Skip to main content

2019 Portfolio

Page 1

PORTFOLIO 2019


________________________ education 2008 - 2010 Professional Diploma in Architectural Studies ( Year 2 -3 ), HKU SPACE, Hong Kong 2010 - 2012 Bachelor of Applied Science (Architectural Science ) ( Final Year only ), Curtin University, Australia

________________________ work 09.2011 - 02.2012 Internship, Tendering and modeling LBA Arch. & Planning Ltd, Macau 03.2012 - 11.2013 Architect Assistant, Tendering and Submission CKL Arch. & Engi. Ltd, Hong Kong 12.2013 - 12.2014 Architectural Designer, Schematic and detial design Approach Studio Ltd, Beijing, China 04.2014 - 04.2019 Architectural Assistant, Schematic design and Project mangement atelier C+ Ltd, Hong Kong


WINERY AND VILLA

酒庄別墅

Rural area, Yintai, Shandong, PRC

中國山東煙台

Site / Project program This project is located at Yantai, Shandong. This area were started to be developed into the china WINE sources, including lots of international company. The Client was based on personal interest and investment to develop one of this area. I was joined at early 2015 when the building was completed the main concrete structure and started the secondary structure and design stage. This is a 30,000 sq. ft architecture including 20,000 sq. ft wine factory and 10,000 sq. st. residential area for his own family. This project will be completed at early 2017 and interior and landscape

atelier C plus, hong kong

Architect : Daniel Tung, Andrew Choy 2013- 2017, completed ( Architectural)

I joined this project during the main structure completion. I was handling the building secondary design directly with the local contractor. Since it is a rural private investment, i develop the building design with the contractor for every section of building element. The contractor management is very different with the other urban project. It is required to use every resource you have and lead up the contractor to the standard contract requirement. This the greatest task of this project. After the architecture completion, now I am working on the landscape and interior works.


1. Approaching view from downhill 2. Winery front door 3. Sample wall 4. Winery factory

1 3

2 4

winter, 2016, in-process


2

1

4

Guest Room

Guest Room

Office

Wine Factory

Plant Room

Skylight at entrance

Kitchen & Dinning Enrerance

Living Room Swimming Pool

3

3F Building plan Factory side window

building layout


Residential area 1/f

Residential area 2/f

Interior design Ground Floor Layout Plan

First Floor Layout Plan

ISSUE DATE: 21 NOV 2016

In OCT, 2016, we are having the interior design with the owner, since they planed to completed the architecture ďŹ rst. The previous architect have left a clean plan only for statuary use.

ISSUE DATE: 21 NOV 2016

The architecture will be completed in early 2017, then start to interior work. Living room

Entrance

Villa


5

OUTDOOR WINE TASTING AREA 戶外品酒區

5

2

3

6

150

3

MAIN ENTRANCE 正門

- 圖樣比例只供參考

GARDEN 花園 150

7

6

2

- 圖樣比

- 所有尺吋以現場為準 - 圖樣設計版權歸設計師所有 - 圖樣必須經批核才可使用

10T Fer. / Sto.

10T Fer. / Sto.

6T Fer. REV.

STORAGE ROOM 儲藏室 6 m²

STAIR 3 樓梯三

DATE

DRAWN BY

6T Fer.

APPROVED BY

30-07-2018 07-08-2018 21-08-2018 20-09-2018 04-10-2018 11-10-2018 15-01-2019

6T Fer.

6T Fer.

下層空間 6T Fer.

6T Fer. SHOP AND DISPLAY AREA 商店及展示區 138m²

R

SIGHTSEEING LOBBY 觀光大堂

SIGHTSEEING ELEVATOR 觀光電梯 (specified by client 由甲方指定)

EX. FIRE RATED GATE 現有防火門

WINE LIBRARY 酒庫 40 m²

NEW ENTRANCE LAYOUT FOR LICENSING.

STORAGE 储藏室 49 m²

DUMBWAITER 食物升降机

EX. IRON GATE 現有改鐵門

BOTTLING UNITS 三联体区

SAFE 保险箱

LABEL & PACKING STORE ROOM 酒标、酒帽及酒箱储藏室 37 m²

Yantai Winery Phase 2 Factory

STAIR 1 樓梯一

BOTTLE STORAGE AREA 酒瓶区

22R

B

MLP-P001

R

STAIR 2 樓梯二

WINE STOPPER STORE ROOM 酒塞储藏室 13 m²

1层平面图 1F LAYOUT PLAN

4

2

1:150

1:150 (A3) ----

VISITORS AREA 访客区

5

VILLA AREA 别墅区

6 NEW WALL

1

UN-LOCKABLE DOOR 不可锁门

7 8

LOCKABLE DOOR 可锁门 B

STAIR 1 樓梯一 22R

C

SYSTEM PLANT ROOM 发醇罐冷却系统 机房29 m²

22R

-

FORKLIFT CHARGING STATION 叉车充电站

LIFT 电梯 (specified by client 由甲方指定) 7 m²

2

1:150

m/f 16-18 st. francis yard wanchai hongkong tel 852-2525 8883 fax 852-2501 4128

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE.

INGREDIENTS ROOM 配料间 6m²

4

TOILET CHANGED COOL AND HOT PLANT ROOM AS PER EQUIPMENT SIZE.

1

In Summer, 2018, the production line design had been started after the government document stage is competition. During the coordination with a new Wine Maker, the spacial arrangement has been rescheduled. At the same time, we have provided the coordination service for the New Zealand wine maker and the local wine making consultant.

WInery

30-0 07-0 21-0 20-0 04-1 11-1 15-0

Yan Pha

蓬莱仙

第二期

BARRELS ROOM 桶室 (202 Barrels @ 280 kg/bar.) 210 m²

PLANT ROOM 機房 11m²

5

2F

LAYO

2层平面

W

VISITORS AREA 访客区

VILLA AREA 别墅区

6 NEW FUNCTIONAL ROOM FOR LICENSING.

C

UN-LOCKABLE DOOR 不可锁门

7 8

LOCKABLE DOOR 可锁门 B

m/f 16-18 tel 852-25

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWIN

Interior & Production line design

Tasting and selling area

R

PRODUCTION AREA 生产区

3

2层平面图 2F LAYOUT PLAN

TEMPERATURE CONTROL PANEL 温度控制面板 EXISTING GATE 現有鐵門

B

MLP-P002

22

STAIR 2 樓梯二

泵及工具站

PRESSING AREA AND WHOLE BUNCH AREA 压渣及榨汁区

CHANGING ROOM 更衣室 3 m² CLEANING ROOM 消毒室 TANKS COOLING 4 m²

CORRIDOR 走廊 20m²

NEW IRON GATE 新鐵門

- --

STAIR 5 樓梯五 NEW DOOR 新門

Pumps & tools station

1T Sto.

EXISTING GATE 現有鐵門

DA

R1 R2 R3 R4 R5 R6

6T Fer.

1T Sto.

6T Sto.

1层平面图

PRODUCTION AREA 生产区

3

6T Fer.

1T Sto.

WR-MLP-P001

STORE ROOM 储藏室 6 m²

REUSE GATE 現有鐵門改

NEW IRON GATE 新鐵門

STAIR 4 樓梯四

1T Sto.

GUEST RECEPTION LOBBY 宾客接待大堂 49.5m²

DUMBWAITER 食物升降机

新甲級防火玻璃門

6T Sto.

LAYOUT PLAN

C

CARGO LIFT 货物电梯 (specified by client 由甲方指定) 7 m²

6T Fer.

NEW FIRE RATED GLASS DOOR

RED STORAGE AREA 6T Sto. 红酒存储区

1F

EX. IRON GATE 現有鐵門

LOADING ZONE 装卸区 43m²

C

WINE TEMP. STORAGE 成品酒儲存區 347 m²

EX. IRON GATE 現有鐵門

22

CHANGING ROOM 更衣室 6 m²

3T Fer.

6T Sto.

下層空間 NEW IRON GATE 新鐵門 0

FINISHING AREA 缩帽、贴标、喷 码、封箱区

20T Fer. / Sto.

REV.

GUEST CAR PARK 宾客停車場 81.2m²

SIGHTSEEING ELEVATOR 觀光電梯 (specified by client 由甲方指定)

3T Fer.

蓬莱仙谷酒业有限公司

15

CLEANING ROOM 消毒室 4 m²

20T Fer. / Sto.

3T Sto.

6T Sto.

第二期B段室内装修工程 BOTTLING AREA 装瓶区 95 M²

GARAGE 车库 104 m²

6T Fer.

3T Sto.

6T Sto.

EX. IRON GATE 現有鐵門

SIGHTSEEING LOBBY 觀光大堂 81m²

6T Fer.

3T Fer.

OFFICE 辦公室 26 m²

GARAGE FRONT DOOR 车库前

6T Fer.

- 所有尺 - 圖樣設 - 圖樣必

CONFERENCE ROOM 会议室 53m²

R

下層空間 M. TOILET 男廁所

KITCHEN 厨房 21m²

BOTTLING LOADING ROOM 上瓶区

SHUTTER 卷闸

F. TOILET 女廁所

DIS. TOILET 廁所

22

6T Fer.

6T Fer.

R

LOBBY AND RECEPTION 大堂及接待處 40 M²

STAIR 3 樓梯三 22R

22

22

NEW BOTTLING LAYOUT FOR LICENSING.

22R

SECURITY ROOM 保安室 6 m²

R1 R2 R3 R4 R5 R6

7

Barrels room


Master planning and landscape design Zoning

We have provided the new zoning analysis and planning of the site to Client for further business development. During the cost and investment, this design is being on hold.

Road

In the original proposal, we have provided a access planning with 3 roads, Winery guest, Personal access and winery use with detail construction design(see below) and LDI contraction drawings.

Landscape within the Lot

Due to the cost and investment, the Master planning has been changed. It is also within the duty.

Fermantation room

VIP Dining and Observation deck

Master PLan


Connectivity of Spacial control Coloring

We use the dried wine color to connect the all spaces. Since the large scale of building, we have to reduce the wall finishing cost and materials application. Wine Making This color arrangement is base on th concept of wine making from upper. It is reflected the gravity flow of the production line.

Spacial control


xx-12-2018

WR FER

EXISTING HANDRAIL

現有扶手

001

NEW MCB BOX FOR WATERPROOF SOCKET & EMERGENCY BOTTON 新防水插座制箱及緊急制

NEW FIRE RATED GLASS DOOR 新甲級防火玻璃門

NEW MODIFIED LAMP POST

新改燈柱

WR PT

- 圖樣比例只供參考

NEW FIRE RATED DOOR 新甲級防火門

003

100H S.S. WATER STOPPER COVER 100 高不锈鋼擋水板

- 所有尺吋以現場為準 - 圖樣設計版權歸設計師所有 - 圖樣必須經批核才可使用

NEW SHUTTER 新卷闸

REV.

DATE

DRAWN BY

APPROVED BY

EXISTING SHUTTER 現有卷闸

RED FERMENTATION AREA 红酒發酵区

1300

3AP3

0.000 AFFL AFFL

6T Fer.

6T Fer.

6T Fer.

6T Fer.

6T Fer. HR

1300

10T Fer.

-50

消防栓 2AP1

蓬莱仙谷酒业有限公司 第二期B段室内装修工程

AFFL 150

2F 0.000

Yantai Winery Phase 2 Factory

PLANT ROOM 機房 18m² 900

-50

AFFL

FEREMTATION ROOM ELEVATION 01

发酵区立面图 01 150H S.S. WATER STOPPER COVER 150 高不锈鋼擋水板 WR PT

002

NEW S.S. WATER SUM

新不锈鋼排手坑

1050H S.S. COVER 1050 高不锈鋼防撞板 WR PT

002

Pumps & tools station 泵及工具站

WR-FER-E001 1:100 (A3) ----

22R

- --

22R

L *2100BED W 1830 SIZE KING

22R

DRMK

DRMK

DR

MK

DRMK

E01 FER-E001

1:100

DRMK DRMK

DRMK

MK

发酵区立面图 01 FEREMTATION ROOM ELEVATION 01

DR

3F

1300

1300

UNLOADING & WEIGHING AREA 卸貨及称重區

DRMK

22R 22R

m/f 16-18 st. francis yard wanchai hongkong tel 852-2525 8883 fax 852-2501 4128 THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE.


SUQIAN CITY IMAGE DESIGN COMPETITION 宿迁花卉交易中心

SUQIAN CITY FLOWER + MARKET 宿迁花卉交易及销售城

SUQIAN FLOWER TRADING & RETAIL DISTRICT

New Suqian City – Sustainability for further development 宿迁新发展– 可持续发展 全新城市规划 Suqian, an agent city about undergoing a major transformation to become a 22nd century. Valuable urban development have been built around the city. To have a landmark that connects the new development together will be the icing on the cake. This landmark will be the place where the economical activities meet the cultural need and the daily life of Suqian’s people. Currently, the city – from Luoma Lake harbor to the city park- and the flower farm is the back bone of Suqian’s people everyday life. And in the middle of this framework will be the largest FLOWER MARKET in the region. The FLOWER MARKET will spread along the main crossroad of the city. This new complex is located at the end of the path, resembling a blossoming flower and it will be a great meeting place for everyone to see the flower. Either it is the starting point of travel this Suqian City or as a relax end of a journey after seeing the flower.

Aerial View from old tower at park

Board 1

atelier C plus, hong kong

Architect : Andrew Choy Team : Andrew Ng, Grace Zhou


Suqian Flower industry

Master layout plan

宿迁花卉业 Local flower trading industry has become the backbone of the city and Suqian is now a significant flower and related products trading center for surrounding area. The FLOWER MARKET will seeks to be a vibrant city center, allowing the neighborhood to gather in the FLOWER MARKET during different time of the day. Trading businessman can visit the market during the day time to buy flesh flowers, while housewives can pick up fresh flowers to decorate their homes. The FLOWER MARKET is also a great place for the public over the weekends. Young couples can spend weekends wandering around the FLOWER MARKET and enjoying a nice meal in the city center. Families can spend some time in the FLOWER HOTEL

Morning, Beautiful Day

晨光中的花墟 Hustle and bustle in the flower market, as loads of people walk by during the day.

Perspective from Flower market Board 2

5 individual buildings comprising of layered outlook create a unique landscape at the edge of the FLOWER MARKET. Shopping mall building together with a cinema and F&B building provide wide variety entertainment for the public while the officer tower will provide support to the merchants in the FLOWER MARKET and other prime office location in the new CBD. Tourists visiting the city can also stay in the hotel facilitating visit to the FLOWER MARKET and nearby tourist attractions. The FLOWER MARKET will be a great step for the development of Suqian, transforming a traditional flower market to an architecture with iconic value and for public use.


Evening, dazzling night

盛放烟花下的都市花会 During special occasion, the flower market can be converted into a special stage for traditional celebration, where walkways can be used for different events and the beautiful outlook of the architecture as background for fireworks.

Aerial View form upper hotel

Metropolitan System

大都会下的骨幹 The Flower suppliers will transfer the flowers to minor level by ramp and load up the flowers at minor level. This circulation system across the site from north to south. This minor level will be connected to the city subway system. Flower market center is one of the crossing point of the city

Buidling section Board 3


Chromehreats store in Hangzhou

atelier C plus, hong kong

Architect : MWS (US design team), Andrew Choy (atelier C+) 2013- 2015, completed ( Architectural and Interior)


Chromehreats store in Chengdu FFL ± 11400 / ± 37'-4 3/16" LEVEL 3

355

ORIGINAL LOUVER

D04 FAC-D01

PREFABRICATED GLAZING UNIT STRUCTURAL STEEL FRAME LIGHTWEIGHT PRECAST CONCRETE

ACCESS CORRIDOR

MAX. 750 - MIN. 330 FFL ± 6000 / ± 19'-8 3/16" LEVEL 2

D02 FAC-D01

01 EXTERIOR

FAC-P02

10 10 320

STORE INTERIOR

380

360

FAC-E03

1

5075

125

610

2

2

4

外立面剖面图 Facade Section

E01

1:50

1

FAC - E01

4

3

3

Chrome Hearts Chengdu In99 成都 In99 - 克羅心

- 圖樣比例只供參考

2 1

3

3

5

Mock up wall selected area 样本墙范围

S01 -

1:50

Facade Elevation ---

Waterproof Membrane 防水膜

3

外立面图 Facade Front Elevation 1:50 (A3)

- 所有尺吋以現場為準 - 圖樣設計版權歸設計師所有 - 圖樣必須經批核才可使用

2

1

610

FFL ± 0000 675 LEVEL 1 ±70

S01

1

2

1 860 610

FAC - E01

1

880 600

25 105

D01 FAC-D01

A

880 600

10 120

FAC - E01

REV.

DATE

180122 ---

DRAWN BY

APPROVED BY

REV.

DATE

DRAWN BY

APPROVED BY

2590

- --

10

2/f china hong kong tower 8-12 hennessy road wanchai hong kong tel 852-2525 8883 fax 852-2501 4128

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE.

Mastic Seal 密封胶泥

Waterproof Membrane at bolt point 螺栓点防水膜

±3515

320

360

10

155

125

270

880 610 600

10 120

300

30 100 380 860

880

610

600 610

2100

±10 125

Movement Joint 伸缩缝

350

± 390

Mastic Seal 密封胶泥

D01 FAC - D01

外立面底部大样图 Facade - Bottom Detail

D02

1:50

FAC - D01

外立面二层梁连接大样图 Facade - 2F Beam connection Detail 1:50

1:50 (A3)

- 圖樣比例只供參考 - 所有尺吋以現場為準 - 圖樣設計版權歸設計師所有 - 圖樣必須經批核才可使用

Chrome Hearts Chengdu In99 成都 In99 - 克羅心

Facade Detail ---

D04

FAC - D01

180122 ---

REV.

FAC - D01

DATE

DRAWN BY

APPROVED BY

REV.

DATE

FAC - E03

Mock up wall selected area 样本墙范围

外立面样本墙大样图 Facade - Mock Up Elevation 1:10

1:50

DRAWN BY

1:10 (A3)

APPROVED BY - 圖樣比例只供參考

atelier C plus, hong kong - --

A

外立面頂部大样图 Facade - Top Detail

- 所有尺吋以現場為準 - 圖樣設計版權歸設計師所有 - 圖樣必須經批核才可使用

Chrome Hearts Chengdu In99 成都 In99 - 克羅心

Facade Detail ---

Architect : MWS (US design team), Andrew Choy (atelier C+) 2018 - Present ,in-progess 2/f china hong kong tower 8-12 hennessy road wanchai hong kong tel 852-2525 8883 fax 852-2501 4128

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE.

FAC - D01

180122 ---

- --

REV.

DATE

DRAWN BY

APPROVED BY

REV.

DATE

DRAWN BY

APPROVED BY

2/f china hong kong tower 8-12 hennessy road wanchai hong kong tel 852-2525 8883 fax 852-2501 4128 THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE.


WAREHOUSE RENOVATION 貨倉改建

Small yard near Sanlitun, Beijing 北京三里屯

Program The existing building is a brick structure. In case to renovate into a 2 stories fashion shop, a new structure a needed to superimpose with the brick system and create the client’s wiling.

Rendering

atelier C plus, hong Kong

Architect : Andrew Choy 2014, Schematic design


2 Floor Plan

Section A

1 Floor Plan

Section C


Win Hanverky Office renovation 永嘉集團翻新

atelier C plus, hong kong

Architect : Andrew Choy Team : Arthur Ying


°

60

26

5

82°

8735

11

7°

UP

DN

SECRET FABRIC STORAGE

)

°

EQ

628

4075(EQ)

HR

MANA. ROOM 10

EQ)

8893

8( ) 62

(EQ

PR

MANA. ROOM 17

CONFERENCE ROOM

MANA. ROOM 11

H.R. DEPT ROOM

628

SERVER ROOM

Q)

RECEPTION

01 REC-P002

MANA. ROOM 18

GRAY WALLS WRITING BOARD MAIN LOBBY

Q)

ROOM USAGE TBC

E (2

EX. FACE DETECTION SYSTEM

Q)

(EQ

HR

SHR

MCB

1770(3E

50

CARGO LOBBY

Q)

8(E

62

12

PR SHR

WAITING AREA

C

82 580

GREY WALLS WRITING BOARD

8(

EQ

62

EQ

8(E

MULTI FUNCTION ROOM 3

PR

475

703

50

FABR ROOM.

)6 2

MANA. ROOM 12

30

HR

MANA. ROOM 13

1410

(GROUP) HR ROOM

Pantry 1

MANA. ROOM 14

8893

MCB

EXEC. TOILET

FEMALE TOILET 1

MANA. ROOM 15

HR

MALE TOILET 1

MANA. ROOM 16

73

UP

725

153°

DN

MANA. ROOM 19

0

0

UP

DN

D MULTI FUNCTION ROOM 2

101

65

CLOSET

DISPLAY ABOVE

MULTI FUNCTION ROOM 1

18°

0

10

8735

260

DIRECTOR ROOM 6

SHR

UP

DN

FEMALE TOILET 2

MALE TOILET 2

280 4800

MANA. ROOM 1

MANA. ROOM 2

MANA. ROOM 4

MANA. ROOM 3

MANA. ROOM 5

MANA. ROOM 6

MANA. ROOM 7

MANA. ROOM 8

MANA. ROOM 9

4280

A

SCALE 1:250

Win Hanverky Office .6th Floor, Phase 6, Hong Kong Spinners Ind. Bldg., 481 Castle Peak Road, Kowloon,

171010 ---

-

REV. 12 13 14 15 16 17

DATE DRAWN BY 13 MAR 2018 LL 09 APR 2018 AY/LL 29 MAY 2018 AY 04 JUN 2018 AY 25 JUN 2018 AY 26 JUN 2018 AY

APPROVED BY -

580

50

1200

400

300 200

EQ) ) 62 8( (EQ 628 Q) (E )6 28 8(

135

1130

2070

2210

275

1 CONFERENCE ROOMS 4 MULTI FUNCTION ROOMS

1:5

EQ 1845

1105

170 FILING CABINET

840

1 PRIVATE TOILET W/. BATH

182 SEATS

120

650

2670

4 TOILETS (2 MALE, 2 FEMALE)

1 RECEPTION (2 SEATS)

1180

19 MANAGER ROOMS

750

40

WAIST HEIGHT CABINET FULL HEIGHT CABINET

6/F LAYOUT PLAN

1 SERVER ROOM

16

01

5 PRINTING ZONE (1 IN HR ROOM)

6 DIRECTOR ROOMS

200

SHR SHREDDER ZONE REFR. REFRIGERATOR FABR. FABRIC DRYER MACHINE

MINOR PART

1 BOARD ROOM

REC-P002

RECETION & CONFERENCE ROOM PLAN - BOLD UP

20

365

MAJOR PART

LEGEND PR PRINTING ZONE

0

212

4075(EQ)

GRAY WALLS WRITING BOARD

01

62

GRAY WALLS WRITING BOARD

1400

GRAY WALLS WRITING BOARD

20

300

50

SECRET FABRIC STORAGE

PR

DIRECTOR ROOM 5 FREDERICK LI

30

400

DIRECTOR ROOM 4 TERENCE WONG

5270

1200

DIRECTOR ROOM 3 CECIL LAI

EQ

EQ

8893

DN

DIRECTOR ROOM 2 IAN LI

9020

199

UP

DIRECTOR ROOM 1 ROY LI

HR

BOARD ROOM

GREY WALLS WRITING BOARD

1410(EQ)

MULTI FUNCTION ROOM 4

Pantry 2

1400

EQ PR

HR

EQ

B

1410(EQ)

AUTO. SCREEN

685

SHRINE PR

30

9

8735

5

512 133 540

°

8

8735

900

915

8735

900

81

7

6

8735

900

83

5

4 8735

900

800

9785

900

3685

3

2 8735

900

00 15

1

1005

67

0

45

0

50°

N

90

350

59

REC-P002

RECETION & CONFERENCE SETTING OUT PLAN 1:50

2 PANTRY

REV. DATE DRAWN BY 18 12 JUL 2018 AY

AS SHOWN APPROVED BY - 圖樣比例只供參考

2/f china hong kong tower 8-12 hennessy road wanchai hong kong tel 852-2525 8883 fax 852-2501 4128

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE.

- 所有尺吋以現場為準 - 圖樣設計版權歸設計師所有 - 圖樣必須經批核才可使用

WIN HANVERKY OFFICE 永嘉集團荔枝角辦公室 6th Floor, Phase 6, Hong Kong Spinners Ind. Bldg., 481 Castle Peak Road, Kowloon,

RECETION & CONFERENCE SETTING OUT PLAN

REC-P002

171010 ----

REV. DATE DRAWN BY R0 03 APR 2018 AY/LL R1 17 APR 2018 AY/LL

APPROVED BY -

REV.

DATE

DRAWN BY

APPROVED BY

2/f china hong kong tower 8-12 hennessy road wanchai hong kong tel 852-2525 8883 fax 852-2501 4128 THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE.


Meditation Center Renavation 佛堂重建

Bao Guo Si, Lezhi, Ziyang, Sichuan

四川樂至報國寺

Model picture / Existing over all

Site / Project nature This is rural project, part of a temple renavation. The requirements are : i. keeping the existing plant at the midden, ii. including 1 tea room, 1 storage, iii. adding a second floor, and iv. using wooden structure. First of all, we localed the volume by the site condition and extended the meditation hall at the upper floor. Therefore, the issue of this project is design the relationship between the architecture and the surrounding under the BUDDHISM. Model picture / Existing design

Approach Studio, Beijing

Site Picture Architect : Jingyu, Liang 2014, Completed


The Renavation

茶室

庭柏轩

庭柏轩

基地现状 离欲念佛堂

庭柏轩

This structure have to be minimize, hidden in the forest. And we want to control the maintenance period is 20 years. So, the roof top is a slope and joint system should as less as possible.

改造后 离欲念佛堂

庭柏轩

Massing The lower part structure have to be showed its weight and hidden in the nature at the same time. We decided to make it have lesser translucence. And, at last, we use the vertical wood sticks to control the weight and translucence.

Layer / Massing of each part

Bird’s eye view / Front Elevation

Development


3d model picture / Side Elevation form the temple entrance

The Upper Structure We decided to use a big sloped roof to replace the old design. Because it increase the water proofing and more center gravity inside the meditation hall. So, the massing divided into three parts : the heavy lower part; the in-between part - handrail system; and the roof part.

Perspective / Front Elevation

Architectural design

Axiomatic / Cladding structure


1. / Roof Structure sit-on the concrete structure

4. / Detail Drawing

The Primary Joint Structure There are a lot of chooses of the roof structure design. Under the economic and construction consideration, we picked up this design scheme. As showed at the 2., there are 4 identical metal plant. This is a isosceles triangulation system in section and a girl system in horizontal plan. The material, wooden bamboo is a 2hr fire-proofed structural material.

3. / Wooden bamboo

2. / Primary Joint

Detail design


1

2

3

4

5

1. View from main entrance 2. Coner view 3.Vew from the deck 4. View in the meditation room 5. RooďŹ ng detail

COmpletion image


Zheng Hong No. 7 Community Center

社區中心

Zheng Zhou , China

中國鄭州新鄭市

Servicing area

Roof Plan

Outline Zoning Plan

Brief Issue / Situation of Users

30k workers in each circle

This is a community center for 300,000 people in a new city, which built for the factory company Foxconn. As the Outline zoning plan shown, there are 8 circles and 300,000 people within this city.

Our design purpose is reduce the experience different between the original life and new one.

There were over 400 cultural buildings are taken down when this city were started developed. At the end, for a requirement of units, lots of typical residential were built. Although there are very good outlooking, the environment inside is still under the line. On the other hand, the people are going to this city are came from the rural farm.

Approach Studio, Beijing

Architect : Jingyu, Liang 2014, Presentation

There is 25,000 sq.m. GFA required for the follow functions: Commercial area, Wet and dry market, Cultural center, office, Community health center, Elderly day-care center, Community service center, Committee office, Retail office, Police station and Sports area. Beside it, there is no another commercial area in the residential area but some small shop under the towers. This complex is the only one.


Model picture

Aerial view

40,000 people

15,000 sq.m.

3 towers

Families of 30k workers 1. There is offering 40,000 people’s community service within this 15,000 sq.m., over 30,000 sq.m. of G.F.A. is required form the government. 2. And we are focusing on the non-economic activities. 3. So, we hide the society functions at the bottom part and group the cultural and leisure part on the towers. The upper landscape should as big as it can. Side entrance

Sizing


Conceptual image

The architectural language

1.

2.

3.

4.

5.

6.

A. It is facing a massive and stager urban architecture, which is designed by Zaha Hadid. Therefore, a relatively simple and silent structure is needed for the people who living in a new, modern and empty city.

Massing control development

The local government building in China The architectural solution B. Because it is a low budget project but a lot of requirement, especial the responding of urban image. We design a variation facade by the sunlight. The deepness between the exterior wall, gray brick wall and glass, and the brick feature is casting a shadow that changing our elevation.

Dividing the Massing

Because this is a town development project, the budget of each community center is very limited. Therefore, we wanted to have a passive variation feature. It is planed by the function. But, at the end, a patten elevation and a kind of between movement and stable facade is the most suitable way of this government building.


Conceptual image

托老所

街道办

Elder Centre

文化

Cultural Centre

居委会

派出所

办公

Office Tower

商业

The other is not particularly dependent on the position of the first floor and second floor features, including cultural centers, office and daycare center, set up in three or more areas.

街道办

卫生中心

Street Office

Health Centre

居委会

Neighborhood Committees

派出所

商业区

Local Police Station

Commercial Area

48m

Taking into account the requirements of commercial business, most of the two-story building area available to commercial use, internal office space for local public services. Vertical transportation - were provided by the arrival of the first floor of their respective owners.

24m

Green land in the new city

商业区 To solve the massive look of volume for the landscape, we try to use some of the programs to form a landscape. Context Diagram

托老所

Elder Centre

街道办 Street Office

卫生中心 Health Centre

居委会

Neighborhood Committees

文化

Cultural Centre

派出所

Local Police Station

商业

This upper urban space can directly change the perspective of human relatively far the city and the noise. It can be make sure the enough space of the sports and green space. Due to the political reason the secondary space have to be controlled. Therefore, we kept the number of tower in three. When we are standing on the platform, we are moved into a urban scale that different with the street level. That can bring people off from the dying daily life in the factory.

办公

Commercial Area

Office Area

Will be open to the public all the necessary settings on the first floor of community service, such as police stations, community health centers, neighborhood, street offices and so on. In the area of public services to meet the community’s premise, the rest of the first floor of the building area reserved for community commercial use.

acticities


A-A 剖面图 SECTION AA

北立面图 NORTH ELEVATION

0

5m

10m

15m

B

B

东立面图 EAST ELEVATION

elevations

0

0

5m

10m

15m

5m

10m

15m


B-B 剖面图 SECTION BB N

N N

停车场出入口

停车场出入口

Car Park Entrance

Car Park Entrance

停车场出入口

社区服务中心 Community Service Center

Car Park Entrance

社区服务中心 Community Service Center 社区服务中心 Community Service Center

文化中心 Cultural Center 商业区 Commercial Area

文化中心 Cultural Center 社区服务中心 文化中心 Community Service Center Cultural Center

商业区 Commercial Area

商业区 Commercial Area

居委会

居委会

商业区 Commercial Area

居委会 Committees Office

居委会 老人中心 Elderly Center

老人中心 Elderly Center

老人中心 Elderly Center 社区卫生服务中心 Community Health Center

派出所 Local Police Station

商业区 Commercial Area

社区卫生服务中心 Community Health Center 停车场出入口 Car Park Entrance

社区卫生服务中心 Community Health Center

派出所 Local Police Station 派出所 社区卫生服务中心 Local Police Station Community Health Center

商业区 Commercial Area 派出所 Local Police Station

商业区 Commercial Area

商业区

停车场出入口 Commercial

Car Park Entrance

Area

停车场出入口 Car Park Entrance

一层平面图 FIRST FLOOR PLAN 一楼平面图 FIRST FLOOR PLAN

二层平面图 SECOND FLOOR PLAN

一楼平面图 FIRST FLOOR PLAN 二楼平面图 一楼平面图 SECOND FLOOR PLAN FIRST FLOOR PLAN

plans


Wu Youg’s Workshop & Concept Store

無用工作室及概念店

Beijing, China中國北京 C

B

Lower Floor Plan

Section

Approach Studio, Beijing

Architect : Jingyu, Liang 2013, completed.

A


Beijing City / Old Town District This project is located at the east of forbidden city and north of the Wong Fu Jing Main Street. It was a factory came from the word of the first leadership of the republic of china, 毛澤 東, and his word “ here will be 4,000 chimneys are set in this city. After 70 years, the fail of the factory and the development of cultural indenture, such as 798 art district and the rest of slimier developments. This one is located in the central old town, next to the old residential, Alley. This kind of factory building is a kind of the historical and cultural symbol of the modern Beijing, an city ruled by five different governments. Client / Tradition Technology Maintainer Wu Youg is company aim to keep the China traditional fabric making technology, there are including the north, south and the west district. Also, all of their products are custom made. Therefore, the special requirement is they shall service one custom at the one time.


Housing for People in All Age 社區集合住宅

Tai Po old Market Street, Hong Kong

SITE

香港大埔舊墟

SITE

1 2 Image from google map

3

Existing Station

The low energy program

This project is a housing for people in all age, the requirement is min. 50 units with 3 type of room types, such as studio flat, single bed and double bed. This project is located at center of old town. It had been strongly separated by the city grid system, away from the other estate and living area. To re-link this old urban space the current city flow is my core vision of this project. It help the people who living in my building also with the neighborhood.

Old Station

Replacing Station

Image from google map

The shift of the town center.

Site Context - Tai Po, one of the early developed town in Hong Kong. The Tai Po Old Market station was the meeting point of the main market of north of old Hong Kong when the Hong Kong cities development was started. As the time pass and the new town, station has been developed, this old market is still running very strong. But there is no population move over there, it is getting older and the younger are not using it anymore. District development diagram

70’s

50’s

90’s

Market area

50’s

70’s

Image from HKSAR record

1

90’s

Year 3, BAS, CURTIN UNIVERSITY

3

Instructor : Bryan Chan 2010, Final project

2

1. Man Wu Temple 2. Former train station 3.Fu Shin Street


Tai Po population distribution

Tai Po population distribution

8%

23%

19%

11%

19% 20%

Building / Estate

15% Work in town

66% Work out of town

11% School

Society analysis - a no-centralized town

19% Daily life Community - Restaurant

Market After work / school

Back to town Activity

Park

34% will stay in town for daily. Compare the age distribution, there is 25 % stay in the town is elderly.

leasure / out town activities

Tai Po population distribution Age distribution Dwelling size distribution

Working location

Society Movement in old town

A SELF SUPPORTING SOCIETY Data from 2011, Census Results report, HKSAR

As the one of the oldest town in Hong Kong, there are different density residential area in this district. There are different classes of Hong Kong residents who maybe the new immigrants, the second or third generation of immigrants or the originals of Hong Kong. They have different career form and mostly work out of town including the both parents and left children and elderly in this small old town. They are having very different community bonding in town.

1.Typical Housing system

2. Village form

As arm to stronger the connectivities, I wanted to strategically merge the elderly and younger generation. They look after each others and share the activities like the old time. Once the space and politically allow and permit they occupation such as the traditional culture work in the public space, which mean more community activities are allowed and possibilities for our city. Then the clan grow up as the pass.

Analysis


Design stage 1 - SELF SUPPORTING SOCIETY

Design stage 1 - extend the society circle to the NEIGHBORHOOD

In the current society

PAGE 22

05

Elderly Housing in Tai Po Market, HK., Overlapped Village, Feb. 2011

Elderly Housing in Tai Po Market, HK., Overlapped Village, Feb. 2011

PAGE 22

05

Schematic Section

Conceptual drawings

Partial detail drawings Previous design / Concept diagram The diagram above is the initial idea, the comfortability is the most importance to the elderly. The passive lighting and the ventilation be come the main issue. Therefore, the self-community have to superimpose with it. portfolio 24

Concept development

The space of local people life are divided into indoor and outdoor, building and, street. It is very dierent from our memories, specially on the elderly. They will only meet the others on the street, restaurant or shopping mall, which is not very welcome for the lower movability people. Therefore, the elderly are getting less care,except from family and social workers. So I want to transfer the street, landscape and building into a FOLDING VILLAGE. By creating the semi-translucence wall of dwelling and opening and sharing space surrounding the house. The Elderly will have a better ventilation and lighting condition, also the activities space. I will call it - the FIREFLIES HOUSE.

3. Living on Landscape


As See Detail 01

Third Floor Plan / 3 f There are three typical dwelling, small for Studio flat, big for single bedroom and big for double bedroom. The aim of rotation is dividing the semi-privacy space as shown below drawing.

typical plan


Typical Floor Plan

As See Detail Drawing 02

detail plan of a part of dwelling


The FIREFLIES HOUSE - Dwelling

Typical Screening detail

The sunlight will get into the house during the day and house will become a light bulb in the night. The surround can easy to care and understand the elderly in this building. It create the relationship between is society.

In-side

The construction detail 1. Translucent polyester-fibre insulation encase the entire wood frame building. Life of the elderly a closed environment, so to achieve a translucent film material composed with natural light in a room,Bring energy savings of lighting power.

In-side

Out-side In-side

2. Walls and ceilings with a double membrane, the air conditioning and energy saving air conditioners, in order to improve the insulation performance In order to improve the heat insulating effect of the building of the warm air circulating in the double membrane wall, results in energy savings. 3. Installing windows and velcro endometrium, simplifying replacement parts, can be easily replaced, also simplifies the replacement of insulation.

East Elevation

Out -side

Out-side

Elevation and detail concept


Market Side Elevation Main Section

Partial View at Upper Units

Images and g/f plan

Ground Floor Plan Axonometric


Architectural Center 建築中心

St. Francis St., Wan Chai, Hong Kong

香港灣仔聖佛蘭士街 Central Business area

Mid-levels

SITE . St cis an Fr

Old district

ee str t

Wan Chai, commercial district Image from google map

Site photo

The ARCHITECTURAL CENTER between Cities

The building is named , St. Francis Street. It is a 80’s high-end residential area in the Hong Kong old town, Wan Chai. As the time pass, the neighbor town, Admiralty, was been developed into the CBD of Hong Kong. In 21s, the town development had been shifted to Wan Chai, one of the oldest district of Hong Kong. It recorded lots of Hong Kong urban development history and transformation changing in this moment. This project is located at the center of the St. Francis Street, the edge between two cities.

SITE

Kiosk / A old outdoor restaurant

Car Park

St. Francis lane, the surrounding of Cultural and Business space Site / Front view

St. Francis street is a ramp road which is the main road of resistances, visitors travel between Wan Cahi and this area. This project is located at the highest part of this road, as the yellow building in the photos.

Year 3, pdas, hku space

Instructor : Rui Leao 2009, second project

St. Francis street St. Francis Street / Entrance from Queen’s Rd E.

St. Francis street


The energy of this area

Program analysis Wan Chai

Urban Response Urban Response

Urban Response Urban Response

Sun St.

Tai Koo Center

St Francis St.

St Francis Lane

of HK Information Architecture of HK Architecture

Moon St.

Public Education Public Information Education Center of Information Architecture Center of Architecture Information

Public Education Public Information Education Center of Information Architecture Center of Architecture Information

of HK Information Architecture of HK Architecture

Restaurant Shop

Star St.

Community shop type plan

Design Brief

Cargo

Sun St.

St Francis Lane

Tai Koo Center

St Francis St.

Wan Chai

a floating aNagetive floating space Nagetive space A Void A Void

Moon St.

Star St.

Concept diagram

Community activities space G/f plan

Situation

A Hyper-community

Strategy A Void

By find out the nature of the architecture center and the need of urban space, it is easy to be find out that the whole urban could be a gathering space of this area. It is ready for transform to any activity space of people need.

By comparing the 2 diagrams above, there are different type of services and activity for two independent groups of people, resistance and visitors/office clerks. The daily office clerks occupied the day time and the resistance and visitor enjoy the happy hour at the night time. It allowed the different restaurants survived in this historical town and lot of potential high-end product shops started up over here. A unique cultural space was weaved by those people and urban space.

A large architectural space

A iconic object is a evolution direction of the small town to record, transform and distribute the culture. I believe it is the duty of the architecture in here. A floating platform is a state for the event city. It is a very large negative space for people living in this town, a upper street space. And it is a solid statement of architecture to superimpose with the urban contents. It is the image of urban architecture.

concept Development


15.00

Theater

12.00 9.50

Member club Library

7.00 Park

Exhibition

4.50

oďŹƒce

1.85

Road

Cafe shop

Car Park

0.00 Section / Vertical system

Front Elevation / The Void and the society Back Elevation

Road side Elevation

Front Elevation

Car Park side Elevation

Theater Private corner

Member club

Theater

landscape

Exhibition

Library

oďŹƒce

Library Exhibition

Entrance

Admin. office Cafe shop

Folded Elevation / the strategy of openings

conceptual Architectural drawings

The Program

*1

The program is arranged for enlarge its feature and the society events. The library is located at the observation desk, that make everyone, include the locals, are using this space together. The rest of them are arranged by the private requirement. *1 : Images searched from Internet


West Entrance / From the PP3

Floating Landscape / the public space

Axiomatic / East Elevation

Activities At daytime, the sun light will cast on the opened part and those space are the public space. In this small society, everyone can see and hear those activities, when they are having lunch, walking, driving, even he is sleeping at home.

East Entrance / From St. Francis St.

model montage


Road side Elevation

street side Elevation

St .

Fr an c

La ne

PARK side Elevation

Elevations and 3f plan

Floating level floor plan

St .

Fr an c

is

str ee

t

Pa rk

is


Turn static files into dynamic content formats.

Create a flipbook
2019 Portfolio by kuichuen lo - Issuu