instances of non-compliance. This

for both Design and Construction

in turn improves the efficiency of

stages. To be an PQP, the individual

the construction process and reduces

must pass and exam which will test

maintenance and operational costs.

their administrative and technical

The Pearl Operational Rating System

knowledge of the Pearl Rating System.

(PORS) is another unique element

All pearl rating procedures must be

to Estidama and the Pearl Rating

undertaken by a certified PQP, who is

System. Resource use during buildings

regarded as a mediator between the

operation far outweighs that during the

project team and the Urban Planning

design and construction phases. The

Council. As an integral member of

continual efficient operation of building systems is critical to ensure that the resource savings calculated during the design process become real. The first on-site audit is to lay a solid framework and foundation for a project; the second audit is to establish the top-level and exterior structures; the third audit is for internal maintenance and MEP (mechanics, equipment and pipelines) engineering; the fourth audit is for readjustment and document transfer. On-site audits are carried out jointly by UPC staff members and Pearl Qualified Professionals. If a project fails to pass an on-site audit, the UPC will mandatorily put a stoppage on the project and convene a meeting, in which all stakeholders will attempt to detect the crux of the matter and work out a proper solution. The Pearl Qualified Professional (PQP) is a member of the design team who facilitates the Pearl Rating System