Submission by the African Centre for Biodiversity to the South African Human Rights Commission
23 July 2026

![]()

Submission by the African Centre for Biodiversity to the South African Human Rights Commission
23 July 2026

The African Centre for Biodiversity (ACB) welcomes the South African Human Rights Commission (SAHRC)’s call for public submissions on the human rights implications of the rapid expansion of data centres and digital infrastructure in South Africa (SA).
The Commission’s notice correctly recognises that, while data centres may be presented as enabling economic growth, digital transformation and artificial intelligence (AI) readiness, they also raise serious questions regarding electricity demand, water use, climate impacts, e-waste, land use, community participation, privacy, transparency, accountability, business and human rights, equitable access and the adequacy of current regulatory frameworks (SAHRC, 2026).
ACB is a South African-based civil society organisation working to advance food sovereignty, agroecology, seed and biodiversity justice, and democratic control over food and agricultural systems in Africa. ACB’s interest in this inquiry arises from its work on digitalisation in food and agricultural systems (ACB, 2026d) especially its fact sheets on digital infrastructure and data centres, which challenge the assumption that the “cloud”, AI and digital platforms are clean, immaterial or socially neutral (ACB, 2026a; ACB, 2026b; ACB, 2026c).
Data centres are material industrial infrastructure. They require land, electricity, cooling, water or water-saving technologies, fibre connectivity, backup generation, batteries, minerals, hardware supply chains and waste-management systems. Their impacts are therefore distributed across land, water, energy, climate, food systems, labour and public infrastructure (ACB, 2026a).
This submission argues that SA requires a rights-based, precautionary and public-interest governance framework for data centres and their associated infrastructure. This framework must assess not only the data- centre building itself, but the whole infrastructure chain that makes data- centre expansion possible, including oS-site renewable energy projects, power-purchase agreements (PPAs), wheeling arrangements, grid connections, backup systems, land-use approvals, water implications, e-waste streams, data governance and corporate ownership structures.
Data- centre governance must be situated within SA’s Constitutional order.
- Sec-on 24 of the Cons-tu-on guarantees everyone the right to an environment that is not harmful to health or well-being, and requires the state to protect the environment for the benefit of present and future genera-ons through reasonable legisla-ve and other measures.
- Sec-on 27 protects the right of access to sufficient food and water.
- Sec-on 32 protects the right of access to informa-on, while Sec-on 33 protects just administra-ve ac-on.
These rights are directly implicated where data- centre developments, or their linked energy and water infrastructure, place pressure on scarce resources, aSect food-producing land, rely on public infrastructure, or proceed without adequate disclosure and public participation (Republic of SA , 1996).
The SAHRC should also approach data- centre expansion through the lens of interdependence and indivisibility of rights. Electricity, water, land, food, health, a healthy environment, access to information, equality, dignity, participation, and administrative justice are not separate silos in this context. A decision to allocate scarce grid capacity, water resources, municipal attention or food-producing land to corporate digital infrastructure may aSect multiple rights at once, especially for low-income communities, rural residents, farm workers, smallholder producers, children and future generations.
Recent South African jurisprudence confirms that environmental and energy decisions must be assessed for their implications for constitutional rights. In the Cancel Coal judgment, the High Court held that government decision-making on future electricity supply had to take proper account of the rights to an environment not harmful to health or well-being, children’s rights and the interests of future generations (African Climate Alliance and Others v Minister of Mineral Resources and Energy and Others, 2024).
In the Deadly Air litigation, the Supreme Court of Appeal confirmed that state duties to implement air- quality protections may become binding where failure to act undermines section 24 rights in polluted and marginalised communities (Minister of Environmental ASairs v Trustees for the Time Being of GroundWork Trust and Others, 2025).
These cases are directly relevant by analogy: the SAHRC should insist that data- centre and linked energy decisions be assessed before approval for their impacts on health, environment, children, future generations, and communities already burdened by infrastructure inequality.
The National Environmental Management Act 107 of 1998 (NEMA) requires environmental management to place people and their needs at the forefront of concern, to pursue environmental justice, to apply the precautionary principle, to consider cumulative impacts, and to ensure public participation in environmental governance (Republic of SA , 1998). These principles are highly relevant to data centres because project-by-project approvals may fail to capture the cumulative burden of multiple data- centre campuses, energy projects, grid upgrades, diesel backup systems, water demand, construction impacts and e-waste streams.
SA’s obligations should also be interpreted consistently with international business and human-rights standards. The United Nations Human Rights Council (UNHRC) Guiding Principles on Business and Human Rights (UNHRC, 2011) require states to protect against human rights abuses by business enterprises and require companies to conduct human rights due diligence, identify and address adverse impacts, and provide or cooperate in providing remedies where harm occurs. Data- centre companies, cloud providers, energy developers, landowners, municipalities and financiers should therefore not be permitted to treat resource-intensive digital infrastructure as a purely private investment matter.
In summary, ACB submits that the SAHRC should treat data- centre expansion as a humanrights issue because it implicates several mutually reinforcing constitutional and international obligations.
- First, data- centre and linked energy decisions may aSect the section 24 environmental right where electricity demand, water use, diesel backup, land-use change, biodiversity impacts, e-waste, and cumulative climate eSects are inadequately assessed.
- Second, they may aSect section 27 rights to food and water, where scarce water, grid capacity, land or public infrastructure are redirected towards corporate digital infrastructure in ways that undermine food-producing landscapes, rural livelihoods, smallholder producers, municipal services or water-stressed communities.
- Third, they raise concerns about equality and dignity, where low-income communities, rural areas, farm workers, small-scale food producers, and underserved municipalities bear the environmental and infrastructure burdens while benefits accrue mainly to large technology companies, corporate customers, and wealthier urban users.
- Fourth, they directly engage access-to -information and administrative-justice rights because meaningful participation is impossible unless aSected communities receive full, plain-language disclosure of electricity demand, water-use assumptions, cooling technologies, diesel-backup arrangements, wheeling contracts, grid impacts, land-use approvals, public incentives and cumulative risks.
- Fifth, they require business and human-rights accountability: data- centre operators, cloud providers, energy developers, financiers and public authorities to conduct transparent human-rights and environmental due diligence, prevent and mitigate foreseeable harms, ensure non- discrimination and benefit-sharing, and provide eSective remedies where harms occur.
For these reasons, the SAHRC should not assess data centres as ordinary commercial property or technology investments, but as resource-intensive infrastructure systems whose approval and governance must be tested against the Constitution, NEMA, the UNHRC Guiding Principles on Business and Human Rights, and the lived realities of communities already aSected by inequality, water insecurity, food insecurity, unreliable basic services and climate vulnerability (Republic of SA, 1996; Republic of SA, 1998; UNHRC, 2011; African Climate Alliance and Others v Minister of Mineral Resources and Energy and Others, 2024; Minister of Environmental ASairs v Trustees for the Time Being of GroundWork Trust and Others, 2025).
Data centres are often marketed through abstract language: cloud, digital transformation, AI readiness, resilience, and clean growth. This language can obscure their material footprint. A data centre is an industrial facility comprising servers, cooling systems, power infrastructure, backup generation, batteries, fibre connectivity, buildings, security systems, roads and logistics chains. Its operation depends on continuous electricity supply and cooling, and its expansion is tied to hardware replacement, mineral extraction, electronic waste, land-use change, and public infrastructure.
The rapid growth of AI and cloud services intensifies these concerns. Public reporting has highlighted that data centres are already a significant and growing source of electricity demand globally, and that localised impacts can be far more severe than global averages suggest, particularly where data centres cluster in specific cities or regions (Carnie, 2026).
In SA, these risks arise in a context of historical load-shedding, municipal water failures, high electricity costs, uneven access to digital infrastructure, spatial inequality and climate vulnerability. This means that data- centre expansion may deepen existing inequalities if public electricity, water, land, municipal capacity or regulatory attention are diverted towards corporate digital infrastructure while low-income communities, rural areas, smallscale food producers and under-serviced municipalities continue to face unreliable basic services and limited digital access.
The equality and dignity dimensions are therefore central: communities that already experience unreliable water, sanitation and electricity services should not be asked to subsidise, through public infrastructure or environmental sacrifice, high- capacity digital systems that primarily serve corporate cloud customers and wealthier users.
ACB therefore submits that data- centre assessments should not accept “renewable energy”, “carbon neutrality” or “digital transformation” claims at face value. Promoters of data- centre expansion in SA commonly frame these facilities as essential infrastructure for economic growth, AI readiness, cloud adoption, innovation, job creation, digital skills development, regional competitiveness and SA’s positioning as a continental digital hub.
Government and industry sources have argued that digital infrastructure can help close the digital divide, drive economic growth, create sustainable jobs and support a more enabling environment for digital investment and innovation (Department of Communications and Digital Technologies, 2024).
Recent oSicial communications have also presented cloud and data- centre investment by major technology companies as evidence that SA is becoming a leading digital investment destination, with claims that cloud regions and related infrastructure could contribute substantially to gross economic output and support large numbers of jobs by 2030 (SAnews, 2026).
Microsoft has similarly framed its South African cloud and AI infrastructure investments as enabling start-ups, large companies and government entities to improve eSiciency, productivity, service delivery and innovation, while supporting SA’s ambition to become a competitive AI economy (Microsoft, 2025).
Financial and industry actors also describe data centres as the “lifeblood” or backbone of the emerging digital economy, supporting AI, machine learning, high-performance computing, connectivity, cloud services and regional digital transformation (Nedbank Corporate and Investment Banking, 2024; Teraco, 2026).
These arguments should not be dismissed, but neither should they be accepted uncritically.
The central human-rights question is not whether digital infrastructure has potential benefits, but who benefits, who pays, who controls the infrastructure and data, and who bears the environmental, social, water, energy, land-use, and public-infrastructure costs.
Claims of job creation and growth must be tested against:
- the quality, loca-on, dura-on and accessibility of those jobs;
- whether benefits accrue mainly to mul-na-onal technology companies, large corporate customers and urban elites;
- whether small businesses, rural communi-es and low-income users can access the promised benefits; and
- whether public resources are being redirected away from basic services, local food systems and community needs.
Similarly, claims that data centres are needed for AI and cloud services must be assessed alongside their electricity demand, water requirements, backup diesel generation, e-waste, land footprint, mineral and hardware supply chains, grid impacts and cumulative climate implications. Rights-based governance therefore requires full disclosure of electricity demand, water use, backup generation, emissions, air pollution, noise, land-use implications, e-waste, grid impacts, corporate ownership, financing, public incentives, procurement arrangements, local-benefit commitments, digital-access outcomes and the identity of aSected communities and end-users.
ACB supports a just transition away from fossil fuels. However, renewable energy procurement by data- centre companies should not be treated as automatically just, sustainable, or rights- compliant.
Dedicated solar farms, batteries, substations, transmission infrastructure, and wheeling arrangements also have land, water, ecological, labour and food-system implications.
A data centre may be physically located in one province while its energy, land, and grid footprint are displaced into another. The sustainability claim must therefore be tested across the whole infrastructure chain.
Recent international evidence strengthens this point. The International Energy Agency (IEA)’s 2025 report on energy and AI emphasises that there is “no AI without energy”, because AI model training and deployment occur mainly in data centres, and because servers, cooling, networking equipment, storage, uninterruptible power supply systems and backup generators all form part of the electricity demand profile of these facilities (IEA, 2025a).
In 2026, the IEA reported that global data- centre electricity demand grew by 17% in 2025, with AI-focused data centres growing even faster, and projected that data- centre electricity consumption could double by 2030 while power use from AI-focused data centres could triple (IEA, 2026). This evidence makes it inadequate to assess South African data- centre proposals only as discrete property developments or isolated investment projects. They are part of a fast- expanding global AI and cloud infrastructure system with material energysecurity, aSordability, grid-planning and climate implications.
The same evidence also complicates claims that corporate renewable procurement resolves the problem. The IEA reported that the technology sector accounted for around 40% of all corporate renewable PPAs signed globally in 2025, while data- centre developers also faced bottlenecks in grid connections, transformers, gas turbines, advanced chips and regulatory approvals (IEA, 2026).
This suggests that renewable procurement is not merely a benign climate solution: it can reshape energy markets, grid planning, land allocation, and infrastructure priorities to meet the needs of large technology firms.
In SA, where energy access, aSordability, municipal capacity and grid reliability remain deeply unequal, private power-purchase and wheeling arrangements should therefore be assessed for their distributional impacts as well as their carbon claims.
South African energy-market evidence points in the same direction. GreenCape’s 2025 large-scale renewable energy market intelligence report identifies strong momentum in private renewable PPAs and wheeling arrangements but also highlights grid capacity constraints and policy uncertainty as key barriers to renewable energy delivery (GreenCape, 2025).
Reporting on the 2025 South African Renewable Energy Grid Survey indicates that renewable energy development is increasingly constrained not only by grid connection capacity but also by the system’s ability to absorb and balance large volumes of solar and wind output, as well as battery projects, across time and location (Ntephea, 2025). These dynamics matter for human rights because scarce grid capacity, transmission planning, municipal wheeling rules, and balancing infrastructure are public-interest issues, not merely private procurement matters.
Water impacts also remain central, and the South African context makes this concern especially acute. Recent local reporting on proposed Equinix-linked facilities in Cape Town states that the development could use approximately 12.05 million litres of water per day, according to the Legal Resources Centre, while campaigners have objected that insuSicient information has been disclosed on water consumption, electricity demand,
cooling systems, diesel backup and environmental impacts (Monzon, 2026). Eyewitness News has also reported concerns that Cape Town’s approved data- centre proposals raise major water and electricity questions in a city still shaped by the memory of the 2017–2018 “Day Zero” drought, with experts warning that evaporative cooling can permanently remove water from local systems rather than simply cycling it back for reuse (Ho Hip, 2026).
These South African examples show why water use cannot be treated as a generic global issue or deferred to later technical design. It is a direct constitutional and human-rights concern in a water-scarce country where households, informal settlements, farms, schools, clinics and municipalities already face unreliable water services.
Gauteng provides a further warning: during the province’s recent water-supply problems, industry reporting noted that data centres depend on cooling systems that must keep servers within specific temperature and humidity limits, even though newer operators such as Teraco state that their closed-loop cooling systems reduce ongoing water use and that boreholes and rainwater harvesting are used for on-site needs (McLeod, 2024).
The SAHRC should therefore require facility-specific, location-based disclosure of water sources, cooling technologies, daily and peak water demand, borehole or groundwater use, municipal supply dependency, wastewater arrangements, drought contingency plans and cumulative impacts on water-stressed municipalities.
Finally, renewable- energy infrastructure itself has biodiversity and land-use consequences. The International Union for Conservation of Nature (IUCN) guidance on cumulative biodiversity impact assessment for wind, solar and associated infrastructure stresses that cumulative impacts must be assessed across multiple projects and associated infrastructure, not only at the level of a single site (Bennun et al., 2024).
A 2025 literature review for The Wildlife Trusts similarly notes that ground-mounted solar can aSect biodiversity and agricultural land depending on siting, design, management and cumulative land-take, while also recognising that biodiversity benefits are possible only where projects are carefully planned and managed (Green, 2025).
For ACB, this means that renewable energy for data centres should not be treated as a clean oGset that cancels out the rights concerns associated with data- centre expansion. It should instead trigger a broader assessment of land, biodiversity, water, grid and food-system impacts, especially where linked infrastructure is located in strategic agricultural landscapes such as the Free State.
The Free State example illustrates this concern and shows that the project has moved beyond a general corporate ambition into a concrete infrastructure pathway. Africa Data Centres (ADC) and Distributed Power Africa (DPA) Southern Africa announced in April 2024 that they had broken ground on a solar farm in the Free State under a 20-year PPA signed in March 2023. Public announcements state that the first phase is a 12 MW solar facility intended to wheel power to ADC’s CPT1 carrier-neutral data centre in Cape Town, with later phases intended to supply JHB1 and JHB2 in Johannesburg once municipal wheeling arrangements are concluded (ADC, 2024; Cassava Technologies, 2024; Reuters, 2024).
Technology-sector reporting provides further evidence that this is an advancing project rather than a speculative proposal: ADC’s chief financial oSicer was reported as saying that construction was expected to start within three months of the April 2024 announcement and that the company aimed to have 12 MW available to the grid within 12 months Cape Town was prioritised because it had the relevant regulatory framework and infrastructure in place before other municipalities, while talks with Johannesburg and Tshwane were reported to be at an advanced stage (TechCentral, 2024).
This is important because it indicates that the Free State project is embedded in a broader municipal wheeling and corporate energy procurement strategy, not merely a stand-alone solar development.
Industry reporting also described the project as part of ADC’s strategy to decrease reliance on grid power and decarbonise its energy sources, while relying on independent power producers and wheeling frameworks because data- centre campuses do not have suSicient space to generate all required power on site (TechCentral, 2024; African Review, 2024).
These details strengthen the need for the SAHRC to treat the Free State solar project as data- centre-linked energy infrastructure whose land, grid, food-system and community impacts should be assessed as part of the data- centre value chain.
ACB does not present this as a data- centre building physically located in the Free State. Rather, it should be understood as data- centre-linked energy infrastructure. That distinction is important. It shows that the impacts of data- centre expansion may be geographically distributed: the servers may be in Cape Town or Johannesburg, the dedicated energy generation may be in the Free State, the grid and wheeling arrangements may involve municipalities and public infrastructure, and the data and profits may be controlled by corporate actors. Fragmented assessment risks hiding the full public-interest implications.
A proper human-rights assessment requires the SAHRC to understand the scale and geography of SA’s data- centre build- out. Publicly available information indicates that this is not a single-site issue. SA already hosts a substantial and expanding data- centre market concentrated in Gauteng, Cape Town, and Durban, with further proposed capacity.
A 2026 market report summary states that SA hosts around 55 existing data centres and between 9 and 10 upcoming data centres across multiple cities, with Johannesburg and Cape Town having a strong presence and Johannesburg accounting for the dominant share of power capacity (Research and Markets, 2026; Arizton, 2026). While these commercial reports should be treated cautiously because full underlying datasets are paywalled, they indicate that the SAHRC should not assess data- centre impacts only through isolated project approvals.
Known operators include Teraco now part of Digital Realty which publicly lists facilities in Johannesburg, Cape Town and Durban, including Johannesburg sites at Isando and Bredell, Cape Town sites at Rondebosch and Brackenfell, and a Durban site at Riverhorse Valley (Teraco, 2026a; Teraco, 2026b). ADC, part of the Cassava Technologies group, lists South African facilities including JHB1 in Midrand, JHB2 in Samrand/Centurion and CPT1 in Cape Town, with the JHB1 Midrand site described as including 9,000 m² of white space and a 20 MW client IT load upon completion (ADC, 2026a; Datacenters.com, 2026a). NTT
Global Data Centers operates Johannesburg 1 in Samrand, Centurion, which it describes as its first data centre in SA, with 6,200 m² of server space and a 12 MW IT critical load (NTT, 2026). Open Access Data Centres operates facilities including Isando/JNB1 in Johannesburg, Brackenfell/CPT2 and Rondebosch/CPT1 in Cape Town, and Durban/DUR1, while its Isando site is described as a 12 MW facility in Johannesburg’s primary trade, logistics and technology corridor (Open Access Data Centres, 2026; Datacenters.com, 2026b).
Hyperscale cloud infrastructure is also part of the picture. Microsoft announced the general availability of Azure cloud regions in Johannesburg referred to as South Africa
North and Cape Town referred to as South Africa West in 2019, presenting these as its first enterprise-grade data centres in Africa and as infrastructure intended to support digital transformation, data residency, compliance and cloud services across Africa (Microsoft Azure, 2019). Microsoft’s subsequent investment announcements continue to frame SA’s cloud and AI infrastructure as central to productivity, service delivery, innovation, and economic competitiveness (Microsoft, 2025). These facilities and regions therefore form
part of the broader data- centre and cloud infrastructure landscape that should be assessed for energy, water, land, digital-access and corporate- control implications.
Proposed and expanding projects raise additional concerns. Equinix opened its first South African facility, JN1, in Isando on the East Rand in 2024 and has reportedly acquired land in Johannesburg and Cape Town as part of an R7.5 billion investment push that could add 160 MW of data- centre capacity, on top of capacity already under construction (TechCentral, 2026a). In Cape Town, Equinix-linked proposed data- centre developments on land within the King Air Industria precinct near Cape Town International Airport have attracted objections due to insuSicient disclosure of information on water use, electricity demand, emissions, diesel backup, air pollution, noise, and building details. Reporting in July 2026 indicates that Cape Town’s Municipal Planning Tribunal approved rezoning related to two proposed facilities, with one proposed facility of approximately 50,000 m² and another of approximately 72,542 m², while Equinix stated that it had not yet submitted an actual datacentre planning application for the site (DatacenterDynamics, 2026; Kretzmann, 2026).
This demonstrates the need for the SAHRC to intervene before land-use changes and infrastructure commitments become eSectively irreversible.
The linked renewable- energy footprint must be mapped together with these facilities. The clearest current example is the ADC/DPA Southern Africa Free State solar project, which is intended to wheel power first to ADC’s CPT1 facility in Cape Town and later to JHB1 and JHB2 in Gauteng, subject to municipal wheeling arrangements (ADC, 2024; Cassava Technologies, 2024; TechCentral, 2024). This means that the data- centre footprint is distributed across provinces: data- centre buildings in Gauteng and the Western Cape, linked energy generation in the Free State, and grid and municipal wheeling arrangements involving multiple public authorities.
The SAHRC should therefore request a national inventory of existing, proposed and planned data centres and their linked infrastructure, including facility location, operator, ownership, power capacity, electricity demand, water use, cooling systems, backup generation, renewable- energy contracts, wheeling arrangements, grid- connection approvals, land-use approvals, public incentives, aSected communities and disclosed public-benefit commitments.
The Free State is not an empty technical platform for energy procurement. It is one of SA’s most important agricultural provinces and forms a central part of the maize belt. Decisions
about land, water, electricity, public infrastructure and rural development in the Free State cannot be separated from food security, food prices, farm workers, smallholder producers, agro -processing, grain storage, local food economies and climate resilience.
ACB is particularly concerned that renewable energy infrastructure serving data centres may be sited on or near high-potential agricultural land, grazing land, watercourses, smallholder production areas or ecologically sensitive landscapes. Even where an individual project appears modest, the cumulative eSect of solar farms, transmission infrastructure, substations, battery systems, roads and associated development may fragment agricultural land and change the governance and economic value of rural landscapes.
Climate and water risks deepen this concern. Data- centre-linked infrastructure must be assessed through a water- energy-food nexus lens. Even where a solar farm uses less water than a data- centre cooling plant, its construction, panel cleaning, vegetation management, fire control, substations, battery systems and associated infrastructure may have water and ecological implications. More importantly, the allocation of land and grid capacity to corporate digital infrastructure must be evaluated against the needs of farming communities, rural municipalities and food-system resilience.
A recurring concern in data- centre governance is information asymmetry. Communities may be asked to comment on a land-use, environmental, or energy application without being told clearly that the project is linked to corporate cloud, AI, or data- centre expansion. Consultation that treats a project as a stand-alone renewable- energy investment may conceal its real function in enabling resource-intensive digital infrastructure.
The Cape Town data- centre challenge, reported in 2026, demonstrates the importance of full disclosure. Campaigners objected to a major proposed data- centre development on the basis that decision-makers and communities lacked substantive information on water use, emissions, electricity demand, diesel generators, air pollution, noise, and building details. The reported projected power usage for the two proposed facilities was up to 160 MW, raising concerns in a city still marked by the 2017–2018 “Day Zero” drought crisis (Reuters, 2026). This example underscores that meaningful participation is impossible without the information needed to understand cumulative and rights-related impacts.
ACB submits that aGected communities, farm workers, smallholder producers, water users, local residents, municipalities, food-system actors and civil society organisations must be told plainly who the data- centre end-users are, what facilities are being powered, what contractual arrangements are in place, what public infrastructure is required, what alternatives were considered, and what cumulative impacts are expected.
The right of access to information is especially important in this inquiry. Communities cannot exercise meaningful participation, challenge administrative decisions, or protect their section 24 and section 27 rights if electricity demand, water-use assumptions, cooling technologies, diesel-backup arrangements, grid- connection studies, PPAs, wheeling arrangements, and public incentives are treated as confidential commercial information. The SAHRC should therefore recommend proactive disclosure, not merely reactive access-to -information requests, for all data- centre projects and linked energy infrastructure.
Public participation must also be assessed against the standard of meaningful, informed, and inclusive participation. South African environmental governance recognises that vulnerable and disadvantaged persons must have an eSective opportunity to participate in decisions that aSect their environment and livelihoods (Department of Environmental ASairs, 2017; Hall and Lukey, 2023). This requires plain-language disclosure, locallanguage communication where appropriate, suSicient time, accessible venues or platforms, disclosure of cumulative impacts, and support for communities to understand technical issues such as megawatt demand, water intensity, diesel backup, wheeling, and grid constraints.
Data- centre companies and their partners should be required to conduct robust humanrights and environmental due diligence before projects are approved and throughout their life cycles. This should include due diligence by data- centre operators, cloud providers, energy developers, landowners, financiers, municipalities and any public bodies enabling the project through incentives, land-use approvals, grid arrangements or infrastructure support.
Such due diligence must include, at a minimum, assessment of electricity demand, water demand, climate risk, land-use change, biodiversity impacts, impacts on food-producing land, e-waste, labour conditions, privacy and data protection, cybersecurity, public subsidies, tariS impacts, municipal service impacts, aSected communities, grievance mechanisms and access to remedy. It must be independent, publicly available,
understandable to aSected communities, and updated when project design, energy sourcing, or end-user arrangements change.
Human rights due diligence should also be explicit about non- discrimination and benefitsharing. It should identify which groups are likely to benefit from data- centre infrastructure and which groups are likely to bear the burdens. It should test whether promised jobs, skills programmes, local procurement, digital access, energy benefits or communitydevelopment commitments are enforceable, monitored and accessible to aSected communities. Where harms occur, remedies should include disclosure, suspension or revision of approvals, enforceable mitigation, community benefit agreements, rehabilitation, compensation where appropriate, and independent grievance mechanisms.
ACB respectfully recommends that the SAHRC adopt the following positions in its engagement, findings, and recommendations:
1. Apply a whole-infrastructure-chain approach. Data-centre assessments must include off-site energy genera-on, wheeling arrangements, grid connec-ons, substa-ons, backup genera-on, water infrastructure, e-waste streams and cumula-ve impacts.
2. Require full public disclosure. Developers should disclose electricity demand, water use, cooling technologies, backup genera-on, emissions, air pollu-on, noise, land-use impacts, energy contracts, public incen-ves, grid dependencies, ownership structures and end-user arrangements.
3. Mandate human rights and environmental due diligence. Data-centre companies, energy partners, financiers and public authori-es should iden-fy, prevent, mi-gate and account for adverse impacts in line with cons-tu-onal du-es and the United Na-ons Guiding Principles on Business and Human Rights.
4. Protect food-producing land and rural livelihoods. Data-centre-linked energy projects in agricultural regions, including the Free State, should be assessed for impacts on highpoten-al agricultural land, maize produc-on, farm workers, smallholder producers, water users, agro-processing, grain storage and local food economies.
5. Strengthen public par?cipa?on. Consulta-on must be early, meaningful, accessible, and informed. Communi-es must be told clearly where a project fits within the data-centre value chain and who benefits from it.
6. Address water-energy-food nexus risks. Approvals should not assess electricity, water, land and food impacts in isola-on. Cumula-ve and climate-related impacts must be central to decision-making.
7. Scru?nise green claims. Renewable energy procurement should not be accepted as a complete answer to environmental and human rights concerns. “Carbon neutral” or “green cloud” claims must be tested against land, water, grid, waste and community impacts.
8. Ensure equitable digital infrastructure. Public resources and regulatory support for data centres should be jus-fied by demonstrable public benefit, not merely private computa-onal capacity or corporate cloud expansion.
9. Develop binding governance standards. SA should develop clear regulatory requirements for data-centre transparency, environmental assessment, water and energy repor-ng, e-waste management, public par-cipa-on, business and human-rights due diligence, and access to remedy.
10. Protect equality, dignity and non-discrimina?on. Data-centre governance must ensure that low-income communi-es, rural areas, farm workers, smallholder producers and under-serviced municipali-es do not bear dispropor-onate environmental, water, energy, land-use or tariff burdens while benefits accrue mainly to large technology companies and corporate users.
• What is the current and projected electricity demand of exis-ng and proposed data centres in SA?
• How much of this demand relies on public grid capacity, wheeling arrangements, dedicated renewable energy projects, diesel backup genera-on, or ba_ery storage?
• What water sources and cooling technologies are used, and how are these assessed in water-stressed municipali-es?
• How are cumula-ve impacts assessed where mul-ple data centres cluster in one city or rely on off-site infrastructure in another province?
• Are affected communi-es informed when local energy or land-use projects are linked to data-centre end-users elsewhere?
• What safeguards exist to ensure that data-centre-linked energy projects do not displace food-producing land or undermine rural livelihoods?
• What public incen-ves, tax benefits, infrastructure support or regulatory concessions are being provided to data-centre operators?
• What mechanisms exist for communi-es to access informa-on, par-cipate meaningfully, and seek remedy?
• How will decision-makers ensure that data-centre approvals do not dispropor-onately burden communi-es already affected by poverty, unreliable services, water insecurity, food insecurity, pollu-on or limited digital access?
• What enforceable commitments will developers make regarding local benefit-sharing, affordable digital access, local procurement, skills development, grievance mechanisms, remedies, and independent monitoring?
Data centres are not merely digital infrastructure. They are resource-intensive industrial systems embedded in land, water, energy, food, labour, data, and governance systems. SA should not permit data- centre expansion to proceed through fragmented approvals, inadequate disclosure, weak consultation or untested claims of sustainability. A rightsbased approach requires that data- centre infrastructure be assessed in relation to constitutional environmental rights, rights of access to food and water, access to information, equality, dignity, just administrative action, children’s rights, the interests of future generations, climate justice, food sovereignty, public participation and business accountability.
The Free State example shows why the SAHRC should look beyond the visible data- centre building. A data centre may sit in Cape Town or Johannesburg, while its energy and land footprint extends into the maize belt. Renewable energy for data centres is not automatically just or sustainable if it externalises costs onto food-producing regions, rural communities, water systems, municipal infrastructure or future generations.
ACB therefore urges the SAHRC to recommend a robust, transparent and precautionary governance framework that places human rights, environmental justice and food-system resilience at the centre of SA’s digital infrastructure pathway.

ACB (2026a). Digital infrastructure in Africa: Deconstructing the myth of dematerialisation and unveiling corporate power. Fact sheet 1: Digital infrastructure in Africa: implications for the environment, agriculture, and food systems.
ACB (2026b). Linking Africa with cables: resource extraction, impacts on marine and coastal ecosystems, and climate footprints. Fact sheet 2: Digital infrastructure: implications for Africa’s environment, agriculture, and food systems.
ACB (2026c). Ownership and power in Africa’s digital infrastructure: corporate, state and geopolitical actors across cables, clouds and connectivity. Fact sheet 3. Digital infrastructure: implications for Africa’s environment, agriculture, and food systems
ACB (2026d). Feeding Big Tech or feeding Africa? Fact sheet 4. Digital infrastructure: implications for Africa’s environment, agriculture, and food systems.
Africa Data Centres (2024) ‘Africa Data Centres and DPA SA breaks ground on solar farm in Free State’, 8 April. Available at: https://www.africadatacentres.com/africa- data- centres-anddpa-sa-breaks-ground- on-solar-farm-in-free-state/ (Accessed: 20 July 2026).
Africa Data Centres (2026a). ‘Midrand: JHB1 Midrand Data Centre’. Available at: https://www.africadatacentres.com/midrand/ (Accessed: 20 July 2026).
African Climate Alliance and Others v Minister of Mineral Resources and Energy and Others (2024). High Court of South Africa, Judgment of 4 December 2024.
African Review (2024). ‘Free State solar farm to power Africa Data Centres facilities’, 8 April. Available at: https://africanreview.com/energy/free-state-solar-farm-to -power-africa- datacentres-facilities (Accessed: 20 July 2026).
Arizton (2026). ‘Data Centers in South Africa: Upcoming and existing data centers in South Africa’. Available at: https://www.arizton.com/market-reports/south-africa- data- center-portfolio (Accessed: 20 July 2026).
Bennun, L., Fletcher, C., Cook, A., Wilson, D., Jobson, B., Asante-Owusu, R., Dakmejian, A. and Liu, Q. (2024). Guidance on biodiversity cumulative impact assessment for wind and solar developments and associated infrastructure. Gland: International Union for Conservation of Nature.
Carnie, T. (2026). ‘Growth spurt of data centres could threaten SA’s electricity and water supply’, Daily Maverick, 8 February. Available at: https://www.dailymaverick.co.za/article/2026-0208-growth-spurt- of- data- centres- could-threaten-sas- electricity-and-water-supply/ (Accessed: 20 July 2026).
Cassava Technologies (2024). ‘Africa Data Centres and DPA SA breaks ground on solar farm in Free State’, 8 April. Available at: https://www.cassavatechnologies.com/africa- data- centresand- dpa-sa-breaks-ground- on-solar-farm-in-free-state/ (Accessed: 20 July 2026).
DatacenterDynamics (2026). ‘Approval for rezoning given to pair of proposed Equinix data centers in Cape Town, South Africa’, 15 July. Available at: https://www.datacenterdynamics.com/en/news/approval-for-rezoning-given-to -pair- ofproposed- equinix- data- centers-in- cape-town-south-africa/ (Accessed: 20 July 2026).
Datacenters.com (2026a). ‘Africa Data Centres: JHB1 Midrand Data Centre’. Available at: https://www.datacenters.com/africa- datacentres-jhb1-midrand- data- centre (Accessed: 20 July 2026).
Datacenters.com (2026b). ‘Open Access Data Centers: South Africa Data Centers Locations’. Available at: https://www.datacenters.com/providers/open-access- datacenters/locations/south-africa (Accessed: 20 July 2026).
Department of Communications and Digital Technologies (2024). ‘South Africa’s Digital Transformation Infrastructure Roadmap’, 28 October. Available at: https://www.dcdt.gov.za/minister-s-speeches/534-south-africa-s- digital-transformationinfrastructure-roadmap.html (Accessed: 20 July 2026).
Department of Environmental Abairs (2017). Public Participation guideline in terms of NEMA EIA Regulations. Pretoria: Department of Environmental Abairs.
Green, J. (2025). Impacts of ground mounted solar farms/parks on biodiversity: literature review. Ipswich: SWT Trading Ltd/Wilder Ecology for The Wildlife Trusts.
Hall, J. & Lukey, P.J. (2023). Public participation as an essential requirement of the environmental rule of law: Reflections on South Africa’s approach in policy and practice, African Human Rights Law Journal, 23(2). Available at: https://doi.org/10.17159/1996-2096/2023/v23n2a4 (Accessed: 20 July 2026).
Ho Hip, C. (2026). ‘Cape Town’s data centre boom raises water and electricity concerns’, Eyewitness News, 17 July. Available at: https://www.ewn.co.za/2026/07/17/cape-town-sdata- centre-boom-raises-water-and- electricity- concerns (Accessed: 20 July 2026).
IEA (2025a). Energy and AI. Paris: International Energy Agency. Available at: https://www.iea.org/reports/energy-and-ai (Accessed: 20 July 2026).
IEA (2026). ‘Data centre electricity use surged in 2025, even with tightening bottlenecks driving a scramble for solutions’, 16 April. Available at: https://www.iea.org/news/data- centreelectricity-use-surged-in-2025- even-with-tightening-bottlenecks- driving-a-scramble-forsolutions (Accessed: 20 July 2026).
Kenny, R. (2026). Water use in AI and data centres. London: Government Digital Sustainability Alliance.
Minister of Environmental Abairs v Trustees for the Time Being of GroundWork Trust and Others (2025). Supreme Court of Appeal of South Africa, [2025] ZASCA 43.
McLeod, D. (2024). ‘Gauteng water crisis: the impact on data centres’, TechCentral, 25 March. Available at: https://techcentral.co.za/gauteng-water- crisis-impact- data- centres/241895/ (Accessed: 20 July 2026).
Monzon, L. (2026). ‘Battle over data centres that will use 12 million litres of water per day in South Africa’, MyBroadband, 17 July. Available at: https://mybroadband.co.za/news/technology/658479-battle- over- data- centres-that-willuse-12-million-litres- of-water-per- day-in-south-africa.html (Accessed: 20 July 2026).
Microsoft (2025). ‘Microsoft invests an additional ZAR 5.4bn in South Africa and launches youth certification programme for high- demand digital skills’, 6 March. Available at: https://news.microsoft.com/source/emea/features/microsoft-invests-zar-5-4bn-in-southafrica/ (Accessed: 20 July 2026).
Nedbank Corporate and Investment Banking (2024). ‘Africa’s data centre boom: driving digital growth’, 22 October. Available at: https://cib.nedbank.co.za/insights/articles/africas- datacentre-boom.html (Accessed: 20 July 2026).
Ntephea, M. (2025). ‘South Africa’s renewable grid constraint shifts: system now running out of load’, Energize, 28 October. Available at: https://www.energize.co.za/article/south-africasrenewable-grid- constraint-shifts-system-now-running- out- of-load (Accessed: 20 July 2026).
Republic of SA (1996). Constitution of the Republic of South Africa, 1996.
Republic of SA (1998). National Environmental Management Act 107 of 1998
Research and Markets (2026). South Africa Existing & Upcoming Data Center Portfolio. Available at: https://www.researchandmarkets.com/reports/5794189/south-africa- existing-andupcoming- data- center Accessed: 20 July 2026).
Reuters (2024). ‘Africa Data Centres, DPA break ground on 12 MW solar farm in South Africa’, 8 April. Available at: https://www.reuters.com/business/energy/africa- data- centres- dpabreak-ground-12-mw-solar-farm-south-africa-2024-04-08/ (Accessed: 20 July 2026).
Reuters (2026). ‘Equinix faces challenge to Cape Town data centres over environmental concerns’, 18 May. Available at: https://www.reuters.com/world/africa/equinix-faces- challenge- capetown- data- centres- over- environmental- concerns-2026-06-04/ (Accessed: 20 July 2026).
SAHRC (2026). ‘Media Advisory: South African Human Rights Commission calls for public submissions on data centres and human rights in South Africa’, 22 May. Available at: https://www.sahrc.org.za/index.php/sahrc-media/news-2/item/4479-media-advisorysouth-african-human-rights- commission- calls-for-public-submissions- on- data- centresand-human-rights-in-south-africa (Accessed: 20 July 2026).
SA Government News Agency (SAnews) (2026). ‘South Africa is building a secure and inclusive digital future’, 6 July. Available at: https://www.sanews.gov.za/south-africa/south-africabuilding-secure-and-inclusive- digital-future (Accessed: 20 July 2026).
TechCentral (2024). ‘Africa Data Centres to wheel power from new Free State solar farm’, 8 April. Available at: https://techcentral.co.za/africa- data- centres-free-state-solar-farm/242513/ (Accessed: 20 July 2026).
Teraco (2026). ‘Africa’s data centres and cloud infrastructure: growth, connectivity, and digital transformation’, 28 May. Available at: https://www.teraco.co.za/blog/africas- data- centresand- cloud-infrastructure-growth- connectivity-and- digital-transformation/ (Accessed: 20 July 2026).
UNHRC (2011). Guiding Principles on Business and Human Rights: Implementing the United Nations “Protect, Respect and Remedy” Framework. A/HRC/17/31. New York and Geneva: United Nations.
Yañez-Barnuevo, M. (2025). ‘Data centers and water consumption’, Environmental and Energy Study Institute, 25 June. Available at: https://www.eesi.org/articles/view/data- centers-andwater- consumption (Accessed: 20 July 2026).