www.specificationonline.co.uk ll www.letstalkspecification.co.uk
September 2026
This month’s features: Sector Reports: • Public Sector Projects • Offices & Commerical Buildings
Features: • Drainage & Water Management • External Walls
• Floors, Walls & Ceilings • Kitchens, Bathrooms & Washrooms
Martyn’s Law: Putting compliant security at the centre of building design with Abloy UK
Magazine
SPECIFICATION
BUILT RIGHT
Firestopping by others? Not anymore. Tested in British Gypsum systems and backed by a 25-year SpecSure® Warranty Gyproc® Firestopping from British Gypsum
IN *Scan the QR code for further details on 25-year SpecSure® Warranty
British Gypsum launches the Gyproc® Firestopping range: Tested solutions for safer buildings Fire safety remains one of the most critical considerations in modern construction. While the industry has made significant progress, maintaining compliance from specification through to handover continues to present challenges. Research commissioned by British Gypsum found that 81%1 of contractors experience difficulties in ensuring firestopping compliance across the project lifecycle, with unclear design specifications often cited as the main issue. To help address these challenges, British Gypsum has launched the Gyproc® Firestopping Range – a suite of comprehensively tested products including sealants, collars, wraps and putties – designed to complement the company’s existing fire rated flexible wall systems. With the addition of firestopping products alongside its drylining offer, the company now provides a fullsystem solution for construction projects of any size. Part of the company’s ongoing commitment of more than 100 years, the range supports the creation of safer, more resilient buildings while aligning with evolving regulations and the growing demand for greater transparency and accountability in construction. This development positions British Gypsum as a singlesource supplier, enabling specifiers to streamline design and procurement, and reduce complexity on site.
Why integration matters Currently, firestopping solutions are sourced from multiple manufacturers, creating potential gaps between design intent and installation. British Gypsum’s research highlighted that brand trust influences 80% of firestopping specification decisions1, and that professionals across the supply chain are seeking greater clarity and assurance.
Supporting better practice The launch is not just about products. British Gypsum is investing in resources to support the industry’s ongoing journey toward safer buildings. This includes technical guidance, CPD content and training, support is available through online resources as well as hands-on learning delivered by our Build Better Academies, recently recognised as an ASFP Recognised Training Provider. British Gypsum is committed to helping professionals navigate regulatory reform and rising safety expectations. Coral Morgan, Head of Fire Protection Solutions at British Gypsum, explains: “We’ve listened to the challenges faced by specifiers and contractors. The Gyproc Firestopping Range is about more than optimising specification – it’s about providing confidence through robust testing, certification and practical support.”
A step toward safer spaces Fire safety is an evolving discipline, shaped by regulatory reform and rising expectations from clients and communities. British Gypsum’s approach combines insight, innovation, and collaboration to help the industry meet these demands. By offering a complete solution from one trusted source, the company aims to make compliance easier and support the creation of resilient, high-performing buildings. For specifiers, this means fewer uncertainties, streamlined processes and access to expert guidance – all underpinned by a commitment to building better.
The new range aims to start closing that gap, with a robust evidence base including UKTA and supporting fire test data across the Gyproc® Firestopping range, backed by the SpecSure® Systems 25-year* firestopping warranty for new-build applications. This provides long-term performance assurance and confidence for specifiers working to meet stringent safety standards.
Explore the range The launch of the Gyproc® Firestopping Range marks an exciting milestone for British Gypsum and the wider construction industry. For specifiers looking to optimise specification and deliver safer buildings, this is the solution you’ve been waiting for. Read more on pages 24-25. Enquiry 1
1 All statistics referenced are drawn from British Gypsum research conducted with 169 UK construction professionals in May 2025
ATTEND OUR CERTIFIED CPD SEMINAR
The Essential Guide to External Wall Insulation
FASSATHERM System
Reviewing the process of specifying the right EWI solution. Delivers an in-depth understanding of system components, thermal performance, fire considerations, and regulatory compliance. Outlines how EWI can improve energy efficiency, enhance façade aesthetics, and contribute to achieving net-zero objectives
“I would like to thank Daniel and the rest of your team for the fantastic CPD, it was hugely interesting and brilliantly presented.” Jacob Midgley, Arkle Boyce Architects
NEW 2026 CPD SEMINARS
BDA Agrément
Attend an independently certified CPD seminar arranged and hosted by Fassa Bortolo. • An Informative Guide to Render Solutions
• A Guide to Modern Lime Render Systems
• Solutions for Render in Very Severe Locations
• Essential Guide to External Wall Insulation
• Render Systems for Timber Frame Construction
• A Guide to Subfloor Preparation
BOOK NOW! Enquiry 2
Email info.fassauk@fassabortolo.com or call 01684 218 305
Welcome
Welcome
ANSELMI The concealed hinge system for residential doors
Heat death figures should be wake-up call on excess heat in homes
T
he record-breaking extreme weather conditions of this summer has created a whole set of challenges.
From wildfires to drought conditions, ministers have been forced to take action on a whole raft of significant issues that the prolonged heatwave conditions have brought to much of the UK. Now the Chartered Institute of Environmental Health (CIEH) says new heat death figures from the UK Health Security Agency (UKHSA) should be a wake-up call on the need to tackle excess heat in homes. A UKHSA interim heat mortality monitoring report indicates there were an estimated 2,877 heat-associated deaths during two notable periods of hot weather in England in May and June 2026, almost double the figure reported annually for 2025. CIEH argues that, as heatwaves become more frequent due to global warming, environmental health practitioners (EHPs) have a crucial role to play in tackling the housing problems that contribute to heat-associated deaths. Many EHPs work for local authority teams enforcing housing legislation. CIEH says their expertise makes them particularly well placed to identify homes where the risk of harm due to excess heat is high and to ensure that measures are taken to reduce this risk. CIEH is urging the Government to ensure that funding for local authority housing enforcement is sustained and predictable and permits local authorities to attract new staff and fund their training. Dr Henry Dawson, a member of the housing advisory panel of the Chartered Institute of Environmental Health, said: “Environmental health practitioners are one of the few professional groups bringing about the changes to our existing housing stock that are needed to combat the effects of more frequent extreme weather events. “The resilience of existing homes to these events is an issue that affects the lives of millions of people. We need to drive it up the political agenda.”
ANSELMI • completely concealed hinge system for residential doors • for timber and aluminium frames • for unrebated residential doors • 3D adjustable • load capacity up to 60 kg • opening angle 180° • hinges with reduced frame part 21 mm available
It all hinges on excellence.
www.simonswerk.co.uk
Paul Groves || Group Editor Enquiry 3 SIM_Anz-2024_Anselmi_Text_UK_halb_90x260_RZ.indd 1
5 07.03.24 12:18
WARRANTY
FD30
(AVAILABLE)
EXPERT SUPPORT
Extractable track
Runners tested to 100,000 cycles
No need to break into the wall to remove the track
That’s approximately 25 years of use!
Quick-click easy-fit frame
1.2mm galvanised steel specially formed profiles
Quick and easy to assemble and install
Strong & robust
Use standard building materials Fits standard CLS and metal C-shaped stud. Uses standard 12.5mm plasterboard.
Comes with a specially designed jamb kit
Self-centering floor guide Fits in seconds
Discover our full range of quality, competitively priced products at www.eclisse.co.uk
Perfecting Pocket Doors for more than 35 years www.eclisse.co.uk | 0333 577 0828 Enquiry 4
27
September 2026
Magazine
SPECIFICATION
Contents
www.specificationonline.co.uk ll www.letstalkspecification.co.uk
This month’s features: Sector Reports: • Public Sector Projects • Offices & Commerical Buildings
Features: • Drainage & Water Management • External Walls
• Floors, Walls & Ceilings • Kitchens, Bathrooms & Washrooms
Martyn’s Law: Putting compliant security at the centre of building design with Abloy UK
12 News Martyn's Law In this article from Abloy UK, Commercial Director Pat Jefferies explores the introduction of Martyn’s Law, examining how it represents a significant shift in the UK’s approach to physical security and is reshaping how security must be considered across public spaces and buildings. See pages 22-23 to find out more. Enquiry - 5
8 Latest News 14 Project 16 News 22 Front Cover Spotlight
Sector Reports 26 Public Sector Projects 34 Offices & Commercial Buildings
70
24 Corporate Spread
44
TSP Media Ltd, Grosvenor House, Central Park, Telford, TF2 9TW T: 01952 234000 E: info@tspmedia.co.uk www.tspmedia.co.uk
Follow us @MySpecNews
Features in Focus 40 Drainage & Water Management 52 External Walls
Products in Focus
56 Floors, Walls & Ceilings
70 News & Developments
62 Kitchens, Bathrooms & Washrooms
71 Building Services
7
News
New heat death figures should be wake-up call on excess heat The Chartered Institute of Environmental Health (CIEH) says new heat death figures from the UK Health Security Agency (UKHSA) should be a wake-up call on the need to tackle excess heat in homes. A UKHSA interim heat mortality monitoring report indicates there were an estimated 2,877 heat-associated deaths during two notable periods of hot weather in England in May and June 2026, almost double the figure reported annually for 2025. Hot weather poses particularly significant health risks for older people and people with underlying medical conditions. It also increases the pressures on the NHS. CIEH argues that, as heatwaves become more frequent due to global warming, environmental health practitioners (EHPs) have a crucial role to play in tackling the housing problems that contribute to heat-associated deaths. Many EHPs work for local authority teams enforcing housing legislation. CIEH says their expertise makes them particularly well placed to identify homes where the risk of harm due to excess heat is
high and to ensure that measures are taken to reduce this risk. CIEH is urging the Government to ensure that funding for local authority housing enforcement is sustained and predictable and permits local authorities to attract new staff and fund their training. Dr Henry Dawson, a member of the housing advisory panel of the Chartered Institute of Environmental Health, said: “Environmental health practitioners are one of the few professional groups bringing about the changes to our existing housing stock that are needed to combat the effects of more frequent extreme weather events. The resilience of existing homes to these events is an issue that affects the lives of millions of people. We need to drive it up the political agenda.” As the UK experiences increasingly extreme summer temperatures, NFRC is calling for climate resilience to become a standard consideration in the design, refurbishment and maintenance of roofs.
NFRC has published Future (P)roof: Five Years On – The Importance of Climate-Resilient Roofs as the UK Swelters, revisiting research originally commissioned by the NFRC Charitable Trust and undertaken by the University of Southampton in 2021. Gary Walpole, NFRC Technical Safety, Health, and Environment Officer, and author of the report, said: “The climate that roofs need to perform in is changing. A roof installed or significantly refurbished today could still be in place in the 2050s, so relying solely on historical weather conditions when designing for its service life is no longer enough. “Climate resilience does not mean that every building needs an expensive or innovative roofing system. Good design, effective drainage, appropriate ventilation, inspection and maintenance remain fundamental. But we need to take a longer-term view of how roofs will perform and make better use of the opportunities that roof space provides.”
Housebuilder to deliver additional 330 homes
New £16.9m health centre Morgan Sindall Construction has been appointed to deliver the new Thornbury Health Centre, a £16.9 million facility on the former Thornbury hospital site that will provide modern, purpose-built healthcare for the local community. Appointed by South Gloucestershire Council through the Southern Construction Framework, the health centre will provide a new home for Severn View Family Practice and Streamside Surgery. A major housing development is set to deliver 330 additional homes following a strategic re-plan and planning approval from Glasgow City Council. Set to be one of the largest regeneration schemes in the UK across multiple phases, top 10 UK housebuilder, Keepmoat, will
8
increase its delivery from 834 homes to 1,164 at its flagship NorthBridge scheme. In late 2025, the housebuilder celebrated the success of its first phase at the site, located off Pinkston Road, which created 154 homes, enhanced and new transport links, green spaces and walking and cycling routes.
The development will provide a total of 24 consulting rooms, three treatment rooms and two phlebotomy rooms for the two surgeries. It will include a joint reception and waiting area and office space for both GP practices, as well as Severnvale Primary Care Network. Sirona care & health will also have office space and consulting rooms to support community services.
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Enquiry 6
News
AI use surges across construction but firms struggle to move beyond pilot studies AI adoption across construction and commercial property has accelerated significantly over the past year, but firms are struggling to turn pilot studies into routine practice, according to new research from the Royal Institution of Chartered Surveyors (RICS). The RICS AI in Commercial Property and Construction Report 2026, based on more than 3,100 responses from industry professionals worldwide, found that about two-thirds of construction professionals are using AI in some form, up from just over half in 2025. In commercial property, more than three-quarters report some level of AI use. Both sectors have the same proportion of organisations running early-stage AI pilots, at 39%, but commercial property is proving more successful at converting these into regular use. Regular AI use stands at 29% in commercial property compared with 19% in construction.
organisations reporting no AI use has fallen by more than a third since 2025, while regular use has risen from 12% to 19%. But barriers remain. A lack of skilled personnel continues to be a major issue, whilst privacy and security concerns in construction increased from 22% to 30% over the past year. RICS is calling on organisations to consider from the outset how successful AI pilots will become routine practice, including the data, integration, professional supervision and governance they require. The report also highlights the importance of the RICS professional standard, Responsible use of artificial intelligence in surveying practice, which came into effect in March 2026. Greater awareness and adoption of the standard will be increasingly important as AI becomes embedded in professional work.
Investment intentions suggest adoption will continue. 47% of commercial property respondents plan to increase AI investment over the next 12 months, compared with 37% in construction. RICS says the findings show the industry's challenge has shifted from getting organisations to experiment with AI to successfully embedding it into professional practice.
Maureen Ehrenberg FRICS CRE, President Elect of RICS, said: “A year ago, this report described an industry approaching an inflection point. The conditions for AI to take hold were in place, but adoption itself was still limited. This year’s data shows that point has been crossed. This shift matters, as does the responsibility that comes with it. RICS’ professional standard Responsible Use of Artificial Intelligence in Surveying Practice, which came into effect in March 2026, provides members with a well-defined framework for acting with confidence.
Construction has nevertheless seen substantial progress. The proportion of
“This is the moment for the profession to lead, not follow.”
Major school transformation awarded to Bouygues UK A comprehensive transformation of Holy Trinity CofE Secondary School in Crawley has been awarded to Bouygues UK. The project encompasses a brand-new 9,300m² school building, refurbished facilities, five Multi-Use Games Areas and an ambitious BREEAM Excellent sustainability approach, with works commencing in August 2026.
A landmark rebuilding programme at Holy Trinity CofE Secondary School in Crawley, West Sussex has been awarded to Bouygues UK, one of the UK's leading construction companies. The project forms part of the Government's national School Rebuilding Programme which targets schools with buildings identified as being in the poorest condition across the country.
CIOB publishes free advice for clients A new guide to help construction clients better understand their responsibilities under Building Regulations and the Building Safety Act has been published by the Chartered Institute of Building (CIOB). The free guide is aimed at anyone commissioning building work on behalf of a business, public body, charity or other non-domestic organisation. It clearly sets out a client’s legal duties under the Building Safety Act 2022, as well as helping identify which projects are and are not subject to Building Regulations. The guide also includes a checklist clients are recommended to follow in advance of each project, which covers checking the competence of experts, confirming processes for managing compliance and checking if their project is categorised as a high-risk building. Ayo Allu, Chair of CIOB’s Client Steering Group, said: “As a client your role is no longer simply to commission construction work. You should help ensure it is properly planned, managed and delivered in compliance with the Building Regulations, keeping in mind the decisions you make before and during the project influence safety, quality and compliance. “You are not expected to be a technical expert. However, you are expected to make informed decisions, appoint competent people, provide necessary information to your contractor and estate manager, maintain records and remain engaged throughout the project. “It is not uncommon for projects to be derailed when clients are unaware of the level of involvement they need to have and only realise when it’s too late. By empowering clients to make good decisions from the outset and fulfil their legal obligations, their relationships with their contractors are likely to be easier and their projects more successful.”
10
For the ultimate ventilation this summer
25
Rooflight
Years of Expertise
0116 497 1249 sales@roof-maker.co.uk Enquiry 7
Hinged Opening Slimline Roof Lantern Minimalistic clean lines without glazing bars Built-in rain sensor for automated closure 700N 24V DC chain actuators with 300mm opening
www.roof-maker.co.uk
Available in popular sizes up to 3000mm × 2000mm
News
Breathing new life into a high street landmark The transformation of a long-vacant Marks & Spencer building in the heart of Margate into a cutting-edge digital learning campus is a powerful example of how ambitious regeneration, sustainable refurbishment and collaborative delivery can create lasting social impact. Developed for EKC Group, designed by Lee Evans Partnership and delivered by main contractor Jenner, the £6 million Margate Digital project has converted a redundant retail asset into a future-focused hub for digital and creative education. Part-funded through the Government's Levelling Up Fund, the scheme provides more than 2,000m² of specialist learning space and will support over 300 students studying subjects ranging from animation and digital design to programming, media production and emerging creative technologies. While the completed building presents a seamless contemporary learning environment, the journey to delivery was anything but straightforward. At the heart of the project was a commitment to reuse rather than replace. Rather than demolishing the former department store, the project team adopted a fabric-first refurbishment strategy, retaining the building's existing structure and preserving important architectural features, including the historic rear façade overlooking Cecil Square. This approach significantly reduced waste, retained embodied carbon and demonstrated the potential of adapting existing buildings to meet modern educational requirements. The complexity of repurposing a building never designed for educational use required close collaboration between client, architect
and contractor from the outset. Through a series of detailed workshops and design reviews, Lee Evans Partnership worked closely with EKC Group to develop learning environments capable of supporting a rapidly evolving digital curriculum. The result is a highly flexible campus incorporating creative production studios, specialist digital spaces, co-working areas, recording facilities and social learning environments centred around a striking new entrance foyer and feature staircase. Delivered under a Design and Build procurement route, Jenner played a crucial role in translating the architect's vision into a buildable and economically viable solution. The contractor worked collaboratively with the wider project team to balance programme, budget and quality requirements
while maintaining the integrity of the original design concept. Rather than pursuing simple cost-cutting measures, a collaborative value engineering process enabled design and construction solutions to be refined without compromising the building's functionality or architectural ambition. As with many major refurbishments, unforeseen challenges emerged during construction. One of the most significant involved the need for additional structural reinforcement to floor joists discovered during the works. With programme certainty critical to the project's success, Jenner deployed additional resources and carefully resequenced activities, allowing structural strengthening works to progress alongside other trade packages. This proactive approach minimised delays and ensured the project remained on track. Specialist craftsmanship also played a key role. Jenner's subsidiary, Park Farm Joinery, was engaged to restore 30 original windows, carefully balancing heritage conservation requirements with modern performance standards and energy efficiency objectives. The completed Margate Digital campus stands as more than a new educational facility. It is a catalyst for regeneration, bringing a prominent High Street building back into use, increasing footfall and investment, and creating a pipeline of digital and creative talent for the region. It demonstrates how the thoughtful reuse of existing buildings, combined with strong partnerships and expert delivery, can create transformative places that serve communities for generations to come.
12
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
THE LEADING PRECAST FRAME MANUFACTURER ACROSS THE UK & IRELAND
O’Reilly Precast delivers high-quality full-frame and insulated facade wall panel solutions designed to accelerate construction programmes. Our offsite-manufactured systems enable rapid installation, reduced site labour, and consistent, factory-controlled quality across projects throughout the UK and Ireland. Designed and manufactured in-house, our approach is built around one dedicated team focused on your project, with the flexibility to adapt as plans change.
OREILLYPRECAST.COM Enquiry 8
Talk to our precast team about accelerating your next build
0121 630 3472 sales@oreillyprecast.com oreillyprecast
Project
Project: Gwynfaen Architect: Stride Treglowan Suppliers: Mitsubishi Electric; Sika; Nuaire; Aico; Nordan; SO Modular; BSW Timber; Viridian Solar
A home-grown housing solution setting an important new benchmark Gwynfaen is more than just a typical housing development. It’s a vision from Stride Treglown and Pobl Group of ultra-low carbon, affordable living that invests in its community.
G
uided by the Welsh Future Generations Act, Pobl Group, set out to create a place that promotes resident health and wellbeing, while being deeply rooted in local heritage. The development features 144 timber frame homes arranged around a natural landscape, with a village green and community hub at its heart. The design draws on the historic settlements and natural beauty of the Gower Peninsula, using Welsh timber and cladding sourced from sustainable woodlands within 100 miles of the site—some of it from as close as 13 miles away. Working closely with local manufacturer, SO Modular, each home is built offsite using Category 2 Modern Methods of Construction. This ‘kit-of-parts’ system—made up of pre-insulated wall panels, floor panels, and
14
roof cassettes using wood fibre — reduces embodied carbon, cuts waste, speeds up construction, and allows air tightness detailing to be done in a controlled environment to help the homes meet their ambitious energy targets. Gwynfaen looks to set a precedent for future housing projects across Wales. By providing affordable, sustainable homes in a community-first environment—while using local materials and labour—the development shows how largescale developments can forge a brighter future, while still feeling connected to their heritage.
The 144-home, ultra-low-carbon community features off-site manufactured Welsh timber frames, natural woodfibre insulation, fossil-fuel-free "combustion-free" systems like air source heat pumps, solar PV, battery storage, and an EPC A rating.
Project
Key elements: • Superstructure: Off-site manufactured closed-panel timber frames sourced from sustainable Welsh woodlands within 100 miles. • Insulation: Natural woodfibre insulation packed within wall and roof panels to lower embodied carbon. • External Finishes: Welsh-sourced timber cladding (such Welsh Larch) alongside Sika Parex render systems over base coats and reinforcing mesh. • Openings: High-performance Scandinavian timber triple-glazed windows and doors. • Energy Performance Certificate (EPC) A rating across all house types. • Fossil-fuel-free setup using lowtemperature air source heat pumps. • Integrated rooftop solar photovoltaic (PV) panels paired with home battery storage systems. • Mechanical Ventilation with Heat Recovery (MVHR) units to maintain indoor air quality and reduce heat loss. It is also setting new standards for masterplanning and community design, with the layout arranged around generous green corridors, a central village green, and active walking or cycling networks. The scheme combines social rent, shared ownership, and outright sale properties in a landscape-led approach. Pobl is one of Wales’ leading housing associations, managing over 17,500 homes and providing care and support to over 9,000 people in Wales. It employs over 2,500 staff from various locations co-ordinated from offices in Newport and Swansea. Its ambition includes a plan to develop 10,000 new homes between 2020 and 2030, to decarbonise its activity to become ‘Net Zero’ by 2050.
Elfed Roberts, Head of Sustainability & Innovation at Pobl, said: “Gwynfaen will become the benchmark for low carbon living in Wales, capturing best practice approaches to placemaking, urban greening and fully integrated renewable technologies, as well as low carbon design.”
Sika’s registered installers, NTJ Plasterers, were appointed to apply the render system to the panels using Parex Maite base coat, embedded with Parex 355 AVU glass fibre reinforcing mesh for additional impact resistance. Parex REVLANE+ REGULATEUR, a ready-to-use primer was then applied prior to the application of Parex REVLANE topcoat render in either a bright white, natural white or ash grey colour.
Tom Edwards, Director at NTJ Plasterers commented, “Having worked with Hale Construction on previous projects, we were able to recommend the Sika Parex render system as a final façade finish due to its ease of sprayapplication and quality finish. “Sika’s local render stockist, The Render Depot, also provided excellent customer service by supplying the tinted render colours direct to site, on-time and meeting the build schedule.”
15
News
Why façade substructures are driving higher building performance As performance expectations for rainscreen and rear ventilated façades grow ever higher, in line with more stringent targets for the building overall, the substructures used to construct them can no longer be regarded simply as a means to fix cladding panels. Gary Robson, Business Development Manager at EJOT UK explains why.
T
he contribution that the support framing, fasteners and fixings make to successful rainscreen or rear ventilated façade projects is often overlooked. However, what sits behind the façade can make or break the strategy to elevate overall building performance, particularly in respect of how well it is insulated thermally, the ability to minimise fire risks and achieve reductions in embodied carbon. Critically important commercially-driven objectives aligned to processes, such as buildability, installation efficiency, durability and long term sustainability, can also be met more effectively through good substructure design and specifying the right fasteners and fixings. The key to realising these benefits is early consultation with a façade substructure specialist like EJOT. Consulting with our UK team at the design stage ensures optimum performance levels can be achieved in a rear ventilated façade project, whilst also ensuring full compliance with all the relevant building regulations and enabling efficiency to be maximised in both the design and construction processes.
16
Product and system innovation driving higher standards The shift from the substructure being a package of relatively basic construction components to a sustainable building enabler has been driven by the development of advanced products and systems that can deliver proven benefits. EJOT is at the forefront here, with a façade solutions range spanning everything from backing structure anchors and bracket fixings suitable for all substrates, to fasteners and fixings for both the insulation and cavity barriers. Only by choosing the correct products is it possible to meet all the required design and performance objectives, whether it is to transfer loads safely from the cladding system back to the primary structure, reduce thermal bridging to improve energy performance or comply with fire regulations. They must also be appropriate to accommodate the variety of substrates and façade materials encountered in many projects.
component makes as part of the complete assembled system is equally important. Reducing operational and embodied carbon As EJOT’s solutions are used to create highly insulated rear ventilated façades, they can play a key role in minimising a building’s operational carbon emissions through lower heating and cooling demands. But that is only one dimension to the carbon reduction benefits associated with EJOT products – embodied carbon can also be assessed and minimised using their supporting EPDs and, in the case of many products, European Technical Assessments (ETAs).
Remember too that while each product’s performance credentials must be sufficient for the application and thoroughly evaluated before specification, the contribution each
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
News
Streamlining façade delivery with a complete system approach As the construction sector adapts to more robust processes for demonstrating compliance and providing whole life traceability, fully tested, independentlycertified systems like CROSSFIX are becoming an increasingly attractive solution. Being an ETA and Passivhaus certified system, CROSSFIX is designed and manufactured to reduce thermal bridging while providing high structural strength and load capacity, as well as excellent fire performance.
One of the most important factors here is the high quality of the raw materials used in EJOT products and systems. Being manufactured from premium materials means they are built to last. Once installed they offer reliable durability and longevity that minimises the need for repair or replacement during the façade’s design life.
Supplied as a package including the anchors, rails, brackets and cladding fasteners, its award-winning Konsole bracket is designed to be used with both vertical and horizontal rails, optimising design and installation efficiency.
Early consultation key to unlocking potential As every façade project is unique, the design and specification of the substructure and all the associated fasteners and fixings is always bespoke. What works for one project may not be appropriate for the next. The key to success is early consultation with product and system manufacturers including EJOT UK. Our team can help you get it right, whether you need a full design recommendation or advice on how to optimise the façade, with the potential to provide a complete suite of products from a single source for streamlined project delivery. And, because we are set up to support the complete building envelope supply chain, we can assist start to finish from the original concept through to practical on-site delivery. EJOT UK – Enquiry 9
Choosing the EJOT CROSSFIX substructure system offers a holistic stand-alone solution with multiple performance benefits in respect of embodied carbon reduction, primarily due to its stainless steel composition, rather than aluminium as is used on most systems. That means ease of recovery and recycling at the end of its service life to support circular economy objectives, but also a way to save on resources due to the material’s higher strength and load bearing capacity. This could mean fewer brackets and anchoring points are required to support the façade, reducing material use in the project overall.
17
News
Spelling out EPDs - how Senior is offering a clearer view for specifiers We spoke to Senior Architectural Systems’ UK sustainability lead Luke Osborne to find out more about the manufacturer’s campaign to improve clarity around sustainability in the aluminium fenestration industry.
T
he launch of Senior’s expanded suite of independently verified Environmental Product Declarations (EPDs) has been the catalyst for the manufacturer’s ‘what you see is what you spec’ campaign. Developed in a deliberately different way, these publications have triggered a wider call for the industry to adopt a more transparent, evidence based approach to environmental reporting. The company has challenged the traditional format of EPDs, particularly those used in aluminium fenestration systems, in favour of transparent, specification ready data that reflects the true performance of the systems being designed into a project. This approach is intended to give architects and contractors greater confidence and clarity when assessing environmental impact and to support more accurate whole building assessments. Senior Architectural Systems’ UK sustainability lead Luke Osborne explains more. What are the key requirements of EPDs for a manufacturer? EPDs must be independently verified, developed to recognised standards, and transparent about system boundaries. They must clearly define what product is being assessed and apply a consistent methodology that reflects the product as it is actually supplied. For aluminium fenestration systems such as curtain walling, doors and windows, this means including the environmental impact of profile extrusion and non aluminium components such as thermal breaks, gaskets and fixings. These elements are often excluded from conventional EPDs, yet they can significantly influence the overall footprint of a façade system. Including them provides a more complete picture of the materials being specified and supports accurate comparisons between systems as without this level of detail, the data risks being misleading or incomplete.
18
Luke Osborne, UK sustainability lead with Senior Architectural Systems
Securing an EPD is a detailed process. Can you explain the level of commitment it involves for a manufacturer like Senior? Developing an EPD requires a significant level of time and focus , both in terms of data collection and methodological accuracy.
is exactly what our campaign is about. We want to raise the standards of EPDs across the aluminium fenestration sector and at the same time, encourage specifiers to challenge and seek clarification on the information they are being given.
Each declaration must be independently verified and developed in accordance with EN 15804+A2 and ISO 14025:2011, and for curtain walling, aligned with the latest BS EN 18001:2024 Product Category Rules.
With many public sector projects now engaging carbon auditors, the need for full transparency is not only an ethical matter but also a commercial one. We believe that EPDs should be open to interrogation, audits and robust scrutiny as above all, they should be reliable resource rather than a marketing tool.
But more than this, an EPD should give a full and accurate picture. For us, this meant that we accounted for the environmental impact of all system components, including thermal breaks, gaskets and fixings, as well as the energy intensive extrusion process and the delivery of fabricated products through our UK fabricator network. For our first EPD on our SF52 aluminium curtain wall system, we also took the decision to use non linear scaling, with multiple system sizes independently verified and consolidated into a single publication. This provides a holistic overview that spans from manufacture to delivery and fabrication, and ensures that the data is genuinely project relevant. The level of detail required is substantial, but in our opinion, essential for producing accurate and useful information. What assurances does the presence of EPDs give to architects, specifiers and installers? EPDs should provide transparent, third party assessed data on environmental performance, giving architects, specifiers and installers the information they need to make informed decisions at concept stage and throughout the specification process. However, the level of assurance they give is really dependent on how accurate, transparent and useful the data is as well as how easy it is to interpret. This
Do you see EPDs as an ongoing drive to keep raising your own standards? Yes, definitely, but it’s not just about having these resources in place but being committed to the ideology behind them and maintaining full transparency over sustainability claims. As well as influencing how we have developed our EPDs, this commitment has also led to us encouraging greater clarity over how the industry presents information relating to the carbon figures of aluminium fenestration systems. There is a general trend of quoting carbon figures relating to aluminium billets only in isolation which can be misleading if taken on face value. The issue here is that the billet figure alone doesn’t account for the extrusion and profiling process so again, doesn’t reflect the products that are actually installed on site. It can be a helpful guide of course but context is so important and here at Senior, we believe that what you see, really should be what you spec. For more information, please visit www.seniorarchitectural.co.uk or search for Senior Architectural Systems on LinkedIn, Instagram and Facebook. Senior Architectural Systems – Enquiry 10
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
CHOOSE SENIOR FOR STABILITY For 35 years, Senior Architectural Systems has been at the forefront of the aluminium fenestration industry, designing and manufacturing aluminium windows, doors and curtain wall systems that are built to last.
Bringing buildings to life. Aluminium fenestration specialists since 1991. Enquiry 11
For specification, design and technical advice call 01709 772 600 email info@sasmail.co.uk or visit www.seniorarchitectural.co.uk
News
Verta column casings - covering up with style Decorative architectural casings are widely used in contemporary building design, offering a versatile, effective and stylish way to conceal structural steelwork and concrete support columns.
P
racticality, versatility and aesthetics are central to Encasement’s Verta column casing range, which has been installed across many sectors, including retail, education, healthcare, hotels, sport and leisure, and commercial refurbishment. This versatility is driven by the wide range of materials and finishes available to architects and specifiers, together with the choice of standard shapes and sizes alongside bespoke solutions manufactured for individual projects. As a result, Verta casings have been specified and installed for many well-known brands, including Tesco, Porsche, Premier Inn, TATA, Kia Motors, Halfords and, as well as retail outlets, hospitals, universities, leisure projects and office buildings across the UK. Worksop Bus Station
Winchester College
As with other column casings in the range, a wide choice of finishes is available. Decorative high-pressure laminate (HPL) is the most popular option for Circa and Quadra, as it is resistant to damage, scuffs and scratches, with finishes including plain colours, wood grains, metallics, textured effects and real wood veneers.
While all Encasement column casings are suitable for interior applications, Polyma and Forma can also be used externally due to their weather resistance and durability. Forma casings are manufactured from aluminium or stainless steel and are available as circular profiles from 250mm to 1000mm in diameter, as well as square, rectangular, hexagonal and bespoke forms. Finish options include British Standard and RAL colour PPC, alongside brushed, anodised, embossed and textured surfaces.
The range comprises six products: Circa pre-formed MDF casings, Quadra plywood casings and the Forma metal range. Polyma GRP and Gypra GRG casings are moulded from glass-reinforced polymer and glassreinforced gypsum respectively, while Metza provides up to two hours’ fire protection for mezzanine floor support columns. Both Circa and Quadra casings are made from sustainably sourced, UKTR-compliant materials and are designed for interior use only. Each range offers circular and square profiles in a wide choice of sizes, along with extended circles and rectangular profiles using pre-sized infill panels for further design flexibility.
Premier Inn, Cardiff
Polyma GRP casings also offer durability and extensive colour choice. Produced from moulds, they provide strong design flexibility, with shape, size and colour options that can be tailored to bespoke project requirements. TATA
Lime Wood School
20
Circa is also available unfinished for on-site painting and decoration. Notable Circa and Quadra installations include Liverpool University, Gateshead International Stadium, Blackburn Markets, Worksop Bus Terminal, Farnborough College 6th Form Centre and the Dame Kelly Holmes Sports Centre.
Projects including Lime Wood Primary School in Erith and Winchester College together with Porsche West London and Cardiff’s Premier Inn demonstrate the versatility of bespoke Forma and Polyma column casings for both interior and exterior applications. Encasement – Enquiry 12
News
THE MOST TESTED SPANDREL PANEL ON THE MARKET
THE SPANDREL BUILT TO PERFORM. The ULTIMA Aluminium Insulated Spandrel Panel is the most extensively tested spandrel panel available, delivering exceptional quality and proven performance while providing confidence in regulatory compliance.
A2-s1,d0 Fire Classification to BS EN 13501-1
CWCT Tested for wind load and impact resistance
Flexible Design perfect for new build and cladding remediation projects
WHERE QUALITY MEETS COMPLIANCE
Contact us today for further information www.metalline.co.uk | +44 (0)1543 456 930 | sales@metalline.co.uk Enquiry 13
Fire rated steel hatch offering up to 60-minute protection
Thermally insulated & airtight hatch to keep in the warmth (U value from 0.17 W/m K)
Heavy-duty ladder for strength & durability (load rating of 250 kg/tread)
Find our products on NBS Source
Enquiry 14
0345 9000 195 | sales@premierloftladders.co.uk 21
Front Cover Spotlight
Martyn’s Law: Putting compliant security at the centre of building design Pat Jefferies, Commercial Director at Abloy UK, discusses why the introduction of Martyn’s Law is changing the way security needs to be considered across public spaces and buildings.
T
he introduction of the Terrorism (Protection of Premises) Act 2025, Martyn’s Law, represents a significant change to the UK’s approach to physical security. With implementation expected in 2027, many organisations are currently preparing for the new requirements. However, viewing this date as a deadline could result in important preparations not being implemented effectively and on time.
As organisations review their preparedness, architects and specifiers can provide support in translating security requirements into practical measures and ensuring physical security works alongside wider emergency planning. Although responsibility for compliance sits with building owners, specialist expertise will be important in helping organisations understand risk and implement appropriate measures. Dynamic lockdown Traditional emergency procedures have often focused on evacuation, but dynamic lockdown provides another option by enabling certain areas of a building to be secured rapidly while maintaining compliant escape routes. The aim is to prevent attackers reaching vulnerable areas, protect people who are already in secure locations, and to allow evacuation where necessary.
For architects and specifiers, the legislation provides an opportunity to reconsider how security is incorporated at the design stage of a project, as well as how it will then be installed and managed. Organisations need to consider how its people, procedures and technology can work together to create buildings and spaces that are prepared for evolving threats. Martyn’s Law introduces requirements based on the size and nature of premises, meaning terrorist risks will need to be assessed, and appropriate protective measures put in place, plus staff must understand how to respond effectively during an incident. A school, hospital, university campus, sports stadium, retail centre or entertainment venue will all have different operational requirements and vulnerabilities; therefore, security needs to reflect the way a building is occupied and used.
22
This approach can be relevant across a wide range of environments, including education, healthcare, commercial offices, retail, transport hubs and public venues. Threats may originate either inside or outside a building, meaning emergency procedures need to account for different scenarios. In addition to evacuation, organisations should also consider invacuation procedures, where occupants are brought into a building or directed to secure areas in response to an external threat. These "read in" and "read out" scenarios require access control systems that can manage movement quickly and safely while maintaining appropriate levels of security. Systems designed and tested to standards such as BS EN 13637 can help support these capabilities by combining controlled access, lockdown functionality and compliant emergency escape.
Access control therefore has an important role to play as systems must be capable of supporting rapid lockdown while continuing to provide compliant emergency escape. Lockdown procedures should also be practiced regularly alongside fire evacuation drills, ensuring occupants understand how they can escape safely. Modern buildings need access control systems that can manage everyday movement, restrict unauthorised access, support lockdown procedures, all while being able to provide safe escape during an emergency. Products such as the ASSA ABLOY Escape Door System (EDS) have been developed to address these competing requirements. During normal operation, authorised users can move efficiently through secure areas while restricted spaces remain protected. Where unauthorised egress is attempted, the system can prevent exit and resist attempts to force doors open, helping to reduce theft and giving security teams additional response time. During a fire evacuation, the system automatically releases doors within one second to allow unrestricted escape.
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Front Cover Spotlight
Battery backup and fail-safe operation also ensure occupants can exit safely in the event of power failure. This ability to combine access security, theft prevention, dynamic lockdown and emergency escape reflects the integrated approach that Martyn’s Law encourages.
Electrically controlled locking systems specifically designed for compliant escape applications can instead provide secure access control while maintaining dependable emergency egress.
Compliance As organisations invest in security measures, the quality of specification becomes increasingly important. Many buildings already contain electronic locking systems that were originally installed to improve convenience or security, but these may not meet current escape requirements.
Correct specification protects everyone involved, from architects and specifiers, to installers, facilities managers and building owners. It also helps ensure buildings can respond appropriately during both fire and security incidents.
Retrofitting access control to escape doors without considering compliance can introduce significant risks to occupants. Standards including BS EN 179 for emergency escape devices, BS EN 1125 for panic exit devices and BS EN 13637 for electronically controlled escape systems establish performance requirements intended to maintain life safety.
Certification CE marking and documented performance are essential indicators that products meet relevant regulatory requirements, but certification alone does not mean a solution will be suitable for every application.
Non-compliant solutions can still appear in the market, particularly where electromagnetic locking solutions are incorrectly installed on escape routes.
Even a compliant product can become non-compliant if it is incorrectly specified or integrated into an unsuitable door set or installed contrary to its intended application. This places greater emphasis on competent design, thorough risk assessment and continuing professional development throughout the security supply chain. Education is an important part of raising standards, helping specifier and, architects, understand both their legal responsibilities and the practical implications of modern access control. As Martyn’s Law approaches implementation, technical knowledge will be as important as technology itself. For example, the Abloy Partner Program provides security professionals with technical support, training, specification guidance, and business development, helping partners develop the expertise needed to advise customers across applications including education, healthcare, commercial offices, critical infrastructure and public venues.
The Abloy Academy also provides RIBAaccredited CPD training covering compliant access control, escape door systems, electric locking, relevant standards and dynamic lockdown to help delegates understand how compliant solutions should be specified and installed. How organisations can prepare Intelligent access control, compliant escape systems, dynamic lockdown capability and ongoing staff training all have a role to play in creating environments that are both secure and safe. For architects and specifiers, preparation for Martyn’s Law should begin well before legislation comes into force. By reviewing risks, applying recognised standards, specifying appropriate technology, and developing the right expertise, buildings can be better prepared to protect the people who use them. For further information on products and services available from Abloy, call 01902 364 500, email info@abloy.co.uk or visit https://bit.ly/46bB5RG ASSA ABLOY – Enquiry 5
23
Corporate Spread
Collaborating to shape the future of firestopping: Building safe futures together
The construction industry is evolving at an exciting pace. New safety standards, regulatory reforms, and rising expectations from clients and communities are reshaping the way we design, build, and maintain buildings. In this landscape, firestopping has taken on a new significance as a central thread that runs through every stage of a project, helping to deliver safer, more resilient, and trusted spaces. Yet research also indicates that collaboration improves outcomes. Early coordination between design and site teams helps avoid last-minute substitutions. Clear communication of design intent ensures that what is specified is what gets built. And accessible training builds installer confidence, reducing the likelihood of errors or rework. These approaches demonstrate that firestopping is most effective when treated as a collective responsibility.
A
t British Gypsum, we’ve gathered perspectives from across the supply chain, including architects, specifiers, contractors, installers, and distributors, to explore how we can work together to navigate the evolving landscape in our latest Insights Report. Collaboration across the supply chain Findings show architects are prioritising tested systems and clear guidance in their designs; contractors are applying practical know-how on site to deliver installations with confidence; distributors ensure that the right products and support reach the teams who need them; manufacturers, like British Gypsum, are innovating and developing new solutions, testing, and providing guidance to make compliance straightforward and achievable. As it stands, 81%1 of construction professionals say there are challenges in maintaining compliance from design through to delivery.
24
Building confidence through support Training and accessible guidance are central to success. CPD-accredited resources, training opportunities, and practical demonstrations equip professionals to stay up to date with evolving regulations and complex designs. And with our research showing that 35%1 of construction professionals still feel product information could be improved across the market, there’s a clear opportunity for the industry to step up. By providing the right support at every stage, and tailored towards those who need it, in a format they want it in, the industry can build confidence, reduce risk, and stay compliant throughout the project. Gyproc® Firestopping: Simplifying Success As the trusted partner of architects, contractors, and drylining and plastering professionals, we’ve always led the way to help the construction industry build better. In response to these findings, and as a natural next step, we have launched our new Gyproc® Firestopping range, designed with this collaborative approach in mind. Tested to be installed alongside the British Gypsum systems professionals already know and trust, it streamlines the specification
process, reduces risk, and ensures everything is supplied from a single, trusted source. Backed by full testing, the SpecSure® Systems 25 year* firestopping warranty for newbuild applications in British Gypsum Systems, and practical training, it equips every team member with the tools to succeed. Explore the range: www.british-gypsum.com/gyproc-firestopping A Based on 169 external respondents across the UK supply chain. Research was conducted independently on behalf of British Gypsum.
1
* The provisions made in the United Kingdom Technical Assessment for Gyproc® Firestopping are based on an assumed working life of the (product) of 25 years, provided that the conditions laid down in the manufacturer’s datasheet and instructions for the packaging/transport/ storage/installation/use/repair are met. See SpecSure® Firestopping Insert for full details here: british-gypsum.com/SpecSure
British Gypsum – Enquiry 15
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
British Gypsum Launches Dedicated Guidance to Fire-Rated Junctions Junctions – where walls meet ceilings, floors, structural steel, or external façades – are fundamental to a building’s fire compartmentation strategy. Yet they are often the weak link in fire compartmentation design. Our new guide provides tested, evidence-led solutions developed in collaboration with architects, specifiers and contractors. Reduce uncertainty, meet compliance with confidence, and design safer buildings.
Visit our website to download your essential Fire-Rated Junctions guide today
Tested in British Gypsum systems and backed by SpecSure® Gyproc® Firestopping from British Gypsum
Public Sector Projects
Traditional civic sites and public buildings are getting a new lease of life As local government prepares for a significant reorganisation, many council buildings and public sector properties are being transformed in significant new projects.
W
alworth Town Hall has undergone a landmark transformation, emerging as a vibrant new workspace and community hub more than a decade after a devastating fire left the Grade II‑listed building severely damaged and placed on Historic England’s Heritage at Risk register. Led by architects Feix & Merlin, in collaboration with developer General Projects and Southwark Council, the refurbishment represents a major achievement in heritage‑led regeneration, combining sensitive restoration with bold contemporary interventions. The completed scheme reopens the building as a dynamic centre for work, culture and community life. More than 550 people can now be accommodated across a mix of flexible offices, studios and coworking spaces, designed to attract creative and independent businesses. With this came the need for an extensive furniture package which has been delivered by Hunters, experts in the planning, design, procurement and installation of workplace furniture. The project required a carefully curated furniture package that balanced strong design intent, client preferences and an understanding of
26
the different users of the building. Hunters demonstrated they had the skills and expertise to meet this complex brief. Hunters worked with the design team at Whitepaper to understand the brief and deliver the furniture package that spanned the full spectrum of workplace requirements. At its core, the scheme included hot‑desking solutions, ergonomic task chairs and a variety of workstations designed to accommodate different working styles and levels of occupancy. These were complemented by a suite of meeting room tables and seating options, ensuring that both formal and informal collaboration could take place comfortably and efficiently. To enhance the social and communal character of the building, a wide range of breakout and collaboration furniture was introduced. This included sofas, armchairs and coffee tables that encouraged interaction, relaxation and creative exchange. Rugs and soft furnishings were included to add warmth, texture and acoustic comfort, helping to soften the historic interior and create a welcoming atmosphere throughout.
The project followed a structured, multi‑stage design and approval process. Whitepaper provided initial visual concepts, which Hunters used to propose furniture options aligned with aesthetic, budget and functional requirements. For each item, multiple alternatives were presented at similar price points, allowing the design team to refine the scheme without compromising the overall vision. The completed project provides an elegant, flexible, multi‑use workspace that expertly respects its heritage character. Hunters has delivered a beautifully furnished workspace that blends Scandinavian influences with a wider European aesthetic, all tailored to the unique character of the historic building. The careful balance of restoration and renewal has not only revived a much‑loved local landmark but also removed it from the Heritage at Risk register, a testament to the quality and ambition of the work. Walworth Town Hall now stands as a benchmark for adaptive reuse, demonstrating how historic buildings can be sensitively transformed to meet contemporary needs while retaining their architectural and cultural significance.
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Public Sector Projects
Art gallery’s historic renewal Morgan Sindall Construction is involved in the £4.3m restoration project at the Grade II* listed Southampton City Art Gallery, marking a significant milestone in the preservation of one of the city's most important cultural landmarks. The tier one contractor began the first phase of the restoration in July 2024, working in partnership with Hampshire County Council and Southampton City Council. The project includes extensive re-roofing and refurbishment works across multiple phases, all while ensuring minimal disruption to the connected civic facilities. During the first phase of works at the gallery, which is in the Southampton City Council Civic Centre, a significant engineering achievement was realised with the installation of one of the UK’s largest single-span independent scaffolded roof systems, spanning the West Wing Galleries. This pioneering solution facilitated the intricate removal of the existing ventilation plant, asphalt roofing, and roof lights, while safeguarding the gallery’s nationally important art collection. The refurbishment has also included installing insulated asphalt roofing and conserving double-glazed rooflights, which were carefully designed to enhance the building’s sustainability while preserving its historic character. The project has been supported by a £2.23m grant from the Department for Culture, Media and Sport’s Museum Estate and Development (MEND) Fund, administered by Arts Council England.
Transforming a 19th-century hospital Edinburgh University’s Futures Institute is the most significant project in the city’s UNESCO World Heritage Site for many years. Extensive repair and remodelling of the Category A listed Victorian hospital has brought this substantial building back to life after years of dereliction, the NHS having vacated in 2003. Designed by Bennetts Associates, the main contractor is Balfour Beatty and it has been shortlisted for RIBA's Reinvention Award 2026.
The original main entrance has been reworked to make it truly accessible for the first time, with a new public square replacing a gatehouse and railings. Beneath the square, a 450-seat auditorium has been formed within the slope of the site. Internally, enhanced by new insertions on either side, the long corridor that separated the six ‘Nightingale’ ward blocks has been transformed into a social resource, with break-out spaces, display areas, new stairs and four-storey stacks of flexible lecture spaces. The generosity, texture and colour of the spaces is unlike anything that could be achieved with a newbuild equivalent.
27
Public Sector Projects
Education Estates® returns next month as the sector prepares for a decade of estate renewal
Education Estates® returns to Manchester Central on 20–21 October 2026, bringing together schools, colleges, universities, local authorities, academy trusts and the wider network of contractors, architects, consultants, suppliers and government representatives who shape, deliver and manage education environments across the UK.
A
s the UK’s leading event for education infrastructure and an anticipated attendance of over 5,000 sector specialists, the event has become a focal point for the sector, a place where strategic conversations take place, partnerships are formed and practical solutions are explored. The event offers direct access to procurement leads, estates directors and facilities managers responsible for capital investment decisions across schools, colleges and universities, alongside framework providers, technical experts and representatives from the Department for Education, all within one environment.
Delivered in partnership with the Department for Education, Education Estates® arrives at a significant time for the sector following the publication of the Education Estates Strategy: a decade of national renewal. As organisations across education continue to respond to increasing expectations around sustainability, suitability, inclusion and long-term asset
28
performance, the event provides a valuable opportunity to explore how policy ambitions are translating into delivery priorities across the estate. The CPD-accredited conference programme runs across six themed stages, with more than 170 speakers and over 36 sessions covering the full lifecycle of education infrastructure, from strategic planning and capital investment through to design, delivery and long-term estate performance. Alongside the conference sits the largest Education Estates® exhibition to date, with more than 220 exhibitors expected. This is where everyone from construction firms, consultancies, digital solution providers, furniture manufacturers, modular building specialists and sustainability technology comes together. It's your chance to see the latest products and services designed specifically for education environments, and to talk directly to the suppliers and specialists shaping the sector.
Several new features will also debut in 2026, including two co-located events. EdTech UK will examine the intersection between education technology and infrastructure, while the new European Universities Estates Congress will bring together professionals involved in campus development and university estate strategy from across Europe. New networking and engagement spaces will also feature prominently throughout the venue, including the Career Conversations stand, alongside the Fireside Exchange, a more informal discussion-led setting designed to encourage open conversation and shared learning. For private sector organisations, one-day delegate passes are priced at £375 + VAT, with two-day passes at £499 + VAT. The exhibition is free for all to attend. Please quote ‘SPEC10’ for a 10% discount on your delegate place! Education Estates – Enquiry 16
Follow us on #educationestates
Join the national conversation around the education estate Schools | Colleges | Universities Education Estates® is the UK’s leading event for education infrastructure, focussing on the funding, design, build, maintenance and management of schools, colleges and universities.
220+
Exhibitors
6
Stages
170+
Speakers
5000+ Attendees
650
Awards Guests
2026 PREDICTED STATISTICS
Registration is now open! The event is free to attend for the public sector*. Private sector attendees can purchase a delegate pass for one or two days, or attend the exhibition for free. Please quote ‘SPEC10’ for a 10% discount on your delegate place! Expand your network Access CPD-accredited conference sessions Learn from expert insight and gain practical guidance Meet suppliers and service providers that can deliver on your most ambitious plans DISCOVER MORE
educationestates.com For more information about exhibiting or sponsorship opportunities, please call 01892 351626
* Attendance at the conference is free for those directly employed in schools, colleges, universities, Government and local authorities (including governors and independent schools).
Enquiry 17
Public Sector Projects
Protect your education buildings for the years ahead From busy corridors and classrooms to dining halls and sports facilities, education buildings work hard every day. Bags, chairs, trolleys and equipment can all leave their mark, creating scuffed walls, damaged corners and battered doors. Over time, those repairs place pressure on maintenance budgets and estates teams.
Y
eoman Shield helps schools, colleges and universities take a longer view. By protecting vulnerable surfaces before damage occurs, its wall and door protection solutions help extend the life of building interiors, reduce repeated redecoration and keep learning environments looking welcoming and well maintained.
A complete service, wherever you are For education estates teams balancing competing priorities, managing improvement works needs to be straightforward. Yeoman Shield offers a full turnkey service, taking projects from initial enquiry and expert advice through product selection, supply and installation to completion.
60 years of practical experience Established in 1966, Leeds-based Harrison Thompson & Co. Ltd., trading as Yeoman Shield, brings 60 years of experience to manufacturing, supplying and installing protection products.
Professional installation is available nationwide, giving customers access to experienced support whether they are improving one building or planning works across multiple sites. Discussing access requirements and project timings early helps schools and colleges plan work around their operational needs.
Its range includes wall protection panels, protection rails, handrails, corner protection, heavy-duty solutions and fire-rated wall and door protection. With a wide choice of colours, protection can complement existing interiors or support a refurbishment scheme. Whether the priority is protecting a busy entrance, reducing trolley damage or maintaining the appearance of communal spaces, the team helps customers select products suited to their building and everyday use.
30
Give fire doors the attention they need Alongside protecting interiors, Yeoman Shield provides comprehensive fire door services, including inspections, maintenance, remedial works and installation. Fire doors face frequent use in education settings, and damage or wear can affect their performance. A professional inspection helps establish their condition, identify defects and inform the next steps for repair or replacement.
Yeoman Shield’s accredited fire door services give estates teams access to support beyond the initial inspection. From addressing identified issues to installing replacement doors and suitable fire-rated protection, the team can help manage ongoing fire door care. Invest in protection that works harder Choosing wall and door protection is an investment in the future of your premises. Reducing avoidable damage helps maintenance budgets go further, limits disruption from recurring repairs and supports an environment that students, staff and visitors can take pride in. Planning a refurbishment, tackling persistent damage or arranging fire door inspections? Contact Yeoman Shield to discuss your requirements and discover how its experienced team can help. Email info@yeomanshield.com or visit www.yeomanshield.com/contact-us today. Yeoman Shield – Enquiry 18
e c n p. a i l p du m o oun c t r r e g p Ex m the fro
test e d ça e d fa rom th e e t i d is tf ccre s righ expert . a y u c rt ct s’ d pa s our fo eynaer r proje r i h ou tt ,R ei rges plianc allation ge of y a l m he inst ach sta , co of t o e t e p n n uro tio gh e ho u o r Wit ies in E ecifica h p ce t lit faci From s ssuran a t. star ve you gi will
• 60 years of independently certified test data • Dedicated project support team • Project specific solutions • Dedicated training and onsite support • Digital convenience inc. Product Passports, EPDs, DigiTrace
With over 60 years of global product development and 7 testing centres worldwide, you can be reassured with Reynaers Aluminium. Get in touch to find out how we can help you to reduce compliance delays.
Together for better reynaers.co.uk
Enquiry 19
Public Sector Projects
Portakabin has joined the Everything Estates frameworks designed to innovate public sector procurement
Portakabin is now an approved supplier on the Everything Estates frameworks; the fast, compliant and flexible solution that enables the delivery of a broad range of estates services to the public sector, devolved administrations and third-sector entities.
Keith Rayner, Head of Frameworks at Portakabin commented: “Joining the Everything Estates framework reinforces our commitment to making it easier for public sector organisations to access highquality modular building solutions, for both temporary and permanent requirements.
E
verything Estates’ innovative design offers public sector organisations the opportunity to directly appoint Portakabin from the framework, quickly and compliantly without going out to tender. It also allows customers to select a new supplier through an efficient mini competition process. Everything Estates blends critical public sector compliance and social value together with pace and commercialism. By being accepted by the framework, Portakabin has already demonstrated it has the requisite know-how, experience, business processes and policies, and financial standing to deliver modular buildings across the UK.
32
“Whether responding to growing demand, replacing ageing facilities or delivering new accommodation at pace, the framework provides customers with a compliant and streamlined procurement route that saves valuable time, while ensuring excellent value.”
It removes unnecessary bureaucracy and creates a time efficient route for procurement, which delivers enhanced ROI for all parties.” Claire Delaney, Managing Director, Everything Estates. Everything Estates was established by Hornchurch Academy Trust and is operated by Place Group Limited, who have over 25 years of experience supporting innovation and social value in the public sector. To find out more visit www.place-group.com Portakabin– Enquiry 20
“Quite simply, Everything Estates gives control to our clients by allowing customers to obtain the best value for money based upon their requirements and not those that are pre-determined by the framework operator.
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
AluK Commercial
Glazing can make or break a learning environment Aberporth Primary
Get façade performance right from the very first specification.
School Case Study:
We’re Exhibiting at
20 - 21 October 2026 Manchester Central
Stand: 648 Chat with our commercial team to understand how we can support you and your project.
Aberporth Primary School Featured
Designed for Learning
Expert Support at Every Stage
Daylight, ventilation, overheating, acoustics, security and compliance all meet at the façade. In education buildings, one poor glazing decision can affect comfort, safety and learning outcomes.
– – – – –
Proven aluminium window, door and curtain walling systems Expert specification support from project inception Comprehensive BIM resources to streamline design Extensive testing to support performance requirements Compliance guidance to help meet regulatory demands Enquiry 21
Specify better learning spaces with AluK Commercial.
Email: projects.uk aluk.com Call: 01291 639739
Offices & Commercial Buildings
Stannah launches Midilift PL2 – a nextgeneration platform lift designed for improved reliability, performance and flexibility Stannah New Lifts Division, a leader in the UK lift sector, has introduced Midilift PL2, a next-generation platform lift engineered to deliver enhanced reliability, performance and design quality.
P
L2 is a carefully re-engineered vertical platform lift solution for public and commercial environments. It provides a robust, dependable option that supports modern accessibility requirements while offering greater confidence at specification stage. This compact screw and nut platform lift delivers a smoother, quieter ride alongside and consistent installation quality, supporting efficient servicing over its lifetime. With a highly configurable design, Midilift PL2 allows inclusive access solutions to be seamlessly integrated into a wide range of architectural schemes. Available in a range of platform sizes, the Midilift PL2 gives specifiers increased flexibility. A choice of door styles is available, including fire-rated, panoramic and vision panel options, maximises natural light and creates a modern, open aesthetic. Every lift is supported by Stannah’s established after-sales proposition, including a two-year warranty. Specification and aftercare have also been simplified with site-specific drawings available early in the design process and support from highly trained specialists and experienced installation teams. Open-protocol parts offer greater flexibility over long-term maintenance arrangements, alongside the option of Stannah’s planned maintenance packages. Graham Mears, General Manager at Stannah New Lifts Division, said: “Midilift PL2 is a newly introduced product to Stannah with a clear focus on quality, performance and ease of installation, and designed to deliver dependable long-term performance.” The new Midilift PL2 is now live on Stannah Lifts’ website: https://www.stannahlifts. co.uk/product/platform-lifts/verticalplatform-lift/midilift-pl2-platform-lift Stannah Lifts – Enquiry 22
34
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
FIRE-RATED, LAMINATED, ACOUSTIC, TOUGHENED & MIRRORED GLASS
THE FUTURE OF FIRE & SAFETY GLASS
WE PROTECT WHAT MATTERS We’re huge stockists of fire and safety glass, offering fast delivery from local branches. Our team provides technical help and specification support, with options for supply-only or supply-and-fit to suit your project and budget needs.
#TRUSTTHEEXPERTS FAST DELIVERY FROM OUR WELL-STOCKED LOCAL BRANCHES
MIDLANDS 0121 667 9089
NORTH 0161 532 8371
SOUTH 01206 805 922
WEST 01174 528 800
SCOTLAND 0131 526 4141
INSTALLATION 0121 667 9089
0121 667 9089
CONNECT WITH US: Enquiry 23
WWW.FIREGLASSUK.COM
Offices & Commercial Buildings
Holiday Inn Telford expands Vieunite Pro deployment Hospitality venue extends digital communications project following successful pilot, with further Textura Pro installations added during its 2026 refresh.
I
n March 2025, Southwater Event Group (SEG) who manage Holiday Inn Telford, began a wider refresh of the hotel’s guest communications. The main focus of the project was to digitalise the printed posters used throughout the hotel’s high-traffic guest areas. One of the first high traffic areas they wanted to focus on putting displays in was the main reception area. SEG wanted a large elegant solution that complemented the existing interiors rather than the look of a domestic television. They did not want the display to look out of place. This screen needed to grab attention and make a real statement about the hotel. With multiple Textura Pro Canvas sizes available all coming with elegant wooden frame styles, SEG would be able to choose canvases that matched the premium interior of their spaces. For the reception area they took the 55-inch 4K Textura Pro with a walnut frame and for the other areas of the hotel the 27-inch Textura Pro. The 27-inch canvas being smaller than the 55" canvas actually comes with a wider choice
36
of frame colours with pine, black, walnut and white however to keep things consistent, they selected all walnut frames. With a texture accurate display, the panels of both sizes use advanced anti-glare technology to replicate lifelike textures. The surface of the panel is unlike any domestic or commercial display in that it helps disguise the displays digital nature so that if you weren't aware that the screen was digital, the viewer would believe they were looking at artwork. With a Vieunite Pro Advanced Subscription, SEG would be able to easily manage and control the content on the displays via the Vieunite Pro Portal that works on both desktop and mobile devices via the internet. This meant that they could manage the display even when they were not at the hotel itself. Even better was that by using Vieunite Pro they gained access to the vast Vieunite Curated Collection of artwork. This world class collection allows them to insert art between their advertising content, keeping the display curated and guest friendly while their key messages stay front of mind. The Holiday Inn and SEG both responded very positively to the Textura Pro.
The premium quality of the canvas and the concept of the art collection put this over other digital signage solutions that had been considered. In July 2025, three 27-inch Textura Pro Displays were installed, two in the male washroom and one in the ladies washroom. The screens were very well received not just by the hotel due to the ease of installation and the quality of the canvas but by visiting guests also. Building on the success of the initial installation, SEG has since expanded the deployment across the hotel. The latest phase, completed in April 2026, includes a 55-inch 4K Textura Pro in the main reception, two additional 27-inch Textura Pro canvases outside the function rooms and another 27inch at the entrance to the newly opened Olive Tree restaurant.Today, the hotel uses Vieunite Pro to manage promotional content, guest messaging and curated artwork throughout multiple guest-facing areas. For more information, call +44 (0)345 548 1311, email info@vieunite.com or visit www.vieunite.com Vieunite – Enquiry 24
As part of a refurbishment of the Grade II* listed Pitt Building, TORMAX UK partnered with IQ Glass to deliver advanced automation for the building's new frameless glass draft lobby. Supplying an advanced iMotion 2202 operator to power the single internal sliding door, TORMAX helped create an accessible, energy-efficient and reliable entrance solution that complements this prestigious heritage refurbishment.Designed and manufactured
Offices & Commercial Buildings
TORMAX automation for historic entrance to exacting standards, the TORMAX range of iMotion operators offers exceptional whole-life value through reduced wear, low energy consumption and long operational life, making them an ideal choice for prestigious refurbishment projects where performance, sustainability and accessibility are equally important. Precise control of door movement, integrated safety monitoring and programmable operating parameters make the operator ideally suited to this key public access point. Installed within the elegant glass lobby, the sliding door system is top hung, with a discreet floor guide rail to maintain a clean threshold. The TORMAX iMotion 2202 operator is concealed within bespoke metal housings finished to complement the interior, ensuring the mechanism does not detract from the building’s refined aesthetic. Sensors and push button controls provide intuitive access for staff, visitors and event delegates, meeting modern accessibility expectations within a historic context. TORMAX – Enquiry 25
Ideal enters commercial hot water market with EQMAX Ideal Commercial Heating has expanded its product portfolio with the launch of the EQMAX range of gas-fired condensing water heaters, marking the company’s first move into commercial domestic hot water products. Available from September 2026, EQMAX will enable contractors to source commercial heating and hot water equipment from a single market-leading and trusted manufacturer.
Marmox Multiboard spreads the load for fit-out A nationally renowned flooring specialist is making use of Marmox Multiboards as part of a highspecification installation covering much of the 13th floor to Moor House, an architecturally striking commercial office building located on the capital’s historic London Wall. Epping based OSF is a family run business serving clients from the commercial, residential and other sectors across the UK, and recognised for carrying out work to the highest possible standards. OSF opted to employ a proven build-up where – with the original carpet tiles removed – the raised access floor is being covered with a 12.5 mm thick layer of Multiboard to carry unusually large format limestone tiles. The 445 number 1200 x 600mm sheets of Multiboard were supplied through Protiler Tools in Northampton: being installed using approximately 150 tubes of the manufacturer’s 360 adhesive along with the special galvanised steel washers to spread the load from the screw fixings. Marmox Multiboards are manufactured from extruded polystyrene or XPS encapsulated in reinforced polymer concrete, produced in a range of thicknesses up to 80mm and offering a variety of positive physical characteristics in addition to being fully waterproof. Marmox – Enquiry 26
This will make it simpler to order a more complete commercial plant room solution, supported by Ideal Commercial Heating’s nationwide sales, technical and aftersales services. Designed for commercial buildings with hot water requirements, the EQMAX water heater range comprises ten models offering outputs from 20kW to 120kW and storage capacities of 210, 356 and 538 litres. This broad selection allows the output and stored-water volume to be closely matched to the requirements of each application. EQMAX is suitable for both planned refurbishment projects and urgent replacement installations, where restoring the hot water supply quickly is a priority. Its familiar look and configuration, commonly used hydraulic connection sizes and straightforward controls make installation straightforward. As with Ideal Commercial Heating condensing boilers and heat pumps, EQMAX comes with a five year warranty at no extra cost when the appliance is commissioned free by Ideal within three months of the installation date. Ideal Commercial Heating – Enquiry 27
37
Offices & Commercial Buildings
What makes a successful commercial lighting project?
Chris Boote, Commercial Manager at NVC Lighting UK, explains why successful office and commercial lighting projects rely on more than just the right products, and why support from initial specification through to completion can make all the difference.
T
he demands placed on today’s commercial projects have never been greater. Budgets remain under pressure, timescales continue to tighten and expectations around energy efficiency, sustainability and the quality of the finished environment continue to rise. Whether delivering a new office fit-out, refurbishing an existing workplace or working on a major commercial development, project teams are expected to deliver quality projects, on time and on budget. In that environment, choosing the right lighting product is only part of the equation. More than the product Today’s contractors, consultants and specifiers need technical expertise as specifications evolve, practical support when challenges arise and confidence that there is an experienced team behind every project. Behind every project is a joined-up UK team. Our Area Business Development Managers work closely with dedicated in-house Lighting Design, Projects, Technical, Customer Service and Product teams, supporting customers from initial enquiry and specification right through to delivery and after-sales support.
38
This is backed by a 360-degree approach to lighting, with solutions for the whole project. From offices, meeting rooms and reception areas to corridors, back-of-house and industrial spaces, through to emergency lighting, controls, car parks, exterior areas and architectural and roof lighting, NVC can help bring the requirements of an entire site together. Emergency is an important part of that approach. As an ICEL member, NVC provides dedicated emergency lighting expertise, with solutions backed by an up to 7-year nononsense warranty, including batteries. Experience where it matters NVC has delivered projects across offices and commercial developments, education, healthcare, industrial and logistics, residential, retail and data centres, bringing broad experience to every project. At Calztec Fitout’s Romsley Point workspace, NVC supported a contemporary office designed around flexible working and collaboration, with DALLAS PRO specified throughout alongside ARLINGTON LiFe emergency lighting.
For Future Publishing’s London offices, NVC helped create the right working environment for more than 120 employees, including areas with little or no natural light. At Royal Albert Dock in London, NVC developed a solution incorporating 6,500 emergency fittings based on STERLING panels, adapted specifically to work with the development’s air handling system. Products matter. People make the difference. As Chris Boote explains: “Customers don’t just buy lighting products, they’re buying confidence. Every project is different, so having the products, expertise and people to support the whole site really matters. Our teams work closely together, making sure customers get the support they need from the first enquiry right through to project completion and beyond. "Because ultimately, successful lighting projects aren’t built on products alone. They’re built on the people behind them.” Please contact: sales@nvcuk.com NVC Lighting UK - Enquiry 28
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Project management Compliance support Technical expertise In-house manufacture Assured lead-times Post-project support Certified Doorsets | Delivery Assurance
Certified doorsets. Delivering assurance. Dorplan is one of the UK’s leading specialist doorset providers, offering a single source solution for your fire, security and acoustic doorsets, and combining this with a wide range of architectural ironmongery – with 30 years of expertise behind it. When your project matters, you can rely on Dorplan. To discuss your next project and how we can add extra value contact us on 01366 386800, email enquiries@dorplan.co.uk or visit www.dorplan.co.uk
Enquiry 29
Drainage & Water Management
Water UK
Lack of water risks blocking a million new homes Independent analysis by Public First, commissioned by Water UK, finds that England will only have enough water for 420,000 of the Government's target of 1.5 million homes.
T
here is not enough spare water to accommodate the new housing and in some parts of the country there is only a 2% buffer between what is available and what is used. England has been increasingly unable to supply new businesses and homes with the water they need for two reasons: 1. Past governments have blocked applications to build new reservoirs, while planning rules continue to slow down new water infrastructure. 2. New water resources, such as reservoirs, can only be designed on the basis that people and businesses use much less water than they actually do. Rules also prevent companies from building to meet future demand like the growing use of water by data centres. Water UK’s recommendations include granting water schemes the same fast-track planning route used for Universal Studios, which cut its process from two years to six months, and instructing Natural England and the Environment Agency to use available scientific evidence rather than demanding unnecessary additional assessments based on hypothetical risks.
40
Water UK
Household water use is falling more slowly than government targets assume. We also project business demand to rise as waterintensive industries such as data centres come online. Yet government targets force water companies to plan on the basis that business demand will fall by 9% by 203738. Water UK believes that assumptions about demand reduction should reflect realworld experience and not be unreasonably optimistic.
building new reservoirs much slower than it should be and unrealistic optimism about how much water people will use in the future. The fix is in the government's gift and most of it doesn't need new legislation."
David Henderson, CEO of Water UK, said: "We desperately want to be able to provide enough water for new housing, but are being held back by a regulatory system that makes
One consequence of regulators’ use of very optimistic assumptions about the availability of future water is that less investment was approved, and so bills were reduced.
Data centres are explicitly excluded from the Environment Agency's National Framework for Water Resources, meaning their additional demand for water isn't currently accounted for in water resource planning.
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
“Developers invest significant time and money into landscape design, plant selection and ecological mitigation. However, if planting is introduced into poor or lifeless soil, the results are predictable. Plants fail to establish properly, drainage becomes inconsistent and maintenance requirements increase. The consequences are not just visual. They translate directly into cost.
Between 2010 and 2024, Ofwat cut water bills by around 20% in real terms. Keeping bills below inflation meant we missed the opportunity to finance an additional £100 billion of investment (when interest rates were at record lows). Although households saved money in the short-term, this has left the country unable to keep up with the pressures of climate change, population growth and new businesses. Water UK's recommendations include: • Extend permitted development rights so water companies can install standard equipment, such as the 3,500 water quality monitors required by 2030, without separate planning applications for each one. • Grant water infrastructure Special Development Orders, as used for Universal Studios. • Issue stronger guidance to Natural England and the Environment Agency to use expert judgment and available scientific evidence rather than demanding what can be years of additional assessments to address hypothetical or highly speculative risks. • Raise the threshold below which smaller developments are excluded from Environmental Impact Assessments. • End the preference for biodiversity net gain to be delivered onsite.
The UK Government must do everything it can to remove the barriers that are making the construction of new reservoirs and other water resources unnecessarily slow and expensive. Investing in soil biology makes business sense Walk around almost any new housing development a year or two after completion and a familiar picture begins to emerge.
Drainage & Water Management
issue sits beneath the surface - quite literally. The condition of the soil and more importantly, the absence of healthy soil biology, is one of the most overlooked factors in the long-term success of a development, but from a commercial perspective, it is also one of the most important.
Water UK
“First impressions matter. The condition of landscaping prior to and at the point of sale and occupation plays a significant role in how a development is perceived. Healthy, well-established planting creates an immediate sense of quality. It enhances the setting of the homes and contributes to a more attractive environment for residents. Conversely, struggling landscapes can undermine even the best-designed schemes. “There is a growing recognition that external spaces are not an optional extra, but a core part of the product being delivered.” Ruskins
Lawns are patchy and poorly drained, shrubs are struggling, trees are staked but barely establishing and public open spaces look tired far sooner than they should. As a result - what was intended to be a selling point often becomes a source of complaint, explains Aaron Morley at Ruskins, the soil and tree specialists. “This is not usually down to poor planting or lack of specification,” he said. “More often, the
Ruskins
The National Framework for Water Resources – an official document that sets out the national strategy for water infrastructure - should be corrected states Water UK to reflect actual use of water and the risk of additional demand from businesses like data centres, which are currently explicitly excluded.
41
Drainage & Water Management
How Specifiers can utilise the Marsh Industries Technical Library and BIM Objects to support their projects In today's construction industry, specifiers are under increasing pressure to deliver compliant, sustainable and efficient designs while maintaining tight project schedules. Access to accurate technical information at the earliest stages of a project is therefore essential. Marsh Industries has developed a comprehensive Technical Library and BIM resource centre to help architects, engineers, consultants and specifiers make informed decisions throughout the design and specification process.
T
he Marsh Industries Technical Library provides a central source of up-to-date product information, technical guidance, specifications, certifications, performance data and installation resources for the company's extensive range of wastewater treatment, drainage and water management solutions. This enables specifiers to quickly access the information required to assess suitability, demonstrate compliance and complete project documentation with confidence.
One of the key advantages of the library is the availability of detailed technical documentation covering products such as sewage treatment plants, pump stations, attenuation systems, oil separators, grease management solutions and phosphate reduction technologies. Specifiers can review dimensional data, performance characteristics, certification details and installation requirements without the need for time-consuming information requests. Having access to the latest documentation also reduces the risk of outdated specifications being incorporated into project designs. For projects requiring compliance with increasingly stringent environmental standards, the Technical Library provides supporting performance data and certification information. This can assist designers in demonstrating conformity with relevant British Standards,
42
while ensuring that selected products are appropriately integrated into the wider drainage and water management strategy.
environmental permitting requirements and project-specific discharge criteria. The availability of supporting technical evidence can be particularly valuable when engaging with local authorities, approval bodies and project stakeholders. Alongside the Technical Library, Marsh Industries offers BIM resources specifically developed for architects, engineers, consultants and specifiers. These BIM objects enable designers to integrate Marsh products directly into digital project models, improving coordination and reducing design risk. The resources support modern design workflows by providing accurate product representation within BIM-enabled projects. Using BIM objects during the design phase allows specifiers to visualise space requirements, coordinate product placement with other building elements and improve clash detection before construction begins. This can reduce costly design revisions later in the project
Marsh Industries further supports specifiers through additional resources including NBS specifications, SpecifiedBy content, technical drawings and design support tools. The company's proprietary Gaia process design software can be used to optimise system designs, providing additional assurance that selected solutions are tailored to individual project requirements and regulatory standards. By combining a comprehensive Technical Library, BIM objects and specialist design support, Marsh Industries provides specifiers with the tools needed to streamline design development, improve specification accuracy and deliver compliant, sustainable drainage and water management solutions. As projects become increasingly data-driven, having instant access to reliable technical resources can make a significant difference to project efficiency and long-term performance. Marsh Civils – Enquiry 30
Enquiry 31
Drainage & Water Management
Buildability: Bridging the gap from intent to success Andy Janney, Operations Director at Polypipe Civils & Green Urbanisation explains why buildability should be a priority in AMP8 design.
F
ew topics have received as much attention as AMP8 (the eighth, and current, asset management period – a regulatory investment cycle for the water industry) in the past two years and, as the water industry entered this period with unprecedented levels of investment, regulatory pressure and prominent public scrutiny, the attention is justified.
Much of this attention has rightly been focused on compliance, environmental impact and performance targets but there’s an increasing risk that projects may suffer if buildability isn’t a central consideration at the early stages of design. Within AMP8, thousands of projects will be delivered simultaneously – many of them in complex, live environments – and, while crucial, compliant assets alone don’t ensure successful delivery. Only time will tell whether the industry can deliver all it has planned, but the prioritisation of buildability early in the design and
44
Andy Janney, Operations Director at Polypipe Civils & Green Urbanisation
construction process will certainly prove to be a key differentiator in successfully meeting the demand that the scale of AMP8 necessitates. At Polypipe Civils & Green Urbanisation, as part of the supply chain, we’ve seen the benefits of early-stage contractormanufacturer collaboration first-hand, having long worked alongside our project partners to refine designs, develop bespoke solutions (which often evolve into repeatable ‘build once, use many’ standard asset designs – a key component as the industry works towards a ‘Tetris’ model for AMP8 delivery) and optimise installation and flexibility with our range of pre-formed systems – including modular units (like our geocellular system, Polystorm) and pre-engineered systems, such as our large-diameter Ridgistorm-XL chambers and manholes. By incorporating prefabricated systems into design, key activity can be moved away from the site itself and into controlled manufacturing environments, meaning that manufacturing, assembly and quality checks are all complete before arriving on site. Once on site, all that’s left to do is install the system, reducing risk of programme delay and improving consistency – a benefit that becomes particularly useful in retrofit environments, which often bring numerous challenges, from navigating existing infrastructure at design to access restrictions at installation. At installation stage, large gains can be made in terms of project efficiency as modular and prefabricated solutions can be installed much faster than traditional alternatives,
which require significant handling on site, hence reducing health and safety risk and removing some need for large machinery. Site logistics aside, faster installation plays an important role in reducing external disruption; many AMP8 sites are in busy urban areas, and with that comes significant disruption for local communities. By reducing the amount of labour and construction activity, we can minimise how much the public feel the impact – from noise and site aesthetics to roadworks and access limitations - of works. Sustainability has received appropriate attention from the outset of AMP8, but many of the factors that improve carbon performance also positively impact buildability. For too long, the two have been viewed as separate objectives; AMP8 is proving that they go hand in hand. In the second year of this AMP cycle, it’s clear that solutions that balance performance, resilience and practicality are of utmost importance. Prioritising buildability from the outset can accelerate the delivery of such, while also reducing risk and maximising investment. Polypipe Civils & Green Urbanisation – Enquiry 32
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Across university campuses, hospital sites, hotels and mixed-use developments, drainage and wastewater management is becoming a genuinely multi-layered design task.
M
ultiple buildings, phased construction, fluctuating occupancy and increasingly demanding compliance requirements all add complexity before a single pump is chosen. Getting this right is rarely about finding one correct answer. It is about working through the right questions early, so the system installed matches the site it actually serves, as Matt Camille, Jung Pumpen Division, Pump Technology Ltd, explains. “Three areas consistently make the difference,” he said. “Duty point calculation comes first. A pump chosen on flow rate alone often ends up working outside its efficient range. “Backwater level assessment follows closely. Where a fixture sits beneath the level of the public sewer, gravity drainage is not a design choice, it is a technical constraint, and an EN 12056-4 compliant lifting station becomes a requirement.
“Redundancy deserves real consideration wherever failure has consequences. A singlepump system has one obvious weakness: if it fails, everything stops. Duo configurations remove that single point of failure and keep a site operational during maintenance, with isolation valves on inlet and discharge allowing individual units to be removed without draining the whole station. This is where the Jung Pumpen range earns its place. Compli lifting stations are built for below-backwater-level applications, DrainMajor Duo brings built-in redundancy to busy commercial and campus sites, and DrainMinor covers lighter-duty applications where gravity drainage is not achievable.”
Drainage & Water Management
Water and drainage management for buildings and campus sites
As the UK's leading authorised Jung Pumpen distributor, Pump Technology Ltd supports specifiers through the whole process, from duty point calculations to full data sheet packages, backed by 30 years of specification experience. Pump Technology Ltd – Enquiry 33
Proven Solutions for Demanding Sites
ce
fiden n o C h Wit Specify
German engineering meets UK expertise Because when it comes to wastewater, failure isn't an option. Compli 1010: The "fit and forget" lifting station for large-scale residential & commercial sewage DrainMajor 730ES: The specialist high-temp pump built to handle 90°C water from commercial kitchens
Expert support • Correct specification guaranteed • Stock ready
0118 9821 555 www.jung-pumps.co.uk Enquiry 34
45
Drainage & Water Management
Wade Linear Drainage specified for landmark leisure centre Wade Linear Drainage Channels from Alumasc Water Management Solutions (AWMS), have been installed throughout the new Platinum Jubilee Leisure Centre in West Drayton, helping to deliver effective water management across one of London’s most recent and significant leisure developments.
O
perated by Greenwich Leisure Limited (GLL) on behalf of Hillingdon Council, the £37-million facility was designed by Hunters Architects, and officially opened its doors to the public in April 2026. Specification Wade Linear Channel Drainage was specified via the main contractor, with installation works overseen by the London Borough of Hillingdon. Wade Linear offers one of Alumasc’s most versatile and aesthetically refined channel drainage solutions, making it suitable for both new-build and refurbishment applications. Available in a wide variety of profiles, including systems with integrated falls, the stainless steel range combines efficient drainage performance with low maintenance requirements and long-term durability.
At the Platinum Jubilee Leisure Centre, Wade Linear systems in Grade 304 stainless steel were installed throughout the changing rooms and public washroom areas. The material was selected for its suitability in hygienic and wet environments, providing excellent corrosion resistance while delivering a clean, contemporary appearance. The drainage channels also help visually define wet and dry areas within the facility, contributing to both safety and aesthetics. For the swimming pool environments, Grade 316 stainless steel was used, to provide enhanced protection against the more aggressive conditions associated with chlorinated water and continuous exposure to moisture. Its superior corrosion resistance makes it particularly well-suited to demanding aquatic applications where durability and long-term performance are essential. Comprehensive Product Options In addition to the stainless steel option used at the Platinum Jubilee Leisure Centre, Wade Linear gratings are also available in alternative metals to suit a range of applications. Nickel bronze gratings offer a practical yet decorative solution for interior and exterior applications. Their warm metallic finish complements premium floor finishes including terrazzo, marble, York stone and sheet flooring, while performing well in areas subject to high pedestrian traffic. Cast iron gratings remain the traditional choice for heavy-use service zones and plant areas, delivering exceptional strength and long-term durability. Cast iron is also widely used in refurbishment projects and heritage environments, where its robust construction and traditional appearance integrate well with older architectural features.
46
Wade Linear offers a range of channel configurations for different environments and volumes of water. Load classes include A15, B125, C250 and D400 depending on channel type. The channels are low maintenance and are easily cleaned by directing a jet of water along the channel towards the outlet. The system meets the requirements of BS EN 1433 and is engineered for efficient flow management and long-term reliability. Faceted and curved channel systems offer further flexibility for designers seeking bespoke architectural solutions. Wade Linear also includes a range of custom channels designed to accommodate nonstandard applications. For information call 01787 475151 or visit www.alumascwms.co.uk Alumasc Water Management Solutions – Enquiry 35
Enquiry 36
Drainage & Water Management
DRAINFIX BLOC HD crate system helps to achieve SuDS solution for Norfolk residential project HAURATON’s crate system, DRAINFIX BLOC HD, was specified as the attenuation solution for a new residential development in Bungay, Norfolk.
T
he development of three houses required the installation of two attenuation tanks, the first (5.5m x 8m x 0.8m) positioned under a drive and the other (3m x 11m x 0.8m) in soft ground to be landscaped with vegetation. Though the project itself sits in Flood Zone 1, there is significant risk of flooding in the village and surrounding area. Therefore, the need to manage surface water as close to where it falls as possible (in-line with the principles of Sustainable Urban Drainage Systems (SuDS)) was all-the-more critical. Each tank consisted of a double layer of crates laid into an impermeable geomembrane. The membrane was sealed around the tank with tape and the tank was then wrapped in a protective fleece, before being covered to ensure effective distribution of the anticipated surface load. David Moore, owner of installing contractor DS Moore Building and Groundworks, said “This was our first time working with the DRAINFIX BLOC HD system and the team found it easy and intuitive to work with. We appreciated the closed crates, ready-specced for structural stability, as they reduced the labour time involved in constructing the tanks.” Why Retention? Retention systems temporarily store excess rainwater and release it slowly into drainage networks and natural waterways. This controlled discharge reduces peak flows, prevents sewer overload, and mitigates flooding. By holding back runoff during heavy rainfall, retention systems help prevent erosion, protect water quality, and stabilise downstream water levels.
They play a crucial role in managing stormwater sustainably, especially in areas where infiltration is limited due to soil or site conditions. With the soil in the local area of the project having high clay content and therefore low permeability, conditions were best suited to the use of a retention system vs infiltration. About DRAINFIX BLOC HD DRAINFIX BLOC HD is HAURATON’s dualcrate system, designed for easy construction and efficient transportation. The closed outer crates are used to quickly create the
outer boundary of the structure - with no need for separate face plates or end panels - and provide exceptional rigidity and protection during backfilling. Meanwhile, the open inner crates offer a 75% increase in transportation efficiency, stacking neatly for compact transport and reduced carbon footprint. DRAINFIX BLOC HD has a large storage capacity (383.2 litres) with 95.8% voids and is made of 100% recycled polypropylene. The crates are also PVC free and can be fully recycled following lifetime use. The system can be used for both retention and infiltration projects, paired respectively with an impermeable geomembrane or permeable geotextile of choice. It can be configured to suit any project scale or footprint and easily expanded retrospectively in all directions to meet varying storage requirements. In the case of this residential project, DRAINFIX BLOC HD has enabled the developer (a local businessman) to reinforce his commitment to his local community by ensuring that rainwater is managed responsibly and sustainably on-site. HAURATON – Enquiry 37
48
Much of our built environment was constructed when temperatures were predictable and rainfall levels followed patterns. The hard, non-permeable surfaces of tarmac and concrete that dominate urban landscapes didn’t consider a world where those same materials would increase rain runoff and contribute to Urban Heat Island effect as populations grow and flock to dense urban spaces.
Drainage & Water Management
The grey and green blueprint for climate resilient cities
But if that water isn’t filtered, it will carry firstflush pollutants and fuel residues straight into natural ecosystems. This is why green assets must be paired with grey pre treatment. That’s where the Wavin Certaro Lamella Hydrodynamic Separator (HDS) can offer high-performance sediment solution, so water can function as a quality resource even in tight spaces. It can be installed under car parks to catch vehicle sediments and near industrial zones, removing up to 80% of Total Suspended Solids (TSS).
H
ere, Blair McDonald, Commercial Manager for Urban Climate Resilience at Wavin explores how a hybrid blend of green and grey infrastructure offers robust resilience to manage the growing volatility of a changing climate. A climate stress testing our streets Climate change is already revealing the incompatibility between our urban environments and a future of flash floods and wildfires. 71.3% of England was declared to be in drought in August 2026. And when the rain does return, over 6.3 million properties, are exposed to flood risk. Introducing innovation to grey infrastructure To futureproof urban space, we must incorporate a smarter approach to grey infrastructure. Sustainable drainage systems (SuDS) bring an adaptative way to bring control to the uncontrollable. The systems create safe water storage and movement, turning rain from a flood risk into a resource. Grey solutions such as Wavin’s PolderRoof turn the confined space of a roof into a controlled water reservoir, enabling evapotranspiration to prevent overheating. For rain that misses the roof, underground attenuation systems such as Wavin’s AquaCell NG steps in, preventing surface flooding. By temporarily storing runoff and releasing it gradually, the system helps reduce surface flooding and pressure on drainage networks, while allowing valuable surface space to be used for landscaping, biodiversity and public realm improvements.
The nestled and modular design means it takes up four times less space than alternative tanks. Adding a buffer with green infrastructure As we retrofit our urban areas to become climate resilient, there is an opportunity, to restore the biodiversity lost amongst the excess of concrete. Access to nature reduces stress for residents and can strengthen social cohesion, while also taking the immense pressure of grey infrastructure for environmental resilience. Leaves and roots hold water temporarily, and trees absorb cardon dioxide to improve air quality. But natural elements have a limit of what they can take. Soil infiltration and wetland buffering can regulate water and sustain vegetation.
Growing cities need layered resilience Green infrastructure delivers environmental performance but only within its natural limits and climate change and ageing drainage networks are testing those limits. As cities continue to adapt to climate change and population growth, the most successful schemes will be those that combine engineered and nature-based solutions. By integrating technologies that manage water quantity, improve water quality and support biodiversity, specifiers can create developments that are better equipped to withstand future environmental pressures. For more information on Wavin’s urban climate resilience solutions, visit: https://wavin.com/ gb/solutions/urban-climate-resilience Wavin – Enquiry 38
49
Drainage & Water Management
Modular geocellular systems: a SuDS solution for surface water management As one of the UK’s leading manufacturers of above and below ground drainage systems, Brett Martin offers a comprehensive range of underground drainage solutions – including systems designed to help specifiers manage surface water effectively, while meeting increasingly stringent planning and environmental requirements.
S
ustainable Drainage Systems (SuDS) Brett Martin’s modular geocellular system, StormCrate55, can play an important role within a Sustainable Drainage Systems (SuDS) strategy for commercial and residential developments. By providing temporary underground storage for stormwater, StormCrate55 helps manage rainfall close to where it falls, reducing the volume and rate of surface water entering conventional drainage infrastructure. Used as part of a SuDS strategy, geocellular systems can help reduce flood risk, relieve pressure on sewer infrastructure, protect local watercourses and contribute towards more resilient developments that are better equipped to manage periods of heavy rainfall. Applications at a glance • Stormwater management: StormCrate55 soakaway crates provide an effective means of collecting and temporarily storing stormwater below ground, helping to reduce surface water run-off and flood risk. • Rainwater infiltration: StormCrate55 can be wrapped in a permeable geotextile, allowing stored water to gradually infiltrate the surrounding ground and return to the water table. • Rainwater attenuation: Alternatively, StormCrate55 can be surrounded by an impermeable geomembrane to create a sealed underground tank. The outlet is controlled so that stored stormwater is released gradually back into the drainage system over a longer period. StormCrate55 in numbers • 237.5 litres - the storage capacity of each 1200mm x 600mm x 347mm module. Four crates create 1m³ of underground storage, while a 95% void ratio maximises the volume available for stormwater.
50
•
•
•
15.5kg - the weight of each factoryassembled module, enabling StormCrate55 units to be quickly installed on site. 562kN/m² – the load-bearing strength of each unit. StormCrate55 is designed for trafficked and untrafficked applications, including landscaped areas, pedestrian spaces, parking areas, driveways and access areas. Made with 100% recycled polypropylene - combining structural performance and efficient water storage with a more resource-conscious approach to manufacture.
Technical support Effective stormwater management requires more than selecting individual components. Brett Martin supports its underground drainage range with technical expertise ranging from drainage specifications to design and loading calculations and site support. Brett Martin’s comprehensive range of underground pipes, fittings and stormwater management solutions enables specifiers to develop integrated drainage strategies from collection and conveyance through to attenuation or infiltration.
With surface water management being fundamental to resilient development, StormCrate55 provides specifiers with a flexible, high-performance solution for incorporating effective stormwater management into below-ground drainage design. To find out more, visit www.brettmartin.com Brett Martin – Enquiry 39
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Effective drainage is a critical element of any below-ground waterproofing strategy. Without a properly designed and maintained drainage system, water can accumulate around a structure, increasing pressure on the structure and potentially leading to dampness, seepage, and costly remedial works. Internally, within Type C waterproofing systems, drainage plays a vital role. Water entering the structure is controlled behind cavity drain membranes and channelled through drainage systems before being discharged via gravity or mechanical sump pump systems.
W
hy Drainage Matters Externally, groundwater levels can fluctuate not only throughout the year due to rainfall, seasonal changes, and local ground conditions, but also over the lifetime of a structure. A well-designed drainage system helps manage this water, reducing hydrostatic pressure and directing it safely away from the building.
Saniflo Saniboost Smart fixes pressure issue in Dublin property Saniflo’s new Saniboost Smart booster pump has solved a persistent low water pressure problem in a large Dublin home with six bathrooms. Despite an existing booster pump, running multiple showers and taps resulted in very low flow. Jacks Pumps replaced the old system with a Saniboost Smart, setting it to a constant pressure of 3.5 bar. The compact pump has completely resolved the issue, allowing multiple showers and taps to run simultaneously without a drop in pressure. Owner Jack Phelps said the pump is easy to install and commission, with pressure easily adjusted at the push of a button. The system has also been installed in a Dublin pub, providing a constant hot water supply for its glass washer. Saniflo – Enquiry 41
Key Components of a Cavity Drainage System A successful below-ground drainage solution often includes: • Cavity drain membranes • Perimeter drainage channels • Inspection ports for maintenance access • Sump chambers and pumps • High water level alarms • Appropriate discharge points
Drainage & Water Management
The importance of effective drainage in protecting below-ground structures
Each component must work together to ensure water is managed effectively and reliably. Maintenance and Design Considerations Even the best drainage systems require regular inspection and maintenance. Silt, debris, and construction materials can build up within drainage channels and sump chambers over time, affecting performance. Every project should be assessed individually, taking into account factors such as ground conditions, water table levels, site topography, and the intended use of the space. Careful design in accordance with BS 8102 helps ensure reliable, long-term protection against water ingress. Delta Membranes – Enquiry 40
Freefoam Building Products’ EPDs enable transparent product specification Three new Environmental Product Declarations (EPDs) are announced for PVC rainwater systems and PVC & U-PVC roofline products. Freefoam Building Products are delighted to announce the release of three Environmental Product Declaration’s. Summary documents of the full EPD’s are now available covering PVC Downpipes, PVC Gutter and PVC Fascia, Soffit and Window Trim ranges, giving the trade clear, concise access to verified environmental performance information for key roofline and rainwater products. Aidan Harte, CEO, commented: “We’re delighted to announce the availability of these 3 EPD’s. Our teams have worked hard over the last 12 months alongside external assessors to measure, calculate and produce this information. It’s been a long process but vital as our industry works towards the transition towards a net-zero future.” Three new summary documents are now available online containing key information and highlevel data designed to give clear concise information to help building product distributors, installers, housebuilders, specifiers and contractors respond to the growing need for transparent sustainability data across the construction supply chain. Each document presents key assessment results for 1kg of product. These summarise product cradle-to-gate carbon footprint data, along with embodied carbon footprint data for the entire lifecycle of the product. Freefoam Building Products – Enquiry 42
51
External Walls
Supporting the accurate delivery of your passive fire safety specifications
Passive fire protection is a safety critical element of the building envelope, requiring careful design and specification to ensure the measures will adequately prevent the spread of fire across the external wall system if needed.
H
owever, with the Building Safety Act increasing the need for project partners to not only ensure due diligence for their role within the project but consider how they can holistically support the delivery of a safe building, specification considerations don’t stop at ensuring solutions are appropriately tested and certified. This is especially important when it comes to passive fire protection within the external envelope of buildings. The performance of cavity barriers and firestops is reliant on them being installed in line with their manufacturer recommendations as this is how they will have been tested. Any unapproved installations that differ from the approved project details may not only result in Gateway 3 rejections, delays and costly remedial works but, more importantly, the potential risk of compromising compartmentation, allowing fire and smoke to spread beyond the assumptions of the building’s fire strategy. To help project teams create and maintain these records for its standard passive fire protection and acoustic systems, Siderise has launched its new Inspection App. This new user-focused tool gives site teams a practical way to capture installation evidence, monitor workmanship standards and create a robust audit trail throughout construction. Designed for installers of Siderise's standard passive fire protection and acoustic systems, the app enables users to document installations in real time using their mobile devices. Photographs and key project information can be uploaded directly through the app and converted into
52
structured reports. These reports can then be submitted to Siderise's technical team for remote review, providing confirmation that installations align with the manufacturer's recommendations. This remote approach not only reduces delays associated with arranging site inspections but also allows potential issues to be identified quickly and rectified before they are repeated across multiple floors or areas. Importantly, the reports generated through the app can be incorporated into project quality records and the Golden Thread of information. This gives construction managers, particularly those acting as Principal Contractor, a valuable source of evidence when compiling Gateway 3 submissions. Because installation records are gathered continuously during
construction, rather than retrospectively at project completion, the risk of documentation gaps delaying approval or handover is significantly reduced. Freely available for download via Google Play and Apple App Stores, The Siderise Inspection App is part of the unparalleledtechnical support ‘wrapper’ that surrounds the manufacturers’ highly tested product ranges, including technical design advice, project specific testing, CPD and product training and more. This holistic support helps customers demonstrate competence and deliver high-quality outcomes at every project stage and Gateway. Learn more at www.siderise.com Fire Safety > Fire safety - Inspection app Siderise – Enquiry 43
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Enquiry 44
External Walls
Building Knowledge, Supporting Excellence: Fassa Bortolo’s Training Academy At Fassa Bortolo, technical expertise is at the heart of everything we do. From product development and system design through to specification and on-site application, the company’s commitment to technical support helps ensure that contractors, installers, and construction professionals have the knowledge and confidence to achieve the best possible results.
T
he Fassa Bortolo Training Academy provides a dedicated environment where practical experience meets technical knowledge. Designed to support professionals across the construction industry, the Academy offers hands-on training that allows delegates to work with Fassa Bortolo products and systems while developing a deeper understanding of correct preparation, application, and installation techniques. A key focus is External Wall Insulation (EWI), an increasingly important solution for improving the thermal performance and energy efficiency of buildings. Fassa Bortolo’s EWI training provides installers with valuable practical experience of the complete system, from substrate preparation and insulation board installation through to reinforcement, basecoats, and finishing solutions.
Rather than simply focusing on individual products, the training emphasises the importance of the system as a whole. Delegates can develop an understanding of how the different components work together and why correct installation techniques are essential for achieving a durable, highperformance finish. This practical approach is particularly valuable for installers working on projects where thermal performance, weather resistance and long-term durability are critical considerations. Supporting the Academy is Fassa Bortolo’s experienced Technical Team, providing specialist knowledge and assistance throughout the project journey.
54
The team can help professionals understand system requirements, select appropriate products, and address technical considerations before work begins. Their support can also extend to site-based guidance, helping installers resolve practical challenges and maintain the required standards of workmanship. This combination of formal training and ongoing technical support provides an important resource for Fassa Bortolo’s approved applicators and wider network of construction professionals. It also reflects the company’s belief that successful specification and installation depend on more than simply having access to high-quality products; they require knowledge, training, and confidence in how those products should be used. As demand for energy-efficient construction continues to grow, EWI is playing an increasingly significant role in both new-build
and refurbishment projects. By investing in practical training and specialist technical support, Fassa Bortolo is helping installers keep pace with evolving construction requirements while promoting best practice across the industry. Through its Training Academy and Technical Team, Fassa Bortolo offers more than products and systems. It provides knowledge, practical expertise and ongoing support designed to help professionals deliver quality results - from the training centre through to the finished building. For more information on our Training Academy and EWI training courses, call our team on 01684 218305 or email info.fassauk@fassabortolo.com Fassa Bortolo – Enquiry 45
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Fassatherm
HANDS-ON TRAINING EMPOWERING OUR PARTNERS
If you work with EWI systems, specify them for projects or want easier access to technical advice and practical training, join us at our FREE training days at our Tewkesbury HQ Fassa Bortolo Training Academy. With more than 300 years of history, Fassa Bortolo is one of Italy’s most established names in render and building materials. Now we’re bringing that technical expertise and product knowledge to our training academy.
WHO’S IT FOR? Applicators and contractors who want to sharpen their skills across a wide range of render, flooring systems and building projects.
WHY BECOME A FASSA APPROVED APPLICATOR? • Official product training. • Recognised approved applicator pathway.
UPCOMING TRAINING DAYS FASSAREND FASSATHERM FASSALIME
6 OCT & 10 NOV 7 OCT & 11 NOV 8 OCT & 12 NOV
WANT TO ATTEND OUR FREE TRAINING DAYS? Please call 01684 218 305 or email info.fassauk@fassabortolo.com Visit www.fassabortolo.co.uk Enquiry 46
• Confidence in best practice. • Quality-led installer network.
WHAT DO THE DAYS INCLUDE? • Expert guidance from the Fassa team. • Practical do’s and don’ts. • Machine familiarisation. • Hands-on application. • Free lunch.
LUNCH INCLUDED
Floors, Walls & Ceilings
Hunter Douglas Architectural supports on the first phase of ambitious Walsall transformation Hunter Douglas Architectural has played its part in the first phase of the ambitious £1.5 billion Connected Gateway project in Walsall.
T
he project aims to transform the town centre with newly revitalised retail spaces, as well as improved connectivity, public realm and community facilities. Part of this is a major modernisation of The Saddlers Centre, the town’s main shopping centre which first opened in 1980 and was refurbished in 1989. The first phase to refurbish the lower mall of the centre has now been completed, with Hunter Douglas supplying an eyecatching ceiling. Led by Birmingham-based Associated Architects, the refurbishment of Bradford Mall included new flooring and the installation of a new 475m2 timber-baffle ceiling, supplied by the global architectural products company. It was specified to supply Derako® Veneered Grill system in high-quality real Birch. A madeto-measure solution, the wooden grill system comprises of veneered MDF engineered slats, which are formed into panels using a black aluminium dowel.
56
The slat cores are made from MDF engineered solid wood (ESW) and are finished with a decorative varnish of a highquality real wood veneer. Not only does the ceiling bring warmth and structure to the retail space, it combines natural aesthetics with modern functionality. The grill ceiling layout was designed to allow the linear lighting to be fully integrated into the overall design, with a grill module of 3-69-31-100. Associated Architects said the introduction of the Hunter Douglas veneered wooden grill system introduced “a modern and visually appealing element to the space”. With sustainability at the heart of the Hunter Douglas ethos, the wood used is efficiently in the production of veneer because modern production methods ensure that about 8001000m² of veneer can be produced from just 1m3 of wood.
And because each bespoke system is madeto-measure, it requires no cutting adjustments on site. When combined with an acoustic pad in the void, it can offer a high acoustic absorption, and installation is simple, thanks to the standard T24 grid. For more details about Hunter Douglas wood veneered grill systems, which can be used as a ceiling or fixed directly back to a wall, visit: https://www.hunterdouglasarchitectural.eu/ uk-en/product/derako-veneered-grill Hunter Douglas Architectural – Enquiry 47
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
fermacell® fibre gypsum boards
Sustainability you can build on.
CO2 STORING
© 2026 James Hardie Europe GmbH. Unless otherwise noted, TM and ® denote unregistered and registered trademarks of James Hardie Technology Limited and James Hardie Europe GmbH. *CO² storing refers to production stages A1-A3 of EPD.
www.fermacell.co.uk
Enquiry 48
Floors, Walls & Ceilings
Healthcare bathrooms design meets compliance For healthcare specifiers and designers, creating accessible bathrooms and wet rooms that meet compliance requirements while delivering an attractive, welcoming environment can often feel like a balancing act. “Visual contrast is one of the most important considerations when designing healthcare bathrooms and wet rooms,” she explained. A 30-point LRV difference is also required under Approved Document M of the Building Regulations for adjoining surfaces in newbuild and major refurbishment projects.
E
lmira Magomedova, Creative Designer at Altro, explains that research shows that healthcare design can have a significant impact on patient wellbeing, staff satisfaction, and the overall user experience. As healthcare environments evolve, there is growing recognition that practical, hygienic spaces can also be contemporary, calming, and design led.
“In addition, BS 8300 recommends this level of contrast as best practice to help create more accessible and inclusive environments for everyone. While these requirements are essential, they shouldn't be viewed as a barrier to good design. “There is often a perception that accessible healthcare design results in stark, institutional spaces. In reality, thoughtful colour selection can achieve the required LRV contrast while creating environments that feel welcoming, premium, and modern. “To demonstrate this, at Altro we've developed a range of healthcare bathroom
and wet room concepts that achieve a 30point LRV difference between Altro walls and floors while showcasing contemporary colour palettes. These designs show how colour can be used confidently within healthcare settings without compromising on accessibility guidance. “From soft, nature-inspired tones to richer accent colours, designers have more flexibility than ever to create spaces that support both wellbeing and compliance.” Altro – Enquiry 49
Mapei ensures a safe landing at Specialist Emergency Care Hospital A Mapei coating system has been used to create a helipad at Northumbria Specialist Emergency Care Hospital – England’s first purpose-built specialist emergency care facility.
R
eplacing an existing landing area, the helipad now supports both daytime and night-time air ambulance operations, with new aviation lighting and safety markings ensuring safe landings in all conditions. The installation was completed by Roadgrip for main contractor, Integrated Health Projects, the joint venture between VINCI Building and Sir Robert McAlpine, and Ryder Architecture. The specification included Mapecoat TNS Primer EPW and Mapecoat TNS Extreme. Mapecoat was selected to meet stringent performance criteria, providing excellent day and night-time visibility, resistance to heavy rotor wash and reliable grip in wet and icy conditions. Multiple colours were used – including shades of red, yellow, dark green and white - to create the necessary helipad markings and meet the required specification. This includes the large “H” and touchdown circle to guide incoming pilots.
58
Roadgrip’s Ryan Watts said: “As with many airfield projects, the weather posed significant challenges. The site is exposed, and strong winds, cold temperatures, and high humidity levels were a constant factor throughout the installation. The work required patience, precision and close
coordination between teams, along with a top-quality coating system. Mapecoat provided this solution, allowing us to successfully meet our objectives - at this site and others throughout the UK.” Mapei – Enquiry 50
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Floors, Walls & Ceilings
Enquiry 51
Headingley Cricket Club (After)
COVER EVERY INCH OF THE HALL. It’s...Where Champions Play. Taraflex® is the most widely specified indoor sports surface in the world. Its’ unique construction and technical performance is unrivalled, it has been fitted at every Olympic Games since 1976. Taraflex® delivers optimum safety and comfort for all users, and is widely recognised and installed in the education sectors. Over 8 million pupils everyday enjoy the benefits of Taraflex® sports flooring. Did you know that Gerflor also have other flooring solutions for any education and leisure facility, including rubber tiles, technical tiles & safety flooring? Best sellers are in stock now for fast delivery. CONTACT US FOR FURTHER INFORMATION +44 (0) 1625 428 922 contractuk@gerflor.com
(Before)
www.gerflor.co.uk
Enquiry 52
59
Floors, Walls & Ceilings
HLM Architects specify Gerflor and Gradus for Design Studio to improved underfoot comfort, acoustic absorption and modular flexibility.
HLM Architects has delivered a new studio environment in Cardiff, underpinned by a coordinated flooring specification from Gerflor. The project incorporated 330m² of floor finishes, comprising Gerflor Creation 55 Looselay luxury vinyl tile (LVT) and Gradus Lunar carpet tiles, installed across circulation routes, meeting rooms and informal breakout areas to support varied workplace functions.
The specified solution reflects a considered approach to material application, with each product selected to respond to the specific functional demands of its designated area while maintaining a unified design language throughout the studio. The combined use of LVT and carpet tiles establishes a durable, performance-led flooring solution suitable for diverse applications, from high-traffic circulation to informal collaborative spaces. The project outcome demonstrates the effectiveness of a coordinated specification approach, where material performance, installation efficiency and spatial functionality are aligned to support a modern workplace model. Gerflor – Enquiry 53
Gerflor Creation 55 Looselay LVT was specified for primary circulation and high-traffic zones, offering a robust, dimensionally stable surface with the added benefit of simplified installation and future adaptability. Gradus Lunar carpet tiles were utilised within meeting rooms and breakout spaces, contributing
Forbo’s sustainable flooring at the heart of university facility
Forbo Flooring Systems – Enquiry 55
With varied household needs and unpredictable maintenance, the comfort and well-being of tenants needs to be considered. Failure to deliver on these will mean a compromised floor that fails to live up to standard. Beauflor sheet vinyl floors are made to fulfil all of these requirements: affordable, durable, easy to look after, comfortable and in a wide range of calming natural designs, they are the ideal choice.
Ten years of Woodura: the hardened wood floor that keeps raising the bar This year, Bjelin marks a decade of innovation since its launch in Sweden in 2016. In ten years, the company has grown from a Scandinavian start-up to an international wood flooring brand with production facilities in Sweden and Croatia and a presence in markets across the world, including the UK. The milestone also comes at a moment of significant growth: Woodura flooring production increased by 40% in the last year alone. At the heart of that growth is Woodura® technology, developed by Välinge® to compress and harden real wood, creating a surface that is three times stronger than traditional hardwood. The result is the Woodura range, engineered for durability without compromising on the authentic look and feel of real timber. Woodura Planks 3.0 and the recently launched Woodura Herringbone 3.0 both feature the leakproof 5G Dry® click system for fast, glue-free installation, with watertight joints. Built on FSC®certified timber, the range delivers a finish that suits residential and commercial interiors alike. Ten years on, the message remains the same: specify the real thing, without the restrictions. Bjelin – Enquiry 56
60
Durability is a key factor in the specification of kitchen and bathroom flooring in social housing, and Beauflor cushion vinyl flooring is the first line of defence against premature wear and early replacement.
Beauflor – Enquiry 54
When the University of South Wales were looking to expand its on-site chiropractic clinic, Stride Treglown were appointed to carry out the works. To achieve the sustainability principles included in the brief, a number of Forbo Flooring Systems’ floor coverings were specified, including its Allura Flex vinyl using the innovative IOBAC MagTab system. MagTabs are an innovative solution on the market, being magnetic on one side and dry tack on the other, locking the flooring together. Each tile can be easily lifted up without damaging the floor covering itself or contaminating the metal raised access flooring.
Durability that doesn’t compromise comfort
SPECIFY CFA MEMBERS
for sustainability support and advice on your flooring projects Specifying CFA members for your flooring projects means you’ll be gaining a wealth of experience from vetted contractors with the knowledge and products to fulfil your specification with a sustainability criteria. CFA members are part of a supply chain that includes specialist contract flooring contractors, manufacturers and distributors, all of whom promote the highest standards and expertise.
PLUS! Get the very latest contract flooring news @ floorscape.org.uk Clockwise from left: Mapei UK Ltd, Flooring Matters SW Ltd, Loughton Contracts plc
cfa.org.uk Enquiry 57
T: 0115 941 1126
E: info@cfa.org.uk
FIND OUT MORE
Download the "Why Choose a CFA Member" leaflet from cfa.org.uk
Kitchens, Bathrooms & Washrooms
Designing Out Failure in Wet Rooms Within wet room design, we explore the considerations required beyond sourcing high-performance tiles.
They should then assess: the substrate, waterproofing system, falls, drainage positions, tile format, adhesive, grout, sealant and movement joints, as well as corners, penetrations and drainage outlets, all requiring care. A coordinated system specification helps ensure that individual products work together rather than simply appearing suitable when assessed in isolation.
S
teve Moore, National Specification Manager at Nicholls & Clarke, explains why successful specification depends on looking beyond the tile and considering the complete system. Why can a correctly specified tile still form part of an installation that ultimately fails? Preparation is at the heart of every wetroom system. Understanding the system and how it works is imperative. A tile may meet every required performance criterion, but within a wet room project, it is the visible surface of a much larger system. The condition and preparation of the substrate, waterproofing, falls, drainage, adhesive selection, movement accommodation and workmanship all influence the finished result. Failures often occur because these elements have been specified or installed independently. Successful wet room design therefore begins beneath the tile. Every component must be appropriate for the environment, i.e. compatible with the surrounding products and installed in accordance with the relevant guidance. What should architects consider beyond the tile itself when specifying a complete wetroom or bathroom system? Remember, water will always try to find a way to where it shouldn’t be. The starting point should be to determine the intended use, how will the space be used? Specifiers should consider expected traffic /footfall, whether users will be barefoot or wearing footwear, the likely presence of water or other contaminants, cleaning procedures and maintenance capabilities.
62
Why can terms such as ‘Anti-Slip’ and R ratings provide an incomplete picture of how a floor will perform in use? Anti-Slip is a broad description rather than a complete measure of performance. An R rating can provide useful comparative information, but it is derived from a rampbased test carried out under defined conditions. Those conditions may not represent how a particular wet room will be used. A surface may behave differently when wet, contaminated with soap or cleaning products, or used by someone who is barefoot or has reduced mobility. Specifiers should therefore look beyond a single classification and consider the test method, the conditions under which the result was obtained and the risks present within the wet room environment and usage. How can Pendulum Test Values help specifiers make more informed decisions about slip resistance? The pendulum test provides a recognised method of assessing slip potential and can test surfaces in both dry and wet conditions. This enables the result to be considered more closely against the environment in which the floor will be used. However, a Pendulum Test Value should not be treated as a universal answer on its own. Specifiers should confirm whether the result relates to the correct surface finish and relevant conditions. Cleaning regimes, wear, contaminants, drainage and whether users are likely to be barefoot must also be considered. With the first ever digital pendulum testing facility, we always recommend testing in situ within the intended usage condition prior to client handover. Slip resistance is most effective when it forms part of a wider, use-specific risk assessment.
Why should tiles, adhesive and grout not be treated as the waterproofing system? Tiles and grout form the finished surface, but that does not necessarily make the installation waterproof. Water can reach the substrate through joints, movement points, penetrations or small defects in the finished surface. Even when water-resistant adhesives or epoxy grouts are selected, the substrate still requires appropriate protection. In wet areas such as showers and wet rooms, this is normally provided by a suitable tanking or waterproofing membrane system. Waterproofing must be designed as a continuous layer, with compatible details at corners, pipe penetrations, drains and junctions. It should not depend on the tiled finish alone. Which parts of a wet room are most vulnerable to water ingress? The greatest risks usually occur where surfaces or materials meet. Internal corners, wall-to-floor junctions, pipe penetrations, drainage outlets, thresholds and changes in substrate can all become vulnerable if they are not addressed correctly. Movement is another important consideration. Buildings and backgrounds move, especially with new builds, while different materials can react differently to moisture and temperature.
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Poor cleaning can allow residues to build up, altering the appearance and potentially affecting slip performance. Conversely, unsuitable chemicals or techniques may damage finishes or joints.
Visual contrast can help users distinguish between floors, walls, sanitary fittings and controls. Abrupt changes in level should be avoided where possible, while surface patterns should not create the impression of steps or changes in level. We offer LRV ratings (Light Reflectance Values) to help our clients to determine suitability when designing accessible spaces.
The specification should therefore balance slip resistance, cleanability and anticipated maintenance resources. Handover information should also include clear cleaning and care guidance for the facilities team.
There is no need for an inclusive wet room to feel institutional. Careful selection of colours, formats and finishes can support accessibility while creating an attractive and welcoming environment. What are the risks of substituting individual products without reviewing the complete system? Value engineering and product substitution are sometimes necessary because of cost, availability or programme pressures. The risk arises when one component is changed without assessing its effect on the rest of the specification.
Rigid finishes cannot be expected to accommodate every movement without suitable joints and flexible detailing. This should be resolved at the design stage, with the waterproofing, drainage and tiling specifications coordinated rather than leaving critical decisions to be made during wet room installation. What considerations need to be made when using large-format tiles to form falls and coordinating drainage? Large-format tiles can create a clean and attractive finish, but they require particularly careful planning in wet rooms. A large, rigid tile will not easily follow falls in several directions without cutting, lipping or compromising the intended drainage. The tile format, drainage position and pattern of falls should therefore be developed together. A linear drain may allow a simpler single-direction fall, while a point drain may require additional cuts or a smaller tile format around the outlet. Set-out should be considered early so that falls work technically, cuts remain visually balanced and water is directed effectively towards the drain. How can tile specification contribute to safer and more inclusive wet rooms?
A substituted membrane, adhesive, tile or grout may have different performance characteristics, installation requirements or compatibility limitations. Changing the tile format could also affect falls, drainage, adhesive coverage and set-out.
How can N&C support architects with coordinated tile specifications? N&C supports architects from early product selection through to the development of a coordinated tile and installation-system specification. This includes guidance on tile formats, technical characteristics, slip resistance, substrates, waterproofing, adhesives, grouts and associated preparation products and their compatibility with each other.
Kitchens, Bathrooms & Washrooms
Inclusive design should consider how people with different levels of mobility, vision and balance will experience the space. Slip resistance is important, but it is only one part of that discussion.
By considering these components together, our specification team can help identify potential risks before they reach site. We can also provide samples, technical information and project-specific guidance to support informed decision-making. Further technical resources and information about our tile collections and specification services are available at www.ncspecifier.co.uk Nicholls & Clarke – Enquiry 58
Any proposed substitution should therefore be reviewed as part of the complete system. Equivalent appearance or price does not necessarily mean equivalent technical performance. How should cleaning and maintenance be considered at specification stage? The floor must be capable of being cleaned effectively using methods that are realistic for the building operator. Highly textured surfaces can offer useful slipresistant characteristics but may require a more rigorous cleaning regime, appropriate equipment and suitable cleaning products.
63
Kitchens, Bathrooms & Washrooms
Saniflo launches new range of Grease Traps for hospitality sector From portable and mobile applications through to large-scale commercial and hospitality installations, Saniflo now offers a comprehensive and updated range of grease traps and separators designed to remove fats, oils and grease (FOG) from wastewater before they enter the drainage system.
T
he Water Industry Act 1991, Section 11, makes it an offence to discharge anything into a public sewer that could obstruct flow or damage the sewer system and FOG is specifically recognised as a major cause of blockages and fatbergs. Using a grease trap or separator eliminates FOG solidification in pipework - helping to prevent blockages, reduce costly maintenance, eliminate unpleasant odours and reduce environmental pollution. Installation of a correctly specified grease trap enables commercials businesses to be fully compliant with the regulations. Saniflo has a range of solutions for every catering scenario. Sanigrease T24 A compact, lightweight grease trap designed for temporary or mobile applications where space is limited. Weighing just 4kgs, it is manufactured from durable polyethylene and can be installed under a sink and intended for daily emptying. It features a total volume of 24 litres and sludge trap volume of 8 litres and is ideal for: • Food trucks and mobile catering units • Pop-up kitchens • Temporary catering facilities • Mobile dishwashing stations • Small commercial food preparation areas Sanigrease T Series A hygienic stainless-steel grease trap range designed for installation beneath restaurant and commercial kitchen sinks. With 4 units in the range that are denominated according to covers served, the T40, for example, is designed for up to 40 covers and has 39 litres capacity, whilst the largest T100 serves up to 100 covers and has a 82 litre capacity. The corrosion resistant units are mounted on feet for easy cleaning and are suitable for permanent kitchen installations. With fast maintenance access for quick servicing, the T Series is suitable for: • Restaurants • Cafés • Commercial kitchens • Hospitality venues • Catering operations with under-sink installation requirements
64
Sanigrease S Series A larger-capacity grease separator range designed specifically for busy commercial kitchens requiring higher grease-handling capabilities. The range consists of five nominal sizes, the NS2 to the NS15 with sludge trap volumes from 200-1500 litres, separator volumes from 450 – 1800 Litres and total volumes from 650 – 3300 litres. Manufactured from rotationally moulded recyclable polyethylene for above ground installation, the width of the unit ensures it can easily fit through standard internal door sizes for ease of access and quick installation. The S Series is available in various capacities for: • Large restaurants • Hotel kitchens • Commercial catering facilities • Schools and universities • Care homes • Food production and preparation facilities
Sanigrease SU Series An underground grease separator system for larger commercial applications, the Sanigrease SU range comprises 5 models - SU 1, SU 1.5, SU 2, SU 3 and SU 4, with volumes from 340 litres to 1500 litres. Each robust rotomoulded recyclable polyethylene tank features an integrated sludge trap and reinforced pedestrian-rated access cover, as well as optional alarm monitoring. Ideal for discreet installation, the SU Series is perfect for: • Large restaurants • Hotels • Food manufacturing facilities • Commercial developments • New-build hospitality projects • Sites requiring underground grease management solutions For more information or for flow rate calculations for your hospitality premises, the technical team at Saniflo is available to answer any questions during working hours. Saniflo – Enquiry 59
Saniflo has a range of solutions for every catering scenario.
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
The UK’s Authority in Wet Rooms
Discover the latest...
Wet Room Collections British Company | One Complete Specification Resource
150 Year Credibility | British & European Manufacturing | Technical Expertise 0845 605 1345 | info@ncspecifier.co.uk Enquiry 60
info@nichollsandclarke.com clarke.com
1www.nichollsand-
View Online
Kitchens, Bathrooms & Washrooms
Balancing space, hygiene and performance in washroom drainage Across gyms, spas, hotels and other high-use washrooms, specifiers are under increasing pressure to deliver premium aesthetics alongside reliable performance.
S
hallow floor build-ups, demanding hygiene standards and expectations around sustainability all add complexity to drainage design. Erik Mul, Technical Product manager at ACO Building Drainage, explains that with the right approach and product selection, specifiers can avoid common pitfalls and achieve washroom environments that perform as well as they look. “Drainage is a critical but often overlooked element of washroom design,” he said. “When compromises are made, the consequences can include poor flow performance, blockages, unpleasant odours and costly remedial work. These issues can undermine the user experience and detract from wider project goals around wellbeing, sustainability and long-term value.
The rise of the calm, 'lived-in’ kitchen
“To overcome these challenges, specifiers should focus on three key considerations: adaptability, hydraulic performance and serviceability. “To support specifiers navigating these challenges, ACO Building Drainage has developed its latest ShowerDrain range with adaptability, hydraulic efficiency and ease of maintenance at its core. “The range includes low-build, modular solutions suitable for a variety of floor constructions and layout requirements, helping specifiers achieve greater design flexibility without compromising performance. Enhanced gully designs deliver improved flow rates, simplified cleaning and
easier installation, making them well suited to demanding hotel and leisure applications. “By combining performance, hygiene and aesthetics in a single solution, ACO ShowerDrain helps specifiers create washrooms that meet modern expectations while avoiding the trade-offs traditionally associated with drainage design.” ACO – Enquiry 61
A premium alternative to stainless steel
Kitchen retailers are seeing growing demand for warmer, more functional spaces as homeowners move away from polished 'show kitchens' in favour of relaxed, lived-in interiors. Paul Berryman, Head of Life Trade, says: "Today's kitchens are designed for everyday living rather than display. Homeowners are embracing natural materials, layered textures, warm colour palettes and practical features that create a welcoming atmosphere without compromising on functionality. It's no longer about perfection - it's about designing a space that's comfortable, personal and works hard for modern family life.” Life Trade – Enquiry 62 Stainless steel has long been the go-to choice for contract and specification projects, but it no longer needs to be the only option. Clearwater Products’ Granite Mio Compact range offers specifiers a competitively priced alternative, combining the premium look and feel of granite with practical design and accessible pricing. Designed specifically with compact kitchen spaces in mind, the Mio Compact range features scaled-down dimensions and a slender profile depth, making the sinks particularly well suited to galley kitchens and smaller layouts. Available in a choice of configurations, including single bowl and drainer, 1.5 bowl and drainer, and a round bowl option, the range provides flexibility across a variety of projects. Models feature reversible designs, pre-scored tap holes and standard waste kits, helping to simplify specification and installation. With a choice of Blizzard, Fossil and Jet finishes, Mio Compact allows projects to move beyond conventional stainless steel without compromising on practicality or value. A lifetime warranty further reinforces its suitability for specification-led projects. Clearwater – Enquiry 63
66
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
With Kinedo you don’t have to scrimp on style to get your bathroom on budget
Shower trays
Decorative bathroom panels
Walk-in showers
Image shows: Kinecity tray, Tropical Tiles Kinewall, Solo Design with flipper panel in brushed graphite profile and Cosmos XL glass.
At Kinedo, we pride ourselves on delivering outstanding after-sales support to ensure your projects are smooth and hassle-free We’re here to support you – from your choice of tray, walk-in, wall panel or all-in-one cubicle. We also provide on-site visits, training and after care. Contact our technical team to talk through cost effective solutions to meet your project needs and budget. We are here for you every step of the way.
Anti-slip
Easy installation
Anti-limescale
10-year warranty
Multiple sizes Easy maintenance
kinedo.co.uk Email: info@kinedo.co.uk Enquiry 64
Telephone: 020 8842 0033
Technical support
Customer service
Kitchens, Bathrooms & Washrooms
Schlüter-Systems showcases solutions at multiplex centre for excellence Schlüter-Systems is proud to be part of the newly opened Multiplex Centre for Excellence in Woolwich, London - a pioneering facility designed to elevate standards for Multiplex, their clients, and sub-contractors through hands-on technical training, collaboration and quality assurance.
heating solutions throughout the Centre. Their specification underscores the importance of reliable, highperformance waterproofing and heating systems in achieving quality installation standards while supporting industry learning and skills development.
O
pened in May 2026, the Centre for Excellence is a first of its kind training hub for Multiplex in the UK. Designed to bring industry excellence to life, the facility combines classroom-based learning with live demonstrations and full-scale construction mock-ups, enabling professionals to explore best practice in a practical immersive environment. As part of this landmark project, Multiplex incorporated a range of Schlüter-Systems’ advanced waterproofing and underfloor
At the heart of the Centre are the mockups themselves - full-scale physical replications of real construction details and interfaces. These allow users to see beyond the finished surface and understand the critical layers beneath. Schlüter-Systems’ waterproofing module plays a key role in this, offering clear visibility into correct system design and installation, while demonstrating best practice in waterproofing and tiled applications. Training sessions at the Centre will focus on these modules, combining expertled theoretical learning with detailed, hands-on inspections. This approach ensures that contractors, consultants and project stakeholders can gain a deeper
understanding of system performance, installation requirements and quality assurance from the outset. Commenting on the collaboration, Ian Knifton, Head of Technical at Schlüter-Systems Ltd, said: “We are delighted to be involved in the Multiplex Centre for Excellence. By contributing our waterproofing expertise to the facility, we’re helping to support a shared commitment to quality, collaboration and technical excellence across the industry. "The ability to see and understand systems in a full-scale mock-up environment is invaluable for ensuring best practice is delivered on site.” Crucially, the Centre for Excellence provides a platform for bringing together professionals, fostering collaboration and promoting a unified approach to quality delivery. By engaging manufacturers, contractors and consultants early in the process, the facility supports better project outcomes and raises standards industry-wide. The launch of the Centre marks an important step forward in how construction projects are developed, understood and delivered - and Schlüter-Systems Ltd is proud to play a role in shaping this future. Schlüter-Systems Ltd – Enquiry 65
68
Showerlay Wetroom System
Reworked from the surface down
Fully waterproof with flexible drainage for reliable wetroom installation.
Enquiry 66
W: www.marmox.co.uk
T: 01634 835290
E: sales@marmox.co.uk
News & Developments
New from Garador! - BIG ideas for compact spaces Garador introduces GaraCompact • • • • • •
A space saving roller garage door designed for garages where every millimetre matters. Requires just 205mm headroom Space saving vertical opening Automated operation Built-in Safety Sensor Five contemporary colours.
Alongside its space-saving design, GaraCompact incorporates a range of premium features as standard, including smooth automated operation with a tubular motor; BiSecur 4 button hand transmitter, integrated LED lighting, optical safety sensor with automatic reverse function, mechanical anti-lift security and a 5 year warranty. For more information about GaraCompact or to find your nearest Garador installer, visit www.garador.co.uk Garador – Enquiry 67
Upgrade your rooflight with Made-to-Measure SKY-BLIND®
benefits of natural daylight.
Rooflights are an effective way to bring natural daylight into the home, creating brighter, more inviting spaces. As UK summers become warmer, a made-tomeasure rooflight blind provides greater control over light, heat and comfort. SKYBLIND® integrates seamlessly with rooflights, helping to manage heat and glare while retaining the
Marlon CST Heatguard gets herd approval As part of a refurbishment project, Brett Martin’s Marlon CST Heatguard has been installed for the roof of a milking shed at Bloor’s Farm in Warrington, Cheshire. Chosen by one of the farm’s owners, the innovative roofing solution, with advanced heat reflective pigment, has helped to introduce improved levels of light, while reducing energy costs and enhancing the cows’ welfare and productivity. Marlon CST Heatguard 6mm Triplewall polycarbonate sheets are eight times lighter than fibre cement sheeting and can be used as a complete roof covering or incorporated into cladding or profile roofing. Brett Martin – Enquiry 69
Supplied by SKY-BLIND® and factory-fitted into Roof-Maker rooflights, the blind is neatly concealed within the plasterboard for a clean, minimalist finish. Factory pre-fitting eliminates the need for on-site measuring and installation, saving time while ensuring a precise fit. Its advanced cellular fabric features an internal aluminium foil lining to reduce heat gain, glare and harmful UV rays in summer, while improving heat retention during winter. Available in translucent or blackout fabrics, SKY-BLIND® can enhance comfort and privacy in kitchens, home offices and bedrooms. SKY-BLIND® is available with mains power or a rechargeable 24V battery, which can be installed without an electrician. Electric blinds feature a durable 24V DC IP66-rated motor and belt-driven mechanism for smooth operation, with multi-channel remote control supplied as standard. Available in bespoke sizes for flat, pitched and vertical rooflights and roof lanterns, SKY-BLIND® offers a practical, stylish finishing touch for any project. Roof-Maker – Enquiry 68
70
To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card
Building Services
ACV UK launches next generation of commercial products ACV UK has released the WaterMaster Evo 2 gas-fired condensing water heater and the HeatMaster Evo 2 commercial combi boiler. Building on the success of the existing WaterMaster Evo and HeatMaster Evo, these latest models feature an integrated time clock, allowing hot water to be efficiently scheduled around building occupancy. This makes them an efficient solution for a wide range of commercial buildings, including offices, schools, healthcare facilities and hospitality venues.
New white paper on future of sustainable commercial heating
Featuring leading edge tank-in-tank technology, with both the inner tank and heat exchanger constructed from durable stainless steel, the WaterMaster and HeatMaster Evo 2 models deliver rapid hot water and excellent resistance to scaling and corrosion.
Ideal Commercial Heating has launched a new white paper exploring how hybrid heating systems can support the decarbonisation of commercial buildings while addressing the practical constraints faced by consultants, specifiers and building owners. Titled ‘The Future of Sustainable Commercial Heating: The Role of Hybrid Systems’, the free-to-download document examines the decision-making process behind commercial heating decarbonisation projects and highlights why hybrid systems are increasingly being adopted as part of a realistic and effective transition to lower carbon heating. The white paper is available to download free of charge from https://idealcommercialboilers.com/net-zero
ACV UK – Enquiry 70
Ideal Commercial Heating – Enquiry 71
Available in six models ranging from 25-120 kW, the new WaterMaster and HeatMaster Evo 2 deliver fast heat-up times and continuous flow rates of 473-1,754 L/h at 60°C. Suitable for plant rooms with limited space or restricted access, models feature a compact and lightweight construction that simplifies installation. The HeatMaster Evo 2 further reduces footprint by combining space heating and domestic hot water in a single appliance. Both models also feature integrated hot water storage to easily meet peak load demands and can be cascaded to meet higher demand on larger sites.
Clade sustainability report highlights progress on responsible growth
Grundfos highlights need for more efficient cooling as UK data centre demand rises Grundfos highlights need for more efficient cooling as UK data centre demand rises
Clade Engineering Systems, specialists in natural refrigerant heating and refrigeration products, has published its fifth annual Sustainability Report, setting out the company’s progress across carbon reduction, responsible business practice, product innovation and customer impact in the transition to a low carbon built environment. The 2025 Sustainability Report highlights a year in which energy security has become an increasingly important driver for building owners and operators, alongside the continuing requirement to reduce carbon emissions. Against this backdrop, Clade emphasises its commitment to natural refrigerants with their low global warming potential (GWP) and highlights the benefits of natural refrigeration heat pumps. Clade Engineering Systems – Enquiry 72
As investment in UK data centres continues to accelerate, Grundfos is urging operators to prioritise energy-efficient cooling infrastructure to manage rising power demand, reduce operating costs and improve long-term performance. Cooling can account for up to 40% of a data centre’s total energy consumption, making efficient pumping systems, intelligent controls and effective water management increasingly important. Variable-speed pumps can adjust performance in response to changing cooling demand, helping to minimise unnecessary energy use while maintaining the flow and reliability required. “Efficiency isn't simply about choosing an efficient pump,” says Pieter Swart, Grundfos Head of Specification, Fire & Modular Systems. “You need to look at how the whole system operates - how much flow is actually required, how demand changes and whether pumps are working harder than they need to.” Water usage is another key consideration. Depending on the cooling system and site requirements, water reuse can help reduce consumption, while waste heat recovery can provide opportunities to put excess heat to use elsewhere. With data centre capacity continuing to grow, Grundfos highlights the importance of considering both energy and water efficiency when designing and optimising cooling systems. Even relatively modest improvements can deliver meaningful savings over a facility’s lifetime. Grundfos – Enquiry 73
71
Independently BBA Certified for Safe and Reliable Structural Roof Deck Construction
BBA CERTIFIED FOR STRUCTURAL ROOF DECKS
OTHER ROOFING APPLICATIONS
Multi-Purpose Sheathing | Bitumen Felt | Capping Recovery & Protection Board | Liquid Waterproofing Lead & Hard Metals | Single Layer Membranes | Sarking
FOR MORE INFORMATION VISIT
magply.co.uk
+44 (0) 1621 776 252
Enquiry 74
sales@magply.co.uk