We can reduce the waste going to landfill through N15 Technology!!
Waste to Energy Plant
Chonburi & Saraburi
Challenges of Implementing the new model
1. Availability of bins( green, yellow, blue bins at all locations of the campus)
2. Facility for segregation and storage - cost implications
3. Willingness of the Waste collection staff to segregate -extra staff requirement?
4. Awareness of the community on proper segregation ● Waste segregation guide and manual for proper disposal ● Awareness activities by OSC 5. Other facilities at prime locations for recyclable disposal 6. Hazardous waste on campus?
Survey to Identify the garbage bins and its locations
Garbage bin information signage @ 108 locations
Type of material to be used and cost is yet to be determined
Garbage Collection Station- Current Status
Garbage station has existing segregation sections
Option 1 : Renovation and extension of the Garbage Collection Station with proper recyclable segregation facility
Option 2 : Establishment of new recyclable and large size waste collection station:
Proposal
Move
Repair and move from EEM entrance to area near Library for visibility
Move
Repair and move from AIT square to area near Opposite to 7 Eleven
Thank you for your attention!
Any suggestion to Improve the Model or Address Challenges ?