Introduction
User information Doka dam formwork
Introduction
© by Doka Industrie GmbH, A-3300 Amstetten 2
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Introduction
Contents 4 4 6 7
Introduction Elementary safety warnings Eurocodes at Doka Product description
8 8 9 10 11 12
Dam formwork D15 Dam formwork D15 K and D15/3 System overview Areas of use Dam formwork D15 K Dam formwork D15/3
14 14 15 16 17
Dam formwork D22 Dam formwork D22 K and F System overview Areas of use Dam formwork D22 - retractable and tiltable
18 18 20 22 23 26 28 30 32 34 35
General remarks Starting up Striking, lifting and erecting the formwork Starter-block formwork Anchoring on the structure Platform configurations Plumbing & aligning the formwork Resetting by crane Possible formwork systems Structural design Doka service offerings
36
Component overview
999706002 - 10/2010
3 The Formwork Experts
Introduction
User information Doka dam formwork
Elementary safety warnings Introduction
User target groups
Planning
● This User Information booklet (Method Statement) is aimed at everyone who will be working with the Doka product or system it describes. It contains information on the standard design for setting up this system, and on correct, compliant utilisation of the system. ● All persons working with the product described herein must be familiar with the contents of this manual and with all the safety instructions it contains. ● Persons who are incapable of reading and understanding this booklet, or who can do so only with difficulty, must be instructed and trained by the customer. ● The customer is to ensure that the information materials provided by Doka (e.g. User Information booklets, Instructions for Assembly and Use, Operating Instruction manuals, plans etc.) are available to all users, and that they have been made aware of them and have easy access to them at the usage location. ● In the relevant technical documentation and formwork utilisation plans, Doka shows the workplace safety precautions that are necessary in order to use the Doka products safely in the usage situations shown. In all cases, users are obliged to ensure compliance with national OH&S (occupational health and safety) rules throughout the entire project and to take appropriate additional or alternative workplace safety precautions where necessary.
● Provide safe workplaces for those using the formwork (e.g. for when it is being erected/dismantled, modified or repositioned etc). It must be possible to get to and from these workplaces via safe access routes! ● If you are considering any deviation from the details and instructions given in this booklet, or any application which goes beyond those described in the booklet, then revised static calculations must be produced for checking, as well as supplementary assembly instructions.
Hazard assessment ● The customer is responsible for drawing up, documenting, implementing and continually updating a hazard assessment at every job-site. This document serves as the basis for the site-specific hazard assessment, and for the instructions given to users on how to prepare and utilise the system. It does not substitute for these, however.
Remarks on this document ● This User Information booklet can also be used as a generic method statement or incorporated with a site-specific method statement. ● Many of the illustrations in this booklet show the situation during formwork assembly and are therefore not always complete from the safety point of view. Any safety accessories not shown in these illustrations must still be used by the customer, in accordance with the applicable rules and regulations. ● Further safety instructions, especially warnings, will be found in the individual sections of this document!
4
Rules applying during all phases of the assignment: ● The customer must ensure that this product is erected and dismantled, reset and generally used for its intended purpose under the direction and supervision of suitably skilled persons with the authority to issue instructions. These persons' mental and physical capacity must not in any way be impaired by alcohol, medicines or drugs. ● Doka products are technical working appliances which are intended for industrial/commercial use only, always in accordance with the respective Doka User Information booklets or other technical documentation authored by Doka. ● The stability of all components and units must be ensured during all phases of the construction work! ● The functional/technical instructions, safety warnings and loading data must all be strictly observed and complied with. Failure to do so can cause accidents and severe (even life-threatening) damage to health, as well as very great material damage. ● Fire-sources are not permitted anywhere near the formwork. Heating appliances are only allowed if properly and expertly used, and set up a safe distance away from the formwork. ● The work must take account of the weather conditions (e.g. risk of slippage). In extreme weather, steps must be taken in good time to safeguard the equipment, and the immediate vicinity of the equipment, and to protect employees. ● All connections must be checked regularly to ensure that they still fit properly and are functioning correctly. It is very important to check all screw-type connections and wedge-clamped joins whenever the construction operations require (particularly after exceptional events such as storms), and to tighten them if necessary.
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Introduction
Assembly
Regulations; industrial safety
● The equipment/system must be inspected by the customer before use, to ensure that it is in suitable condition. Steps must be taken to rule out the use of any components that are damaged, deformed, or weakened due to wear, corrosion or rot. ● Combining our formwork systems with those of other manufacturers could be dangerous, risking damage to both health and property. If you intend to combine different systems, please contact Doka for advice first. ● The assembly work must be carried out by suitably qualified employees of the client's. ● It is not permitted to modify Doka products; any such modifications constitute a safety risk.
● Always observe all industrial safety regulations and other safety rules applying to the application and utilisation of our products in the country and/or region in which you are operating.
Erecting the formwork ● Doka products and systems must be set up in such a way that all loads acting upon them are safely transferred!
Pouring ● Do not exceed the permitted fresh-concrete pressures. Excessively high pouring rates lead to formwork overload, cause greater deflection and risk causing breakage.
Striking the formwork ● Do not strike the formwork until the concrete has reached sufficient strength and the person in charge has given the order for the formwork to be struck! ● When striking the formwork, never use the crane to break concrete cohesion. Use suitable tools such as timber wedges, special pry-bars or system features such as Framax stripping corners. ● When striking the formwork, do not endanger the stability of any part of the structure, or of any scaffolding, platforms or formwork that is still in place!
Transporting, stacking and storing ● Observe all regulations applying to the handling of formwork and scaffolding. In addition, the Doka slinging means must be used - this is a mandatory requirement. ● Remove any loose parts or fix them in place so that they cannot be dislodged or fall free! ● All components must be stored safely, following all the special Doka instructions given in the relevant sections of this User Information booklet!
Instruction as required by EN 13374: ● If a person or object falls against, or into, the edge protection system and/or any of its accessories, the edge protection component affected may only continue in use after it has been inspected and passed by an expert.
Maintenance ● Only original Doka components may be used as spare parts. Repairs may only be carried out by the manufacturer or authorised facilities.
Symbols used The following symbols are used in this booklet:
☞
Important note Failure to observe this may lead to malfunction or damage.
CAUTION / WARNING / DANGER Failure to observe this may lead to material damage, and to injury to health which may range up to the severe or even life-threatening.
Instruction This symbol indicates that actions need to be taken by the user.
Sight-check Indicates that you need to do a sight-check to make sure that necessary actions have been carried out.
Tip Points out useful practical tips.
Reference Refers to other documents and materials.
Miscellaneous We reserve the right to make alterations in the interests of technical progress.
999706002 - 10/2010
5 The Formwork Experts
Introduction
User information Doka dam formwork
Eurocodes at Doka In Europe, a uniform series of Standards known as Eurocodes (EC) was developed for the construction field by the end of 2007. These are intended to provide a uniform basis, valid throughout Europe, for product specifications, tenders and mathematical verification. The EC are the world's most highly developed Standards in the construction field. In the Doka Group, the EC are to be used as standard from the end of 2008. They will thus supersede the DIN norms as the "Doka standard" for product design.
Ed Ed
Fd
Fk
γF
Design value of effect of actions (E ... effect; d ... design) Internal forces from action Fd (VEd, NEd, MEd) Design value of an action Fd = γF · Fk (F ... force) Characteristic value of an action "actual load", service load (k ... characteristic) e.g. dead weight, live load, concrete pressure, wind Partial factor for actions (in terms of load; F ... force) e.g. for dead weight, live load, concrete pressure, wind Values from EN 12812
Comparison of the safety concepts (example) Permissible stress design
115.5 [kN]
Fyield
EC/DIN concept
Rk
115.5 [kN]
Rd gM = 1.1
90<105 [kN] n ~ 1.65
Factual
A
98013-100
60 [kN]
gF = 1.5
Fpermissible
98013-102
60<70 [kN]
A
Ed
90 [kN]
Factual≤ Fpermissible
The widely used "Permissible stress design" (comparing the actual stresses with the permissible stresses) has been superseded by a new safety concept in the EC. The EC contrast the actions (loads) with the resistance (capacity). The previous safety factor in the permissible stresses is now divided into several partial factors. The safety level remains the same!
Rd Rd
Design value of the resistance (R ... resistance; d ... design) Design capacity of cross-section (VRd, NRd, MRd) Rk Rk Timber: Rd = kmod · Steel: Rd = γM γM
Rk
Characteristic value of the resistance e.g. moment resistance to yield stress
γM
Partial factor for a material property (in terms of material; M...material) e.g. for steel or timber Values from EN 12812
kmod
Modification factor (only for timber – to take account of the moisture and the duration of load action) e.g. for Doka beam H20 Values as given in EN 1995-1-1 and EN 13377 The "permissible values" communicated in Doka documents (e.g.: Qpermissible = 70 kN) do not correspond to the design values (e.g.: VRd = 105 kN)! ➤ Avoid any confusion between the two! ➤ Our documents will continue to state the permissible values. Allowance has been made for the following partial factors: γF = 1.5 γM, timber = 1.3 γM, steel = 1.1 kmod = 0.9 In this way, all the design values needed in an EC design calculation can be ascertained from the permissible values.
Ed≤ Rd
A Utilisation factor
6
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Introduction
Product description Doka dam formwork - the formwork system for mass concrete structures On mass concrete structures, it is not normally feasible to place form-ties through to the opposing formwork. For this reason, the pressure of the fresh concrete has to be transferred into the previous concrete block. Doka dam formwork ensures that the forces which occur here are transferred safely and reliably. Areas of use: ● Dams and barrages ● Run-of-river power stations ● Navigation locks The formwork and dam scaffold are lifted to the next casting section in one single crane cycle.
2 systems For optimum adaptation to every construction project, Doka offers two different dam formwork systems, both of which always use the same method of working:
Dam formwork D15 for anchor tensile forces of up to 150 kN ● Dam formwork D15 K - for block heights of up to 3.0 m - formwork is tiltable ● Dam formwork D15/3 - optimised for a block height of 3.0 m - formwork is tiltable, and can also be modified to make it retractable
The dam scaffold can be fitted with various different formwork systems, e.g.: ● Large-area formwork Top50 ● Framed formwork ● Steel formwork
Dam formwork D22
☞
● Dam formwork D22 K - formwork is tiltable ● Dam formwork D22 F - formwork is retractable
The Doka dam formwork system is extremely flexible. For this reason, detailed planning and static calculations are required for every single project.
- for block heights of between 3.0 and 4.0 m for anchor tensile forces of up to 220 kN
999706002 - 10/2010
7 The Formwork Experts
Dam formwork D15
User information Doka dam formwork
Dam formwork D15 K and D15/3 Dam formwork D15
Doka dam formwork D15 is used for forming block heights of up to 3 m. The Dam scaffold D15 can sustain anchor tensile forces of up to 150 kN. The formwork can be tilted backwards to leave enough space for preparing the suspension points. Doka dam formwork D15 is easy to adapt to sloping wall surfaces and to kinks in the walls.
2 versions Dam formwork D15 K When tilted backwards, the formwork leaves plenty of space for preparing the suspension points. The platforms are a generous 1.7 m wide, making it easy to operate the spindle strut.
Dam formwork D15/3 The Dam formwork D15/3 is the optimum dam scaffold for block heights of 3.0 m. Its 2.2 m wide platforms allow great freedom of movement. The Dam formwork D15/3 can easily be modified to equip it with a travelling unit. This makes the formwork retractable as well.
Product features ● ● ● ● ● ● ● ● ● ●
anchor tensile force: 150 kN easy to anchor formwork elements are freely selectable formwork is tiltable, and can also be modified to make it retractable easy angle adjustment accurate, easy-to-use height adjustment pre-assembly of platform decking is possible generously sized workspace and access passage formwork is pressed onto the previous casting section quickly and securely only a small number of different parts
Dam formwork D15 K ● block heights of up to 3.0 m ● platform width 1.7 m
Dam formwork D15/3 ● optimised for a block height of 3.0 m ● platform width 2.2 m
9706-214-01
8
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Dam formwork D15
System overview
H
C
D
E
K
A B
● Cantilever bracket D15 K (A) The cantilever bracket constitutes the working platform and the climbing scaffold on which the formwork is stood. The pressure of the fresh concrete is transferred by way of the suspension point and the supporting profile. ● Cantilever bracket D15/3 (B) This cantilever bracket is designed as standard to permit the formwork to be tilted backwards. Retrofitting the Retraction set D15 (K) makes it possible for the formwork to be travelled, as well as just tilted. ● Vertical waling D15 3.00 m U120 (C) The vertical waling is for holding and adjusting the formwork element, and for transferring the concrete forces into the cantilever bracket. ● Spindle strut D15 3.00 m (D) This is bolted in between the cantilever bracket and the vertical waling. It has the job of transferring the concrete forces, and is also used for plumbing and striking the formwork elements. ● Swivel bearing plate D15 or D15 S (E) The swivel bearing plate makes it possible to connect the vertical waling firmly and tightly to the cantilever bracket. Thanks to its articulated joint, the vertical waling can be inclined forward and back without difficulty. - D15: designed to be used with timber-beam formwork and framed formwork - D15 S: designed to be used with framed formwork and steel formwork ● Suspension profile D15/D22 (G) The suspension profile is bolted onto the vertical profile of the cantilever brackets. ● Screw-on access bracket MF75 (H) The Screw-on access bracket MF75 is a universal working bracket. - can be used as a pouring platform (fastened to the vertical waling) - and as a suspended platform (fastened to the suspension profile)
G
H 9706-213-01
999706002 - 10/2010
9 The Formwork Experts
Dam formwork D15
User information Doka dam formwork
Areas of use The flexibility of Doka dam formwork D15 gives it a very wide spectrum of use. It can master all manner of different wall sequences:
Kink in wall
Straight walls
A
9706-203-02
9706-203-01
Forward/rear-inclined walls
9706-203-03
Note: The max. angle of inclination α will depend on the project, and in particular on the constructional height of the formwork system that is being used.
A
9706-203-04
9706-203-05
A A project-specific check should be made to determine whether a back-stay is needed
☞
Important note: The system can be used at a forward or rearward inclination of up to max. 45° with no need to modify the suspension points. However, where walls have a greater inclination than 45°, this must be co-ordinated and agreed with Doka Engineering.
10
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Dam formwork D15
Dam formwork D15 K Tiltable The formwork can be tilted back to leave plenty of space for preparing the suspension point.
9706-216-01
999706002 - 10/2010
11 The Formwork Experts
Dam formwork D15
User information Doka dam formwork
Dam formwork D15/3 The D15/3 is tiltable as standard. The Dam formwork D15/3 can easily be modified to equip it with a travelling unit. This makes the formwork retractable as well.
Modified to be retractable a
Tiltable
9706-204-02
a ... e.g. with Large-area formwork Top50: max. 45 cm 9706-204-01
Travelling unit
D
C
A
B 9706-223-01
E
B
9706-222-01
C 9706-224-01
Retraction set D15, consisting of: A ... Travelling profile D15 B ... Drive shaft D15 C ... Two Anti-liftout guards D15, one mounted on either side of the Swivel bearing plate D Ratchet MF 3/4" SW50 E Swivel bearing plate D15
12
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Dam formwork D15
999706002 - 10/2010
13 The Formwork Experts
Dam formwork D22
User information Doka dam formwork
Dam formwork D22 K and F Dam formwork D22
Doka dam formwork D22 is used for forming block heights of up to 4.0 m. The high load-bearing capacity of the dam scaffold enables this formwork to sustain anchor tensile forces of up to 220 kN.
2 versions Dam formwork D22 K (tiltable) When tilted backwards, the formwork leaves plenty of space for preparing the suspension points. The platforms are a generous 1.9 m wide, making it easy to operate the spindle strut. There is also enough space for operators to pass behind the spindle strut.
Dam formwork D22 F (retractable) The formwork can be retracted. This makes it easier to clean and maintain the form-ply, to attach fittings and to place reinforcements. The generous platform width of 2.40 m permits very great freedom of movement.
Product features block heights of up to 4.0 m anchor tensile force: 220 kN easy to anchor easy angle adjustment accurate, easy-to-use height adjustment pre-assembly of platform decking is possible generously sized workspace and access passage formwork is pressed onto the previous casting section quickly and securely ● only a small number of different parts ● ● ● ● ● ● ● ●
Dam formwork D22 K ● formwork is tiltable ● platform width 1.9 m
Dam formwork D22 F ● The retractable formwork makes it possible to - clean the formwork even where there is densely placed reinforcement - Reinforcement work is carried out under the protection of the formwork - Mounting and stripping box-outs ● Platform width 2.4 m
9706-200-01
14
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Dam formwork D22
System overview
H
D
E
F
C
A
B
● Cantilever bracket D22 K (A) or F (B) The cantilever bracket constitutes the working platform and the climbing scaffold on which the formwork is stood. The pressure of the fresh concrete is transferred by way of the suspension point and the supporting profile. - D22 K: formwork is tiltable - D22 F: formwork is retractable ● Travelling profile D22 (C) This is used together with the Cantilever bracket D22 F. The travelling profile is bolted onto the swivel bearing plate. Together with the drive pinion of the cantilever bracket, it makes it possible for the entire formwork unit to be moved in and out very smoothly and easily. ● Vertical waling D22 3.00m U160 or 4.00m (D) The vertical waling is for holding and adjusting the formwork element, and for transferring the concrete forces into the cantilever bracket. ● Spindle strut D22 3.00m or 4.00m (E) This is bolted in between the cantilever bracket and the vertical waling. It has the job of transferring the concrete forces, and is also used for plumbing and striking the formwork elements. ● Swivel bearing plate D22 or D22 S (F) The swivel bearing plate makes it possible to connect the vertical waling firmly and tightly to the cantilever bracket. Thanks to its articulated joint, the vertical waling can be inclined forward and back without difficulty. - D22: designed to be used with timber-beam formwork and framed formwork - D22 S: designed to be used with framed formwork and steel formwork ● Suspension profile D15/D22 (G) The suspension profile is bolted onto the vertical profile of the cantilever brackets. ● Screw-on access bracket MF75 (H) The Screw-on access bracket MF75 is a universal working bracket. - can be used as a pouring platform (fastened to the vertical waling) - and as a suspended platform (fastened to the suspension profile)
G
H 9706-212-01
999706002 - 10/2010
15 The Formwork Experts
Dam formwork D22
User information Doka dam formwork
Areas of use The flexibility of Doka dam formwork D22 gives it a very wide spectrum of use. It can master all manner of different wall sequences:
Kink in wall
Straight walls
A
9706-205-02
9706-205-03
9706-205-01
Forward/rear-inclined walls
A
9706-205-04
9706-205-05
A A project-specific check should be made to determine whether a back-stay is needed
☞
Important note: The system can be used at a forward or rearward inclination of up to max. 45° with no need to modify the suspension points. However, where walls have a greater inclination than 45°, this must be co-ordinated and agreed with Doka Engineering.
16
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Dam formwork D22
Dam formwork D22 - retractable and tiltable D22 F - retractable
D22 F without travelling unit - tiltable
Plenty of space for convenient working.
Dam formwork D22 F can also be used without a travelling unit. This leaves a wider working platform. a
9706-206-01
9706-206-02
a ... e.g. with Large-area formwork Top50: max. 65 cm
9706-206-05
D22 K - tiltable
The retractable forming unit is easy to operate By turning the Ratchet MF 3/4" SW50, which is placed against the drive pinion, the operator can move the entire formwork unit back and forward.
C B
A
9706-206-04
A Cantilever bracket D22 F B Travelling profile D22 C Ratchet MF 3/4" SW50
9706-206-03
999706002 - 10/2010
17 The Formwork Experts
General remarks
User information Doka dam formwork
Starting up General remarks
First casting section
Second casting section
The system components of the dam formwork can be used right from the first casting section. ➤ Use the starter-block unit (A) instead of the cantilever bracket. The loads are transferred by way of e.g. pigtail anchors (B) embedded in the base slab.
➤ Suspend the pre-assembled scaffold unit (C) , consisting of cantilever brackets and platform decking ➤ Hoist the formwork onto the scaffold and fix it in place.
C
H
d
a
a
e
H
a
Instead of the starter-block unit it is also possible to use Doka supporting construction frames
A B 9706-207-01
c
18
b
9706-207-02
f
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
General remarks
Third casting section ➤ Add the suspended platform (D) .
D
9706-207-03
H ... Block height a ... Distance between top of poured concrete and anchoring point b ... Width of starter-block unit + vertical waling c ... Constructional height of formwork d ... Distance between suspension point and pressure strut e ... Formwork overlap f ... Width of bracket
System dimensions [cm] H a b c d e f
Type of bracket D15/3 D22 K D22 F 300 300-400 300-400 35 147 147 168 168 depends on the formwork system being used 203 253 253 253 10 180 228 202 250
D15 K up to 300
999706002 - 10/2010
19 The Formwork Experts
General remarks
User information Doka dam formwork
Striking, lifting and erecting the formwork The formwork elements, dam scaffolds, pouring platforms and suspended platforms are firmly interconnected. They are lifted and repositioned as a complete unit, in one crane cycle. This reduces the repositioning time, and thus the crane times.
Striking ➤ Remove the Cone screw B 7cm from the positioningpoint. ➤ Release the pressure wedges. ➤ Detach the formwork element from the concrete by turning the spindle struts, and tilt it back (or retract it). ➤ Tighten the pressure wedges ➤ Screw a Cone screw B 7cm into the Universal climbing cone. The next suspension point is now ready for use. ➤ Remove the Universal climbing cone (working from the suspended platform).
9706-208-01
20
How to lift WARNING ➤ "Passenger transportation" is forbidden! ➤ Remove any loose parts from the scaffold and formwork before lifting. ➤ Attach a crane-cable hook to the suspension bolt of the vertical waling. ➤ Release the connection bolt on the cantilever bracket. ➤ Lift the dam scaffold, together with the formwork element, and suspend it from the prepared suspension points. ➤ Use connection bolts to secure the cantilever bracket against accidental lift-out. ➤ Detach the crane-cable hook.
9706-208-02
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Lifting past overhanging surfaces The (project-specific) overhanging lifting device makes it possible to lift and reposition dam formwork safely where overhanging concrete surfaces are being formed. Variable hoisting points on the overhanging lifting device enable the entire unit to be held at the required angle during lifting.
General remarks
Erecting the formwork ➤ Release the pressure wedges. ➤ Line-and-level the formwork element with the spindle struts and adjusting spindles. ➤ Attach pressure wedges to press the formwork element against the previous casting section. ➤ Fasten positioning anchors to the formwork.
9706-208-04
9706-208-03
999706002 - 10/2010
21 The Formwork Experts
General remarks
User information Doka dam formwork
Starter-block formwork The system components of the dam formwork can be used right from the first casting section. However, the starter-block unit (A) is used here instead of the cantilever bracket. Instead of the starter-block unit it is also possible to use Doka supporting construction frames
Anchoring in the base slab
☞
As a basic rule: The anchoring arrangements for the starter-block formwork are always dimensioned on a project-specific basis.
● The loads from the diagonal anchors are transferred via anchor walings (E) . ● The tie-rod 15.0mm and the super-plate 15.0 (F) together secure the anchor waling so that it cannot tilt or slip out of position. ● For each starter-block unit, two anchors are each placed 15 cm either side of the vertical axis of the starter-block unit. Exception: If the load-bearing capacity is sufficient for 1 anchor per starter-block unit, the anchors on each unit must be placed symmetrically.
E
C B
D
F A 9706-220-01
A Starter-block unit B Pigtail anchor C She-bolt D Super-plate E Anchor waling F Tie-rod 15.0mm + Super-plate 15.0
For more information on anchoring in the base slab, see the User Information booklet "Doka supporting construction frames". C
G
A B
X 9706-207-04
Formwork system e.g. Large-area formwork Top50 e.g. framed formwork Framax
Dimension X
Anchor inclination α
40.7 cm 30.6 cm
45°
Note: The back-stay (G) makes it easier to line-and-level the formwork. A project-specific check must be made to determine whether the back-stay is also required for structural design reasons.
22
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
General remarks
Anchoring on the structure Positioning point and suspension point
☞
Important note:
☞
In standard applications using the dam formwork, the shear forces occurring at the suspension point are very small and so do not need to be allowed for.
Components: F
D E
E
ONLY use "Form-tie system 20.0" or "Form-tie system 26.5"! Due to the high loads imposed on the suspension points by dam formworks, the "Form-tie system 15.0" is not suitable!
Preparing the positioning point and suspension point
A C B
9751-237-01
A Universal climbing cone B Sealing sleeve K (expendable anchoring component) C Cone screw B 7cm D Pigtail anchor (expendable anchoring component) E Depth mark F Stop-anchor (expendable anchoring component)
Both the positioning points and the suspension points are prepared using one single type of cone, the Universal climbing cone (A) . The Cone screw B 7cm (C) also fulfils 2 functions: ● On the positioning point - for fastening the Universal climbing cone. ● On the suspension point - as a safe means of suspending the cantilever bracket. Preferably, pigtail anchors (D) are used, or - depending on the characteristics of the structure - stopanchors (F) .
Dimensioning the suspension point The required cube compressive strength of the concrete at the time of loading must be specified separately for each project by the structural designer. It will depend on the following factors: ● the tensile force actually occurring ● length of stop-anchor or pigtail anchor ● distance from edge The introduction of the forces, the transfer of these forces into the structure, and the stability of the overall construction, must all be verified by the structural designer.
WARNING - against not screwing the pigtail anchor or stop anchor far enough into the Universal climbing cone. This may subsequently lead to reduced loadbearing capacity and to the failure of the suspension point - resulting in injury and damage. ➤ Always screw in components until they fully engage (i.e. up to the depth mark). CAUTION ➤ For the positioning point and suspension point, ONLY use Cone screws B 7 cm (head of screw is red, to indicate its high load-bearing capacity)! ➤ The axis of the cantilever bracket and the axis of the Universal climbing cone must align - maximum angle-deviation 2°. ➤ Every time the Universal climbing cones are used, fit them with new sealing sleeves first. WARNING Sensitive rod steel! ➤ Never weld or heat tie-rods. ➤ Tie rods that are damaged or have been weakened by corrosion or wear must be withdrawn from use. ➤ Only use approved tie-rods. Tools needed: ● Reversible ratchet 3/4" ● Spanner for Universal climbing cone 15.0/20.0 ● Box nut 50 3/4"(for Cone screw B 7cm)
The required cube compressive strength fck,cube,current must be at least 10 N/mm2, however. On dam projects using concretes that have been specifically tailored to the project, the required length of the pigtail anchors must be determined in on-site trials (regarding concrete strength, type of concrete etc.).
999706002 - 10/2010
23 The Formwork Experts
General remarks
User information Doka dam formwork
Positioning point with hole drilled through the form-ply ➤ Fasten a packing plate (G) (e.g. Dokaplex 15 mm) to the form-ply (position as per project plan). ➤ Drill a diam. 30 mm hole in the form-ply (position as shown in the project plan). ➤ Push the Cone screw B 7cm (C) through the formply, screw it into the Universal climbing cone (A) and tighten it firmly. ➤ Screw the Pigtail anchor (D) into the Universal climbing cone (A) , until it engages (up to the depth mark (E) ). ● The axis of the universal climbing cone must be at right-angles to the surface of the concrete – maximum angle of deviation: 2°. ● The depth mark on the pigtail anchor or stop-anchor must be right up against the Universal climbing cone = must be screwed in to the full depth. ● The pigtail anchor must be facing downwards a
D
E
Form-ply protection The "Form-ply protector for cone 15.0" protects the form-ply from damage around the positioning-point. This is a particular advantage for formwork with high numbers of repeat uses. Possible thicknesses of form-ply: 18 - 27 mm In order to fit the Form-ply protector, a 46 mm diam. hole must be drilled in the form-ply first. B
A C
9706-230-01
A Form-ply protector for cone 15.0 (width-across 70 mm) B Universal climbing cone C Cone screw B 7cm
If necessary, the Form-ply protector for cone 15.0 can be closed off with a Ribbed plug d38 (included with product).
A B G C
9706-209-01
a ... 35 - 45 mm
Tr768-202-01
Note: Universal climbing cones are supplied with Sealing sleeves K (B) . Every time the Universal climbing cones are used again, fit them with new sealing sleeves first!
☞
Important note: The cone-fixing method that involves drilling through the form-ply is the one that is most suitable for the working conditions encountered on dam construction sites. If the large size of the drilled hole makes it impracticable to use the Cone screw B 7cm for the positioning-point, (e.g. if the suspension points are often not in the same position as in the previous casting section), then the Positioning clamp M30 must be used (hole diam. = 9 mm). The cone should only be fixed with the Positioning disc M30 in exceptional situations! However, in this case additional precautions must be taken to ensure that it is not dislodged from its exact installation location during pouring!
24
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
General remarks
Before pouring ➤ Check all positioning points and suspension points once again.
Repeat use Universal climbing cones are supplied with Sealing sleeves K (B) . Every time the Universal climbing cones are used again, fit them with new sealing sleeves first!
Suspension point ➤ Screw the Cone screw B 7cm into the Universal climbing cone until it engages, and tighten it firmly. A tightening torque of 100 Nm (20 kg assuming a ratchet-length of approx. 50 cm) is sufficient.
Suspending and securing the cantilever bracket ➤ Suspend the cantilever bracket (H) from the Cone screw B 7cm (C) of the finished suspension point. ➤ Push the connection bolt (I) into the cantilever bracket, at 90° to the platform decking, until it engages. ➤ Turn the connection bolt (I) down onto the platform deck. The cantilever bracket is now secured against accidental lift-out. The connection bolt must be in the horizontal!
Ensure that control-dimension b = 30 mm!
C
b
C 9706-209-05
H
I
A 9706-209-03
999706002 - 10/2010
25 The Formwork Experts
General remarks
User information Doka dam formwork
Platform configurations The modular "building-set" principle also gives wide scope for different ways of combining and using platforms. The pouring platform and suspended platform are both assembled using the same screw-on access bracket.
Working platform For manipulating the formwork elements.
Pouring platform For reinforcement and concrete-placing work. The Screw-on access bracket MF75 is attached directly to the vertical waling. Platform width = 75 cm.
9706-200-02
9706-200-03
9706-227-01
Close-up showing how the Screw-on access bracket MF75 is fastened to the vertical waling
26
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
General remarks
Suspended platform For removing the Cone screw B 7cm, for grouting the cone holes and for doing finishing-work on the concrete. The Screw-on access bracket MF75 is also used here, in the same way as on the pouring platform. Platform width = 75 cm.
Adjusting the inclination / widening the platform Using the Swivel plate MF, the inclination of the platforms can be incrementally adjusted, and the working platform can be widened.
30° 10° 10° 30° 20° 0° 20° 9706-219-01
e.g. on working platforms:
9706-218-02
9706-200-04
Close-up showing how the Screw-on access bracket MF75 is fastened to the Suspension profile D15/D22
Manhole B 70/60cm Passage units provide access to (and between) various platform levels, for instance between the pouring platforms, main platforms and suspended platforms.
9706-228-01
☞
Put up safety netting in the ladder and manhole zone, as required by the applicable regulations.
● Passage units are installed in the platform decking. ● Clear opening in passage unit: 700x600 mm ● Position the passage units so that the ladders can be stood on alternate sides.
A
9706-217-01
A Passage unit
999706002 - 10/2010
27 The Formwork Experts
General remarks
User information Doka dam formwork
Plumbing & aligning the formwork Length adjustment
Adjusting the formwork In order to permit exact adjustment of the formwork elements in relation to one another and to the structure, they are adjustable in both the vertical and the horizontal.
☞
➤ Push the formwork to either side.
To make it possible to compensate for any deformations during pouring, the formwork should be adjusted with a forward inclination. The extent of this forward inclination (see project plan) will depend on the following factors: ● Block height ● Pressure of the fresh concrete ● Influence width per parallel frame section
Tools needed: ● Hammer ● Reversible ratchet 1/2" ● Box nut 24 1/2" and ● Fork wrench 22/24 (for the threaded joins on the adjusting spindles)
9706-215-01
Preparing the adjusting operation ➤ Release the pressure wedge (A) .
A
9706-200-05
➤ Detach the formwork from the concrete. ➤ Loosen the Waling-to-bracket holder D22 (B) with a blow of the hammer.
B 9706-210-01
28
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
General remarks
Height and angle adjustment
Ending the adjusting operation
The adjusting spindles (C) permit a vertical adjustment range of approx. 150 mm. Also, the adjusting spindles can be re-mounted in different holes in the grid of fixing holes on the vertical waling (D) .
➤ Tightly clamp the Waling-to-bracket holders D22 again.
D
C
CAUTION There is a risk of the formwork tipping over in high winds. ➤ If high wind speeds are likely, and when work finishes for the day or before prolonged work-breaks, always take extra precautions to fix the formwork in place. Suitable precautions: Move the formwork up against the concrete and wedge it firmly against the concrete.
9706-210-02
Height adjustment ➤ Turn both adjusting spindles.
For more information (wind loads etc.) see the section headed "Vertical and horizontal loads" in the Doka Calculation Guide.
Press the formwork to the concrete For clean, exact concrete surfaces and transitions, the formwork element must be pressed very tightly against the previous section. This can be done quickly and easily with the pressure wedge of the swivel bearing plate. ➤ After adjusting the formwork elements, tighten the pressure wedges (A) . This presses the formwork element up against the previously cast section. 9706-215-03
Side angle adjustment ➤ Only turn one adjusting spindle. A
9706-200-05
9706-215-02
999706002 - 10/2010
29 The Formwork Experts
General remarks
User information Doka dam formwork
Resetting by crane
☞
Important note: ● Observe all regulations applying to the operation of cranes where higher wind speeds are experienced. ● Only fasten the crane-cable hook to the suspension bolt (A) of the vertical waling. The crane-hoisting lugs on the formwork elements must not be used for lifting the formwork unit. ● Angle of inclination β: max. 30° ● Brace the vertical waling sufficiently against oblique pull (B) . Tightening torque of the couplers (C) : 50 Nm ● Bring the travelling unit as close to the centre-of-gravity position as possible, and secure the Swivel bearing plate with the Swivel bolts. ● If lifting past sloping walls, fasten an overhanging lifting device to the vertical waling. Where the formwork is inclined forward, check whether a tension guy-bracing chain is needed. ● When a single dam formwork unit is lifted, two open ends are left in the formwork system. These must be secured by mounting side protection (e.g. Handrail clamp S).
A
B
C
WARNING ➤ "Passenger transportation" is forbidden! ➤ Remove any loose parts from the scaffold and formwork before lifting. Length of chain = at least the space between the slinging points This automatically leads to the required angle of inclinationβ.
9706-221-01
β ... max. 30° A Suspension bolt B Bracing against oblique pull (e.g. scaffolding tube) C Screw-on couplers
30
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
General remarks
999706002 - 10/2010
31 The Formwork Experts
General remarks
User information Doka dam formwork
Possible formwork systems Timber-beam formwork
Framed formwork
e.g. Large-area formwork Top50 With timber-beam formwork, the Swivel bearing plate D15 or D22 (D) must be used.
e.g. framed formwork Framax Xlife In the case of framed formwork, the choice of swivel bearing plate (D) must be reviewed on a project-specific basis.
A A
D D
9706-211-01 9706-211-02
Attaching the formwork: ➤ Fasten the Steel waling WS10 Top50 (G) to the framed formwork using the Framax/supporting construction frame bolt 36cm (E) and the Super-plate 15.0 (F) .
B E
C
For more information, see the User Information booklet "Doka large-area formwork Top50".
9706-211-05
9706-211-04
Attaching the formwork: ➤ Fasten the formwork element (A) to the vertical waling (C) with the Waling-to-bracket holder D22 (B) .
F G
➤ Fasten the formwork element (A) to the vertical waling (C) with the Waling-to-bracket holder D22 (B) .
9706-211-07
B
C
For more information, see the User Information booklet "Doka framed formwork Framax Xlife".
32
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
General remarks
Steel formwork Steel formwork must always be planned and dimensioned on a project-specific basis: ● It must be possible to attach waling-to-bracket holders ● It must be possible to support the adjusting spindles In the case of steel formwork, the choice of swivel bearing plate (D) must be reviewed on a project-specific basis.
A
D
9706-211-03
9706-211-06
Attaching the formwork: ➤ Fasten the formwork element (A) to the vertical waling (C) with the Waling-to-bracket holder D22 (B) .
B C
999706002 - 10/2010
33 The Formwork Experts
General remarks
User information Doka dam formwork
Structural design The cantilever centres are computed from various different influences: ● Pressure of the fresh concrete ● Block height ● Angle of inclination of formwork ● Wind loads
☞
Allow for the following when performing the structural design calculations: The formwork used must be dimensioned as required by the cantilever centres (e.g. the correct steel walings must be selected). Max. service load of the working platform: 1.5 kN/m2 (incl. loads occurring as a result of pouring)
This is why dam formwork must always be dimensioned on a project-specific basis.
When determining the pressure of the fresh concrete, allow for the following: ● Additional loads from concrete spreading devices (e.g. caterpillar concrete spreader). ● Slow setting of the concrete (fly-ash)) ● Low concrete temperature (cooled concrete) ● Low proportion of cement in the concrete
Determining the cantilever centres for perpendicular formwork* * Formwork and cantilever bracket perpendicular and in one plane (no kink in wall)
Dam formwork D15 3.0
9706-100
Pouring height [m]
2.9 2.8
25 kN/m² 40 kN/m²
2.7
30 kN/m²
2.6
45 kN/m²
2.5
35 kN/m²
2.4
50 kN/m²
2.3 2.2 2.1 2.0 0.5
1.0
1.5
2.0
2.5
Influence width per bracket [m]
Dam formwork D15/3 3.5
9706-101
Pouring height [m]
3.4
25 kN/m²
3.3 3.2
30 kN/m²
3.1
40 kN/m²
3.0
35 kN/m²
2.9
45 kN/m²
2.8 2.7
50 kN/m²
2.6 2.5 0.5
1.0
1.5
2.0
2.5
Influence width per bracket [m]
Dam formwork D22 4.0
9706-102
Pouring height [m]
3.9 3.8
25 kN/m² 40 kN/m²
3.7
30 kN/m²
3.6
45 kN/m²
3.5
35 kN/m²
3.4
50 kN/m²
3.3 3.2 3.1 3.0 0.5
1.0
1.5
2.0
2.5
Influence width per bracket [m]
34
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
General remarks
Doka service offerings Doka "Ready-to-Use" Service
Doka customer training
Ready-to-use formworks - for even the most unusual assignments
Formwork training pays
Whatever it is you need to construct from concrete, the Doka Ready-to-Use Service can put together the right formwork for you - quickly, and in guaranteed Doka quality. The professionals from the Doka Ready-to-Use Service plan and make ready-to-use standard and custom formworks exactly to your specifications. By delivering "just-in-time", straight to your site, we save space on your site and reduce the amount of planning and assembly work that you have to do.
Pre-assembled platform decking reduces assembly times The pre-assembled platform decking has many advantages: ● Pre-assembly in the factory or at the depot helps to cut costs. ● Operations scheduling ensures efficient assembly. ● High precision ensured by use of assembly bench. ● No space problems. ● No need for on-site improvisation. ● Reduces assembly times on the site. ● Cantilever brackets are quickly ready for use. ● Low transport volume.
Forming operations account for the lion’s share of labour costs on concrete construction sites. Modern formwork equipment helps to rationalise operations. By improving the overall construction sequence at the same time, however, further very worthwhile gains in efficiency can be achieved. This requires not only better equipment, but also greater skill in making optimum use of this equipment. Doka can help here, with its specialist training programme - to help each and every member of the team do his bit towards boosting efficiency and lowering costs. Doka customer training events also look at the formwork equipment and handling methods that are needed in order to achieve optimum safety - knowledge and awareness which can only enhance workplace safety on the site. You’ll find the Doka training programme well worth looking into. Your nearest Doka branch will be pleased to tell you more about Doka's various training offerings.
999706002 - 10/2010
35 The Formwork Experts
Component overview
User information Doka dam formwork [kg]
Article n°
[kg]
Article n°
87.6 119.7 115.5 154.5
580632000 580638000 580613000 580615000
Component Doka Dam formwork Climbing overview Systems
Cantilever bracket D15 K
136.4 580630000
Sperrenkonsole D15 K
Painted blue Width: 166 cm Delivery condition: railing included
Cantilever bracket D15/3
Vertical waling D15 3.00m U120 Vertical waling D15 3.50m U140 Vertical waling D22 3.00m U160 Vertical waling D22 4.00m U160 Sperrenriegel D
Painted blue
170.0 580631000
Sperrenkonsole D15/3
Painted blue Width: 215 cm Delivery condition: railing included
Spindle strut D15 3.00m
38.0 580633000
Spindelstrebe D15 3,00m
Painted blue Length: 211 - 252 cm
Cantilever bracket D22 K
190.0 580610000
Sperrenkonsole D22 K
Spindle strut D22 3.00m
52.6 580616000
Spindelstrebe D22 3,00m
Painted blue Length: 215 - 258 cm
Painted blue Width: 189 cm Delivery condition: railing included
Spindle strut D22 4.00m
55.4 580617000
Spindelstrebe D22 4,00m
Painted blue Length: 258 - 301 cm
Cantilever bracket D22 F
203.0 580611000
Sperrenkonsole D22 F
Painted blue Width: 237 cm Delivery condition: railing included
Swivel bearing plate D15
20.8 580634000
Gelenkaufsatz D15
Painted blue Length: 43.5 cm Height: 22.8 cm
Swivel bearing plate D15 S
18.5 580635000
Gelenkaufsatz D15 S
Painted blue Length: 36.8 cm Height: 22.4 cm
36
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Component overview [kg]
Swivel bearing plate D22
Article n°
30.0 580618000
Gelenkaufsatz D22
Anchor waling 1.95m Anchor waling 2.95m
Article n°
76.3 580545000 110.0 580546000
Ankerriegel
Painted blue Length: 52 cm Height: 27 cm
Swivel bearing plate D22 S
[kg]
Painted blue
26.0 580624000
Gelenkaufsatz D22 S
Painted blue Length: 45 cm Height: 27 cm
Travelling profile D22
20.0 580619000
Fahrprofil D22
Galvanised Length: 114 cm
Suspension profile D15/D22
28.6 580621000
Hängeprofil D15/D22
Galvanised Height: 260 cm
Retraction set D15
21.0 580637000
Rückfahrset D15
Galvanised Length: 114 cm
Waling-to-bracket holder 9-24cm
2.9 580639000
Riegelhalter 9-24cm
Galvanised
Screw-on access bracket MF75 Anschraubbühne MF75
19.0 580669000 Waling-to-bracket holder D22
Galvanised Length: 113 cm Height: 152 cm
2.7 580623000
Keilriegelhalter D22
Galvanised Length: 31 cm Height: 31 cm
Handrail clamp S
11.5 580470000
Schutzgeländerzwinge S
Swivel plate MF
Galvanised Height: 123 - 171 cm
4.5 580672000
Schwenkplatte MF
Galvanised Length: 29 cm Height: 20 cm
Manhole B 70/60cm
22.0 581530000
Bühnendurchstieg B 70/60cm Steel parts galvanised Timber parts varnished yellow Length: 81 cm Width: 71 cm
Starter block unit D15
48.2 580636000
Grundblockriegel D15
Painted blue Length: 145 cm
Scaffold tube 48.3mm 1.00m Scaffold tube 48.3mm 1.50m Scaffold tube 48.3mm 2.00m Scaffold tube 48.3mm 2.50m Scaffold tube 48.3mm 3.00m Scaffold tube 48.3mm 3.50m Scaffold tube 48.3mm 4.00m Scaffold tube 48.3mm 4.50m Scaffold tube 48.3mm 5.00m Scaffold tube 48.3mm 5.50m Scaffold tube 48.3mm 6.00m Scaffold tube 48.3mm .....m
3.6 5.4 7.2 9.0 10.8 12.6 14.4 16.2 18.0 19.8 21.6 3.6
Gerüstrohr 48,3mm
682014000 682015000 682016000 682017000 682018000 682019000 682021000 682022000 682023000 682024000 682025000 682001000
Galvanised
Starter block unit D22
80.0 580622000
Grundblockriegel D22
Painted blue Length: 147 cm
999706002 - 10/2010
37 The Formwork Experts
Component overview
User information Doka dam formwork [kg]
Screw-on coupler 48mm 50 Screw-on coupler 48mm 95
Article n°
0.84 682002000 0.88 586013000
Anschraubkupplung
Galvanised Width-across: 22 mm
Swivel coupler 48mm
GF-Werkzeugbox included in scope of supply:
Article n°
6.5 580390000 0.73 580580000
Galvanised Length: 30 cm
Galvanised Width-across: 22 mm
Fix-De-Fix remote uncoupling system 3150kg
Tool box GF
(A) Reversible ratchet 1/2"
1.5 582560000
Drehkupplung 48mm
[kg]
(B) (C) (D) (E) (F) (G) (H) (I) (J) (K) (L)
Fork wrench 13/17 Fork wrench 22/24 Fork wrench 30/32 Ring spanner 17/19 Extension 11cm 1/2" Extension 22cm 1/2" Universal joint coupling Nut for box spanner 19 1/2" L Box nut 13 1/2" Box nut 24 1/2" Box nut 30 1/2"
0.08 0.22 0.80 0.27 0.20 0.31 0.16 0.16 0.06 0.12 0.20
580577000 580587000 580897000 580590000 580581000 580582000 580583000 580598000 580576000 580584000 580575000
27.0 586014000
Abhängeautomat Fix-De-Fix 3150kg Follow the directions in the "Operating Instructions"!
Additional tools MF
4.1 580682000
(A) Reversible ratchet 3/4"
1.5 580894000
Zusatzwerkzeuge MF consisting of:
Warning sign "No entry" 300x300mm Verbotsschild "Zutritt Verboten" 300x300mm
0.70 581575000
Galvanised Length: 50 cm
(B) (C) (D) (E) (F)
Ratchet MF 3/4" SW50
3.8 580648000
Antriebsknarre MF 3/4" SW50
Box nut 17 1/2" Box nut 50 3/4" Extension 20cm 3/4" Transition piece A 1/2"x3/4" Universal cone spanner 15.0/20.0
0.07 0.81 0.68 0.18 0.90
580685000 581449000 580683000 580684000 581448000
Galvanised Length: 9 cm Width-across: 50 mm
Galvanised
38
999706002 - 10/2010 The Formwork Experts
User information Doka dam formwork
Component overview [kg]
Article n째
Tie rod system 20.0
[kg]
Article n째
Tie rod system 26.5
Universal climbing cone 20.0 Universal-Kletterkonus 20,0
1.2 581442000
Universal climbing cone 26.5
Galvanised Length: 13 cm Diameter: 5 cm Tool: Spanner for universal climbing cone 15.0/20.0
Sealing sleeve K 20.0
0.03 581443000
Dichtungsh체lse K 20,0
Galvanised Length: 12.6 cm Diameter: 5 cm Tool: Spanner for universal climbing cone 15.0/20.0
Sealing sleeve K 26.5 Violet Length: 12 cm Diameter: 6 cm
0.86 581444000
Konusschraube B 7cm
red Length: 10 cm Diameter: 7 cm Width-across: 50 mm
Pigtail anchor 20.0
0.03 581998000
Dichtungsh체lse K 26,5
Green Length: 12 cm Diameter: 6 cm
Cone screw B 7cm
1.1 581987000
Universal-Kletterkonus 26,5
Pigtail anchor 26.5
3.6 581900000
Wellenanker 26,5
Non-treated Length: 80 cm
2.0 581450000
Wellenanker 20,0
Non-treated Length: 76 cm
Stop anchor 20.0 22cm
1.6 581452000
Sperranker 20,0 22cm
Non-treated
Stop anchor 20.0 45cm
2.1 581453000
Sperranker 20,0 45cm
Non-treated
Positioning clamp M30
0.19 581833000
Vorlaufklemme M30
Galvanised Diameter: 4 cm
Positioning disk M30
0.25 581975000
Vorlaufscheibe M30
Galvanised Diameter: 9 cm
999706002 - 10/2010
39 The Formwork Experts
Doka dam formwork is the strong system-solution for all mass concrete structures. Extremely high load-bearing capacity, and a maximum of workplace safety - these are the distinguishing features of Doka dam formwork. With the twin D15 and D22 systems, you can exploit Doka's long experience in the mass-concrete structure field to the full. Doka dam formwork is available for either rental or purchase. At any of the Doka branches in your region. Why not give us a call?
The Doka Group's central plant at Amstetten, Austria
Doka international
Certified to
Doka GmbH
ISO 9001
Josef Umdasch Platz 1, A 3300 Amstetten, Austria Tel.: +43 (0)7472 605-0, Fax: +43 (0)7472 64430 E-Mail: info@doka.com Internet: www.doka.com
Algeria
Japan
Qatar
Tunisia
SARL Doka Algérie 24 A Route de la Rassauta Bordj-El-Kifane, BP 170, 16120 Alger Telephone: +213 (0)21 21 27 26 Telefax: +213 (0)21 21 28 98 E-Mail: Algerie@doka.com
Doka Japan K.K. Miwanoyama 744-6 Nagareyama-shi 270-175 Chiba-Ken Telephone: +81 (0)471 78 8808 Telefax: +81 (0)471 78 8812 E-Mail: Japan@doka.com www.dokajapan.co.jp
Doka Qatar WLL P.O.Box 23439 Doha, Qatar Telephone: +974 44500628 Telefax: +974 44500608 E-Mail: Qatar@doka.com
Doka Tunisia Ltd. Bureau de Liaison Zone Industrielle, Rue d l‘usine Le Kram 2015 Tunis Telephone: +216 (0)71 977 350 Telefax: +216 (0)71 977 856 E-Mail: Tunisia@doka.com
Korea
Doka Formwork Technology Mahmoud Othman & Sons LLC P.O. Box 7620 Jeddah 21472 Telephone: +966 0)2 669 10 08 Telefax: +966 (0)2 664 86 25 E-Mail: Jeddah@doka.com
Canada Doka Canada Ltd./Ltée 5404 - 36th Street S.E. Calgary AB T2C 1P1 Telephone: +1 403 243-6629 Telefax: +1 403 243-6787 E-Mail: Canada@doka.com
China Doka Formwork (Shanghai) Co. Ltd. Bldg. 2, No.3883 Yuanjiang Road Minhang District Shanghai 201109 Telephone: +86 21 6090 0899 Telefax: +86 21 6090 1099 E-Mail: China@doka.com
India
Doka Korea Ltd. Rm.N.220, Doosan Venture Digm Bldg., 126-1 Pyeongchon-Dong, Dongan-Gu, 431-755 Anyang City, Gyeonggi-Do Telephone: +82 31 478 3700 Telefax: +82 31 478 3701 E-Mail: Korea@doka.com
Saudi Arabia
Singapore Kuwait Doka Kuwait Div. of Riham Gen. Trad.& Cont. Co. P.O. Box 2217 Salmiyah 22023 Kuwait Telephone: + 965 2 4822 462 Telefax: +965 2 4822 472 E-Mail: Kuwait@doka.com
Doka Formwork Pte. Ltd. 9 Gul Circle Singapore 629565 Telephone: +65 6897 7737 Telefax: +65 6897 8606 E-Mail: Singapore@doka.com
South Africa
Turkey Doka Kalip-Iskele Sanayi ve Ticaret A.S. Güzeller Org. San. Bölgesi Inönü Mah. Nazarbayev Sok. No:19 41400 Gebze, Kocaeli Telephone: +90 262 751 50 66 Telefax: +90 262 751 50 05 E-Mail: Turkiye@doka.com
United Arab Emirates Doka Gulf FZE P.O. Box 61407 Jebel Ali Free Zone, Dubai Telephone: +971 (0)4 881 8096 Telefax: +971 (0)4 881 8097 E-Mail: Emirates@doka.com
United Kingdom
Doka Branch Lebanon Sodeco Square, Block C / 9th floor Beirut Telephone: +961 (0)1 612569 Telefax: +961 (0)1 612570 E-Mail: Lebanon@doka.com
Doka South Africa (Pty) Ltd. Johannesburg Branch CA Brand Bldg, 2 Sebasa Road Chloorkop Ext.10 Kempton Park 1619 Telephone: +27 (0)11 310 9709 Telefax: +27 (0)11 310 9711 E-Mail: South-Africa@doka.com
Ireland
Norway
Sweden
USA
Doka Ireland Formwork Techn. Ltd. Monasterboice, Drogheda County Louth Telephone: +353 (0)41 686 1620 Telefax: +353 (0)41 686 1525 E-Mail: Ireland@doka.com
Doka Norge AS Heggstadmoen 4 N 7080 Heimdal Telephone: +47 72 89 38 10 Telefax:n +47 72 89 38 11 E-Mail: Norge@doka.com
Doka Sverige AB Kurödsvägen 20 S 451 55 Uddevalla Telephone: +46 (0)10 45 16 300 Telefax: +46 (0)10 45 16 309 E-Mail: Sverige@doka.com
Doka India Pvt. Ltd. Hiranandani Business Park Sentinel Bldg 2nd Floor Commercial Premises No 201&202 Powai, Mumbai - 400 076 Telephone: +91 22 402 64435 Telefax: +91 22 402 64436 E-Mail: India@doka.com
Lebanon
Doka UK Formwork Technologies Ltd Monchelsea Farm, Heath Road Boughton Monchelsea Maidstone, Kent, ME17 4JD Telephone: +44 (0)1622 74 90 50 Telefax: +44 (0)1622 74 90 33 E-Mail UK@doka.com
Other subsidiaries and representatives: Angola Azerbaijan Bahrain Belgium Belarus Bosnia and Herzegovina Brazil Bulgaria Chile Croatia Czech Republic Denmark Egypt Estonia Finland France Germany Greece Hungary Iceland Iran Italy Jordan
Kazakhstan Latvia Lithuania Luxembourg Marocco Mexico Netherlands New Zealand Oman Panama Poland Portugal Romania Russia Senegal Serbia Slovakia Slovenia Spain Switzerland Taiwan Thailand Ukraine Vietnam