthicknessnotlessthan4mm(125mm x65mmx4mmto300mmx65mmx4mm)
12)Hinges:Parliamentarytypeheavydutyhinges5mmthickbrassoxidized
13)Towerboltshavingboltdiaof10mminbrassoxidized,inbrassbody600mm longetccomplete
14)Doorhandles 'Dorma'TGDI35025Spullhandle,25mmdia,350mmlongor 'DORMA'TG9155ormatchingwithexistinghandleasspecifiedandapprovedby theArchitect
15)BrassoxidizedBabylatches 75mmlongwith25mmx8mmthickboltcomplete withknob,Vacant/Engagedetcasperapprovedsamples Brassaldropsshall matchexistingoriginalaldropsinthebuildingandshallbereusedorfabricatedto matchtheoriginal
16)ConcealedtypehydraulicdoorcloseroropendoorcloserofDormaor equivalentbrandwithDormadoorstopper,springloadedwithrubberbushandfoot release
17)PlainMorticelocks6leversLatchBoltofGodrejmakeequivalentwithbrass bodyandchromeplatedflatplatetoedgeofdoorincludingfixingtotimberor aluminiumshutterframesetccomplete
18)Sameasaboveitem(16)butwithdeadlock
19) 3mmthickSSkick/pushplatefixedwithSSscrewsof150-400mmdepth (CP brassdomicalhead)
20) Doorbufferwithrubber/PVCbushshutterorwallmounted
21)Providingandfixing andrepairrateswillalsobeinclusivealdrops,handles stopperetc allcomplete
D1-Providingandfixingteakwooddoorframesalongtheedge,sunmicaboard doorofthickness40mmwithWPCframearound6mmclearfloatglass Wooden
D2-Providingandfixingteakwooddoorframesalongtheedge,plywoodboard doorofthickness40mmwithWPCframearound5mmthicktintedpolycarbonate
D6-Providingandfixing15mmthickplywoodfoldingfullypanelledandsizesas perthedrawingincludingaluminiumframe,foldingmechanism,brassfixturesand fasteningsandfinishingthewoodworkwithonecoatofprimer/polishedas specified Ratealsotoincludeprovidingplain6mmthickModiorAsahifloatglass
D7- ProvidingandfixingteakwooddoorframesalongtheedgeofUPVCdoorsof
W6-Providingandfixinghermeticallysealedglasspanelsusing12mmdryair spaceand6mmcleartemperedglass TheInsulatedglass(DoubleGlazedpanel) shallhaveAluminiumspacersandprimarysealantasPoly-isobutylene(PIB)anda secondarysealwithsiliconsealantofDowcorning983orDLLR982/DLLR3362/ GeneralElectricIGS3204orTremcoProglazeTwocomponentsiliconsealantor
W8-Providingandfixingaluminiumframes(200mmX60mm)along35mmthick WPCfixedverticallouvers(300mmwideand900mlong)
W9-Providingandfixingskylightswith15mmthickclearfloatglassfittedwithin
Notes:
1)Thecontractorwillgivea10yearsguaranteeoftheworkundertakenon Rs100/-Stamppaperontheapprovedformatdulyregistered
2)Tenpercentamountofvalueofworkswillberetainedfortheperiodoffiveyears fromthedateofactualcompletionofthework,willbereleasedprogressivelyat fourpercentaftertwoyearssubjecttoattendinganyrectificationofdefectsand balanceamountsbytheendoffiveyears
3)Allworktobedonethroughspecialistwaterproofingandstructuralrepair agenciesshallbeundertakenonlyontheapprovaloftheArchitect
Providingandapplying70mmto75mmthickproprietarybrandcementbased waterproofing(boxtype)forbottomRCCraftslabandsidesofRCCwallsofwater tanks,septictanks,effluenttreatmenttanks,etc including providingleakproof treatmentby injectiongrouting toconcretemembersat10mcentresinboth directionsandalsoatallconstructionjoints,andprovidingandfixing20mmto 25mmthickroughShahabadstoneorotherapprovedstonetilessetin20mmthick 1:3waterproofcementmortarandfinishingthebylaying/plastering with20-30 mmthickC:Min1:3withwaterproofcompound(Contractortogivecomplete
ProvidingandlayingwaterproofinginWCandbathroomincludingBB cobainall positionconsistingofspecialisedapprovedwaterproofingcompoundandmaterial
Providingandlayingcementbasedwaterproofingtreatmenttoterracewithbricks batslaidinrequiredslopetodrainthewaterforanyspanaftercleaningthe base surfaceapplyingacoat ofcementslurryadmixedwithapprovedwaterproofing compoundandlayingthebrickbatsonbottomlayerinC:M1:5admixedwith approvedwaterproofingcompoundfillinguptohalfdepthofthebrickbats curing thislayerfor3daysapplyingcementslurryoverthislayerjointingofbrickbatswith C:M1:3admixedwithapproved waterproofcompoundandfinallytopfinishingwith average20mmthicklayersofcementmortaraddedwithjutefiberat1kgperbag includingfinishingthesurfacesmoothwithcementslurryadmixedwithapproved
WaterProofingChajja
Providingandapplyingwaterproofingtreatmentoverchajjausingproprietary cementbasedsystemlikeIndiaWaterproofingusingbrickbatsof50mmormetal no2,averagethicknessoftreatment50mm,finishedwithsmoothcementfinish withfalsetilemarks,includingbreaking/removingexistingwaterproofingand cartingawaythedebrisetc
Tilejointfilling
Providingandfillingcementbasedtilejointsealingcompound(JohnsonBalGrout orequivalent)inbath/WC/toilet/flooringtilesincludingrakingoutoldloose jointingmaterial,curingetc
Gapssealing
Providingandfillinggapsbelowdoorframes,aroundNahanitrapswith Roffe-grout-GPorequivalentincludingcleaningthesurfaceofallloosematerials curing,mixingaspermanufacturer'sinstructionsetc complete
GapSealing-Siliconsealant
ProvidingandfillingRTVsiliconesealant orequivalentFisherproductwithagun usingapprovedmaterialingapsaroundwindowsincludingcleaningthegaps, scaffoldingetc complete
ProvidingandfixingLeadFlashing750mmoverChajjashallbehoused approximately300mmabovechajjainamortarjointofadjoiningmasonrywall,this sheetctshallbeslopingoutwards Fasteningdown –Thesheets,shallbe fastenedwiththebestSSorBrassscrews/boltsandleadwashersAllen’s,Fisher orotherapprovedfasteningsasdirectedbytheConservationArchitect Thelead sheetingshallbegoodmilledleadnotlessthan10Kg/Sqmbenttotheshape fastenedintothewall groove20mm,withbrass/sswallhookswithjointsatright anglestotheflowbyadripwithaproperlap,iflevelspermit,orby75mmjointsof
TOTALOFSUBSECTION-N
TOTALOFSECTION-II
SECTION-III: CARPENTRYANDBUILTINFURNITURE
Notes:
1)CarpentryandJoinery,forpartitions,tables,cupboards,storageunits,desks, labfurniture,museumdisplayfurniture,officefurniture,auditoriumandlecture theatrefurniture,doors,windows,skylights,falseceilingetc
2)Forallcarpentryandfurnitureworks,thecontractorshallsubmitshopdrawing foreachitemofworkindicatingthesectionofwoodits joinerydetailetc Whereverpossiblewoodenpinsshallberesortedtoforconnection Alternatively stainlesssteel/brass,screwscouldbeused Noothernails/screwsshallbeused foranyfastenings,etc
3) Therateshallbeinclusiveofproviding&fixingglasspanelsincludescostofall typesoffixturesandfasteningsmadeofanymaterials,neoprenerubbergaskets, screws,etc
358383743
4)Contractorshallsubmitsamplesofassemblysectionsfromdifferent manufacturer'sforapproval Architectdecisionshallbefinal
5)Alljointsbetweencivilworkandtimberframesshallbesealedandmadeair tightbyapplyingSiliconesealantorequivalentasapprovedatContractor'scost
6)Ratesforrepairsaswellasprovidingandfixingofnewcarpentryitemsand furnitureinthissectionshallbeinclusiveofalltheitemsofhardwareandfittings requiredandnoextrashallbepaidtothecontractortowardsthecostofhardware/ fittings
7)AllHardwareshouldbeaspersamplesapprovedbyArchitect Providingand fixingfollowinghardwareitemsinoxidizedbrass(unlessotherwisestated) including,fixingwithappropriatescrewsandfastenersinbrass/stainlesssteel metalscrews(Nettlefoldorequivalent)whereverspecifiedetcofapprovedmake typeandthickness:
8)Providingandfixingthehardwarecompleteinallrespectswithnecessarypins, plates,screwsetc(Allfittings&fixturesshallbeofHeavydutybrassoffirstquality)
9)Allhardwareandhingesshallbeofpalladiumorapprovedequivalentbrand,all otherhardwareshallbeofDormaorapprovedequivalentbrand
10)Hinges:Railwaytypeheavydutyhingesinbrassoxidizedwithstainlesssteel pinsofdiameternotlessthan4mmandleafthicknessnotlessthan4mm(125mm x65mmx4mmto300mmx65mmx4mm)
11)Hinges:Parliamentarytypeheavydutyhinges5mmthickbrassoxidized
12)Towerboltshavingboltdiaof10mminbrassoxidized inbrassbody600mm longetccomplete
13)Doorhandles 'Dorma'TGDI35025Spullhandle,25mmdia,350mmlongor 'DORMA'TG9155ormatchingwithexistinghandleasspecifiedandapprovedby theArchitect
14)BrassoxidizedBabylatches,75mmlongwith25mmx8mmthickboltcomplete withknob,Vacant/Engagedetcasperapprovedsamples Brassaldropsshall matchexistingoriginalaldropsinthebuildingandshallbereusedorfabricatedto matchtheoriginal
15)ConcealedtypehydraulicdoorcloseroropendoorcloserofDormaor equivalentbrandwithDormadoorstopper,springloadedwithrubberbushandfoot release
16)PlainMorticelocks6leversLatchBoltofDorma/Godrejorapproved equivalentmakeequivalentwithbrassbodyandchromeplatedflatplatetoedgeof doorincludingfixingtotimberoraluminiumshutterframesetccomplete
17)Sameasaboveitem(16)butwithdeadlock
18)3mmthickSSkick/pushplatefixedwithSSscrewsof150-400mmdepth (CP brassdomicalhead)
19)Doorbufferwithrubber/PVCbushshutterorwallmounted
20)Providingandfixing andrepairrateswillalsobeinclusiveofaldrops,handles stopperetc allcomplete
InbuiltStoneseats
Providingandconstructinginbuiltmasonryandroughkotahseatsasshownin architecturaldrawingsalongwithacladdingofBluecolourterrazzo(make:Bharat FlooringsandTilesPvt Ltd -Premiumterrazzoseriesorequivalent),laidona bedof1:4cementmortarincludingneatcementbacking,fillingjointsandwhite /colouredcementslurry,curingandcleaningcomplete
Sameasabovebutfinishedwith25mmthickmirrorpolishedKotahonallvisible surfacesetc complete
StainlessSteelBenches
ProvidingandfixingperforatedSSsheet(SS304)benchofapproveddesignwith SSpipeframingand3mmthickperforatedSSsheetpanelsasshowninthe architecturaldrawingswithnecessarybolting/weldingandfixingontilesurface withanchorfastenerbolts,etc complete
GIsheetbenches
Sameasabove(a27),butwithperforatedGIsheetandGIpipeframing,powder coated,etc complete
ProvidingandFixingRailingincludingbendingandweldingwithapprovedspecial electrodesandfixinginpositionhandrailsconsistingof50mmdia SS(stainless steel304)handrailsofvariousheightsupto1000mmasperdrawings(refer sheet:)and,includingprovidingandfixingSSpipebracketsonwallsandflooror baseplatesfixingtotheconcrete with12mmdia Anchorbolts4Nos/bracket,or weldingtoinsertplatesincludingbuffingasdirected
Providing&fixingRailingincludingbendingandweldingwithapprovedspecial electrodesandfixinginpositionhandrailsconsistingof50mmdia SSpipesand perforatedSS(StainlessSteel304)plateboltedtoSSflat/boxsectionsasper drawings(refersheet:)and,includingprovidingandfixingSSpipebracketson wallsandfloororbaseplatesfixingtotheconcrete with12mmdia Anchorbolts4 Nos/bracket,orweldingtoinsertplatesincludingbuffingasdirected
Providingandfixingseatingaroundtreeasperdrawings Internaldiameterofthe seatingtobeconsideredas15m Seatmadeof150mmdiaSS pipe35mmthick andbackrestof50mmdiaSS pipe35mmthick Bothpipestobebent&grouted intothegroundateitherend Seat&backresttobeweldedtointermediateleg support,eachlegconsistingof2nos 'Z'shapedSS plate4mmthk spaced 40mmapart&connectedat4pointswithSS bolts&cylindricalspacers
SECTION-IV: MISC.
Notes:
1)Rateshallincludeminorcivilwork,scaffolding,electricalworks,dismantling, liasoningcost,steelitems,etc
2)Thequotedpriceshallbeinclusiveofcentralexciseduty,VAT,octroiandservice taxandallotherapplicabletaxes Thisquotationshallnotbesubjecttoprice variationcost
3)Thecontractorshallmakenecessaryarrangementstoprovidesuitablelockable weatherproofstoragespaceforthematerialsandshallalsostacktheexisting dismantledmaterialinasafesecureplaceforthedisposalofthemunicipal authorities
4)Thecontractorshallincludeinthequotation60monthsfreemaintenance,which willbecommencedfromthedateofcompletionofproject
5)Thecostshallbeinclusiveofallpreparatoryworkandnoextracostwillbe providedtowardsthisitem
7) Therateshallbeinclusiveofproviding&fixingglasspanelsincludescostofall typesoffixturesandfasteningsmadeofanymaterials,neoprenerubbergaskets, screws,etc
6)Forallworksinthissectionasspecifiedbytheconservationarchitect,the contractorshallsubmitshopdrawingforeachitemofworkindicatingthesections materials,its joinerydetailetc Whereverpossiblewoodenpinsshallberesorted toforconnection Alternativelystainlesssteel/brass,screws/boltscouldbeused Noothernails/screwsshallbeusedforanyfastenings,etc
8)Contractorshallsubmitsamplesofassemblysectionsfromdifferent manufacturer'sforapproval Architectdecisionshallbefinal
9)Alljointsbetweencivilworkandtimberframesshallbesealedandmadeair tightbyapplyingSiliconesealantorequivalentasapprovedatContractor'scost
FabricationandinstallationofInformationSignasspecifiedinthedrawings
Providing&fixinginposition inaluminiumextrudedbrown anodizedsectionwithlettersinvinylonbothsidescoveredwithacrylicsheetand asperapprovedsamplebyArchitectfixingasdirected
FabricationandinstallationofTreeGratingasspecifiedinthedrawings
i)Castirontreegrating,paintedwithanticorrosionprimerand2coatsof polyurethane/epoxypaintinapprovedshade,tobefixedontoconcretebaseas shownindrawings Ratetobeinclusiveofbasegrouting,providing,fixing,nuts, bolts,welding,painting,etc complete
ii)GraniteStonecobblestoneedgingaroundthetreebase,withwhiteround pebbles/withgravelbedinsideasindicated
Providingandfixingseatingaroundtreeasperdrawings Internaldiameterofthe seatingtobeconsideredas15m Seatmadeof150mmdiaSS pipe35mmthick andbackrestof50mmdiaSS pipe35mmthick Bothpipestobebent&grouted intothegroundateitherend Seat&backresttobeweldedtointermediateleg support,eachlegconsistingof2nos 'Z'shapedSS plate4mmthk spaced 40mmapart&connectedat4pointswithSS bolts&cylindricalspacers
SECTION-V: ELECTRICAL
ThisitemisworkedoutbytheElectricalConsultant Forthepurposeofthiscourseanapproximateamountisbudgeted
Supply Installation TestingandCommissioningofEarthingstationasperIS3043 consistingof40mmGI3000mmlongpipe suppliedwithfunnelattopincluding saltcharcoal,masonrychamber,testlinkbox,hardwareincludingexcavationand masonryworkwithcastironcoverforthechamber
Supply&Layingof followingsizesofstrips &wiresfromearthingchamber/Gridto theelectricalequipment&terminatingthesame Theportionofthestripunder groundshallbelaidatadepthof600mmandonsurfaceshallbefixedwith spacers&clamps&alsoonTray Excavation&allcivilworktobeincluded 25mmx3mmGI stripforDistributionBoard(FirstDistributionBoardinacluster ofDistributionBoards)
8SWGGI EarthingwireforLighting&PowerDistributionBoard
Supply,Installation,testing andcommissioningof3phaseenergymetersuitable forunbalanceloadandincludingnecessarycutoutandjumperwiresetccomplete aspersupplycompany'srequirement
Supply,Installation,testing andcommissioningofTPNMCB16A andincluding ncessarycutoutandjumperwiresetccompleteaspersupplycompany's requirement
Supply,Installation,testing andcommissioningofTPNMCB40A andincluding necessarycutoutandjumperwiresetccompleteaspersupplycompany's requirement
Supply,Installation,testing andcommissioningofTPNMCB32A andincluding necessarycutoutandjumperwiresetccompleteaspersupplycompany's requirement
Supply&InstallationofstandardmanufacturersDistributionBoardforLighting It shallbeastandardBoardwithdoubledoor&suitableforrecess mounting&shall beasfollows Scopeincludesmountingarrangementincludingnecessarysteel, hardwareetcWiresinDB tobeproperlydressedwithbuttontapeandwithlugs, labelsetc
Incomer40ATPNMCB-1No 40A,30mA,2P,RCBO-3NosOutgoing 6/10ASP MCB-24Nos
Supply,Installation,Testing&CommissioningofPVCArmouredCablefixedto walls,Ceilingswithclamps,spacerssaddlesorlaidinreadymadetrenchortiedto cablestraywithcableties,tagsetc asfollows 1100VgradeasperIS Installation,Testing&Commissioningofcables(onwalls,trays) PVCinsulated, 1100Vgrade,steelarmoredasperIS1554withlatestamendmentincluding spacers,saddles,tags, etcThecablesto beproperlydressed
4Cx16SqmmALAYFY
3Cx10SqmmALAYFY
4Cx10SqmmAYFY
3Cx4SqmmAYFY
3Cx6SqmmAYFY
3Cx25SqmmAYFY
TerminationofcableswithHeavydutySiemenstypeglands&lugs Lugsused shouldbeCopperforcoppercables&Aluminiumforaluminiumcable Scopeto includeallmaterial&labourincludingpropertools,Insulationtape
4Cx16SqmmALAYFY
3Cx10SqmmALAYFY
4Cx10SqmmAYFY
3Cx4SqmmAYFY
3Cx6SqmmAYFY
3Cx25SqmmAYFY
Pointwiringforlight,bellpoint ScopetoincludecircuitWiringforlighting&the lightswitchboardwithswitches&furtherwiringtolightpoints Theswitchboard shallberecessmounted/surfacemountedofGIstandardasperthesupplier The pointWiringshallconsistof3x15Sq mmcopperwire,PVCinsulated,1100V gradeinPVCconduit/PVCcasingcaping Thewires&conduitsshallrunfromthe switchboardtotheindividualpoint&circuitwiringshallbeof3x25mm2copper wirefromdistributionboardtothe switchboard Modularplatetypeswitchestobe used6ASwitchSocketonswitchboardtobeincludedInmajorityofthecasesthe lightsaregroupswitchedfromtheDistributionBoardinwhichcasethewireshall be3x25mm2 AllwiresshallbeFRLS
PrimaryLightPointwiringofaveragelengthupto5meterslengthofwire
PrimaryLightPointwiringofaveragelengthupto55to10meterslengthofwire
PrimaryLightPointwiringofaveragelengthupto105to15meterslengthofwire;
PrimaryLightPointwiringofaveragelengthupto155to20meterslengthofwire;
SECONDARYLIGHTPOINT(FirstLighttosecondlightpointUpto5metersof lengthofwire3x15sq mmwires
SECONDARYLIGHTPOINT(FirstLighttosecondlightpointUpto55to10 metersoflengthofwire3x15sq mmwires
SECONDARYLIGHTPOINT(FirstLighttosecondlightpointUpto105to15 metersoflengthofwire3x15sq mmwires
SECONDARYLIGHTPOINT(FirstLighttosecondlightpointUpto155to20 metersoflengthofwire3x15sq mmwires
FanpointwiringshallbesameasPrimarylightpointpointwithindividual controlWireofsize3x15sq mmsizeshallrunfromtheswitchboardtothefan pointthroughPVCconduit/PVCcasingcaping ThecircuitfromtheDBtothe switchboardshallbe3x25sq mmwiresSpaceforregulatortobeprovidedinthe switchboard Upto5Metersof lengthofwire
FanPointwiringwiringlength55to10meterlength
FanPointwiringwiringlength105to15meterlength
FanPointwiringwiringlength155to20meterlength
Exhaustfan/WallFanpointswiringshallbesameasPrimarylightpointwith individualcontrol&6Asocket&top@thefanpoint Wireofsize3x15mm2size shallrunfromtheSwitchBoardtothefanpointthroughconduit Thecircuitfrom theDB totheSwitchBoard with3x25mm2wire
Pointwiringfor6Ampswitchsocketpoint Scopetoincluderunningof3x25mm2 copperwire,PVCinsulated,1100VgradeinPVCconduit Wirestoberunfromthe PowerDistributionboardtotheIndividualsocketsupto4socketscanbeloopedon onecircuitWorkstationRawpowerAllwiresshallbeFRLSWiringlengthupto5 meters
6Asocketpointwiringlength55to10meters
6Asocketpointwiringlength105to15meters
6Asocketpointwiringlength155to20meters
Pointwiringfor6/16Amp switchsocketpoint ScopetoincludecircuitfromDB toindividualpoints Conduit,accessories&wireswith3x4mm2copperwiretobe laidfromDBtoindividualsocket TwosocketpercircuittobeconsideredAllwires shallbeFRLSWiringlengthupto5meters
6/16APointwiring55to10meterlengthofwire
6/16APointwiring105to15meterlengthofwire
6/16APointwiring155to20meterlengthofwire
6/16APointwiring205to25meterlengthofwire
Supply,Installation,Testing&Commissioning6Aswitchsocketoutlet&box consistingofModularplatetypeswitchesincludingconnections
Supply,Installation,Testing&Commissioning6/16Aswitchsocketoutlet&box consistingofModularplatetypeswitchesincludingconnections
Supply,Installation,Testing&Commissioningof20AReyrollPlugsocketwith3pin MetalTop,inmetalboardwith20ASPMCB
Supply,Installation,Testing&Commissioningof225mmDia ExhaustFanwith connection
Providingandinstalling,connectingandcommissioning32ATPNSFUwithHRC Fuse
ProvidingandlayingTwopairTelephonecableinexistingconduit/casingcaping
Providingandinstallingoutlet fortelephonecable
Providingandinstallingcelingfan1200mmsweepwithfivestepselectronic regulator
Supply&InstallationoflightfixtureswithSigmaBallastincludinglamps,junction boxes,downrod/supports,hardwares rawlplugs,wires/cablesetc asrequired andconnectingittoswitchboards
SupplyandInstallationofPortableEmergencyLightonBatterysuitableforupto10 hours Installite/Canaramake Mountingarrangementforlamptobeincluded 1x18WBracketlight
WST71150withGI waterpipearm1mlongweldedtothecap
WFZ42250 WIF22228SGW
Liasoningchargeswithrespectiveauthoritiesforshiftingofpointofelectrical serviceandothers
Excavationinoutsidesoilincludingrefilling
Supplyinganderectingsteeltubulerpole1651x1397x1143mmthickwith 45x45x365mmthickand(56x27x27mm)respectively11mtrs LongasperIS 2713withtestcertificatefrommanufacturercompleteerecteddulypaintedwithtwo paintsofredoxideandtwocoatsofaluminiumpaintcompleteerectedinposition withMS baseplateof30x30x06cmsthickweldedatthebottomandsuitable polecaperactedwithsetscrewsorwieldedcompleteerectedCC foundationand plinthJunction/Loopingboxincluded
Note:Foritemnos 16,17and18,ratesshouldbeinclusiveofa comprehensivemaintenancefor60monthsbythevendor
Supplyinganderectingcentrifugalwaterpump(Monoblock)withCI impler, primingfunelcockandcommonflangemountedonacommonshaftofinduction motorof400V3phaseAC supplyofminimum3H P Motorcapableof dischargingwater600to170litesperminutesat125to275meterstotalhead fromallclauseswithfoundationandwith50mmsuctionand50mmdelivery,water pumpshallbeconfirmingtoIS1520complete(Crompton/Kirloskar/Grundfosor anyotherequivalentmake)
Waterlevelcontrollerwithnecessaryprobesforcontrollingmotorforcutoffwhen uppertankwaterlevelisfull,whenwaterlevelinthetankcomestopredetermined levelpumpshallstartautomatically When waterlevelinthesuctiontankisbelow thewaterlevel,thepumpshouldnotstart Alsopumpshouldnotrundry The controllershallhavemanual,autoswitchesandselectionofpump Therateshall includenecessarywiringwithcopperwires
DOLStartersuitablefor3HP
Providingandfixing25mmPVCconduits/Casingcapingincludingallfittings
Note: Allcataloguenos referredinvariousitemsofsanitaryfittingsareasperHindustan /ParrywareSanitarywareCataloguesandallfixturesareJaguarContinental series
ThisitemisworkedoutbytheServicesConsultant Forthepurposeofthiscourseanapproximateamountisbudgeted
Providing,laying,fixingjointingwithscrewedjointsusingteflontapeGIpipes heavyqualityconformingtoIS1239includingallfittingssuchassockets,unions reducers,longorshortbends,elbows,nipples,flanges,checknuts,clampsetc testingthepipesandspecialsandpaintingthepipesandfittingswithonecoatof approvedprimer&finishingcoatsallasperspecificationsForpipesinexposed conditions:
Providing,laying,fixingjointingwithscrewedjoints'C'classheavyGIpipes conformingtoIS1239includingallfittings,testing,paintingwithbitumasticpaint protectionwrappingwithHessienfacedpolyethylenetaping&paintingcompleteas perspecifications Forpipelineslaidbelowgroundlevelandlaidinchasesin walls Therateincludesexcavationandcuttingchasesinwallsandreinstatement)
Providing,fixingandtestingheavyqualitygunmetalorbrassballvalvewith screwedends20kgmclassonGIorcopperpipelines(Leader/ZOLOTOmake)
ProvidingandfixinginpositiontestedheavyqualityISImarkedfullwaygunmetal gatevalveofneworequivalentmakehavingbothendsscrewedfemale conformingtoIS778:1984etc complete
i)50mmdia
ii)40mmdia
iii)32mmdia
iv)25mmdia
v)20mmdia
vi)15mmdia
Providing,erecting,fixingandcommissioningPVCoverheadwatertank(BMC approved)includingmakingofproperplatformasperconsultant'sdirection,lifting oftanktoterracefloorlevel,placingoftankonplatforminproperalignment, makingofinlet/outletconnectionsasperbye-lawsetc complete
i)5000litrescapacity
ii)2000litrescapacity
iii)1000litrescapacity
Providing,fixinggunmetalnonreturnvalveofapprovedquality
ProvidingandfixingapprovedISImarkedmakeCIflangedwatermetersdirect readingtypecalibratedinlitres&kilolitrestestedandapprovedbyMCGMwithdirt box(strainer)includingmakingnecessaryflangedjoints,testingetc complete
40mmsize
50mmsize
Constructingbrickmasonryvalve&meterchambersin230mmthickbrickmasonry incementmortar15usingfirstclassbricksconstructedoverabedof150mmthick cementconcrete1:2:4plasteringinsideoutsideandallexposedsurfacewith 20mmthickcementmortar13,finishing'insidewithafloatingcoatofneatcement providing&fixingCIframe&coversize weightmentionedbelowpaintingallCI itemswith3coatsofapprovedbitumasticpaintetc complete Chamber600x600mmclearinsidewith600x600CIframe&coverweightingnot lessthan72kgms Depthofchambernotexceeding1000mm
ProvidingStructuralsupportforpipelinesusingchannels,tees,angles,flats& platesfabricationbycuttingthreading&weldingifrequired,applyingonecoatof redoxideprimerandthreecoatsofsyntheticenamelpaint,includingnecessary boltsnuts,washeretc asrequiredbytheEngineer-in-charge Theweightofthe supportshallbecalculatedonthebasisofcatalogueweightsofsectionsused (weightofbolts,nutsetc willnotbeconsidered)
Providing&fixingbrassfloatvalveswithbrassrodandcopperfloat suitableto withstandapressure2 kg/sqcm
50mmnb
40mmnb
ThisitemisworkedoutbytheServicesConsultant Forthepurposeofthiscourseanapproximateamountisbudgeted
Providingandfixingcastiron traps of selfcleansing design with watersealnot lessthan50mmwith or without vent,including setting the trapin1:2:4cement concreteetc complete Thetrapshall be P' or S'type as required Trapwith 100mm inlet and100mmdiaoutlet
Asinitem31buttrapwith75mmoutlet
Asinitem31buttrapinPVC
Asinitem32butwithPVCtrap
Providingandfixingstainless steel gratingof 18 gaugethick withcircular perforationofapprovedpatternoverCItraps Thegratingshallbeofsize100mmx 100mmorcircularof100mmdia(asdirected) and shallbesetin cement,sand mortar1:3etc complete
-Do-gratingofsize150mmx150mm
Providing, fixing, jointingand testingPVCWCpanconnectorofapprovedcolour with or withoutvent horn all as perrequirementsofEngineer-in-charge Size 100mmi/d-Length300mmto400mm
Supplying laying fixingjointing&testingheavyISImarkedcastiron spun soil pipes/centricastpipesincludingallfittingswithorwithoutinspectiondoors,vents, cowls at topetc jointing with leadcaulked joints all as perspecification and as directedbyEngineer-in-charge
150mmi/d
100mmi/d
75mmi/d
65mmi/d
50mmi/d
Providing, laying, jointing with screwed jointsusing teflon tape GI pipesof classTataorZenithconformingtoclassheavyofIS1239withallfittingstestingthe piping painting with 2coatsofbitumasticpaintwrapping with Hasseinfaced polyethylenetapeintwo layers and againpaintingwith2coatsofbitumastic paint Therateincludesforcuttingchasesinwall&floorsforembeddingthepipe andreinstatementofsurfacetooriginalconditions
50mmi/d
40mmi/d
32mmi/d
Providing and fixing inposition cast iron rain water inlets withgravelguard anddometypegratingspeciallycastgenerallyconformingtodrgs
Inletfor:
150mmi/dpipes
100mmi/dpipes
Preparationofgroundforraisingoflawnonsoftsurface:
Preparationofgroundforplantationoflawnbyexcavatingthegroundtodepthof 300mmremovingexcavatedmaterialfromthesite fillingRedHillEarthandCow dungmanurein2:1proportion,mixingofRedHillearthandcowdungmanure, wateringtodepthof1inchthreetimes,weedingafterevervywateringbefore plantationofthegras,levelling,rollingafteresablishmentofgrass
Preparationofgroundforraisingoflawnonhardsurface:
PlantingofFloweringtreesonsoftsurface:
Diggingofpitforplantationoftreebyexcavatingthegroundintheearth/murum/ sandof10mx10mx10msize removingexcavatedmaterialfromsite filling RedHillEarth(033Cum),Cowdungmanure(033Cum)andgoodexcavated earthfrompit(033Cum),mixingofRedHillearthandcowdungmanureand plantationoftreesapling,stakingoftreesapling,preparationoftreebasin, levelling,wateringandmaintainingfor30dayssftercompletionofplantationand
PlantingofFloweringtreesonhardsurface:
Diggingofpitforplantationoftreebyexcavatingthegroundintheconcrete/ masonary/asphaltof10mx10mx10msize,removingexcavatedmaterialfrom site,fillingRedHillEarth(033Cum),Cowdungmanure(033Cum)andgood excavatedearthfrompit(033Cum),mixingofRedHillearthandcowdung manureandplantationoftreesapling,stakingoftreesapling,preparationoftree basin,levelling,wateringandmaintainingfor30dayssftercompletionofplantation
ForallItemsinallSections:Rateshallincludetransportation,loading/unloading,providing/supplying/laying/fixing/installing/ fabricating/testing/commissioningetconsite RateshallalsoincludealltaxessuchasVAT,excise,salestax,octroi,etc
SECTION-I: SitePreparation&Cleaning
SECTION-II: CIVILWORK
Note:
1)TheitemsgivenbelowshallbeasperSectionA""Earthwork,MetalPacking& SubsurfaceDrainage"ofthespecifications
2)Rateforexcavationshallincludedewateringduringtheexcavationincluding shoring,struttingetcandkeepingitdryduringexcavationandconstruction
3)AllearthworkshallbecarriedoutasperConservationArchitect'sinstructions andsafetynormsasperrelevantIScode Therateshallincludeallscaffolding andmeasuresforcordoningoffareasduringdismantling,providingsignboards etc
4)Alldebrisandscrapmaterialsfromearthworkshallbecontractorspropertyother thanthatwhichisreusedforback-fillingetc andthisdebrisandscrapmaterials shallberemovedawayfromsiteimmediatelyonhisown Thecontractortogive rebateinratesagainstmaterialsandscrap/debrisfromsuchdismantledwork whichshallbecontractor'sproperty
5)Forallearthworkitems,thecontractorshouldcarefullystackallexcavated materialatsiteaspertheinstructionsoftheConservationArchitect Alldebris associatedwiththeearthworkshouldhoweverbedisposedoffbytheContractor
6)Themeasurementofexcavationshallbetakenincum asperrectangular trenchofbottomwidthofconcretemultipliedbyverticaldepthoffoundationfrom groundeventhoughcontractormighthaveexcavatedwithslopingside/fulllength trenchforhisconviency
Surfaceexcavationandexcavationforretainingwalls,basement,watertanks, effluenttreatmenttanks,etc includingbackfillingofapprovedexcavatedmaterials infoundations &behindretainingwallsaftercompletionofwaterproofingetc wateringandconsolidating,cartingawaysurplusearth, includingpreparingthe surface (Note:Allbackfilling&spreadingofearthshallbecarriedoutinlayersnot exceeding200mmandcompactedto90%ordinaryproctordrydensity)
Fillinginplinthandinotherplaceswithapprovedmurumbroughtfromoutside includingwateringconsolidatinginlayersnotexceeding200mmby8-10tonnes roadrollerorotherapprovedmechanicalequipmentetc
Anti-termitePreconstructionTreatment:(AsperIS:6313Part-III)(Note: Anti-termitetreatmentshallbecarriedoutthroughspecialisedagencyreputedin PestControltreatmentandapprovedbytheArchitect
Providingpost-constructionalanti-termitetreatmentbydrillinginholesatthe junctionsofwallsandflooringandinjectingchemicalemulsion,wallsprayanddoor framestobedrilledandsprayedcompleteusingapprovedchemicalsattherateof 5litersofemulsionconcentrateofonepercentconcentrationofCHLORPYRIFOC 20%EC,ISIapprovedconforming(IS8944),Includingtreatmentofwoodfor
Providingpost-constructionalanti-termitetreatmentbydrillinginholesatthe junctionsofwallsandflooringandinjectingchemicalemulsion,wallsprayanddoor framestobedrilledandsprayedcompleteusingapprovedchemicalsattherateof 5litersofemulsionconcentrateofonepercentconcentrationofCHLORPYRIFOC 20%EC,ISIapprovedconforming(IS8944),Includingtreatmentofwoodfor
ProvidingexhaustiveAntiTermitetreatmenttothewoodenframesbydrilling6mm holesatthefourcornersorasdirectedononesideatdownwardangleof45 degreeatthejunctionofwoodworkandmasonryandinbetweenasinstructedby theengineerattherateof60millimeterofchlorpyrifos20%ECandfillingwith puttyetc withtwoyearsguaranteebondasperIS 6313(PartIII)of1981
Providing,chasing,inserting/layingDampproofcourse50mmthickM-20cement concretelayerandbitumenusingcementwithapprovedwaterproofingcompound attherateof1Kgper50kgofcementetc
Note:
1)TheitemsgivenbelowshallbeasperSectionB"Concrete-Plain&Reinforced" ofthespecifications
2)ForsmallconcreteonapprovalofConservationArchitect,weighbatched concreteasperdesignmix,inmanuallyormechanicaltypeoperatedweigh batcherdialtypeormechanicaltypeofminimumcapacity650Kgsshallbeused Weighbatchershallbecalibratedregularly
3)Forallmajorconcretepours,Contractorshallusereadymixedconcrete(RMC) ofUnitechPrefabLtd orM/s Larsen&ToubroLtd approvedAgencies Only53 gradecementshallbeusedinRMC Aggregatepropertiesandgradingdesign mix,quantityofsuperplasticiser,settingtime,amountofslumpatthepouringsite shallbegotapprovedbeforeitsuseineachmajorconcreting
4)Concretemixproportionwillbebasedon50kg weightofcementbags deliveredatthemixer
5)TheContractorisentirelyresponsibleforthedesignofconcretemixes The designishowever,tobeapprovedbytheArchitect
6)ConcreteM-20/20meansconcretemixM-20gradeusingmaximumsizeof coarseaggregates20mm
7)Shuttering,formwork,centeringshallnotbepaidseparatelyandshallconform toSection-C
8)Curingcompoundmaybepermittedonlyforinaccessiblelocations
9)OnlyRiverSandshouldbeused Washingofsandinrotaryscrewtypewashing machinesisamust
10)RatesshallbeinclusiveofcostofSuperplasticiserofapprovedqualityandof approveddosage
11)Ratesshallbeinclusiveofprovidingpockets,holes,inserts,pipes,etc
12)Mechanicalvibrators,internaland/orexternaltobeused
13)AlldefectiveconcreteifapprovedbyArchitect,shallberepairedbythe contractorathisowncost,usingapprovedepoxymortarorPolymermodified mortarasperManufacturer'sspecifications
14)Therateshallincludethecostofapplying2coatsofpolymerbondingagenton allsurfaceofoldornewconcreteatconstructionjointpriortoconcretingagainst thesame
15)Useoffinesandwithpropergradingisamust
16)Screeningofmetal-IandIIforremovingexcessiveflakyunderandoversize material,stonedustetc isamust
17)Onlyapprovedmouldreleasingagentshouldbeused
18)Cleaningofshutteringplatesbymechanicalbuffingaftereveryuseisamust
19)Allconcretesurfacesshallbeformfinished
20)Whereplasteringisspecified,concretesurfacesarerequiredtobehacked immediatelyaftertheremovalofformworkasdirectedbytheArchitectwherever required Additionalrateshallnotbepaidtocontractorforhacking
21)Contractorshouldmakearrangementfortablevibratorforcastingthecover blocksofrequiredsizeandgrade
22)Rateshallbeinclusiveofprovidingcoverblocks Coverblocksshallbemade ofthesamegradeofconcreteofstructuralmemberinwhichtheblocksaretobe used
23)Alljointsinshutteringshallbesealedbyuseof5mmthickcompressible materialgasketsandfixingagent
24)Constructionjointshallbeminimuminnumbersandtheirlocationshallbe approvedbytheConsultant Constructionjointsshallbetreatedproperlywith bondingcoatofapprovedmaterialtobeappliedattheoldconcretebefore commencingthefreshconcretingoperations
25)Informfinishsurfacesthepatternstobeprovidedfortheformworkshallbeas perarchitectssuggestions
26)Allsack-rubbedsurfaceshallbesackrubbedwithwhitecementofsuggested proportionasperArchitectsapproval
27)Allconcealeditemslikeconduits junctionboxes fixturesetc shallbelocated asperdetailsandlocationstobeapprovedbeforecasting
NotesforFormwork:
Note:1)TheitemsgivenbelowshallbeasperSectionC:'Formwork'ofthe specifications
2)ContractorshouldsubmitfortheConsultant'sapprovaldesignanddrawingfor allformworkshowingsizesofmemberincludingpropsanditsfoundation consideringRMCbypumping
3)Amockupofformworkforcolumns,typicalcolumn-beamjunction,beams shouldbemadeandonlyafterobtainingapprovalofthemockup,thecontractor willbeallowedtoproceedwiththework
4)Allsurfacesofconcreteelementsshallnotbetreatedinanywayunless otherwiseinstructed
5)Allconcretesurfacesshallhavesmoothandevenfinishoriginallybythemselves withoutanyfinishingorrendering IncasetheArchitectisnotsatisfiedwiththe finishobtained,remedialmeasuresforimprovingthemshallbecarriedoutbythe Contractorathiscost
6)Ratesquotedshallbeinclusiveofallformworkatalllevels
7)Rateshallincludeuseof5mmthickcompressiblegasketmaterials fixingagent adhesivetapeandmechanicalbuffingofshutteringplates
8)Onlyapprovedmouldreleaseagentshouldbeused
9)Manual/mechanicalcleaningofshutterplatesaftereveryuseisamust
10)Therateshallincludehackingofconcretesurfacerequiredtobeplastered immediatelyafterremovalofformwork
11)Onlynewsteelandplywoodshutteringshallbepermittedforitsfirstuseatsite anditsnumberofuseswillbesolelywithdiscretionofArchitect
b1*
12)Providingcutouts,holes,slits,depressionetc forelectricalfixturesshallnotbe paidseparately
13)Sizeofthepanelsusedforexposedconcretefinishareasshallbeapprovedby theArchitect
14)Thesupportingsystemforplatformdoorshallbehavingselfalignmentdevices toensureperfectlineandlevel,andverticalityoftheshuttering,stagingtoachieve requireddegreeofperfection
15)Forquickerectionofshutteringandstagingthesystemshouldhavesuitable arrangementformovingentiresetintransverseaswellasinlongitudinaldirections andrails/wheelsonanysuitablearrangementwhichwillbeapprovedbythe consultant
b2*
b3
b4
b8
b9*
PCCworksbelowraft slab,plinthbeams,foundations,
ProvidingandlayingConcreteM20/40usingRMCforall etc includingsideformsifrequired Therate shallbeinclusiveofalltaxes towardsplants&machinery labour allleads&lifts allfloorsallchargesrequiredincludingtransportation,centering,formwork, compacting,rougheningthesurfaceifspecialfinishistobeprovidedandcuring
RCCworkoffloorslab
ProvidingandlayingconcreteM25/20usingRMCfor on gradeincludingfinishingthesurfacesmoothetccomplete Therateshallbe inclusiveofalltaxes,towardsplant&machinery,labour,allleads&lifts,allfloors allchargesrequiredincludingtransportation,shuttering,centering,formworkasper
floorslab
ProvidingandlayingconcreteM25/20usingRMCfor ongradeincluding finishingthesurfacesmoothetccomplete Therateshallbeinclusiveofalltaxes, towardsplant&machinery,labour,allleads&lifts,allfloorsallchargesrequired includingtransportation shuttering centering formworkasperconditionbelow
floorslab
ProvidingandlayingconcreteM25/20usingRMCfor ongradeincluding finishingthesurfacesmoothetccomplete Therateshallbeinclusiveofalltaxes, towardsplant&machinery labour allleads&lifts allfloorsallchargesrequired includingtransportation,shuttering,centering,formworkasperconditionbelow,
foundation, pilecaps,raftslab,column,walls,shearwalls,boxcolumn,retainingwalls, plinthbeams,floorbeams,invertedbeams,slabs,staircase,droppardis, chajja,parapets,pergolas,trenchslabandbeams
Providing&layingM30/20,usingRMCforRCCincludingpumpingfor
instructuralfloors,loftslabs atalllevels,lintelbeams/verticalstiffenersetcincludingRCCundergroundwater tanks septictanks effluenttreatmenttanks overheadwatertanksetccomplete Therateshallbeinclusiveofalltaxes,towardsplants&machinery,labour,all leads&lifts,allfloorsallchargesrequiredincludingtransportation,shuttering, centering,formworkasperconditionsbelowetc complete
plinth protectionandpaving
Providing&layingConcreteM20/40,usingRMC,inalternatebaysfor includingcompacting vibrating curing finishingtocorrect line&levelwiththeuseofwoodenbottomandsurfacefinallyfinishedwithbrooms asdirectedbyArchitect Jointsofandasprovidedinalternatebaysshallbefilled
ProvidingandconstructingRCCundergroundwatertankincludingexcavationinall typesofsoil,refillinginsidesoftank,trimming,dressing,leveling,stackingand disposalofsurplussoilandincluding:
i)Rubblesoling230thk
ii)PCC,M20/30belowraft
iii)M-25/20RCCworkinraftslabs sumpbase beams RCCwalls columns top slabsetc includingunwrotshutteringtoRCwallsatalllevels
iv)TMTreinforcement
v)Waterproofcementplastertoinsideofwatertanks
vi)BoxtypewaterproofingtreatmentforraftandwallsofUGtank
vii)Patentedcementbasedwaterproofingtreatmenttotopofslabs
viii)50mm thk IPStoraftslab
ix)Providingandfixingcastironmanholecovers2nos 600mmdia withlocking arrangements
x)PVCwaterstop150mmdia;embeddedintakeandoutletpipesetc
Providing,erecting,fixingandcommissioningSintexorapprovedequivalent doublelayeredtanksonoverheadelevatedpedestalasdirectedincluding scaffoldingallalliedplumbing,valves,stopcocks,MCGMcertifiedwatertankcap, includingcleaningetc
ThisitemisworkedoutbytheStructuralConsultant Forthepurposeofthiscourse anapproximateamountisbudgeted
Notes:
1)TheitemsgivenbelowshallbeasperSectionD:'Reinforcement'ofthe specifications
2)CoverblocksshallbeofgoodqualityconcreteM30/10andshallbevibratedon atablevibratortoreducethepermeability
3)Whereverweldingofreinforcementisspecified,thesameshallbecarriedout conformingtoIS:9417orIS:2751 Weldingshallbecarriedoutbyapproved qualifiedweldersonly Onepercenttestingofweldsshallbecarriedforalltypesof welds
4)Overweightofthesteelshallnotbeconsideredforcalculatingconsumptionand paymentpurpose,IS constantforweightofdifferentdia ofbarsshallbe consideredforpaymentaswellasconsumptionpurpose
5)Columnreinforcementbarsarerequiredtobelappedinthemiddleportionof columnsasperIS13920 Properarrangementshallbemadetosupport reinforcementprojectingabovefloorlevel Similarlylapswithinadistanceof2D (depthofbeam)or1/4spanfromthefaceofthecolumnarenotallowed The overhangingbarsshouldbeproperlysupported Thecostoftheseworksis deemedtohavebeenincludedintherate
ProvidingandfixinginpositionmildsteelreinforcementofTATA/Vizag/SailSteel ofvariousdiametersforRCC piles,pilecaps,footings,foundations,slabs,beams, columns,canopies,staircases,dowels,chajjas,lintels,pardis,copings,fins,arches etc asperthedetaileddesigns,drawingsandschedulesincludingcutting, welding,bending,hookingthebars,bindingwithGIwiresandconcretecover blocksetc complete Noseparatepaymentforchairs laps wastageandbinding
Providing,fabricating,erectingandfixingatalllevelsstructuralsteelofTATA/ Vizag/SailSteelinalltypesofmembersforColumns,Beams,TrussRafter, Canopies roofcovers purlinforroofs lofts mezzanines storageracksforparaffin boxes,portals,braces,underpinning,shoring,frames,workforallstructuraland otherpurposes,includingcuttingedgestotherequiredprofile,bolting,welding, anchorfastening,riveting,groutingetc completeinallrespects,includingepoxy paintingasspecifiedine5
PaintingofSteelWork
Supplyingpaintingandothermaterialsandlabourrequiredforpaintingofstructural steelasdetailedbelow:
i) Surfacepreparation: Mechanicalcleaning,removinglooserust/scaleusinghardtools,powertools,use ofaromaticsolventstoremovesoil/greasepresentandtoensureacleananddry surfacebeforepriming
ii) Primer: SinglecoatofEpoxyresinandzincphosphateoftotaldryfilmthicknessof25 microns
iii) Finish-Coat1: Singlecoatofhighbuildchlorinatedrubbermediumwithmicaceousironoxideof totaldryfilmthickness of75microns
iv)FinishCoat2&3:
Twocoatsofplasticchlorinatedrubbermediumsuitablypigmentedof25microns dryfilmthickeach TotalDFTofpaintsystemshallnotbelessthan200micron
Providing,fabricating&fixinginpositionRSandCRsteelsections asperdesignwithMSquadranttracksandguidewheelsandallotherfixing accessoriesasspecified&directed,weighing50kgpersqm andpaintedwithtwo coatsofEpoxypaintandtwocoatsofEnamelpaintandcompletewithpivot aldropsetc
Providingfabricating erectingandfixingSquareHollowor Sections/Round HolloworsolidSections,foranysizeandshape ,withorwithout perforatedsheets,asperdetaileddrawingsanddesignincludingnecessary anchoring,includingcleaning,sandblasting,threeormorecoatsofepoxypaint etc completetothesatisfactionofArchitect etc complete
Note:
Measurementshallbetakenforcompletelaidroofinsquaremeter Overlapswill notbepaidextra Therateshallincludeallthematerial labourbolts nut washers andtoolsandplantsetc complete SteelFramedRoofingSystem
ProvidingandfixingPUFpanelbyKoreaPuffPUFPanelSolutionsforroofing inclusive offixingtostructuralsteelsupportsystemasperdesignand manufacturer'sspecification Thecostshallbeinclusiveofalltaxes Allnecessary scaffolding craneandaccessoryworktobeusedincarryingouttheworksistobe includedinthecost Thecontractorshallhavetotakeduecareofthesurrounding buildingandseetoitthatthefacadeskinanditselementsarenotdamagedinthe processofcarryingoutthiswork
ThisitemisworkedoutbytheConsultant Forthepurposeofthiscourseanapproximateamountisbudgeted
Note:
1)Theitemsgivenbelowshallbeasper'MasonryWork'ofthespecifications
2)Rateshouldbeinclusiveofscaffolding,curingandalsodewatering&keeping surfacedryduringconstruction
3)CementformanufacturingconcreteblockstobeprovidedbyContractor
4)Onlyselfsupportingscaffoldingwillbeallowed noholesinmasonrywouldbe permitted
5)Contractorwillberesponsibleformakinggoodallthesurfacesofbrick/block masonrywallinitsoriginalformwhereverinchasingthewallisdoneforproviding servicelineslikeelectrical,telecommunicationandwatersupplyandplumbingetc
6)Factoryincludingblockmakingmachineformanufacturingofconcreteblocks shallbeapprovedby Architect-in-charge
7)Thecementforblockmasonryshallconfirmtotherequirementofminimum cementrequirementforPCC ofconcretespecifications
8)Requiredquantityofconcreteblocksaretobemanufacturedwithgroovesto accommodatetheconduitpipes/waterpipesetc Thegroovesshouldbestaggered onbothsides
9)Therateforconcreteblockmasonrywallsshallbeinclusiveofproducinghalf blocksandoddsizedblockstosuittheconstruction
10)Mortarsforallmasonryworkshallbemixedinanapprovedmortarmixeror concretemixer
11)Handmixingofmortarwillnotbeallowed
12)Onlyriversandand43gradecementshallbeused
13)Washingofsandinrotaryscrewtypewashingmachinesisamust
14)Bricksusedshallbeoffirstclassandshallbeofregularinshapeandtheir edgesshouldbesharpandshallbefreefromcrack Brickshallbefullysoakedin cleanwaterbysubmerginginatankforaperiodof12hoursimmediatelybefore use
15)Contractorwillberesponsibleformakinggoodallthesurfacesofbrick/block masonrywallinitsoriginalformwhereverinchasingthewallisdoneforproviding servicelineslikeelectrical,telecommunicationandwatersupplyandplumbingetc LengthofRunningWall Providingandlaying1:6C:M atalllevelsforexternalwallsincluding makinggroovesforconcealingelectricalconduitsofdiaupto32mmincluding
200mmx200mmhighx600mmlongsolid concreteAACblocksmasonrywalls
Providingandlaying in1:6 C:M,aboveplinthoratalllevelsincludingforoddshapedwalls,brickfins, columns etc includingstrikingjoints rakingoutjoints scaffolding curingetc complete (Min cementcontent15Bag/cum)
ProvidingandlayingrandomrubblemasonryofbasaltstoneinC:M1:6inretaining walls,foundation,inplinth&superstructure,includingrakingoutjointswhen plasteringtobedone/strikingoutjoints,wateringandscaffoldingetc
ProvidingandlayingcoursedrubblemasonryofbasaltstoneinC:M1:6inplinth& superstructure,includingrakingoutjoints,approvedpointing,wateringand scaffoldingetc
wide100mm thicknessinpiecesof600mmlengthoveramortarbeddingofCM
Notes:
1)Theitemsgivenbelowshallbeasper'Plasteringofthespecifications
2)Scaffoldingforplasteringshallbeofselfsupportingtype Holeswillnotbe allowed,tobemadeinthemasonryorRCCworkforanchoringthescaffolding
3)OnlyRiverSandshouldbeused Howeverwashingofsandinrotaryscrewtype washingmachinesisamust
4)Mortarforplasteringworkshallbemachinemixedinamortarmixerorconcrete mixer Handmixingofmortarwillnotbeallowed
5)Therateforplasteringshallalsoincludeprovidingandmixing/applyingan approvedbondingagentasperdirectionofArchitect-in-charge,andalsoapplying approvedhack-aidonsurfacereceivingplaster
6)Only43gradecementshallbeused
7)Rateshouldbeinclusiveofscaffoldingandcuringshallbestartedassoonas theplasterhashardenedsufficientlynottobedamagedwhenwatered Theplaster shallbekeptwetforatleast10days
Providing12mmthick intwocoatsincementmortar1:4 with/withoutneeru,finished smoothforallRCC/brickblockmasonrywork
Providingandapplying18mmthick incementmortar
1:4without/withneerufinishedsmooth forRCC/brick/blockmasonrycompletein allrespectsincludingscaffolding bondingagent curingandasdirectedby
Providing&applyingacontinuouscementplaster ofsize50mmwide and15mmthickunderRCCpardi,chajjaandaroundwindowopeningsatalllevels includingnecessaryscaffolding stagingetc andcuringcomplete
Notes:
1)Theitemsgivenbelowshallbeasper'Paintingofthespecifications
2)ScaffoldingforPaintingshallbeofselfsupportingtype Holeswillnotbe allowed tobemadeinthemasonryorRCCworkforanchoringthescaffolding
3)ThebrandsofthePaintshallbespecifiedandreadymadepaintofrequired shadeshouldbeused
4)Thesurfaceshallbemadeperfectlysmoothbyrubbingwithsandpaperof differentgrades
5)Allholesandopenjointsshouldbefilledwithstrongputtyorwithamixtureof glueandplasterofparisandsmoothenedbyrubbingwithsandpaper
6)Insteelwork,allscales,dirt,suppliersdeliverymark,oil,greaseetcshallbe removedwithsandpaperbeforepainting Specialcareshallbetakenforcleaning thecorners
7)Eachcoatsshallbeallowedtodryupperfectlybeforethesucceedingcoatis laidoverit
8)Rateshouldbeinclusiveofscaffolding,curingandalsodewatering&keeping surfacedryduringconstruction
Providingandapplying3coatsoveracoatofprimer ofoilbounddistemperof approvedshadeandofapprovedmakeoverconcrete/plasteredsurfaces includingpreparingofthesurfaces,scaffoldingetc
Notes:
1)Theitemsgivenbelowshallbeasper'Flooring'ofthespecifications
2)Atleast6samplesforallfinishingitemsofwork fromdifferentapproved sourcesshallbesubmittedbeforestartingtheworkforapproval Architectin chargedecisionregardingtheshade,qualityandthesourceisfinal Alllike materialsofflooring,cladding,etctobefromsamebatchasperapprovedsample
3)Rateshallbeinclusiveofallexposedstone/tileedgestobechamfered,hand polishedandmouldedasdirected
4)Ratesforverticalcladdinginstoneofthicknessfrom6mmto25mmshallinclude exposedrightangularcornerjointsfinishedandedgespolishedandmouldedas perArchitect'sinstruction,withcutting6mmgroovesandalsoedgepreparationto suitcornerangles
5)Skirting/dado/cladding,becauseofvaryingheightwillbemeasuredandpaidon squaremetrebasisinsteadofonrunningmetrebasis
6)Therateforflooring/claddingshouldbeinclusiveofbedding/backcoatas specified Thethicknessofmortarbeddingorbackcoatspecifiedisminimum Thisthicknesswillvaryaccordingtothethicknessofflooringorcladdingmaterial soastosuitthespecifiedlevelorline TheContractorshallberesponsiblefor properbondingbetweenbackingcoat&masonryworkorRCCworkandhisrate shallbeinclusiveofprovidingandapplyingapprovedbondingagent
7)Forallverticalcladding,anapprovedchemicaladhesivefortilesasper manufacturer'sinstructionsshallbeusedandtheratesquotedshallbeinclusiveof thecostofthisadhesive forathickness3mmto4mm
8)Unlessotherwisespecified allsizestobeinmetricsystem
9)Scaffoldingforexternalcladdingshallbeofselfsupportingtype Holeswillnot beallowedtobemadeinthemasonryorRCCworkforanchoringthescaffolding
10)Therateforverticalcladdingshouldalsoincludetheworkonisolatedcolumns, chamfers,etc
11)Noseparatepaymentwillbemadeforprovidingandfixing,oddsizedtilesof anyshapeandsizetosuitconsultantrequirement
12)White/ColouredcementwithmatchingpigmentsorJohnsonBALgroutwith appropriatecolourshallbeprovidedbyContractorathiscost
13)TheContractorshallprovidesuitablesupportsforsupportingthecladdingtiles andremoveitonlyafterthetileshavefirmlyadheredtoitslocation
14)Edgesofcladdingtilesfixedonthecornersofthecolumnsandwallsshouldbe polishedasperdirectiveofArchitect,orasindicatedinthedrawings
15)Themaximumthicknessofthepastepreparedbyusingtileadhesiveand appliedonthewallandcolumnsurfacesshouldnotbemorethan3mm
Contractorshallhavenoextraclaimsonaccountofincreaseinthethicknessofthe pastebeyondmaximumthicknessasspecifiedaboveduetofaultyworkmanshipor anyotherreason
16)Mortarrequiredforbedding/backcoatshallbemixedmechanicallyinmortar mill Onlyriversandshallbeusedinthemortar
17)Allfixtures,electricalpoints,lightsetctobealightedwithtiling,groovesand pattern,flushwiththewallfaceasperdetailsanddrawings Amockupforthe sameshallbegotapprovedfromArchitect
k1*
18)Thecontractorsarerequiredtostudydrawingscarefullytounderstandfixing detailsofflooring,skirting,claddingetc,tokeeprequiredgroovesbetweendifferent finishesatdoorandwindowlocationsflooringandskirtingjunction,wallandceiling junctionetctomatchflushlinei e verticalplaneofwallandskirtingetc
19)Rateshallbeinclusiveofcostofscaffolding,grouting,curing,finalpolishingby non-slipwaxpolishandcleaningofsurfacesandalsodewatering&keeping surfacedryduringconstruction
20)Asample/mockupofflooring,cladding,etctobegotapprovedfrom,Architect
21)Alladditionalgroovestobeprovidedinvertical,horizontalanddirectionas shownindetaileddrawingsorasdirected
22)Tomakewallcladdingsurfaceandskirtingsurfaceflush wallatskirtinglevel shallberequiredtorecessinsideasperfixingdetails Thenecessaryrecessesin RCCwalletcshallbetakenatthetimeofconstructionitself
23)Only43gradecementshallbeused
Providingandlaying40mmthickIndianPatentedStoneflooringincementmortar, includingprovidingjointsandgroovesasdirected,inpatchesorinlargerareas
Providingandlaying25thickhandcutandmirrormachinepolishedgreen square600mmx600mmfinishedsize andofapprovedcolourandshadeinsmallerpatchesforrepairorin largerareasincluding20mmthick1:2limemortarbeddingor1:6cementmortar bedding tobecompactedproperlybysuitablemethodasapprovedbythe Architect,beforelayingKotahstoneinposition Jointsfinishedwithneatcement slurry,widthofjointshallbebetween10mmto150mmlayingasperdesign, including3coatsofmachinepolishingafterlaying,curing,cleaningcompleteas
k2 kotah stoneflooring forclassroomand coridoor
k3
k5
dadoofheight1200 5mmthickkotahstone300x300mm
k6* anti-skidvitrifiedtilesof300mmx300mm toiletblocks
Providinganffixing and10mm thickness(Santron)greycolourfor asdirectedincluding15mmthick backingcoatplastering1:4cementmortar,fixingwithadhesivesasspecified,joints filledwithwhitecementpasteorofapprovedcolourgroutingmaterialsincluding curing scaffoldingetc complete (Overalltilevariationallowance+10mm)(Base
k14*
CobblestonePaving
Providing&layinggranitecobblestonefloor(BasantBetonorequivalentapproved make)withstonesizevaryingfrom100x100mmto150mmx150mmlaidasper approvedfan,circularorotherpatternandcolour,onA75mmthkPCCbedM:10, layingblockstotherequiredslope,leveling,filling,cleaningthesurfaceetcwithall labourandtransportationtositeandasperdirectionsoftheSite Architect
M DOORS,WINDOWSANDPARTITIONS
Notes:
1)CarpentryandJoinery,Timber,Steelcasement,AluminumDoorsWindows, skylightsopenable slidingwindows rollingshuttersandpolycarbonatesheet curtainwalls,etc
2)Forallaluminumworks thecontractorshallsubmitshopdrawingforeachitem ofworkindicatingthesectionofaluminum,itsweightandjoinerydetailandtotal weightofwindow/door/partitionwallsetc Whereverpossiblerivetingshallbe resortedtoforconnection Alternativelyhotdippedgalvanizedpinheadedsheet metal/brass screwscouldbeused Nomildsteelwithouthotdippedgalvanizing shallbeusedforanyfastenings,etc
3)TheratesshallnotbepaidseparatelyforAluminumsectionsusedonweight basis
4) Therateshallbeinclusiveofproviding&fixingglasspanelsincludescostofall typesoffixturesandfasteningsmadeofanymaterials neoprenerubbergaskets screws,etc
5)Contractorshallsubmitsamplesofassemblysectionsfromdifferent manufacturer'sforapproval Architectdecisionshallbefinal
6)Alljointsbetweencivilworkandaluminumframesshallbesealedandmadeair tightbyapplyingSiliconesealantorequivalentasapprovedatContractor'scost
7)Ratesforrepairsaswellasprovidingandfixingofnewdoors windows sky light,rollingshutters,etc inthissectionshallbeinclusiveofalltheitemsof hardware/fittingsandnoextrashallbepaidtothecontractortowardsthecostof hardware/fittings
8)AllHardwareshouldbeaspersamplesapprovedbyArchitect Providingand fixingfollowinghardwareitemsinoxidizedbrass(unlessotherwisestated) including fixingwithappropriatescrewsandfastenersinbrass/stainlesssteel metalscrews(Nettlefoldorequivalent)whereverspecifiedetcofapprovedmake typeandthickness:
9)Providingandfixingthehardwarecompleteinallrespectswithnecessarypins, plates,screwsetc(Allfittings&fixturesshallbeofHeavydutybrassoffirstquality)
10)Allhardwareandhingesshallbeofpalladiumorapprovedequivalentbrand,all otherhardwareshallbeofDormaorapprovedequivalentbrand
11)Hinges:Railwaytypeheavydutyhingesinbrassoxidizedwithstainlesssteel pinsofdiameternotlessthan4mmandleafthicknessnotlessthan4mm(125mm x65mmx4mmto300mmx65mmx4mm)
12)Hinges:Parliamentarytypeheavydutyhinges5mmthickbrassoxidized
13)Towerboltshavingboltdiaof10mminbrassoxidized,inbrassbody600mm longetccomplete
14)Doorhandles 'Dorma'TGDI35025Spullhandle,25mmdia,350mmlongor 'DORMA'TG9155ormatchingwithexistinghandleasspecifiedandapprovedby theArchitect
15)BrassoxidizedBabylatches,75mmlongwith25mmx8mmthickboltcomplete withknob,Vacant/Engagedetcasperapprovedsamples Brassaldropsshall matchexistingoriginalaldropsinthebuildingandshallbereusedorfabricatedto matchtheoriginal
16)ConcealedtypehydraulicdoorcloseroropendoorcloserofDormaor equivalentbrandwithDormadoorstopper,springloadedwithrubberbushandfoot release
17)PlainMorticelocks6leversLatchBoltofGodrejmakeequivalentwithbrass bodyandchromeplatedflatplatetoedgeofdoorincludingfixingtotimberor aluminiumshutterframesetccomplete
18)Sameasaboveitem(16)butwithdeadlock
19) 3mmthickSSkick/pushplatefixedwithSSscrewsof150-400mmdepth (CP brassdomicalhead)
20) Doorbufferwithrubber/PVCbushshutterorwallmounted
21)Providingandfixing andrepairrateswillalsobeinclusivealdrops,handles stopperetc allcomplete
D1-Providingandfixingteakwooddoorframesalongtheedge plywoodboard doorofthickness40mmwithWPCframearound6mmclearfloatglass Wooden stripof10mmthicknessfordoorhandle
D2-Providingandfixingteakwooddoorframesalongtheedge,plywoodboard doorofthickness40mmwithWPCframearound5mmthicktintedpolycarbonate sheetofapprovedcolour Woodenstripof10mmthicknessfordoorhandle
D3-Providingandfixingteakwooddoorframesalongtheedge,plywoodboard doorofthickness40mmwith6mmclearfloatglass
D6-Providingandfixing15mmthickplywoodfoldingfullypanelledandsizesas perthedrawingincludingaluminiumframe,foldingmechanism,brassfixturesand fasteningsandfinishingthewoodworkwithonecoatofprimer/polishedas specified Ratealsotoincludeprovidingplain6mmthickModiorAsahifloatglass
W10-Providingandfixing15mmthickclearfloatglassbetweentrussforroofof
n1*
Notes:
1)Thecontractorwillgivea10yearsguaranteeoftheworkundertakenon Rs100/-Stamppaperontheapprovedformatdulyregistered
2)Tenpercentamountofvalueofworkswillberetainedfortheperiodoffiveyears fromthedateofactualcompletionofthework willbereleasedprogressivelyat fourpercentaftertwoyearssubjecttoattendinganyrectificationofdefectsand balanceamountsbytheendoffiveyears
3)Allworktobedonethroughspecialistwaterproofingandstructuralrepair agenciesshallbeundertakenonlyontheapprovaloftheArchitect
bottomRCCraftslab
Providingandapplying70mmto75mmthickproprietarybrandcementbased waterproofing(boxtype)for andsidesofRCCwallsof watertanks,septictanks,effluenttreatmenttanks,etc including providingleak prooftreatmentby injectiongrouting toconcretemembersat10mcentresinboth directionsandalsoatallconstructionjoints,andprovidingandfixing20mmto 25mmthickroughShahabadstoneorotherapprovedstonetilessetin20mmthick
1:3waterproofcementmortarandfinishingthebylaying/plastering with20-30 mmthickC:Min1:3withwaterproofcompound(Contractortogivecomplete specificationsforwaterproofingsystemheproposetocarryout)
n4 waterproofinginWC BB coba
in allpositionconsistingofspecialisedapprovedwaterproofingcompoundand
n5* waterproofingtreatmenttoterracewith bricksbats
laidinrequiredslopetodrainthewaterforanyspanaftercleaningthe basesurfaceapplyingacoat ofcementslurryadmixedwithapproved waterproofingcompoundandlayingthebrickbatsonbottomlayerinC:M1:5 admixedwithapprovedwaterproofingcompoundfillinguptohalfdepthofthebrick bats,curingthislayerfor3daysapplyingcementslurryoverthislayerjointingof brickbatswithC:M1:3admixedwithapproved waterproofcompoundandfinally topfinishingwithaverage20mmthicklayersofcementmortaraddedwithjute fiberat1kgperbagincludingfinishingthesurfacesmoothwithcementslurry
WaterProofingChajja
Providingandapplyingwaterproofingtreatmentoverchajjausingproprietary cementbasedsystemlikeIndiaWaterproofingusingbrickbatsof50mmormetal no2 averagethicknessoftreatment50mm finishedwithsmoothcementfinish withfalsetilemarks,includingbreaking/removingexistingwaterproofingand cartingawaythedebrisetc
Tilejointfilling
Providingandfillingcementbasedtilejointsealingcompound(JohnsonBalGrout orequivalent)inbath/WC/toilet/flooringtilesincludingrakingoutoldloose jointingmaterial,curingetc
Gapssealing
Providingandfillinggaps with Roffe-grout-GPorequivalentincludingcleaningthesurfaceofallloosematerials curing,mixingaspermanufacturer'sinstructionsetc complete
belowdoorframes,aroundNahanitraps
GapSealing-Siliconsealant
ProvidingandfillingRTVsiliconesealant orequivalentFisherproductwithagun usingapprovedmaterialin includingcleaningthegaps scaffoldingetc
gapsaroundwindows
ProvidingandfixingLeadFlashing750mmoverChajjashallbehoused approximately300mmabovechajjainamortarjointofadjoiningmasonrywall this sheetctshallbeslopingoutwards Fasteningdown –Thesheets,shallbe fastenedwiththebestSSorBrassscrews/boltsandleadwashersAllens,Fisher orotherapprovedfasteningsasdirectedbytheConservationArchitect Thelead sheetingshallbegoodmilledleadnotlessthan10Kg/Sqmbenttotheshape fastenedintothewall groove20mm withbrass/sswallhookswithjointsatright anglestotheflowbyadripwithaproperlap,iflevelspermit,orby75mmjointsof foldedlead 107 m
SECTION-III: CARPENTRYANDBUILTINFURNITURE
Notes:
1)CarpentryandJoinery forpartitions tables cupboards storageunits desks labfurniture,museumdisplayfurniture,officefurniture,auditoriumandlecture theatrefurniture,doors,windows,skylights,falseceilingetc
2)Forallcarpentryandfurnitureworks,thecontractorshallsubmitshopdrawing foreachitemofworkindicatingthesectionofwoodits joinerydetailetc Whereverpossiblewoodenpinsshallberesortedtoforconnection Alternatively stainlesssteel/brass screwscouldbeused Noothernails/screwsshallbeused foranyfastenings,etc
3) Therateshallbeinclusiveofproviding&fixingglasspanelsincludescostofall typesoffixturesandfasteningsmadeofanymaterials,neoprenerubbergaskets, screws,etc
4)Contractorshallsubmitsamplesofassemblysectionsfromdifferent manufacturer'sforapproval Architectdecisionshallbefinal
5)Alljointsbetweencivilworkandtimberframesshallbesealedandmadeair tightbyapplyingSiliconesealantorequivalentasapprovedatContractor'scost
6)Ratesforrepairsaswellasprovidingandfixingofnewcarpentryitemsand furnitureinthissectionshallbeinclusiveofalltheitemsofhardwareandfittings requiredandnoextrashallbepaidtothecontractortowardsthecostofhardware/ fittings
7)AllHardwareshouldbeaspersamplesapprovedbyArchitect Providingand fixingfollowinghardwareitemsinoxidizedbrass(unlessotherwisestated) including,fixingwithappropriatescrewsandfastenersinbrass/stainlesssteel metalscrews(Nettlefoldorequivalent)whereverspecifiedetcofapprovedmake typeandthickness:
8)Providingandfixingthehardwarecompleteinallrespectswithnecessarypins, plates screwsetc(Allfittings&fixturesshallbeofHeavydutybrassoffirstquality)
9)Allhardwareandhingesshallbeofpalladiumorapprovedequivalentbrand,all otherhardwareshallbeofDormaorapprovedequivalentbrand
10)Hinges:Railwaytypeheavydutyhingesinbrassoxidizedwithstainlesssteel pinsofdiameternotlessthan4mmandleafthicknessnotlessthan4mm(125mm x65mmx4mmto300mmx65mmx4mm)
11)Hinges:Parliamentarytypeheavydutyhinges5mmthickbrassoxidized
12)Towerboltshavingboltdiaof10mminbrassoxidized,inbrassbody600mm longetccomplete
13)Doorhandles Dorma TGDI35025Spullhandle,25mmdia,350mmlongor 'DORMA'TG9155ormatchingwithexistinghandleasspecifiedandapprovedby theArchitect
14)BrassoxidizedBabylatches 75mmlongwith25mmx8mmthickboltcomplete withknob,Vacant/Engagedetcasperapprovedsamples Brassaldropsshall matchexistingoriginalaldropsinthebuildingandshallbereusedorfabricatedto matchtheoriginal
15)ConcealedtypehydraulicdoorcloseroropendoorcloserofDormaor equivalentbrandwithDormadoorstopper,springloadedwithrubberbushandfoot release
16)PlainMorticelocks6leversLatchBoltofDorma/Godrejorapproved equivalentmakeequivalentwithbrassbodyandchromeplatedflatplatetoedgeof doorincludingfixingtotimberoraluminiumshutterframesetccomplete
17)Sameasaboveitem(16)butwithdeadlock
18)3mmthickSSkick/pushplatefixedwithSSscrewsof150-400mmdepth (CP brassdomicalhead)
19)Doorbufferwithrubber/PVCbushshutterorwallmounted
20)Providingandfixing andrepairrateswillalsobeinclusiveofaldrops,handles stopperetc allcomplete
PartitionWalls
Providingandfixingfullheight90mmthk 12meter-48meterhigh teakwood partitionwallsusing,50x40mmTWsectionsinfirstqualityBTCwoodhorizontal andverticals,atevery600mmc/c with 15mmAnchormarineplycladdingfrom bothsides,with50mmthk glasswoolpackingbothsidesaluminiumfoilbacking, andfinishedinapproved2mmthicklaminateonbothsides Thepartitionwallsto haveconcealed50x50mmaluminiumboxsectionstop,middleandbottom, powdercoatedasdirected, forrunningelectricalconduits Allpartitionswallsto have100mmx12mmthk skirtinginburmateakonbothsidesandcappedwith 90mmx90mmontopofpartitions,etc allasperdrawingsattached All necessarytermitetreatmentshouldbedonebeforefixingtheexternalplywood panels Rateshallinclude sidemattfrenchpolishing/melaminepolishing/Duco paintinapprovedshadeandmakeetccomplete
InbuiltStoneseats
Providingandconstructinginbuiltmasonryandroughkotahseatsasshownin architecturaldrawingsalongwithacladdingofBluecolourterrazzo(make:Bharat FlooringsandTilesPvt Ltd -Premiumterrazzoseriesorequivalent),laidona bedof1:4cementmortarincludingneatcementbacking,fillingjointsandwhite /colouredcementslurry,curingandcleaningcomplete
Sameasabovebutfinishedwith25mmthickmirrorpolishedKotahonallvisible surfacesetc complete
StainlessSteelBenches
ProvidingandfixingperforatedSSsheet(SS304)benchofapproveddesignwith SSpipeframingand3mmthickperforatedSSsheetpanelsasshowninthe architecturaldrawingswithnecessarybolting/weldingandfixingontilesurface withanchorfastenerbolts etc complete GIsheetbenches
Sameasabove(a27),butwithperforatedGIsheetandGIpipeframing,powder coated,etc complete
ProvidingandFixingRailingincludingbendingandweldingwithapprovedspecial electrodesandfixinginpositionhandrailsconsistingof50mmdia SS(stainless steel304)handrailsofvariousheightsupto1000mmasperdrawings(refer sheet:)and,includingprovidingandfixingSSpipebracketsonwallsandflooror baseplatesfixingtotheconcrete with12mmdia Anchorbolts4Nos/bracket,or weldingtoinsertplatesincludingbuffingasdirected
Providing&fixingRailingincludingbendingandweldingwithapprovedspecial electrodesandfixinginpositionhandrailsconsistingof50mmdia SSpipesand perforatedSS(StainlessSteel304)plateboltedtoSSflat/boxsectionsasper drawings(refersheet:)and includingprovidingandfixingSSpipebracketson wallsandfloororbaseplatesfixingtotheconcrete with12mmdia Anchorbolts4 Nos/bracket,orweldingtoinsertplatesincludingbuffingasdirected
Providingandfixingseatingaroundtreeasperdrawings Internaldiameterofthe seatingtobeconsideredas15m Seatmadeof150mmdiaSS pipe35mmthick andbackrestof50mmdiaSS pipe35mmthick Bothpipestobebent&grouted intothegroundateitherend Seat&backresttobeweldedtointermediateleg support,eachlegconsistingof2nos 'Z'shapedSS plate4mmthk spaced 40mmapart&connectedat4pointswithSS bolts&cylindricalspacers
SECTION-IV: MISC
Notes:
1)Rateshallincludeminorcivilwork,scaffolding,electricalworks,dismantling, liasoningcost,steelitems,etc
2)Thequotedpriceshallbeinclusiveofcentralexciseduty,VAT,octroiandservice taxandallotherapplicabletaxes Thisquotationshallnotbesubjecttoprice variationcost
3)Thecontractorshallmakenecessaryarrangementstoprovidesuitablelockable weatherproofstoragespaceforthematerialsandshallalsostacktheexisting dismantledmaterialinasafesecureplaceforthedisposalofthemunicipal authorities
4)Thecontractorshallincludeinthequotation60monthsfreemaintenance,which willbecommencedfromthedateofcompletionofproject
5)Thecostshallbeinclusiveofallpreparatoryworkandnoextracostwillbe providedtowardsthisitem
7) Therateshallbeinclusiveofproviding&fixingglasspanelsincludescostofall typesoffixturesandfasteningsmadeofanymaterials,neoprenerubbergaskets, screws,etc
6)Forallworksinthissectionasspecifiedbytheconservationarchitect,the contractorshallsubmitshopdrawingforeachitemofworkindicatingthesections materials its joinerydetailetc Whereverpossiblewoodenpinsshallberesorted toforconnection Alternativelystainlesssteel/brass,screws/boltscouldbeused Noothernails/screwsshallbeusedforanyfastenings,etc
8)Contractorshallsubmitsamplesofassemblysectionsfromdifferent manufacturer'sforapproval Architectdecisionshallbefinal
9)Alljointsbetweencivilworkandtimberframesshallbesealedandmadeair tightbyapplyingSiliconesealantorequivalentasapprovedatContractor'scost
FabricationandinstallationofInformationSignasspecifiedinthedrawings
Providing&fixinginposition inaluminiumextrudedbrown anodizedsectionwithlettersinvinylonbothsidescoveredwithacrylicsheetand asperapprovedsamplebyArchitectfixingasdirected
ii)GraniteStonecobblestoneedgingaroundthetreebase,withwhiteround pebbles/withgravelbedinsideasindicated
SECTION-V: ELECTRICAL
ThisitemisworkedoutbytheElectricalConsultant Forthepurposeofthiscourseanapproximateamountisbudgeted
Supply,Installation,TestingandCommissioningofEarthingstationasperIS3043 consistingof40mmGI3000mmlongpipe suppliedwithfunnelattopincluding saltcharcoal,masonrychamber,testlinkbox,hardwareincludingexcavationand masonryworkwithcastironcoverforthechamber
Supply&Layingof followingsizesofstrips &wiresfromearthingchamber/Gridto theelectricalequipment&terminatingthesame Theportionofthestripunder groundshallbelaidatadepthof600mmandonsurfaceshallbefixedwith spacers&clamps&alsoonTray Excavation&allcivilworktobeincluded 25mmx3mmGI stripforDistributionBoard(FirstDistributionBoardinacluster ofDistributionBoards)
8SWGGI EarthingwireforLighting&PowerDistributionBoard
Supply,Installation,testing andcommissioningof3phaseenergymetersuitable forunbalanceloadandincludingnecessarycutoutandjumperwiresetccomplete aspersupplycompany'srequirement
Supply,Installation,testing andcommissioningofTPNMCB16A andincluding ncessarycutoutandjumperwiresetccompleteaspersupplycompany's requirement
Supply,Installation,testing andcommissioningofTPNMCB40A andincluding necessarycutoutandjumperwiresetccompleteaspersupplycompanys requirement
Supply,Installation,testing andcommissioningofTPNMCB32A andincluding necessarycutoutandjumperwiresetccompleteaspersupplycompanys requirement
Supply&InstallationofstandardmanufacturersDistributionBoardforLighting It shallbeastandardBoardwithdoubledoor&suitableforrecess mounting&shall beasfollows Scopeincludesmountingarrangementincludingnecessarysteel hardwareetcWiresinDB tobeproperlydressedwithbuttontapeandwithlugs, labelsetc
Incomer40ATPNMCB-1No 40A,30mA,2P,RCBO-3NosOutgoing 6/10ASP MCB-24Nos
(LDB)
Supply,Installation,Testing&CommissioningofPVCArmouredCablefixedto walls,Ceilingswithclamps,spacerssaddlesorlaidinreadymadetrenchortiedto cablestraywithcableties tagsetc asfollows 1100VgradeasperIS
Installation,Testing&Commissioningofcables(onwalls,trays) PVCinsulated, 1100Vgrade,steelarmoredasperIS1554withlatestamendmentincluding spacers,saddles,tags, etcThecablesto beproperlydressed
4Cx16SqmmALAYFY
3Cx10SqmmALAYFY
4Cx10SqmmAYFY
3Cx4SqmmAYFY
3Cx6SqmmAYFY
3Cx25SqmmAYFY
TerminationofcableswithHeavydutySiemenstypeglands&lugs Lugsused shouldbeCopperforcoppercables&Aluminiumforaluminiumcable Scopeto includeallmaterial&labourincludingpropertools,Insulationtape
4Cx16SqmmALAYFY
3Cx10SqmmALAYFY
4Cx10SqmmAYFY
3Cx4SqmmAYFY
3Cx6SqmmAYFY 3Cx25SqmmAYFY
Pointwiringforlight,bellpoint ScopetoincludecircuitWiringforlighting&the lightswitchboardwithswitches&furtherwiringtolightpoints Theswitchboard shallberecessmounted/surfacemountedofGIstandardasperthesupplier The pointWiringshallconsistof3x15Sq mmcopperwire,PVCinsulated,1100V gradeinPVCconduit/PVCcasingcaping Thewires&conduitsshallrunfromthe switchboardtotheindividualpoint&circuitwiringshallbeof3x25mm2copper wirefromdistributionboardtothe switchboard Modularplatetypeswitchestobe used6ASwitchSocketonswitchboardtobeincludedInmajorityofthecasesthe lightsaregroupswitchedfromtheDistributionBoardinwhichcasethewireshall be3x25mm2 AllwiresshallbeFRLS
PrimaryLightPointwiringofaveragelengthupto5meterslengthofwire
PrimaryLightPointwiringofaveragelengthupto55to10meterslengthofwire
PrimaryLightPointwiringofaveragelengthupto105to15meterslengthofwire;
PrimaryLightPointwiringofaveragelengthupto155to20meterslengthofwire;
SECONDARYLIGHTPOINT(FirstLighttosecondlightpointUpto5metersof lengthofwire3x15sq mmwires
SECONDARYLIGHTPOINT(FirstLighttosecondlightpointUpto55to10 metersoflengthofwire3x15sq mmwires
SECONDARYLIGHTPOINT(FirstLighttosecondlightpointUpto105to15 metersoflengthofwire3x15sq mmwires
SECONDARYLIGHTPOINT(FirstLighttosecondlightpointUpto155to20 metersoflengthofwire3x15sq mmwires
FanpointwiringshallbesameasPrimarylightpointpointwithindividual controlWireofsize3x15sq mmsizeshallrunfromtheswitchboardtothefan pointthroughPVCconduit/PVCcasingcaping ThecircuitfromtheDBtothe switchboardshallbe3x25sq mmwiresSpaceforregulatortobeprovidedinthe switchboard Upto5Metersof lengthofwire
FanPointwiringwiringlength55to10meterlength
FanPointwiringwiringlength105to15meterlength FanPointwiringwiringlength155to20meterlength
Exhaustfan/WallFanpointswiringshallbesameasPrimarylightpointwith individualcontrol&6Asocket&top@thefanpoint Wireofsize3x15mm2size shallrunfromtheSwitchBoardtothefanpointthroughconduit Thecircuitfrom theDB totheSwitchBoard with3x25mm2wire
Pointwiringfor6Ampswitchsocketpoint Scopetoincluderunningof3x25mm2 copperwire,PVCinsulated,1100VgradeinPVCconduit Wirestoberunfromthe PowerDistributionboardtotheIndividualsocketsupto4socketscanbeloopedon onecircuitWorkstationRawpowerAllwiresshallbeFRLSWiringlengthupto5 meters
6Asocketpointwiringlength55to10meters
6Asocketpointwiringlength105to15meters
6Asocketpointwiringlength155to20meters
Pointwiringfor6/16Amp switchsocketpoint ScopetoincludecircuitfromDB toindividualpoints Conduit,accessories&wireswith3x4mm2copperwiretobe laidfromDBtoindividualsocket TwosocketpercircuittobeconsideredAllwires shallbeFRLSWiringlengthupto5meters
6/16APointwiring55to10meterlengthofwire
6/16APointwiring105to15meterlengthofwire
6/16APointwiring155to20meterlengthofwire
6/16APointwiring205to25meterlengthofwire
Supply,Installation,Testing&Commissioning6Aswitchsocketoutlet&box consistingofModularplatetypeswitchesincludingconnections
Supply Installation Testing&Commissioning6/16Aswitchsocketoutlet&box consistingofModularplatetypeswitchesincludingconnections
Supply Installation Testing&Commissioningof20AReyrollPlugsocketwith3pin MetalTop,inmetalboardwith20ASPMCB
Supply,Installation,Testing&Commissioningof225mmDia ExhaustFanwith connection
Providingandinstalling,connectingandcommissioning32ATPNSFUwithHRC Fuse
ProvidingandlayingTwopairTelephonecableinexistingconduit/casingcaping Providingandinstallingoutlet fortelephonecable
Providingandinstallingcelingfan1200mmsweepwithfivestepselectronic regulator
Supply&InstallationoflightfixtureswithSigmaBallastincludinglamps,junction boxes,downrod/supports,hardwares rawlplugs,wires/cablesetc asrequired andconnectingittoswitchboards
SupplyandInstallationofPortableEmergencyLightonBatterysuitableforupto10 hours Installite/Canaramake Mountingarrangementforlamptobeincluded
1x18WBracketlight
WST71150withGI waterpipearm1mlongweldedtothecap
WFZ42250
WIF22228SGW
Liasoningchargeswithrespectiveauthoritiesforshiftingofpointofelectrical serviceandothers
Excavationinoutsidesoilincludingrefilling
Supplyinganderectingsteeltubulerpole1651x1397x1143mmthickwith 45x45x365mmthickand(56x27x27mm)respectively11mtrs LongasperIS 2713withtestcertificatefrommanufacturercompleteerecteddulypaintedwithtwo paintsofredoxideandtwocoatsofaluminiumpaintcompleteerectedinposition withMS baseplateof30x30x06cmsthickweldedatthebottomandsuitable polecaperactedwithsetscrewsorwieldedcompleteerectedCC foundationand plinthJunction/Loopingboxincluded
Note:Foritemnos 16,17and18,ratesshouldbeinclusiveofa
Supplyinganderectingcentrifugalwaterpump(Monoblock)withCI impler, primingfunelcockandcommonflangemountedonacommonshaftofinduction motorof400V3phaseAC supplyofminimum3H PMotorcapableof dischargingwater600to170litesperminutesat125to275meterstotalhead fromallclauseswithfoundationandwith50mmsuctionand50mmdelivery,water pumpshallbeconfirmingtoIS1520complete(Crompton/Kirloskar/Grundfosor anyotherequivalentmake)
Waterlevelcontrollerwithnecessaryprobesforcontrollingmotorforcutoffwhen uppertankwaterlevelisfull,whenwaterlevelinthetankcomestopredetermined levelpumpshallstartautomatically When waterlevelinthesuctiontankisbelow thewaterlevel,thepumpshouldnotstart Alsopumpshouldnotrundry The controllershallhavemanual,autoswitchesandselectionofpump Therateshall includenecessarywiringwithcopperwires
DOLStartersuitablefor3HPmotorincludingoverload
referredinvariousitemsofsanitaryfittingsandotherfixturesare
a)White/colouredglazedvitreoushindwarecornerwashbasin,size450x390 mmwithsupportingMSorCIbrackets
b)1No15mmCPbrasspillarcockwithallfittings
c)1No32mmCPcastbrassbottletrapwithextensionpiecetowall,wallflange withrubberadopterwasteconnection
d)1NoheavyqualityCPbrassangularstopcock15mmsizewithCPbrassflexible connectorpipe Thesupportingbracketshallbeprovidedwith3coatsofapproved paintofapprovedshade
Providingandfixing ISImarkedmakeheavyqualityCPbrassconcealed type withheavyqualitycastwallflange
SupplyandfixingHindustanPilkingtonmake 6mmthickwithplainor bevelededge,8mmthickplywoodbacking,4NosCPbrassscrewswithCPbrass capsscrewedtorawlplugsembeddedinwall
ThisitemisworkedoutbytheServicesConsultant
Forthepurposeofthiscourseanapproximateamountisbudgeted
Providing,laying,fixingjointingwithscrewedjointsusingteflontapeGIpipes heavyqualityconformingtoIS1239includingallfittingssuchassockets unions reducers,longorshortbends,elbows,nipples,flanges,checknuts,clampsetc testingthepipesandspecialsandpaintingthepipesandfittingswithonecoatof approvedprimer&finishingcoatsallasperspecificationsForpipesinexposed conditions:
25mmnb 32mmnb 40mmnb 50mmnb 65mmnb 80mmnb
100mmnb
Providing,laying,fixingjointingwithscrewedjoints'C'classheavyGIpipes conformingtoIS1239includingallfittings,testing,paintingwithbitumasticpaint protectionwrappingwithHessienfacedpolyethylenetaping&paintingcompleteas perspecifications Forpipelineslaidbelowgroundlevelandlaidinchasesin walls Therateincludesexcavationandcuttingchasesinwallsandreinstatement)
15mm 20mm 25mm 32mm
Providing,fixingandtestingheavyqualitygunmetalorbrassballvalvewith screwedends20kgmclassonGIorcopperpipelines(Leader/ZOLOTOmake)
ProvidingandfixinginpositiontestedheavyqualityISImarkedfullwaygunmetal gatevalveofneworequivalentmakehavingbothendsscrewedfemale conformingtoIS778:1984etc complete
i)50mmdia
ii)40mmdia
iii)32mmdia
iv)25mmdia
v)20mmdia
vi)15mmdia
Providing,erecting,fixingandcommissioningPVCoverheadwatertank(BMC approved)includingmakingofproperplatformasperconsultant'sdirection,lifting oftanktoterracefloorlevel placingoftankonplatforminproperalignment makingofinlet/outletconnectionsasperbye-lawsetc complete
i)5000litrescapacity
ii)2000litrescapacity
iii)1000litrescapacity
Providing fixinggunmetalnonreturnvalveofapprovedquality 80mm
ProvidingandfixingapprovedISImarkedmakeCIflangedwatermetersdirect readingtypecalibratedinlitres&kilolitrestestedandapprovedbyMCGMwithdirt box(strainer)includingmakingnecessaryflangedjoints,testingetc complete
40mmsize
50mmsize
Constructingbrickmasonryvalve&meterchambersin230mmthickbrickmasonry incementmortar15usingfirstclassbricksconstructedoverabedof150mmthick cementconcrete1:2:4plasteringinsideoutsideandallexposedsurfacewith 20mmthickcementmortar13,finishing'insidewithafloatingcoatofneatcement providing&fixingCIframe&coversize, weightmentionedbelowpaintingallCI itemswith3coatsofapprovedbitumasticpaintetc complete Chamber600x600mmclearinsidewith600x600CIframe&coverweightingnot lessthan72kgms Depthofchambernotexceeding1000mm
ProvidingStructuralsupportforpipelinesusingchannels,tees,angles,flats& platesfabricationbycuttingthreading&weldingifrequired,applyingonecoatof redoxideprimerandthreecoatsofsyntheticenamelpaint,includingnecessary boltsnuts washeretc asrequiredbytheEngineer-in-charge Theweightofthe supportshallbecalculatedonthebasisofcatalogueweightsofsectionsused (weightofbolts,nutsetc willnotbeconsidered)
Providing&fixingbrassfloatvalveswithbrassrodandcopperfloat suitableto withstandapressure2 kg/sqcm
50mmnb 40mmnb
Excavationintrenchesforpipelinesofrequiredwidthanddepthasdirectedby Engineer-in-chargeincludingtrimmingbottomandsides,excavationforsockets includingrefillingwithselectedexcavatedmaterial(afterlayingofpipeline)in 200mmlayers,wateringconsolidationdisposalofsurplusearthwithin50metc complete
Inordinarysoil(forCIpipelineslaidoutsidethebuildingonly)depthnotexceeding 15m
-Do-insoftrock
ProvidingandfixingbestIndianmakeCPbrassairvalveswithisolationvalvefixed onGIlines 15mmnbairvalvewith15mmisolationvalve 20mmnbairvalvewith20mmisolationvalve
Providingconnectionstoequipments(Kitchen/Laundryetc includingprovisionof controlvalve,runningjointwithunionetc complete 65mmconnections
50mmconnections
40mmconnections
32mmconnections
25mmconnections
SupplyingandinstallingBourdentypepressuregaugesrange0to20Kg/sqcm calibratedbothinpsiandkg/sqcm with10mmbrassgaugecocketc complete
Providingandfixingpipesleevesupto600mmlong,cutfromheavyqualityMS pipesconformingtoIS1239or3589(dependingonsizeofpipewithMSflange conformingtotable13ofIS 6392onbothendsanda6mmpuddleflangeatthe centreofthesleeve,allflangesweldedtopipe,fixingthesleeveinpositionbytack weldingtoreinforcementetc complete
40mmnb 50mmnb 65mmnb 80mmnb 100mmnb
Providingandfixingcastiron traps of selfcleansing design with watersealnot lessthan50mmwith or without vent,including setting the trapin1:2:4cement concreteetc complete Thetrapshall be P' or S'type as required Trapwith 100mm inlet and100mmdiaoutlet
Asinitem31buttrapwith75mmoutlet
Asinitem31buttrapinPVC
Asinitem32butwithPVCtrap
Preparationofgroundforraisingoflawnonsoftsurface:
Preparationofgroundforplantationoflawnbyexcavatingthegroundtodepthof 300mmremovingexcavatedmaterialfromthesite,fillingRedHillEarthandCow dungmanurein2:1proportion mixingofRedHillearthandcowdungmanure wateringtodepthof1inchthreetimes,weedingafterevervywateringbefore plantationofthegras,levelling,rollingafteresablishmentofgrass
Preparationofgroundforraisingoflawnonhardsurface:
Preparationofgroundforplantationoflawnbyexcavatingthegroundtodepthof 300mmremovingexcavatedmaterialfromthesite fillingRedHillEarthandCow dungmanurein2:1proportion,mixingofRedHillearthandcowdungmanure, wateringtodepthof1inchthreetimes,weedingafterevervywateringbefore plantationofthegras,levelling,rollingafteresablishmentofgrass
Plantationofgrassonpreparedground:
Planting grassonapreparedgroundat50mmcentretocentreand maintainingthesamebywateringandweedingtill30daysafterthecompletionof grassplantation
PlantingofFloweringtreesonsoftsurface:
Diggingofpitforplantationoftreebyexcavatingthegroundintheearth/murum/ sandof10mx10mx10msize removingexcavatedmaterialfromsite filling RedHillEarth(033Cum),Cowdungmanure(033Cum)andgoodexcavated earthfrompit(033Cum),mixingofRedHillearthandcowdungmanureand plantationoftreesapling,stakingoftreesapling,preparationoftreebasin, levelling wateringandmaintainingfor30dayssftercompletionofplantationand replacementofcasualtiestill30days (Excludingcostoftheplant)
PlantingofFloweringtreesonhardsurface:
Diggingofpitforplantationoftreebyexcavatingthegroundintheconcrete/ masonary/asphaltof10mx10mx10msize,removingexcavatedmaterialfrom site,fillingRedHillEarth(033Cum),Cowdungmanure(033Cum)andgood excavatedearthfrompit(033Cum),mixingofRedHillearthandcowdung manureandplantationoftreesapling stakingoftreesapling preparationoftree basin,levelling,wateringandmaintainingfor30dayssftercompletionofplantation andreplacementofcasualtiestill30days (Excludingcostoftheplant)