No construction document set is every truly 100% complete, things get forgotten, things change, but at a certain point you must turn it over and hope you’ve been clear enough and specific enough to communicate your design intent and limit your liability. As in the industry, the best way to avoid too much additional work with RFI’s and over bidding from the contractor is to have had plenty of dialog during the design process. With that, the intent of this final assignment is for you to take everything you’ve learned, and go through all the feedback you have been given this semester, and update your set for 100% CD submittal.
没有任何施工文件集是真正 100% 完成的,事情会被遗忘,事情会发生变化,但在某个时候你必须把它翻过来,希望你已经足够清楚和具体,能够传达你的设计意图并限制你的责任。 与行业一样,避免与 RFI 进行过多额外工作和承包商过度投标的最佳方法是在设计过程中进行大量对话。