Skip to main content

Bond Construction Update-October 2020

Page 1

ALAMO HEIGHTS ISD B O N D U P DAT E

OCTOBER 2020


Cambridge Elementary School Fine Arts and Landscape Recently issued a Post Occupancy Evaluation for Faculty and Staff feedback

FINE ARTS MAIN ENTRY

ART CLASSROOM

MUSIC CLASSROOM

FINE ARTS CORRIDOR

STRINGS CLASSROOM


Cambridge Elementary School Fine Arts and Landscape


Junior School STEM Building Elevator walls are now complete with Ceramic Steel cladding Parapet roofing work will commence this month

STEM STUDENT ENTRY

SCIENCE CLASSROOM

STEM COLAB SPACE

DETAIL

STEM COLAB SPACE

STEM LAB


Woodridge Elementary School Fine Arts and Gymnasium

WOODRIDGE FINE ARTS AND TRACK

ART CLASSROOM ENTRY

BRICK DETAIL

LANDSCAPE AREA


Howard Early Childhood Center Interior Renovations/Site Storm Drainage - Teacher Workroom and Break Room Renovations are complete - Cafeteria Renovations are complete - Electrical Feeder to Gymnasium has been restored - Sod installation is complete - Sidewalk replacements are complete

TEACHER WORKROOM

STORM SEWER TRENCH

STORM DRAIN WORK

STORM DRAIN AND ELECTRIC FEEDER

SODDING AND HYDROSEED


Alamo Heights Natatorium Shotcrete work is complete at pool Brick is nearing completion Aluminum Bleachers are being erected Graphics are being reviewed with Athletic Director

THE POOL

MAIN ENTRY

TRENCH FOR LIGHTING

BLEACHERS

BRICK


Alamo Heights Natatorium

LOCKER ROOM HALLWAY

GRAPHICS AT MAIN ENTRY


High School | The Oaks and Studio 09 Shade Structure for Courtyard Space is in progress Hybrid Classes are in session

CERAMICS STUDIO

THE OAKS COURTYARD AND SOCIAL DISTANCING

SHADE STRUCTURE


High School | STEM Hybrid Classes are in session Building has been cordoned off from remainder of campus construction

MAKER SPACE

ROCKETRY CLASSROOM

FASHION DESIGN

ROCKETRY LAB


High School | Athletics Complex Press Box steel is erected and concrete has been poured Field Lighting is in place and in use Concrete Masonry work continues on the interior Air Barrier installation continues Exterior Brick is underway Interior stud framing is underway New Weight Room doors are being installed to connect to Play Field Roof work is underway

MULEDOME ENTRY

STADIUM WITH VISITOR LIGHTS RUNNING

CERAMICS STUDIO

DANCE/CHEER GYM

WEIGHT ROOM


High School | Athletics Complex

PRESS BOX

VIEW FROM VISITOR BLEACHERS

VIEW OF COMPETITION GYMNASIUM FROM COACHES OFFICES

VIEW OF COACHES OFFICES FROM COMPETITION GYMNASIUM


VIEW FROM PRESS BOX

LPADesignStudios.com ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

LANDSCAPE ARCHITECTURE

PLANNING

|

IRVINE

SACRAMENTO

SAN DIEGO

SAN JOSE

DALLAS

SAN ANTONIO


Turn static files into dynamic content formats.

Create a flipbook
Bond Construction Update-October 2020 by Alamo Heights Independent School District - Issuu