Skip to main content

Portfolio_Agathe Decroocq

Page 1

Agathe Decroocq Selected works 2022 - 2026

Architectural Designer


Agathe Decroocq Selected works 2022 - 2026

About me

Architectural Designer

I am a French architectural designer educated in Belgium, with professional experience at MV2 Architectes, where I contributed to public, educational and renovation projects. This experience allowed me to develop a strong understanding of architecture as a dialogue between context, users and construction, from the early design stages through to technical development. My approach is driven by the search for meaningful and responsible architecture, where spatial quality, materiality and environmental considerations are integrated throughout the design process. I am particularly interested in developing resilient and resourceconscious projects that create lasting value for both people and their surroundings. Curious and collaborative by nature, I am eager to continue developing my practice within an international architectural environment where design exploration, knowledge sharing and collective thinking shape thoughtful places.

Education Master’s degree in Architecture Uclouvain - Faculty of Architecture LOCI Tournai, Belgium 2020-2025

Experience MV2 Architectes - Architectural Designer 2025-2026

Software DESIGN AND MODELING Revit AutoCAD Sketchup VISUALIZATION Enscape Twinmotion AI GRAPHIC DESIGN Adobe Photoshop Adobe InDesign

Languages

French (Native Speaker) English Snapish

Contact

agathe.decroocq59@gmail.com +33 7 69 87 59 32


01. CONTRE-JOUR Location: Nice, Vallée du Magnan, France Year: 2023 (Uclouvain, Belgium) Project: 46 student housing units - Dining facilities - Outdoor performance space Tools: Autocad, Adobe Suite Role: Team project - conceptual design, design development, drawings, material studies, and visual communication

Conceptual model

Réhabilitation de l’église paroissiale Saint - Thomas en école | TOURCOING | 19.03.2026

A project in the heart of the Magnan Valley

0

100

N

0

2

5

10 m

A modular system designed for adaptability

SARL Capital 7500 € | 118, rue Solférino - 59000 LILLE | tél : 03.20.51.47.23 | mv2@mv2architectes.com | Code APE NAF 7111Z | SIRET 445 223 316 00032 | 445 223 316 RCS LILLE

Inhabiting the slope

A dialogue between solids and voids


02. A PRIVATE PLACE, A SHARED CONNECTION rethinking housing for ageing well Location: Le Quesnoy, France Year: 2023-2025 (Graduation project - Uclouvain, Belgium) Project: An intergenerational housing project designed for diverse profiles and generations, combining 17 housing units for up to 60 residents with a balance between public, shared and private spaces. Tools: Autocad, Revit, Photoshop, Rhino, Physical model Role : Independent graduation project combining academic research and architectural design, from conceptual exploration to the development of a comprehensive architectural proposal. Thesis supervisor : Damien Vanneste Co-supervisor : Matthieu Meunier External advisor : Vincent Huet This research investigates the following question : How can architecture create inclusive and adaptable living environments that respond to the challenges of an ageing society ?

Réhabilitation de l’église paroissiale Saint - Thomas en école | TOURCOING | 19.03.2026

Train station Religious building Senior housing School building Healthcare facility Museum Theatre Hiking trail

N

0

2

5

10 m

SARL Capital 7500 € | 118, rue Solférino - 59000 LILLE | tél : 03.20.51.47.23 | mv2@mv2architectes.com | Code APE NAF 7111Z | SIRET 445 223 316 00032 | 445 223 316 RCS LILLE

An intergenerational housing project embedded within the urban fabric


Starting point for hiking trails

Community hub

Playground

Multi-purpose hall

Care home

Primary school

Pocket sliding - Top track: ROB 130 000 - Double roller carriage

Community garden

Repair cafe and laundry

Theatre company facilities

Plasterboard (13mm) Metal track (50mm) Plasterboard (13mm) Insulation (80mm) Plasterboard (13mm) Plasterboard (13mm) Insulation + Metal framing (80mm) Plasterboard (13mm)

Accessible and adaptable housing, designed to evolve with different stages of life


Maitre d'ouvrage : GROUPE IMMO INVEST

61 Avenue de Canteleu Bâtiment A 59650 Villeneuve d'ASCQ Maitre d'ouvrage :

Opération :

GROUPE IMMO INVEST

61 Avenue de Canteleu Bâtiment A 59650 Villeneuve d'ASCQ

CHANGEMENT DE DESTINATION D'ANCIENS BUREAUX EN 9 LOGEMENTS 85 Rue de Roubaix, 59242 Templeuve-en-pévèle

Chute EU

WC 1.59 m².

G.T.L.

EMETTEUR

PHASE

INDICE

ECHELLE

MV2

DCE

A

1/50

DATE

AFFAIRE

EMETTEUR

PHASE

28 MAI 2026

D-2552

MV2

DCE

ARCHITECTE MANDATAIRE ECHELLE

1/50

GROUPE V.M.C.

118, rue Solférino 59000 LILLE Tél.: 03 20 51 47 23 - Email: mv2@mv2architectes.com

A

SDB 4.08m²

SDB 3.86 m².

Toiture terrasse. 6.68 m². G.T.

Chute EU Chute EU

Retombée BA13

Chute EV

CHAMBRE 01 13.04m²

Chute EU

XXX

AGENCE XXX, Rue XXX - 59XXX XXX Tél.: 03 20 42 76 10 - Email: XXX@XXX.com

WC 1.43m²

COORDONNATEUR S.P.S. CONTROLE TECHNIQUE

XXX XXX

AGENCEXXX, XXX,Rue RueXXX XXX- -59XXX 59XXXXXX XXX AGENCE Tél.:03032020424276761010- -Email: Email:XXX@XXX.com XXX@XXX.com Tél.:

Chute EU

Chute EU

ESPACE COMMUN R+2. 7.92 m².

COORDONNATEUR S.P.S.

Year: February 2026

%

XXX

SDB 4.82m²

WC 1.96m²

SDB 9.38m²

CHAMBRE 02 13.44m²

SEJOUR 26.37m²

Création d'une lucarne en toiture ardoise

DEGAGEMENT 3.24m²

LOGEMENT 3. 79.97 m².

Rgmt.

Chute EV

CHAMBRE 01 18.38m² CHAMBRE 01 14.31m²

+ 7,51 m

CHAMBRE 01 10.86m²

ENTREE 7.73m²

BUANDERIE 3.51m²

LOGEMENT 2. 56.64 m².

DEGAGEMENT 3.67m² ENTREE

Project: Adaptive reuse project - 9 apartments within a former office building, with a new extension and shared landscaped garden.

WC 3.65m²

Chute EV

Palier de repos.

Palier de repos.

G.T.L.

Chute EU

SEJOUR 26.90m²

VE etuhC

Chute EU

WC 1.42m²

SEJOUR 22.67m²

LOGEMENT 8. 49.22m²

Documents exclusivement destinés à la consultation des entreprises. Les côtes portées sur le plan sont indicatives. L'entreprise adjudiciaire est tenue de les vérifier sur place et de soumettre au maître d'ouvrage et maître d'oeuvre les dessins d'execution.

Chute EU

Toiture en ardoise.

PRINCIPALE.

Documents exclusivement destinés à la consultation des entreprises. Les côtes portées sur le plan sont indicatives. L'entreprise adjudiciaire est tenue de les vérifier sur place et de soumettre au maître d'ouvrage et maître d'oeuvre les dessins d'execution.

+ 3,20 m

DEP

Seuil en pierre bleu 30 mm

G.T.L.

ESPACE COMMUN RDC 26.77 m².

Chute EV

AGENCE XXX, Rue XXX - 59XXX XXX Tél.: 03 20 42 76 10 - Email: XXX@XXX.com

SDB 9.27m²

DEP DEP Chute EU

DEP

Chute EV

CHAMBRE 01 16.29 m².

DEP Toiture terrasse accessible. 40.5 m²

DEGAGEMENT 2.46

G.T.L.

118, rue Solférino 59000 LILLE CONTROLE TECHNIQUE Tél.: 03 20 51 47 23 - Email: mv2@mv2architectes.com

Chambre 01 9.43m²

ENTREE 5.13m²

LT. 1.31 m².

Chute EV

ENTREE 5.41m²

ARCHITECTE MANDATAIRE

MV2 ARCHITECTES

Location: Templeuve-en-Pévèle, France

SEJOUR 27.63m²

Garde-corps métallique HT:110cm.

DEP

DEGAGEMENT 1.21m²

LOGEMENT 01 70.77 m². LOGEMENT 9. 51.82m²

SEJOUR 25.30m²

MV2 ARCHITECTES

INDICE

Dallage sur vide sanitaire isolé

%

AFFAIRE

D-2552

LOGEMENT 4. 52.65 m². Bande de propreté - cailloux.

Brise-vue métallique HT:200cm.

DATE

Seuil en pierre bleu 30 mm

Chute EU

SEJOUR 30.79 m².

Chute EU

28 MAI 2026

SDB 4.32m²

CHAMBRE 02 14.78 m².

%

DEP

DEP

DEP

%

3.2

PHASE DCE.

Chute EU

%

3.1

Brique

Chute EV

G.T.L.

TECHNICAL DESIGN AND TENDER DOCUMENTATION (DCE)

Vers le collecteur EU

EU

DEP

DEP

PLAN GENERAL PROJET PHASE DCE. PLAN GENERAL PROJET

EU

%

CHANGEMENT DE DESTINATION D'ANCIENS BUREAUX EN 9 LOGEMENTS 85 Rue de Roubaix, 59242 Templeuve-en-pévèle

03. LA CAMPAGNETTE - MV2 ARCHITECTES

EU

EU

Opération :

EU

EU

Chute EV

Chute EU

Chute EU

EU

EU

EU

Mur existant conservé

Mur existant à démolir

10m

G.T.L.

Plantation.

Mur conservé Murexistant neuf - Remplissage

Maître d'ouvrage :

7m

5m

Changement de destination d’anciens bureaux en neuf logements

0m

Opération :

Tools: AutoCAD, Adobe Suite, Skecthup and Twinmotion

DEP

DEP

DEP

DEP

DEP

+ 3,20 m

Chute EU

Mur existant àdes démolir Revêtement sols à déposer Mur neuf à- Remplissage Plafond déposer

DEP

Cloison à déposer Revêtement des sols à déposer

Balcon terrasse.

EP

ITE

LIM

EP

EP

EP

EP

EP

COORDONNATEUR S.P.S.

XXX

EP

EP

EP

DEP

EP EP

EP

+ 3,00 m EP EP

EP EP

EP

EP

EP

DEP

AGENCE XXX, Rue XXX - 59XXX XXX Tél.: 03 20 42 76 10 - Email: XXX@XXX.com

EP

EP

XXX

AGENCE XXX, Rue XXX - 59XXX XXX Tél.: 03 20 42 76 10 - Email: XXX@XXX.com

Documents exclusivement destinés à la consultation des entreprises. Les côtes portées sur le plan sont indicatives. L'entreprise adjudiciaire est tenue de les vérifier sur place et de soumettre au maître d'ouvrage et maître d'oeuvre les dessins d'execution.

Palier de repos.

Cailloux.

CONTROLE TECHNIQUE

DE

Cailloux.

EP

Palier de repos.

EP

EP

EP EP

9m= 22.0 TE = PRIE PRO

Type3 - Porte : Coupe boisxplein Dimensions passage librefeu, : 930 2040 mm Dimensions passage libre : 930 x 2040 mm EI 30 EI 60 porte intégré Ferme Ferme porte intégré Référence indicative : Type Malerba (ou équivalent) Référence indicative : Type Malerba (ou équivalent)

Type3 - Porte : Coupe feu, bois plein Dimensions passage libre : 930 x 2040 mm EI 60 Ferme porte intégré Référence indicative : Type Malerba (ou équivalent)

Création de garde coprs bois RAL 9016

Création d'une lucarne en toiture. Ardoise

Création d'une baie vitrée

Bandeau de toiture en zinc pré patiné ardoisé ME - 04

315

DEP

EU

ME - 01

EP

EP

315

DATE

EMETTEUR

PHASE

INDICE

MV2

DCE

A

North-West Elevation

ECHELLE

SEJOUR 30.79 m².

DEP

1/50

Chute EV Chute EU

MV2 ARCHITECTES

DATE

AFFAIRE

EMETTEUR

PHASE

INDICE

28 MAI 2026

D-2552

MV2

DCE

A

Chute EV

LT. 1.31 m².

Chute EU

XXX

320

Boîte EP en zinc

Boîte EP en zinc

Bardage bois claire-voie

Bardage bois claire-voie

Profil de rive Aluminiul - RAL 7016

Bardage bois claire-voie

Palier de repos.

Bardage bois claire-voie

33

PARCELLE AP 217

PARCELLE AP 216

250

Descente d'eau pluviale Zinc

Seuil en pierre bleu 30 mm

Descente d'eau pluviale Zinc

279

ENTREE ENCLOS POUBELLE

ENTREE PRINCIPALE.

200 ACCES ABRIS VELO

Palier de repos.

Plantation.

COUPE PROJET - 1/75 ech. FACADES DU LOCAL VELO - 1/75 ech.

320

Boîte EP en zinc

Boîte EP en zinc

Profil de rive Aluminiul - RAL 7016

220

Plantation.

Boîte EP en zinc

Descente d'eau pluviale Zinc

250

250

250

Mur neuf - Remplissage

Descente d'eau pluviale Zinc

33

Enclol poubelles projeté.

Revêtement des sols à déposer 279

Porte L=80 à déposer

Bardage bois claire-voie

WC 1.42m²

DEP

ENTREE ENCLOS POUBELLE

700

Porte L=90 à déposer

Aménagements extérieures

Réseau GAZ . Compteur d'arrivé GAZ .

Sable stabilisé.

Engazonnement Pavé gris clair béton à joint fermé15x30cm. Parking perméable engazonée. Sable stabilisé.

Réseau EP. Regard eaux pluviales 40x40cm

Haie vive - Charme - hauteur Réseau ERDF.150cm Coffret d'alimentation.

EP

Brise-vue métallique HT:200cm. Brise-vue métallique HT:200cm.

7.73m²

BUANDERIE 3.51m²

EU

WC 3.65m²

EU

Chute EU

DEP

VE etuhC Chute EU

EU

EU

EU

DEP

Bardage bois claire-voie

DEP

20

Enclol poubelles projeté.

Enclol poubelles projeté.

Palier de repos.

Descente d'eau pluviales

Palier de repos.

EU

Ground floor plan DEP

Palier de repos.

EU

DEP

Réseau EU.

EU

Boîte de branchement EU

Bande de propreté - cailloux. Garde-corps métallique HT:110cm.

PLAN RDC PROJET - 1/50 ech.G.T.L.

Chute EU

DEP

Chute EU

CHAMBRE 02 15.38m²

DEP

Infiltrations des eaux pluviales

Réseau GAZ . Compteur d'arrivé GAZ . Réseau EP.

Chute EU

EU ENTREE

DEP

EU

Raccordement EP sur acodrain.

Bande de guidage PMRTELECOM. - Résine + Réseau granulats de marbre blancs. Chambre de tirage telecom.

Bordures, clôtures et soutènements

EU

Chute EU

Réseau TELECOM. Chambre de tirage telecom.

Réseaux Cloture métallique grillagée - RAL 9005 ht: 150cm AEP. SoubassementRéseau en plaque de béton AEP Fosse à compteur d'eau.

EU

CHAMBRE 01 10.86m²

Réseau ERDF. Coffret d'alimentation.

Parking perméable engazonée.

Enrobé

EU

Chute EV

FACADES DE L'ENCLOS POUBELLE - 1/75 PLAN RDC PROJET - 1/50 ech.ech.

Réseau AEP. AEP Fosse à compteur d'eau.

Engazonnement Pavé gris clair béton à joint fermé15x30cm.

Aménagements extérieures

VE etuhC

Soubassement béton

Réseaux

Enrobé

Porte L=80 à déposer

LOGEMENT 3. 79.97 m².

700

Soubassement béton

Palier de repos.

Proposed condition - North West facade after the extension

FACADES DU LOCAL VELO - 1/75 ech.

Chute EV

Chute EU

Chute EV

20

Existing condition - North West facade

Seuil béton intérieur.

Chute EU

Local poubelles projeté.

ACCES ABRIS VELO

Cloison à déposer Seuil en pierre bleu 30 mm

Chute EU

Bardage bois claire-voie

Plafond à déposer

ACCES ABRIS VELO

SEJOUR 26.90m²

170

106

Local poubelles projeté.

Porte L=90 à déposer 250

Profil de rive Aluminiul - RAL 7016

WC 3.65m²

Soubassement béton

Soubassement béton Bardage bois claire-voie

Profil de rive Aluminiul - RAL 7016

Bardage bois claire-voie

Profil de recouvrement en zinc par pliage

Bardage bois claire-voie

Cloison à déposer

Mur existant conservé Mur existant à démolir

Descente d'eau pluviale Zinc

309

FACADES DE L'ENCLOS POUBELLE - 1/75 ech.

Plafond à déposer

Bardage bois claire-voie

ENTREE 7.73m²

BUANDERIE 3.51m²

20

Bardage bois claire-voie

DEP

Soubassement béton

20

Profil de rive Aluminiul - RAL 7016

Soubassement béton

Enclol poubelles projeté.

Revêtement des sols à déposer

200

Seuil béton intérieur.

ME - 05

Chute EU

LOGEMENT 2. 56.64 m².

Bardage bois claire-voie

Palier de repos. 309

SEJOUR CHAMBRE 01 26.90m² 18.38m²

Bardage bois claire-voie

700

Descente d'eau pluviale Zinc

Documents exclusivement destinés à la consultation des entreprises. Les côtes portées sur le plan sont indicatives. Mur neuf - Remplissage L'entreprise adjudiciaire est tenue de les vérifier sur place et de soumettre au maître d'ouvrage et maître d'oeuvre les dessins d'execution.

ACCES ABRIS VELO

Seuil en pierre bleu 30 mm

Chute EV

WC 1.42m²

Rgmt.

700

Mur existant conservé

CHAMBRE 01 10.86m²

DEGAGEMENT 3.24m²

Local poubelles projeté.

FACADE DU PORTAIL D' ENTREE PRINCIPAL - 1/75 ech.

Mur existant à démolir

ME - 05

ENTREE PRINCIPALE LA CAMPAGNETTE.

Local poubelles projeté.

Boîte EP en zinc

CHAMBRE 02 13.44m²

SEJOUR 26.37m²

Bardage bois claire-voie

Palier de repos.

Soubassement béton

Chute EV

170

106

LOGEMENT 3. 79.97 m².

SDB 9.38m²

LOGEMENT 2. 56.64 m².

309

Profil de rive Aluminiul - RAL 7016

G.T.L.

CHAMBRE 02 13.44m²

SEJOUR 26.37m²

DEGAGEMENT 3.24m²

Chute EU

Rgmt.

CHAMBRE 01 18.38m²

ESPACE COMMUN RDC 26.77 m². 309

Documents exclusivement destinés à la consultation des entreprises. Les côtes portées sur le plan sont indicatives. L'entreprise adjudiciaire est tenue de les vérifier sur place et de soumettre au maître d'ouvrage et maître d'oeuvre les dessins d'execution. Bardage bois claire-voie

DEP

Remise en peinture Dito existant - RAL 3022

SDB 9.27m²

ENTREE PRINCIPALE.

Profil de rive Aluminiul - RAL 7016

DEP

SDB 9.38m²

Seuil en pierre bleu 30 mm

Chute EV

AGENCE XXX, Rue XXX - 59XXX XXX Tél.: 03 20 42 76 10 - Email: XXX@XXX.com

COUPE PROJET - 1/75 ech.

SDB 9.27m²

DEGAGEMENT 2.46

26.77 m².

Retombée BA13

CHAMBRE 01 16.29 m².

G.T.L.

G.T.

Chute EU

XXX

ENTREE 5.13m²

ENTREE PRINCIPALE LA CAMPAGNETTE.

Chute EV

COORDONNATEUR S.P.S.

DEP Chute EU

Chambre 01 9.43m²

Remplacement d'un portail double vantail en bois dito existant ESPACE COMMUN RDC Peinture dito existant - RAL 3022

Rénovation de la toiture en ardoise

Chute EU

AGENCE XXX, Rue XXX - 59XXX XXX Tél.: 03 20 42 76 10 - Email: XXX@XXX.com

DEP SEJOUR 27.63m²

Retombée BA13

FACADE DU PORTAIL D' ENTREE PRINCIPAL - 1/75 ech.

CONTROLE TECHNIQUE

DEGAGEMENT

Seuil en pierre bleu 30 mm

PARCELLE Remplacment AP 216 d'une porte en bois dito existant RAL 3022

LOGEMENT 4. 52.65 m².

G.T.

Chute EU

GROUPE SDB PARCELLE AP 217 01 CHAMBRE V.M.C. 3.86 16.29m². m².

XXX

Chambre 01 9.43m²

Dallage sur vide sanitaire isolé 2.46

Remise en peinture Dito existant - RAL 3022

Chute EU

G.T.L.

MV2 ARCHITECTES

Limite parcellaire.

COORDONNATEUR S.P.S. AGENCE XXX, Rue XXX - 59XXX XXX Tél.: 03 20 42 76 10 - Email: XXX@XXX.com

ENTREE 5.13m²

LT. 1.31 m².

SDB 4.32m²

SDB 3.86 m².

Vers le collecteur EU

Seuil en pierre bleu 30 mm

Chute EV

CHAMBRE 02 14.78 m².

DEGAGEMENT 1.21m²

LOGEMENT 01 70.77 m².

AGENCE XXX, Rue XXX - 59XXX XXX Tél.: 03 20 42 76 10 - Email: XXX@XXX.com

1/50 ARCHITECTE MANDATAIRE

ME - 04 Brique

Triple Châssis fixe aluminium + Teinte: RAL 9016 . H: 3290mm x L: 2800 mm (largeur de passage 900 mm). Imposte vitrée triangulé Subdivision style atelier Quantité: 1

GROUPE V.M.C.

Soubassement béton

Profil de recouvrement en zinc par pliage

DEP

Chute EV

XXX

ECHELLE

118, rue Solférino 59000 LILLE Tél.: 03 20 51 47 23 - Email: mv2@mv2architectes.com

Profil de rive Aluminiul - RAL 7016

Brique

RAL 3022

SEJOUR 27.63m²

EU

Chute EU

MV2 ARCHITECTES

ME - 05

EU

DEGAGEMENT LOGEMENT 01 Remplacment d'une porte en bois 1.21m² Peinture dito existant - RAL 3022 70.77 m². dito existant

WC 1.59 m².

Seuil en pierre bleu 30 mm

LOGEMENT 4. 52.65 m². Dallage sur vide sanitaire isolé

Remplacement d'un portail double vantail en bois dito existant

Rénovation de la toiture en ardoise

FACADE SUD OUEST PROJET - 1/75 ech. SEJOUR 30.79 m².

SDB 4.32m²

DEP CHAMBRE 02 14.78 m².

DEP

118, rue Solférino 59000 LILLE Tél.: 03 20 51 47 23 - Email: mv2@mv2architectes.com

CONTROLE TECHNIQUE

3.1

Chute EU

WC 1.59 m².

EU

ARCHITECTE MANDATAIRE

PHASE DCE.

FACADE NORD OUEST PROJET - 1/75 ech.

1M80

AFFAIRE

D-2552

Brique

G.T.L.

20m

Bâtiment existant non concerné par les travaux.

Cheminement PMR.

280

Seuil en pierre bleu 30 mm

Bâtiment existant concerné par les travaux.

ME - 04

Ancien pavage existant

Cailloux.

ME - 03

15m

Place véhiculée PMR. (Marquage au sol)

Arbre de haute tige à planter.

Zone engazonner.

Pavé infiltrant.

Haie bocagère.

Descentes des eaux pluviales

Réseau AEP. Réseau ERDF. Réseau TELECOM. Réseau EP. Réseau EU/EV.

Puits d'infiltrations des eaux pluviales

Brique

10m

118, rue Solférino 59000 LILLE Tél.: 03 20 51 47 23 - Email: mv2@mv2architectes.com

LEGENDE

DEP

Clôture ajourée en bois - HT:200cm .

Clôture barreaudé en acier gris antrhacite - HT:200cm .

329

EP

280

3.PROJET 1 28 MAI 2026 PLAN GENERAL

Ouverture en voussure brique . Menuiserie Aluminium - RAL 9016

Ouverture en voussure brique Porte fenêtre Aluminium - RAL 9016

Vers le collecteur EU

EU

Chute EV

FACADE SUD OUEST PROJET - 1/75 ech.

EU

ME - 01

EU

DEP

Bandeau de toiture en zinc pré patiné ardoisé

PLAN GENERAL PROJET

ME - 03

ME - 04

First floor plan

EU

GROUPE IMMO INVEST

CHANGEMENT DE DESTINATION D'ANCIENS BUREAUX EN 9 LOGEMENTS PHASE DCE. 85 Rue de Roubaix, 59242 Templeuve-en-pévèle

Ouverture en voussure brique Baie vitrée Aluminium - RAL 9016

DEP + 4,01 m DEP

ME - 01

61 Avenue de Canteleu Bâtiment A 59650 Villeneuve d'ASCQ

FACADE NORD OUEST PROJET - 1/75Opération ech.:

DEP DEP

PLAN TOITURE PROJET - 1/50 ech.

61 Avenue de Canteleu Bâtiment A 59650 Villeneuve d'ASCQ

Ouverture en voussure brique . Menuiserie Aluminium - RAL 9016

Ouverture en voussure brique Porte fenêtre Aluminium - RAL 9016

DEP

Balcon terrasse.

PLAN R+1 PROJET - 1/50 ech.

CHANGEMENT DE DESTINATION D'ANCIENS BUREAUX EN 9 LOGEMENTS 85 Rue de Roubaix, 59242 Templeuve-en-pévèle

ME - 05 ME - 03

Maitre d'ouvrage : Ouverture en voussure brique Baie vitrée Aluminium - RAL 9016

LOGEMENT 6. 41.82 m².

Bandeau de toiture en zinc pré patiné ardoisé

GROUPE IMMO INVEST

.

ME - 01: Opération

ME - 01

173

ME - 04

Teinte: RAL 9016 . H: 3290mm x L: 2800 mm (largeur de passage 900 mm). Imposte vitrée triangulé Subdivision style atelier Quantité: 1

02

ME - 05

+ 9,53 m

Rénovation des cheminées

Rénovation des cheminées. Type2 - Porte : Acoustique, bois plein

Bandeau de toiture en zinc pré patiné ardoisé

ME - 01

5m

Brique

Triple Châssis fixe aluminium + Teinte: RAL 9016 . H: 3290mm x L: 2800 mm ME - 05 900 mm). (largeur de passage Imposte vitrée cintré - Subdivision style atelier Quantité: Triple1 Châssis fixe aluminium +

Rénovation des cheminées

1M80

0m 1m 2m

Chute EU

Toiture en ardoise.

DEP

FACADE NORD EST PROJET- 1/75 ech.

Type2- - Porte Porte: :Acoustique, Acoustique,bois boisplein pleinporte battante Type1 Dimensionspassage passagelibre libre: : 930 930xx2040 2040mm mm Dimensions EI 30 anti-pince doigt intégré Système Ferme EI 60 porte intégré Référenceindicative indicative: :Type TypeMalerba Malerba(ou (ouéquivalent) équivalent) Référence

.

01

G.T.L.

EP

Rue

02

Création de garde coprs bois RAL 9016

Création d'une lucarne en toiture. Ardoise

Maitre d'ouvrage :

Rue

ré

FACADE SUD EST PROJET - 1/75 ech.

OU de R

t au men

orde

ENTREE PRINCIPALE.

Racc

EP EP

EP EP

190

=7.01m=

700

01

ME - 03

EP EP

Chute EU

%

Type1 - Porte : Acoustique, bois plein porte battante Dimensions passage libre : 930 x 2040 mm Système anti-pince doigt intégré EI 60 Référence indicative : Type Malerba (ou équivalent)

Remplacement d'une porte par un châssis fixe vitrée en Aluminium - RAL 9016

ME - 02

ME - 03

Chute EV

Chute EU

+ 9,53 m

Brique

Châssis aluminium Ouverture type Ouvrant à la française Teinte: RAL ME9016 - 04. H: 3150mm x L: 1730mm Imposte vitrée cintré - Subdivision style atelier Triple Châssis aluminium + Localisation : Façadefixe principale de l'extension Teinte: Quantité: 1 RAL 9016 . H: 3290mm x L: 2800 mm (largeur de passage 900 mm). Imposte vitrée cintré - Subdivision style atelier Quantité: 1

%

Chute EV

Ebrasement en brique peinte RAL 9016

ME - 02

Chute EU

Clôture ajourée en bois - HT:200cm .

Création d'une baie vitrée

Brique

Project site plande ROUBAIX Racc

Construction d'un enclos poubelle.

EP

=48.43m= LIMITE DE PROPRIETE

EP

20m

t au

men

orde

IE

OPR

PR DE ITE LIM lic pub aux rése

.0

WC 2.56m²

Toiture en ardoise.

Pavé en verre

ME - 02

Feuille de plâtre BA18 + Isolant Laine de roche Ep160mm

Clôture barreaudé en acier gris antrhacite - HT:200cm .

Remplacement du portail.

PP100

+ 2,00 m

EP EP

EP

ENTREE PRINCIPALE.

Enclos poubelles

Parking visiteur 4 places.

Cailloux. Palier de repos.

Palier de repos.

EP

EP

EP EP

992

EP EP

ME ME - 02- 03

Châssis aluminium plein cintre Châssis aluminium Teinte: RAL 9016 . Ouverture type Ouvrant à la française H: 1900mm x L: 1000mm Teinte: RAL 9016 . vitrage dépoli H: 3150mm x L: 1730mm Localisation : Façade latérale de l'extension Imposte vitrée cintré - Subdivision style atelier Quantité: 2 Localisation : Façade principale de l'extension Quantité: 1

9m=

BAIX

E DE LIMIT blic x pu seau

190

Haie bocagère HT: 80 cm

Parking 8 places.

504 Palier de repos.

Plantation.

732

320

EP

EP

309

1070

22 TE =

PP100

EP

EP

CHAMBRE 01 10.88m²

WC 1.16m²

SDB 3.82m²

Ouverture en voussure brique Menuiserie Aluminium - RAL 9016

Rénovation des cheminées

177

173

100

EP

+ 9,53 m

EP

EP

Haie bocagère HT: 80 cm

EP EP EP EP EP

Haie bocagère HT: 80 cm

EP

HT:200cm.

EP

Brique

EP

15m

Clôture + portail barreaudés

EP

EP

+ 9,53 m

Palier de repos.

ENTREE PRINCIPALE.

=21.93m=

Toiture en ardoise.

+ 12,96 m

248 EP EP

Balcon terrasse.

EP EP

EP EP

EP

Toiture ardoise.

EP

EP

100

22.18m²

Toiture en ardoise.

Rénovation des cheminées

G.T.L.

EP

EP

EP

Descentes des eaux pluviales

5

EP

EP

EP

EP

EP

EP

Brique

DEP

Remplacement du portail.

ME - 02 ME - 01

EP

EP

EP

2

EP

DEP

EP

EP

16

EP

EP

EP

EP

EP

EP

EP

DEP

Parking 6 places.

EP EP EP

Toiture ardoise. EP EP EP

EP

Toiture ardoise.

+ 13,26 m

Toiture en ardoise.

EP

165 DEP

EP EP

13 EP

EP

EP

EP

Clôture ajourée en bois HT:200cm.

EP

1314

EP

EP

Cloison Placostil 98/48 Duo Tech + isolant Laine de roche 50mm Feuille de plâtre BA18 + Isolant Laine de roche Ep160mm Cloison SAA 120 Duo Tech 25 + isolant Laine de roche 70mm Cloison vitrée sur allège Rénovation des cheminées .

AFFAIRE : D-2552

EP

EP

South-East Elevation

+ 8,17 m

Bandeau de toiture en SEJOUR zinc pré patiné ardoisé

en ardoise. FACADE NORD EST Toiture PROJET1/75 ech.

Cloison vitrée sur allège

METALLIQUE (RAL 9005) PuitsBARREAUDAGE d'infiltrations des eaux pluviales

DATE : 12.02.2026

EP

EP

Cloison SAA 120 Duo Tech 25 + isolant Laine de roche 70mm

FACADE SUD EST PROJET - 1/75 ech.

ECHELLE : 1/250.

EP

EP

190

1750

EP EP

Jardin potagée. 379.8 m²

EP EP

EP

EP

EP

EP

DEP

EP

Cailloux.

1955

Toiture en ardoise. Toiture ardoise.

EP

162

+ 6,29 m EP EP

EP

EP

DEP

EP

EP

EP

EP

EP

+ 9,53 m

EP

10m + 9,53 m

Haie bocagère HT: 80 cm

EP

EP

1409 Verrière.

+ 8,17 m

40.5m².

Toiture terrasse accessible

Garde-corps métallique HT:110cm.

Toiture bac acier.

Bande de propreté - cailloux.

1220 + 4,62 m EP

EP EP

EP

EP EP

EP

EP

Toiture terrasse. Toiture terrasse.

EP EP

4

17

EP

EP

ME - 02

ME - 01 Châssis aluminium plein cintre Teinte: RAL 9016 . Châssis aluminium cintre H: 1900mm x L:plein 1000mm Teinte: RALdépoli 9016 . vitrage H: 1900mm x L: 1000mm Localisation : Façade latérale de l'extension Localisation : Façade principale de l'extension Quantité: 2 EP EP EP EP EP EP Quantité: 3 EP

100

329

EP

EP

Clôture ajourée en bois HT:200cm. DEP

793

EP EP

100

2000

EP

5m

Jardin Logement 01. 284.8 m²

2000

EP

DEP

EP

EP

ME - 01

Brique

Jardin potagée. 379.8 m²

Haie bocagère HT: 80 cm

EP

EP

ME - 01

Châssis aluminium plein cintre Teinte: RAL 9016 . H: 1900mm x L: 1000mm Localisation : Façade principale de l'extension Documents exclusivement destinés à la consultation des entreprises. Les côtes portées sur le plan sont indicatives. Quantité: 3 est tenue de les vérifier sur place et de soumettre au maître d'ouvrage et maître d'oeuvre les dessins d'execution. L'entreprise adjudiciaire

=21.93m=

EP

EP

0m 1m 2m

Construction d'un enclos poubelle.

EP

Haie bocagère HT: 80 cm

EP

EP

EP

EP

EP

EP EP

EP

309

=7.01m=

EP

100

Construction d'un Abri vélo.

1750

500

Parking 8 places.

PP100

700

166

EP

Jardin Logement 04. 218.9 m²

EP

EP

+ 2,00 m

Enclos poubelles EP

EP

Parking 6 places.

190

320

EP EP

EP

500

EP

1070

Parking visiteur 4 places.

504

EP

DEP

Abri Vélo

EP

EP

EP EP

509

Haie bocagère.

Réseau AEP. Cloture + portail barreaudé Réseau ERDF. HT: 200cm Réseau TELECOM. Réseau EP. Réseau EU/EV.

SDB 4.71m²

%

EP

%

EP

SEJOUR 30.99m²

Bande de propreté - cailloux.

tallique HT:200cm.

EP

CHAMBRE 01 10.26m²

%

EP

CHAMBRE 02 14.98m²

+ 13,26 m

%

EP

SEJOUR 24.90m²

DEGAGEMENT 1.88m²

Chute EV

20

EP

Création d'une lucarne en toiture ardoise Toiture ardoise.

G.T.L.

EP

+ 6,90 m G.T.L.

20

EP

220

EP

220

EP

+ 4,01 m

DEP

200

EP

WC 1.46m²

Duo Tech + isolant Laine de roche 50mm

LIMITE SEPARATIVE

EP

Mur neuf - Parpaing

Remplacement d'une porte par un châssis fixe vitrée en Aluminium - RAL 9016 Cloison Placostil 98/48

20

EP

Arbre de haute tige à planter.

DEP

DEP

Chute EU

Toiture ardoise.

ESPACE COMMUN Pavé en verre R+1. Création d'une lucarne en toiture. Ebrasement en brique peinte Ardoise 14.90 m². RAL 9016ardoise. Toiture

ME - 02

DEP

Toiture en ardoise.

DEGAGEMENT 15.98m²

ENTREE 6.17m²

Création de garde coprs bois RAL 9016

G.T.L.

EP

ME - 02

Seuil en béton préfabriqué 30 mm

Chute EU

EP

BARREAUDAGE METALLIQUE (RAL 9005)

20

EP

ENTREE 5.80m²

220

EP

177

250

EP

100

+ 8,17 m

LOGEMENT 7. 82.06m²

DEP

Fourreau BT 68mm Mur neuf - Parpaing Seuil en pierre bleu 30 mm

250

1955

PRIE

EP

CHAMBRE 01 18.29m²

Toiture terrasse accessible. Toiture terrasse 40.4 m² accessible 40.5m².

Chute EU

=68

EP

Zone engazonner.

Bandeau de toiture en zinc pré patiné ardoisé

Ouverture voussure brique Création deen garde Menuiserie - RAL 9016 coprs bois RAL Aluminium 9016

Seuil enEV. béton préfabriqué 30 mm Réseau

250

EP

ARCHITECTE MANDATAIRE

MV2 ARCHITECTES

118, rue Solférino 59000 LILLE Tél.: 03 20 51 47 23 - Email: mv2@mv2architectes.com

TE

EP EP

EP

EP

EP

EP EP

Abri Vélo

EP

EP

DEP

Chute EV Chute EU

Réseau GAZ . Seuil en pierre bleu 30 mm EU Réseau EU.

B.F.

Chute EU

Chute EU

+ 12,96 m EU

Fourreau BT 68mm Réseau TELECOM.

Ancien pavage existant

DEP

Chute EV

%

Bareaudage HT:200 cm. + Portail double vantaux

EP

EP

1/75

A

ht:100 cm

G.T.L.

DCE

Soutènement béton profil T

Réseau GAZ .

Cailloux.

Création de garde coprs bois RAL 9016 %

Réseau EU. Réseau AEP. AEP RéseauERDF. EV. Réseau

Pavé infiltrant.

Bouchement plancher. LT 02. Toiture terrasse. 3.27 m².

SDB 4.93m²

DEGAGEMENT 1.49m²

Chute EU

MV2

LOGEMENT 5. 83.24 m².

Réseau EV.

200

D-2552

Toiture ardoise.

Réseau EU. Boîte de branchement EU

Réseau TELECOM.

Place véhiculée PMR. (Marquage au sol)

Création d'une lucarne en toiture. Ardoise

Rénovation des cheminées

LIMITE SEPARATIVE

28 MAI 2026

EP

INDICE

SEJOUR 30.99m²

%

PHASE

Caniveau béton CS1

DEP

Création de garde coprs bois RAL 9016

Chute EU

EMETTEUR

Cheminement PMR.

Boîte de branchement EU Infiltrations des eaux pluviales Réseau EV.

EU

+ 6,29 m

CHAMBRE 02 15.38m² Rénovation des cheminées

Chute EU

EP

EP

918

AFFAIRE

PRO

EP

AGENCE XXX, Rue XXX - 59XXX XXX Tél.: 03 20 42 76 10 - Email: XXX@XXX.com ECHELLE

EP EP

Construction d'un Abri vélo.

EP

EP EP

793

EP EP

EP

4 17

DATE

EP

248 EP

XXX

+ 4,01 m EP

EP

DEP

EP

EP

04

DEP

Bareaudage HT:200 cm. + Portail double vantaux

Parking 2 places.

918

+ 6,90 m

162

+ 3,00 m

992

+ 8,17 m

+ 4,01 m

EP

EP EP

EP

EP

EP EP

EP

+ 4,01 m

13

EP EP

DEP

EP EP

EP

D

EP

AGENCE XXX, Rue XXX - 59XXX XXX Tél.: 03 20 42 76 10 - Email: XXX@XXX.com COORDONNATEUR S.P.S.

EP

EP

ITE

LIM

165 DEP

XXX

Parking

PHASE 2 places. DCE.

CS1. S1. Réseau AEP. AEP Réseau ERDF.

Cloture + portail barreaudé HT: 200cm

CONTROLE TECHNIQUE

+ 8,17 m

EP

EP

FACADES PROJET

Toiture en ardoise.

EP

EP

EP

Balcon terrasse.

EP

EP

Toiture ardoise.

EP EP

=

.23m

=68

TE

PRIE

EP

EP

2

EP

EP

Bordure béton type P1. (200x80mm)

Garde-corps métallique HT:110cm.

Garde-corps métallique HT:110cm.

G.T.L.

EP

EP

16

DEP

+ 4,01 m

EP

EP

EP

EP

EP

EP

EP

EP

+ 9,53 m

EP

Plantation.

EP

EP

DEP

EP

PC.02 - PLAN MASSE PROJET.

Palier de repos.

EP

118, rue Solférino 59000 LILLE Tél.: 03 20 51 47 23 - Email: mv2@mv2architectes.com

EP

EP

EP

EP

EP

Palier de repos.

EP

PP100

ENTREE PRINCIPALE.

EP

EP

DEP

Toiture ardoise.

+ 13,26 m

Toiture en ardoise.

732

EP

EP

+ 6,90 m

Toiture en ardoise.

+ 9,53 m

EP

EP

DEP

Toiture ardoise.

EP

Clôture + portail barreaudés HT:200cm.

1409

+ 8,17 m

Toiture bac acier.

509

Toiture terrasse. Toiture terrasse.

EP EP

EP EP

EP

Toiture ardoise.

ARCHITECTE MANDATAIRE

MV2 ARCHITECTES

200

Toiture terrasse accessible 40.5m².

EP

+ 12,96 m

Verrière.

Garde-corps métallique HT:110cm.

+ 6,29 m

EP

EP

EP

=

EP EP

EP

DEP

DEP

Caniveau béton CS1

CS1.

P1.

Bande de propreté - cailloux.

Bande de propreté - cailloux.

DEP

Descente d'eau pluviales

EU

+ 4,62 m

DEP

Chute EU

Infiltrations des eaux pluviales

Soutènement béton profil T ht:100 cm S1. Bordures, clôtures et soutènements

Bâtiment existant non concerné par les travaux.

G.T.L.

Raccordement EP sur acodrain. Réseau EU.

Bande de guidage PMR - Résine + Bordure béton type P1. (200x80mm) granulats P1. de marbre blancs.

Bâtiment existant concerné par les travaux.

LIMITE SEPARATIVE

Bande de propreté - cailloux.

.23m

EP

EP EP EP

+ 9,53 m Chute EU

Descente d'eau pluviales Réseau EP. Raccordement EP sur acodrain. Regard eaux pluviales 40x40cm

EP

Bordures, clôtures et soutènements

Rénovation des cheminées

B.F.

INDICE : A

Réparation du mur DATE DE DESTINATION AFFAIRE EMETTEUR PHASE INDICE ECHELLE CHANGEMENT D'ANCIENS BUREAUX EN 9 LOGEMENTS démolie en brique. Rue de Roubaix, 1/75 MV2Templeuve-en-pévèle DCE A 28 MAI85 2026 D-2552 59242

04

1220

EP

EP

EP EP

EP

EP

EP

DEP

EP

EP EP

EP

DEP EP

EP

Haie vive - Charme - hauteur 150cm

Limite parcellaire.

Documents exclusivement destinés à l'obtention des autorisations administratives de construire. Les côtes portées sur le plan sont indicatives. L'entreprise adjudiciaire est tenue de les vérifier sur place et de soumettre au maître d'ouvrage et maître d'oeuvre les dessins d'execution.

166

+ 9,53 m

EP

EP

1314

EP

EP

DPC

DEP

Réseau GAZ . Compteur d'arrivé GAZ .

Cloture - RAL+9005 ht: 150cm Bande métallique de guidagegrillagée PMR - Résine Soubassement en plaque de béton granulats de marbre blancs.

LIMITE SEPARATIVE

PHASE DCE.

Opération :

EP

EP

=48.43m= LIMITE DE PROPRIETE

LEGENDE

59650 Villeneuve d'ASCQ

+ 4,62 m + 9,53 m

Jardin Logement 03. 508.9 m²

118, rue Solférino 59000 LILLE Tél.: 03 20 51 47 23 - Email: mv2@mv2architectes.com

FACADES PROJET Maitre d'ouvrage :

Jardin Logement 03. GROUPE IMMO INVEST 508.9 m² 61 Avenue de Canteleu Bâtiment A

200

Jardin Logement 04. 218.9 m²

+ 9,53 m

Réseau EP. Réseau TELECOM. Chambre de tirage telecom. Regard eaux pluviales 40x40cm

Haie vive - Charme - hauteur 150cm

DEP

Rénovation des cheminées

RéseauERDF. GAZ . Réseau Compteur d'arrivé GAZ . Coffret d'alimentation.

Parking perméable engazonée. Cloture métallique grillagée - RAL 9005 ht: 150cm Soubassement en plaque de béton Sable stabilisé.

LIMITE SEPARATIVE

Jardin Logement 01. 284.8 m²

RéseauAEP. TELECOM. Réseau AEPtelecom. Chambre de tirage Fosse à compteur d'eau.

Sable stabilisé. Pavé gris clair béton à joint fermé15x30cm.

MV2 ARCHITECTES

Rénovation des cheminées

ERDF. Réseaux Réseau Coffret d'alimentation.

Parking perméable engazonée. Engazonnement

LIMITE SEPARATIVE

Clôture ajourée en bois HT:200cm.

Clôture ajourée en bois HT:200cm.

Réparation du mur démolie en brique.

DPC

INDICE : A

ECHELLE : 1/250.

Documents exclusivement destinés à l'obtention des autorisations administratives de construire. Les côtes portées sur le plan sont indicatives. L'entreprise adjudiciaire est tenue de les vérifier sur place et de soumettre au maître d'ouvrage et maître d'oeuvre les dessins d'execution.

EP RO

e

5

AFFAIRE : D-2552 CHANGEMENT DE DESTINATION D'ANCIENS BUREAUX EN 9 LOGEMENTS : 12.02.2026 85DATE Rue de Roubaix, 59242 Templeuve-en-pévèle

Réseau AEP. AEP Fosse à compteur d'eau.

Engazonnement

%

ux en neuf logements

PC.02 - PLAN MASSE PROJET.

Enrobé

Pavé gris clair béton à joint fermé15x30cm. Enrobé

EU

%

A,

Palier de repos.

PLAN RDC PROJET - 1/50 ech.

Réseaux

Aménagements extérieures

Rénovation des cheminées

Second floor plan

PLAN R+2 PROJET - 1/50 ech. Palier de repos.

Porte L=80 à déposer

Aménagements extérieures

03

Opération :

Porte L=80 à déposer Porte L=90 à déposer

03

T

59650 Villeneuve d'Ascq

GROUPE IMMO INVEST

61 Avenue de Canteleu Bâtiment A 59650 Villeneuve d'ASCQ

GROUPE IMMO INVEST

Maitre d'ouvrage :

Porte L=90 à déposer Cloison à déposer

61 Avenue de Canteleu Bâtiment A,

=56.93m=

85 Rue de Roubaix

LIMITE DE PROPRIETE

59242 Templeuve-en-Pévèle

Role : Conceptual design, architectural development, drawings, material studies, and visual communication Plafond à déposer

Garde-corps métallique HT:110cm.

Toiture terrasse accessible. 40.4 m²


04. LA BOURGOGNE - MV2 ARCHITECTES

Réhabilitation de l’église paroissiale Saint - Thomas en école | TOURCOING | 19.03.2026

CONCEPT DESIGN PHASE (ESQ) Location: Tourcoing, France Year: March 2026 Project: Adaptive reuse of Saint-Thomas Church into a nursery and primary school. The existing volumes are transformed to accomodate educational facilities, opening the chapel and activity hall onto a landscaped courtyard. The project integrates independent accessible entrances for the school and the chapel, while converting part of the park into a secure playground. Tools: Revit, Adobe Suite, Skecthup, Twinmotion and AI Role : Conceptual design, architectural Réhabilitation de l’église paroissiale Saint - Thomas en école | TOURCOING | 19.03.2026 development, drawings, material studies, and visual communication

CONTEXTE EXISTANT CONSTAT

PLAINE DE SPORTS

+

- Se situe au coeur du quartier - En face du métro - Bâtiment typique des années 1970 - Grande portée en charpente 5 10 m N 0 2 bois : permet l’évolutivité du bâtiment SARL Capital 7500 € | 118, rue Solférino - 59000 LILLE | tél : 03.20.51.47.23 | mv2@mv2architectes.com | Code APE NAF 7111Z | SIRET 445 223 316 00032 | 445 223 316 RCS LILLE - A proximité de la méGarden level plan North West Facade - Existing condition diathèque, des halles, et se East Facade - Existing condition situe à la jonction de nouRéhabilitation de l’église paroissiale Saint - Thomas en école | TOURCOING | 19.03.2026 veaux axes du master plan

CIMETIERE

COEUR DE QUARTIER

-

- Eglise trop grande - Salle paroissiale non utilisée - Problème d’entretien dû à la taille du bâtiment et au sysRéhabilitation de l’église paroissiale Saint - Thomas en école | TOURCOING | 19.03.2026 tème de chauffage - Insécurité et intrusion

Dortoir SRF 12.99 m²

LE PARC OPTION : LIAISON AVEC LE REZ-DE-JARDIN

LE PARC PROPOSITION B

Réhabilitation de l’église paroissiale Saint - Thomas en école | TOURCOING | 19.03.2026

The future schoolboulevard at the hearth of the neighbourhood industriel

North West Facade - Proposed design

Accès école

East Facade - Proposed design

Parc clôt, dédié à l’école SARL Capital 7500 € | 118, rue Solférino - 59000 LILLE | tél : 03.20.51.47.23 | mv2@mv2architectes.com | Code APE NAF 7111Z | SIRET 445 223 316 00032 | 445 223 316 RCS LILLE

Réhabilitation de l’église paroissiale Saint - ThomasLiaison en école |minérale TOURCOING |vers 19.03.2026 le métro

Accès PMR à l’école maternelle et à la chapelle Accès au parvis (via escalier) Accès à la salle paroissiale

SAS SRF

Stock. SRF 10.00 m²

l’école) - Une entrée pour les élémentaires directement dans la cours - Un accès PMR indépendant à l’école maternelle et à la chapelle - Nécessite de remanier l’accès PMR - Mise à niveau du terrain pour accès via l’actuelle sacristie

Circulation and spatial transformations

Bureau ADM SRF 10.81 m²

280

Accès à la salle paroissiale

LE PARC Accès technique B PROPOSITION Rampe PMR

Classe SRF 63.87 m²

Accès cours de récréation

Salle de motricité SRF 85.61 m² WC F SRF 12.56 m²

Enclosed Parc clôt, dédiépark àGradins l’école

WC G WC PMR SRF 10.63 m² SRF 7.88 m²

Haie: filtrer la vue entre le Mineral pathway chapelle Liaison minérale vers lepour métro domaine public et la cour de récréation Ménage Accès

550

Haie: pour filtrer la vue entre le Réhabilitation de l’église paroissiale Saint - Thomas en école | TOURCOING | 19.03.2026 domaine public et la cour de récréation

Classe SRF 63.90 m²

Parc clôt, dédié à l’école

LE PARC -entrance -JARDIN OPTION : LIAISON AVECAccès LE PMR REZ DEmaternelle LE PARC Accessible à l’école et à la chapelle OPTION : LIAISON AVEC LE REZ DE JARDIN - Un parc plus restreint (à l’échelle de

Réhabilitation de l’église paroissiale Saint - Thomas en école | TOURCOING | 19.03.2026

4.68 m²

SRF

SAS SRF

15.00 m²

2.52 m²

Patio SRF 35.72 m²

Salle prof SRF 23.81 m²

Forecourt access

Accès au parvis (via escalier) Parc clôt, dédié à l’école - Valoriser les parties délaissées du parc Accès à la hall salle paroissiale Parish access - Assurer un liaison PMR rez-de-jardin / Accès à ladédié salle paroissiale Parc clôt, à l’école Classe rez-haut Chapelle SRF 57.37 m² Hedge 63.40 m² Haie: pour filtrer la vueSRF entre le usages : amphithéâProposer d’autres Accès technique à lapublic salle paroissiale domaine la cour récréationgradin... tre,etclasse endeextérieur,

Technical Rampe PMR access Accès technique - Un parc plus restreint (à l’échelle de l’école) Gradins Rampe PMR seating Stepped - Une entrée pour les élémentaires direcNentre le tement dans cours N Haie: pour la filtrer la vue Gradins Reactivating underused park areas : outdoor stepped seating - Un domaine accès PMR indépendant à l’école public et la cour de récréation maternelle et filtrer à la chapelle Haie: pour la vue entre le SARL Capital 7500 € | 118, rue Solférino - 59000 LILLE | tél : 03.20.51.47.23 | mv2@mv2architectes.com | Code APE NAF 7111Z | SIRET 445 223 316 00032 | 445 223 316 RCS LILLE SARL Capital 7500 € | 118, rue Solférino - 59000 LILLE | tél : 03.20.51.47.23 | mv2@mv2architectes.com | Code APE NAF 7111Z | SIRET 445 223 316 00032 | 445 223 316 RCS LILLE - Nécessite de remanier l’accès PMR domaine public et la cour de récréation - Mise à niveau du terrain pour accès via l’actuelle sacristie - Valoriser les parties délaissées du parc

Classe SRF 59.24 m²

N

0

2

5

10 m

SARL Capital 7500 € | 118, rue Solférino - 59000 LILLE | tél : 03.20.51.47.23 | mv2@mv2architectes.com | Code APE NAF 7111Z | SIRET 445 223 316 00032 | 445 223 316 RCS LILLE

Ground floor plan


05. SCALE 1:1 Location: Uccle, Belgique Year: 2022 (Uclouvain, Belgium) Project: The project involved the design and construction of a greenhouse sheltering a shared bread oven. Located at La Roseraie in Uccle, this community facility aims to foster social interaction, collective living and civic engagement through values of sharing, solidarity and diversity. The prefabricated wooden structure is assembled from reclaimed window frames, which define the façade composition. The workshop developed an approach to construction from design to detail, focusing on material reuse and technical coordination.

50x50

125x50

Tools: Autocad, Adobe Suite, manual work and craftsmanship Role : Facade composition, assembly logic and on-site fabrication process

200x25

50x50

19x150

Visualisation of the greenhouse and shared bread oven

25x125

25x103 25x78

25x125

125x50

100x25

19x150

Example of reclaimed window frames

Structural and assembly studies

East elevation

Corner assembly detail 50x125

125X50 50x40

19x125

Example of reclaimed window frames

Timber roof structure model

West elevation

Column construction detail


Contact agathe.decroocq59@gmail.com +33 7 69 87 59 32


Turn static files into dynamic content formats.

Create a flipbook
Portfolio_Agathe Decroocq by Agathe Decroocq - Issuu