Construction sequence
from Cochlea Museum
by AfraaMahgob
This phase is of utmost significance, as it marks the beginning of the building’s construction. It involves laying concrete in the structure’s mold to create the main framework. Subsequently, the primary structure of the bridge will be prefabricated and assembled on-site.
During the final phase, the installation of the building’s exterior tiles and interior wood will take place. Simultaneously, the remaining construction work on the bridge will require a temporary closure of Mancunium way for a couple of days. However, the off-site manufacturing approach will ensure that this closure is minimized and the disruption is kept to a minimum.