Skip to main content

Integral cs christies

Page 1

CASE STUDY

Christies Auction House / London

www.integral.co.uk

full fire strategy Providing a full fire strategy to

delivering engineering excellence


overview Christie’s is a name and place that speaks of extraordinary art, unparalleled service and expertise, as well as international glamour. Founded in 1766 by James Christie, Christie’s has since conducted the greatest and most celebrated auctions through the centuries providing a popular showcase for the unique and the beautiful. Integral have the pleasure of maintaining the buildings within the UK including the Fire precaution elements to ensure the ongoing safety of staff, customers and the building fabric and artefacts.

www.integral.co.uk

Christies King Street Integral were instructed to undertake a Fire strategy of King Street to establish its conformity with the recommendations of both the RRO 2005 and approved document B (building regulations). Owing to the size and the quantity of the works involved, it was decided to split the works into 3 phases. Phase 1 basement, Phase 2 front of house, Phase 3 back of these works consisted identified major upgrade requirements of Fire alarm, Fire doors, Fire stopping, emergency lighting and the package incorporated CCTV and access control systems. The works were undertaken over a 4 year period to ensure the works could be undertaken while normal business could continue. The majority of the works were undertaken outside normal working hours and the challenge was to ensure the existing fire systems and emergency lighting systems were fully operation throughout the whole of the installation period. To enhance the existing fire alarm system, fire curtains, VESDA systems and a graphics package were incorporated into the multi networked addressable system.


CASE STUDY

Christies Auction House / London

Phase 1 Basement Phase 2 Front of house Phase 3 Back of these works consisted identified major upgrade requirements of fire alarm, fire doors, fire stopping, emergency lighting, CCTV and access control systems.

delivering engineering excellence


our services

compliance refrigeration

cle an ing

pre dict ive

ma bui n ldin g co agem ntr e ols nt

su fir pp e res sio n

pr oj ec ts

fabric

delivering engineering excellence

al itic cr

ty uri ec s & s tem fire sys

ir repa tive reac

energy services

mobile

ele se ctric rvi al ce s s ce rvi se n ing ig ild es bu & d

ed n an pl

mechanical services

m an ne d

n sigy e y d nc ert ulta p s procon

mp s u p tem s sy

(commercial & industrial)

Company Registration No. 5307588

www.integral.co.uk delivering engineering excellence


Turn static files into dynamic content formats.

Create a flipbook
Integral cs christies by 10bristol - Issuu