Skip to main content

Learning from Cities - The 2nd Guangzhou International Award for Urban Innovation

Page 101

Asian-African Line

085

be granted a higher rating if it meets the requirements in the innovative practice section. A striking example in this regard is Masdar City Project, which has been granted one pearl in terms of innovative practices, mainly because free PRS training is provided to employees working for the project. As for the construction waste, the PRS requires a project to recycle at least 30% of its construction waste. The Executive Council Order of May 2010 states that all new applicable buildings must meet the one Pearl requirements starting in September 2010, while all government funded buildings must achieve minimum of 2 â–Ą Microclimate Design

pearls. Three rating stages have been established under the PRS, namely,

region of Abu Dhabi.

design, construction and operational

All aspects of sustainable

stages, for the overarching objective

development pertinent to Abu Dhabi

of making sustainability run through

are encompassed in the PRS, namely,

the entire life cycle of a project.

the integrated development process,

PRS requirements have already been

natural systems, livable buildings,

implanted into the first two stages

precious water, resourceful energy,

(design and construction), while the

stewarding materials and innovative

third stage (operational) is still in a trial

practices. A unique emphasis is placed

period. As of 2010, PRS requirements

on energy and water saving, which

became compulsory and bound with

makes up a 50% share in the overall

the issuance of construction licenses.

scoring system. Requirements in all

Four on-site audits are conducted

sections except the innovative practice

during the construction stage to reduce

section are compulsory. A project will

defects and liability issues and removes


Turn static files into dynamic content formats.

Create a flipbook