Advisory Note - Navigating Heat Pump Retrofits: A Guide for Facility Managers

Page 1

A Service to A.G. Coombs Group Clients

Navigating Heat Pump Retrofits A Guide for Facility Managers Electrification projects can be complex undertakings, bringing together a range of technical elements along with planning, coordination and logistics challenges to be addressed to minimise disruption to building operations. With the prevalence of Net Zero commitments among building asset owners and occupants, and with the often-quoted target year of 2030 rapidly approaching, Facility Managers are now being tasked with planning and executing this technology transformation – and there are many technical and other aspects they need to consider. This Advisory Note provides Facility Managers with key considerations and recommended actions to navigate heat pump retrofit projects successfully.

Plan Ahead The most challenging time to effectively plan a heat pump retrofit is when your building’s gas-fired heating hot water (HHW) boilers or domestic hot water (DHW) systems have failed – or are about to. A heat pump retrofit is rarely as straightforward as swapping out a gas boiler for an equivalent capacity heat pump; even if this approach were technically feasible, the building owner may be paying a hefty cost premium for such a solution. Facility Managers should plan ahead by ensuring that building asset registers are up to date, and there is a good understanding of when the service life of gas-fired plant is forecast to expire. It is also essential to be mindful of any Net Zero target dates or interim target dates by which site degasification is required to occur. Working backwards from these milestones allows adequate time for the additional feasibility and engineering exercises required to find the right solution for the building, and to set an appropriate project budget. These tasks could include preparation of a business case, a feasibility study or options analysis, conducting system testing including low-temperature HHW testing, and an implementation plan, over and above the standard detailed design and tendering processes. Also be mindful of the supply lead times for heat pumps, which may be longer than those that Facility Management teams would be accustomed to for gas-fired units.

BMCS Trend Data The correct sizing of heat pump plant is key to ensuring the feasibility and success of a heat pump retrofit project, and it can be a complex engineering task. One of the best ways a Facility Manager can support their engineering team with this task is with the provision of suitable Building Management and Control System (BMCS) trend data. Heat pumps are more expensive on a $/kW basis than the gas-fired equipment they will be replacing – not just in terms of their unit supply cost, but also in terms of the cascading effect on related services infrastructure upgrades (such as electrical infrastructure) that may be initiated by their installation. Sizing heat pumps simply to match the existing boiler kW capacity may attract a significant cost premium, particularly where existing boilers are oversized, which is not uncommon. Utilising historical BMCS trend data on metrics such as the annual building heating load profile, field Heating Hot Water (HHW) temperatures and building warm up times will greatly aid the design process, ensuring that heat pumps are not oversized, oversized, and also improving the accuracy of future cost and emissions impact calculations. The Facility Manager can play a pivotal role here by engaging early with the incumbent BMS contractor to address the following questions:

• • • •

Are the relevant HHW or DHW system control sensors monitored and trended by the BMCS? Are field sensors and meters calibrated and correctly interfaced to the BMCS? Does the BMCS incorporate accurate calculation of heating kW demand? Is there adequate trend history stored (ideally, multiple years of data could be accessed) and are trending intervals short enough (hourly rather than daily)? Is check metering in place to provide an understanding of electrical loads within the distribution system? Ensure that all electrical load is accounted for.

These are questions that the Facility Manager can and should address as early as possible in the project planning stages.