PATHWAYS TO A LOW-CARBON FUTURE:
ELECTRIC FEEDER CONTAINERSHIPS IN THE UNITED STATES IN PARTNERSHIP WITH
TABLE OF CONTENTS 1. EXECUTIVE SUMMARY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. INTRODUCTION AND OVERVIEW OF PREVIOUS WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 3. RECENT DEVELOPMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 4. ORIGINALLY PROPOSED SCOPE OF STUDY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 5. SWAPPABLE ISO CONTAINER BATTERIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 6. REASSESSMENT OF 2019 FEEDER CONCEPT DESIGN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 7. SERVICE ROUTES AND VOYAGE PROFILE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 8. THE CONVENTIONAL FOSSIL-POWERED FEEDER SHIPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 9. THE SHORTSEA BATTERY POWERED FEEDER SHIPS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 10. U.S. CONSTRUCTION ESTIMATES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 11. SHORESIDE SUPPORT AND BATTERY CHARGING INFRASTRUCTURE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 12. OPERATIONAL AND COMBINED VOYAGE COSTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 13. GHG EMISSIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 14. THE DIESEL-FUELED HYBRID OPTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 15. CONCLUSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 16. WHAT ARE THE POSITIVE ACCOMPLISHMENTS OF THE STUDY?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 17. REFERENCES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 18. APPENDIX A — FEEDER ROUTE EVALUATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 19. APPENDIX B — FLEET FINANCIAL ANALYSIS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
ABOUT THE COVER This publication features several conceptual renderings of a 2,500 TEU containership, designed in collaboration between ABS and HEC. It is intended to demonstrate the potential for emissions-free short sea shipping on a typical U.S. East-Coast route. By using containerized battery packs — which can be charged onshore — then loaded and unloaded like cargo and quickly connected to the vessel, carbon-free cargo transport can be offered when coupled with renewable on-shore energy.
SPECIAL THANKS Several of the calculations and conclusions presented in this publication were drawn with the assistance of Fleetzero’s knowledge base and proprietary calculators. ABS and HEC would like to thank Fleetzero for their contributions to this study.
While ABS uses reasonable efforts to accurately describe and update the information in this publication, ABS makes no warranties or representations as to its accuracy, currency, or completeness. ABS assumes no liability or responsibility for any errors or omissions in the content of this publication. To the extent permitted by applicable law, everything in this publication is provided “as is” without warranty of any kind, either expressed or implied, including, but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or noninfringement. In no event will ABS be liable for any damages whatsoever, including special, indirect, consequential, or incidental damages or damages for loss of profits, revenue or use, whether brought in contract or tort, arising out of or connected with this publication or the use or reliance upon any of the content or any information contained herein.
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
1. EXECUTIVE SUMMARY In 2019, a preliminary assessment for ABS of battery-powered feeder containerships concluded that, while they were technically feasible, their short operational range and recharge time between voyage legs likely made them commercially inviable. Since 2019 there have been several important developments in the field of maritime battery technology: • The storage capacity, weight, cost and safety of marine batteries have significantly improved. • Swappable battery packs help solve the issues of long charging times and port access to high-voltage charging shore infrastructure, compared to fixed batteries installed on board. • There are now multiple international manufacturers producing containerized battery packs. • There are now several prototype small containerships entering or about to enter service on short feeder voyages in China and Europe. Clearly, shortsea battery-powered feeder containerships deserve another look. For decades, the domestic maritime industry has attempted to establish a financially viable, United States (U.S.)-flagged maritime container-feeder service along the nation’s marine highways. Historically, attempts have failed under the weight of high domestic capital requirements, high union trucking and longshoring rates, and high U.S. flag crewing and operating costs. However, recent advancements in technology and a greater focus on carbon emissions demanded a rigorous reanalysis. This study evaluates Jones Act-compliant, U.S.-built, flagged, crewed and operated feeder vessels in the Atlantic Northeast Corridor operating in a loop service connecting a major container import hub, Newark, through a series of short regional intermediate legs, up to Boston. This corridor represents a good technical match for battery-electric propulsion with short voyage legs mirroring an expensive, highly congested highway distribution trucking network. Feeder ships powered by both fossil fuel and battery-electric power have been developed and evaluated in this study. The total economic profiles of the shipping part of the costs are remarkably close. The battery version is currently about seven percent more expensive than the total capital and operating costs of the conventional fossil fuel version. While U.S.-built, Jones Act-compliant ships are expensive, the battery ship requires higher initial capital (primarily for the cost of the batteries) and insurance, but comes with desirable green financing, as well as lower operating and crewing costs. If there are future U.S. financial incentives to drive greenhouse gas (GHG) reductions, the extra cost of low-carbon biodiesel fuel for the conventional ship version would result in the battery-electric versions showing slightly better total economic costs, see Figure 1.
50 Annual Capex and Opex in Million (M) USD ($)
45 40 35 30 25 20 15 10 5 0 2,500 TEU Diesel (MDO)
2,500 TEU Diesel (Biodiesel at 1.7x)
2,500 TEU Battery-electric
Crewing Expense
Management Fee
Maintenance and Repair
H&M and P&I Insurance
Lube Oil and Consumables
Capex Batteries
Energy, Fuel and Power
Capex Ship
Figure 1: Annual costs of feeder ships (2,500 TEU size).
Page 1
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS However, the shipping part of the overall feeder service is a relatively minor cost component and is not the deciding factor in the overall economic viability when aiming to displace shoreside long-haul trucking. Additional terminal handling charges and local drayage costs required for the Northeast corridor remain the dominant economic drivers. Despite the technical success and GHG reductions of the electric variant, the broader economic analysis reveals a severe financial challenge. The primary economic justification for any short-sea feeder aiming to displace trucking is the wholesale replacement of long-haul over-the-road (OTR) trucking with feeder ship delivery paired with short-haul drayage from local regional ports. However, this study demonstrates that this trade-off is fundamentally asymmetrical: While the ship successfully eliminates thousands of long-haul highway miles (over 500,000 miles per weekly ship round-trip voyage), trucking costs are not reduced proportionally. The short-haul drayage move from a regional pier to the final destination remains disproportionately expensive. The additional challenge to the feeder’s financial viability compared to trucking is from the shoreside terminal handling charges (THCs). In a union-dominated port environment, the per-container handling fees at major hubs like Newark force imported containers to incur a full second handling fee just to be lifted onto the feeder ship at the hub terminal. This, combined with additional THC for the unloading at the regional port, creates a financial burden that is hard to overcome.
OTR Trucking vs. Feeder Service ($/Forty Foot Equivalent Unit (FEU))
The combined cost of rehandling at the import terminal, plus the local port handling, and the disproportionately expensive last-mile drayage, routinely exceeds the entire cost of simply trucking the container straight from the hub to the final destination via the highway, even before considering the cost of the feeder operation, conventional or battery. See Figure 2 with terminal fees in shades of blue, trucking fees in shades of green, and feeder service costs in red.
$2,500 $2,000 $1,500 $1,000 $500 $0 OTR Trucking Baseline
Conventional Feeder (MDO)
Battery-Electric Feeder
Gateway Inbound Lift; Newark
Hub Transshipment THC; Second Lift
Reginal Port Discharge THC; Boston
Refional Short-haul Drayage + Gate/Chassis
Over-the-road Long-haul Freight and Tolls
Vessel Linehaul; Opex + Energy + Capital
Figure 2: OTR vs. container feeder service. Environmentally, due to the inherent efficiencies of water transport compared to trucking, the battery-electric feeder is a success. When modeled against a baseline of long-haul trucking, carbon accounting demonstrates clear advantages: • The diesel feeder service emits roughly 70 percent of the CO2e generated by equivalent truck transportation, a saving of over 16,000 tons of CO2 per year per feeder ship. • The battery-electric feeder service emits a mere 24 percent of the OTR trucking baseline even when drawing from the current North Atlantic utility grid. These rates will continue to improve over time with planned carbon reductions in the base utility electric grid, and the introduction of battery-electric short-haul trucking.
Page 2
CO2 Emissions (tons/year)
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS The final analysis indicates that, under current Jones Act shipbuilding costs, terminal handling charges and drayage economics, the batteryelectric container feeder service, just like the fossil-fueled feeder services historically evaluated, can be a technical success but is unlikely to be commercially competitive with existing truck-based logistics on the Atlantic North corridor.
50,000 40,000 30,000 20,000 10,000 0 OTR Trucking Baseline
2,500 TEU 2,500 TEU Diesel Feeder Battery Feeder
This evaluation has been based on fuel and energy prices in the early 2026 timeframe, Figure 3: Annual CO2 emissions. pre-Iran conflict. Since that time, we have seen highway diesel prices, trucking fuel charges, and marine diesel oil (MDO) prices rise significantly, while grid electricity prices have risen only moderately due to the relatively stable natural gas prices. Marine biodiesel prices have remained fairly constant, where currently the price of marine fossil diesel and biodiesel are nearly the same. The impact of these changes, if they persist long term, would be to improve the economics of the battery-electric feeder service in comparison to both the diesel feeder service and long-haul trucking container distribution. The battery-electric feeder would be approximately at parity with the fossil-fueled feeder, and it would eliminate about half of the economic advantage of OTR trucking vs. container feeder service.
Total Handlig Fee ($/container)
Prospective future improvements in U.S. shipyard construction prices, continued improvements in battery technology, cheaper future electric utility fees, or even the implementation of carbon taxes or credits combined will bring the container feeder service economics closer to the current OTR trucking costs, but will not alter this overall conclusion without significant changes to the terminal handling fee structure to align closer to the fee structure seen in most international container hubs.
$800 $700 $600 $500 $400 $300 $200 $100 $0 Newark (ILA Tier 1)
Savannah (Hybrid GPA)
Hub Inbound THC ($/container)
Rotterdam
Singapore
Piraeus
Transshipment Feeder Lift ($/container)
Figure 4: International transshipment terminal (TTHS) fees. It would take a remake of both the current terminal handling fee structure through automation and terminal redesign (as we see in Savannah and internationally), and a restructuring of short-haul trucking fees in the secondary ports, to economically justify feeder ship service on the North Atlantic route. Until then, the trucking and American interstate highway system will remain the primary corridor for regional container distribution in the Northeast. While the proposed battery-electric feeder service is not currently economically viable in the Northeast Corridor at this time, there are several positive observations of this study that impact how we might now look at low-GHG emission maritime transportation and services: • The most significant technical finding of this study is that the total life-cycle cost (capex plus opex) of batteryelectric feeder ships has now become roughly comparable (within about seven percent) to conventional fossil-fueled vessels and has essentially economic parity, or better, if low-carbon fuels or carbon reductions become a regulatory
Page 3
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
reality, or if marine diesel prices stay at their elevated levels. And these economic comparisons between fossil fuel and battery-electric feeder ships will continue to improve as battery density increases, battery cost per megawatt hour (MWh) capacity decreases and the price of grid electric power delivered to the ports decreases. • This report successfully validates the model of using modular, swappable ISO container battery packs for container feeder vessels with operating legs of at least 200 nautical miles and potentially longer. We have established that a mid-sized feeder ship can dedicate cargo slots to energy storage without rendering the underlying vessel logistics or weight distribution unworkable. This provides a clean engineering and structural framework for future projects to design scalable, very low-emission coastal assets with this same swappable battery technology. The slower and lower-power charging of swappable battery packs solve several problems associated with fixed shipboard batteries, namely, required high power for fast recharging and extending expensive high-power grid connections to the dock. • This study demonstrates that the battery-electric feeder is technically and commercially ready. Its lack of competitiveness on the U.S. East Coast is entirely due to local, external variables —specifically, primarily high terminal rehandling fees in International Longshoremen’s Association (ILA) Tier 1 hub ports, and conservative shorthaul drayage rates. (In retrospect, a version of the Atlantic South feeder service, considering only Savannah as an import hub, avoiding large ILA Tier 1 import terminals, might be a viable demonstrator project for this technology.) • Where existing feeder service is currently already economically viable, such as Southeast Asia, the Mediterranean or Northern Europe, and simultaneously where financial incentives are driving conventional diesel ships to more expensive low-carbon fuels, the battery-electric feeder is expected to show economic superiority on routes with a maximum range of a few hundred nautical miles. • Like the international feeder services, the battery-electric feeder design should be commercially viable in closedloop, non-contiguous, or road-constrained U.S. trades (e.g., Inter-Island Hawaii, Coastal Alaska, and Puget Sound) where ocean transportation is mandatory. • The near life cycle parity discovered in our machinery and running cost analysis has immediate, positive implications for the switch to battery-electric powering for other domestic short-range vessels that are not subject to the rehandling fees of U.S. commercial container terminals. This opens the door for electrification of alternative Jones Act sectors where the basic service is already considered viable with existing short- and mid-range, fossilfueled services such as roll-on/roll-off (ro/ro) and railcar ferries, shorter-range tug-barge services, and local workboat and tug fleets benefiting from duty cycles that match battery charging profiles. • Finally, from a sustainability standpoint, this study establishes an undeniable environmental benchmark. Achieving a 75 percent net reduction in carbon emissions compared to the OTR trucking baseline, even when drawing from the current asset mix of the North Atlantic utility grid, is a significant finding. This is an example for future justification for shifting freight corridors to meet long-term Scope 3 decarbonization mandates. • In conclusion, this study successfully separates the shoreside economic challenges of a specific geographic route from the technical success of the battery-electric ship architecture. We have shown that the technology works on shorter routes, the running costs are reasonable, and the emission reductions are very significant. The maritime industry is now technically equipped to deploy zero-emission container feeders; the next step is solving the shoreside logistical and institutional barriers required to let them compete with long-haul trucking. • Several areas for further investigating potential improvements in the battery-electric feeder economic competitiveness with trucking, as well as investigations of potential U.S. flag routes for non-contiguous, island, and protected coastal maritime trades where road competition is absent or heavily constrained, have been presented at the end of the report in Section 16.7 and 16.8.
Page 4
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
2. INTRODUCTION AND OVERVIEW OF PREVIOUS WORK In 2019, as part of one of the early reports for ABS in support of the Low Carbon Outlook series, Herbert Engineering Corp. (HEC) developed multiple conceptual designs of potential low-carbon ships, projected for entering service around the 2030 timeframe. The designs included a conventional baseline fossil-fueled design for a 2,000 TEU feeder ship, and a 14,000 TEU Very Large Crude Carriers (VLCCs). The low-carbon versions were based on liquid biofuel and liquefied hydrogen plus fuel cells. The study also included a very preliminary assessment of a battery-powered 2,000 TEU feeder containership, again based on a projected 2030 service. The year 2030 projected volumetric density and mass densities of batteries were projected to be respectively 150 kilowatt hours (kWh)/m3 and 120 kWh/metric ton, which were roughly a two-times improvement of the 2019 state-of-the-art lithium-ion battery. In the 2019 study, the operating range of all the low-carbon feeder ships was reduced from the industry standard 4,000 to 2,000 nautical miles due to the lower volumetric density of alternative low-carbon fuels compared to fossil fuels. But even this was found to be impractical based on the required battery weight and volume. A 400 nautical mile range, about a one-day voyage, was selected for the preliminary assessment as a practical maximum for a battery feeder, based on a review of typical Northern Europe services. The assessment concluded that a 400 nautical mile range feeder might be technically feasible; however, the short range might not be commercially viable for Northern Europe and the significant out-of-service port time required for daily high-voltage recharging of the ship’s battery would likely be problematic.
3. RECENT DEVELOPMENTS There have been several important developments in the field of maritime battery technology since this initial assessment in 2019: • The volumetric and mass densities of lithium-ion batteries have continued to improve rapidly, and current state-ofthe-art batteries in 2026 are already meeting and slightly exceeding our previous projections for 2030. • Also, during this time, the onboard technology and safety aspects for battery energy storage systems (BESS) have improved, as has the technology for swappable ISO container-sized battery packs. • There are now several prototype battery-powered ships that are just entering service or scheduled to go into service shortly; and specifically, there is great interest in the two-ship 700 TEU COSCO ships (Greenwater 01 and Greenwater 02) for Yangtze River feeder service, with a published range of 600 miles and an operational speed in the 10 to 12 knot range, using swappable 20-foot container batteries. Swappable battery packs help solve the problem of access to rapid high-voltage charging of fixed batteries installed on board ships. Also similar is the Ning Yuan Dian Kun, a 742 TEU fully electric containership operated by the Ningbo Ocean Shipping Company (NBOSCO), which operates as a coastal sea-river feeder shuttle across Hangzhou Bay between Ningbo-Zhoushan and Zhapu. • Recently, the Norwegian shipping group Eitzen signed a contract with China’s Zhejiang Dongpeng Shipbuilding to build two 900 TEU containerships expected to enter service in 2028 and become the world’s largest fully batterypowered vessels, with an operational range of 500 to 600 nautical miles between Norway and Germany. • Another interesting ship in this design space is the Yara Birkeland, the world’s first fully electric and autonomous feeder containership, 120 TEU and 80 m long, equipped with a 7 MWh fixed battery capacity and electric azimuth podded propulsion. The service route is a short 12-nautical-mile coastal shuttle connecting Yara’s chemical/fertilizer production plant in Porsgrunn to export hub terminals in Brevik and Larvik, Norway. The ship entered service four years ago and during the first two years gradually transitioned from crewed to uncrewed, fully remote-controlled operation. The ship was designed from day one around Kongsberg’s Remote Operations Center (ROC) in Horten, Norway. • Since prototypes and pilot projects have been further developed and technological readiness has advanced, we now have more reliable information about the engineering details and costs of swappable marine battery systems. These developments minimize the primary technical barriers identified in 2019 and point to the need for an updated analysis and expansion on the previous assessment.
Page 5
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
4. ORIGINALLY PROPOSED SCOPE OF STUDY As envisioned in the April proposal to ABS, HEC set out to perform the following tasks for this project, which was approved and funded by ABS: 1. Review the current state-of-the-art regarding battery technology, swappable ISO container unit battery packs, and shoreside battery swapping and recharging technology to recast projections for onboard battery systems and shoreside battery charging infrastructure in the 2030 timeframe and beyond. Followed by an update of the technical assessment of the 2,000 TEU, 16-knot battery feeder ship from the 2019 study, indicating the range as a function of the number of charged battery packs that are carried for ranges from 100 to 1000 nautical miles. 2. Make an additional technical assessment of additional battery feeder containership designs with alternative size, speed and range that might be considered more viable by a U.S. operator for a potential East Coast feeder service. Nominal container capacities (assuming batteries for a 200-mile service) and service speed: 1,000 TEU and 14 knots, 1,500 TEU and 15 knots, 2,000 TEU and 16 knots, and 2,500 TEU and 17 knots. 3. Make rough estimates for U.S. construction costs for each design and their conventional fossil fuel equivalents. 4. Shoreside and port infrastructure investigation. Review arrangement and financial options for battery and charging facilities for a representative feeder voyage profile, including the number and service life of fleet batteries required and the electric capacity and load profile of battery recharging stations. 5. Make a rough estimate of operational costs and combined voyage costs for each design and their conventional fossil fuel equivalents and project the approximate total transport costs/TEU for a representative feeder voyage profile. 6. Develop a 3D graphic model of the design mutually agreed as having the most favorable economics, with three rendered views.
Page 6
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
5. SWAPPABLE ISO CONTAINER BATTERIES Before they were considered for marine use or for other swappable battery systems, containerized battery packs have been in use since around 2010. These were primarily for battery energy storage systems (BESS) and used to solve power peaking issues and time-shifting non-dispatchable solar and wind electrical generation for land-based power grids. The use of 20-foot and 40-foot ISO container dimensions facilitated the lithium-ion battery arrays to be factory manufactured and tested, followed by shipping and simplified installation worldwide. An integrated containerized BESS battery pack generally includes specialized racking systems for thousands of individual battery cells, a battery management system (BMS), usually cooling systems for thermal management, and fire detection and suppression systems. Over the last five years, the focus has shifted from stationary grid storage of these containerized battery packs to mobile applications, and in particular their use for short-sea shipping and inland waterway maritime operations.
5.1 VENDORS AND STATE-OF-THE-ART Storage capacities are rapidly improving, and battery designs and technologies continue to rapidly evolve, but some of the current 2026 manufacturers of the ISO container battery packs and their characteristics and capabilities are as follows: • Fleetzero — A Houston, U.S., based developer of 20-foot ISO half-height battery containers at a very high industry standard of 3.47 MWh capacity per half TEU. Weighing in at 26.5 metric tons, they are specifically designed for swappable marine use. Fleetzero has a strategic technical partnership with ABS, focused on certifying and standardizing containerized battery systems for the global maritime market. • Shift Clean Energy — A Vancouver, Canada, based company manufacturing PwrSwap containerized battery packs at about 2.8 MWh per 20-foot ISO container size. Figure 5: A photo of Fleetzero’s “Leviathan” containerized battery. • Corvus Energy — An international leader in fixed marine battery installations, they also provide Corvus BOB (Battery-on-Board) which is an ISO 20-foot battery at 2 MWh, usually sourced as permanent deck-mounted electric storage, but they can theoretically also be used as swappable modular units. • Wärtsilä — Makes containerized units designed to be integrated with their shipboard power management system, typically fixed installations, for onboard zero-emission harbor operations. • CATL and COSCO Shipping Heavy Industry — This is the manufacturing partnership arrangement in China for the COSCO 700 TEU feeder ships, Greenwater 01 and Greenwater 02. CATL, the world’s largest EV battery maker, supplies LFP (lithium iron phosphate) cells and battery management system, and COSCO Shipping Heavy Industries handles the physical manufacturing of the containers and the battery integration. Storage capacity is apparently 6.25 MWh per TEU. • EVE Energy — Another major Chinese battery manufacturer and competitor to CATL in the auto battery market. They have a dedicated marine battery division primarily providing fixed systems for hundreds of electric ferries, workboats, and inland waterway barges. They also have proprietary “swap-and-go technology” for longer route vessels. • CIMC (China International Marine Containers) — The world’s largest manufacturer of marine ISO containers, have teamed up with several local second tier Chinese battery manufacturers to provide ISO 20-foot battery packages. • Gezhouba Group — An integrated Chinese infrastructure company with their own electric container vessel featuring 12-slot hot-swappable battery system using their own proprietary containerized units. • PowerX (Japan) — Is currently building “battery tankers” using their own 20-foot ISO battery modules and conventional container ships, designed to transport fully charged battery containers and their electrical energy from offshore wind farms that are not (yet) connected to the shoreside grid with cables. This is a representative rather than exhaustive list of vendors. There are others like Hanwha Energy, BYD, etc. and there will be others entering this market as it develops.
Page 7
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
5.2 SELECTION FOR CURRENT STUDY Considering location, strategic relationship with ABS, their willingness to provide detailed design information, and their current high volumetric power density of 3.47 MWh for a half-height ISO 20-foot container, we have chosen Fleetzero as the basis of our further concept design development.
5.3 POWER DENSITY PROJECTION FOR 2030 AND BEYOND Battery volumetric density and battery cost continue to improve rapidly over time, and battery technology continues to improve regarding their required cooling systems and fire safety. For rechargeable batteries in general, the typical annual increase of volumetric density has improved at the following rates historically:
2010–2015
7–9% per year
Optimization of Lithium Cobalt Oxide (LCO) batteries
2015–2020
10–12% per year
Transition to Lithium Nickel Manganese Cobalt (NMC) along with improvements in cell packing engineering
2020–2025
5–7% per year
Adoption of Lithium Iron Phosphate (LFP) chemistry types
Volumetric densities at the time of the 2019 evaluation were approximately 75 kWh/m3, and we assumed that this value would likely improve to 150 kWh/m3 by 2030, which reflects an annual improvement of seven percent. But note that the current Fleetzero battery is already at 197 kWh/m3, reflecting an actual improvement between 2019 and 2026 of over 10 percent per year, exceeding our 2019 projections. Rates of annual improvements in volumetric density between now and 2030, 2040, and 2050 are uncertain, but the rates of annual improvement are generally, as projected by the automotive industry, are expected to continue but at a slower pace. Estimates of growth rates are forecast to be approximately:
2026–2030
2% per year
Transitioning from liquid electrolyte to semi-solid-state architecture
2030–2040
4% per year
Solid-state maturity
2040–2050
2% per year
Reaching near theoretical limits for volumetric density baring any unanticipated developments or breakthroughs
300
8 7
250
6
kWh/m3
200
5
150
4 3
100
2
50
1
0
kWh/m3
Projected kWh/m3
2050
2048
2046
2044
2042
2040
2038
2036
2034
2032
2030
2028
2026
2024
2022
2020
2018
2016
2014
2012
2010
0
Projected MWh/0.5 TEU
Figure 6: Battery volumetric density. Improvements in battery cell energy density do not necessarily correspond to improvement overall container energy density, since capacity is influenced by cooling systems, fire protection systems, and specific structural and access requirements. But past performance predicts that this will likely be the case, so we have assumed parallel improvement paths.
Page 8
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
While battery energy density continues to improve, long-term lifecycle performance remains an important economic consideration. Battery degradation is influenced by the number of charge-discharge cycles, operating temperature, depth of discharge, charging rates, and operational profile. For this preliminary assessment, a nominal 12-year service life is assumed for the battery packs. Future investigations could include a more detailed evaluation of degradation rates, replacement planning, residual asset value, recycling economics, and potential secondary stationary energystorage power arbitrage applications. Given these historical performances and predictions for the future battery development, we have gone with the Fleetzero standard of 3.47 MWh per half height ISO 20-foot container times eight percent projected improvement or 3.75 MWh per ½ TEU as the design basis of projected 2030 newbuild concept designs evaluated in this study. Note that while the MWh capacity of the battery container packs directly results in the number of batteries required for a specific range, modest variations in this capacity based on degradation rates or slower annual improvements will not significantly impact on the overall economics and will only require loading of a couple of extra batteries as the initial supply of batteries very gradually degrade. The Fleetzero recommended operational range for the state of charge for these containerized batteries is two to 98 percent, effectively 96 percent of the battery capacity (96 percent of 3.75 = 3.6 MW) is available to power the ship on each charge/discharge cycle. We have also assumed an overall battery charging efficiency of 90 percent, meaning you pay for 4 MW of electricity to charge a battery which you can recover 3.6 MW, the net usable battery capacity adopted for this study. Note that the weight density (kWh/metric ton) for the batteries are expected to see comparable % improvements, meaning that the same size and weight of battery simply gains storage capacity over time and the battery weight density in kg/m3 remains fairly constant, and therefore the weight per standard container size stays the same, or perhaps increases slightly over time. It is notable that during the life of the ship the volumetric density for a ½ height 20-foot ISO container battery pack may improve to about 6 MWh by 2040 and to over 7 MWh, nearly double the current capacity by 2050. The implications of this continual improvement, and the gradual degradation of the battery capacity with multiple discharge-charge cycles, are that the batteries for the feeder ship system will be candidates for replacement at some time during the life of the ship, which will increase either the carrying capacity of the ship or the operational range based on carrying a specific number of batteries. The economic analysis conservatively assumes an average 10-year lifetime for battery packs.
Page 9
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS 350
As battery density continues to increase, battery costs continue to drop in line with clean energy learning curves [Rubin et al., 2015; Berckmans et al., 2017]. In 2019 the project cost of a containerized battery pack was about $800 to $1000/kWh [Berckmans et al., 2017; Cole and Frazier, 2020]. Costs have dropped dramatically and are currently about $200 to $350/kWh (Fleetzero currently quotes $170/kWh). Projections for 2030 are $130 to $250/ kWh [Cole and Frazier, 2020]. The cost basis used for the 2030 economic evaluation is conservatively assumed to be $200/kWh. Note that by the time of the anticipated battery replacement in 10 years, costs are anticipated to fall further, to about $120 to $150/kWh [Hsieh et al., 2019; Cole and Frazier, 2020].
5.5 BATTERY SAFETY
Cost of Energy Components (2019 $/kWh)
5.4 BATTERY COST PROJECTIONS
300 250 200
High
150 100 50
Mid
Low
Large-scale marine battery installations, utilizing 0 Lithium Iron Phosphate (LFP) or Nickel Manganese 2015 2025 2035 2045 Cobalt (NMC) chemistries, introduce distinct risk profiles to ship operations from battery thermal runaway. This chain-reaction phenomenon occurs when an internal Figure 7: Cost projections for battery systems. cell shorts or mechanical damage, or overcharging Source: Cole and Frazier, 2020. triggers an uncontrollable spike in temperature, causing the cell to release highly toxic and flammable gases that can lead to severe fires or explosions. To mitigate these risks, the maritime industry has moved away from relying solely on traditional reactive firefighting with water mist or CO2 dousing, in favor of deep, multi-layered preventive engineering. Modern marine-classed battery systems utilize ultrasensitive off-gas monitoring that detects hydrogen or carbon monoxide minutes before a temperature spike occurs, paired with localized cell-to-cell thermal barriers or ceramic insulation, and targeted liquid-cooling plates designed to isolate and quench a single failing cell before it can propagate to its neighbors. When containerized and placed on deck, these systems drastically alter a vessel’s overall safety risk management strategy. While deck-mounting segregates the fire risk from internal machinery spaces, it requires rigorous structural fire protection such as A-60 thermal boundaries. Consequently, the maritime insurance sector, through Protection and Indemnity (P&I) Clubs and Hull and Machinery (H&M) underwriters, have significantly tightened their scrutiny. Insurers now demand comprehensive, vessel-specific risk assessments, formal adherence to class guidelines, and verified crew training frameworks before extending coverage. Because an unmitigated thermal event can result in a total constructive loss, underwriters are increasingly tying premium rates directly to the sophistication of the system’s BMS and its proven ability to prevent cascading cell failures, shifting the commercial viability of green propulsion to the manufacturers and class societies.
Page 10
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
6. REASSESSMENT OF 2019 FEEDER CONCEPT DESIGN 6.1 FUNCTIONAL REQUIREMENTS The following is a preliminary assessment of the use of containerized swappable battery power for the feeder containership in the original 2019 study. Note that, as of 2019, battery-powered vessels had only been proposed or deployed on very short routes, typically for ferry or harbor service, along with port-installed capabilities for frequent recharging. For this reason, battery power was not even considered for the 15,000 TEU VLCS with the long-haul deep-sea service. The feeder containership in our service had the following general functional requirements, and might be a candidate for an all-battery version:
Container “Slot” Capacity
2,000 TEU feeder
Average Weight/TEU
9.5 metric tons
Endurance
2,000 nautical miles (nm)
Bow Thrusters
1 at 1,000 kW
Design Draft
About 8.5 m
Service Speed at Design Draft
16 knots or slower
Reefers
300 plugs
As previously noted, these performance requirements (except for the endurance and service speed requirements) were generally consistent with typical ships currently being designed and built for North European and inter-Asia feeder service.
6.2 FINDINGS FROM 2019 Note that, based on our preliminary investigation, we attempted to predict 2030 technology. To meet the functional requirements, assuming the 2,000 nm range, we made the following assumptions: • The feeder will require about 12MW total installed power to meet the 16-knot service speed with a service margin (including service loads and reefers). • The volume density of batteries is assumed to be 150 kWh/m3 for the full battery package, which is about double the technology at that time. • The weight density of the batteries is assumed to be 120 kWh/metric ton (also better than current lithium-ion batteries). • An 80 percent depth of discharge before recharging 10 to 90 percent as recommended by the battery manufacturers to preserve battery life.
Page 11
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS For our feeder containership, this resulted in the following characteristics of the battery configuration: Design Range
2,000 nm
Days Range
5.2 days
Hours for Range
125 hours
Required Energy
1,500,000 kWh
Depth of Discharge
80%
Required Battery Energy
1,875,000 kWh
Volume Density
150 Wh/L
Volume of Batteries
12,500 m3
Battery Spaces Vol. Factor
1.5
Volume of Battery Spaces
18,750 m3
Mass Density
110 Wh/kg
Battery Mass
17,045 million tons
Note that a typical 40 ft container bay underdeck for this ship is approximately 4,000 m3, so even assuming some batteries are stowed in the upper engine room due to the smaller size of the motor and electrical equipment compared to a conventional diesel, the batteries would have displaced about 12 percent of the cargo volume, and more importantly about 70 percent of the cargo deadweight. (Note that this gross weight of the batteries would be netted against the weight savings for the electric motors and other electrical equipment as compared to the conventional diesel, auxiliaries and the bunker fuel.) Fully battery-powered ships are generally proposed for much shorter voyages, typically significantly less than one day. For further consideration, the range was reduced to 400 miles, or about a one-day voyage. The resulting battery configuration would then be reduced to something a bit more manageable: Design Range
400 nm
Days Range
1 day
Hours for Range
25 hours
Required Energy
300,000 kWh
Depth of Discharge
80%
Required Battery Energy
375,000 kWh
Volume Density
150 Wh/L
Volume of Batteries
2,500 m3
Battery Spaces Vol. Factor
1.5
Volume of Battery Spaces
3,750 m3
Mass Density
110 Wh/kg
Battery Mass
3,409 million tons
Note that the batteries, electric motor, and other electrical equipment for this shorter one-day range were believed to be accommodated within the current engine room space plus a single additional underdeck 40 ft. container bay forward of the accommodation, as seen below; and would displace approximately 10 percent of the cargo deadweight, which might be considered reasonable. However, highvoltage recharging the depleted onboard batteries would require considerable time (overnight) between each leg of a feeder voyage, making the concept impractical.
Page 12
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
6.3 2026 REASSESSMENT If the 2019 2000 TEU feeder design was updated for the current volumetric density and the switch to deck stowage of the current halfheight ISO 20 ft. Fleetzero battery containers, the ship would require: • Battery Energy required for 400 nautical mile range = 300,000 kWh (unchanged) • Depth of Discharge 90 percent = 333,333 kWh • Single half-height ISO 20 battery capacity: 4.1 MWh • Required number of batteries: 81 plus some traditional 10 to 15 percent margin • Battery volume = 41.5 TEU (about 1600 m3) • Weight of batteries at 26.5 mt each = 2,147 metric tons The batteries are one-third lighter and physically occupy less than one 40 ft on-deck container bay. The general conclusion of this simplified reassessment of battery weight and volume, combined with the advantages of swappable ISO container batteries for not requiring significant extra port time, reinforces the original recognition that the concept of a shortsea battery powered feeder containership deserves another look, including an in-depth evaluation of the ship on some specific feeder service routes and voyages for U.S. flag feeder service.
7. SERVICE ROUTES AND VOYAGE PROFILE 7.1 BACKGROUND Internationally, as container shipping has grown and container ships have been getting larger, the “hub and spoke” model with a small number of mega “hub” ports, each connected by a feeder ship system to multiple secondary “spoke” ports, has become the global standard. However, this was not normally the case in the U.S. due to a combination of the combined excellent Interstate Highway System and rail networks, and the high construction and operational cost for Jones Act-compliant feeder sized containerships. There are exceptions to this domination by highway and rail distribution systems where these services are not available: • Island services: such as Hawaii, and Puerto Rico • Absence of highway infrastructure: non-contiguous services like Alaska • Service exceeding road weight limits: dense cargo is typically carried in 20 ft containers which have a maximum payload of up to 28 tons, but typical road limits are for payloads of about 16 to 21 tons. Most transportation studies evaluating feeder container services, including this one, focus on routes that are being served by highway and rail services to compare pricing for the modal shift to maritime transportation. In the early 2000s, landside congestion on Interstate transportation corridors prompted a renewed interest in short-sea shipping. Over the years there have been many attempts to launch short sea services sponsored by the U.S. ports, by the U.S. Government Accountability Office (GAO) and by the U.S. Maritime Administration (MARAD). These efforts proved to be largely unsuccessful.
Page 13
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
The modern era of U.S. feeder service investigations began with the United States Marine Highway Program (USMPH) established in 2007 which included extensive MARAD feasibility studies on the East Coast (M-95) route, and other coastwise routes, with most studies concluding that such services face significant challenges. These challenges included Jones Act construction costs, Harbor Maintenance Tax (HMT) on domestic shipments, rehandling cost for the additional maritime leg, and the continuing efficiencies and low costs of the trucking system on the Interstate Highway System and the established rail system.
7.2 THE 2011 MARAD/HERBERT STUDY In 2011 HEC was contracted to prepare the report American Marine Highway Design Project for MARAD. This study evaluated 11 different designs, including roll-on/roll-off (ro/ro), roll-on/roll-off containerships (ro/con), pure container and ro/ro passenger vessels (ro/pax) with speeds ranging from 14 to 30 knots, primarily focusing on vessel types thought to be best suited for long-haul transportation of trailers and cargos normally driven over the road. The designs were intended for dual use, meaning that while being primarily used for reducing congestion on the national highway system, they would also be suitable for military transport use in times of national emergency, with a minimum range of 10,000 nautical miles and minimum speed of 15 knots. The focus was not on short coastal routes or inland routes. The primary routes analyzed were longer routes along the Atlantic Corridor (designated by MARAD as M-95) and the Pacific Corridor (M-5). Also analyzed were routes between Maine, southern New England to the ports of New York/New Jersey, and routes originating from Gulf of Mexico ports (M-10). One of the designs considered was an 826 TEU 18-knot feeder containership. Key conclusions of the American Marine Highway (AMH) study were: • There are opportunities for AMH services at competitive rates to trucking and rail. • The best opportunities are where trucking costs are high and intermodal rail competition is not strong. • Government support and tax policies can have a major impact on viability. • Both ro/con and pure containerships were generally more economical than pure ro/ro types and ro/pax depending on the specific route, and the very high-speed ships were generally uncompetitive because of very high fuel costs.
Page 14
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
7.3 OVERVIEW OF CURRENT INTERNATIONAL FEEDER SERVICES Current international feeder routes can be generally characterized by the three dominant geographical regions: 1. Asia with the super-hubs of Singapore, Shanghai, Ningbo-Zhoushan and Busan with feeder shuttles to smaller regional ports in China, Vietnam, Thailand and Indonesia. Typical round-trip voyages of 1,000 to 3,000 nautical miles, and single-leg distances are between 300 and 800 nautical miles. 2. Europe and the Mediterranean with super-hubs of Rotterdam, Antwerp-Bruges and Hamburg with feeders to the Baltic, U.K., North Sea and the Mediterranean. Typically, shorter round-trip voyages of 500 to 2,000 nautical miles, and single-leg distances of 150 to 600 nautical miles. 3. Middle East and India with key hubs of Dubai, Port Sultan Qaboos, Oman and Mundra, India, with feeder routes to the Persian Gulf, East Africa and India. Typically, 2,000 to 2,500 nautical mile voyages with long legs or 900 to 1,200 nautical miles. In general, most major international feeder routes operate on legs of 300 to 1,000 nautical miles and typically use larger feeder ships of 1,500 to 2,900 TEU and higher speeds of 16 to 19 knots. There are also smaller regional shortsea feeder ships operating on legs of 10 to 150 nautical miles, typically of the smaller 500 to 1,500 TEU size, with slower speeds of 10 to 15 knots, and lighter drafts for smaller ports. The inter-port distances for this type of regional service are closer to what is anticipated for the proposed battery-electric shortsea feeder ships under consideration in this study. Some examples of comparable services to use as a model for the potential U.S. feeder ship might be: • The Aegean Sea (Greece and Turkey) sailing out of the regional hub of Piraeus to the Greek Islands and Turkish ports, typically 60 to 90 nautical mile legs and typically 1,000 to 2,000 TEU container feeder ships and ro/cons. • The Malacca Strait and Indonesian Archipelago sailing out of Singapore on 20 to 60 nautical mile legs to secondary Indonesian and Malaysian ports. • Caribbean Basin sailing out of regional hub ports of Kingston, Jamaica, and Freeport, Bahamas, to secondary ports in Haiti, Puerto Rico, Cuba, Trinidad, Barbados and Aruba. Note that these are currently very small, geared, feeder ships in line with the draft limitations and lack of shoreside crane facilities on these islands.
7.4 U.S. DUAL EVALUATION FRAMEWORKS: MODAL-SHIFT VS. CAPTIVE MARITIME CORRIDORS The potential for battery-electric shortsea feeder containerships in the U.S. can come from displacing long-haul trucking and rail distribution, or in direct competition with existing legacy diesel maritime distribution systems. These two distinct operational types can be described as follows: 1. Modal-shift Corridors: Routes operating parallel to interstate highways (e.g., U.S. East Coast I-95), or established coastal rail lines, where waterborne shipping attempts to displace direct long-haul trucking or rail service. Here, the feeder ship must absorb additional terminal handling charges and local drayage fees that direct trucking avoids. 2. Captive Maritime Corridors (Non-Contiguous and Islanded Trades): Routes with few or zero highway or rail alternatives (e.g., Inter-island Hawaii, Coastal Alaska, Puerto Rico and perhaps Puget Sound). In these trades, maritime transport is the sole logistics channel. Terminal handling and short-haul drayage are baseline costs for all cargo. The economic evaluation simplifies to a direct comparison between vessel architectures: battery-electric opex/capex vs. legacy diesel/barge opex/capex. To examine the greatest potential for feeder service, this study focuses on the Modal Shift Corridors in order to look at capex and opex costs compared to highway and rail distribution. While making this comparison, we also evaluated conventional diesel-fueled container feeder ships in order to gain insight into the economics of how battery-electric ships might compare on the Captive Maritime Corridors.
7.5 MODAL SHIFT CORRIDORS: U.S. LOGISTICS FOR HIGHWAY AND RAIL DISTRIBUTION Prior to considering how and where a U.S. Flag feeder service might fit into the current freight delivery system, it is necessary to understand the current logistics of container shipping and freight delivery in the U.S., which has developed in the absence of any significant waterborne service. As previously mentioned, the pattern of a small number of large mega-hubs with feeder ship service to deliver containers to secondary ports did not develop in most regions in the U.S. as it did in Asia, Europe and the Middle East.
Page 15
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Except for island and non-contiguous regions, the U.S. freight delivery system developed emphasizing the highway and rail systems, with some limited container-on-barge services (primarily for low-value cargo and containers exceeding highway weight limits). Very large containerships, carrying predominantly ISO standard 20- and 40-foot marine containers, call at several large U.S. port container import hubs. These major hubs are Los Angeles/Long Beach and Seattle/Tacoma on the West Coast, Houston on the Gulf Coast, and primarily Savannah, Norfolk and New York (NY)/ New Jersey (NJ) on the East Coast. The distribution of container freight from these major hub ports to the ultimate customer has evolved into four distinct pathways: 1. Transloading to domestic 53-foot containers, or 53-foot highway trailers. This represents a significant component of long-haul inland cargo transportation. Transloading offers several advantages. Logistics managers at freight consolidation centers can often combine the contents of three 40-foot marine containers into two 53-foot domestic trailers, improving trucking efficiency. Also, many marine containers are homogeneously loaded with a single product, where there are advantages to distribute and consolidate the products into multiple trailers, each with a desired mix of products suitable for delivery directly to a store, local warehouse, or manufacturing site. These freight consolidation centers are normally located close to the marine hub terminals, requiring only short initial truck delivery distances (drayage) for the marine containers, followed by longer runs with the 53-foot units. 2. Direct Delivery or Intact Delivery of marine containers to customers or warehouses by trucking. Also, a significant portion of the container cargo is best suited for direct delivery to the destination when it is in reasonable proximity (within a few hundred miles) from the mega hub ports. Usually, this happens when the distances cannot justify the transloading costs for a three 40-foot marine to two 53-foot domestic units, or when the contents of a single container are all going to the same customer destination or regional warehouse, or for moderately heavy loads where consolidation into 53-foot trailers would exceed their 80,000-pound highway limit. 3. Initial distribution by train from hub-ports, followed usually by direct delivery by truck, or sometimes after transloading. This pathway is limited to ports with integrated on-dock railway infrastructure facilitating direct transfer from ship to rail. Rail is typically best suited for distances over 250 miles and, more often, but not always, oriented inland from the ports, rather than coastwise. Rail distribution is primarily seen in West Coast ports, especially Oakland and LA/LB (connecting to inland rail hubs in Chicago, Kansas City and Dallas, but also to a lesser extent in Norfolk (connecting westward to Chicago, Detroit, Louisville and Columbus), and Savannah (connecting Atlanta, Memphis, and Nashville). 4. Container-on-barge feeder service, followed by direct delivery by trucking. Existing services are operating on services from NY/NJ to Boston, Norfolk to Richmond, Charleston to Savannah, Miami to Freeport Bahamas. These are comparatively slow services using tugs and barges at seven to 11 knots. This pathway represents only a small fraction of the cargo moving through these corridors due to the usually limited frequency, slow barge loading/ unloading productivity, and slow service speed. However, the prices per TEU are less than the comparable trucking rates, so the cargo typically moved by container-on-barge services is often heavy goods, which might exceed highway weight limits and other lower-value, less time-sensitive cargo.
Page 16
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
Essentially, a renewed U.S. feeder system would need to develop improved services and commercial advantages to draw cargo away from these traditional pathways: 1. For cargo that needs to be sorted and transloaded before delivery remote from the hub ports, a feeder system would bypass the crowded freight consolidation centers built on expensive property near the mega-hubs, followed by the long-haul trucking on crowded and congested interstate highways. These primarily 40-foot, medium-weight marine containers would be directly loaded onto feeder ships without ever leaving the marine terminal, transported to secondary ports where they could be offloaded and consolidated into domestic 53-foot trailers for distribution to nearby customers. The main advantages are locating freight consolidation centers away from the mega-ports and nearer the ultimate delivery locations, closer to the secondary feeder ports. Since we are considering shortrange feeder services where most cargo would normally not be transloaded, this pathway is not believed to be a significant opportunity for short-range feeder service. 2. For marine containers directly delivered to destinations near the mega ports, the feeder ship concept offers no advantages and will have little or no impact on this delivery pathway. However, direct delivery to locations, moderate driving distances away from the mega ports (something like 100 to 300 miles) and near the secondary ports should be a competitive alternative, especially in areas with significant highway congestion. 3. In many cases, feeder ship systems would not have any impact on the distribution by train from hub-ports, especially for inland destinations away from the sea. The exception may be where secondary train hubs are located near the coast and in proximity to secondary ports. Here the coastal feeder ship may offer a competitive pathway to the train distribution for the shorter distances, under 200 miles from the hub terminal where train handling is less efficient. 4. Some of the existing container-on-barge cargo would be a key target for a new feeder service with its faster and more frequent service, particularly for well-developed secondary ports with deep water access and berthing. Container-on-barge service to inland waterways/rivers and shallow, less-developed ports would continue to be best served by tug and barge services.
Page 17
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
7.6 DESIRABLE FEATURES FOR INITIATING A BATTERY-ELECTRIC FEEDER SERVICE Considering the characteristics of successful international feeder services, the operational features of possible batteryelectric feeder ships, and the U.S. container distribution pathways where cargo volumes could be developed, the following are considered to be the desirable characteristics of potential feeder services and routes to have the potential to displace long-haul trucking or rail distribution: • Direct transfer from inbound large international containerships to feeder ships within the large import hub-port. • Secondary ports along the interstate corridors where there is existing significant domestic trailer cargo service coming from the hub port to final destinations near these secondary ports. • Due to the technical issues related to the weight and cargo displacement by the onboard batteries, voyage legs between ports should be practically minimized, initially proposed to be preferably less than 150 nautical miles, but not significantly more than 200 nautical miles. • Moderately developed secondary ports with minimal draft and height restrictions for seagoing feeder ships, preferably 10-meter drafts, and air drafts under bridges of 40 meters or more. Preferably with shoreside container gantry cranes, or at least minimal shoreside cranes to handle containers. • Where possible, in alignment with existing container-on-barge services which have demonstrated routes that are viable for feeder service, and where the enhanced delivery speed and frequency of a feeder ship would be beneficial.
7.7 POTENTIAL FEEDER SERVICES The main container hubs in the U.S., and their total annual volumes are as follows: 1. Los Angeles and Long Beach (over 19 million (M) TEU/year) 2. New York and New Jersey (about 9M TEU/year) 3. Savannah (5.7M TEU/year) 4. Houston (4M TEU/year) 5. Norfolk (about 3.5M TEU/year) 6. Seattle and Tacoma (about 3M TEU/year) Moving down the annual volume list, smaller secondary container ports are: • Charleston (about 2.5M TEU/year) • Oakland (over 2M TEU/year) • Jacksonville (1.4M TEU/year) • Miami (over 1M TEU/year) • Port Everglades (about 1M TEU/year) • Baltimore (about 1M TEU/year) • Philadelphia (about 900k TEU/year) • Mobile (about 500k TEU/year) • Wilmington NC (about 400k TEU/year) • Wilmington DE (about 300k TEU/year) • Boston (about 280k TEU/year) • Gulfport (about 230k TEU/year) • Tampa Bay (about 200k TEU/year) • Hueneme CA (about 130k TEU/year) • New Orleans (about 120k TEU/year) • Freeport TX (about 110k TEU/year)
Page 18
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
Figure 8: Major container hubs (red) and other container ports (yellow). Circle size is proportional to annual container volumes. Over the years, the MARAD studies have looked at multiple potential coastwise container and trailer services along the Interstate Highway System, designated as marine highways, including: • M-5 (I-5): Pacific (San Diego, California to Bellingham, Washington) • M-10: Gulf (Brownsville, Texas to Pt Manatee, Florida) • M-35: Upper Mississippi River (Grafton, Illinois to Minneapolis, Minnesota) • M-55: Lower Mississippi and Illinois Rivers (New Orleans to Chicago) • M-64: James River — Port of Virginia (Norfolk) to Richmond Marine Terminal • M-69: (I-45 and Highway 288) — Houston to Freeport • M-70: Ohio, Mississippi and Missouri Rivers (St. Louis, Missouri to Pittsburgh, Philadelphia) • M-90: Great Lakes • M-95: Atlantic (Miami, Florida to Maine) • M-580: Oakland to Stockton, California Several M-95 potential feeder routes that pass initial inspection to be considered for the battery-electric feeder ship are: • Mid-Atlantic Shuttle (Richmond-Norfolk-Philadelphia) • South Atlantic Loop (Savannah-Charleston-Jacksonville) • North-South Loop (NY/NJ-Savannah) • James River Shuttle (Norfolk to Richmond) • NY/NJ to Philadelphia • Savannah to Charleston • Norfolk-Baltimore-Philadelphia • NY/NJ Boston Shuttle • Florida Coastal Loop (Miami-Port Everglades-West Palm Beach)
Page 19
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Based on the desirable features for a feeder service, the following short list of four routes was initially selected as possible candidates: • Gulf Coast: Houston – Freeport - New Orleans – Gulfport - Mobile – Tampa • Atlantic South: Miami – Port Everglades – Jacksonville – Savannah – Charleston • Mid-Atlantic: Norfolk – Baltimore – Wilmington, DE – Philadelphia – Newark • Atlantic North: Newark – Boston, with stops in Connecticut and Rhode Island A detailed review and evaluation of these 4 routes is presented in Appendix A.
7.8 OTHER POTENTIAL SERVICES NOT CONSIDERED IN THIS STUDY Note that the island and non-contiguous routes were not considered directly in these route investigations due to reasons previously noted in Section 7.4. That is not to say that the battery-electric would not be competitive on these routes. On the contrary, the following regions present very different economic, geographic and institutional dynamics where a battery-electric feeder could be successful: 1. Atlantic South variant: an Atlantic South route that utilizes only the hybrid port of Savannah as the import hub, avoiding high ILA intra-port transshipment costs in Miami and Jacksonville. 2. Inter-island Hawaii: a promising candidate due to zero long-haul trucking alternatives; the inter-port distances ranging from 80 to 200 nautical miles are well suited to the battery-electric configuration, the state incentives for green services, and the high local cost of diesel fuel ($100 to $200 premium over Los Angeles costs). The shortsea battery-electric feeder would need to be competitive on service and cost with Matson and Young Brothers’ current barge operations. 3. Miami/San Juan, Puerto Rico: This corridor represents the largest non-contiguous Jones Act trade lane in the nation. Like Hawaii, there is no trucking alternative, but the distances of about 1,100 to 1,300 nautical miles really lend themselves to a liner service, are beyond battery range and would require hybrid operation; see Section 14. The hybrid shortsea battery-electric feeder would need to be competitive with existing services by Tote and Crowley. Note that there is no real feeder service out of San Juan that would require Jones Act tonnage. 4. Coastal Alaska: Mainly served currently by liner service out of Tacoma by Tote and Matson. The reconfiguration for feeder service would likely see liner service continue to an Anchorage hub, and smaller battery-electric feeder service out of the Anchorage hub to secondary coastal Alaska ports. Some inter-port distances would require supplemental hybrid diesel range extension. 5. Pacific Northwest/Puget Sound: Puget Sound and the Inside Passage feeder service out of the Seattle and Tacoma hubs offer protected, low-sea-state waters on legs under 100 nautical miles, which are very suitable for batteryelectric feeders. Seattle, Tacoma, and Vancouver, BC have aggressive Scope 3 zero-emission mandates and are actively looking to subsidize green maritime corridors, and potentially terminal handling rebates or dedicated berths for low-emission feeder vessels. 6. Great Lakes: While there is potential for a shortsea shuttle connecting Chicago, Milwaukee, Detroit, Cleveland and Duluth, most of the container cargo is coming overland from Atlantic hubs, and there is little justification and market for such a feeder service at this time. In summary, Hawaii, Alaska and Puget Sound all have potential and merit further investigation.
7.9 ROUTE SELECTION On initial inspection, the three Atlantic feeder routes look to be viable, and consideration should be given to focusing on a single ship design that can serve all three services rather than a design that is constrained to one or more of these services. The Gulf Coast service is believed to be slightly beyond the current practical range for the proposed pure-battery design, with Houston to Freeport and Mobile to Tampa legs at about 350 nautical miles each. But this service, as well as other services with longer voyage legs, could be accommodated with a hybrid design as examined in Section 14. This study will further consider the voyage specifics, route itinerary, and economics for a single-representative service. Considering the potential to capture container hub cargo for distribution to the second-tier ports, the congestion of the avoided interstate highway system, and the premium price of the trucking alternative, the three Atlantic routes can be ranked for their potential for a successful new battery-electric feeder service as follows:
Page 20
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
Boston
Providence Davisville
Newport
New Haven
New York City Newark
1 — ATLANTIC NORTH (NEWARK-BOSTON) This service is the most robust market to develop a successful business based on competition with interstate trucking. The stretch of I-95 between New Jersey and Boston, going through Connecticut and Rhode Island, is among the most congested corridors in the world and has some of the highest trucking rates in the U.S. This route has access to an ideal cargo mix of heavy, highvalue imported consumer goods from the Port of NY/NJ, the largest gateway import hub on the East Coast, to the densely populated New England centers near New Haven, Providence and Boston. The distances are manageable for the current capabilities and range of battery-electric feeders, and the secondary ports either have reasonable existing container facilities or the ability to readily adopt them. There is also a great demand for repositioning empty containers southbound, back to the NY/NJ hubs. 2 — ATLANTIC SOUTH (MIAMI-CHARLESTON) This corridor has massive cargo potential but faces higher operational constraints. Savannah is a booming highvolume hub, with a progressive hybrid mixed union/ nonunion labor mix. Charleston and the Florida ports generate large volumes of imports and Jacksonville/ Canaveral have significant heavy cargo of sugar, produce, and automobiles. Florida trucking is expensive, with long distances and limited rail alternatives. I-95 and I-75 are congested and chronically overloaded. Major manufacturers in this region have aggressive decarbonization targets and are the most likely to pay a premium for “green” low-carbon transportation. The Gulf Stream current makes this route somewhat more complex to manage from both a battery and schedule-keeping perspective.
Charleston
Savannah
Jacksonville
Port Canaveral
West Palm Beach Port Everglades Miami
Page 21
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS 3 – MID-ATLANTIC (NORFOLK-NEWARK)
Newark
Philadelphia
Baltimore
Washington
Norfolk and Newark represent significant container import hubs, and this feeder serves the multiple metropolitan markets of New York City, Philadelphia, Baltimore and Washington, DC. The port distances are short and quite suitable for battery-electric operation. However, while highvolume, this route faces the stiffest competition from existing efficient direct rail lines and established container-on-barge services. The other alternatives on the Pacific coast and Gulf coast also present opportunities for battery-electric feeder ships but likely do not offer the greatest current potential for traffic and revenue considering the connection to fewer hubs and lower expected volumes. These alternatives might be considered in a second round of a phased feeder ship rollout.
7.10 EVALUATION OF FEEDER ITINERARY FOR THE ATLANTIC NORTH ROUTE Some general assumptions for the feeder routes are:
Richmond
Norfolk
• Design service speeds are based on 15 knots for all four ship sizes. • A 15 percent sea margin is included on the ship propulsion power to account for open-ocean Atlantic weather conditions. • Maneuvering, docking and mooring are to be completed within 90 minutes per port call.
• Pre-cargo operations preparation for lashing and hatch cover shifting is allocated 60 minutes per port call. • Battery swapping operations are completed during cargo handling operations. • A cargo handling rate of about 25 to 30 moves per hour per crane is assumed, leading to port stays of about six hours for the minor ports, and about 10 hours for the major hubs of Newark and Boston.
8. THE CONVENTIONAL FOSSIL-POWERED FEEDER SHIPS 8.1 PARTICULARS AND SPEED SELECTION FOR THE CONVENTIONAL FEEDER SHIPS Herbert Engineering Corp. currently maintains a database of 242 containership classes designed and built since 1990. Of these, 40 are relatively modern ship designs built since 2018. Through a regression analysis of the containership database, the general particulars and characteristics of 2,500, 2,000, 2,500, and 1,000 TEU containerships were derived. Modern feeder containerships are, on average, larger, slower, and have higher deckloads than historical designs of feeder ships. The newer designs are progressively more efficient, with somewhat larger and slower turning propellers and derated main engines. For the speed selection, we have chosen to initially stay with the typical speed for each TEU size based on the regression of international feeder ships, which turns out to be: • 2,500 TEU — 19.3 knots • 2,000 TEU — 18.6 knots • 1,500 TEU — 17.6 knots • 1,000 TEU — 15.9 knots These speeds are based on the design draft, with 90 percent of the derated engine MCR power, with a 15 percent sea margin. Note that each design has three capacities: the traditional total slot capacity and the contract Rated Heavy Load Capacity at 14 metric ton/TEU, plus a capacity at 12 metric ton/TEU average weight, which more closely corresponds to the capacity at the container weights for the feeder service being proposed. Note that each of these ships was downrated to 15 knots service speed in the economic analysis so that they could be compared on an equal basis to the battery-electric alternative versions.
Page 22
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
8.2 TABLE OF CHARACTERISTICS OF THE CONVENTIONAL FEEDER SHIPS TEU
2,500
2,000
1,500
1,000
LOA
190
174
160
146
LBP
183
167
154
141
Beam
32.2
30
27.5
24.6
Depth
16.8
16.8
14.5
12
Draft (scant)
11.2
10.7
9.9
9.0
Draft (design)
9.9
9.4
8.7
7.9
Displacement (design)
38,375
32,222
24,997
18,610
Speed (design)
19.3
18.6
17.6
15.9
Propeller Diameter
7.1
6.6
6.2
5.8
EHP (Pe) kW
8,080
6,733
4,861
2,873
RPM
100
90
90
85
Propulsive Coefficient
0.72
0.71
0.72
0.74
Required Power — Trial kW
11,288
9,474
6,760
3,897
Sea Margin
0.15
0.15
0.15
0.15
Required Power — Propulsion kW
12,981
10,895
7,774
4,482
Page 23
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
8.3 THE 2,500 TEU CONVENTIONAL FEEDER SHIP
8.4 THE 2,000 TEU CONVENTIONAL FEEDER SHIP
8.5 THE 1,500 TEU CONVENTIONAL FEEDER SHIP
8.6 THE 1,000 TEU CONVENTIONAL FEEDER SHIP
Page 24
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
9. THE SHORTSEA BATTERY POWERED FEEDER SHIPS 9.1 CONFIGURATION DISCUSSION: HOUSE/BRIDGE AFT OR FORWARD The predominant design configuration for modern conventional fossil fuel-powered feeder ships is the traditional house and bridge aft arrangement. There are, however, positive and negative features for both the house aft and house forward designs. For the traditional aft configuration, the machinery space and superstructure are vertically aligned, which, for the battery-electric version, results in a simplified electrical architecture; also, the crew are near the engine room and, in the battery-electric version, presumably near the machinery, batteries, switchboards, DC hubs, connectors and cabling are all optimized and minimized. Crew comfort is better for the house aft in heavy winter Atlantic seaways. The capacity disadvantage for the house aft configuration is the need to step down the forward container rows to maintain the SOLAS bridge visibility requirements. This often requires pushing the accommodation higher for visibility over five- and six-high container stacks, with corresponding increases in the operational air draft. Conversely, the forward house/bridge configuration has no bridge visibility constraints, often gaining up to five percent of the container capacity, along with increased heavy weather protection for the forward container stacks, and reduced wind resistance from providing a somewhat aerodynamic fairing forward of the container deck load. Bridge heights and overall accommodation heights are several decks lower than required for aft bridge visibility over the forward containers. This results in lower operational air drafts. Many 2,500 TEU containerships have operational air drafts of 40 to 44 meters (132 to 144 feet). Keeping the air draft well under the 135-foot low water limit seen on several segments of these feeder services would serve to give the ship feasibility to be employed to a greater range and selection of secondary ports during the service lifetime of the ships. Forward bridge locations are vulnerable to green-water head sea impacts and need to be heavily reinforced, and the motions are not advantageous for crew comfort. While forward visibility at sea is superior for the house forward designs, docking at busy U.S. East Coast ports is considered easier from high vantage-point aft house positions, and can be challenging from a forward bridge, often requiring cameras and docking sensors. The major disadvantage of forward bridge and house, the seakeeping motions and their impact on the crew, can be mitigated and minimized. The individual sea legs in the voyage are relatively short, 10 hours or less, and the worst of major winter storm conditions can be avoided by implementing weather delays. Preference will be to stay on the schedule for distributing the high-priority import goods from Newark on the northbound leg. If weather delays are required, one or two secondary stops on the return southbound leg (carrying empties and domestic cargo) can be skipped to stay on the weekly fixed schedule. Alternate transportation by I-95 trucking is always available for any high-priority southbound cargo. The operational advantages for the bridge aft configuration, in our opinion, are negated by the lower cost of the smaller house, the protection and aerodynamic fairing of the containers, the added container capacity (to compensate for the slots dedicated to battery packs), and the reduced air draft permitting greater route flexibility to ports with bridge restrictions. The following battery feeder ships presented here are house forward designs with air drafts under 120 feet (36 meters).
9.2 SPEED SELECTION FOR THE BATTERY FEEDER SHIPS The basic particulars, hull form and characteristics for the battery feeder ships are similar to the conventional versions above, except that all have been adjusted to reflect the capacities without bridge visibility constraints, and the speeds are all based on 15 knots, to reflect the required service speed desired for the proposed U.S. feeder service with a 15 percent sea margin. While the differences in the required time for cargo operations between these ship variants should result in earlier port departures and permit the smaller ships to operate a slightly slower design speed, this is a secondary effect and not considered in the project at this initial stage of the economic and voyage analysis.
Page 25
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
9.3 TABLE OF CHARACTERISTICS OF THE BATTERY FEEDER SHIP TEU
2,500
2,000
1,500
1,000
LOA
190
174
160
146
LBP
183
167
154
141
Beam
32.2
30
27.5
24.6
Depth
16.8
16.8
14.5
12
Draft (scant)
11.2
10.7
9.9
9.0
Draft (design)
9.9
9.4
8.7
7.9
Displacement (design)
38,375
32,222
24,997
18,610
Speed (design)
15
15
15
15
Propeller Diameter
7.1
6.6
6.2
5.8
EHP (Pe) kW
3,358
3,092
2,720
2,332
RPM
54
59
63
67
Propulsive Coefficient
0.74
0.73
0.73
0.73
Required Power — Trial kW
4,545
4,226
3,728
3,181
Sea Margin
0.15
0.15
0.15
0.15
Required Power — Propulsion kW
5,227
4,860
4,288
3,658
Auxiliary Power (hotel + 200 reefers)
3,000
3,000
3,000
3,000
Total Power
8,227
7,860
7,288
6,658
200 nautical mile/15 knots (hours)
13.33
13.33
13.33
13.33
Total Energy 200 nautical miles (kWh)
109,691
104,804
97,169
88,779
Single Battery Power (kW)
3,600
3,600
3,600
3,600
Number of Batteries for 200 nautical mile range
30
28
26
24
Displaced Cargo Slots for Batteries (TEU)
15
14
13
12
Page 26
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
9.4 THE 2,500 TEU BATTERY FEEDER SHIP
9.5 THE 2,000 TEU BATTERY FEEDER SHIP
9.6 THE 1,500 TEU BATTERY FEEDER SHIP
9.7 THE 1,000 TEU BATTERY FEEDER SHIP
Page 27
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
10. U.S. CONSTRUCTION ESTIMATES 10.1 INTRODUCTION Ultimately, U.S. construction prices are heavily influenced by market conditions at the time of any requested bid. The limited number of recent U.S. built deepwater ships and the limited number of shipyards capable of, and interested in pursuing, this work, with capacity availability, for this type of project make construction cost prediction extremely difficult. Herbert Engineering Corp. maintains our core ship price estimating tools, which are frequently benchmarked against known international newbuilding contracts, primarily in Korea and China. These cost estimates are derived from building up the individual material and labor rates for the components of the ship design (hull steel, hull outfit, machinery, accommodation, piping, cargo gear, and engineering), which are then benchmarked and adjusted against recent contracts. Due to frequent benchmarking, we have a reasonably high confidence in predicting the current Asian construction contract prices within plus/minus 10 percent. The current Korean price for a standard 19-knot, 2,500 TEU feeder ship is a bit under $50M. Our derivation of predicted U.S. construction costs is then based on a multiplier over the prevailing international price. We do our best to track this multiplier whenever possible through benchmarking of all known prices for significant U.S. ship construction projects. This multiplier changes over time due to market conditions and construction slot availability in the U.S. shipyards, considering their participation in other commercial construction. The current Korea/ U.S. multiplier is believed to be approximately five for these moderate-sized containerships.
10.2 THE CURRENT CONSTRUCTION PRICE — CONVENTIONAL FEEDER SHIPS Herbert Ship Evaluation Program (SEP) prices, benchmarked against recent container feeders in Korea: Construction Cost
Cost $M
TEU Size
2,500
2,000
1,500
1,000
Design Speed
19.3
18.6
17.6
15.9
SEP "Korea 2006" Price (five-ship order)
44.7
41.0
35.3
27.6
Adjusted for 15 knots
41
39
34
27
Benchmark for 2026 (x 1.07)
44
42
36
29
U.S. Price (x 5.0)
219
209
182
144
10.3 THE CURRENT CONSTRUCTION PRICE – BATTERY FEEDER SHIPS Reduced conventional for lower power at 15 knots, plus 10 percent premium for electrical, and the same U.S. multiplier: Construction Cost
Cost $M
TEU Size
2,500
2,000
1,500
1,000
SEP "Korea" (five-ship order) adjusted for 15 knots
41
39
34
27
Benchmark for 2026 (x 1.07)
44
42
36
29
Benchmark for Electric (x 1.15)
50
48
42
33
U.S. Price (x 5.0)
252
240
209
166
Page 28
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
10.4 POTENTIAL POLICY CATALYSTS IMPACTING SHIP CAPEX AND OPEX Several national federal maritime policy initiatives as well as developing international regulations could alter these financial capex and opex costs for U.S. Jones Act feeder containerships: • The Maritime Action Plan (MAP): By proposing a Maritime Security Trust Fund financed by foreign-built vessel port fees, MAP creates a potential revenue stream to subsidize domestic shipyard capex and zero-emission port charging infrastructure. Furthermore, MAP’s regulatory focus on vessel automation and terminal modernization directly targets the high labor and rehandling charges. • The SHIPS for America Act: If enacted, the SHIPS Act’s proposed capital and operational support payments for commercially viable, U.S.-Flagged vessels could significantly absorb the Jones Act construction premium. Crucially, the vessel architecture developed in Section 14 (Diesel Hybrid) positions this battery-electric feeder to meet the “militarily useful” sealift criteria required to access these federal operating stipends and Title XI financing guarantees. • The IMO Maritime Autonomous Surface Ship (MASS) Code: The recently enacted code provides a goal-based framework for remote control and Remote Operations Center (ROC) certification. The cost analysis in this study reflects an engine department reduction of four billets, made possible by the solid-state operational profile of battery-electric powertrains and the elimination of complex fuel treatment requirements and internal combustion auxiliaries. However, substantial additional labor efficiencies remain uncaptured under current regulatory frameworks. Battery-electric short-sea vessels represent an optimal platform for MASS technologies. The integration of an AI-driven sensor package (radar, LiDAR, thermal optical imaging) and automated collision-avoidance software might deliver situational awareness superior to traditional visual watchkeeping. When paired with shore-based ROCs, a single shore-side watch officer could oversee multiple short-sea vessels during open-water transits, reserving onboard personnel primarily for docking and emergency response. None of these measures have been considered in this study, and all represent future potential to improve the base economics presented.
11. SHORESIDE SUPPORT AND BATTERY CHARGING INFRASTRUCTURE Using modular, swappable battery container modules, the shoreside infrastructure differs significantly from a traditional high-megawatt direct-to-ship shore power charging for an onboard ship battery energy storage system. Instead of plugging the ship into a massive utility connection for rapid charging during a brief port stay, the battery swapping decouples the ship port time from the charging time and rate. For a typical one-week feeder ship schedule, like for the 15-knot, 2,500 TEU example shown in Section 7.9, each port will have two to four days to charge the depleted batteries after they are discharged from the ship, to be reloaded back onto a ship on its next arrival.
Page 29
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
Consider the overall charging required. The one-week round trip voyage is a bit under 1,000 nautical miles, in seven days. One thousand nautical miles of steaming for the 2,500 TEU feeder require about 150 (5 x 30) freshly charged batteries or 615 MWh (150 x 4.1 MWh). If we have 168 hours (seven days x 24 hours) and 6 charging stations at the six ports on the service, the charging rate, if perfectly balanced, would be 615/(168 x 6) x (1,000) = 610 kW. This means that if properly balanced between ports, and trickle-charging the batteries at low C-rates, the port connection would only require a standard connection at less than 1 MW. The estimation of the number of fleet batteries required was based on the following assumptions: • The 2,500 TEU ship needs 22 batteries for the longest leg based on a 20 percent service margin, including steaming and maneuvering (this is less than the 30 batteries for the design 200 nautical mile range). • Four additional batteries are required at each port to cover hotel and reefer container loads while the ship is pier-side. • Each port is required to have a reservoir of the number of batteries to cover the required number for the next leg of the service, either northbound or southbound, whichever is a greater distance. • The number of fleet batteries is the number of shoreside batteries plus the 22 batteries aboard each ship. • In ship economic analysis, each ship in the service is allocated costs for fleet batteries divided by the number of ships in the service. • Terminal charging infrastructure capex and battery acquisition capex are highly dependent on the number of ships in the service (or other services that share the same charging infrastructure and battery supply. • The assumptions for this study are for a two-ship service, so the total fleet batteries required for the 2,500 TEU service is 149 plus 2 x 22, or 193 batteries, and every single ship economic analysis is allocated 97 batteries.
Page 30
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Grid connections at 2 MW and higher are generally considered to have industrial/substation impact. These connections may require medium voltage utility transformers, metering cabinets, and circuit switchgear with long procurement lead times. Total time to get an operational industrial connection is up to two years. Keeping grid connection limited to 1 MW can often drop you out of the heavy industrial /substation impact and move the project into a standard medium commercial and industrial load, often bypassing substation upgrades and standardized medium voltage transformers and switchgear. Total time to get an operational connection is a more reasonable six to 12 months. A specific port where up to a 2 MW connection might be more straightforward is Davisville, Rhode Island, where that port facility is part of the Quonset Business Park with a quasi-independent industrial entity coordinating directly with the Rhode Island Energy utility. A 2 MW connection might be achievable within 12 to 14 months, and a 1 MW connection in six to eight months. This is in contrast to a high-power 15 MW pier-side connection that would be required for reasonably quick overnight charging of an equivalent onboard battery system, which could cost $25M or more and might take five years for approval and complete operational buildout. Cost to add the port infrastructure for a 1 MW electrical station to charge the Fleetzero battery packs depends on the local labor, infrastructure age and the port and utility technical and regulatory requirements. The costs are estimated in the following locations: TIER 1 – OPTIMIZED INDUSTRIAL SITES Quonset/Davisville, Rhode Island and Providence/ProvPort, Rhode Island have modern, accessible industrial layouts where medium-voltage distribution is easily accessible near the port. Permitting is streamlined and business friendly. Estimated cost: $450 to 600k. TIER 2 – MODERN MUNICIPAL PORT TERMINALS Connley Terminal, Port of Boston and the State Pier, Port of New London have been significantly updated, but costs are still impacted by dealing with state authorities and union labor costs. Estimated costs: $600 to 750k. TIER 3 – LEGACY INFRASTRUCTURE TERMINALS Ports of Newark, New Jersey, and New Haven, Connecticut involve dealing with a rigorous engineering and structural permit review process; modifications to any mature, densely packed terminal acreage can cause complications, delays and added expenses. Estimated cost: $750k to 1M.
Page 31
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS GRID UTILITY COSTS Assuming the feeder service will be using a Medium General Service/General Time-of-Use tariff, pulling a peak of 950 kW (under 1 MW), the utility cost for power will be approximately:
Port
Utility and Representative Tariff Class
Demand Charge (Per kW/month)
Volumetric Energy Rate (Avg ¢/kWh)
Estimated Monthly Demand Fee (at 950 kW peak)
Newark, NJ
PSE&G (Rate LGS - Secondary)
$16.50/kW
11.5¢ – 13.5¢
$15,675
Boston, MA
Eversource (Rate G-3/B-3)
$19.80/kW
14.5¢ – 16.5¢
$18,810
ProvPort, RI
Rhode Island Energy (Rate G-32)
$15.20/kW
12.0¢ – 14.0¢
$14,440
Davisville, RI
RIE/QDC Industrial Tariff
$13.50/kW
11.0¢ – 13.0¢
$12,825
New London, CT
Eversource CT (Rate 56/57)
$17.40/kW
13.0¢ – 15.0¢
$16,530
New Haven, CT
United Illuminating (Rate GS)
$21.50/kW
12.0¢ – 14.5¢
$20,425
Where the charging capacity significantly exceeds the required capacity, the battery charging can take advantage of variable Time-of-Use pricing structures. If charging can avoid the peak hours and primarily charge overnight and on weekends, the energy rates can be reduced by 30 to 50 percent.
12. OPERATIONAL AND COMBINED VOYAGE COSTS The total voyage costs of the feeder service for the 2,500 TEU designs, capital costs and operational costs, have been developed and compared to the cost of long-haul trucking that the feeder service replaces. Operational costs of the diesel and battery-electric versions of the feeder ship differ primarily in the areas of maintenance and supplies, oil consumption, insurance and required engineering manning. While there may be future options for further manning reductions through the new IMO MASS Code, these have not been considered in this financial analysis. See Appendix B for details about the development of the capex and opex of the feeder service, both conventional fuelled and electric, compared to the cost of the avoided long-haul trucking. The results for the 2,500 TEU feeder service are summarized in the table below. The results indicate that the cost of the feeder service (including the rehandling costs in the hub ports, the container handling in the hub ports, and the short-haul trucking from the secondary port to their final destination) is more expensive than the cost of long-haul trucking of the container from the hub port. What makes the feeder service uneconomical operating in the standard U.S. East Coast Tier 1 hub corridors is the combination of (1) re-handling fees in the hub ports for the import containers arriving from overseas, and (2) the minimal savings for short-haul trucking in the secondary ports as compared to the long-haul OTR that is being avoided.
Page 32
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
13. GHG EMISSIONS The current carbon intensity of the power used to charge the batteries is determined by the regional independent system operator grid mix. Newark sits in the PJM grid, while the other five ports sit in the ISO-New England (ISO-NE) grid. PORT OF NEWARK (PJM GRID): • Average Intensity: approximately 710 lbs. $CO2/MWh • Grid Profile: PJM relies heavily on a mix of natural gas (approx. 40 percent) and nuclear (approx. 33 percent) but still carries a baseline percentage of coal (approx. 15 to 18 percent), resulting in a higher carbon footprint than New England. NEW ENGLAND PORTS (BOSTON, PROVPORT, DAVISVILLE, NEW LONDON, NEW HAVEN — ISO-NE GRID): • Average Intensity: approximately 520 lbs. $CO2/MWh • Grid Profile: ISO-NE is significantly less carbon-intensive. It has virtually no coal or oil left in its daily baseload, relying heavily on natural gas (approx. 45 to 50 percent), nuclear (approx. 25 percent), and a growing share of regional wind, solar and Canadian hydro imports. Note that all these utilities are gradually adding renewables and reducing their average carbon intensities over time, and short-haul trucking is a prime candidate for adoption of battery-electric trucking, further reducing carbon intensity. If the shipping rates can justify it, there are opportunities to further reduce carbon emissions by sourcing low-carbon power through Virtual Power Purchase Agreements with off-site regional wind and solar power producers, potentially reducing the charging carbon footprint to zero using Renewable Energy Certificates. Currently, VPPAs in New Jersey and New England are nearly five to eight times the price of standard grid power; these differences should diminish over time as more solar and wind power resources are developed. The following summary shows the carbon accounting for the feeder service compared to the long-haul trucking currently employed. Environmentally, the battery-electric feeder is a major success. When modeled against a baseline of 100 percent longhaul OTR trucking, carbon accounting demonstrates clear advantages. The conventional diesel feeder service emits roughly 70 percent of the CO2e generated by equivalent truck transportation, including local short-haul trucking. This is not due to any carbon-saving equipment or fuel; it is purely due to the better efficiency of maritime vs. highway transportation. The battery-electric feeders emit a mere 24 percent of the OTR trucking baseline, including the fossil-fueled shorthaul trucking, even when drawing from the current asset mix of the North Atlantic utility grid. This could be reduced even further to about 16 percent with dedicated short-haul battery trucking at the regional ports. A savings of about 40,000 tons of CO₂ per year per feeder ship. And these rates would continue to improve over time with planned carbon reductions in the base electric grid throughout the Northeast.
Page 33
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
14. THE DIESEL-FUELED HYBRID OPTION 14.1 BACKGROUND There are multiple reasons to consider conventional diesel- or bio-diesel-powered options for this short sea feeder containership. Among them are: Redundancy and backup: Battery power, and specifically ISO container battery power, are fairly new technologies for ships, at least at this size and scale. It seems reasonable to include some level of redundancy, backup, and safe return to port capability on conventional diesel fuel when introducing such a new technology. Alternatives to lack of port grid connections: In the early days of implementation of the swappable battery-featured feeder containership, it might be that the electrical infrastructure to accomplish battery charging at each of the ports could be delayed or temporarily unavailable. To not jeopardize the implementation of the entire feeder operation, it might be necessary to provide a hybrid alternative to bypass battery charging at any individual port that might be lacking the infrastructure build-out a grid connection to implement swapping and charging of ISO container battery packs. An anticipated reluctance to finance an electric battery-powered feeder ship because the service might be limited due to unavailability or delays of the charging infrastructure in the ports. The hybrid diesel fuel capability could permit timely launching of the service, allowing a gradual transition to batteries as the charging infrastructure and grid access matures. Range extension: Some desirable feeder routes may have one or more legs with inter-port distances beyond the practical battery range (currently assumed to be around 200 nautical miles). An example of this is the Gulf feeder service, which has a single 350 nautical mile leg from Freeport, Texas to New Orleans, Louisiana. The ability to cover this extended range by a conventional liquid fuel hybrid operation might be very desirable. Also, there might be seasonal route variations of the current proposed feeder services that might be beyond the current practical range for battery-powered operation. Qualification for strategic sealift: For commercial U.S. Jones Act shipowners and operators, having a ship that qualifies for strategic sealift duty may provide both tangible and intangible benefits through the Voluntary Intermodal Sealift Agreement (VISA). Qualified ships have advantages with regard to preference bidding on shipping contracts for U.S. government military cargo for MSC and DoD goods when enrolled in the sealift program. VISA ships are also guaranteed pre-negotiated, predictable charter rates, and zero-cost insurance during times of national emergency when the ship is required for sealift duty. While an extended operational range is not strictly mandatory for sealift duty and qualification for these programs, most sealift ships are capable of an unrefueled steaming range, at 14+ knots, for 10,000 nautical miles on conventional marine fuels to be considered “militarily useful” for sustaining long-distance supply chains to overseas military theaters. Even shorter-range shuttle service ships are assumed to have unrefueled range of 3,000 to 5,000 nautical miles. Shorter-range ships won’t necessarily be rejected outright by the program but may be designated for limited “inter-theater” shuttle service. The short, approximately 200 nautical mile practical range limitation of the battery-electric feeder would likely be considered a weakness, limiting the “military usefulness” of the ship during national emergencies.
Page 34
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Adding the hybrid capability for running on diesel fuel and greatly extending the range changes the capabilities of a limited-range feeder ship dramatically and expands the military usefulness significantly, making the ship much more desirable in a sealift context. This ship has the capabilities for transoceanic repositioning in support of global operations, in combat theatre redundancy to run on either battery or diesel propulsion and can even assist in supplying electricity to rapidly established, austere base locations onshore. All desirable features for DoD planners in a military surge.
14.2 ENGINEERING CONSIDERATIONS The conventional diesel-fueled power option can be relatively easily implemented for battery-powered feeder designs by using containerized diesel generator sets. Currently, there are multiple vendors that offer containerized power modules ranging from 1,500 kW to over 3,000 kW. Current systems are offered by: • Cummins: Centum Force Power Modules at 1,500 to 2,000 kW in a standard ISO 40-foot container • Caterpillar: Cat Power Modules at 1,750 to 2,000 kW in 40-f00t-ISO standard containers • Rolls-Royce: (MTU Series, Tier 4) at 3,000 kW in a 40-foot high-cube container • Wartsila: Deck-Mounted Marine Gensets at 1,300 electrical kilowatts (kWe) in a 40-foot ISO container Note that these units are typically sold for standby and emergency power backup. When used on board the feeder ship at continuous power output, they should typically be utilized at 20 to 30 percent lower power. They need to be CSC-rated and certified, and class-approved. A preliminary choice might be the Cat XQ2000 Series Mobile Generator Set rated at 2,000 kWe standby and 1,825 kWe, 440 V AC at 50/60 Hz continuous power. It is marine- and CSC-certified, and class-approved for nine-high marine stacking, ISO 40-foot high-cube container, and weighs in at 30 metric tons. To utilize these containers as replacements or supplements to the battery containers, several capabilities need to be integrated into the initial feeder ship electrical design: • The ship electrical distribution system must be designed to accept 1,000-volt DC output from a containerized battery pack, and the 440-volt, 3-phase AC power output from the diesel generator container. The ship’s power management system must be designed for sensing, syncing, and regulating these inputs to the propulsion motors and other ship equipment. The AC power from the generator containers must be run through an AC-to-DC rectifier to match the power to the ship’s 1,000-volt DC Bus. This could be accomplished by installing the rectifier permanently in the ship’s switchboard room, or in another modular ISO container that pairs alongside the generator containers, acting to convert all the AC power to match the ship’s main DC Bus. • Design considerations for air intake and exhaust gas ventilation of the containerized diesel generators must also be accounted for, consistent with their onboard positioning. • Wing and double bottom diesel fuel tanks sized for the intended range will need to be integrated into the feeder ship design. For fully diesel-fueled, long-range operations, for example, the 2,500 TEU feeder ship at 15 knots requires about 6,000 kW of power (without reefer container loads) and would therefore require four of these ISO 40-foot hi-cube generator container modules running continuously at 82 percent capacity. Fuel consumption would be approximately 6.7 metric tons of marine diesel per generator per day. A sealift-inspired 10,000-nautical-mile, 28-day voyage at 15 knots would require about 750 metric tons (872 m3) of fuel capacity on board the ship. This should be reasonably easy to accommodate on the 2,500 TEU battery feeder ship since most modern conventionally powered 2500 TEU feeder containerships typically have between 1,500 to 2,500 m3 of onboard fuel storage capacity. The approximate cost for a new Cat XQ2000 Series Mobile Generator Set is approximately $1.2M, or slightly under $5M for the set of four required generators. Note that if the longer hybrid range was required from the start for the commercial feeder service, it would likely be more economical to install fixed diesel generators rather than the modular container-based diesel generators.
Page 35
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
15. CONCLUSION Conventional fossil-fueled feeder ships and battery-electric-powered feeder ships have been evaluated in this study. From a pure life cycle perspective of the shipping component, the total economic profiles are remarkably close. While U.S.-built, Jones Act-compliant vessels carry a severe capital premium, the actual ship machinery and structural components are not the ultimate deciding factor in the system’s economic viability. When comparing a 2,500 TEU conventional diesel vessel to a similar-sized, 15-knot, 8,000 kW battery-electric alternative, the total capex plus opex costs are about seven percent more expensive. The battery ship requires higher initial capital costs and insurance, but rewards the operator with desirable green financing, as well as lower crewing costs, reduced routine maintenance, spare parts and lubrication expenses. For traditional maritime financing for the conventional-fueled version, we have assumed a nine percent, 20-year loan, and for green financing of the battery version we have assumed a six percent, 25-year loan, which are believed to be representative current financing options. If there were financial incentives driving GHG reductions, the extra cost of low-carbon biodiesel (at 1.7x the cost of $700/ton MDO) for the conventional ship version would result in the battery-electric versions being slightly more economical.
Page 36
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
15.1 THE INTERMODAL ECONOMICS REALITY Despite the technical success and machinery-level efficiencies of the battery-electric variant, the broader intermodal economic analysis reveals a severe financial challenge. The primary economic justification for any short-sea feeder competing in the modal-shift highway corridors is the wholesale replacement of long-haul OTR trucking with short-haul drayage from local regional ports. However, this study demonstrates that this trade-off is fundamentally asymmetrical: • The Short-Haul Trucking Paradox: While the ship successfully eliminates thousands of long-haul highway miles (over 500,000 miles per weekly ship round-trip voyage), trucking costs are not reduced proportionally. Due to rigid trucking industry minimum day rates, chassis rentals and terminal congestion fees. A short-haul drayage move from a regional pier to a local warehouse remains disproportionately expensive, absorbing a large share of the expected highway savings. • The Additional Terminal Rehandling Charges: The shoreside Terminal Handling Charges (THCs) are a significant component of the total feeder cost. In a union-dominated port environment, the per-container handling fees at Tier 1 hubs like Newark and Boston are severe. Forcing an imported container to undergo a fully second rehandling fee just to be lifted onto the feeder ship at the hub terminal. This, combined with a subsequent but lower cost unloading fee at the regional port, creates a financial burden that cannot be overcome for this feeder route. Economic Reality: The combined cost of rehandling at the import terminal, plus the local port container terminal handling, and the last-mile drayage, can exceed the entire cost of simply trucking the container straight from the hub to the final destination via the highway, even before considering the economic cost of the feeder operation, conventional or battery. The intermodal economic challenge identified in this study applies specifically to highway-competing modal-shift corridors like the U.S. Northeast. Where direct long-haul trucking exists as an alternative, rigid short-haul drayage rates and Tier 1 THCs exceed the ship’s operational savings. However, this financial barrier does not exist in captive maritime trades such as Inter-island Hawaii, Coastal Alaska or Puget Sound services. Because these regions have zero or limited highway alternatives, terminal handling fees are an unavoidable baseline for all freight. In these captive markets, the battery-electric feeder’s machinery-level efficiency, lower routine maintenance and zero direct emissions make it an immediate, prime candidate to replace aging diesel fleets and to meet aggressive local decarbonization mandates. CARBON ACCOUNTING PERFORMANCE Environmentally, the battery-electric feeder is a major success. When modeled against a baseline of 100 percent longhaul OTR trucking, the carbon accounting demonstrates clear advantages: • Conventional Diesel Feeders: Even with the inherent efficiencies of waterborne vs. road transport, the diesel feeder service emits roughly 70 percent of the CO2e generated by equivalent truck transportation, including the local shorthaul trucking. A savings of over 16,000 tons of CO2 per year per feeder ship • Battery-Electric Feeders: Emit a mere 24 percent of the OTR trucking baseline, including the fossil-fueled short-haul trucking, even when drawing from the current asset mix of the North Atlantic utility grid. This could be reduced even further to about 16 percent with dedicated short-haul battery trucking at the regional ports. A savings of about 40,000 tons of CO₂ per year per feeder ship. And these rates would continue to improve over time with planned carbon reductions in the base electric grid. Note that long-haul trucking also has the potential to electrify, but the longer range and logistics of fast megawatt charging at trucking terminals will make this one of the last land transport resources to switch to batteries.
15.2 TRANSSHIPMENT REHANDLING FEES IN INTERNATIONAL CONTAINER HUBS Since high terminal rehandling fees are a significant impediment to any successful feeder service challenging trucking in the U.S., it is useful to consider how transhipment fees are handled at other major international hub ports. Newark’s terminals are primarily designed for high-revenue gateway imports feeding the massive U.S. East Coast consumer market. Because yard space is at a premium for domestic containers, carriers attempting transshipment are often forced to pay close to two full, standard gate-tariff handling fees rather than a heavily discounted, bundled transshipment rate. Approximately $380 per container for an average mix, times two for rehandling to the feeder ship.
Page 37
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS In dedicated international transshipment hubs, terminals offer ocean alliances massive volume discounts on Transshipment THC (TTHC), pricing the double-handling cycle at just a fraction more than a single gateway move, typically 20 to 30 percent higher than a single handling fee. So, for international ports like Singapore or Rotterdam, where an average single handling fee might be closer to $250, an additional handling fee for transshipping would be only $75. Arrangements like this would be necessary for feeder service to be viable in U.S. coastwise services that challenge trucking distribution. True transshipment hubs utilize massive, highly automated grid yards featuring Automated Guided Vehicles or specialized straddle carrier systems designed to shuffle containers rapidly between berths. Unfortunately, Newark’s costs are high due to a combination of high union salaries and terminals that are currently configured for truck chassis exchanges and rail loading. Moving a container from a deep-sea container ship at one berth to a feeder ship at another berth often requires complex terminal tractor movements through yards crowded with domestic import boxes, increasing the operational time and cycle cost.
15.3 CONCLUSION AND STRATEGIC OUTLOOK The final analysis forces a stark conclusion: the battery-electric container feeder service, just like the fossil-fueled feeder service historically evaluated, can be a technical success, but it is not presently economically competitive in the U.S. Atlantic feeder market. Crucially, due to these high port handling fees, this analysis is structurally insulated from sensitivities and improvements from many future market optimizations. Hypothetical future scenarios, such as a significant drop in U.S. shipyard construction costs, continued high diesel prices due to Iran/Hormuz effects, a dramatic reduction in battery manufacturing expenses, cheaper grid electricity, or even the implementation of aggressive federal carbon taxes are unlikely to alter this overall conclusion, without fundamental restructuring of terminal fees. It would likely require substantial reductions in terminal rehandling fees (similar to what has happened through automation in most of the major international container terminals and in the hybrid port of Savannah), and a restructuring of short-haul trucking fees in the secondary ports to correspond to actual delivered mileage, to make an economic justification for feeder ship service on the North Atlantic route. The financial viability of U.S. coastal shipping is not being held back by the price of steel, batteries or electricity. It is structurally dominated and rendered uneconomical by shoreside port-handling tariffs, primarily at the major hub ports. Until the underlying economics of domestic marine terminal handling are fundamentally restructured, the trucking and American interstate highway system will remain the only viable corridor for regional container distribution in the Northeast.
Page 38
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
16. WHAT ARE THE POSITIVE ACCOMPLISHMENTS OF THE STUDY? While the overarching financial analysis indicates that a domestic, U.S.-flagged container feeder service faces severe structural barriers to making an impact on long-haul trucking and emission reductions due to shoreside terminal tariffs, it is a critical mistake to view this study as a negative result. From an engineering, environmental and macroeconomic perspective, this research has achieved several profound, positive breakthroughs that redefine how we look at low-emission maritime logistics. The successful accomplishments and broader industry implications of this study are outlined below.
16.1 EMPIRICAL VALIDATION OF LIFE CYCLE COST PARITY The most significant technical finding of this study is that at a system level, the total life cycle cost (capex plus opex) of a battery-electric feeder ship is rapidly approaching parity with a conventional fossil-fueled vessel. Historically, maritime electrification has been dismissed as cost-prohibitive, heavily subsidized luxury. This report disproves that assumption. By providing a rigorous, line-item accounting of shipboard operations, we have demonstrated a clear economic equilibrium: the higher initial capital layout required for a 7,000 kW electric powertrain and the required batteries is effectively clawed back through the near-elimination of cylinder oil, a drastic reduction in maintenance on mechanical moving parts and a streamlined engine department. The battery ship is roughly economically competitive on a running-cost basis, and the economics will continue to move in the battery-electric direction as a combination of the battery technology continuing to improve and carbon reduction market measures are gradually introduced. The battery-electric configuration also lends itself to potentially taking advantage of future manning reductions through the MASS and ROC initiatives.
16.2 A BLUEPRINT FOR INTERNATIONAL FEEDER SUCCESS This study proves that the battery-electric feeder is commercially ready; its lack of competitiveness on the U.S. East Coast is entirely due to local, external variables — specifically, high Jones Act shipbuilding premiums and high terminal handling fees. In international trade corridors, the economic landscape is fundamentally altered. International transshipment hubs routinely feature THCs for rehandling to a feeder ship that are a fraction of U.S. Tier 1 hub terminal costs (for example, $50 to $100 for the additional lift versus $380, or doubling the unloading fee, in Newark). Because this report proves battery ships achieve near cost parity with diesel, a battery-electric feeder operating in a low-THC international environment would likely be technically viable and profitable while delivering immense GHG reductions. This study serves as an actionable, exportable blueprint for global shortsea shipping networks.
16.3 VIABILITY FOR CLOSED-LOOP AND ROAD/RAIL CONSTRAINED DOMESTIC SERVICES The life cycle parity discovered in our machinery and running costs has immediate, positive implications for other domestic short-range vessels that are not subject to the rehandling fees of commercial U.S. container terminals. This data opens the door for economically justifiable electrification of alternative Jones Act sectors where the basic service is already considered viable with existing fossil-fueled hulls. The findings of this study confirm that the battery-electric shortsea containership is technically viable and economically competitive at the vessel level. By achieving near life cycle cost parity with conventional diesel ships, while delivering an immediate 75 percent-plus reduction in GHG emissions, the swappable ISO battery architecture represents a commercially ready asset for maritime decarbonization. However, the commercial deployment of this asset is highly dependent on route-specific intermodal structures. Some areas where battery-electric feeders should be competitive are: • Captive Maritime Corridors: The battery-electric feeder design should be commercially viable in closed-loop, noncontiguous, or road-constrained trades (e.g., Inter-island Hawaii, Coastal Alaska, Puget Sound, ro/ro, rail car ferries, and low-THC international feeder corridors) where ocean transportation is mandatory or where high terminal rehandling penalties do not exist. • Domestic Product Carriers and Industrial Bulkers: On moderately short voyage legs, moving commodities between private corporate terminals with minimal handling fees. • Local Workboats and Tug Fleets: Benefiting from localized, high-frequency duty cycles that perfectly match battery charge profiles.
Page 39
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS On corridors competing directly with parallel interstate highway trucking (such as the U.S. North Atlantic I-95 loop), vessel opex savings are currently absorbed by legacy shoreside THCs and rigid short-haul drayage tariffs. Commercial viability along U.S. East Coast interstate corridors does not require technical breakthroughs in steel, batteries or powertrains. Instead, it requires targeted shoreside interventions: policy catalysts (such as the MAP or SHIPS Act), restructuring transshipment fees like the hybrid operation in Savannah, and terminal electrification/ automation.
16.4 OPERATIONAL VALIDATION OF THE “SWAPPABLE ISO BATTERY” ARCHITECTURE This report successfully validates the operational model of using modular, swappable ISO container battery blocks for vessels in the 1,500 to 2,500 TEU range. We have established that a mid-sized feeder ship can dedicate cargo slots to energy storage for a 200-plus nautical range without rendering the underlying vessel logistics or weight distribution unworkable. This provides a clean engineering and structural framework for naval architects looking to design scalable, zero-emission coastal assets. Swappable batteries, with their slower recharging requirements, help to mitigate the issues related to high voltage quick charging of fixed onboard batteries, and inevitable delays to extend highcapacity grid connections to the ship.
16.5 SETTING THE ENVIRONMENTAL BENCHMARK Finally, from a sustainability standpoint, this study establishes an undeniable environmental benchmark. Achieving at minimum a 75 percent net reduction in carbon emissions compared to the OTR trucking baseline, even when drawing from the current asset mix of the North Atlantic utility grid, is an environmental success. This data provides corporate logistics managers with the precise empirical backing required to justify shifting freight corridors to meet long-term Scope 3 decarbonization mandates.
16.6 SUMMARY In conclusion, the battery-electric feeder is not a speculative concept; it is a deployable solution awaiting improvements in shoreside intermodal logistics. Shipowners and logistics operators have a clear blueprint for low GHG-emission coastal shipping that can be deployed today in favorable geographic markets and scaled into mainstream U.S. domestic trades as shoreside policy and fee structures evolve.
16.7 FUTURE AREAS OF STUDY TO IMPROVE MODAL SHIFT COMPETITIVENESS While this study confirms the technical and life cycle viability of the battery-electric vessel architecture, unlocking its commercial potential along domestic coastal corridors displacing long-haul trucking delivery requires addressing the shoreside cost structure. Future research should focus on specific engineering, operational, and institutional mechanisms to lower terminal handling friction and last-mile logistics costs: INSTITUTIONAL AND LABOR COST RESTRUCTURING: • Dedicated Domestic Feeder Fees: Investigate the financial impact of port authorities establishing a specialized “ShortSea Shipping (SSS)” fee sub-class, similar to Savannah. Existing ILA/ILWU structures treat domestic feeder lifts with the same heavy cost baseline as deep-sea transoceanic moves. • Comparative Labor Model Analysis: Conduct a comparative study between Tier 1 ILA-dominated hub terminals (e.g., Newark, Boston) and hybrid/publicly operated labor models (e.g., Georgia Ports Authority in Savannah) to quantify how non-traditional labor agreements can lower domestic transshipment penalties. TERMINAL AUTOMATION AND DEDICATED LOW-CAPEX FEEDER BERTHS: • Bypassing Mainline Terminals: Evaluate the feasibility of low-overhead, dedicated “feeder micro-terminals” or automated barge-to-ship transfer facilities located outside primary container terminals to avoid Tier 1 congestion and high transshipment fees. • High-Efficiency Automation: Assess how reorganizing yard layouts, automated stacking cranes, automated guided yard vehicles and AI can impact the per-lift operating expense (opex) for shortsea vessel handling compared to manual crane operations. TERMINAL ELECTRIFICATION AND UTILITY ENERGY OPTIMIZATION: • Port Equipment Opex Reduction: Analyze the cost savings achieved by electrifying shoreside cargo handling equipment such as electric rubber-tired gantry cranes and electric yard tractors supported by port-side solar/wind microgrids and Time-of-Use power tariffs.
Page 40
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS • Shared BESS Power Buffering: Study the dual-use economics of using the vessel’s swappable ISO battery packs as stationary energy storage systems (BESS) for the port grid, offsetting port peak-demand charges. POLICY FRAMEWORKS AND TARGETED LIFT INCENTIVES: • Federal and Regional Lift Subsidies: Quantify the impact of expanding MARAD Marine Highway grants or state Scope 3 decarbonization credits to directly subsidize terminal lift fees for zero-emission vessels. • Harbor Maintenance Tax (HMT): Re-evaluate the tax burdens on domestic multi-port feeds to ensure waterborne cargo is not double-taxed relative to highway trucking.
16.8 FUTURE AREAS OF STUDY FOR NON-CONTIGUOUS, ISLANDED AND PROTECTED CORRIDORS While this study focused on an East Coast mainland corridor competing directly against interstate highway trucking, future research should include captive non-contiguous, islanded, and protected coastal maritime trades where road competition is absent or heavily constrained, and terminal handling fees represent an unavoidable baseline for all cargo. Some examples could be: INTER-ISLAND HAWAII NETWORK OPTIMIZATION: • Single-Ship vs. Multi-Barge Modeling - Conduct a detailed fleet capacity, schedule, and cost simulation evaluating a single pure-battery container feeder (or ro/con) replacing multi-barge towed operations. • Solar Sponge Charging Sync – Hawaii has a heavy overproduction of daytime solar power and lowest grid rates in the daytime sunny hours. Model the operational and financial benefits of synchronization of daytime battery charging Neighbor Island ports with mid-day Time-of-Use (TOU) charging solar power tariffs where the ship acts as a grid-stabilizing asset for island utilities (HECO/KIUC), providing a predictable, 1 MW daytime load that absorbs excess renewable energy that would otherwise be curtailed. PUGET SOUND AND PACIFIC NORTHWEST GREEN CORRIDOR FEASIBILITY: • Protected Short-Leg Loops - Evaluate pure-battery feeder shuttles connecting Seattle/Tacoma hub terminals with secondary Puget Sound, Vancouver Island, and Olympic Peninsula ports (e.g., Victoria, Nanaimo, Bellingham, Port Angeles) on protected routes of under 100 nautical miles. • Hydroelectric Tariff and Terminal Electrification Synergies - Quantify the opex advantage of low-cost Pacific Northwest hydroelectric power, leveraging state green corridor funding and terminal power infrastructure being deployed under the Northwest Ports Clean Air Strategy and regional port electrification programs. ALASKA NORTH PACIFIC HYBRID CORRIDOR ANALYSIS: • Alaska Configuration: Evaluate options for the Alaska service, including hybrid deployment to include the long hybrid Tacoma-Anchorage leg in the service, or a separate Tacoma-Anchorage long-range liner service with local battery-electric feeders on the Anchorage–Kodiak–Dutch Harbor loops, potentially adding other secondary Alaska ports. • Environmental and Duty Cycle Constraints: Model required extreme cold and heavy weather powering margins (20 percent-plus sea margins), structural ice-strengthening weight impacts, in-port low-emission battery operations, and the summer continuous electrical load required for high-density seafood reefer containers. ISLAND AND REGIONAL PORT INFRASTRUCTURE AND GRANT FUNDING PATHWAYS: • Grid Connection Feasibility: Perform site-specific utility capacity assessments for 1 MW medium-voltage pier drops at secondary island and regional terminals. • Federal/State Funding Mechanisms: Evaluate how EPA Clean Ports grants, MARAD Port Infrastructure Development Program (PIDP) funds, and state clean-energy mandates can be leveraged to subsidize shoreside battery-swapping infrastructure.
Page 41
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
17. REFERENCES E. S. Rubin, I. M. L. Azevedo, P. Jaramillo, and S. Yeh, “A review of learning rates for electricity supply technologies,” Energy Policy, vol. 86, pp. 198–218, 2015. G. Berckmans et al., “Cost Projection of State of the Art Lithium-Ion Batteries for Electric Vehicles Up to 2030,” Energies, vol. 10, no. 9, p. 1314, 2017. W. Cole and A. Frazier, “Cost Projections for Utility-Scale Battery Storage (2020 Update),” National Renewable Energy Laboratory (NREL), NREL/TP-6A20-79236, 2020. I.-Y. L. Hsieh, M. S. Pan, Y.-M. Chiang, and W. H. Green, “Learning only buys you so much: Practical limits on battery price reduction,” Applied Energy, vol. 239, pp. 218–224, 2019.
Page 42
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
18. APPENDIX A — FEEDER ROUTE EVALUATION Based on the desirable features for a feeder service, the following four routes were initially selected as possible candidates and a more detailed review is presented below.
ROUTE 1 — GULF COAST HOUSTON – FREEPORT - NEW ORLEANS – GULFPORT - MOBILE – TAMPA The approximate sea distances along this proposed feeder service are: Houston – Freeport
50 to 55 nautical miles (nm)
Freeport – New Orleans
330 to 350 nm
New Orleans – Gulfport
90 to 100 nm
Gulfport – Mobile
60 to 70 nm
Mobile – Tampa
330 to 350 nm
These are all deepwater ports, with Gulfport being 39 feet maximum draft and the rest being 43- to 51-foot drafts, with no bridge-restricted air drafts. Note that Freeport–New Orleans is beyond 200 nautical miles, which is the current expected practical maximum range of battery-powered feeder ships, with no suitable intermediate ports on the TexasLouisiana coastlines. The Mobile – Tampa leg is also beyond the practical battery-powered range. These two long legs make the Gulf Coast more suitable for a conventionally fueled feeder ship at this time. Only a shorter New Orleans – Gulfport – Mobile service would be under consideration for a battery-electric service, but these are not container import hubs and have fairly low volumes of containers.
ROUTE 2 — ATLANTIC SOUTH MIAMI – PORT EVERGLADES – JACKSONVILLE – SAVANNAH – CHARLESTON The approximate sea distances along this proposed feeder service are: Miami – Port Everglades
30 to 35 nm
Port Everglades – Jacksonville
300 to 320 nm
Jacksonville – Savannah
120 to 140 nm
Savannah – Charleston
100 to 110 nm
These are all deepwater ports with operating drafts of at least 47 feet. The Port of Jacksonville (JAXPORT) has the only bridge air draft restriction, but it is 175 feet (53 meters) and not a concern for the feeder-sized ships under consideration. The Port Everglades – Jacksonville leg is beyond the current expected maximum range of batterypowered feeder ships, necessitating an intermediate stop to take on fresh, fully charged batteries. Probably best suited would be Port Canaveral, and while this is mostly a breakbulk and cruise line terminal and not a true container terminal, it has a 38- to 40-foot draft. Mobile cranes would need to be arranged to handle container battery swapping, perhaps developing this into a future container terminal. One interesting aspect of the Atlantic South feeder service is the hub of Savannah. Unlike most East Coast ports that are strictly controlled by the International Longshoremen’s Association (ILA), it operates under a hybrid agreement where the ship-to-shore and yard container crane drivers are non-union and employed by the Georgia Ports Authority (GPA). This means that the re-handling fees typical in other East Coast ports are not applicable, and rehandling and shifting a container from an inbound transoceanic ship to a regional feeder ship can be considerably cheaper (about 1.3x the single handling fee rather than 2x). A major distinction for the Atlantic South service is the Gulf Stream, which makes the service quite different for the Northbound and Southbound directions. Between Miami and Port Canaveral, the Florida peninsula acts like a funnel. The Gulf Stream is squeezed into the Florida Straits, making it narrower, faster, and closer to shore. Up north from Jacksonville to Savannah, the current speed is 1.5 to 2.5 knots and often 50 to 70 miles offshore, while between Port Canaveral and Port Everglades the current can be as fast as 5 knots and only two to five miles from the beaches. The impact on the service is that Northbound there will be sections where the speed over the ground will be a 3-knot or more bonus, meaning the Port Everglades to Port Canaveral leg can be sailed at a faster speed, or with lower power. Conversely, when heading back to Miami, you fight the current and try to stay closer to the coast to avoid the worst of the current effects. This asymmetry needs to be accounted for in the feeder ship schedule, battery charging, and route planning. It could also require an additional intermediate port between Port Everglades and Port Canaveral on the Southbound service when the Gulf Stream is running strong, perhaps stopping at the Port of Palm Beach.
Page 43
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Approximate sea distances and typical current effects are shown below; included are the intermediate stops at Port Canaveral and at Palm Beach: Northbound (sailing offshore near mid-Gulf Stream) Miami – Port Everglades
25 to 30 nm
+1.5 knots current
Port Everglades – Palm Beach
40 to 45 nm
+3.5 knots current
Palm Beach – Port Canaveral
110 to 120nm
+3.5 knots current
Port Canaveral – Jacksonville
125 to 130 nm
+2.0 knots current
Jacksonville – Savannah
105 to 115 nm
+0.5 knots
Savannah – Charleston
85 to 90 nm
neutral
Southbound (sailing inshore to avoid the worst of the Gulf Stream) Charleston – Savannah
85 to 90 nm
neutral
Savannah – Jacksonville
105 to 115 nm
neutral
Jacksonville – Port Canaveral
125 to 130 nm
-0.5 knots current
Port Canaveral – Palm Beach
110 to 120 nm
-1.5 knots current
Palm Beach – Port Everglades
40 to 45 nm
-2.0 knots current
Port Everglades – Miami
25 to 30 nm
-2.0 knots current
Note that the Port of Palm Beach has a limiting 33-foot (10 meter) draft, which may be an issue for the larger feeder ship designs, and only some modest container facilities with mobile cranes. NORTHBOUND SERVICE • The service begins in Miami headed northward, picking up a full load of recently arrived imported electronics, high-end retail, high-value perishables, and medical equipment. • At Port Everglades, discharge some heavy consumer retail goods and building supplies. • At Palm Beach, discharge additional high-end consumer and retail goods and load refrigerated produce. • At Port Canaveral, discharge aerospace components for SpaceX and NASA, lumber and cruise ship provisions. • At Jacksonville, discharge automobile components and paper/pulp products. • At Savannah, discharge retail consumer goods and other imports. Load textiles and other industrial manufacturing supplies bound for Miami. • At Charleston, discharge all remaining imported loaded containers from Miami. SOUTHBOUND SERVICE • With the empty ship in Charleston, load auto parts (BMW, Volvo), heavy industrial loads, textiles and chemicals. • At Savannah, drop off manufacturing components and load regional-specific exports bound for Miami. • At Jacksonville, drop regional retail and load finished automobiles and specialized glass. • At Port Canaveral, discharge recycled metals and materials and specialized heavy machinery. • At Palm Beach, load sugar, molasses and refrigerated produce for export through Miami. • At Port Everglades, drop off industrial goods and load empties for Miami. • At Miami, discharge of all regional return cargo and empties. The service is a reasonable feeder service capable of pulling import containers arriving at Miami and Savannah for distribution to consumer markets along I-95 and picking up exports and empties to return to Savannah and Miami. This service is somewhat complicated due to the Gulf Stream and includes some long voyages with stops at intermediate ports for fresh batteries that do not have significant cargo opportunities.
Page 44
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
ROUTE 3 — MID-ATLANTIC NORFOLK – BALTIMORE – WILMINGTON, DE – PHILADELPHIA – NEWARK The approximate sea distances along this proposed feeder service are: Norfolk – Baltimore
140 to 160 nm
Via Chesapeake Bay; protected waters
Baltimore – Wilmington DE
80 to 100 nm
Chesapeake, C&D Canal, Delaware River
Wilmington, DE – Philadelphia
30 to 40 nm
Short upriver run
Philadelphia – Newark/Elizabeth
120 to 140 nm
Delaware Bay – Atlantic – NY Harbor
Baltimore – Wilmington has a draft limit of 35 feet (10.6 meters) from the C&D Canal and an air draft limit under the Summit Bridge Reedy Point Bridge of 135 feet (about 40 meters), which might be tight for the larger feeder ships. But the other ports all have drafts at or beyond 45 feet and all have fully developed container terminals with gantry cranes. The former Francis Scott Key Bridge had an air draft limit of 185 feet (56 meters). The 35-foot (10.6 meter) draft limit should be easily attainable for all except the largest feeder designs. This service might consider adding the James River Shuttle to Richmond to the schedule, but this would introduce the 25 to 27 foot (7.6 to 8.2-meter) draft restriction and air draft of 145 feet (44 meters) to transit the winding river route. This draft is probably too shallow for all but the smallest feeder ship designs. For this extension to the feeder service, it will be difficult to compete with the very successful existing barge service and is likely only suitable for ships designed specifically to meet a shallow draft. NORTHBOUND SERVICE • The service begins in Norfolk heading northward, picking up arriving loaded dry and reefer containers to be distributed to the mid-Atlantic, Baltimore, Washington and Philadelphia. • In Baltimore, dropping off loaded containers from Norfolk with retail imports and picking up some heavy machinery and auto components bound for export through Newark to Europe and the Middle East. • Next stop at Wilmington, DE, while not a traditional container hub like Newark, it is a major direct importer of fresh fruit (bananas, grapes, and citrus) and fruit juice concentrates. There is significant cargo directly arriving in Wilmington from Central/South America on smaller reefer ships and reefer container-carrying ships. The feeder service would be targeting these high-turnover reefer containers and break-bulk pallets of refrigerated fresh fruit that are currently transloaded into 53-foot reefer trailers for road transport to Ripening Centers or Distribution Centers in the Newark/Philadelphia area. Empty reefers can be picked up bound for cleaning and redistribution in Newark. Note that this will dictate reefer electrical capacity and additional battery requirements. • In Philadelphia, dropping off loaded containers from Norfolk with retail imports, dropping Wilmington reefer containers, and picking up specialized exports of pharmaceuticals and chemicals bound for Newark. • In Newark, dropping off empty dry and empty reefer containers since Newark is the primary destination for empty containers being returned to the global pool, and Baltimore/Philadelphia sourced loaded containers for export. SOUTHBOUND SERVICE • In Newark, the now empty ship picks up a full load of imported containers arriving on large transoceanic container ships from Asia and Europe destined for regional distribution in the mid-Atlantic. • In Philadelphia, dropping off loaded containers from Newark with retail imports, and picking up mostly empties and the occasional outbound load bound for export from Norfolk, • In Wilmington, DE, dropping off primarily empty reefers, and picking up any loaded fruit reefers arriving from Central/South America bound for Baltimore or Norfolk. • In Baltimore, dropping off loaded containers from Newark with retail imports, and picking up empties and heavy machinery and auto components bound for export through Norfolk to Europe and the Middle East. • Back to Norfolk, primarily dropping off empties and export containers sourced from Philadelphia and Baltimore, and starting the next round-trip cycle. • This is a reasonable and well-balanced feeder service with major import hubs of Norfolk and Newark at the ends of the route. The configuration is also accommodating for picking up Wilmington fruit reefer containers headed north, for picking up machinery in Baltimore and pharmaceuticals and chemicals in Philadelphia bound for large international export ships in Newark.
Page 45
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
ROUTE 4: ATLANTIC NORTH NEWARK – BOSTON The proposed feeder service would link the Newark/Elizabeth hub with the Conley Terminal in Boston, with stops at third-tier ports along the I-95 corridor which currently handle few containers but would be required to limit the leg distance to about 150 nautical miles and could be developed into second-tier container ports fairly easily. The approximate sea distances along this proposed feeder service are: Newark – New London
145 to 155 nm
Lower NY Bay, Sandy Hook, LI Sound via The Race
New London – New Haven
35 to 40 nm
Inside eastern Long Island Sound
New Haven – ProvPort
105 to 115 nm
Long Island Sound, Pt. Judith, Narragansett Bay
PortProv – Davisville
15 to 18 nm
South within Narragansett Bay
Davisville – Boston
145 to 155 nm
Narragansett-around outer Cape-Massachusetts Bay
The first and last legs are long but reasonable distances, but necessary to avoid the shorter but very restricted paths of the East River/Hell Gate (135-foot air draft and extreme tidal currents) and the Cape Cod Canal (32-foot draft and 135foot air draft). Note that using the inside passage as a back door to Long Island Sound through the East River and Hell Gate would permit adding Bridgeport, CT, to the schedule. New London and New Haven have draft restrictions of about 35 feet, but none of these ports have any air draft restrictions. The last stage between Davisville and Boston around Cape Cod is in the open Atlantic and subject to much heavier weather, especially in the winter. This will also increase the battery consumption, and this leg should include a significant battery sea margin to account for this. Note that this service can carry empties at a low marginal cost compared to trucking. The Southbound Service can act as an empty sweeper to provide a service to the big transoceanic carriers who need empties back in Newark. Truck service will remain faster than this short sea feeder shipping but is subject to highway congestion, delays and driver shortages. For some high-volume retailers, a reliable weekly arrival should be desirable compared to a “fast but variable” trucking service. NORTHBOUND SERVICE • The service begins in Newark, heading northbound, picking up a full load of arriving containers from Europe and Asia to be distributed to regional locations in New England. • Dropping off primarily imported retail goods containers in New London and loading some marine and defense export cargo. • In New Haven, dropping off containers with imported construction and industrial goods and loading export aerospace parts and components bound for Boston. • In PortProv, dropping off imported retail as well as specialized lumber and steel and loading food and beverage exports bound for Boston. • Minimal cargo transfer in Davisville, primarily a “pit stop,” to take on fresh batteries before rounding the Cape in the open ocean. • Arrival in Boston to discharge all remaining export-loaded containers for loading onto mainline large transoceanic container carriers. SOUTHBOUND SERVICE • In Boston with the ship fully discharged, loading high-value tech, electronics, and seafood, and empties to be relocated to Newark. • Again, in Davisville, battery swap only for discharge of Atlantic-spent units and taking on a full set of fully charged batteries. • In ProvPort, drop off loaded import retail containers from Boston, and load export containers from local manufacturing and empties bound for Newark. • New Haven to drop loaded import retail containers from Boston and load industrial scrap and specialized regional exports and empties bound for Newark. • New London to drop loaded imported supplies and load manufacturing exports and empties bound for Newark. • At Newark, discharge all export-bound loads and repositioned empties.
Page 46
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS
19. APPENDIX B — FLEET FINANCIAL ANALYSIS Light green are spreadsheet input values, and yellow are updated in Rev. 1. Variable Input Data Fuel Costs
US$/mt
MGO
800
VLSFO
600
bio-Diesel (est. 1.7 x MGO)
1,360
Fuel Consumption Slow Speed Engines
180
g/kW/hour
Fuel Consumption Medium Speed Aux.
210
g/kW/hour
24 hour
Off Peak
NJ
14.0
11
Average Industrial Electric Rates (¢/kWh) CT
18.5
15
RI
17.0
14
MA
19.0
15.5
Average
17.1
13.9
Current Fleetzero Rated Capacity (MWh)
3.47
Depth of Discharge
96.0%
2030 Capacity Increase
8.0%
Usable Battery Capacity MWh
3.60
Battery Charging Overall Efficiency
90.0%
Service years at less than 100 cycles/year Fuel CO2 Factor
96% of current Fleetzero capacity increased by 8% for 2030
12 gCO2e/mt
MGO
3.206
Tank-to-wake
3.900
Well-to-wake
bio-Diesel
2.900
Tank-to-wake
0.65
Well-to-wake
Construction Costs U.S. Shipyard 2026 Korea Escalation Factor
1.07
Electric Adjustment
1.15
Korea-U.S. Multiplier
5.0
Ships per order
5
Construction Costs ($M) Ship Type and Size
Conventional
Battery
TEU
2,500
2,000
1,500
1,000
2,500
2,000
1,500
1,000
Design Speed
19.3
18.6
17.6
15.9
19.3
18.6
17.6
15.9
SEP "Korea 2006" Price (five-ship order)
44.7
41.0
35.3
27.6
44.7
41.0
35.3
27.6
Adjusted for 15 knots
41.0
39.0
34.0
27.0
41.0
39.0
34.0
27.0
Benchmark for 2026 (x 1.07)
44
42
36
29
44
42
36
29
Benchmark for Electric (x 1.15)
--
--
--
--
50
48
42
33
US Price (x 5.0)
219
209
182
144
252
240
209
166
Note: Battery-electric prices do not include the cost of batteries.
Page 47
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Ship Capacity Fossil ICE
TEU
Nominal Capacity
2,500
2,000
1,500
1,000
Actual Full Rated Capacity
2,530
2,088
1,536
1,030
Homogenious 14 mt/TEU
1,832
1,492
1,140
810
Design Four-high Deckload
2,114
1,728
1,316
950
2,000
1,500
1,000
Battery Electric
TEU
Nominal Capacity
2,500
Actual Full Rated Capacity
2,696
2,216
1,616
1,140
Homogenious 14 mt/TEU
1,838
1,496
1,154
840
Design Four-high Deckload
2,124
1,736
1,352
980
Batteries Onboard (1/2 TEU each)
22
20
19
17
Design Four-high Deckload (loads)
2,113
1,726
1,343
972 Continued on next page
Page 48
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Voyage Analysis 2500 TEU (same for conventional or battery) Container Types
Weight (mt)
20ft Dry Loads
18.5
40ft Dry Loads
22.0
40ft Reefer Load
24.5
Empty
2.0
Containers
20ft Dry
Weight
40ft Dry
Weight
40ft Reefer
Weight
20ft MTY
Weight
TEU
Total Wt
Newark-load and departure
500
9,250
612
13,464
200
4,900
0
0
2,124
27,614
New London-disch
-100
-1,850
-50
-1,100
0
0
0
0
-200
-2,950
New London-load
0
0
25
550
0
0
0
0
50
550
400
7,400
587
12,914
200
4,900
0
0
1,974
25,214
0
0
-150
-3,300
-50
-1,225
0
0
-400
-4,525
New London-departure New Haven-disch New Haven-load
50
925
0
0
0
0
0
0
50
925
New Haven-departure
450
8,325
437
9,614
150
3,675
0
0
1,624
21,614
ProvPort-disch
-110
-2,035
-120
-2,640
0
0
0
0
-350
-4,675
ProvPort-load
0
0
75
1,650
0
0
0
0
150
1,650
ProvPort-daparture
340
6,290
392
8,624
150
3,675
0
0
1,424
18,589
Davisville-disch
0
0
-50
-1,100
-100
-2,450
0
0
-300
-3,550
Davisville-load
0
0
0
0
50
1,225
0
0
100
1,225
Davisville-departure
340
6,290
342
7,524
100
2,450
0
0
1,224
16,264
Boston-disch
-340
-6,290
-342
-7,524
-100
-2,450
0
0
-1,224
-16,264
Boston-load
200
3,700
350
7,700
100
2,450
400
800
1,500
14,650
Boston-departure
200
3,700
350
7,700
100
2,450
400
800
1,500
14,650
Davisville-disch
0
0
-50
-1,100
0
0
0
0
-100
-1,100
Davisville-load
0
0
75
1,650
0
0
200
400
350
2,050
Davisville-departure
200
3,700
375
8,250
100
2,450
600
1,200
1,750
15,600
ProvPort-disch
0
0
-50
-1,100
0
0
0
0
-100
-1,100
ProvPort-load
0
0
100
2,200
0
0
200
400
400
2,600
ProvPort-daparture
200
3,700
425
9,350
100
2,450
800
1,600
2,050
17,100
New Haven-disch
0
0
-50
-1,100
0
0
0
0
-100
-1,100
New Haven-load
100
1,850
75
1,650
0
0
200
400
450
3,900
New Haven-departure
300
5,550
450
9,900
100
2,450
1,000
2,000
2,400
19,900
New London-disch
0
0
-20
-440
0
0
0
0
-40
-440
New London-load
0
0
50
1,100
0
0
66
132
166
1,232
New London-departure
300
5,550
480
10,560
100
2,450
1,066
2,132
2,526
20,692
Newark-discharge
-300
-5,550
-480
-10,560
-100
-2,450
-1,066
-2,132
-2,526
-20,692
0
0
0
0
0
0
0
0
0
0
Newark-ready to load
Continued on next page
Page 49
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Long-haul and Short-haul Trucking Costs OTR Trucking
$/mile
Standard OTR Trucking /mile
2.50
Typical tolls/fuel surcharge
2.00
Detension and Chasis fees
1.00
Average Combined Rate for >110 miles
5.50
Fixed rate for <110 miles
$600
Premium for 20's acessory fees
110%
Discount for empties
80%
Drayage and Freight Consolodation (Fixed minimum) Newark — Dryage port to local CFS
$525
Boston — Dryage port to local CFS
$512
ProvPort and Davisville — Dryage port to local CFS
$438
New Haven and New London — Dryage port to local CFS
$475
Continued on next page
Page 50
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Inter-Port Container Moves
20ft Dry
Weight
40ft Dry
Weight
40ft Reefer
Weight
20ft MTY
Weight
TEU
Total Wt
Containers Moved
Newark-New London
100
1,850
50
1,100
0
0
0
0
200
2,950
150
Newark-New Haven
0
0
150
3,300
50
1,225
0
0
400
4,525
200
NewarkProvPort
110
2,035
120
2,640
0
0
0
0
350
4,675
230
NewarkDavisville
0
0
50
1,100
100
2,450
0
0
300
3,550
150
NewarkBoston
290
5,365
242
5,324
50
1,225
0
0
874
11,914
582
New LondonBoston
0
0
25
550
0
0
0
0
50
550
25
New Haven - Boston
50
925
0
0
0
0
0
0
50
925
50
ProvPortBoston
0
0
75
1,650
0
0
0
0
150
1,650
75
DavisvilleBoston
0
0
0
0
50
1,225
0
0
100
1,225
50
Total Northbound
550
10,175
712
15,664
250
6,125
0
0
2,474
31,964
1,512
Inter-Port Container Moves
20ft Dry
Weight
40ft Dry
Weight
40ft Reefer
Weight
20ft MTY
Weight
TEU
Total Wt
Containers Moved
BostonDavisville
0
0
50
1,100
0
0
0
0
100
1,100
50
BostonProvPort
0
0
50
1,100
0
0
0
0
100
1,100
50
Boston-New Haven
0
0
50
1,100
0
0
0
0
100
1,100
50
Boston-New London
0
0
20
440
0
0
0
0
40
440
20
BostonNewark
200
3,700
180
3,960
100
2,450
400
800
1,160
10,910
880
DavisvilleNewark
0
0
75
1,650
0
0
200
400
350
2,050
275
ProvportNewark
0
0
100
2,200
0
0
200
400
400
2,600
300
New HavenNewark
100
1,850
75
1,650
0
0
200
400
450
3,900
375
New LondonNewark
0
50
1,100
0
0
66
132
166
1,232
116
Total Southbound
300
650
14,300
100
2,450
1,066
2,132
2,866
24,432
2,116
Total North and South
5,550
3,628
Page 51
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Inter-Port Container Moves
20ft Dry
Weight
40ft Dry
Weight
40ft Reefer
Weight
20ft MTY
Weight
TEU
Total Wt
Containers Moved
Newark-New London
100
1,850
50
1,100
0
0
0
0
200
2,950
150
Newark-New Haven
0
0
150
3,300
50
1,225
0
0
400
4,525
200
NewarkProvPort
110
2,035
120
2,640
0
0
0
0
350
4,675
230
NewarkDavisville
0
0
50
1,100
100
2,450
0
0
300
3,550
150
NewarkBoston
290
5,365
242
5,324
50
1,225
0
0
874
11,914
582
New LondonBoston
0
0
25
550
0
0
0
0
50
550
25
New Haven - Boston
50
925
0
0
0
0
0
0
50
925
50
ProvPortBoston
0
0
75
1,650
0
0
0
0
150
1,650
75
DavisvilleBoston
0
0
0
0
50
1,225
0
0
100
1,225
50
Total Northbound
550
10,175
712
15,664
250
6,125
0
0
2,474
31,964
1,512
Inter-Port Container Moves
20ft Dry
Weight
40ft Dry
Weight
40ft Reefer
Weight
20ft MTY
Weight
TEU
Total Wt
Containers Moved
BostonDavisville
0
0
50
1,100
0
0
0
0
100
1,100
50
BostonProvPort
0
0
50
1,100
0
0
0
0
100
1,100
50
Boston-New Haven
0
0
50
1,100
0
0
0
0
100
1,100
50
Boston-New London
0
0
20
440
0
0
0
0
40
440
20
BostonNewark
200
3,700
180
3,960
100
2,450
400
800
1,160
10,910
880
DavisvilleNewark
0
0
75
1,650
0
0
200
400
350
2,050
275
ProvportNewark
0
0
100
2,200
0
0
200
400
400
2,600
300
New HavenNewark
100
1,850
75
1,650
0
0
200
400
450
3,900
375
New LondonNewark
0
50
1,100
0
0
66
132
166
1,232
116
Total Southbound
300
650
14,300
100
2,450
1,066
2,132
2,866
24,432
2,116
Total North and South
Page 52
5,550
3,628
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS OTR Trucking Avoided
Longhaul Trucking Avoided
Containers Moved
Shorthaul Trucking Avoided
Miles
20ft
40ft
Empty
Total Moved
Road Miles
20 ft
40 ft
Empty
20ft
40 ft
Empty
132
100
50
0
150
19,800
79,860
36,300
0
52,250
23,750
0
85
0
200
0
200
17,000
0
120,000
0
0
104,500
0
186
110
120
0
230
42,780
123,783
122,760
0
52,998
52,560
0
178
0
150
0
150
26,700
0
146,850
0
0
65,700
0
225
290
292
0
582
130,950
394,763
361,350
0
163,328
149,504
0
102
0
25
0
25
2,550
0
15,000
0
0
12,800
0
136
50
0
0
50
6,800
41,140
0
0
28,160
0
0
50
0
75
0
75
3,750
0
45,000
0
0
38,400
0
0
30,000
0
0
25,600
0
639,546 877,260
0
296,736
472,814
0
67
0
50
0
50
3,350
550
962
0
1512
253,680
Miles
20ft
40ft
Empty
Total Moved
Road Miles
20 ft
40 ft
Empty
20 ft
40 ft
Empty
70
0
50
0
50
3,500
0
30,000
0
0
21,900
0
52
0
50
0
50
2,600
0
30,000
0
0
21,900
0
139
0
50
0
50
6,950
0
38,225
0
0
23,750
0
106
0
20
0
20
2,120
0
12,000
0
0
10,450
0
235
200
280
400
880
206,800
132000
168,000
192,000
284,350 361,900 413,600
191
0
75
200
275
52,525
0
78,788
168,080
0
45,000
96,000
195
0
100
200
300
58,500
0
107,250
171,600
0
60,000
96,000
96
100
75
200
375
36,000
66,000
45,000
96,000
66000
45,000
96,000
142
0
50
66
116
16,472
0
39,050
41,237
0
30,000
31,680
300
750
1066
2116
385,467
350,350
742,213
890,517
198,000 426,000
511,680
Continued on next page
Page 53
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Power (kW) for Ship Type and Size
Conventional
Battery
TEU
2,500
2,000
1,500
1,000
2,500
2,000
1,500
1,000
Propulsion Power at Sea
12,981
10,895
7,774
4,481
5,227
4,860
4,228
3,658
19
19
18
16
15
15
15
15
Power at 15 Knots
6,094
5,714
4,813
3,762
5,227
4,860
4,228
3,658
Service Speed Reefer Power at Sea
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
Auxiliary Power at Sea
500
500
500
500
500
500
500
500
Total Power at Sea
7,594
7,214
6,313
5,262
6,727
6,360
5,728
5,158
Propulsion Power Maneuvering
2,029
1,903
1,603
1,253
1,741
1,618
1,408
1,218
Thruster Power
1,200
1,200
1,200
1,200
1,200
1,200
1,200
1,200
Reefer Power at Maneuvering
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
Auxiliary Power Maneuvering
500
500
500
500
500
500
500
500
Total Power Maneuvering
4,729
4,603
4,303
3,953
4,441
4,318
4,108
3,918
ReeferPower in Port
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
Auxiliary Power in Port
500
500
500
500
500
500
500
500
Total Power in Port
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
Main Engine - Power (kw)
6,094
5,714
4,813
3,762
Main Engine - fuel rate (g/kWh)
180
180
180
180
Aux Engines - Power (kW)
1,500
1,500
1,500
1,500
Aux Engines - Fuel rate (kg/hour)
210
210
210
210
Hours at Sea per RT
65
65
65
65
Fuel Consumption (mt/RT)
92
88
77
65
Main Engine — Power (kw)
2,029
1,903
1,603
1,253
Main Engine — Fuel Rate (g/kWh)
180
180
180
180
Fuel Consumption — Conventional At Sea
Maneuvering
Aux Engines — Power (kW)
2,700
2,700
2,700
2,700
Aux Engines — Fuel Rate (kg/hr)
210
210
210
210
Hours at Sea per RT
14
14
14
14
Fuel Consumption (mt/RT)
13
12
12
11
Aux Engines — Power (kW)
2,500
2,500
2,500
2,500
Port/Waiting/Slack Aux Engines — Fuel rate (kg/hour)
210
210
210
210
Hours at Sea per RT
89
89
89
89
Fuel Consumption (mt/RT)
47
47
47
47
Hours per Round Trip voyage
168
168
168
168
Days per Round Trip voyage
7
7
7
7
Fuel Consumption mt/RT voyage
152
147
136
122
MGO Fuel Cost ($/RT voyage)
121,370
117,548
108,474
97,905
BioDiesel Cost ($/RT voyage)
206,329
199,832
184,406 166,438
Page 54
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Power (kW) for Ship Type and Size
Conventional
Battery
TEU
2,500
2,000
1,500
1,000
2,500
2,000
1,500
1,000
Propulsion Power at Sea
12,981
10,895
7,774
4,481
5,227
4,860
4,228
3,658
19
19
18
16
15
15
15
15
Power at 15 Knots
6,094
5,714
4,813
3,762
5,227
4,860
4,228
3,658
Service Speed Reefer Power at Sea
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
Auxiliary Power at Sea
500
500
500
500
500
500
500
500
Total Power at Sea
7,594
7,214
6,313
5,262
6,727
6,360
5,728
5,158
Propulsion Power Maneuvering
2,029
1,903
1,603
1,253
1,741
1,618
1,408
1,218
Thruster Power
1,200
1,200
1,200
1,200
1,200
1,200
1,200
1,200
Reefer Power at Maneuvering
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
Auxiliary Power Maneuvering
500
500
500
500
500
500
500
500
Total Power Maneuvering
4,729
4,603
4,303
3,953
4,441
4,318
4,108
3,918
ReeferPower in Port
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
Auxiliary Power in Port
500
500
500
500
500
500
500
500
Total Power in Port
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
Main Propulsion - Power (kw)
5,227
4,860
4,228
3,658
Reefer + hotel - Power (kW)
1,500
1,500
1,500
1,500
Hours at Sea per RT
65
65
65
65
Power Consumption (MWh/RT)
439
416
374
337
Main Propulsion - Power (kw)
1,741
1,618
1,408
1,218
Power Consumption — Battery Electric At Sea
Maneuvering Reefer + hotel - Power (kW)
2,700
2,700
2,700
2,700
Hours Maneuvering per RT
14
14
14
14
Power Consumption (MWh/RT)
61
59
56
54
2,500
2,500
2,500
2,500
Port/Waiting/Slack Reefer + hotel - Power (kW) Hours Maneuvering per RT
89
89
89
89
Power Consumption (MWh/RT)
223
223
223
223
Hours per Round Trip Voyage
168
168
168
168
Days per Round Trip Voyage
7
7
7
7
Power Consumption mt/RT Voyage (MWh/RT)
723
697
653
613
Battery Charging Overall Efficiency
1
1
1
1
Charging Power Required
803
774
725
681
24-hour Industrial Electric Rates (¢/kWh)
17
17
17
17
137,511
132,631
124,227
116,647
Power Cost ($/RT voyage) Off-Peak Indust. Electric Rates (¢/kWh) Power Cost ($/RT voyage)
14
14
14
14
111,414
107,460
100,651
94,510
Page 55
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Capital Recovery Factor
Discount Rate
Economic Life
CRF
Standard Commercial Loan
9%
20
10.95%
MARAD Title XI/Green Loan
6%
25
7.82%
Green Loan (Battery Lifetime)
6%
10
13.59%
Battery Cost Rate ($/kWh)
$200
Single Battery Rated Capacity (MWh) Single Battery Cost
3.6 $719,539
Shore Charging Infrastructure ($/kW) 1000 kW Charging Station
$800 $800,000
Number of Ports
6
Charging Infrastructure Capex
$4,800,000
Ships per Service Fleet
2
Charging Infrastructure Capex/Ship
$2,400,000
Default Opex Conventional Base Wages and Overtime
$205,000 average per crew per year (officers and crew, including overtime)
Benefits, Pension and Medical
$110,000 average per crew per year (officers and crew, including overtime)
Travel and Rotation Logistics
$40,000
Provisions
$12,000 per crew/year
Training and P&I Crew Insurance
$18,000
Stores and Supplies
$330,000
Main Engine Lube Oil
0.9 g/kWh x Main Engine kW x 350/2 days/year x 24 hours/day x 1 / 915g/liter x $2.50/liter
SSDG Luba
$30,000 per year
Spare Parts
$180,000 + 4.17 * MCR
Maintenance and Repairs
$200,000 + 10 * GRT
Drydocking costs
$243,000 + 6.7 * GRT
Hull and Machinery
0.2% * 80% Ship Construction Cost
P&I Insurance
$900 *GTR^0.5
Other Insurance
+30%
Management Fee
$50000 * GRT ^ 0.2
Default Opex Battery-Electric Crew Costs
Reduced by 4 engine dept
Provisions
Same
Stores and Supplies
10% lower
Lube Oil
85% lower
Spare Parts
60% lower
Maintenance and Repairs
50% lower
Drydocking costs
30% lower
Insurance
10% higher (Lithium battery risk)
Management Fee
10% higher (coordinating battery logistics Continued on next page
Page 56
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Total Voyage Summary — Capex and Opex Ship Type and Size TEU Ship Capex (M)
Conventional 2,500
2,000
1,500
1,000
$219,350,000
$208,650,000
$181,900,000
$144,450,000
Capital Recovery Factor
10.95%
10.95%
10.95%
10.95%
Ship Annual Capital Cost
$24,029,019
$22,856,872
$19,926,504
$15,823,988
Batteries per Ship (including sea + port time) Terminal Batteries Required Ships per service fleet Fleet Batteries Required Batteries per Ship Single Battery Cost Total Battery Capex Battery Capital Recovery (10-year) Battery Annual Capital Cost Charging Infrastructure Capex Capital Recovery Charging Annual Capital Cost Ship/Battery/Charging Capex
$24,029,019
$22,856,872
$19,926,504
$15,823,988
LBP
183.00
167.00
154.00
141.00
B
32.20
30.00
27.50
24.60
D
16.80
16.60
14.50
12.00
CN (L BP x B x D)/100
990.0
831.7
614.1
416.2
GRT (30.46 CN ^ 0.9883)
27816
23416
17351
11815
ME kW
6094
5714
4813
3762
SSDG kw
1500
1500
1500
1500
No. of Crew
22
22
22
22
Base Wages and Overtime
$4,510,000
$4,510,000
$4,510,000
$4,510,000
Benefits, Pension and Medical
$2,420,000
$2,420,000
$2,420,000
$2,420,000
Travel and Rotation Logistics
$880,000
$880,000
$880,000
$880,000
Training and P&I Crew Insurance
$396,000
$396,000
$396,000
$396,000
Total Crew Costs
$8,206,000
$8,206,000
$8,206,000
$8,206,000
Provisions
$264,000
$264,000
$264,000
$264,000
Stores and Supplies
$330,000
$330,000
$330,000
$330,000
Lube Oil
$124,409
$118,525
$104,556
$88,285
Spare Parts
$291,265
$273,664
$249,405
$227,258
Maintenance and Repairs
$339,081
$317,080
$286,756
$259,073
Drydocking Costs
$429,368
$399,887
$359,253
$322,158
Hull and Machinery Insurance
$350,960
$333,840
$291,040
$231,120
P&I Insurance
$150,104
$137,721
$118,552
$97,826
Other Insurance
$150,319
$141,468
$122,877
$98,684
Management Fee
$387,106
$374,001
$352,238
$326,177
Annual Operation Cost
$11,022,611
$10,896,185
$10,684,676
$10,450,581
Annual Capex + Opex
$35,051,630
$33,753,057
$30,611,180
$26,274,569
Weekly Capex + Opex
$701,033
$675,061
$612,224
$525,491
Weekly Fuel/Power Costs
$121,370
$117,548
$108,474
$97,905
Total Weekly Cost (Capex + Opex + Fuel)
$822,403
$792,609
$720,698
$623,396
Total Annual Cost
$41,120,145
Ratio Battery/Fossil
Page 57
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Total Voyage Summary — Capex and Opex Ship Type and Size TEU Ship Capex (M)
Battery 2,500
2,000
1,500
1,000
$252,252,500
$239,947,500
$209,185,000
$166,117,500
Capital Recovery Factor
7.82%
7.82%
7.82%
7.82%
Ship Annual Capital Cost
$19,732,885
$18,770,305
$16,363,856
$12,994,827
Batteries per Ship (including sea + port time)
22
20
19
17
Terminal Batteries Required
149
138
127
116
Ships per service fleet
2
2
2
2
Fleet Batteries Required
193
179
164
150
Batteries per Ship
97
89
82
75
Single Battery Cost
$719,539
$719,539
$719,539
$719,539
Total Battery Capex
$69,435,533
$99,252,801
$91,294,262
$83,335,722
Battery Capital Recovery (10-year)
13.59%
13.59%
13.59%
13.59%
Battery Annual Capital Cost
$9,434,064
$13,485,275
$12,403,965
$11,322,654
Charging Infrastructure Capex
$2,400,000
$2,400,000
$2,400,000
$2,400,000
Capital Recovery
7.82%
7.82%
7.82%
7.82%
Charging Annual Capital Cost
$187,744
$187,744
$187,744
$187,744
Ship/Battery/Charging Capex
$29,354,693
$32,443,325
$28,955,565
$24,505,225
LBP
183.00
167.00
154.00
141.00
B
32.20
30.00
27.50
24.60
D
16.80
16.60
14.50
12.00
CN (L BP x B x D)/100
990.0
831.7
614.1
416.2
GRT (30.46 CN ^ 0.9883)
27816
23416
17351
11815
ME kW
6727
6360
5728
5158
SSDG kw
$0
$0
$0
$0
No. of Crew
18
18
18
18
Base Wages and Overtime
$3,690,000
$3,690,000
$3,690,000
$3,690,000
Benefits, Pension and Medical
$1,980,000
$1,980,000
$1,980,000
$1,980,000
Travel and Rotation Logistics
$720,000
$720,000
$720,000
$720,000
Training and P&I Crew Insurance
$324,000
$324,000
$324,000
$324,000
Total Crew Costs
$6,714,000
$6,714,000
$6,714,000
$6,714,000
Provisions
$264,000
$264,000
$264,000
$264,000
Stores and Supplies
$297,000
$297,000
$297,000
$297,000
Lube Oil
$20,132
$19,279
$17,811
$16,486
Spare Parts
$116,506
$109,466
$99,762
$90,903
Maintenance and Repairs
$169,540
$158,540
$143,378
$129,537
Drydocking Costs
$300,558
$279,921
$251,477
$225,510
Hull and Machinery Insurance
$403,604
$383,916
$334,696
$265,788
P&I Insurance
$165,114
$151,493
$130,407
$107,608
Other Insurance
$170,615
$160,623
$139,531
$112,019
Management Fee
$425,816
$411,401
$387,461
$358,795
Annual Operation Cost
$9,046,886
$8,949,638
$8,779,522
$8,581,646
Annual Capex + Opex
$38,401,579
$41,392,963
$37,735,087
$33,086,872
Weekly Capex + Opex
$768,032
$827,859
$754,702
$661,737
Weekly Fuel/Power Costs
$111,414
$107,460
$100,651
$94,510
$879,446
$935,319
$855,353
$756,247
118%
119%
121%
Total Weekly Cost (Capex + Opex + Fuel) Total Annual Cost
$43,972,279
Ratio Battery/Fossil
107%
Page 58
PATHWAYS TO A LOW-CARBON FUTURE: ELECTRIC FEEDER CONTAINERSHIPS Total Voyage — Cost Comparison
Conventional — 2,500 TEU
Battery — 2,500 TEU
Total Containers Transported/Voyage
3,628
$/Container
3,628
$/Container
Longhaul OTR Trucking Cost Avoided
$3,499,885
$965
3,499,885
$965
Feeder Ship (Capex/Opex/Fuel)
$822,403
$227
$879,446
$242
Shorthaul Trucking Cost Required
$1,905,230
$525
$1,905,230
$525
Extra Longshore Handling (Hub Ports)
$1,934,200
$533
$1,934,200
$533
Longshore Handling (Feeder Ports)
$476,520
$131
$476,520
$131
Feeder Ship Port Fees
$130,000
$36
$130,000
$36
Total Feeder Cost
$5,268,353
$1,452
$5,325,396
$1,468
Net Gain/Loss for Feeder
-$1,768,468
-$487
-$1,825,511
-$503
Page 59
CONTACT INFORMATION NORTH AMERICA REGION 1701 City Plaza Dr. Spring, Texas 77389, USA Tel: +1-281-877-6000 Email: ABS-Amer@eagle.org
SOUTH AMERICA REGION
Rua Acre, nº 15 - 11º floor, Centro Rio de Janeiro 20081-000, Brazil Tel: +55 21 2276-3535 Email: ABSRio@eagle.org
EUROPE REGION
111 Old Broad Street London EC2N 1AP, UK Tel: +44-20-7247-3255 Email: ABS-Eur@eagle.org
AFRICA AND MIDDLE EAST REGION Al Joud Center, 1st floor, Suite # 111 Sheikh Zayed Road P.O. Box 24860, Dubai, UAE Tel: +971 4 330 6000 Email: ABSDubai@eagle.org
GREATER CHINA REGION
World Trade Tower, 29F, Room 2906 500 Guangdong Road, Huangpu District, Shanghai, China 200000 Tel: +86 21 23270888 Email: ABSGreaterChina@eagle.org
NORTH PACIFIC REGION
11th Floor, Kyobo Life Insurance Bldg. 7, Chungjang-daero, Jung-Gu Busan 48939, Republic of Korea Tel: +82 51 460 4197 Email: ABSNorthPacific@eagle.org
SOUTH PACIFIC REGION
7 Science Park Drive #09-21/32 Geneo, Singapore 119316 Tel: +65 6276 8700 Email: ABS-Pac@eagle.org
© 2026 American Bureau of Shipping. All rights reserved.