Skip to main content

Portfolio Aakangsha Roy

Page 1

AR

PORTFOLIO AAKANGSHA ROY

|

VIVEKANANDA GLOBAL UNIVERSITY,

|

JAIPUR 1


ACADEMIC WORK SEM 01:

VIVEKANANDA MEMORIAL

SEM 02:

CONTAINER OFFICE

SEM 03:

BUNGALOW

SEM 04:

SPORTS COMPLEX

SEM 05:

MULTI FAMILY HOUSING

SEM 06:

SCIENTIST MUSEUM AND MEMORIAL

SEM 07:

MEDICAL CAMPUS

SEM 07:

HOTEL INTERIOR DESIGN

SEM 09:

MIXED USE PROJECT


3


CONTENTS

01.

03.

MIXED USE PROJECT

05.

MEDICAL CAMPUS

02.

UJJAIN MUSEUM

MULTI FAMILY HOUSING

04.

HOTEL INTERIOR


07.

09.

TECHNICAL DRAWINGS

SOLAR DECATHLON

06.

INDOOR SPORTS COMPLEX

08.

INTERNSHIP WORKS

10.

MISCELLENEOUS

5


01

MIXED USE PROJECT


CONCEPT

PROJECT DATA

The dynamic mixed-use project, harmonizing commerce and tranquility, features a commercial block with small terraces, gracefully curved to enhance street appeal. This lively space invites vibrant business activities. Meanwhile, the residential block, nestled in a serene silent zone, boasts double-height alternate balconies, providing residents with a peaceful retreat.

Type Built Up Area Plot Area

Academic 23364 Sqm 10407 Sqm

Location

Kuber Complex, at Village Reed, Khatipura, Gandhi Path, Vaishali Nagar, Jaipur

Semester

9th sem

This project aims to address the shortage of residential and commercial spaces in Jaipur by developing a sustainable, mixeduse tall building. The proposal emphasizes maximizing land use efficiency by incorporating both residential and commercial functions vertically. This eco-friendly development will enhance community amenities and contribute to the overall urban landscape. With a focus on integration, the project aligns with mixed-use zoning principles, providing a holistic solution to the city’s spatial and functional needs, creating an ideal opportunity for real estate investors. Permisible height for the project is 60m with a BAR of 2.25. Maximum ground coverage alloted is 40% of the site area i.e 4162 sqm. The ground coverage achieved is 2998sqm. ECU : 273

7

SITE PLAN


SECTION AA’ GROUND FLOOR PLAN


9 EAST SIDE ELEVATION


02

UJJAIN MUSEUM


CONCEPT This project will bring many children as well as many more visitors who will learn about the struggles our brave scientists faced prior to independence. The museum represents a foetus on the site. The design is fluid and with clear path ,will help visitors explore more without any confusion . The project consists of all the site water collected at a particular area as an ecological pond through channels throughout the periphery of the proposed site.

PROJECT DATA Type Built Area Plot Area Team Mates Location Competition SITE LOCATION AND TOPOGRAPHY

Semester

Competition 8392 Sqm 24500 Sqm Siddharth Sharma Kamna Mishra Ujjain, Madhya Pradesh Azadi ka Amrit Mahotsav Architecture competition, Indore 6th sem

The project is in an important location within the planetarium complex. Madhya Pradesh Science and Technology Minister Omprakash Sakhlecha launched a national level architectural creation competition on the theme “Contribution of Indian Scientists in India’s Freedom Movement”. It is a national level competition not only to honor and recognize the incomparable contribution of Indian scientists in India’s freedom struggle by presenting it in the form of a memorial and museum, but also to present it to the present generations of Indians. The Museum had requirements of atleast six galleries, three seminar halls, exhibition space, play area, a landscape memorial, auditorium(s) having capacity of 1000.

11 SITE PLAN


Gyan mudra, otherwise known as chin mudra, is a sacred hand gesture or ‘seal’ used to direct energy and maintain focus. This symbolises knowledge and expansion. Goddess Saraswati is known for wisdom, education, intellect and speech.This Yantra enhances the knowledge, improves concentration and memory power.

The project itself is a knowledge centre so the landmark memorial should symbolise the same. Yantras are Cosmic instruments or tools which are believed to draw positive frequencies from the Planets and other Cosmic bodies and transmit it in the place it is installed.

13


03

MEDICAL CAMPUS


CONCEPT

PROJECT DATA

Focused on a unified “Campus Plan,” the design prioritizes a seamless circulation system to enhance walkability, ensuring universal access and barrier-free design. The creation of multifunctional buildings, including the Hospital Block, Academic Block, Hostel, and Dining Block, embodies the campus identity, fostering a collective spirit. Emphasizing sustainability, passive energy methods will be employed, and green spaces integrated across the site. The Academic Block, a vibrant hub, aims for a contemporary and inspiring atmosphere,

Type Built Up Area Plot Area

Academic 232290 Sqm 116144 Sqm

Location

Near Azad Cricket Ground, Opposite VGU, Karolan Ka Bagh, Jaipur.

Semester

7th sem

The project involves designing a comprehensive medical campus in Jagatpura, Jaipur, spanning approximately 30 acres. Emphasizing sustainable and barrier-free design, the campus will house a 300-bedded medical hospital, academic block, hostel, dining block, animal hold room, indoor sports block, residence, playground, shops, and a sports complex. With an entry from Ashok Marg, the design aims to create a unified campus plan, establish a distinctive identity, enhance circulation and walkability, fostering social interaction in informal spaces. The proposed development aligns with the institutional land use outlined in the Master Plan of Jaipur 2025, anticipating future healthcare and educational needs.

featuring abundant natural light, shaded courtyards, and tiered lecture halls. This visionary project anticipates future needs while promoting a holistic, inviting, and sustainable medical campus.

BAR 2

15 SITE PLAN


17


04

HOTEL INTERIOR DESIGN


PROJECT DATA Type

Academic

Location

Sirsi Road, Panchyawala, Jaipur.

Semester

7th sem

The project aims to enhance the interior spaces of the reception area, waiting hall, corridor, and offices within the premises. The goal is to create a welcoming, functional, and aesthetically pleasing environment that aligns with the company’s brand identity and promotes a positive and productive atmosphere for both employees and visitors. Ideation process, theme, mood is shown in the concept.

19


21


05

PARADISE PALMS

MULTI FAMILY HOUSING


CONCEPT

The concept is simple segregation of cuboidal zones of 3bhk, 4bhk nd 5bhk flats and easy access to all of them. Diffused light in inner spaces to be assured and site circulation to be throughout accessible. Shading tchniques and play with forms tried out considering the cardinal directions to allow wind as well as light inside most of the possible rooms.

PROJECT DATA Type Built Area Plot Area Team Mates Location Semester

Academic 6190 Sqm 3100 Sqm Pratiksha Roy Tisha Garg Opposite Royal Treasure, Airport Enclave, Ravindra Nagar, Jagatpura, Jaipur 5th sem

The project located in Jagatpura, demands a luxury multi family housing with all basic amenities and some common activities. The site is near airport, so there is height restriction for the particular zone. Permisible height for the project is 24m with a BAR of 2. Maximum ground coverage alloted is 40% of the site area i.e 1240 sqm. Site circulation of 35% and landscape area of 20% is permitted. The ground coverage achieved is 1142 sqm.

• Segregation of spaces for good accessibility, • Use of low transmittance glazing

ECU : 50

windows, • Utilization of renewable energy: solar pv panels, • Use of low flow water fixtures, • Use of AAC blocks for reducing dead load and thermal insulation, • Installation of green walls and terrace garden, • Ceramic tiles on terrace for insulation, • Albedo paint on roof for solar reflectance, • High pressure laminates for elementation of facades.

23 GROUND AND SITE PLAN


FOURTH FLOOR PLAN FIRST, SECOND, THIRD FLOOR PLAN


GREEN WALL SECTION

25 UNIT PLANS RENDERED


06

SWAMI INDOOR SPORTS COMPLEX


CONCEPT

The concept is creacting the form out of a simple cube for increasing the usable space. Spaces to be easily accesible for all. Use of minimum corridors and maximumuse of space for the requirements, including free space and service at each floor. Use of false walls and louvers as shading devices as well as design elements.

PROJECT DATA Type Built Area Plot Area Location Semester

Academic 11280 Sqm 7200 Sqm Behind Gargi Girls Hostel, Vivekananda Global University, Jaipur 4th sem

The aim of the project was to create an indoor sports complex for the use of college students as well as sportspersons across Jaipur. It is not to be a complex only for the university. The task was to design the project to accomodate all the provided list of sports and games within the limited BAR, with comfortable and appropriate circulation. 35% of ground coverage for built up area is allowed and minimum circulation of 30% required on ground. The requirements for the sports complex included basketball court, skating rink, shooting range, kabaddi court, 2 lawn tennis courts, 4 badminton courts, 2 squash courts, meditation and yoga room, taekwondo, judo, karate, boxing room, TT room, chess and carrom room, cafe, swimming pool, guest houses and some other amenities.

27


FLOOR PLANS

The double height badminton courts and basketball courts are planned one above other to save space. Heavy columns are used however to support such structure. All the common toilets are kept vertically stacked. Some sport rooms are merged on based on size and capacity of use. Easy access to every room assured.


MATERIALS Adjustable louvers used on south facade for convenient allowance of light with changing sun position as required. Fixed louvers on east facade majorly to shade terrace seating and aesthetics. The polygons and facade of south and west are false facades of GRC i.e. Glass Fibre Reinforced Concrete. Lawn tennis hardcourt is of decoturf. The sittings for the same are shaded with membrane structures. The pool cover is a hyperbolic steel structure. The stage shade of OAT is a shell structure.

29


07

MR. CHINTAMANI’S RESIDENCE SOLAR DECATHLON PROJECT


8

CONCEPT In 50% of the site, we designed a net-zero single family housing prototype. Our net zero housing concept takes into account the economy, climate, and local regulations, that aims at achieving sustainable and net zero residence in Jaipur which provides comfort, consume less energy and do not compromise with the privacy user. The team decided to create a void and plan courtyard. This not only aided in tree conservation but also helped in increasing the daylight and maintaining the ambient temperature of space.

Living room /dinning area

Kitchen/kitchen garden

Servant room

1

7

2

Courtyard

6

3

Master bedroom

CLIENT REQUIREMENTS

4

Powder toilet

SITE

MASS CREATED , PRESERVING THE TREE

ZONED OUT AT LEVELS

5

Landscaping Element

Terrace garden

GOALS 1. Reducing load through passive design strategies. 2. Reducing mechanical cooling hours and achieving adaptive thermal comfort range. 3. Use of renewable energy sources. 4. Limit water consumption and returning it to the same watershed. 5. Reduction in transportation cost. 6. Make construction and operation functionally efficient. 7. Conserving and replanting existing trees on site.

8. Improve the ambient quality of indoor space. DETAILS AND PASSIVE DESIGN APLLIED

SITE PLAN

PROJECT DATA Type Built Area Plot Area Team Mates

Competition 367 Sqm 306 Sqm Team AMIGOS (9members) Location Akshat Kanota Estate, Jaipur Competition Solar Decathlon India 2021-22 Project type Single Family House Semester 5th and 6th sem Project name Chintamani’s House Project Partner Arvind Chintamani Industry Partner Design 2 Occupancy

The client is currently a resident at Pratap Nagar, Jaipur. The site objective of the client was to purchase a plot of either east or south facing and to conserve the existing vegetation. Their vision is to build home that are ventilated all at the same time. comfortable, with proper daylighting and connected with nature . The biggest challenge was to design a house for a client who is very old (~50+). The second challenge was to preserve the khejri tree which is existing on site . Material Selection because of the hot and dry climate of Jaipur, Rajasthan was a challenge as well. The intent was to move towards net-zero.

31


FLOOR PLANS


DESIGN AND INNOVATION Challenge 1

Barrier free design consideration.

Challenge 2

GROUND FLOOR ISOMETRIC

Created courtyard near dinning area to preserve the existing tree (Khejri).

VENTILATION

FIRST FLOOR ISOMETRIC ( EXPLODED)

Adequate fresh air provided because of centralized courtyard. Cross ventilation increase indoor air quality. Courtyard is connecting indoor environment with nature. Being around plants has a calming and comfortable effect on people.

XPS Insulation 12mm) AAC Block (200mm) Gypsum Plaster Board (6mm) Reflective coating (1mm) SRI Paint (1mm)

Challenge 3

Challenge 4

Material selection on the basis Of their U – Value.

Used passive strategy to provide maximum Thermal comfort in inner spaces. CHALLENGES OF PROJECT

ISOMETRIC VIEW OF THE RESIDENCE

33 VENTILATION


TRUNCATED PUNCTURES Hot air flow in the building through the punctures.

Hot air cools down due to venturi effect.

Air expansion due to the pressure created by the constricted space. POT IRRIGATION Pot irrigation is a self-watering irrigation system. Due to the porous nature of the surface of the pitcher the water inside the pitcher or mud pot will automatically transfer towards the nearest soil and plants takes up water only according to its need. Here we have used pitcher having a capacity of 4 liters which will last for 3-4 days.

GRADED PATHWAY Sequence of graded pathway throughout pavement and track off before entrance used. This promotes indoor environment quality by protecting the house from the dirt and moisture that can be carried by occupant footwear inside.

CHANNELS AIR FILTRATION AND TEMPERATURE In kitchen, courtyard and north-west rooms the wind from west are helping in cross ventilation. The south façade allows winter sun rays in the house which provides proper heat and ventilation during winter. Through courtyard the temperature near it cools down and the circulation of fresh air inside the house is maintained. Channels are created in the periphery of the site which will collect the rain water and further store in the rain water harvesting tank.

Exhaust fan are fitted on the top as the warm and light air rises up from the space and escapes through the fan and cool and fresh air comes inside the space through the openings


ENERGY PERFORMANCE

WATER PERFORMANCE

A series of iterations were performed with cost and U-value as parameters to obtain a building envelope with the desired U-value. Building envelopes were designed based on their use:

100

1.5

80

1

DRINKING - 4L

COOKING - 6L

BATHING - 55L

WASHING OF CLOTHES - 20L

WASHING OF UTENSILS - 20L

FLUSHING - 30L

22%

40 20 WALL

ROOF

U - VALUE

WINDOW

0

Building Envelope (Using AAC)

XPS Insulation 12mm) AAC Block (200mm) Gypsum Plaster Board (6mm) Reflective coating (1mm) Plaster (12mm) SRI Paint (1mm)

WALL DETAIL

We are using 16 No. modules of 320 watt each plate which generates 7000 units per year and 19 unit per day. For effective efficiency as we analysed from climate consultant’ solar radiation guides us solar radiation hour each month overall year so we got average 9.6 hr of efficiency Generally, 1 kw solar grid generates electricity 4x of its capacity and it achieved with 10 hr of effective day lighting, so we quite near to 10 hr but our electricity consumption is 15 unit/ day and we are generating 4 unit/day more than our consumption.

*LPF- litres per flush LPM-*LPFlitreslitres per minute per flush LPM- litres per minute

70L PER CAPITA PER DAY 41%

DRINKING - 4L

COOKING - 4L

BATHING - 25L

WASHING OF CLOTHES - 10L

WASHING OF UTENSILS - 5L

FLUSHING - 22L (USAGE 5 TIMES A DAY

15% 6%

ENVELOPE SELECTION

ROOF DETAIL

REDUCED WATER CONSUMPTION (USE OF EFFICIENT FIXTURES)

3% 4%

15%

Building Envelope

Kitchen Faucet– –6lpf* 8.3 Lpm* WC (Toilet) Showerhead – 9.5 Lpm Kitchen Faucet – 8.3 Lpm* Showerhead – 9.5 Lpm

135L PER CAPITA PER DAY

60

0.5 0

ENERGY CONSUMPTION

BASELINE CONSUMPTION OF FIXTURES BASELINE WATER CONSUMPTION AS PER BASELINE CONSUMPTION OF FIXTURES BASELINE WATER CONSUMPTION AS PER STANDARD WC (Toilet) – 6lpf* STANDARD

MONTHLY WATER HARVESTING POTENTIAL CALCULATION

6%

31%

WATER CATCHMENT AREA FROM ROOF=7% 151m2 RUN-OFF COEFFICIENT OF CONCRETE= 0.95

36%

14%

WATER HARVESTING POTENTIAL = Area Of Catchment x Amount Of Rainfall x Runoff Coefficient In January = 151m2 x 0.95 x 0.0055m = 0.788 m3 = 788 litres In February = 151m2 x 0.95 x 0.0049m = 0.702 m3 = 702 litres (Similar calculation will be followed for each month with varying avg. water rainfall)

STORAGE TANK PROPOSED = 25 m3 = (2.5m x 2.5m x 4m) 4m depth has been provided to settle down the silt and other particles by sedimentation and get fresh water above.

WATER EFFICIENT FIXTURES

SOLAR PANELS

Dual flush WC

Ultra low flow WC

Low flow aerators – SAVES up to 50%

35


08

INTERNSHIP WORK


37


TENDER DRAWINGS, DOOR WINDOW SCHEDULES


DETAIL DRAWINGS

39


STAIRCASE DETAILS, TILING OPTIONS AND COUNT


WARDROBE AND VANITY DETAIL DRAWINGS

41


15 MM DIA

15 MM DIA

PLUMBING DRAWINGS

MALE

CHANGING ROOM FOR SWIMMING POOL

GENTS TOILET

SHAFT

ASSIGNMENT 2.3

N

20 MM DIA 15 MM DIA

IC

IC

IC

GT

GT

IC

LADIES IC TOILET

GT

M

GT

DISABLED

UP

UP

FEMALE MALE

LIFTS AND STAIRCASE IC GT

DISABLED

LADIES TOILET

GT

LIFTS AND STAIRCASE

SHAFT

FEMALE ASSIGNMENT 2.3

MALE DISABLED

20 MM DIA

MALE

LIFTS AND STAIRCASE IC

GT

SHAFT

IC

20 MM DIA 15 MM DIA

LEGEND

TAP INSPECTION CHAMBER

CWP ( COLD WATER PIPE)

GULLY TRAP WASTE WATER PIPE ( 75MM DIA)

FLOW DIRECTION

SHAFT

M

GT

SUBJECT : ARCHITECTURAL DRAWING AND COMPUTER APPLICATIONSCOURSE:

MALE

SOLID WASTE WATER PIPE ( 100MM DIA)

DOWN

MAN HOLE

ANGLE VALVE

SWIMMING POOL 25X 12

FEMALE

GT

FEMALE

CAFE 10 X10 STORE

B.ARCH

DOWN

FEMALE WATER INLET LAYOUT (SPORTS COMPLEX)

CAFE 10 X10

IC

15 MM DIA

STORE

LEGEND

GT

IC

SUBJECT CODE: A BAR 405

GT

M

TISSUE ROLL @ 600mm HT.

INSPECTION CHAMBER

CAFE 10 X10

GULLY TRAP

TOWEL RAIL @ 1320mm HT.

450

D

TO MAIN SEWER

STACK PIPE

15 MM DIA

400

GROUND DRAINAGE FLOOR PLANDRAINAGE LAYOUT (SPORTS COMPLEX)

EMALE

GT

FLOOR TRAP 120

A

430

GT

700 900

75 mm r.w.p (c.p.v.c) pipe

IC

GEYSER

SEM: V

WASH BASIN AT THE HEIGHT OF 800mm

TAP AT 600mm , DIVERTER AT 1100mm SHOWER AT 2000mm HT.

F 500

Diverter

2400 430/B

1050 850

Angle Valve (Health Faucet)

300

900/B

Angle Valve

550

1500/B

Concealed Stop Cock

1650

200/D

C

SANITARY LAYOUT

G.T

GULLY TRAP

300MM X 300MM

I.C

INSPECTION CHAMBER

600MM X 600MM

I.C.R

INSPECTION CHAMBER (RAINWATER)

600MM X 600MM

W.W.P

WASTE WATER PIPE

75 MM DIAMETER

S.W.P

SOIL WATER PIPE

100 MM DIAMETER

R.W.P

RAIN WATER PIPE

75 MM DIAMETER

AR. KRISHN MATHUR

TAP CONCEALED AT THE HEIGHT OF 600mm

MIRROR AT THE HT. OF 1100mm

SANITARY LAYOUT (RESIDENCE) M

SUBMITTED TO:

200

B

C

1200/D

Shower

500

G

180

IC

B

1650

200mmx 200mm TILES IN FLOORING

450

GT

500/D

Angle Valve (2)

ALL PIPELINES ARE OF CHLORINATED POLYVINYL CHLORIDE

10 mmTHICK WALL FINISH

75 mm w.w.p (p.v.c) pipe

ICR

A

F

D

TILE DROP

COURSE: B.ARCH

CENTRE

1050

10mm THICK TILE

BATHING AREA

B

HEIGHT

Basin Diverter (Center hole mixer)

Hand Shower Faucet

250

FLOOR TRAP

IC

POINTS & FITTINGS

C

350

450

S.NO

INSTITUTE: D CENTRE FOR DESIGN EXCELLENCE, E VIVEKANANDA GLOBAL UNIVERSITY

19mm TILE DROP

20 MM DIA

1900

FLOOR TRAP

STORE

E

NAME: AAKANGSHA ROY

100 mm s.w.p (c.p.v.c) pipe

SOLID WASTE WATER PIPE ( 100MM DIA)

MAN HOLE

ALL MEASUREMENTS ARE IN MILLIMETERES PILLAR COCK

CASCADE W.C

FEMALE

FLOW DIRECTION

M

SEM: V

TAP CONCEALED AT THE HEIGHT OF 600mm

80

WASTE WATER PIPE ( 75MM DIA)

TAEKWONDO/JUDO 15 X 15

ANGLE VALVE

HEALTH FAUCET @ 450mm HT.

900

IC

SHOWER AND TAP

20 MM DIA

IC

WONDO/JUDO 5

TAP CWP ( COLD WATER PIPE)

IC

GT

LEGEND

PILLAR COCK

STACK PIPE

IC

SHOWER AND TAP

20 MM DIA

15 MM DIA

FLOOR TRAP

GT

NAME: AAKANGSHA ROY

DOWN GT

MALE

SUBJECT CODE: BAR 405 LEGEND

15 MM DIA

IC

UP

M

TECHNICAL SWIMMING P 25X 12 DRAWINGS

SUBJECT : ARCHITECTURAL DRAWING AND COMPUTER APPLICATIONS

SWIMMING POOL 25X 12

FEMALE

LADIES TOILET

ASKETBALL 0 X 24

MALE

CHANGING ROOM FOR SWIMMING POOL

GENTS TOILET

SHAFT

20 MM DIA 15 MM DIA

CHANGING ROOM FOR SWIMMING20 MM DIA 15 MM DIA POOL

GENTS TOILET

SHAFT

09

SWIMMING POOL 25X 12

SUBMITTED TO: AR. GAURAV AGRAWAL SUBMITTED BY: AAKANGSHA ROY B.ARCH III SEM CODE VGU


ELECTRICAL DRAWINGS SB4 D

1820

BL : BLANK

PL : PICTURE LIGHT SWITCH

EX : EXHAUST SWITH

1600

1860

1100

540

560

1950

1650

PL3

L25

WL7

WARDR0BE L13

L34

1

GEYSER BOARD

WL11 TL 3

SB3 F

WL13

WL12

L28

L27 700

700

L37

L36

SB1 C

2400

4

SB1 D

1350

5

SB1 E

1350

6

SB1 F

1350

7

SB1 G

1350

8

SB1 H

2400

9

SB2 A

1350

SB2 B

1350

11

SB2 C

600

12

SB2 D

600

13

SB2 E

2400

14

SB2 F

1350

15

SB2 G

1350

2400

SB3 C

600

F3

20

SB3 D

600

WL11

SWITCH

21

SB3 E

1350

CALL BELL SWITCH

22

SB3 F

1350

23

SB3 G

24

SB3 H

2400

25

SB4 A

1350

26

SB4 B

1350

27

SB4 C

1350

28

SB4 D

1350

29

SB4 E

1350

30

SB5 A

1350 1350 1500

33

SB5 D

1350

34

SB5 E

1350

1700

1000

5 6 7

(6) SB 4

SS,1CL,1CL,CAL

(8) SB 5

SS,TV,FE,SS

(2) SB 6

CABLE

(2) SB 7

TV SOCKET

450

HW AC 1

HW AC 1 @ 2100 MM

1050 MM

SS,PL

525 MM

(8) SB 10

G,CL,BL,F,R

1050 MM

(6) SB 11

SS,PL,CL,EX

1050 MM

CL : CEILING LIGHT SWITCH

CAL : CABINET LIGHT SWITCH

FL : FOOT LIGHT SWITCH

G : GEYSER SWITCH

WR : WARDROBE LIGHT SWITCH

BL : BLANK

PL : PICTURE LIGHT SWITCH

EX : EXHAUST SWITH

F4

PL4-PL5

L19-L20-L25

L30-L31

WL15

2

F

L32-L33

L34-L35

F5

L36-L37

CONCEALED AC

ODU

OUT DOOR UNIT CONNECTION / SUPPLY LINE RETURN LINE

(18 MM DIA / 15 MM DIA)

DRAIN LINE

HW AC 2

C. AC @ 2470 MM

FALSE CEILING

SUBMITTED TO: AR. GAURAV AGRAWAL

GEYSER

ASSIGNMENT 1

AC

ODU 3

2W

BUILDING SERVICES III CN. AC 1

SUBMITTED BY: AAKANGSHA ROY

2 WAY CONNECTION

ODU 3 @ 1050 MM

940

ODU 4 ODU 5

WARDR0BE

HW AC 2 @ 2100 MM

F : FAN SWITCH

C. AC @ 2470 MM

ASSIGNMENT 2

TV

(18 MM DIA / 15 MM DIA)

CO : COVE LIGHT SWITCH

SUBMITTED TO: AR. GAURAV AGRAWAL.

L16-L17-L18

(15 MM DIA / 18 MM DIA)

FE : FEATURE LIGHT SWITCH

1

L15

L14 WL9

ELECTRIC WIRE

NOTE R : FAN REGULATOR

L29

G

CN. AC

1530

PICTURE LIGHT

SS : SOCKET AND SWITCH

L27-L28 WL14

HIGH WALL AC

C. AC 2

AS PER TV CABINET

SS, CL , WF, AC

TV

WL12 WL13

HW AC

FOOT LIGHT

(8) SB 8

L24-L25-L26

CASSETTE AC

CEILING LIGHTS

1050 MM

(4) SB 9

L22- L23

WL10

PL3

350

800

FAN

525 MM

C. AC 1

660

4

SS,3CL,1CL,F,R

2150

525 MM

AC

C. AC

1200

1050

1220

(8) SB 3

SS,1CL,PL,CO

1050 MM

400

(6) SB 2

F,3CL,2CL,1CL,FL,WR

G

L22-L23

1350

1000

(6) SB 1

L11

1000

LEGENDS

HEIGHT

L12-L13

WL6 WL7

WL8

SB3 B

SB5 C

PL2

WL4 WL5

F2

AC

19

350

DETAILS

L9-L10

18

SB5 B

L3-L4

TV

5A SWITCH AND SOCKET

B.ARCH SEM VI 19FAP2AR001 CODE, VGU

3280

MODULES

G

L9-L10

LEGEND

ELECTRIC PLAN

N

L8

WL3

2400

32

L1-L2

TV

L6-L7

1350

31

L5

AC

SB3 A

400

ODU 1 ODU 2

3

L6-L7

WL1

WL2

C. AC @ 2470 MM

B.ARCH SEM V 19FAP2AR001 CODE, VGU

ASSIGNMENT 2

F1

SB2 H

ARCHITECTURAL DRAWING AND COMPUTER APPLICATIONS

280

AAKANGSHA ROY

ODU 1 @ 1050 MM BUILDING ODU 2 @ 1800 MM SERVICES II

PL1

600

17

ASSIGNMENT 1

ELECTRICAL LAYOUT ELECTRICAL LAYOUT

SUBMITTED BY:

600

SB1 B

16

SUBMITTED BY: AAKANGSHA ROY

SUBMITTED TO: AR. GAURAV AGRAWAL.

SB1 A

2

SWITCH BOARD LEGEND

SUBMITTED TO: AR. KRISHN MATHUR

1980

1000

L26

DESCRIPTION

1

10

TV CABLE

F : FAN SWITCH

2

TELEPHONE POINT WITH INTERNET CABLE

920

580

700

FE : FEATURE LIGHT SWITCH

700

300

SB3 G

1220 MM FAN POINT

5/15A SWITCH AND SOCKET

L35

SB3 D

500

F TL

1800

F5

800

WL14

2 WAY CONNECTION

L12

WARDROBE LIGHT POINT

340

G

1600

720

F3

SB2 G

SB2 F

700

L

855

700

WL10

L24

WL6

CEILING LIGHT POINT

1300

G : GEYSER SWITCH

WR : WARDROBE LIGHT SWITCH

L

CALL BELL

SB3 C

SB3 H

2W

WL

WALL LIGHT POINT

850

WL8

131

FL : FOOT LIGHT SWITCH

L33

L32

660

930

CAL : CABINET LIGHT SWITCH

850

SB5 E

L23

1970

SB3 E

320

R : FAN REGULATOR

1720

160

L29

G

840

300

CL : CEILING LIGHT SWITCH

1200 590

730

SB4B WL9

318

600

SS : SOCKET AND SWITCH

240

1080 1900

AC

SB2 D

PL2

840

SB3 B

L22

PICTURE LIGHT SB2 C TL 2

720

720 1140

GEYSER 990 L11

SB2 H

WL5

CO : COVE LIGHT SWITCH

2W

1300 790

1050 MM

PICTURE LIGHT POINT

DISTRIBUTION BOARD

SB5 D

PL5

2

400

358

160

250

2W

NOTE

SS,PL,CL,EX

L21

5

FALSE CEILING

G

PL

SWITCH BOARD DETAILED LEGEND SL NO. SWITCH HEIGHT BOARD NO. FROM FFL (MM)

EXHAUST FAN POINT

470

5 6 7

1050 MM

720

SB3 A

SB2 E

1440

G,CL,BL,F,R

WL4 800

BEDROOM

F2

310

ELECTRIC WIRE

1000

770

560L4

525 MM

350

380

(6) SB 11

SS,PL

SB4 E PL4

L15

L10

450

(8) SB 10

1050 MM

SWITCH BOARD

850

980

(4) SB 9

SS, CL , WF, AC

550

580

4

L9

TV SOCKET

1700

(8) SB 8

3

410

SB1 E

SB2 A 540

450

450

775 560 L3

FOOT LIGHT 1720

SB

SB5 A

1000

560

560

775

CABLESB2 B

(2) SB 7

9

8

190

(2) SB 6

10

AS PER TV CABINET

L31

1870

1870

1850

SB1 D

410

(8) SB 5

L20

L19

L30

250

SB4 A

580

SS,TV,FE,SS SB1 C 1000

CEILING LIGHTS L7

WL15

2100

580

1050 MM

480

800

G

440

SS,1CL,1CL,CAL L6

L2

(6) SB 4

SB1 H

F4

610

525 MM

560

770

SS,3CL,1CL,F,R

L18

L14

WI FI

(8) SB 3

L17

SB5 C SB5 B

560

L8

FAN

1460

830

1870

1880

HARD DRIVE

525F1MM

910

840

STORE

SS,1CL,PL,CO

SB1 G

SB1 F

200

1050 MM

(6) SB 2

TL 4

SB4 C

L16

193

F,3CL,2CL,1CL,FL,WR

LEGENDS

L5

570

(6) SB 1

680

HEIGHT

480

1130

DETAILS

WL3

250

11

L1

WL2

440

420

775

MODULES

1120

SB1 B1000

1710

TOILET

N

PL1

SB1 A WL1 TL 1

ELECTRICAL LEGEND

190

870

320

SUBMITTED BY: AAKANGSHA ROY BUILDING SERVICES II B.ARCH SEM V 19FAP2AR001 CODE, VGU

HVAC LAYOUT HVAC LAYOUT

ODU 4 @ 1050 MM ODU 5 @ 1800 MM

B.ARCH SEM VI 19FAP2AR001 CODE, VGU

43


SITTING

WORKSPACE CUBICLES CABIN SITTING

CABIN

RECEPTION AND WAITING

CONTROL:RECEPTION

SERVER ROOM

BIOMETRIC

LPG SENSOR

FEMALE WASHROOM

HEAD CABIN

ENTRY

SERVICE PLAN 1 CONFERENCE ROOM

SITTING

MALE CUBICLE WASHROOM MALE WASHROOM

RECEPTION AND WAITING

RECEPTION AND RECEPTION WAITING AND CABIN WAITING

LEGEND

HEAD CABIN

FEMALE WASHROOM FEMALE WASHROOM

E.P.A.B.X

RECEPTION AND WAITING

SERVER ROOM

RECEPTION AND WAITING

CABIN

CONTROL:RECEPTION

HEAD CABIN

CUBICLE

CABIN

RECEPTION AND WAITING

SITTING

FEMALE SITTING WASHROOM

E.P.A.B.X CUBICLE

CABIN RECEPTION AND WAITING

SERVER ROOM

CABIN

LPG SENSOR

FEMALE WASHROOM

65 MM BALL VALVE

RECEPTION AND WAITING

WORKSPACE CUBICLES

HOSE REEL SLEEVE

CABIN

PANTRY

CABIN MEETING/

RECEPTION AND

CUBICLE

SERVICE PLAN 3

MEETING/ CONFERENCE ROOM

CONTROL:HEAD CABIN

FEMALE WASHROOM

WORKSPACE CUBICLES SITTING

CABIN

LEGEND

CABIN

PANTRY

RECEPTION AND WAITING

CABIN

smoke sensor SENSOR- AC OCCUPATION

BUILDING AUTOMAT OCCUPATION SENSOR - LIGHT

VDP

FEMALE WASHROOM

AC

LEGEND building services ii AC

GLASS BREAK SENSOR

CUBICLE

FIRE - ALARM SITTING

WORKSPACE CUBICLES

MALE WASHROOMSITTING

smoke sensor

SITTING PANTRY

CABIN

CABIN

VDP

GLASS BREAK SENSOR

VDP

CABIN

CABIN

PANTRY

WORKSPACE CUBICLES

WORKSPACE CUBICLES

SITTING

CABIN

MALE WASHROOM FEMALE WASHROOM

SERVICE PLAN 5

HEAD CABIN

ENTRY

CABIN SITTING

CUBICLE

assignment 3

WORKSPACE CUBICLES

CABIN

FEMALE WASHROOM

RECEPTION AND WAITING

HEAD CABIN

LEGEND

MALE WASHROOM

ELECTRIC DOOR LOCK

RECEPTION AND WAITING

MEETING/ CONFERENCE ROOM

WORKSPACE CUBICLES

CUBICLE

ENTRY

VDP

OCCUPATION FIRE - ALARMSENSOR - LIGHT

SITTING

SERVICE PLAN 5

ROOM

LEGEND

MALE WASHROOM

ENTRY

MEETING/ CONFERENCE

ROOM RECEPTION CABIN AND MEETING/ WAITING CONFERENCE

MALE WASHROOM

HEAD CABIN

OCCUPATION SENSOR- AC

CUBICLE SERVICE PLAN 3

HEAD CABIN

FEMALE WASHROOM

PANTRY

SERVICE PLAN 5

SERVICE PLAN 3

SERVICE PLAN 3

FEMALE WASHROOM

PANTRY

CABIN

PANTRY

PANTRY

WORKSPACE CUBICLES

25 MM DIA DRAIN PIPE

CABIN

smoke sensor

SITTING

HEAD ENTRY CABIN ELECTRIC DOOR LOCK

FEMALE WASHROOM

FIRE FIGHTING SYSTEM LAYOUT (RESIDENCE)

MALE WASHROOM

SERVICE PLAN 5

RECEPTION AND WAITING

FIRST FLOOR FIRE FIGHTING SYSTEM LAYOUT

PANTRY

CUBICLE

RECEPTION AND WAITING

CONTROL:HEAD CABIN

HEAD CABIN

FIRE - ALARM

SITTING

WORKSPACE CUBICLES

CABIN

LEGEND

ENTRY

MEETING/ CONFERENCE ROOM

B.ARCH SEM VI LEGEND 19FAP2AR001 CODE, VGU CCTV - DSPLAY

ENTRY

CUBICLE

FEMALE WASHROOM

WORKSPACE CABIN CUBICLES

SUBMITTED BY: MEETING/ CONFERENCE AAKANGSHA ROY CABIN ROOM

MALE WASHROOM

FEMALE WASHROOM

65 MM BALL VALVE

WASHROOM

smoke sensor

smoke sensor

CABIN

ENTRY

RECEPTION AND WAITING

PANTRY

SERVICE PLAN 2

CABIN

CCTV - DSPLAY

FEMALE PLAN 3 SERVICE

HEAD CABIN

HEAD SUBMITTED TO: CABIN AR. GAURAV AGRAWAL

CUBICLE

MALE WASHROOM

FIRE - ALARM

FIRE - ALARM

MALE WASHROOM

RECEPTION AND WAITING

RECEPTION AND WAITING

HEAD CABIN

CONTROL:HEAD CABIN

PANTRY

MALE WASHROOM

CUBICLE

LEGEND CCTV - DSPLAY

LEGEND

ENTRY

CUBICLE

CABIN

SERVICE PLAN 1

LEGEND

PANTRY

ROOM

WAITING CABIN

BUILDING SERVICES

LEGEND

SITTING

WORKSPACE CUBICLES

ENTRYCONFERENCE

ESCAPE ROUTE

ASSIGNMENT 3

FEMALE WASHROOM

SITTING

CABIN

65 MM BALL VALVE

PANTRY

FEMALE WASHROOM

WORKSPACE CUBICLES

ENTRY CABIN

MEETING/ CONFERENCE ROOM

CABIN

MALE WASHROOM

SPEAKERS

SITTING

HEAD CABIN

MEETING/ CONFERENCE ROOM

CUBICLE

SERVICE PLAN 2SERVICE PLAN 3

HEAD CABIN

CABIN

WORKSPACE CUBICLES

PANTRYMALE WASHROOM

RECEPTION AND WAITING

CABIN

BIOMETRIC

SITTING

25 MM DIA DRAIN PIPE

CONTROL:HEAD CABIN

CUBICLE

ENTRY

CABIN

25 MM BALL VALVE

CCTV - DSPLAY LEGEND

SITTING

MEETING/ CONFERENCE ROOM

CONTROL:RECEPTION

BIOMETRIC

HEAD CABIN

65 MM BALL VALVE

ENTRY

CABIN

MALE WASHROOM

LEGEND

WORKSPACE CUBICLES MEETING/ CONFERENCE ROOM

25 MM DIA DRAIN PIPE HEAD

ENTRY

CONTROL:HEAD CABIN

FEMALE WASHROOM

WORKSPACE

LEGEND

25 MM DIA DRAIN PIPE

CCTV - DSPLAY SERVICE PLAN 3

MALE WASHROOM

CONTROL:HEAD CABIN

CUBICLES HEAD CABIN

65 MM DIA PIPE CABIN

CABIN

MALE WASHROOM

RECEPTION AND WAITING

CUBICLE

50 MM DIA PIPE

WORKSPACE CUBICLES

LEGEND

CCTV - DSPLAY

PANTRY

CUBICLE

ENTRY

LEGEND

FEMALE WASHROOM

ENTRY

HEAD 40 MM DIA PIPE CABIN

HEAD CABIN

SITTING

CABIN MEETING/ CONFERENCE ROOM

MEETING/ CONFERENCE ROOM

SERVICE PLAN 1

MALE WASHROOM

SERVICE PLAN 1 RECEPTION AND SERVICE PLAN 3 WAITING

FIRE EXTINGUISHER 25 MM DIA PIPE

MEETING/ CONFERENCE ROOM

LEGEND SPEAKERS

WORKSPACE CUBICLES

LPG SENSOR

PANTRY

SERVICE PLAN 1PANTRY

ENTRY

CONFERENCE ROOM

CONTROL:HEAD CABIN

MALE WASHROOM

PANTRY

80 MM RISER PIPE CABIN MEETING/

BIOMETRIC

65 MM BALL VALVE

CCTV - DSPLAY

CUBICLE

SITTING

CABIN

BIOMETRIC

FEMALE WASHROOM

PANTRY

SITTING

CABIN

DOWN PIPE

MALE WASHROOM

LEGEND ENTRY

ROOM

FEMALE WASHROOM

ENTRY

CUBICLE

LPG SENSOR

LPG SENSOR

SITTING CABIN WORKSPACE CUBICLES WORKSPACE MEETING/ CUBICLES CONFERENCE

CABIN

25 MM DIA DRAIN PIPE

PANTRY

FEMALE WASHROOM

WORKSPACE CUBICLES

HOOTER/ CALL POINT

LEGEND

CONTROL:RECEPTION

CONTROL:HEAD CABIN

BIOMETRIC BIOMETRIC

SERVICE PLAN 1

BIOMETRIC

HEAD CABIN

SMOKE/ FIRE SENSOR

SPRINKLER

CONTROL:RECEPTION

E.P.A.B.X

CCTV - DSPLAY

MALE WASHROOM

SERVER ROOM

SERVER ROOM

BIOMETRIC

HEAD CABIN

E.P.A.B.X

ENTRY

CUBICLE

CABIN

CUBICLE

25 MM DIA DRAIN PIPE

LEGEND LEGEND LEGEND

WORKSPACE CUBICLES

ENTRYMEETING/

ROOM

MEETING/ CONFERENCE ROOM

MALE WASHROOM

BIOMETRIC

MEETING/ CONFERENCE MEETING/ ROOM CONFERENCE

65 MM BALL VALVE

CUBICLE

PANTRY SERVICE PLAN 1

CABIN

MEETING/ CONFERENCE ROOM

E.P.A.B.X

PANTRY

AUTOMATION AND SECURITY

CABIN

FIRE FIGHTING SYSTEM

LEGEND

ENTRY

MEETING/ CONFERENCE ROOM

PANTRY

BUILDING AUTOM BUILDING AUTOMATI

SERVICE PLAN 4

HEAD CABIN

3 assignment 3 assignmentSERVICE PLAN 4 WORKSPACE CUBICLES

building servicesiiii building services LEGEND


N

WORKING AND CONSTRUCTION DRAWINGS 120000

8750

LEVEL +75

C'

69000

1041

1259

2368

MALE 691

691

691

691

691

691

3824 691

FEMALE

1567 1013

D6

3400

D6

1023

691

1023

1033

691

691

691

691

691

691

691

1353

9750

1490

1013

1762

D6

D6

D6

D6

228 416

1075

378

1075

D6

D6

1425

8465

1407

D6

D6

361

730

474

477

325

1072

595

2652 3963

6

5550

1240

492

5534

9100

MALE D2

467

D6

1525

2680

D2

1750 2500

D2

2616

2813

535

D6

D6

D6 D6

D2

D2

1

691

691

691

3 2

691

691

1110

1110

2086

1110

691

1040

691 780

D6

DISABLED

1567 2200

691

691

620

1149

D6 1490

D2

2200 16800

V1

691

1490

300

4580

237

V1281 V1

691

564

3294

2704

1

7

4 3

2

6 5

11

12

587

21 22

16

19

18

17

8

20

13 14 15 10 9

LIFTS AND STAIRCASE

5300

SHAFT

691

691

456

D4CHANGING ROOM WITH LOCKERS

3750

3250

V1253 V1

691

6875 1490

UP

2000

W2 4987

560

V1303 V1

814

809

317

1362

1462

1625

D6

LADIES TOILET

D4

677

1212

D6 464

D6188 660

2569

1224

D6 464

D6

1272

1514

1277

D6 657

665

2750

BASKETBALL

2166

1000

1075

1062

V1

239 404

1413

D2

1103

6775

1100

1776

1013

D5

1567

1000

D6 1625

1023

432

CHANGING ROOM FOR D2 SWIMMING POOL D2

D6

484

325

D6

1023

177

404

D6

863

D6

677

203

D6

D2

4500

4850

GENTS TOILET

414

5100

5100

5161

SHAFT

9550

1110

5586

1200

2766

1964

D6

24000

254

211

2400

1470

2791

2313

2550

W1 4061

1653

2900

W1

2129

498

W1 1821

809

W1 1736

445

442

484

D6

D6

D6

D6

1100

1100

1100

353

342

D6

D6

D6

7527

1250

1100

4859

CAFE

3311

1

8

300

60000

4 3

2

1411 3139 791 600

12

D6

V2

D6

D6

D6

D6

V2

D6

D6

D6

D6

W9

2 1

3292

1438

V3

762

3194

V3

4400

LEVEL +135

5000

391

7 6 5 4 3

LEVEL -345

D6

11 10 9

NO.S : 22

V2

D6

686

14

D6

13

RISER : 150MM

W6

V2

D6

5791

15

NO.S : 21

370

D6

19 18 17 16

709

2550

V2

D6 D6

679

7802

1

7

11

2

13 12

4 3

6 5

8

10 9

14

15

19

18 17 16

21

20

17525

D6

21 20

TREAD : 300MM

TAEKWONDO/JUDO

6075

9400

7750

W5

RISER : 150MM

D2 FEMALE

D6

D2

3730 4425

4500

3615

4875

1464

THREAD : 300MM

5

D2

2905

3459

LEVEL +135

NO.S : 21

D2

2007

NO.S : 22

D1

1538

D1

7952

1250

RISER : 150MM

1694

2678

1

2

7

4 3

5083

1250

21 22

16

19

18

17

20

TREAD : 300MM

5013

LEVEL -215

C

1100

9550

2670

5264

8550

6 5

160

571

8750

13 14 15

12

D3

11

3387 138

10 9

W4

329

DOWN

NO.S : 21

8

W3

4425

NO.S : 22

1100

39000

1985

233 1050 9550 5300

16150

W8

73

IN C V

1500

769

W7

104

OPEN AMPHETHEATRE

678

110

19250

20000

LEVEL +45

WORKING DRAWING (SPORTS COMPLEX)

N

GROUND FLOOR PLAN

SUBMITTED TO: AR. GAURAV AGRAWAL

ASSIGNMENT 2

3.

C2 C3

WIDTH

450

600

F3

600

450 300

750 600

C2 540

C3

C2

PB2

LVL -2500

1.

5100

PB13

C2

PB2

PB3

9000 C2

PB4

9550

3400

6620 C2

PB12

C3

F2

2. 3.

2000

8325 C1

SEM: V

PB11

8550

PB11

PB11

8550

5250

PB2

PB3

9550

C3

PB15

C3

8550

PB2

2.

WIDTH 3600

F2

3450

3750

F3

3300

3600

PB12

C3

PB6

PB11

6620

C3

17400

PB7

3.

REGULAR FOOTING

SUBJ ARCH COM

SUBJ BAR

C3

PB6

PB12 C3

PB5

PB13

9550 C3

PB6

3400

PB13

9100

9100

9100

PB9

PB6

PB11

PB11

C1

1.

LENGTH 3450

F1

3400 C3

9400

PB10

PB10

600

5001

LVL -3000 C2

PB12

PB6

PB15 C3

9550

9000 C3

C3

PB4

9550 C3

NAM AAK

DEPTH 3000

2070

C1

F1

SUBMITTED TO:

4. 5.

PB1

PB15

SEM

PB3

HEIGHT 600

NO. BEAMS

3000

C2

F2 1980

C3

F3

HEIGHT

8.

PB8

5100

450

600

450

600

9.

PB9

16800

450

600

PB3

5250

450

600

10.

6620

450

600

PB5

9000

450

450

6.

PB6

9550

450

450

7.

PB7

17400

450

450

AR. KRISHN MATHUR

WIDTH

8550

2070

3000

LENGTH

PB2

PB4

COU B.AR

PB6

C3

5256

PB11

C3

PB6

PB5

PLINTH BEAM LAYOUT COMPLEX) PLINTH(SPORTS BEAM PLAN

NO. FOOTING

C3

9550 C3

9400

9400

COURSE: B.ARCH

INSTITUTE: CENTRE FOR DESIGN EXCELLENCE, WIDTH NO. BEAMS LENGTH VIVEKANANDA GLOBAL UNIVERSITY 8325 450

810

810

C2

5250

8550

8550

C2

10000

G

4800

C3

600

C1

9550

PB6 PB12

PB6

16800

NAME: 8325 AAKANGSHA ROY PB1

5000

600

600

600

5350

600

600

600

3600

LENGTH

C3

PB6 PB12

C3

600

F3

5100

4000

16800

9700

600 600

F

5200 C3

600

C3

PB5

8800

400

8800

600

5200 600

600

4800

600

4000

4900 600

600

600

600

5200 600

600

1401

600

5350

C2

PB14

9550

9550

4500 600

4860 600 600

4800

600

5001

F3 10214

F3

600

2250

2.

C1

C3

F3

C3

600

F3

2160

1.

7061

600

4875

C2

PB9

EXCAVATIONEXCAVATION PLAN (SPORTS PLAN COMPLEX)

SUBMITTED BY: AAKANGSHA ROY B.ARCH SEM VI 19FAP2AR001 CODE, VGU

NO. COLUMN

F3

5350 600

4500 600

C2

C3

PB1

C3

F3

C2

PB14

9550

PB10

9400

450

600

11.

PB11

9400

300

450

12.

PB12

3400

300

450

13.

PB13

9100

300

450

14.

PB14

5100

300

450

15.

PB15

4400

300

450

INSTIT CENT VIVEK

450

300 450

4200

4500 600

C3

F3

C3

5350 600

C2

PB6

600

OVERHEAD

1500

F3

PB14

450

450

PIT

900

BUILDING SERVICES III

F3

1200

CLEAR OPENING

600

1401

1100

600

1675

600

C3

2414

600

C3

1080

1600

4807

600

F3

C3

4500

3761

5714

9801

F3

1350

408

F2

600

C3

1080

KGS

6

10127

600

600

600

600

CAR INSIDE WIDTH DEPTH

F2

11561

4425

600

4800

F1

600

600

PERSON

LIFT SHAFT WIDTH DEPTH

F2

C3

5126

600

4118

600

2000

C1

4802

F1

4802

600

600

600

4350

600

F3 400

600

C2

4800

3611

C2

5100

5700

600

600

4900

600

600

600

F3

600

600

2264

C2

4500

600

600

C1

4950

F2

600

600

5126

PLAN

5000

4350

600

3146

600

3500

10000

A'

600

300 850 100

3500

2100 230

LIFT DETAIL

E

600

C3

600

F2

C2

600

4118

600

1500 230

SECTION

600

600

4950

4950

C2

ENTRY

F2

GLOAD

600

600

600

LIFT

C2

F

600

600

600

230

17425

PB8 9000

C2

C3

PB6

D

600

C3

8800

350

4650

5126

BASEMENT

COUNTER WEIGHT

600

4500 600

600

C3

400

900

600

600

600

1570

350

4650

4650

PLINTH

4500 600

600

C3

MACHINE ROOM

GROUND FLOOR

F3

600

1200 230

E

4650 600

C4

4000

3000

D 1ST, 2ND, 3RD, 4TH FLOOR

800

1675

350

1100

C3

PB5

3400

4500

PB8

9550

C3

C1

PB4

ASSIG

9850

9550

9000

C1

PB3

SUBJECT CODE: BAR 405

C3

5223

F3

600

4900

12750

12750

C2

12750

230

12750

A

1600

460

C1

12750

9700

5TH AND TERRACE / LAST FLOOR

LIFT CAR

2023

C3

5350

F3

6620

C1

PB2

9800

F3

600

C3

C1

9400

9

400

F3

400

600

600

C3

400

F3

14500

2023

C3

7000

5250

8550

8550

PB2

ARCHITECTURAL DRAWING AND C COMPUTER APPLICATIONS

F3

14500

2023

4807

600

600

600

600

600

C3

F2

600

F3

14500

2023

10574

2023

2411

F2

600

600

600

600

600

600

600

10574

2023

600

F2

C2

B SUBJECT :

C3

5800

9000

C1

PB1

600

600

C3

F3

8325 C1

4500 600

600

C3

F1

C2

600

600

4350

F2

600

C

F1

A

9850 4500

600

600

C1

2264

C2

4350

9800 4500

600

600

C1

F1

C2

F2

600

4000

F2

C2

4118

600

C1

F1

2023

2023

10574

5700

2100 1200

4200 3000

C2

9400 4650

600

C1

F1

7000

10363 600

600

C1

F1

B

600

600

600

600

600

2100

600

600

C1

10574

450

600

600

A

900

4650

4650

4650

5800

9000

9000

10574

8700

230

9000

5100

8700

8

3400

ASSIGNMENT 1.2

7

6

5100

9

5

4

3400

8

3

9400

6

2

9400

4

1

4400

3

7

4400

2

5

4400

1

45 SUBM

AR. K


10

MISCELLANEOUS


PHOTOSHOP RENDERS

47


SMALL SCALE MODELS


49


Email: aakangsharoy2001@gmail.com Phone: 7896689868 Social: @parchfect_hunt


Turn static files into dynamic content formats.

Create a flipbook
Portfolio Aakangsha Roy by Aakangsha Roy - Issuu