User information
05/2011
Method statement
999779002 en-GB
9779-203-03
Doka form-ties for special requirements
The Formwork Experts
Introduction
User information Doka form-ties for special requirements
Introduction
Š by Doka Industrie GmbH, A-3300 Amstetten 2
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Introduction
Contents 4 4 6 8 10
Introduction Elementary safety warnings Eurocodes at Doka Doka services Preliminary remarks
12 13 14 16 20 22 24 25 26
Form-tie system 15.0 Design variants - Form-tie system 15.0 Water-stop connector 15.0 Fibre-concrete tube 22mm Water stop G 15.0 Water stop 15.0 Distance piece 20, 25, and 30cm Plastic tube 22mm Expendable tie-rod with Anchor cones 15.0
28 29 30 32 33 34
Form-tie system 20.0 Design variants – Form-tie system 20.0 Water stop 20.0 Fibre-concrete tube for Form-tie system 20.0 Plastic tube 26mm Expendable tie-rod with Anchor cones 20.0
36 36
General remarks Bibliography and literature
37
Component overview
999779002 - 05/2011
3 The Formwork Experts
Introduction
User information Doka form-ties for special requirements
Elementary safety warnings Introduction
User target groups
Planning
● This User Information booklet (Method Statement) is aimed at everyone who will be working with the Doka product or system it describes. It contains information on the standard design for setting up this system, and on correct, compliant utilisation of the system. ● All persons working with the product described herein must be familiar with the contents of this manual and with all the safety instructions it contains. ● Persons who are incapable of reading and understanding this booklet, or who can do so only with difficulty, must be instructed and trained by the customer. ● The customer is to ensure that the information materials provided by Doka (e.g. User Information booklets, Instructions for Assembly and Use, Operating Instruction manuals, plans etc.) are available to all users, and that they have been made aware of them and have easy access to them at the usage location. ● In the relevant technical documentation and formwork utilisation plans, Doka shows the workplace safety precautions that are necessary in order to use the Doka products safely in the usage situations shown. In all cases, users are obliged to ensure compliance with national OH&S (occupational health and safety) rules throughout the entire project and to take appropriate additional or alternative workplace safety precautions where necessary.
● Provide safe workplaces for those using the formwork (e.g. for when it is being erected/dismantled, modified or repositioned etc). It must be possible to get to and from these workplaces via safe access routes! ● If you are considering any deviation from the details and instructions given in this booklet, or any application which goes beyond those described in the booklet, then revised static calculations must be produced for checking, as well as supplementary assembly instructions.
Hazard assessment ● The customer is responsible for drawing up, documenting, implementing and continually updating a hazard assessment at every job-site. This document serves as the basis for the site-specific hazard assessment, and for the instructions given to users on how to prepare and utilise the system. It does not substitute for these, however.
Remarks on this document ● This User Information booklet can also be used as a generic method statement or incorporated with a site-specific method statement. ● Many of the illustrations in this booklet show the situation during formwork assembly and are therefore not always complete from the safety point of view. Any safety accessories not shown in these illustrations must still be used by the customer, in accordance with the applicable rules and regulations. ● Further safety instructions, especially warnings, will be found in the individual sections of this document!
4
Rules applying during all phases of the assignment: ● The customer must ensure that this product is erected and dismantled, reset and generally used for its intended purpose under the direction and supervision of suitably skilled persons with the authority to issue instructions. These persons' mental and physical capacity must not in any way be impaired by alcohol, medicines or drugs. ● Doka products are technical working appliances which are intended for industrial/commercial use only, always in accordance with the respective Doka User Information booklets or other technical documentation authored by Doka. ● The stability of all components and units must be ensured during all phases of the construction work! ● The functional/technical instructions, safety warnings and loading data must all be strictly observed and complied with. Failure to do so can cause accidents and severe (even life-threatening) damage to health, as well as very great material damage. ● Fire-sources are not permitted anywhere near the formwork. Heating appliances are only allowed if properly and expertly used, and set up a safe distance away from the formwork. ● The work must take account of the weather conditions (e.g. risk of slippage). In extreme weather, steps must be taken in good time to safeguard the equipment, and the immediate vicinity of the equipment, and to protect employees. ● All connections must be checked regularly to ensure that they still fit properly and are functioning correctly. It is very important to check all screw-type connections and wedge-clamped joins whenever the construction operations require (particularly after exceptional events such as storms), and to tighten them if necessary.
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Introduction
Assembly
Regulations; industrial safety
● The equipment/system must be inspected by the customer before use, to ensure that it is in suitable condition. Steps must be taken to rule out the use of any components that are damaged, deformed, or weakened due to wear, corrosion or rot. ● Combining our formwork systems with those of other manufacturers could be dangerous, risking damage to both health and property. If you intend to combine different systems, please contact Doka for advice first. ● The assembly work must be carried out by suitably qualified employees of the client's. ● It is not permitted to modify Doka products; any such modifications constitute a safety risk.
● Always observe all industrial safety regulations and other safety rules applying to the application and utilisation of our products in the country and/or region in which you are operating.
Erecting the formwork
Symbols used
● Doka products and systems must be set up in such a way that all loads acting upon them are safely transferred!
The following symbols are used in this booklet:
Pouring ● Do not exceed the permitted fresh-concrete pressures. Excessively high pouring rates lead to formwork overload, cause greater deflection and risk causing breakage.
Striking the formwork ● Do not strike the formwork until the concrete has reached sufficient strength and the person in charge has given the order for the formwork to be struck! ● When striking the formwork, never use the crane to break concrete cohesion. Use suitable tools such as timber wedges, special pry-bars or system features such as Framax stripping corners. ● When striking the formwork, do not endanger the stability of any part of the structure, or of any scaffolding, platforms or formwork that is still in place!
● If a person or object falls against, or into, the sideguard component and/or any of its accessories, the component affected may only continue in use after it has been inspected and passed by an expert.
Maintenance ● Only original Doka components may be used as spare parts. Repairs may only be carried out by the manufacturer or authorised facilities.
☞
Important note Failure to observe this may lead to malfunction or damage.
CAUTION / WARNING / DANGER Failure to observe this may lead to material damage, and to injury to health which may range up to the severe or even life-threatening.
Instruction This symbol indicates that actions need to be taken by the user.
Sight-check Indicates that you need to do a sight-check to make sure that necessary actions have been carried out.
Transporting, stacking and storing ● Observe all regulations applying to the handling of formwork and scaffolding. In addition, the Doka slinging means must be used - this is a mandatory requirement. ● Remove any loose parts or fix them in place so that they cannot be dislodged or fall free! ● All components must be stored safely, following all the special Doka instructions given in the relevant sections of this User Information booklet!
Tip Points out useful practical tips.
Reference Refers to other documents and materials.
Miscellaneous We reserve the right to make alterations in the interests of technical progress.
999779002 - 05/2011
5 The Formwork Experts
Introduction
User information Doka form-ties for special requirements
Eurocodes at Doka In Europe, a uniform series of Standards known as Eurocodes (EC) was developed for the construction field by the end of 2007. These are intended to provide a uniform basis, valid throughout Europe, for product specifications, tenders and mathematical verification. The EC are the world's most highly developed Standards in the construction field. In the Doka Group, the EC are to be used as standard from the end of 2008. They will thus supersede the DIN norms as the "Doka standard" for product design.
Ed Ed
Fd
Fk
γF
Design value of effect of actions (E ... effect; d ... design) Internal forces from action Fd (VEd, NEd, MEd) Design value of an action Fd = γ F · Fk (F ... force) Characteristic value of an action "actual load", service load (k ... characteristic) e.g. dead weight, live load, concrete pressure, wind Partial factor for actions (in terms of load; F ... force) e.g. for dead weight, live load, concrete pressure, wind Values from EN 12812
Comparison of the safety concepts (example) Permissible stress design
115.5 [kN]
Fyield
EC/DIN concept
Rk
115.5 [kN]
Rd gM = 1.1
90<105 [kN] n ~ 1.65
Factual
A
98013-100
60 [kN]
gF = 1.5
Fpermissible
98013-102
60<70 [kN]
A
Ed
90 [kN]
Factual≤ Fpermissible
The widely used "Permissible stress design" (comparing the actual stresses with the permissible stresses) has been superseded by a new safety concept in the EC. The EC contrast the actions (loads) with the resistance (capacity). The previous safety factor in the permissible stresses is now divided into several partial factors. The safety level remains the same!
Rd Rd
Design value of the resistance (R ... resistance; d ... design) Design capacity of cross-section (VRd, NRd, MRd) Rk Rk Timber: Rd = kmod · Steel: Rd = γM γM
Rk
Characteristic value of the resistance e.g. moment resistance to yield stress
γM
Partial factor for a material property (in terms of material; M...material) e.g. for steel or timber Values from EN 12812
kmod
Modification factor (only for timber – to take account of the moisture and the duration of load action) e.g. for Doka beam H20 Values as given in EN 1995-1-1 and EN 13377 The "permissible values" communicated in Doka documents (e.g.: Qpermissible = 70 kN) do not correspond to the design values (e.g.: VRd = 105 kN)! ➤ Avoid any confusion between the two! ➤ Our documents will continue to state the permissible values. Allowance has been made for the following partial factors: γF = 1.5 γM, timber = 1.3 γM, steel = 1.1 kmod = 0.9 In this way, all the design values needed in an EC design calculation can be ascertained from the permissible values.
Ed≤ Rd
A Utilisation factor
6
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Introduction
999779002 - 05/2011
7 The Formwork Experts
Introduction
User information Doka form-ties for special requirements
Doka services Support in every phase of the project Doka offers a broad spectrum of services, all with a single aim: to help you succeed on the site. Every project is unique. Nevertheless, there is one thing that all construction projects have in common – and that is a basic structure with five phases. We at Doka know our clients' varying requirements. With our consulting, planning and other services, we help you achieve effective implementation of your formwork assignment using our formwork products – in every one of these phases.
1 Project development phase
2
3
Tendering phase
Operations scheduling phase
Taking well-founded decisions thanks to professional advice and consulting
Optimising the preliminary work with Doka as an experienced partner
Controlled, regular forming operations, for greater efficiency resulting from realistically calculated formwork concepts
Find precisely the right formwork solutions, with the aid of ● help with the bid invitation ● in-depth analysis of the initial situation ● objective evaluation of the planning, execution, and time-risks
Draw up potentially winning bids, by ● basing them on realistically calculated guideline prices ● making the right formwork choices ● having an optimum time-calculation basis
Plan cost-effectively right from the outset, thanks to ● detailed offers ● determination of the commissioning quantities ● co-ordination of lead-times and handover deadlines
8
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
4 (Shell) construction phase
Introduction
5 (Shell) completion phase
The advantages for you thanks to professional advice and consulting ● Cost savings and time gains When we advise and support you right from the word "go", we can make sure that the right formwork systems are chosen and then used as planned. This lets you achieve optimum utilisation of the formwork equipment, and effective forming operations because your workflows will be correct. ● Maximised workplace safety The advice and support we can give you in how to use the equipment correctly, and as planned, leads to greater safety on the job.
Optimum resource utilisation with assistance from the Doka Formwork Experts
Seeing things through to a positive conclusion with professional support
Workflow optimisation, thanks to ● thorough utilisation planning ● internationally experienced project technicians ● appropriate transport logistics ● on-site support
Doka Services are a byword for transparency and efficiency here, offering ● jointly handled return of rented formwork ● professional dismantling ● efficient cleaning and reconditioning using special equipment
● Transparency Because our services and costs are completely transparent, there is no need for improvisation during the project – and no unpleasant surprises at the end of it. ● Reduced close-out costs Our professional advice on the selection, quality and correct use of the equipment helps you avoid damage, and minimise wear-andtear.
999779002 - 05/2011
9 The Formwork Experts
Introduction
User information Doka form-ties for special requirements
Preliminary remarks To pour walls, it is necessary to have wall-ties with sufficient load-bearing capacity. In general, a distinction is made between: ● wall-ties where no special requirements are made – these only need sustain the pressure of the fresh concrete – and ● wall-ties for special requirements that are fulfilled by additional measures aimed at making the tie-points e.g.: - water-impermeable - fire-resistant - sound-insulating - gas-impermeable - radiation-proof This manual offers ideas and suggested solutions for form-tie points that need to meet one or more of the requirements stated above. General remarks: ● Choosing a suitable formwork system with a widely spaced form-tie pattern is one way of reducing the number of expensive wall-ties that are needed. This will, of course, depend upon the circumstances and requirements applying on each site. ● If the main sealing function is intended to be in the middle of the wall (in the same way as with joint-sealing tape), this has the advantage that the form-tie point is watertight from the moment the formwork is stripped. ● Sealing measures that are carried out on the outside only, e.g. by bonding, call for extremely skilled, painstaking work. ● Tie-holes with small conical openings are more pleasing to the eye (fair-faced concrete) and easier to close off. ● In order to ensure that the wall-tie fulfils the requirements made of it, the points below must be followed, regardless of which design variant is selected: - the wall-tie must be precisely defined in the tendering documents - the relevant regulations and Standards must be observed - the manufacturer's installation instructions must be followed - the personnel involved must be sufficiently skilled
Water-impermeable concrete, and the wall-ties used in it
Concrete with high water-penetration resistance (watertight concrete without any extra sealing layers), has been in use for many years now. When it comes to manufacturing and casting watertight concrete, there is plenty of good, detailed literature with references to DIN regulations etc. Watertight form-ties, on the other hand, do not receive anything like as much attention in the pertinent Standards. ● Recent investigations have shown that the depth of water penetration into watertight concrete is only approx. 7 cm Source: "Feuchtetransport durch Bauteile aus Beton" (Moisture transmission through concrete structural components) in "Beton- und Stahlbetonbau" (Concrete and reinforced concrete construction), 4 1999 d a
b
9779-219-01
a ... up to approx. 7 cm (capillary region) b ... approx. 8 cm (drying-out region) d ... Wall thickness
"Water-impermeable" means that more water vaporises from the side facing away from the water pressure than penetrates into the side which is exposed to it. 10
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie points for special "dry" applications The sealing techniques for fireproofing, acoustic insulation, radiation protection etc. are mostly similar to those for creating water-impermeable form-tie points, and use the same components.
Fitting the wall-tie The properties set out in the test report can only be attained if the following conditions are met: ● only undamaged and clean components are used ● the components are only fitted by trained, skilled personnel ● all the relevant installation instructions are followed
☞
● Do not unscrew form-ties prematurely (in "green", i.e. new, concrete) or with violent hammer-blows. This would break the adhesion between the tie-rods and the concrete in which they are embedded, and might mean that the form-tie point is no longer watertight.
Introduction
Minimum wall thicknesses The wall thickness will be determined by the function that the structure will have to fulfil. The following practical site-related factors may necessitate a larger wall thickness: ● the type of reinforcement ● the concrete-placement method (be careful regarding drop heights and de-mixing) ● the type of compaction (internal or external vibrators) In practice, the wall thickness will already have been decided. If the thickness stipulated is not ideal, then a suitable approach will need to be taken to tackling this situation. Wall thickness required for placing the concrete by drop-pipe in accordance with the regulations a B
C
A
Concrete and concrete placement In order for concrete structures to be cast in such a way that they fulfil architectural specifications, properly prepared wall-ties have to be combined with careful placing of the concrete. ● the concrete must be defined in accordance with the requirements - bid description to EN 206-1:2000 ● attention must be paid to the quality of concrete placement - vibration, weathering, concrete-placement method etc.
D
9779-206-01
b d Example: a ... Drop-pipe diameter 15 cm b ... min. 20 cm d ... Wall thickness min. 30 cm A Drop-pipe B Reinforcement C Formwork D Concrete
(Source: Lohmeyer / Ebeling "Weisse Wannen - einfach und sicher" - "Monolithic concrete tanks made easy".).
Tender documents It is on the basis of the tender documents that the most suitable design variant will be chosen ("suitable", that is, in terms of the use to which the structure will later be put). All the variants outlined must make clear what additional work / costs will be involved, and the care that will need to be taken. It is advisable to give detailed descriptions of sizes, materials, fitting instructions and problem points. Also, there are several different design variants, as outlined in the following sections.
999779002 - 05/2011
11 The Formwork Experts
Form-tie system 15.0
User information Doka form-ties for special requirements
Form-tie system 15.0
12
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 15.0
Design variants - Form-tie system 15.0 Overview of the products used in the Doka Form-tie system 15.0, and their areas of application.
Sound-insulating
Note: For special applications, such as in tunnels, please contact the "Tunnels" Expertise Centre. Fibre-concrete tube 22mm
Water stop G 15.0
Water stop 15.0 or Water stop S 15.0 (sulphateresistant)
Page 16
Page 20
Page 22
Distance piece
Plastic tube 22mm
Expendable Tie-rod 15.0 with 2 anchor cones
Page 24
Page 25
Page 26
Water-impermeable
Water-stop con- Fibre-concrete nector 15.0 tube 22mm
Page 14
Water stop G 15.0
Page 16
Page 20
Water stop 15.0 or Water stop S 15.0 (sulphateresistant)
Page 22
Fire-resistant
Gas-impermeable
Water-stop connector 15.0
Fibre-concrete tube 22mm
Water stop G 15.0
Water stop 15.0 or Water stop S 15.0 (sulphateresistant)
Page 14
Page 16
Page 20
Page 22
Distance piece
Plastic tube 22mm
Expendable Tie-rod 15.0 with 2 anchor cones
Fibre-concrete tube 22mm
Water stop G 15.0
Water stop 15.0 or Water stop S 15.0 (sulphateresistant)
Page 16
Page 20
Page 22
Page 26
Expendable Tie-rod 15.0 with 2 anchor cones
Page 26
Expendable Tie-rod 15.0 with 2 anchor cones
Radiation-proof
Page 24
Page 25
Fibre-concrete tube 22mm
Water stop G 15.0
Water stop 15.0 bzw. Water stop S 15.0 (sulphateresistant)
Page 16
Page 20
Page 22
Page 26
999779002 - 05/2011
13 The Formwork Experts
Form-tie system 15.0
User information Doka form-ties for special requirements
Water-stop connector 15.0 Can be mounted in walls with a thickness of 20 cm and above. Is suitable for preparing wall-ties that meet the following requirements: ● water-impermeable ● fire-resistant to F90
Variant 1 With plastic tubes and cones In this variant, the tie-rods can be re-used.
B C C B
Preparing the form-tie point Various types of wall-tie can be prepared using the Water-stop connector. ➤ Always screw in components until they fully engage. ➤ Use 2 Spanners for tie-rods to tighten the tie-rods so firmly that they cannot be dislodged when the form-tie assembly is being fitted or reinforcement is being placed. ➤ Never weld or heat tie-rods - risk of fracture!
A 9779-215-01
Form-tie point enclosed by formwork A
B
E
C
D
F
General instructions for sealing the form-tie point In its technical bulletin entitled "Fair-faced concrete", the DBV (German Concrete Association) recommends leaving cone indentations as they are. This is because attempts to grout them level with the rest of the surface normally produce unsatisfactory results (colour differences, grouted areas have unclean edges).
9779-210-01
A Water-stop connector 15.0 B Plastic tube 26 mm C Universal cone 26 mm D Tie-rod 15.0mm (length as dictated by formwork) E Super-plate 15.0 F Formwork
Formwork stripped from around form-tie point
9779-210-02
d
b
c
b
d
a Variable dimensions: a ... minimum wall thickness 20 cm b ... depends on wall thickness Fixed dimensions: c ... 7.4 cm d ... 1 cm
Closing off the form-tie point ➤ Either remove the Universal cone 26mm or leave it in place. ➤ If desired, close off the form-tie point with a Plug 26mm (K) .
K
9779-210-03
14
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 15.0
Closing off the form-tie point
Variant 2 Anchor cone 15.0 on one side Can be mounted in walls with a thickness of 30 cm and above. The Anchor cone enables the "Water-stop connector plus tie-rod" assembly to be positioned and fixed on one side of the formwork even before the reinforcement is placed. The tie-rod on the cone-side remains in the concrete. The Anchor cone can be used either on both sides or on one side only.
● For details on closing off the openings on the Anchor-cone side see the section headed "Water stop G 15.0 33cm". ● For details on closing off the opposite side, see the previous Variant.
E D C B A 9779-216-01
Form-tie point enclosed by formwork
D
A
F
B C
E
G 9779-209-03
A Water-stop connector 15.0 B Plastic tube 26 mm C Universal cone 26 mm D Anchor cone 15.0 E Tie-rod 15.0mm (length as dictated by formwork) F Super-plate 15.0 G Formwork
Tools needed for unscrewing the Anchor cone 15.0: ● Reversible ratchet 1/2" ● Box nut 24 1/2" Formwork stripped from around form-tie point
9779-209-04
d
b
e
c
f
a Variable dimensions: a ... minimum wall thickness 30 cm b ... form-tie length 11.6 cm where wall thickness is 30 cm c ... 7.3 cm where wall thickness is 30 cm Fixed dimensions: d ... 6 cm e ... 4.1 cm f ... 1 cm
999779002 - 05/2011
15 The Formwork Experts
Form-tie system 15.0
User information Doka form-ties for special requirements
Fibre-concrete tube 22mm Preparing the form-tie point Can be mounted in walls with a thickness of 8 cm and above.
A
C
☞
● Always use fibre-concrete tubes of the same length – otherwise the formwork cannot be closed cleanly, and laitance may penetrate into the Universal cones, making it difficult to remove them. ● Keep fibre-concrete tubes well away from release-agent. Also, do not wear releaseagent-smeared gloves when fitting them. Otherwise, the in-situ concrete will not bind sufficiently tightly to the tubes. ● Thoroughly moisten the fibre-concrete tubes before pouring. ● Time any interruptions to placement correctly.
Form-tie point enclosed by formwork
B 9779-205-01
A Fibre-concrete tube 22mm
A
D
B
C
B Universal cone 22mm C Fibre-concrete plug 22mm
Is suitable for preparing wall-ties that meet the following requirements: ● water-impermeable ● fire-resistant ● sound-insulating ● gas-impermeable ● for civil defence structures (radiation-proof) Proofs provided by Frank GmbH & Co. KG, Germany. Ready-cut lengths available from Doka: Item name Fibre-concrete tube 22mm 0.18m Fibre-concrete tube 22mm 0.23m Fibre-concrete tube 22mm 0.28m Fibre-concrete tube 22mm 0.38m Fibre-concrete tube 22mm 1.25m
For wall thickness 20 cm 25 cm 30 cm 40 cm For cutting to any length
E 9779-224-04
A Fibre-concrete tube 22mm B Universal cone 22mm C Tie-rod 15.0 D Super-plate 15.0 E Formwork
Formwork stripped from around form-tie point
9779-224-05
c
b
c
a Variable dimensions: a ... minimum wall thickness 8 cm b ... cut-to-size length of the fibre-concrete tube 22mm Fixed dimensions: c ... 1 cm
Longer cones are also commercially available. These cones can be cut to size for e.g. sloping walls.
9779-218-01
16
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Methods of preparing the form-tie point in walls up to 40 cm thick Normal closure – fire-resistant to F30
Form-tie system 15.0
Wall-thicknesses over 40 cm ● From 40 to 60 cm – with a coupling in the middle
9779-204-01
● Over 60 cm – with a steel tube in the middle
9779-204-02
9779-200-01
● One Fibre-concrete plug 22mm is glued in on either side.
Watertight closure – fire-resistant to F30 - F180
Note: Suitable products for preparing special ties in walls that are more than 40 cm thick may be obtained from e.g. Frank GmbH & Co. KG, Germany.
Minimum wall thicknesses for various fire-resistance classes Reinforced concrete walls cast in normal concrete to DIN 4102-4: 1994-03 Fire-resistance class
9779-200-02
● Two Fibre-concrete plugs 22mm are glued in on either side.
☞
The version used on F90 fire-walls corresponds to the watertight type of closure with 2 plugs on either side. Also, completely grout the remaining cavity with FRANK special mortar 3/25.
Soundproof closure
F30 F60 F90 F120 F180
Minimum wall thickness Non-load-bearing Load-bearing 80 mm 120 mm 90 mm 130 mm 100 mm 140 mm 120 mm 160 mm 150 mm 210 mm
Fire-walls cast in normal concrete Fire-resistance class F90
Minimum wall thickness Reinforced Non-reinNon-loadforced Load-bearing bearing 200 mm 120 mm 140 mm
Resistance
9779-200-03
● Several Fibre-concrete plugs 22mm are glued in, together filling 4/5 of the length of the fibre-concrete tube. ● Glue in the plugs with REPOXAL two-component glue.
The whole form-tie point meets the special requirements set out in DBV’s (German Concrete Association’s) technical bulletin for spacers: ● enhanced freeze-thaw resistance ● varying thermal stress ● resistance to chemical attack (incl. seawater-resistance)
Gas-tight and radiation-proof closure
9779-200-03
● Several Fibre-concrete plugs 22mm are glued in, filling the entire length of the fibre-concrete tube
999779002 - 05/2011
17 The Formwork Experts
Form-tie system 15.0
Closing off the form-tie point
☞
The important job of plugging and sealing the form-tie point should only be entrusted to reliable and experienced workers or subcontractors.
User information Doka form-ties for special requirements
➤ Then insert the second plug, after dipping it into the glue in the same way. Push it in until it is flush with the end of the tube, then spread the rest of the glue.
Cleaning the centre-hole ➤ e.g. with a round brush or a drill bit. The fibre-concrete tubes should be as dry as possible; any water must be removed. If the plugs will not fit into the tube because cement paste has run into the opening and dried, this can be drilled out with a Widia drill bit. Specially short drill bits with exactly calibrated diameters are available for this job. Mixing the REPOXAL two-component glue ➤ Completely empty the contents of the hardener pot into the can of REPOXAL glue. Thoroughly mix the hardener and the glue to make a completely homogeneous mass.
9779-202-03
Correctly closed-off form-tie point
9779-202-04
Wrong:
Sealing the tubes with plugs ➤ Always start fitting the plugs on the side of the wall exposed to water pressure. Wherever possible, wear gloves when fitting the plugs. Any glue that gets onto your hands can be cleaned off with spirit or thinner. After this, wash your hands thoroughly with water and soap. ➤ Dip the first plug into the glue and briefly rotate it in the glue so that its entire circumference is wetted. Now push in the plug with the tamping tool until the top of the plug is approx. 5 mm inside the fibre-concrete tube.
9779-202-05
➤ Now these plugs should be left for several hours so that the glue can harden before the end of the tube facing away from the water-pressure is closed off with plugs in the same way. If you do not leave sufficient time for the glue to set, the air being compressed inside the tube may push out or loosen the plugs at the first end of the tube.
☞
9779-202-02
If a hydrostatic pressure test is intended, this should be performed with only the two plugs on the water-pressure side inserted – i.e. before the plugs on the other side have been fitted. After the plugs have been inserted on the water-pressure side, the glue must be allowed to set. The waiting time is highly temperaturedependent. For the structure temperatures given below, it will be as follows: ● 20°C – approx. 10 days ● 10°C – approx. 24 days ● 5°C – approx. 40 days After the end of this waiting time, the tank or vessel (for example) can be filled. Once any pressure test has been carried out, the end of the tube facing away from the waterpressure can be closed off with two plugs as described above.
18
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 15.0
REPOXAL two-component glue
How to use REPOXAL two-component glue is used for plugging fibre-concrete tubes. Product description Owing to its chemical composition, REPOXAL twocomponent glue reacts with the REPOXAL hardener. This chemical reaction results in a hard, watertight, chemical-resistant adhesive. Pot life The ready-mixed adhesive remains workable for max. 4 hours at 20°C. Setting time At temperatures of 20°C, the glued plugs can be subjected to gentle loading after 48 hours, and to normal loading after 96 hours. Higher temperatures shorten the pot-life and the reaction times, while lower temperatures prolong them. At temperatures below +5°C, no chemical reaction takes place and the glue cannot set. For this reason, do not attempt to use the glue at temperatures below +5°C. The temperatures given here always refer to the temperature of the building component. Yield For 1000 plugs, each 2 cm long, the following quantities of REPOXAL two-component glue will be consumed: ● Ø 22 mm - approx. 3 kg ● Ø 27 mm - approx. 4 kg ● Ø 32 mm - approx. 5 kg ● Ø 40 mm - approx. 7 kg Resistance REPOXAL two-component glue is resistant to tap water, seawater, waste water in sewage treatment plants and water containing ozone or chlorine used in swimming pools. In addition, loading tests have been carried out with a wide variety of agents, to which REPOXAL two-component glue has been proven resistant.
999779002 - 05/2011
19 The Formwork Experts
Form-tie system 15.0
User information Doka form-ties for special requirements
Water stop G 15.0 Preparing the form-tie point Can be mounted in walls with a thickness of 25 cm and above.
B B
The Water stop G 15.0 is an economical way of preparing form-tie points that will meet the above requirements. The anchor cones, tie-rods and super-plates can be reused over and over again. The Water stop G remains embedded in the concrete. The form-tie can be ordered in various different lengths, as necessitated by the thickness of the wall. Can be ordered under Art.n° 580100000. Form-tie point enclosed by formwork
9779-213-01
A B
A
D
C
A Water stop G 15.0 B Anchor cone 15.0
Is suitable for preparing wall-ties that meet the following requirements: ● water-impermeable ● fire-resistant to F90 ● sound-insulating ● gas-impermeable ● radiation-proof
E 9779-207-01
A Water stop G 15.0 B Anchor cone 15.0 C Tie-rod 15.0mm (length as dictated by formwork) D Super-plate 15.0
➤ Always screw in components until they fully engage. ➤ Never weld or heat tie-rods - risk of fracture!
E Formwork
Tools needed for unscrewing the Anchor cone 15.0: ● Reversible ratchet 1/2" ● Box nut 24 1/2" Formwork stripped from around form-tie point
9779-207-02
c
b
c
a Variable dimensions: a ... minimum wall thickness 25 cm b ... form-tie length 13 cm where wall thickness is 25 cm Up to a tie-rod length of 40 cm, the plate of the Water stop G 15.0 33cm must be positioned in the middle of the rod. Where the tie-rod is between 40 cm and 150 cm long, the plate must be positioned at a fixed distance of 20 cm from the end of the tie-rod. (Varying lengths - b - can be ordered under Art.n° 580100000). Fixed dimensions: c ... 6 cm
20
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 15.0
Closing off the form-tie point In its technical bulletin entitled "Fair-faced concrete", the DBV (German Concrete Association) recommends leaving cone indentations as they are. This is because attempts to grout them level with the rest of the surface normally produce unsatisfactory results (colour differences, grouted areas have unclean edges).
☞
If it is still necessary to close off the form-tie point, for rust protection reasons (tie-rod), we recommend gluing in a fibre-concrete plug. The job of closing off the form-tie point should only be carried out by reliable skilled workers or competent subcontractors.
Example with fibre concrete plug We recommend the following materials for gluing in the plugs: ● Commercially available cement mortar, e.g. repair and renovation mortar, watertight exterior grouting compound etc. Pay attention to the colour of the concrete here! ● Tile bonding cement (is mostly dark) in cases where the colour of the concrete is unimportant. ➤ Evenly distribute the mortar mixture in the conical opening and then slowly press the Fibre concrete plug 54mm (K) into the opening while gently turning it. (Using a piece of wood makes it easier to fit the plug on the right plane).
K
9779-212-01
Grout level with the rest of the surface ➤ Fill the remaining space (L) with mortar and grout it smoothly. L
K
9779-212-01
999779002 - 05/2011
21 The Formwork Experts
Form-tie system 15.0
User information Doka form-ties for special requirements
Water stop 15.0 Preparing the form-tie point Can be mounted in walls with a thickness of 33 cm and above.
B B
The Water stop 15.0 consists of a tie-rod with a fibreconcrete disc glued onto the middle of the rod. The anchor cones, tie-rods and super-plates can be reused over and over again. The Water stop 15.0 remains embedded in the concrete. The form-tie can be ordered in various different lengths, as necessitated by the thickness of the wall. Can be ordered under Art.n° 580100000. Form-tie point enclosed by formwork
A B
A
9779-214-01
D
C
A Water stop 15.0 B Anchor cone 15.0
Is suitable for preparing wall-ties that meet the following requirements: ● water-impermeable ● fire-resistant to F90 ● sound-insulating ● gas-impermeable ● radiation-proof In addition to these properties, the Water stop S 15.0 is also sulphate-resistant. ➤ Always screw in components until they fully engage. ➤ Never weld or heat tie-rods - risk of fracture!
E 9779-208-01
A Water stop 15.0 B Anchor cone 15.0 C Tie-rod 15.0mm (length as dictated by formwork) D Super-plate 15.0 E Formwork
Tools needed for unscrewing the Anchor cone 15.0: ● Reversible ratchet 1/2" ● Box nut 24 1/2" Formwork stripped from around form-tie point
9779-208-02
c
b
c
a Variable dimensions: a ... minimum wall thickness 33 cm b ... form-tie length 21 cm where wall thickness is 33 cm For form-tie length of up to 150 cm. Above this: on request. (Varying lengths - b - can be ordered under Art.n° 580100000). Fixed dimensions: c ... 6 cm
22
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 15.0
Closing off the form-tie point In its technical bulletin entitled "Fair-faced concrete", the DBV (German Concrete Association) recommends leaving cone indentations as they are. This is because attempts to grout them level with the rest of the surface normally produce unsatisfactory results (colour differences, grouted areas have unclean edges).
☞
If it is still necessary to close off the form-tie point, for rust protection reasons (tie-rod), we recommend gluing in a fibre-concrete plug. The job of closing off the form-tie point should only be carried out by reliable skilled workers or competent subcontractors.
Example with fibre concrete plug We recommend the following materials for gluing in the plugs: ● Commercially available cement mortar, e.g. repair and renovation mortar, watertight exterior grouting compound etc. Pay attention to the colour of the concrete here! ● Tile bonding cement (is mostly dark) in cases where the colour of the concrete is unimportant. ➤ Evenly distribute the mortar mixture in the conical opening and then slowly press the Fibre concrete plug 54mm (K) into the opening while gently turning it. (Using a piece of wood makes it easier to fit the plug on the right plane).
K
9779-212-01
Grout level with the rest of the surface ➤ Fill the remaining space (L) with mortar and grout it smoothly. L
K
9779-212-01
999779002 - 05/2011
23 The Formwork Experts
Form-tie system 15.0
User information Doka form-ties for special requirements
Distance piece 20, 25, and 30cm Preparing the form-tie point for wall thicknesses of 20, 25 and 30 cm.
The tie-rods and super-plates can be re-used over and over again. The distance piece remains embedded in the concrete. Form-tie point enclosed by formwork
C
A
B
A Distance piece with integral plugs
Is suitable for preparing wall-ties that meet the following requirements: â—? fire-resistant to F90 â—? sound-insulating
D 9779-223-01
A Distance piece B Tie-rod 15.0 C Super-plate 15.0 D Formwork
Formwork stripped from around form-tie point
9779-223-02
a Fixed dimensions: a ... wall thickness 20, 25 and 30 cm
Closing off the form-tie point ➤ Close off the distance piece with the plugs (K) supplied with each distance piece unit.
K
9779-223-03
24
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 15.0
Plastic tube 22mm Preparing the form-tie point ➤ Cut a length of Plastic tube 22mm to the desired length, and insert a Universal cone 22mm into either end of the tube. The tie-rods and super-plates can be re-used over and over again. The plastic tube remains embedded in the concrete. Form-tie point enclosed by formwork A C
A
D
B
C
B 9779-222-01
A Plastic tube 22mm E
B Universal cone 22mm
9779-224-01
C Plug 22mm
Is suitable for preparing wall-ties that meet the following requirements: ● sound-insulating ● fire-resistant to F90
A Plastic tube 22mm B Universal cone 22mm C Tie-rod 15.0mm (length as dictated by formwork) D Super-plate 15.0 E Formwork
Formwork stripped from around form-tie point
9779-224-02
c
b
c
a Variable dimensions: a ... wall thickness b ... cut-to-size length of the plastic tube Fixed dimensions: c ... 1 cm
Closing off the form-tie point ➤ Either remove the Universal cone 22mm or leave it in place. ➤ If desired, close off the form-tie point with a Plug 22mm (K) .
K
9779-224-03
999779002 - 05/2011
25 The Formwork Experts
Form-tie system 15.0
User information Doka form-ties for special requirements
Expendable tie-rod with Anchor cones 15.0 Preparing the form-tie point Can be mounted in walls with a thickness of 25 cm and above.
The anchor cones and super-plates can be re-used over and over again. The Tie-rod 15.0 remains embedded in the concrete. Form-tie point enclosed by formwork
B
A
D
C
B B
A 9779-213-02
E
A Tie-rod 15.0 B Anchor cone 15.0
Is suitable for preparing wall-ties that meet the following requirements: ● fire-resistant to F90 ● sound-insulating ● radiation-proof ● gas-impermeable ➤ Always screw in components until they fully engage. ➤ Never weld or heat tie-rods - risk of fracture!
9779-207-03
A Tie-rod 15.0 B Anchor cone 15.0 C Tie-rod 15.0 (length as dictated by formwork) D Super-plate 15.0 E Formwork
Tools needed for unscrewing the Anchor cone 15.0: ● Reversible ratchet 1/2" ● Box nut 24 1/2" Formwork stripped from around form-tie point
9779-207-04
c
b
c
a Variable dimensions: a ... minimum wall thickness 25 cm where the form-tie has a bond length of 27 mm in the concrete b ... form-tie length 13 cm where wall thickness is 25 cm Fixed dimensions: c ... 6 cm
26
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 15.0
Closing off the form-tie point In its technical bulletin entitled "Fair-faced concrete", the DBV (German Concrete Association) recommends leaving cone indentations as they are. This is because attempts to grout them level with the rest of the surface normally produce unsatisfactory results (colour differences, grouted areas have unclean edges).
☞
If it is still necessary to close off the form-tie point, for rust protection reasons (tie-rod), we recommend gluing in a fibre-concrete plug. The job of closing off the form-tie point should only be carried out by reliable skilled workers or competent subcontractors.
Example with fibre concrete plug We recommend the following materials for gluing in the plugs: ● Commercially available cement mortar, e.g. repair and renovation mortar, watertight exterior grouting compound etc. Pay attention to the colour of the concrete here! ● Tile bonding cement (is mostly dark) in cases where the colour of the concrete is unimportant. ➤ Evenly distribute the mortar mixture in the conical opening and then slowly press the Fibre concrete plug 54mm (K) into the opening while gently turning it. (Using a piece of wood makes it easier to fit the plug on the right plane).
K
9779-212-01
Grout level with the rest of the surface ➤ Fill the remaining space (L) with mortar and grout it smoothly. L
K
9779-212-01
999779002 - 05/2011
27 The Formwork Experts
Form-tie system 20.0
User information Doka form-ties for special requirements
Form-tie system 20.0
28
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 20.0
Design variants – Form-tie system 20.0 Overview of the products used in the Doka Form-tie system 20.0, and their areas of application.
Gas-impermeable
Note: For special applications, such as in tunnels, please contact the "Tunnels" Expertise Centre. Water stop 20.0
Fibre-concrete tube for Form-tie system 20.0
Page 30
Page 32
Water-impermeable
Fibre-concrete tube for Form-tie system 20.0
Water stop 20.0
Radiation-proof Page 30
Page 32 Water stop 20.0
Fire-resistant
Water stop 20.0
Fibre-concrete tube Expendable Tie-rod for Form-tie system 20.0 with 2 anchoring 20.0 cones
Page 30
Page 32
Page 30
Fibre-concrete tube Expendable Tie-rod for Form-tie system 20.0 with 2 anchoring 20.0 cones
Page 32
Page 34
Page 34
Sound-insulating
Water stop 20.0
Fibre-concrete tube for Form-tie system 20.0
Page 30
Page 32
Plastic tube 26mm
Expendable Tie-rod 20.0 with 2 anchoring cones
Page 33
Page 34
999779002 - 05/2011
29 The Formwork Experts
Form-tie system 20.0
User information Doka form-ties for special requirements
Water stop 20.0 Preparing the form-tie point Can be mounted in walls with a thickness of 42 cm and above.
The Water stop 20.0 consists of a tie-rod with a fibreconcrete disc glued onto the middle of the rod. The anchoring cones, tie-rods and super-plates can be re-used over and over again. The Water stop 20.0 remains embedded in the concrete. The form-tie can be ordered in various different lengths, as necessitated by the thickness of the wall. Can be ordered under Art.n° 580100000.
B B
Form-tie point enclosed by formwork
A
B
A
D
C
9779-217-01
A Water stop 20.0 B Anchoring cone 20.0 + Sealing sleeve 20.0
Note: It is also possible to use the She-bolt 20.0 instead of the Anchoring cone 20.0. Is suitable for preparing wall-ties that meet the following requirements: ● water-impermeable ● fire-resistant to F90 ● sound-insulating ● gas-impermeable ● radiation-proof
E 9779-211-01
A Water stop 20.0 B Anchoring cone 20.0 + Sealing sleeve 20.0 C Tie-rod 20.0mm (length as dictated by formwork) D Super-plate 20.0 E Formwork
Tools needed for unscrewing the Anchoring cone: ● Cone spanner 20.0 Formwork stripped from around form-tie point
➤ Always screw in components until they fully engage. ➤ Never weld or heat tie-rods - risk of fracture! 9779-211-02
c
b
c
a Variable dimensions: a ... minimum wall thickness 25 cm b ... form-tie length 25.6 cm where wall thickness is 42 cm For form-tie length of up to 150 cm. Above this: on request. (Varying lengths - b - can be ordered under Art.n° 580100000). Fixed dimensions: c ...8.2 cm
30
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 20.0
Closing off the form-tie point
Example with fibre concrete plug
In its technical bulletin entitled "Fair-faced concrete", the DBV (German Concrete Association) recommends leaving cone indentations as they are. This is because attempts to grout them level with the rest of the surface normally produce unsatisfactory results (colour differences, grouted areas have unclean edges).
We recommend the following materials for gluing in the plugs: ● Commercially available cement mortar, e.g. repair and renovation mortar, watertight exterior grouting compound etc. Pay attention to the colour of the concrete here! ● Tile bonding cement (is mostly dark) in cases where the colour of the concrete is unimportant.
☞
If it is still necessary to close off the form-tie point, for rust protection reasons (tie-rod), we recommend gluing in a fibre-concrete plug. The job of closing off the form-tie point should only be carried out by reliable skilled workers or subcontractors.
➤ Remove the sealing sleeve (J) .
➤ Evenly distribute the mortar mixture in the conical opening and then slowly press the Fibre concrete plug 45mm (M) into the opening while gently turning it. (Using a piece of wood makes it easier to fit the plug on the right plane).
M
J
9779-217-02
9779-217-03
Grout level with the rest of the surface ➤ Fill the remaining space (L) with mortar and grout it smoothly. L
M
9779-217-03
999779002 - 05/2011
31 The Formwork Experts
Form-tie system 20.0
User information Doka form-ties for special requirements
Fibre-concrete tube for Form-tie system 20.0
Not in the Doka sales range. Can be obtained from e.g. Frank GmbH & Co. KG, Germany. Allow for delivery times.
A
C
B 9779-205-01
A Fibre-concrete tube d27 ("Frank" product name) B Cone d27 ("Frank" product name) C Stopper d27 ("Frank" product name)
Matching tubes, cones and fibre-concrete plugs for the Form-tie system 20.0 can be obtained from e.g. Frank GmbH & Co. KG, Germany. Is suitable for preparing wall-ties that meet the following requirements: ● water-impermeable ● fire-resistant ● sound-insulating ● gas-impermeable ● for civil defence structures (radiation-proof) Proofs provided by Frank GmbH & Co. KG, Germany.
Preparing the form-tie point The form-tie point is prepared here in the same way as with the Form-tie system 15.0 using the Fibre-concrete tube 22mm.
32
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 20.0
Plastic tube 26mm Preparing the form-tie point ➤ Cut a length of Plastic tube 26mm to the desired length, and insert Universal cones 26mm into both ends of the tube. The tie-rods and super-plates can be re-used over and over again. The plastic tube remains embedded in the concrete. Form-tie point enclosed by formwork C A
A
D
B
C
B
9779-227-01
E
A Plastic tube 26mm
9779-228-01
B Universal cone 26mm C Plug 26mm
Is suitable for preparing wall-ties that meet the following requirements: ● sound-insulating
A Plastic tube 26mm B Universal cone 26mm C Tie-rod 20.0mm (length as dictated by formwork) D Super-plate 20.0 E Formwork
Formwork stripped from around form-tie point
9779-228-02
c
b
c
a Variable dimensions: a ... wall thickness b ... cut-to-size length of the plastic tube Fixed dimensions: c ... 1 cm
Closing off the form-tie point ➤ Either remove the Universal cone 26mm or leave it in place. ➤ If desired, close off the form-tie point with a Plug 26mm (K) .
K
9779-228-03
999779002 - 05/2011
33 The Formwork Experts
Form-tie system 20.0
User information Doka form-ties for special requirements
Expendable tie-rod with Anchor cones 20.0 Preparing the form-tie point Can be mounted in walls with a thickness of 35 cm and above.
The anchoring cones and super-plates can be re-used over and over again. The Tie-rod 20.0 remains embedded in the concrete. Form-tie point enclosed by formwork A
B
D
C
B B
A E
9779-217-04
9779-211-03
A Tie-rod 20.0 B Anchoring cone 20.0 + Sealing sleeve 20.0
Note: It is also possible to use the She-bolt 20.0 instead of the Anchoring cone 20.0. Is suitable for preparing wall-ties that meet the following requirements: ● fire-resistant to F90 ● sound-insulating ● radiation-proof
A Tie-rod 20.0 B Anchoring cone 20.0 + Sealing sleeve 20.0 C Tie-rod 20.0mm (length as dictated by formwork) D Super-plate 20.0 E Formwork
Tools needed for unscrewing the Anchoring cone: ● Cone spanner 20.0 Formwork stripped from around form-tie point
➤ Always screw in components until they fully engage. ➤ Never weld or heat tie-rods - risk of fracture!
9779-211-04
c
b
c
a Variable dimensions: a ... minimum wall thickness 35 cm b ... depends on wall thickness Fixed dimensions: c ... 8.2 cm
34
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Form-tie system 20.0
Closing off the form-tie point
Example with fibre concrete plug
In its technical bulletin entitled "Fair-faced concrete", the DBV (German Concrete Association) recommends leaving cone indentations as they are. This is because attempts to grout them level with the rest of the surface normally produce unsatisfactory results (colour differences, grouted areas have unclean edges).
We recommend the following materials for gluing in the plugs: ● Commercially available cement mortar, e.g. repair and renovation mortar, watertight exterior grouting compound etc. Pay attention to the colour of the concrete here! ● Tile bonding cement (is mostly dark) in cases where the colour of the concrete is unimportant.
☞
If it is still necessary to close off the form-tie point, for rust protection reasons (tie-rod), we recommend gluing in a fibre-concrete plug. The job of closing off the form-tie point should only be carried out by reliable skilled workers or subcontractors.
➤ Remove the sealing sleeve (J) .
➤ Evenly distribute the mortar mixture in the conical opening and then slowly press the Fibre concrete plug 45mm (M) into the opening while gently turning it. (Using a piece of wood makes it easier to fit the plug on the right plane).
M
J
9779-217-02
9779-217-03
Grout level with the rest of the surface ➤ Fill the remaining space (L) with mortar and grout it smoothly. L
M
9779-217-03
999779002 - 05/2011
35 The Formwork Experts
General remarks
User information Doka form-ties for special requirements
Bibliography and literature General remarks
● Prof. K. Simons / Dipl.-Ing. P. Kolbe, "Verfahrenstechnik im Ortbetonbau"("A process-engineering approach to cast-in-place building construction"), 1987. ● Werner Nehls, "Wasserundurchlässige Schalungsanker" ("Water-impermeable form-ties"), Document n° 32825 from the archives of publishers GRIN Verlag ● Lohmeyer / Ebeling, "Weisse Wannen - einfach und sicher" ("Monolithic concrete tanks made easy"), published by Verlag Bau+Technik, Düsseldorf 2004. ● Gottfried C.O. Lohmeyer, Dipl.-Ing. "Schäden an Flachdächern und Wannen aus wasserundurchlässigem Beton" ("Damage to flat roofs and tanks cast in water-impermeable concrete", published by Fraunhofer IRB-Verlag 2001, 3rd Edition. ● "Feuchtetransport durch Bauteile aus Beton" ("Moisture transmission through concrete structural components") in "Beton- und Stahlbetonbau" (Concrete and reinforced concrete construction, 4 1999) ● Report n° 21 0791568 MPA Dortmund, Sept. 1986. Applicant: Reuß GmbH, Sprockhövel. ● German Reinforced-Concrete Committee (DAStb). "Wasserundurchlässige Bauwerke" ("Water-impermeable structures"), Edition 2003 – 11, ● DBV technical bulletin "Wasserundurchlässige Baukörper aus Beton" ("Water-impermeable building members made of concrete"), DBV (German Concrete Association), Aug. 1999. ● DIN 18216 "Formwork ties; requirements, testing, use". ● DIN 1045 "Concrete, reinforced and prestressed concrete structures". ● DIN 4102 and ÖNORM B 3800 "Fire behaviour of building materials and building components". ● DIN EN ISO 717-1 "Acoustics - Rating of sound insulation in buildings and of building elements".
36
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements [kg]
Component overview Article n°
[kg]
Article n°
Component Doka Form ties/Suspension Systemoverview Components cones
Tie rod system 15.0
Plastic tube 22mm 2.50m
0.45 581951000
Kunststoffrohr 22mm 2,50m
Tie rod 15.0mm galvanised 0.50m Tie rod 15.0mm galvanised 0.75m Tie rod 15.0mm galvanised 1.00m Tie rod 15.0mm galvanised 1.25m Tie rod 15.0mm galvanised 1.50m Tie rod 15.0mm galvanised 1.75m Tie rod 15.0mm galvanised 2.00m Tie rod 15.0mm galvanised 2.50m Tie rod 15.0mm galvanised .....m Tie rod 15.0mm non-treated 0.50m Tie rod 15.0mm non-treated 0.75m Tie rod 15.0mm non-treated 1.00m Tie rod 15.0mm non-treated 1.25m Tie rod 15.0mm non-treated 1.50m Tie rod 15.0mm non-treated 1.75m Tie rod 15.0mm non-treated 2.00m Tie rod 15.0mm non-treated 2.50m Tie rod 15.0mm non-treated 3.00m Tie rod 15.0mm non-treated 3.50m Tie rod 15.0mm non-treated 4.00m Tie rod 15.0mm non-treated 5.00m Tie rod 15.0mm non-treated 6.00m Tie rod 15.0mm non-treated 7.50m Tie rod 15.0mm non-treated .....m Ankerstab 15,0mm
0.72 1.1 1.4 1.8 2.2 2.5 2.9 3.6 1.4 0.73 1.1 1.4 1.8 2.1 2.5 2.9 3.6 4.3 5.0 5.7 7.2 8.6 10.7 1.4
581821000 581822000 581823000 581826000 581827000 581828000 581829000 581852000 581824000 581870000 581871000 581874000 581886000 581876000 581887000 581875000 581877000 581878000 581888000 581879000 581880000 581881000 581882000 581873000
Universal cone 22mm
0.005 581995000
Universal-Konus 22mm
Grey Diameter: 4 cm
Plug 22mm
0.003 581953000
Verschlussstopfen 22mm Grey
Distance piece 20cm Distance piece 25cm Distance piece 30cm
0.05 581907000 0.09 581908000 0.10 581909000
Distanzhalter
Grey
Super plate 15.0
1.1 581966000
Superplatte 15,0
Galvanised Height: 6 cm Diameter: 12 cm Width-across: 27 mm
Water stop connector 15.0
Fibre concrete tube 22mm 0.18m Fibre concrete tube 22mm 0.23m Fibre concrete tube 22mm 0.28m Fibre concrete tube 22mm 0.38m Fibre concrete tube 22mm 1.25m
0.28 0.36 0.44 0.61 1.9
Fibre concrete plug 22mm
0.02 581992000
Faserbetonrohr 22mm
581904000 581905000 581906000 581903000 581991000
0.52 581914000
Wasserstopp 15,0
Non-treated Length: 12 cm
Faserbetonstopfen 22mm
Water stop 15.0 33cm Water stop S 15.0 33cm
1.3 581817000 1.2 581819000
Wassersperre 15,0
Non-treated Length: 33 cm Diameter: 7 cm Custom lengths can be ordered under the special-component Art.n° 580100000, quoting the designation and the desired length in mm.
Water stop G 15.0 33cm
REPOXAL two component adhesive
1.2 581993000
REPOXAL-Zweikomponenten Kleber
Reducer 26/22mm
0.01 581853000
Reduzierstück 26/22mm Black
0.68 581818000
Wassersperre G 15,0 33cm
Non-treated Length: 33 cm Width: 12 cm Height: 12 cm Custom lengths can be ordered under the special-component Art.n° 580100000, quoting the designation and the desired length in mm.
Fibre concrete plug 54mm
Tie rod wrench 15.0/20.0
1.9 580594000
Ankerstabschlüssel 15,0/20,0
Galvanised Length: 37 cm Diameter: 8 cm
0.16 581955000
Faserbetonstopfen 54mm
Reversible ratchet 1/2"
Grey
0.73 580580000
Umschaltknarre 1/2"
Galvanised Length: 30 cm
Anchor cone 15.0
0.46 581967000
Spannkonus 15,0
Yellow Length: 11 cm Diameter: 6 cm
999779002 - 05/2011
37 The Formwork Experts
Component overview
User information Doka form-ties for special requirements [kg]
Box nut 24 1/2"
Article n°
0.12 580584000
Stecknuss 24 1/2"
[kg] Plastic tube 26mm 2.00m
0.59 581463000
Kunststoffrohr 26mm 2,00m
Universal cone 26mm
Tie rod system 20.0
0.008 581464000
Universal-Konus 26mm
Tie rod 20.0mm galvanised 0.50m Tie rod 20.0mm galvanised 0.75m Tie rod 20.0mm galvanised 1.00m Tie rod 20.0mm galvanised 1.25m Tie rod 20.0mm galvanised 1.50m Tie rod 20.0mm galvanised 2.00m Tie rod 20.0mm galvanised .....m Tie rod 20.0mm non-treated 0.50m Tie rod 20.0mm non-treated 0.75m Tie rod 20.0mm non-treated 1.00m Tie rod 20.0mm non-treated 1.50m Tie rod 20.0mm non-treated 2.00m Tie rod 20.0mm non-treated .....m Ankerstab 20,0mm
1.3 1.9 2.5 3.2 3.8 5.0 2.5 1.3 1.9 2.5 3.8 5.0 2.5
581411000 581417000 581412000 581418000 581413000 581414000 581410000 581405000 581416000 581406000 581407000 581408000 581403000
Article n°
Grey Diameter: 5 cm
Plug 26mm
0.006 581465000
Verschlussstopfen 26mm Grey
Cone spanner 20.0
3.5 581471000
Konusschlüssel 20,0
Galvanised Length: 57 cm
Super plate 20.0 B
2.0 581424000
Superplatte 20,0 B
Galvanised Height: 7 cm Diameter: 14 cm Width-across: 34 mm
Water stop 20.0 33cm
1.7 581426000
Wassersperre 20,0 33cm
Non-treated Length: 33 cm Diameter: 8 cm Custom lengths can be ordered under the special-component Art.n° 580100000, quoting the designation and the desired length in mm.
Anchoring cone 20.0
1.0 581437000
Ankerkonus 20,0
Galvanised Length: 15 cm Diameter: 5 cm Tool: Cone spanner 20.0
Sealing sleeve 20.0
0.03 581441000
Dichtungshülse 20,0
Grey Length: 16 cm Diameter: 5 cm
Fibre concrete plug 45mm
0.10 581438000
Faserbetonstopfen 45mm
Grey
Concrete cone 52mm
0.19 581939000
Betonkonus 52mm
Grey
38
999779002 - 05/2011 The Formwork Experts
User information Doka form-ties for special requirements
Component overview
999779002 - 05/2011
39 The Formwork Experts
Doka form-ties for the very highest reliability Doka offers a complete range of field-proven form-tie systems covering every possible application. Depending on the intended purpose, form-tie solutions are available which are water or gas-impermeable, fire-resistant, sound-insulating and even radiation-proof. The easy-to-fit form-tie systems save on both time and labour costs. Their uncompromising Doka quality ensures the very greatest reliability and safety on the site. Why not give us a call?
The Doka Group's central plant at Amstetten, Austria
Doka international
Certified to
Doka GmbH
ISO 9001
Josef Umdasch Platz 1, A 3300 Amstetten, Austria Tel.: +43 (0)7472 605-0, Fax: +43 (0)7472 64430 E-Mail: info@doka.com Internet: www.doka.com
Algeria
India
Kuwait
Saudi Arabia
Tunisia
USA
SARL Doka Algérie 24 A Route de la Rassauta Bordj-El-Kifane, BP 170, 16120 Alger Telephone: +213 21 21 27 42 Telefax: +213 21 21 28 98 E-Mail: Algerie@doka.com
Doka India Pvt. Ltd. Plot No. 26 A, Sector-7, Khargar Mahavir Landmark Bldg. 601 to 606, 6th Floor, 410210 Navi Mumbai Telephone: +91 22 2774 6452 Telefax: +91 22 2774 6451 E-Mail: India@doka.com
Doka Kuwait Div. of Riham Gen. Trad. & Cont. Co. Street No. 1, Plot 157-173, Shuwaikh Port Authority Area P.O. Box 2217 22023 Salmiyah Telephone: + 965 2 4822 462 Telefax: +965 2 4822 472 E-Mail: Kuwait@doka.com
Doka Formwork Technology Mahmoud Othman & Sons LLC Thalia Street, Al-Jol Building, 4th Floor, Flat 303/403/404 P.O. Box 7620 Jeddah 21472 Telephone: +966 0)2 669 10 08 Telefax: +966 (0)2 664 86 25 E-Mail: Jeddah@doka.com
Doka Tunisia Ltd. Rue de l‘usine, Le Kram, Zone Industrielle 2015 Tunis Telephone: +216 71 977 350 Telefax: +216 71 977 856 E-Mail: Tunisia@doka.com
Doka USA, Ltd. 214 Gates Road Little Ferry, NJ 07643 Telephone: +1 201 329-7839 Telefax: +1 201 641-6254 E-Mail: usa@doka.com Internet: www.dokausa.com
Lebanon
Singapore
Doka GmbH - Branch Lebanon Damascus Street, Sodeco Square, Block C / 9th floor - Ashrafieh Beirut Telephone: +961 1 612 569 Telefax: +961 1 612 570 E-Mail: Lebanon@doka.com
Doka Formwork Pte. Ltd. 9 Gul Circle Singapore 629565 Telephone: +65 6897 7737 Telefax: +65 6897 8606 E-Mail: Singapore@doka.com
Norway
Doka South Africa (Pty) Ltd. Johannesburg Branch 2 Sebasa Road, Chloorkop Ext.10 Kempton Park 1619, P.O.Box 8337, Halfway House, 1685 Johannesburg Telephone: +27 11 310 9709 Telefax: +27 11 310 9711 E-Mail: South-Africa@doka.com
Australia Doka Formwork Australia Pty. Ltd. 52 Airds Rd 2566 Minto, NSW Telephone: +61 2 8796 0500 Telefax: +61 2 8796 0549 E-Mail: Australia@doka.com
Canada Doka Canada Ltd. 5404 - 36th Street S.E. Calgary AB T2C 1P1 Telephone: +1 403 243-6629 Telefax: +1 403 243-6787 E-Mail: Canada@doka.com
Ireland Doka Ireland Formwork Techn. Ltd. Monasterboice, Drogheda Tinure Industrial Complex County Louth Telephone: +353 41 686 1620 Telefax: +353 41 686 1525 E-Mail: Ireland@doka.com
Japan
Doka Japan K.K. Miwanoyama 744-6 Nagareyama-shi 270-175 Chiba-Ken Telephone: +81 471 78 8808 China Telefax: +81 471 78 8812 Doka Formwork (Shanghai) Co., Ltd. E-Mail: Japan@doka.com No. 3883 Yuanjiang Road www.dokajapan.co.jp Minhang District, Building 2 Shanghai 201109 Korea Telephone: +86 21 6090 0899 Doka Korea Ltd. Telefax: +86 21 6090 1099 444-1, Yongdoo-ri, Gongdo-eup E-Mail: China@doka.com 456-821 Anseong-Si, Gyeonggi-Do Telephone: +82 31 8053 0700 Telefax: +82 31 8053 0701 E-Mail: Korea@doka.com
Doka Norge AS Heggstadmoen 4 7080 Heimdal Telephone: +47 72 89 38 10 Telefax: +47 72 89 38 11 E-Mail: Norge@doka.com
Qatar Doka Qatar WLL 2nd Gate, Light Industrial Area, Mesaieed-Qatar P.O. Box 23439, Doha-Qatar Telephone: +974 4 4500 628 Telefax: +974 4 4500 608 E-Mail: Qatar@doka.com
Turkey Doka Kalip-Iskele Sanayi ve Ticaret A.S. Güzeller Org. San. Bölgesi Inönü Mah. Nazarbayev Sok. No:19 41400 Gebze, Kocaeli Telephone: +90 262 751 50 66 Telefax: +90 262 751 50 05 E-Mail: Turkiye@doka.com
United Arab Emirates
South Africa
Sweden Doka Sverige AB Kurödsvägen 20 45155 Uddevalla Telephone: +46 10 45 16 300 Telefax: +46 10 45 16 309 E-Mail: Sverige@doka.com
Doka Gulf FZE P.O. Box 61407 Jebel Ali Free Zone, Dubai Telephone: +971 4 870 8700 Telefax: +971 4 870 8702 E-Mail: Emirates@doka.com
United Kingdom Doka UK Formwork Technologies Ltd Monchelsea Farm, Heath Road Boughton Monchelsea Maidstone, Kent, ME17 4JD Telephone: +44 1622 74 90 50 Telefax: +44 1622 74 90 33 E-Mail UK@doka.com
Other subsidiaries and representatives: Angola Azerbaijan Bahrain Belgium Belarus
Bosnia and Herzegovina Brazil Bulgaria Chile
Croatia Czech Republic Denmark Egypt Estonia
Finland France Germany Greece Hungary
Iceland Iran Italy Jordan Kazakhstan
Latvia Lithuania Luxembourg Marocco Mexico
Netherlands New Zealand Oman Panama Poland
The Formwork Experts
Portugal Romania Russia Senegal Serbia
Slovakia Slovenia Spain Switzerland Taiwan
Thailand Ukraine Vietnam
999779002 - 05/2011