COFFMAN SPECIALTIES, INC.

9685 Via Excelencia, Suite 200 San Diego CA 92126 Phone 858-536-3100 www.coffmanspecialties.com

Coffman Specialties, Inc. Qualifications

BNSF Railway Company

Issued: 01.22.2024


750,000 CY of Concrete Paving Annually

About Coffman Our expertise has positioned Coffman as a leader in the concrete paving industry, batching and placing more than 750,000 CY of concrete and cement-based materials annually.

WE CONSTRUCT TOP QUALITY PAVEMENT FOR HIGH-PRODUCTION PAVING PROJECTS Coffman has a long history of constructing high quality pavements throughout Southern California, including the desert environments of San Bernardino, Riverside, and Imperial counties.

Coffman Specialties, Inc. was founded in 1990. For over 33 years, owners of heavy civil infrastructure have relied on Coffman to deliver large, technically challenging projects requiring expertise in concrete paving. Our capabilities are coupled with a performance-driven reputation of providing top quality pavements on high-production paving projects. The company has a long history of constructing high quality pavements throughout Southern California, including the desert environments of San Bernardino, Riverside, and Imperial counties. Additionally, Coffman has delivered more freeway lane-miles of concrete paving throughout these counties than all other contractors combined. The company’s success is attributed to our long-standing goals of working in partnership with the owners we serve to safely deliver high quality paving projects on-time and within budget.


Coffman’s position as a leader in the concrete paving industry affords us procurement advantages that result in cost and schedule certainty.

What we do Our capabilities extend well beyond our operational expertise, and include developing concrete mix designs, raw material suitability and source selection, material manufacturing and procurement, site logistics, and control processes that ensure quality regardless of challenging environmental and site conditions. IN-DEPTH KNOWLEDGE OF CONSTRUCTING CONCRETE PAVEMENTS IN A DESERT ENVIRONMENT Aggregate Source selection is the single most important decision to develop economical concrete mixes with the desired strength and durability characteristics. We have explored, tested, and/or sourced both coarse and fine aggregates for concrete mix designs from every commercial quarry in the region, and possess full knowledge of the aggregate characteristics unique to each source. Concrete Mix Designs / Material Suitability

Material Manufacturing and Procurement

In addition to our comprehensive knowledge of regional aggregate sources, Coffman’s position as a leader in the concrete paving industry affords us procurement advantages that result in cost and schedule certainty including direct sales access with the major cement suppliers, and access to exclusive aggregate sources in the Barstow region. Coffman also has the ability and industry resources to process the aggregates ourselves rather than rely on quarry resources.

Site Logistics

Large paving projects require hundreds of deliveries of raw materials (coarse aggregates, fine aggregates, cement, and admixtures) to support the concrete paving operations. The materials are stockpiled for immediate use. Therefore, deliveries during paving operations are continual. A detailed plan for material handling, storage, and site logistics is necessary to ensure these deliveries largely go unnoticed. Coffman has expertise in all aspects of material handling, and the management and coordination of site logistics.

Operational Controls – Mitigating Challenging Conditions

We have completed over 35 concrete paving contracts in the Coachella Valley, Imperial Valley, and Lower Colorado River Valley. Our expertise is bolstered by our experience constructing a wide variety of pavement thicknesses including: 4” thick canal lining (AllAmerican Canal); 12-14” freeway pavement; 18-20” airfield paving; and, 24” craneways (Intermodal Yard, Glamis). All of these desert projects required stringent controls for batching, hauling, and placing a wide variety of pavement types ranging from Portland cement concrete to exotic mixes for high-heat resistant, long-life pavement used for aircraft take-off and landing pads.


Capacity The successful delivery of each project is dependent on our most important asset – our people. STATE-OF-THE ART EQUIPMENT FLEET 33 Years Experience

750,000 CY Annually Batch and Place up to 6,500+ CY per Day 4 Batch Plants 8 Paving Machines (Gomaco) Full Compliment of Support Equipment

250 Projects Complete

WELL-POSITIONED TO TAKE ON LARGE PAVING PROJECTS IN 2024 AND INTO THE FUTURE 500 400 Cost in Millions

OUR TEAM STATISTIC

250 People

Coffman has consistently increased our capacity through the demonstrated performance of our highly skilled and dedicated work force, and our management team. In addition, we place high value on providing our crafts people a state-of-the-art equipment fleet to support their consistent performance and promote continued improvement. For example, Coffman recently purchased two Gomaco GP4 paving machines - the most sophisticated and advanced pavers on the market. Our current resources (people, equipment, and financial capacity) afford us the ability manage and build numerous large paving projects simultaneously, or dedicate a multitude of resources to deliver mega-projects.

300 200 100 0

2024

2025

CA Operations Excess Capacity

2026 AZ Operations

2027

2028

Airfield Operations


Completed more than $3.5B in infrastructure as both a Prime Contractor and Major Subcontractor.

Partners/ Projects

Ames Construction

11 Projects

Granite Construction

9 Projects

Skanska (includes Yeager-Skanska)

Our experience includes numerous concrete paving projects working as a subcontractor and/or joint venture partner with many of the largest and most respected names in the heavy civil construction industry.

26 Projects

Griffith Company

13 Projects

Parsons Transportation Group

1 Project

Fisher Sand & Gravel

2 Projects

Kiewit Pacific

2 Projects

Clark/McCarthy JV

1 Project

0

100 Joint Venture Partner

200

300 Cost in Millions

400

Subcontractor

Stockton, CA – Burlington Northern Railroad Loading Apron (in association with Granite Construction)  The project was part of the original 425 acre BNSF intermodal facility in Stockton, CA.  Coffman batched and placed over 55,000 CY of 12” thick concrete paving.

Phoenix Sky Harbor International Airport – Center and North Runways (Ames/Coffman Joint Venture)  Fast-track reconstruction concrete paving of 300,000 CY of 18” PCCP.  Multi-phased paving at an active airport handling 100,000 passengers and 600 tons of air cargo daily.  Coffman batched and placed up to 6,500 CY per day to complete the concrete paving on each project in 80 calendar days. Los Angeles International Airport – Multiple Projects (Griffith/Coffman Joint Venture)  West Aircraft Maintenance Area developed 68 acres of taxiways, parking aprons, and airfield facilities.  Three Runway Safety Area improvement projects.  Coffman batched and placed a total of 180,000 CY of PCCP on these 4 projects.

Imperial Valley, CA – All American Canal Lining (Ames/Coffman Joint Venture)  Concrete canal lining for over 10-miles of the 82-mile waterway.  The canal is 150-feet wide at the top, 50-feet wide at the bottom, with a 2:1 side-slopes.  Coffman partnered with GOMACO to develop a one-of-a-kind paver capable of lining 72-feet-wide.  850,000 SY, 4” thick canal lining was completed ahead of schedule. Moreno Valley, CA – Route 60 Truck Lanes (in association with Skanska)  Reconstruct a 4.5-mile section of Route 60 from Gilman Springs Road to 1.4 miles west of Jack Rabbit Trail.  Paving completed through mountainous terrain with a curving alignment and steep grades.  90,000 CY of JPCP. Gorman, CA – I-5 North of Castaic (Griffith/Coffman Joint Venture)  Traversed 16-miles along I-5, ascending Tejon Pass along a grade known as The Grapevine.  Coffman self-performed lean concrete base (LCB) and PCCP.  Successfully batched and placed approximately 400,000 CY of LCB and PCCP. Riverside County, CA - I-10/177 Sep to CA/AZ State Line (in association with Fisher Sand & Gravel Co.)  54-mile (216 lane-miles) reconstruction in each direction of I-10 (2 Contracts).  580,000 CY of JPCP (combined).

500


Coffman has completed approximately 250 projects, including numerous projects in the Barstow region.

Portfolio - our work Coffman has completed approximately 250 projects as a Prime Contractor and Major Subcontractor on concrete paving projects in the southwestern U.S., including numerous projects in the Barstow region.

We have used a variety of alternative delivery methods, including designbuild, design-sequencing, best-value trade-off, and CMAR/CMGC. Essential to the success of all of these projects is effective coordination, communication, and collaboration between the design team, construction team, and the owner. We have processes to capitalize on the benefits of these delivery methods while working side-by-side with owners, designers, and regulatory agencies. These processes include: cradle-to-grave risk analysis; risk management; method analysis; value analysis; design coordination; and constructability reviews. SR 58/I-15 in Barstow, CA (in association with E.L. Yeager (now Skanska))

 More than 50,000 CY of PCCP.

Walmart Distribution Center in Victorville, CA (in association with E.L. Yeager-Skanska (now Skanska))

Southern California Logistics Airport, Runway 17/35 Rehabilitation Phase 1A, 1B, and 3 in Victorville, CA

 More than 1,000,000 SF (23 acres) of PCCP.

 62,000 CY of structural runway pavement.  17.5” thick PCCP, 5” of cement-treated base course, 6” aggregate base course, and 12” compacted sub-base.


I-15 Reconstruction, Victorville to Barstow, CA (in association with E.L. Yeager (now Skanska))

 Reconstruct 25-miles in each direction between Victorville and Barstow in the high desert.  Lean concrete base and pavements totaled 500,000+ CY.  46½-feet-wide paved in one pass with a computerized IDBI paver.

I-15 Cajon Pass Rehabilitation in Hesperia, CA (Design-Build) (joint-venture with Parsons Transportation Group)

 North and southbound lanes for 12-miles (52 lane-miles) along I-15 through the Cajon Pass.  Innovative traffic handling strategies were implemented to expedite the work and improve pavement quality including: 55-hour weekend closures, construction islands, crossover lanes, and reversible lanes.  85,000 CY of lean concrete base (LCB) and 213,000 CY of jointed plain concrete pavement.


Thank you for your business COFFMAN SPECIALTIES, INC.

9685 Via Excelencia, Suite 200 San Diego CA 92126 Phone 858-536-3100 www.coffmanspecialties.com