Skip to main content

PORTFOLIO - Adrian Buisan

Page 1

PORTFOLIO

ADRIAN BUISAN LARDIES abuisan.arch@gmail.com


abuisan.arch@gmail.com

680 670 268 issuu.com/adrianbuisan linkedin.com/in/adrian-buisan

AUTOCAD

REVIT

RHINOCEROS

GRASSHOPPER

123D MAKE

3DS STUDIO MAX

ADOBE CREATIVE SUITE

WIN EVA

MICROSOFT OFFICE

WIN. MOVIEMAKER


Adrián Buisán Lardiés I

Experiencia Arquitecto ARB / BIM Manager 45 St. Jame´s Place Londres

AR Architecture - Londres Diciembre 2018 - Presente

Redistribución y reforma integral casa unifamiliar

N

Modelado y preparación de la documnetación para el proyecto básico, desarrollo de detalles técnicos, gestión del modelo BIM y coordinación con consultores externos.

National Concert Hall Vilna

Preparación concurso auditorio nacional de Lituania

27 Kensington Square Londres

Reforma integral y diseño de interiores casa unifamiliar

Modelado y preparación de la documentación a presentar en el concurso Vilnius National Concert Hall.

T

Preparación y organización del modelo BIM.

AR Architecture - Londres

Arquitecto ARB

Junio 2017 - Diciembre 2018

61 Netherhall Gardens Londres

13 Glenmore Road Londres

Desafios Urbanos Fafe

Redistribución y reforma integral edificio de viviendas

Modelado y preparación de la documnetación para el proyecto básico.

Redistribución y reforma integral piso en planta baja

Seguimiento de obra y desarrollo de detalles constructivos.

Preparación concurso Museo del automóvil de Portugal

Modelado y preparación de la documentación a presentar en el concurso Desafios Urbanos.

BCQ Arquitectura - Barcelona

Arquitecto asistente

Junio 2014 - Agosto 2014

Biblioteca Joan Maragall Barcelona

Soy un joven arquitecto con una gran capacidad de adaptación y excelentes dotes de trabajo en equipo. Tengo experiencia en el campo de la arquitectura residencial, escala, a mi entender, básica en esta profesión, pero a la vez insuficiente, esa es la razón por la que me gustaría asumir nuevos retos y explorar otras escalas y sus diferentes interacciones con el usuario.

Publicación del libro “Biblioteca de luz”

Digitalización y redibujado de documentos y producción de contenido audiovisual para la inauguración del proyecto.

Me apasiona la construcción y el urbanismo, considero que el cuidado del detalle y la inserción urbana son elementos fundamentales en arquitectura, independientemente de la escala del proyecto. También estoy familiarizado con el mundo BIM tras dos años de experiencia laboral en Londres donde trabajé con esta metodología, la cual considero una herramienta de presente imprescindible para el futuro.

Formación Universitat Internacional de Catalunya - Barcelona

Grado en Arquitectura

Septiembre 2009 - Julio 2016

University of creative arts - Canterbury

Erasmus

Enero 2015 - Mayo 2015

Pixel 51

Certificados

Cursos oficiales Autodesk 3DS Studio Max

90 horas

Cursos oficiales Autodesk Revit

66 horas

Exposiciones Museu d’Art Nacional de Catalunya

TFG

Julio 2016 Data Processing Circle

Diseño sede corporativa T-Systems (Data Center+Oficinas)

I am a young architect with a great ability to adapt and excellent teamwork skills. I have experience in the residential architecture sector, scale in my opinion essential in this profession but insufficient at the same time, this is the reason why I would like to face new challenges and explore other scales and their different interactions with the user. I am very passionate about construction and urbanism, I consider the care of the detail and the urban insertion fundamental elements in architecture regardless the scale of the project. I am also familiarised with the BIM world after two years of work experience in London where I worked with this methodology which I consider a tool for the present essential for the future.

R O D U C C I

Presentación del proyecto ante el jurado.

Cátedra Ceramica

Exposición Internacional de Cerámica CEVISAMA

Squam

Febrero 2015

Diseño pieza cerámica para envolvente

Ó

Presentación de la pieza ante el jurado.

Idiomas

N


ECOPARQUE TECNOLÓGICO

7

61 NETHERHALL GARDENS

15

NATIONAL CONCERT HALL

23


Í N

11

DATA PROCESSING CIRCLE

D I C

19

45 ST JAMES PLACE

E


E C O P A R Localizado en medio del batiburrillo de la periferia urbana, el master plan propone un área corporativa en los alrededores del aeropuerto de Barcelona. La zona está dominada por una potente infraestructura la cual traza una trayectoria curvilínea en el territorio. El concepto del master plan está basado en la descomposición de esta trayectoria en diferentes niveles para la domesticación del paisaje. Las edificaciones están diseñadas siendo fieles a la geometría circular así como a las diferentes líneas de descomposición. Estas líneas dependiendo de la proximidad a la infraestructura cogen un carácter más blando (vías peatonales, río) o más duro (tráfico rodado).

Q U E

Delta del LLobregat, Barcelona, 08840, España 125 ha TFG ESARQ 2016

Set amid the jumble of the urban periphery, the master plan proposes a corporate area located on the outskirts of Barcelona’s airport site. This zone is dominated by a strong infrastructure, which draws a curvilinear trajectory on the territory. The concept of the masterplan is based on the decomposition of this trajectory in different levels with the purpose of domesticate the land. The buildings are designed being loyal to circular geometry, as well as the different decomposition lines. These lines, depending of the proximity to the infrastructure, take a softer character (pedestrian roads, river) or stronger (traffic road).

T E C N O L Ó G I C O


CONCEPTOS URBANOS ESPACIO NATURAL REMOLAR-FILIPINES

ANILLO AEROPUERTO

HIBRIDACIÓN PROGRAMA

DISCONTINUIDAD FORMA

DESCOMPOSICIÓN INFRAESTRUCTURA

CONTINUIDAD ESPACIOS NATURALES

FLUJO HÍDRICO

1946

FLUJO HÍDRICO REMOLAR-FILIPINES

2016

1946

2016

PROCESO DISEÑO

PROPUESTA Y ÁMBITO DE ACTUACIÓN

ECOPARQUE TECNOLÓGICO

MASTERPLAN TFG ESARQ 2016- DELTA DEL LLOBREGAT

Anánlisis urbano y primeras propuestas

8


PROPUESTA ESPACIOS VERDES

ECOPARQUE TECNOLÓGICO

PROPUESTA VIARIO

MASTERPLAN TFG ESARQ 2016- DELTA DEL LLOBREGAT

CONCEPTO MASTERPLAN

Propuesta final

9


D A T A

El edificio está emplazado en lo alto de un desnivel creado por una potente infraestructura. El proyecto ensancha la pendiente creando un espacio libre sobre ella y concentrando la mayor parte del programa debajo. Debido a la limitación de luz bajo el talud, un data processing center es situado en las dos plantas sótano, con oficinas, restaurante y un auditorio en la planta baja. Todo junto conforma la sede principal de T- Systems. Siguiendo el masterplan, el proyecto se basa en la geometría circular, la cual se rompe con una malla ortogonal. Esto produce un espacio libre en el centro y tres recesos que marcarán las entradas respondiendo a los diferentes niveles. El edificio tiene también una cubierta inclinada que continúa el espacio libre que tiene alrededor y crea un mirador hacia el Delta del Llobregat. Delta del LLobregat, Barcelona, 08840, España 15.000 m² TFG ESARQ 2016

The building is located on the top of the slope created by a major infrastructure. The project widens the slope, developing an open space on the top of it and concentrating most of the brief below. Due to the limited light below grade, a data processing center is situated on the two basement floors, with offices, a restaurant and an auditorium on the ground floor. Altogether, they form the corporate headquarters for T-Systems. In keeping with the master plan, the project is based on a circular geometry that breaks with the grid. This produces an open space at the centre and three recesses that will mark the entrances and respond to the different levels. The building also has a sloped roof that will continue the open space around it and offer a vantage point with views of the Llobregat Delta.

P R O C E S S I N G C I R C L E


RELACIÓN CON ENTORNO

ESPACIO PRODUCTIVO VS SALVAJE

Espacio verde

Oficinas

NIVELES TOPOGRAFÍA

Restaurante

Auditorio

Data Center

CONCEPTO

Data Center PLANTA EMPLAZAMIENTO

Parquing

ACCESOS

SECCIÓN ESCALA URBANA

NIVELES

DATA PROCESSING CIRCLE

T-SYSTEMS HEADQUARTERS TFG ESARQ 2016 - DELTA DEL LLOBREGAT LLOBREGAT

Concepto e inserción urbana

12


ALZADO ENVOLVENTE

CONCEPTO ENVOLVENTE

PLANTA BAJA

PLANTA SÓTANO 1

DATA PROCESSING CIRCLE

T-SYSTEMS HEADQUARTERS TFG ESARQ 2016 - DELTA DEL LLOBREGAT LLOBREGAT

Plantas y envolvente

13


61 N E T H E El proyecto situado en una zona residencial de un céntrico barrio londinense, plantea la reforma de una casa adosada de tres plantas reconvertida en una vivienda plurifamiliar.

R

El concepto principal plantea la adición de un volumen en planta baja, la incorporación de dos unidades en la planta sótano y la inserción de un volumen lateral a lo largo del límite de la parcela permitiendo la incorporación de una unidad más.

H

61 Netherhall Gardens, Londres, NW3 5RE, Reino Unido 800 m² AR ARCHITECTURE

The project is located in a residential area from a centric London neighbourhood, it develops a refurbishment of a three storey semidetached house restructured into a multi-family housing. The main concept proposes the addition of a volume on the ground floor, the incorporation of two units at basement level and the insertion of a volume on the side along the border of the plot allowing to add one more unit.

A L L G A R D E N S


MURO VERDE

ACCESO LATERAL

E F D C G

A

B

UNIDADES RESULTANTES

PLANTA EMPLAZAMIENTO

Muro verde 12460

Unidad Lateral FASE 1 (DEMOLICIÓN)

3740

Buhardilla -3315

SECCIÓN PATIO TRASERO

En suite buhardilla

Client:

Key2 (MOVIMIENTO DE TIERRAS) FASE

Shevinvest Ltd.

AR Architecture 213 Haverstock Hill, London NW3 4QP T: +44 207 209 2851 E: info@ar-arch.co.uk

Job Title:

61 Netherhall Gardens Drawing Use:

For Planning Drawing: R1

FASE 3 (PROPUESTA)

61 NETHERHALL GARDENS

WIP

17.09.28

AB

R0

Design Development 01

17.07.31

BB

Rev

Notes

Date

By

Existing_Location_Plan

COMMERCIAL - HOSPITALITY - RESIDENTIAL

Date of first issue:

Current revision date:

Scale @ A2:

Sheet size:

2017.07.31 1 : 1250

DIAGRAMA ESPACIOS LIBRES

17.09.28 A2

12460

Project Stage:

Document Number:

Checked by:

Project No:

3 Drawn by:

AB

ALZADO FRONTAL

AR

17002-ARA-ZZ-ZZ-DR-A-1.100.100-S2-R1 17002

3765

Drawing No:

A-1.100.100

Status:

S2

Revision:

Proposed tree

R1

DIAGRAMA TALUD AUTOVIA

VIVIENDA PLURIFAMILIAR AR ARCHITECTURE - LONDRES

Emplazamiento y concepto

DI 16


0.00

0.00

Terraza 10.1 m²

0.00

0.22

-2.51

Jardín Trasero 138.5 m²

Contadores 16.0 m²

0.00

3.77

Terraza 7.7 m²

Terraza 6.9 m²

-3.30

0.22

-3.30

Baño 4.6 m²

Cocina/Comedor 30.6 m²

Hall 4.1 m²

Habitación Doble 18.2 m² Corridor 2.3 m²

-2.48

Habitación Doble 16.9 m²

Baño 4.3 m²

Baño 3.0 m²

Pasaje lateral 35.7 m²

Hall 9.4 m²

Despacho 6.9 m²

B

7.02

Hall 10.7 m²

-3.30

Rellano 3.6 m² Escaleras 2.5 m²

Hall 6.7 m²

Double Bedroom 0.22 12.0 m²

Baño Ensuite 4.2 m²

Escaleras 3.9 m²

-3.30

Cocina/Comedor 31.9 m²

0.00

C

Pasillo 3.5 m²

Baño 4.4 m²

Habitación Ensuite 23.8 m²

-3.30

Habitación Ensuite 11.3 m²

Baño Ensuite 5.9 m²

Baño 5.4 m²

Escaleras 2.61 2.6 m²

Rellano 9.8 m²

D

Hall 5.9 m² 3.77

Pasillo 5.1 m²

Escaleras 2.6 m²

Baño 5.5 m²

F

7.02

Almacenamiento 7.3 m²

9.72

Descansillo 3.0 m²

Habitación Doble 13.8 m²

Cocina/Comedor 26.7 m²

Baño 5.0 m²

Habitación Doble 11.6 m² Habitación Principal 20.0 m²

Master Ensuite 5.4 m²

Habitación Simple 7.6 m² Habitación Doble 15.7 m²

-0.03 7.07

Pozo de luz 4.7 m² -3.30 -3.30 Pozo de luz 4.5 m²

Rellano 6.4 m²

5.69

Habitación Ensuite 20.3 m²

-2.30

Baño 3.8 m²

Hall 5.7 m²

0.00

Habitación Doble 11.5 m²

Almacenamiento 5.9 m²

E 7.02

3.77

Cocina/Comedor 24.9 m²

Hall 3.8 m²

Baño 1340 Ensuite 3.3 m²

Habitación Doble 20.8 m²

0.00

Baño Ensuite 5.6 m²

Habitación Ensuite 11.1 m²

Baño Invitados 1.8 m²

-3.30

A

7.03

Terraza 19.4 m²

Cocina/Comedor 26.7 m²

-2.48

G

Terraza 9.8 m² 0.00

Cocina/Comedor 38.8 m²

Habitación Doble 11.4 m²

Balcón 2.1 m²

-0.75 -0.69

Jardin Frontal 63.7 m²

-2.11 -2.07

-1.35

PLANTA SÓTANO

PLANTA BAJA

PLANTA PRIMERA

PLANTA SEGUNDA

PLANTA TERCERA

PLANTA EMPLAZAMIENTO 12460

3765

5

SECCIÓN ACCESO LATERAL

SECCIÓN TRANSVERSAL

61 NETHERHALL GARDENS

VIVIENDA PLURIFAMILIAR AR ARCHITECTURE - LONDRES

Plantas y volúmenes propuesta

17


45 S T

El proyecto, situado en el barrio londinense de Westminster, se basa en la rehabilitación y reforma de una vivienda unifamiliar, la edificación es una antigua casa georgiana de PB +4 con una planta sótano. Se plantea la adición de un volumen en el patio trasero y la redistribución de la vivienda, concentrando la zona de día en dos plantas, cocina/comedor en planta baja y salón en planta primera y las habitaciones en las plantas superiores, dejando el sótano para ocio y servicio. 45 St James’s Place, Londres, SW1A 1NS, Reino Unido 350 m² AR ARCHITECTURE

The project, situated in London’s borough of Westminster, is based on the rehabilitation and refurbishment of a single-family house, the building is an old Georgian house of GF +4 with a basement level.

J A M E S

It is proposed the addition of a volume on the back yard and some changes on the layout of the dwelling, concentrating the day zone in two floors, kitchen/dining room on ground floor and living room on first floor and the bedrooms on the upper floors, leaving the basement for leisure and service.

P L A C E


VOLUMEN PROPUESTA

Hab

it en ación suit e

Ha

bit

ació

ne

Ba

nsu

ite

ño Inv

ita

do

s

Sa

lón

GY

M

Sa

Co

lón

me

do

r

Co

cin

a Ha

bit a niñ ción era

EXISTENTE/PROPUESTA

ZONA DE NOCHE

ZONA DE DIA

OCIO / SERVICIO

PLANTA EMPLAZAMIENTO

PROPUESTA

Habitación en suite (invitados)

Volumen propuesta

Habitación + Baño

INSTALACIONES

Habitación en suite (principal)

SECCIÓN ACCESO

Salón + Baño

FASE 1 (DEMOLICIÓN)

Cocina/comedor

Ocio + Servicio

FASE 2 (PROPUESTA)

45 St JAMES PLACE

ALZADO FRONTAL

VIVIENDA UNIFAMILIAR AR ARCHITECTURE - LONDRES

Emplazamiento y concepto

20


Estudio 8.1 m²

Sala de té 6.3 m²

265 260 255

Pasillo 4.1 m² Pasillo 3.2 m²

Gimnasio 12.3 m²

Comedor 15.8 m²

Baño 2.3 m²

Habitación 12.4 m²

Sala de estar 18.0 m² Hall 13.9 m²

Baño familiar 10.4 m²

Rellano 6.0 m²

Baño invitados 2.6 m²

Vestidor 5.0 m²

Baño ensuite 8.0 m²

Rellano 5.1 m²

Baño ensuite 8.3 m²

Sauna 2.5 m²

Cocina 17.9 m²

Habitación 24.9 m²

Habitación principal 23.2 m²

Pasillo 6.8 m²

Sala de estar 22.8 m²

Au pair 10.1 m²

Almacen / Lavanderia 6.9 m²

Lavanderia 6.2 m²

PLANTA BAJA

PLANTA PRIMERA

PLANTA SEGUNDA

PLANTA TERCERA

PLANTA CUARTA

2615

PLANTA SÓTANO

ALZADO TRASERO

SECCIÓN PATIO TRASERO

45 St JAMES PLACE

VIVIENDA UNIFAMILIAR AR ARCHITECTURE - LONDRES

Plantas propuesta

21


N A T I O El proyecto emplazado en la ciudad de Vilna, actual capital de Lituania, propone la construcción de un edificio, de PB+4 con una planta sótano, para responder a las necesidades planteadas en un concurso público organizado por el ayuntamiento de Vilna que especificaba la construcción de un auditorio nacional que pudiera ser utilizado como “casa de la nación”, representando la cultura e historia lituana. A nivel formal el edificio plantea la yuxtaposición de dos volúmenes: uno curvo, dinámico y sólido, que delimitará la envolvente del edificio; y otro con un carácter más ortogonal, estático y vacío, que marcará el espacio de transición entre el edificio y el exterior. El concepto principal se basa en como los vestíbulos alrededor de los dos espacios musicales crean espacios de interacción en los diferentes niveles, será en estos espacios donde podrán aparecer pequeñas exposiciones que se podrán utilizar para representar la cultura y la historia lituana. Tauro Hill, Vilna, 03106, Lituania

N A L

C O

30.000 m² AR ARCHITECTURE

The project placed on the city of Vilnus, current capital of Lithuania, propose the development of a GF+4 building with a basement level, in order to respond the necessities that were brought up on a public competition organized by Vilnius City Council that specified the arrangement of an National Concert Hall which could be used as a “Nation House” representing Lithuanian culture and history. In shape terms the building presents a juxtaposition of two volumes: one dynamic, curve and solid which will define the building shell; and another one with more orthogonal, static and empty character which will mark the transition space between the building and the exterior. The main concept is based on how the foyers around the two music spaces create interaction spaces on the different levels, will be on these spaces where will appear small expositions that could be used to represent Lithuanian culture and history.

N C E R T

H A L L


Site

AR1704

Viewline 2

Gediminas Castle

Tower

Park

Old Town

Viewline 2

Public Transport Stop Public Parking

Pamėn kalnio

Pedestrian Flow from the City

Bicycle Parking

Street

Tauras Hill

Pedestrian Flow

Lukiskiu Square

Pedestrian Flow from Lukiskiu Square New Town

Park

Disabled Access

Neris River

New Town

Pedestrian Flow from the City

Lukiskiu Square

Park

Bicycle Path

AR1704

Car Flow Restricted Traffic, Emergency Service, Staff and Maintenance Vehicles

1

Lift for people with restricted mobility Open summer stage Summer cafe Multi-functional grounds (eg. skating in winter, market in summer) Children’s playground Sport ground Stone benches on the slope Sleigh area Pedestrian bridge Tauro street

6

fun Future

8

ec�on

conn c�onal

1 2 3 4 5 6 7 8 9

ENCAJE URBANO

AR1704 AR1704

Vin co Ku dir k

os

Str e

et

Tauro Street

7

2

3

Gediminas Castle Tower

cess ck Ac

Ticket Office Main

Fire Tru

5

Cathedral Square

Old Town

Tauras Hill

3

Publi

c Entra

nce

5

Gediminas Castle

4

Tower

Park

Old Town

Car/T axi Dr

Fire T ru

Pedestrian Flow from Viaduct over Tauro Street



Restricted Traffic

CONEXIÓN URBANA

















Small Hall

Panorama 01

Pedestrian Flow from the Cemetery

Tauras Hill

ne

Akmenų Street

wli Vie

Neris River

New Town

Lukiskiu Square

1

Viewline 1 Gediminas Castle Tower

Cathedral Square

Old Town

Tauras Hill

STAGE

V. Mykolaičio-Putino Street

New Town

Park

STAGE Gediminas Castle

STAGE

Tower

Park

reet

Scenario 01 | Basic Configuration | Capacity: 530 people Site

Tauro St

Suvalkų Street

Lukiskiu Square

Park

Car Flow towards Drop-off Area

Old Town

Viewline 2

STAGE







Viewline 2

CONCEPTO







Mail Hall | View from the balcony towards the stage

Pedestrian Flow et











Mail Hall | View from the balcony towards the stage Pamėn



kalnio St  reet



Pedestrian Flow from the City

Bicycle Parking



















Tauras Hill

























New Town



Pedestrian Flow from the City

Lukiskiu Square

Park



River Scenario 02 | Central Neris Stage | Capacity: 483 people

Lukiskiu Square

Pedestrian Flow from   Lukiskiu Square New Town

Park

Disabled Access

go Stre





Scenario 01 | Basic Configuration

Foyer | Looking from the main entrance towards the main hall



Public Parking

Mindau







Public Transport Stop

K. Kalinausko Street

Pedestrian Flow from the City

K. Kalinausko Street

East corner of the site towards the main entrance





STAGE

PLANTA EMPLAZAMIENTO

 STAGE

Site Plan | 1:1000

East corner of the site towards the main entrance



M. Valančiaus Street

Pedestrian Flow from the City

V. Kudirkos Street



9

Waste

cks

TV Tru

Delive ries

Parking

Staff E

Staff

ntran ce

ck Ac

cess

op-off

Bicycle Path Car Flow Restricted Traffic, Emergency Service, Staff and Maintenance Vehicles

Birdview | North-West

Birdview | South-West

Birdview | North-West

1 2 3 4 5 6 7 8 9

1

Lift for people with restricted mobility Open summer stage Summer cafe Multi-functional grounds (eg. skating in winter, market in summer) Children’s playground Sport ground Stone benches on the slope Sleigh area Pedestrian bridge Tauro street

 

Section D-D | 1:250 



Section A-A | 1:250

 Section A-A | 1:250





















et







3

Fire T ruck





3





                 

 

rking







                 













 











 



 

Suvalkų Street

   

 











































ck Ac

cess

p-off





Pedestrian Flow from Viaduct over Tauro Street



9





 

 







           





Pedestrian Flow from the Cemetery







 

















   



  







 









 















 

 

















North facade | June   6am











Car Flow towards Area Drop-off









East facade |  April 9am

















Schematic representation of box in box for the main concert hall









West facade | June C 4pm SECCIÓN 

September 1pm  South facade | 









Section C-C | 1:250

CONCURSO AUDITORIO NACIONAL AR ARCHITECTURE - VILNA 



4

ce





Solar model











 





Section C-C | 1:250

    





xi Dro

Sustainability strategy overview

North facade | Jone 6am





V. Mykolaičio-Putino Street

Birdview | North-East





Restricted Traffic

M. Valančiaus Street



5

Entran

Car/Ta



Fire T ru

Staff Pa

Public



Waste



ntran ce



cks







Pedestrian Flow from the City

Kudirkos Street



Ticket Office

Delive ries

NATIONAL CONCERT HALL

2

Main

Staff E

Section B-B | 1:250

CONEXIÓN INTERNA Y NIVELES



Access



TV Tru

PÚBLICO/PRIVADO

Birdview | North-East



ko Vin co Ku dir



Section B-B | 1:250







SECCIÓN B

                 





5

                 









Scenario 02 | Central Stage

SECCIÓN A





Scenario 03 | Central Stage, Standing Concert | Capacity: 1300 people (standing) Small Hall Configurations | 1:250

7



sS tre



                 

8

ec�on

ESPACIO DE TRANSICIÓN

STAGE

6























  









 





Emplazamiento y concepto 



Schematic representation of MEP strategy for the two halls

 



           

 Roof solar array | Potential solar power generation









 reet

Birdview | South-West

Tauro St

basa

Tauro Street

t

nn nal co func�o Future

Birdview | South-East

e Stre

Akmenų Street

Birdview | South-East

o Jon

us icia nav



 















24

Detailed Section | 1:


AR1704

Núcleo público Núcleo servicios

Núcleo escenario





















PLANTA PRIMERA

PLANTA SEGUNDA

PLANTA TERCERA

PLANTA CUARTA

Núcleo personal



PLANTA BAJA PLANTA SÓTANO

Mail Hall | View from the balcony towards the stage









































 

Section A-A | 1:250









SECCIÓN A

 





Section B-B | 1:250





















 





    



 

 

 







  





 



 

 



























 





    



 























Section C-C | 1:250







 







  



   

 



 









 













 















NATIONAL CONCERT HALL Schematic representation of box in box for the main concert hall

Schematic representation of MEP strategy for the two halls









Detailed Section | 1:50

CONCURSO AUDITORIO NACIONAL AR ARCHITECTURE - VILNA

Plantas propuesta y sala principal

25


GRACIAS POR SU ATENCIÓN

GRÁCIES PER LA SEVA ATENCIÓ

THANK YOU FOR YOUR ATTENTION


Turn static files into dynamic content formats.

Create a flipbook