The Missouri State Capitol is one of the most impressive, functional and beautifully sited Capitol Buildings across the United States. Its stature is the result of the efforts taken through its architecture and design; implementing Missouri limestone, murals, sculpture, artwork, skylights, stained glass and extraordinary craftsmanship throughout. The ornamentation reflects the people of Missouri, our stories, and our 204 years of statehood.
Our predecessors selected this place and created a new city, Jefferson City as home of the third Capitol of Missouri. Unlike any other state capital, Jefferson City was founded for the purpose of being a capital city. Situated high above the Missouri River the Capitol and City have a commanding presence over the site where Lewis and Clark landed during the early days of their Voyage of Discovery. The vistas provide a microcosm of the ecologies of Missouri. The Big Muddy and its flood plane, hills and bluffs, forests and prairies describe the natural might of Missouri.
The architects Tracy and Swartwout created the seat of government that appropriately and proudly represents the people of Missouri. The architects understood the importance of comfort and well-being for each occupant of the Capitol, that is necessary for the work of the State to be carried out efficiently and effectively. Integrated strategies were deployed to utilize natural systems in concert with early twentieth century technological systems to maintain comfort for occupants and visitors.
The Capitol was intentionally organized as a set of grand public internal spaces surrounded by smaller cellular office bays and public corridors. The architects utilized floor openings, skylights, clerestory windows and light wells to bring daylight into the central chambers and corridors of the building.
Each of the 268 perimeter bays function as both office workplace and an integrated purpose for making other spaces in the Capitol comfortable and useful. These tall slender spaces formed with generous operable windows in the exterior limestone and tall clerestory at interior walls deliver light and comfort into the corridors that ring the Capitol. The shape of the corridor ceiling
was designed to improve transmission of both daylight and artificial lighting. Over time many of these spaces have been altered with mezzanines, dropped ceilings and other obstructions diminishing the usefulness and comfort once architecturally imbued.
Throughout the history of the Capitol the original steam heating system has benefited from advances in heating, ventilation and cooling technologies to improve comfort for all occupants. In Preservation Zone 1 these systems have been installed sensitively without challenging the integrity of the original architecture. In other areas - such as a number of House office suites - the interventions have been less sensitive and detrimental to the experiences within, as well as impacting the adjacent corridor environment.
The organization and size of the Capitol reflected the government of 1917. While the building is almost ten times larger than its predecessor, it is no longer sized for our current government needs for staffing and operations. The legislature has increased in number of members -- the House is 163 members today versus 100 in 1917. Additionally the responsibilities and sizes of teams for all elected officials have grown, thus making the space available for meeting the needs of elected officials, staff and public visitors insufficient.
The legislative process involves hearings where citizens better understand proposed legislation and provide important feedback to elected officials. More hearing rooms are needed to allow for better transparency and interchange amongst the public and their elected officials.
The state wide elected officials’ responsibilities have continued to grow and their staff sizes reflect the greater demands. The goals of this master plan included addressing the competing needs for space and creating options for creating quality work environments to aide the State in attracting and retaining the best talent for propelling Missouri forward.
REQUIRED
DESIRED
ACCESSIBILITY & FLOW
CAPITOL BUILDING RESTORATION
GROWTH & EXPERIENCE
Removal of Mezzanines
Accessible entrances
Restroom expansion + upgrade
Vertical circulation expansion
Tunnel slope corrections
Dedicated entrances
Security improvements
Site grading for sidewalk slope
Office suite growth
Mechanical upgrades
Plumbing upgrades
AV low-voltage install
Plaster damage repair
New fire protection systems
Decorative painting
Roofing replacements
Dome paint restoration
Stained glass restoration
Interior stone refinishing
Additional Hearing rooms
Senate garage replacement
Visitor’s Center
Lower level Monumental stair
Shared Conference rooms
Health Center
Upgraded Cafe
Upgraded Gift Shop
PROJECT INTRODUCTION
Major Project Guidelines
Numerous documents and reference materials were made available to the team to inform and guide the Masterplanning efforts. The team used the following resources to conduct research on various components of the Capitol Building, it’s history, and architectural assets.
• 2015 Mural Conditions Report
• 2016 Trivers Master Plan Materials
• 2017 Exterior Stone Restoration Documents
• 2019 Historic Structures Report
• 2019 Design Guidelines
• 2021 Laylight + Stained Glass Assessment
• 2023 MOCA Master Plan Material
The Historic Structures Report was a primary resource utilized. The HSR is a comprehensive book, completed in 2019, cataloging the form and function of the Missouri Capitol Building in depth. Included in various sections are descriptions of the history of the Building, the grounds, features, structures, systems and flow.
The Historic Structures Report has been and will be used as a point of reference for informing the proposals included under this Masterplanning effort. All scopes of work and areas impacted by the renovation will have been analyzed so as to not impede on the structural integrity or historic fabric of the Capitol.
The sections of this document concerning historic finishes of spaces and the Preservation zones therein are based on architectural heirarchy. Space usages have been analyzed and recommended levels of preservation are updated in the plans on the following pages.
VOLUME 1
FEBRUARY 15, 2019 PROJECT NUMBER O1901-01
st Century State Capitol Restoration Project Missouri State Capitol
HISTORIC STRUCTURE REPORT
JEFFERSON CITY, MISSOURI
Cover of the Historic Structures Report by MOCA and Strata.
Cover of the Laylight and Stained Glass Assessment by Strata.
PLAZA LEVEL PLAN Preservation Zones
PRESERVATION ZONE 0:
This area requires little to no work, maintaining its existing architectural integrity.
• No major mechanical upgrades
• Surfaces and finishes remain largely untouched
• Reserved for areas with exceptional historical integrity that demand minimal disruption
PRESERVATION ZONE 1:
Includes limited interventions to preserve the space while introducing essential upgrades.
• Installation of a fire sprinkler system
• Renovation of lighting
• Stone finishes to be repaired and preserved
• Recreation of original decorative painting based on historic documentation
• Preservation of historically significant finishes and detailing
PRESERVATION ZONE 2:
This zone will undergo mechanical and fire protection upgrades.
• Upgrades to mechanical and sprinkler systems
• Updated lighting complements historic character
• Meticulous replication of original historic detailing
PRESERVATION ZONE 3:
This area includes limited work.
• Upgrades to mechanical and sprinkler systems
• Restoration of original ceiling heights
• Selective restoration of historic detailing
PRESERVATION ZONE 3:
This area requires spatial reconfiguration and restoration.
• Removal of non-original mezzanines
• Reconfiguration of space to reflect original historic layouts
• Integration of building systems
• Limited restoration of historic elements
PRESERVATION ZONE 4:
This zone is designated for Support Functions and Infrastructure Routing.
• Incorporation of restrooms, stairwells, elevators (vertical circulation), and mechanical chases
• Use of space for utilities and support services
• Minimal preservation work, with allowance for extensive retrofitting to meet modern code and operational needs
VERTICAL CIRCULATION: Elevators and stairs.
The Preservations Zones are based off of those provided within the Historic Structures Report. Updates have been made to reflect the level of allowable intervention and renovation in various spaces based on their uses.
Updates to the mechanical, plumbing, electrical and fire protection systems will preserve visuals in high profile Zones 1 & 2. Finishes in higher level zones will be careful resurrections of the historic materials, paint, and surface treatments from the original construction.
Office, conferencing and general work spaces (Zone 3) will receive a standardized set of finishes and fixtures. Visible MEP devices will be more allowable in these areas.
Back of house service and support spaces do not receive careful recreation of historic finishes across the board.
Utility spaces meant to house mechanical systems have minimal necessary preservation work.
PROJECT INTRODUCTION
Preliminary Code Review
A preliminary analysis of the Capitol Building was conducted to evaluate the occupancy type/classification on each level. Gross building areas and occupant load factors were run to analyze the general crowding of the building at full capacity.
All perimeter offices and primary corridors were calculated as Business, public areas (Rotunda and museums) as unconcentrated Assembly, and the House and Senate Chambers as concentrated Assembly to factor the occupants throughout. It was discovered that Levels 3 and 4 did not meet the required stair width for safe means of egress.
The Plaza Level and Level 1 both have stairs or doors egressing directly to the exterior, increasing their compliance with exiting width requirements. Level 2 has additional stair width in the public collecting spaces that increases it’s egress capacity along the means of egress. To bring the building into compliance with egress requirements new stair and elevator cores will be put into place on the NE and SW quadrants of the building connecting all floors, egressing directly to the exterior.
EXISTING CONDITIONS
a. Architectural Style
b. Building Organization
c. Art & Ornamentation
d. Defining Features Analysis
EXISTING CONDITIONS
Architectural Style
The Missouri State Capitol building was designed during the period known as the American Renaissance—a time of political and cultural activity influenced by Greek and Roman classicism. The new capitol building was to be bigger, better, bolder—truly a testament to the idealism that marked early 20th century American democracy. As such, the structure is a classical design of symmetry and elegance and is one of the last statehouses constructed in the Roman Renaissance style.
Notable architectural features of the Missouri State Capitol include the Baroque dome loosely modeled after St. Peter’s basilica in Rome rising 238 feet above ground level; the six 40-foot columns on the North portico; the eight 48-foot columns on the South portico with 30-foot-wide grand staircase and extends from the South portico to the third floor. The bronze entrance doors at the top of the grand staircase are each 13 by 18 feet - at the time, the largest cast since the Roman era.
The building is symmetrical in plan, giving equal symbolic weight to both legislative chambers; the House of Representatives and the State Senate. The style makes many historical references to the national United States Capitol in Washington, D.C., as well as to ancient Greek and Roman temples. However, the typical column capital top is a unique variation on the canonical Corinthian style capital, replacing the acanthus leaves with local flora.
Building Organization - Parti
The overall parti of program organization within the Capitol Building is understood and will be preseved in the renovations and restoration outlined within the Master-plan; as well as the programming within the new additions proposed in the various options.
House legislative offices, Chambers, and Administrative & support spaces occupy the West wings of the Capitol.
Senate legislative offices, Chambers, and Administrative & support spaces occupy the East wings of the Capitol.
The central core of the Capitol consists of large scale public spaces with a rotunda and circular atria connecting all levels, culminating in the dome.
The Governor’s portico (connected to Level 2) is located to the North of the Rotunda. The half-round center bay of the Capitol contains formal spaces on various floors of the Capitol including a shared hearing room, governor’s office and portico, and legislative library.
The primary public entrance -- including the Carriage tunnel, grand marble stairs, and monumental bronze doors -- is to the South of the Rotunda.
Executive offices, Statewide offices, and Committee spaces are more fluid in their locations within the plan.
GOVERNOR'S PORTICO /LEGISLATIVE RESEARCH LIBRARY
PRIMARY CIRCULATION
EAST WING TYPICAL FOR SENATE OFFICE SPACE
HOUSE CHAMBERS
WEST WING TYPICAL FOR HOUSE OFFICE SPACE
PRIMARY PUBLIC ENTRANCE
TYPICAL LAYOUT DIAGRAM
PUBLIC SPACES, ASSEMBLY
SENATE CHAMBERS
HOUSE PROGRAM ADJACENCIES
The diagram above shows the relationships between House elected officials, administration offices, staff + committees, and operations services. Adjacencies and connecting lines in place to represent groups that work closely together and will need to maintain physical proximity between their offices for efficiency.
SENATE PROGRAM ADJACENCIES
The diagram above shows the relationships between Senate elected officials, administration offices, staff + committees, and operations services. Adjacencies and connecting lines in place to represent groups that work closely together and will need to maintain physical proximity between their offices for efficiency.
EXISTING CONDITIONS
Art & Ornamentation
In addition to being a monument to Roman Renaissance architecture, the Missouri State Capitol is unparalleled in sculpture and craftsmanship of ornamentation. A plethora of renowned sculptors, painters, and artisans have made their mark on the architecture of the Capitol Building. The exterior and interior spaces have been embellished with friezes, statues, murals and frescoes that illustrate the history of the State, Nation, and World.
The original stone for the exterior of the Capitol Building came from a quarry in Carthage, Missouri. From there, a number of master stone smiths were able to work with the material on various pediments, columns and entablatures. Sculptor Alexander Stirling Carter was the son of another sculptor, Alexander Mine Carter. He notably worked on the statue of Leif Eriksson in Reykjavik. At the Missouri State Capitol, he completed the sculptural elements on the North facade at the Governor’s Portico.
Hermon Atkins MacNeil worked on the Missouri State Capitol as well as the East pediment of the Supreme Court, the Standing Liberty Quarter, and the Pony Express Monument in St. Joseph. Other notable sculptors that have worked on the Capitol are James Earl Fraser, Robert Ingersol Aitken, Alexander A. Weinman, Karl Bitter, and Sherry Edmundsen Fry. The building is truly a catalog of some of the greatest in their craft.
Sculpture adorning the South pediment. Photo taken during stone Restoration project by Trivers.
Unknown working carving the Grand Motive - MacNeil
Sculpture adorning the South pediment. Photo taken during stone Restoration project by Trivers.
Carthage, Missouri quarry at the time of the Capitol construction.
Original construction of the Governor’s Portico column capitals.
EXISTING CONDITIONS
Art & Ornamentation
On the interior, the primary public spaces – Museums, ambulatories, Legislative Library, the Rotunda – are adorned with expansive fresco paintings. Subjects of these murals were chosen by the commission and focus on Missourians who had done work transformative to Education and Literature.
Gari Melchers and Thomas Hart Benton were two of the primary painters behind the murals and wall art throughout the Galleries, domes, and main offices or lounges. The murals in all locations are accompanied by ornate stone or woodwork – wainscoting, cornices, columns and ornamental framing.
Stained glass is the medium of art that connects the exterior and the interior. The rotunda of the primary Dome, monumental staircase, and House and Senate Chambers are all crowned with intricate stained-glass windows. The Great Window, a 22’ x 22’ barrel vault piece above the primary Grand Stair on the South of the Capitol was completed by New York artist Herman T. Schladermundt. It was restored in 2024 and sets the standard for treatment of other stained glass art pieces for the Capitol within this project’s restoration scope.
Chambers artwork and stained glass window, in need of restoration.
Thomas Hart Benton murals in the Legislative Lounge depicting the Industrial Revolution.
Frescoes on the interior of the Level 1 dome under the central Rotunda.
The Great Window, stained glass barrel vault, restored in 2024
Gari Melchers mural of author Mark Twain in the Governor’s Suite.
DEFINING FEATURES ANALYSIS
Building Materials/Finishes
Balcony level (Level 4) of the House Chambers. Drapery wall finish and patterned carpet present on Level 3.
Level 3 primary corridor looking up into the Dome. Stone walls showing non-original white grout and glossy finish to be corrected. Paint scheme on the ceiling does not match historic conditions.
Level 1 primary corridor. Stone walls showing non-original white grout and glossy finish to be corrected. Paint scheme on the ceiling does not match historic conditions.
Ambulatory space off of the Grand Stair between Levels 2-4. Stone walls and columns with painted coffered ceilings. Light stands similar to Rotunda space.
Balcony level (Level 4) of the House Chambers. Same stone cladding below with painting above. Paint palette to be confirmed, assumed not historic. Stained glass windows in need of restoration.
Level 2 of the Rotunda, looking North towards the Governor’s Suite. Arches with stone railings and stairs with metal railings. Consistent treatment of stone below and fresco above. Gold lettering within the metope.
Level 3, smaller dome in a side corridor, matching the architectural language of the main Rotunda, stone walls with frescoes in the pendentives. Painting within the dome is not-historic.
Level 3 of the Rotunda, looking to the Legislative Library (showing historic paint pallete on the coffered ceiling). Ornate railings and light fixtures in front of stone walls with frescoes in the pendentives above.
Staircases & Elevators
Looking up the Grand stair between Levels 2-4 towards the Rotunda. Monolithic stone treatment. Non-historic paint palette seen in the coffered ceiling above.
Typical elevator door off of a Corridor without a lobby space. Bronze doors, ornate level indicator, stone head and jambs.
Level 2-3 of the staircase flanking the Carriage Entrance. Stone walls give way to painted plaster, same finish on the stairs and railing.
Level 4 stair up to the Balcony level of the House Chambers. Accessibility issue present.
Metalwork detail on the edge of slab at the stairwell opening. Alternating rosettes and the letter M, painted bronze.
Typical stair and railing finishes on a back of house, non-public space stair. Painted metal risers, stone dreads, and wood handrail.
Level 1 staircase flanking the Carriage Entrance. Stone treads and risers with an open metal railing. Beyond shows stained wood interior door and painted wood exterior door.
Level 1 Rotunda staircase. Stone walls showing non-original white grout and glossy finish to be corrected. Drapery backdrop for events beyond.
Typical elevator lobby off the main corridors. Stone walls and floors, painted ceilings.
Decorative Painting & Murals
Location in Level 2 where the historic ceiling painting has been uncovered. Additional exploration and testing to occur to determine colors.
Location in Level 1 corridor where paint matching to historic conditions is being tested.
Level 3 Thomas Hart Benton Gallery mural.
Level 3, mural in a lunette of the central corridors.
Level 2 Governor’s office mural.
Level 2 Governor’s office murals, millwork, wainscoting, and light fixtures.
Level 3, smaller dome in a side corridor, matching the architectural language of the main Rotunda. Painting within the dome is not-historic.
Levels 2-4 of the interior of the Dome with side vaults. Layered painting schemes present at different degrees of historic restoration.
Level 2 Corridor. Non-historic paint scheme on vaulted ceiling. Murals in lunettes.
Level 2-3 of the staircase flanking the Carriage Entrance. Stone walls give way to painted plaster, same finish on the stairs and railing.
Balcony level (Level 4) of the House Chambers. Large mural. Paint palette to be confirmed, assumed not historic. Stone cladding below.
Level 1-2 Museum space. Non-historic paint scheme on the barrel vault ceiling above.
DEFINING FEATURES ANALYSIS
Doors, Windows & Stained Glass
Level 1 Staircase flanking the Carriage Entrance. Exterior double-doors with transom window (clear glazing).
Level 2 South entry grand stair restored bronze doors with transom window (clear glazing). Stone walls showing non-original white grout and glossy finish to be corrected.
Level 3 Legislative library double-height windows (clear glazing). No restoration necessary.
Levels 1-4 Exterior windows (clear glazing) from plaza level. No restoration necessary.
Roof Stained glass windows from exterior of House chamber is a high priority of capitol restoration.
Balcony level (Level 4) of the House Chambers. East-facing stained glass window is a high priority for capitol restoration.
Level 3 Rotunda dome arched stained glass skylights is a high priority of capitol restoration.
Above grand stair restored stained glass skylight.
Doors, Windows & Stained Glass
Level 2 corridor office door, flat top, stained panel. Door hardware to be made accessible - lever trim and closer.
Level 4 corridor, House of Rep office. Arched top door with transom windows.
Level 4 corridor, corner alcove. Plaster walls and ceilings, arched top door with blocked transom window. Window to the exterior with stained trim.
Skylight in the Level 4 corridor (clear, translucent glazing) in a painted barrel vault in need of restoration.
Level 1 corridor transom windows, currently blocked by mezzanines and/ or mechanical plenum space. To be opened to natural light and restored. Stone and ceiling paint to be refinished.
Level 3 infill of previous door opening at a Senate Chamber side gallery. Infill done with stained millwork, glazing, and brass metal accents.
Level 4 corridor, House of Rep corner office. Arched top door with blocked transom window.
Level 4 corridor transom windows, currently blocked by mechanical plenum space. To be opened to natural light and restored. Arched doors present on upper levels.
Corridor sconce with bronze finishes.
Corridor pendant fixture with bronze finishes and ceiling plaster detail.
Level 3 Senate hearing room chandelier. Room to be restored as a lounge.
Level 2-3 of the staircase flanking the Carriage Entrance chandelier with bronze finishes.
Level 1 Hall of Governors bowl light fixture with bronze finishes.
Level 2 South entry space sconce with bronze finishes.
Corrridor pendant fixture with bronze canopy.
Level 3 Rotunda chandelier with bronze finishes.
Typical corridor brass drinking fountain.
Cast door pulls on Chamber Gallery doors.
Level 3 Corridor statue in stone alcove. Stone wall showing non-original white grout and glossy finish to be corrected.
Level 2 Corridor bust in stone alcove with a flag display. Plaster, partial
dome ceiling retrofitted with linear uplight. Stone walls showing nonoriginal white grout and glossy finish to be corrected.
Engraved text in the stone metope of the Museum space on Level 1, painted Bronze.
Level 1 Hall of Governors portraits and signage.
Level 1 Hall of Governors signage.
Seal of the State of Missouri inlayed on the Level 1 floor of the Rotunda.
Level 1 Exterior entry door bronze light post. Limestone on building exterior.
Typical corridor hanging exit sign with brass finishes.
Corridor hanging clock with brass finishes.
Plaster ceiling medallion.
Typical corridor vent with custom perforated pattern. Brass window
wall.
Level 2 Above south entry door. Plastered and painted lunette with Missouri state crest painted gold.
Staircase to Senate Accounting offices, no accessible access. Staircase to committee records/Press space, no accessible access.
Wheelchair lift to access Senate/House chambers balcony where public seating is located.
d. Concept Development DESIGN PROCESS
a. Trivers 2016 Report Summary
b. Project Timeline
c. Diagramming + Iterations
Previous Master-plan by Trivers
In late June of 2015, Trivers entered into an agreement with the State of Missouri to prepare a Master Plan for the Missouri State Capitol, including an analysis of space usage with the Capitol and MoDOT buildings. The scope also included an analysis of additional spaces within central Jefferson City for Capitol functions, including the MoDOT-owned Millbottom building, Truman Building, Broadway Building, and leased space available within the Post Office.
The primary goals of that Master Plan were to increase accessibility of legislative offices by removing mezzanines and provide additional space for legislators and support functions by relocating some Capitol functions to other locations in Jefferson City. The allowable construction budget for this project per the original contract was Thirty-One Million Dollars ($31,000,000.00).
After a robust existing conditions and programming analysis, in February of 2016 Trivers presented to the Joint Committee the analysis with a series of options for both the Capitol and Annex (MoDOT Building) and the MoDOT-owned 830 Building. The Joint Committee provided direction that resulted in a modified options and cost estimates showing a range of estimated project costs from $25 million to $33.4 million.
Work continued on the project including additional development of options and programming reviews with House and Senate staff, culminating in a presentation to key leadership of the House, Senate, and Office of Administration on May 3, 2017. This presentation included the final Missouri State Capitol option, including the relocation of certain Capitol functions to the MoDOT Headquarters/Annex Building and Truman Building.
Additionally, this presentation included a detailed Phasing Plan showing how the renovations could occur through a series of 6 phases, divided between in- and out-of-Legislative Session and utilizing the top level of the House Parking Garage as a location for swing space and temporary office space for Legislators and legislative aids.
At this point with the change in administration and concerns about the temporary relocation of Legislators both in- and out-of-session, the Master Planning process stalled and the project did not continue.
FEB 28
MAR 13, 14
Charrette with Capitol Groups
MAR 25
Internal Design Team Charrette
MAR 28
Sub-Committee Meeting and programming meetings with House, Senate, and Lieutenant Governor
Presentation of Initial Options
APR 04
Presentation to the Capitol Commission
APR 11
Sub-Committee Meeting
APR 25
MAY 01
Milestone Presentation to the Capitol Commission
MAY 09
Sub-Committee MeetingMaster Plan Schemes
MAY 16
Sub-Committee MeetingMaster Plan Goals, House Office Layouts, & Monumental Stair Options
MAY 23
Sub-Committee MeetingMaster Plan Goals, Schemes, & Costs
MAY 29
Senate Programming Discussion
+ ITERATIONS
Initial Charrette Photos and Findings
Whiteboards notes from charrette discussions related to project priorities and design options.
Whiteboards notes from charrette discussions related to site programming and design options.
Whiteboards notes from charrette discussions related to adjacent buildings, swing spaces.
Whiteboards notes from charrette discussions related to program areas and circulation factors.
Whiteboard sketch displaying the progression of ideas throughout the duration of the charrette
Sketchbook
Sketchbook
CONCEPT DEVELOPMENT
Physical Model Presentation
MAJOR SCOPE COMPONENTS
a. Introduction
b. Mezzanine Removal
c. MEP/FP Narratives
d. Interior Restoration
e. New Restroom Facilities
f. Carriage Entrance
g. Representative Offices
h. Hearing Rooms
i. Monumental Stair Options
j. Vertical Circulation Bay
k. Corner Meeting Rooms
l. Consolidated Statewide Officials
m. Capitol Drive Loop Road
In the development and documentation phases of the project, the Capitol Commission and Office of the Administrator/FMDC will be intimately involved with the iterative design process. The following are initial items to be included, but not fully resolved at this stage. Section 4 provides breakdown explanations and visuals of some of the proposed scope components. These will or can be applied to any of the Master-plan options that will be outlined in the following Sections.
Items such as the removal of mezzanines, additional stair cores, and renovated restrooms will be necessary to complete as a part of the Master-plan – to meet code and accessibility related goals. Other items i.e. extra meeting rooms, enclosing the Carriage Entrance, and consolidating Statewide Offices are recommended but ultimately left to the preference of the Capitol Commission and other vested partners.
Note the Monumental Stair options were designed with specific option plans in mind but are interchangeable. They will be shown with their recommended Option plans in the following Sections.
Opting into or out of any components outlined in this section will have limited trickle-down affects to the layout and design of the Capitol Building addition on the Plaza Level. This would be in response to the office space that is or is not available within the Capitol Building based on the scope components selected.
Costs for select Scope Components
• Includes contingency and estimated escalation.
• Costs to vary by Option (monumental stair)
• More information for costs available in the Appendix
MEZZANINE REMOVAL
Construction and History
In the late 1970s, mezzanines were added to select office suites on Levels 1 and 2. The additional mezzanine levels were put into place to accommodate the growing Legislature and their staff. The majority of the added area was used for House Member offices.
The mezzanines, however, create inefficient and uncomfortable working spaces. But primarily, they present a number of accessibility issues and do not comply with the requirements set forth in the Americans with Disabilities Act. Because of this, all Master Plan options will address and correct the mezzanines.
Issues created by the mezzanines include but are not limited to non-compliant staircases, occupant capacity issues, and blocking natural daylighting from all office spaces and the shared corridors. Additionally, the office suites created by the mezzanines are not pleasant working spaces due to cramped conditions.
All inaccessible levels will be removed, and additional space will be built on the Plaza Level to accommodate the misplaced legislatures and their staff. Removal of the mezzanines will also make way for the restoration of historic volumes in the member offices as well as allow for daylighting to reach further into the interior spaces.
Excerpt from the original Mezzanine construction drawings - by the Architect’s Alliance, Inc. stamped in 1978. Drawings show stair dimensions, railings, and head heights are not code compliant.
MEZZANINE REMOVAL
Extents and Metrics
Level 1 Area: 11,950 SF + Level 2 Area: 850 SF
TOTAL AREA 12,800 SF
Approximately 70 Legislators and legislative aides to be relocated from the mezzanines to new office spaces on the Plaza level.
Two small mezzanines on Level 2 are used for storage purposes and will be removed and relocated to the Plaza level.
LEVEL 1 - EXISTING PLAN - MEZZANINES
Upper open office facing corridor clerestory windows. Ceiling height issues. Upper open office without natural daylighting. Circulation issues present.
Upper open office without natural daylighting. Circulation issues present.
Open office below mezzanine, ceiling height just above door opening.
Upper mezzanine office with interior window to lower exterior window. Drop ceiling, exposed structure, wall mounted lighting.
Upper mezzanine office without interior window to lower exterior window. Drop ceiling, exposed structure, wall mounted lighting.
Stair to upper mezzanines. Railings to not have compliant heights. Natural lighting blocked from corridor clerestory wondows.
Stair to upper mezzanines with non-compliant riser/run ratios, open risers, and open railings at too low of an elevation.
View down into office below mezzanine office, presenting privacy issues. View down stair to office suite exit. Clerestory windows to corridor blocked from any natural lighting.
Central heating and cooling capacity: The Capitol building is heated using steam and cooled and dehumidified using chilled water generated at and distributed from the Environmental Control Center (ECC) remotely located to the west of the Capitol. Fully conditioning and ventilating the original building which includes heating, cooling, dehumidifying in the summer and humidifying in the winter as well as providing HVAC for new additions will require increased thermal heat and chilled water generated at the ECC.
Heating: Heating demand at the ECC would increase by approximately 6000 lb/hr to serve increased ventilation loads and additional building square footage. Additional data is needed to know if additional heating capacity needs to be installed at the ECC.
Cooling: A fully renovated and expanded Capitol building will require approximately 600 tons (preliminary) increase in cooling capacity over the current operating state of the Capitol. Additional or enlarged chilled water pipes from the ECC to the Capitol may be required to support the increase in cooling loads. Additional data is needed to know if additional cooling capacity needs to be installed at the ECC to support the increased chilled water demand.
The building chilled water pumps located in the Capitol basement will need to be removed and replaced with pumps of larger capacity. Additionally, an additional steam to heating water heat exchanger will need to be installed adjacent to the existing heat exchanger. The building heating hot water pumps are sufficiently sized to serve the renovated building and additions.
Heat Recovery and Summer Reheat: The
ECC steam plant normally does not operate during the cooling season. For summer reheat temperature and humidity control in an energy conscious way, provide a 100-ton (preliminary cooling capacity) heat pump chiller to serve simultaneous heating and cooling requirements for the building during summer operation. The heat pump chiller provides chilled water for cooling uses in the building, reducing
the cooling requirements from ECC chilled water system, while at the same time providing heating water for room temperature and humidity control. This chiller would be located in the Capitol expansion, adjacent to the building steam to hot water heat exchangers.
Outside Air Ventilation Upgrades: All outside ventilation air that enters the building shall be fully conditioned, that being filtered, cooled and dehumidified in the summer, and heated and humidified in the winter. All ventilation air intakes shall meet FEMA Publication 426 –Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings recommendations in that outside air intakes be located as high as possible but no less than the third floor level. Supplement the three existing outside ventilation air handling units located in of the 5th floor mechanical areas by providing three (3) additional outside ventilation air handling units. Two units shall be outdoor custom built air handling units, one located on the southeast roof and one located on the southwest roof, and each shall condition 12,000 CFM of outside air (preliminary capacity) and shall have variable air volume capability, hydronic heat, chilled water cooling and low pressure steam direct injection humidification. Each outside ventilation air handling unit shall have a supply ventilation air duct that extends from the unit to the basement level by way of two new chases, one just east of the south stairs right and one just west of the south stairs left. An additional 24,000 cfm (Option 2, 88,000 gsf expansion) ventilation air handling unit would be installed on the northeast roof (for Option 1 – 64,000 gsf – unit size would be 18,000 cfm, and for Option 3 – 34,000 gsf –unit size would be 9,000 cfm). A new supply and exhaust air chase would be extended from the basement to the roof for the purpose of handling ventilation and exhaust requirements for the new building addition.
The two new ventilation air risers described above and the south side of the building will serve offices on the south side of the building. The new ventilation unit located on the north roof would serve the new building addition. Ventilation air shall be ducted directly to all major air handling units. These direct connections shall be made with pressure independent variable air volume (VAV) terminal units or built up air flow stations. For occupied
areas served by fan coil units or small local air handling units, ventilation air shall be ducted to each room. Direct ventilation branch ductwork serving groups of rooms based on proximity and use type shall be controlled with pressure independent VAV terminal units.
Comfort HVAC– 1st through 5th Floor Existing Building:
Remove existing HVAC including air handling units, fan coil units, ductwork, piping, convectors, radiators and controls unless indicated to remain. HVAC shall be provided to serve each of the areas as follows:
Exterior offices from the exterior walls to the corridors
• 4 pipe fan coil units (FCU) in built-in decorative wood enclosures. Enclosures shall be constructed with removable panels for FCU maintenance and replacements.
• Direct ventilation air outlet in each room
• Use variable air volume with reheat air handling unit (VAV/RH AHU) systems to serve 1st floor offices where practical and were AHUs can be in basement mechanical rooms.
Offices interior of the corridors
• Custom 4 pipe VAV FCUs or small AHUs above ceiling or in mechanical closets
• Direct ventilation air outlet to each room or direct connection to FCU or AHU
Specialty areas
• House and Senate Legislative chambers
• Retain and reuse existing AHUs located on the 5th floor and air distribution systems.
• Legislative lounges – Benton Lounge and Senate Lounge
• Retain and reuse existing AHUs located in basement, including the existing air distribution systems, and ventilation connection to penthouse MAU’s.
• Governor’s office suite and legislative research areas
• Retain and reuse existing multizone AHU, existing air distribution system, and connection to penthouse MAU.
Corridors, rotunda and museums
• Rotunda and 4th floor corridors AHU located on the 5th floor shall be retained and reused.
• 1st floor entryway finned tube heating elements shall be removed and replaced with larger capacity elements. 1st through 4th floor corridor finned tube heating elements at each corner shall be retained and reused.
Comfort HVAC – Basement Existing Building: For roughly half the basement, remove existing HVAC including air handling units, fan coil units, ductwork, piping and controls unless indicated to remain. HVAC shall be provided to serve each of the areas as follows:
Offices and hearing rooms
• Provide central type VAV/RH AHU systems.
• AHUs shall have direct ventilation air connections. Print shops, cafeteria and kitchen
• Provide individual VAV/RH AHU systems or single zone VAV AHU systems for those areas of high fumes or smells and specialty exhaust systems. Garage
• Provide transfer fan(s) to relieve occupied building air through garage.
• Provide garage exhaust fan(s) to maintain negative pressure in relation to occupied building.
• Provide carbon monoxide monitoring system as part of garage ventilation system.
Comfort HVAC – New Additions: The new additionto the original building shall have central type VAV/RH AHU systems. Each AHU shall have a direct ventilation air connection. Chilled water and heating hot water shall be fed from the existing building to each of the additions. For the addition to the north, conditioned ventilation air shall extend from the new ventilation unit located on the north roof of the existing building.
Temperature Controls and Monitoring: Extend the existing Schneider Electric Ecostruxure control system to all new HVAC systems installed in the building.
• 1st through 3rd floor corridor AHUs located in the basement shall be retained and reused. Existing ventilation connection to penthouse MAU’s to remain.
Storm Drains: There has been a patchwork of repairs and replacements of roof drains, terrace drains and storm piping throughout the years. The terrace drains and drain pipe systems were replaced recently and do not need further renovation. Roof storm drain modifications and repairs/replacements should take place during the building wide renovation. Replace the remaining four to six original 100+ year old threaded galvanized and two PVC roof drain risers with heavy galvanized steel pipe and mechanical couplings. Provide one secondary roof drain riser which was never installed in the past due to complications in wall access. Currently, the primary roof drains and the secondary (overflow) roof drains connect in the basement. The secondary roof drains shall be separated from the primary roof drains and piped to downspout nozzles on the exterior of the building. Provide concrete catch basins under the downspout nozzles to drain any overflow water away from the building to the city storm drain system. Storm drainage associated with the new building additions shall drain to the city storm drain system as elevations dictate. A sub-soil drainage lift station may be required for the new additions.
Domestic Water and Drain, Waste and Vent Piping Systems: The domestic water and drain, waste and vent (DWV) piping systems in the Capitol building serve mostly public multi-fixture restrooms, private restrooms, kitchenettes, janitor’s closets/housekeeping and one commercial kitchen in the basement. If public restrooms are replaced or significantly modified, the plumbing piping, both horizontal run-outs and vertical risers, shall be replaced. If public restrooms generally stay as is, existing piping can be retained. In either case, the current temperature mixing valves that provide single stream tempered water to a bank of lavatories work poorly and should be removed and replaced with mixing devices at the point of use. Generally, existing copper domestic cold, hot and hot water circulating piping mains and vertical risers can be reused if compatible with revised architectural plans. Because of extensive renovations in the basement, domestic water piping will most likely be removed and replaced. Original 100+ year old DWV horizontal and vertical riser piping that serves private restrooms shall be replaced. Original 100+ year old waste piping under the basement floor shall be removed in its entirety and replaced as required to meet plumbing requirements for the renovated building. Sanitary drainage associated with the new building additions shall drain to the city sewer system as elevations dictate. A sewage lift station may be required.
Fire Protection and Sprinklers: Provide sprinklers for 1st through 4th floors of the original building and new building additions. Extend the existing basement sprinklers to accommodate basement renovations. Provide dry pipe sprinklers for the 5th floor. Replace the original 100+ year old stand pipes as part of an integrated sprinkler system. To meet fire water flow and pressure requirements for both sprinklers and standpipes, provide a fire pump to serve the existing building and new additions.
Installation Strategy & Extents
To be included with the other systems upgrades taking place as a part of the restoration and renovation of the Capitol building will be new fire protection systems. Currently there are not existing fire protection measures in place with the exception of alarms.
An analysis was conducted of the spaces within the Capitol best suited for, and in the greatest need of fire protection coverage. This consideration, overlaid with the historic importance and presence of certain spaces, served as the basis for defining areas of coverage and degrees of intervention.
Primary public spaces -- the Rotunda on all levels, the Museum spaces, and the House and Senate Chambers -- will receive a fire protection system design that uses alternatives to a sprinkler system and will instead receive upgrades to the existing detection and alarm systems. These spaces have generous access to egress.
The primary corridors will be the public open spaces to be equipped with fire protection coverage via a sprinkler system. Careful design measures will be taken to protect historic materials and will utilize plenum and interstitial spaces or side throw options within walls to conceal piping runs and sprinkler heads everywhere.
All office and support spaces; including conference rooms, hearing rooms, open offices, legislative offices, copy/print rooms and restrooms will receive full sprinkler coverage as well as detection and alarm systems. Similar consideration will be taken in concealing the piping to allow the recreation of historic volumes.
INTERIOR RESTORATION
Paint, Plaster and Stone Finishes
A fundamental part of the Capitol Building renovation effort will be to restore the historically significant interior finishes. Much of the interior of the building on all levels will be touched as a part of the renovation implementing updated MEP/FP and AV/IT systems. This provides an opportunity project-wide to correct and restore the historic finishes.
Base scope for refinishing will be to repair any cracked or damaged plaster finishes and patch paint in the area. This will be implemented throughout the building in public areas and offices. Decorative painting and finishing is to also be restored to historic finishes; including faux marbling of the first-floor vaulted corridors and replacement of non-historic paint colors added over time. Recreation of historic paint detail work has been exposed in select areas through an ‘archaeological’ investigation.
The stone slab and wall tiles throughout the corridors and common spaces have at one time been refinished with a white colored grout and gloss coating. This is not consistent with the historic design of the Capitol interior and should be corrected. The in-place finishes will be removed and replaced with historic grout color matching and a matte stone finish.
Other opportunities for Interior Restoration have been evaluated and considered. Including but not limited to; stained glass and lay-light restoration, light fixture restoration and replication, and molding and trim-work in offices restored to their historic volumes.
Level 2 Museum space, stone walls finish and vaulted ceiling to be corrected to their historic designs.
Capitol Grand Stair with ceiling paint scheme restored to the historic design. Stone walls to be refinished.
Legislative Library, recently restored to its historic finish scheme, to serve as an example for paint restoration on other high-profile public spaces.
Interior of the Capitol dome, displaying a non-historic paint scheme of cream, blue, and gold, to be corrected to its historic finish scheme.
Example of damaged paint over plaster finish to be corrected and restored.
Level 4 of the Rotunda, historic frescoes in the pendentives to be protected. Painting on the drum to be corrected.
Example of damaged paint over plaster finish to be corrected and restored.
Example of corridor ceilings to receive painting refresh.
The
two stories tall up to the bottom of the fresco painted dome.
NEW RESTROOM FACILITIES
Scope and Purpose
As a part of the capacity issues present within the Capitol Building, there is a shortage of plumbing fixtures based on the occupancy of the building. Within the scope of the renovations, existing restrooms will be upgraded and expanded to accommodate growth.
Central core spaces on the interior of the primary corridors will be used for additional restroom space. Fixture counts will be rebalanced, and additional ADA accessible and ambulatory fixtures will be provided in the upgraded facilities. Single-user restrooms and caregiver spaces will be provided to accomodate all.
As a part of the over-arching goal to create a heightened Visitor experience and improve upon circulation and accessibility into the Capitol Building, the historic Carriage Entrance will be turned into an interior, transitional vestibule space. This strategic improvement responds to the increasing need for a centralized, controlled entry that meets current safety and security standards.
Storefront systems can be added to the stone archways on the East and West ends of the tunnel. These would be similar to other exterior door systems existing on the building. The new entrances will have protective glazing, automatic openers, and a design sensitive to the historic fabric of the facade.
Flooring and grading of Carriage Entrance and adjacent drives will be adjusted to ensure an accessible route is provided throughout the site.
The new vestibule space will be conditioned to improve mechanical loads on the building from frequent entering and exiting of the building. This will also provide a space for tour groups to gather or individuals to wait out of the elements for transportation.
VESTIBULE
LEVEL 1 - CARRIAGE ENTRANCE VESTIBULE
Side of the carriage entrance tunnel with office windows.
Historic carriage tunnel, view from the doors into the Capitol Building. Stone arch to be portal to hold new storefront system.
Existing storefront door
Building to serve
storefront design.
Sketch of the possible visual of the Carriage entrance as a Vestibule.
A significant component of the renovations of the Capitol Building is the arrangement of Legislator Offices. As a design guideline, it will be the intent for all Legislature offices to be on a perimeter wall so they have windows to access views, air, and natural light. There exist on the various levels two different styles of office layouts: standard and bullpen.
Standard offices reflect the traditional, historic layout of offices from the original Capitol Building construction. Each elected representative will receive one standard bay in the building with a single exterior window. The space is roughly 12’-0” x 30’-0” depending on the floor and wing of the building it is located within.
NOTE: Standard office bays are more space consuming, allocating 360 SF total per legislator to be shared between office and space for legislative aides.
The bullpen office arrangement, similar to the standard office layout, follows the traditional office bays. Perimeter offices however, will share a common, open office space off of the corridors for assistants and staff members. In the bullpen 25-28% of Representatives will not be adjacent to an exterior window, getting natural daylight from a clerestory. This layout has been found to be more congruent to the way much of the legislature operates, sharing legislative aides and working spaces.
NOTE: Bullpen office layouts are more efficient, they will vary in size, approximately 260 SF total per legislator to be shared between office and space for legislative aides, providing greater opportunities to share staff.
The fit and finishing of the Representative offices included within the renovations will be the same. Offices will be restored to their full volume, removing mezzanines and drop ceilings. Clerestory windows will be opened up and doors, molding, paint and other finishes will be made to represent the historic style of House Representative office spaces.
Rendering of the interior of a House Representative’s office.
Rendering of the open office in a bullpen style layout.
REPRESENTATIVE OFFICES
Standard vs Bullpen Drawing
The Standard and Bullpen office layouts can be applied in part or completely throughout any of the three Master Plan options laid out in the following pages. This will allow for flexibility in programming.
The area utilized by one or the other layout style will only impact the number of House Representative office that will be relocated to the Plaza Level or within the new addition to the Capitol building.
Existing conditions such as available space along the building perimeter and interrupting program components e.g. stair cores, meeting rooms, restrooms, offices for other Capitol groups -- will determine suite sizes.
5 Legislators - 4-5 L. Assistants
Results in 40-50 legislators relocated to Plaza Level/North Addition
7 Legislators - 3-6 L. Assistants Results in 20-30 legislators relocated to Plaza Level/North Addition Standard Office Layout Bullpen Office Layout
HEARING ROOMS
Capacity and Design
The Capitol Building is currently experiencing a deficit in the number of sizable hearing rooms. Within the options outlined below, some Hearing Rooms will be removed for other program spaces.
To address both of these items creating the capacity issue, Hearing Rooms will be a focus of the spaces included within the addition to the Capitol Building. Both the Senate and the House will receive 3-6 new Hearing Rooms in the Plaza Level. One bonus result of this will see the Senate Lounge restored to its original purpose. There are also options to include a larger, high profile Joint Hearing Room.
The design of the Hearing Rooms will be focused on comfort, AV/Telecom capabilities, and access. Improved cameras, speakers, and displays will result in easier and more effective conferencing. There can also be separate access points into the new Hearing Rooms for better security and circulation. h
Due to the lack of hearing rooms the Senate Lounge (pictured above) was repurposed as a Hearing Room. The Master-plan renovation and addition will allow for the space to return to it’s original purpose.
Existing basement Hearing Room, illustrating the need for upgrades in lighting, technology, and access.
Flanking the South Entrance
Each Master Plan option is accompanied with the creation of a new Monumental Stair between the Plaza Level and Level 1. The goals of this new connection will be to strengthen the circulation to and better integrate the Plaza Level of the Capitol Building, as it is receiving an addition in each option; housing Legislators, hearing rooms, and much improved staff office suites.
This option for a Monumental Stair extends the two existing marble stairs flanking the Carriage Entrance on the South of the building to the Plaza Level. This will allow for the seamless extension of the current architectural language existing within the Capitol.
LEVEL 1 PLAN
Plaza Level to Level 1 Rotunda
In this option, a Monumental Stair is created connecting the Plaza Level central lobby directly into the bottom floor of the Cupola. The stair splits at the lower level in a mirroring of the Level 1 to 2 Rotunda Stair. This will be a significantly heightened experience to Visitor’s seeing the interior of the Cupola for the first time.
With the creation of a new visitors entrance experience and sequence through the building, the existing stage and rotunda presentation space can be relocated to the space currently occupied by the gift shop and information desk or to the Plaza Level lobby.
LEVEL 1 PLAN
PLAZA LEVEL PLAN
This design for a Monumental Stair carves out a portion of the Southeast service core space to create a location for a Monumental Stair connecting the new Visitor’s Center to the East of the Capitol Building in Option 3 into the Museum space on Level 1. This will create a new grand space without impacting the visuals of any other existing public space or experience. Plaza Level to Level 1 Museum Space
LEVEL 1 PLAN
VERTICAL CIRCULATION BAY
Added Stairs and Elevators
The initial code analysis of the Capitol building, as related to occupant loads and existing stair widths, requires the addition of new vertical circulation, stair and elevator cores to meet life safety minimums for means of egress.
The existing stairs do not sufficiently support the code calculated occupancy for the upper levels of the Capitol building, largely due to the concentration of public and assembly spaces.
The central service spaces of the floor plates (being used for restrooms, mechanical space, and storage) do not have an overlapping zone on all levels that can be used to insert a stair or elevator vertically through.
The proposal outlines adding two new vertical circulation cores, each with a stair and elevator, on the perimeter of the Capitol. This will allow for direct egress to the exterior from the added stair by replacing a window with a door of similar appearance, exiting directly onto the wraparound stone terraces at Level 1. Assembly of the staircases will be surrounded in fire rated partitions and be fully enclosed with doors connected to the new fire alarm system.
Incorporating the vertical circulation cores on the exterior walls does result in representative offices being relocated to the Plaza Level of each option.
- 16 in Standard Office layout
- 16 to 24 in Bullpen Office layout
FLOOR PLAN - SIMILAR ON LEVELS 0-4
NOT TO SCALE
CORNER MEETING ROOMS
Multipurpose Space Assets
Each above grade floor of the Capitol Building has rooms in the outer corners with an irregular, six-sided shape. These spaces flank corner windows and are currently being used as offices. Based on feedback received during our charrettes and presentations to the Commission and invested members of the project, an option has been created to repurpose some, or all, of these corner spaces as shared meeting rooms.
Separate from a hearing room, these will be universal spaces that are able to be used by all. Representatives, Senators, Executive members, Committees, Statewides, or the general public could reserve and utilize these spaces. The meeting rooms will be adaptable, neutral spaces for a variety of purposes. They can be used to meet with constituents, have a general conference call, host smaller groups for lunches, or have a working session in a common space.
These meeting rooms would be outfitted with tables and chairs that can be reconfigured to meet the needs of the user. Also included would be a large-scale monitor and the ability to connect to online conferencing. The ‘void’ corners at the front of the meeting rooms can provide storage for office supplies or a small counter for catering food, these items are present in existing meeting spaces.
Depending on the extents to which meeting rooms are added (four per floor max) up to 16 Representative offices will be relocated to the Plaza Level.
CONSOLIDATED STATEWIDE OFFICIALS
Level 2 Renovation Opportunity
A design option which could be added to any of the proposed plans is the consolidation of Statewide offices onto a single floor. The concept of all Missouri Statewide offices sharing a level came up during design presentations and discussions.
Secretary of State, State Auditor, State Treasurer, and Lieutenant Governor offices share a combined area of 8,600 square feet. This is approximately one-third of the perimeter office space available on any singular level of the Capitol building proper.
Historically, the programmatic design for the layout of the Capitol building by the original architect/planner showed all Statewide offices on the Second Level of the building. In addition to this precedent, there are operational benefits to consolidating Statewides onto a single floor.
Having these offices together with the Governor’s Suite, any work or initiatives shared by the Executive and Statewide functions would be optimized. Also, tours of the public often stop by the main or ceremonial offices of each Statewide function. The routes and timing of tours will be more efficient with this arrangement.
This option would relocate 8 to 10 representative offices to the Plaza Level.
Currently, there is a one-way ring road, Capitol Avenue that encircles the Capitol Building. The single lane is flanked by parallel parking on either side. The road presents a potential security risk for the Capitol Police. The route is frequently used as a shortcut around other city streets and intersections. Additionaly, idling cars and no designated pick-up/drop-off points create congestion.
Similar to the Monumental Stair, there are options for how to modify and improve Capitol Avenue that can be applied to different Masterplan design options:
One version removes the ring road in its entirety. Roundabouts are added to the East and West ends of the site where visitor pick-up and drop-off will occur. At the grand stair entrance on the South facade of the Capitol Building, a loop drive for drop-off only will replace the existing media lot. This greatly alleviates security concerns and increases the safety and accessibility of the entire Capitol site.
Another option keeps one half of the ring road and make it a two-way drive with no parking. Options 1 and 2 (North Addition) would keep the South half of the drive while Option 3 (MODoT Connector) would keep the North half. Roundabouts will similarly be added to the East and West ends of the site. Traffic calming measures would be used to reduce speeds and increase pedestrian safety.
Complete removal of Capitol Ave.
Partial removal of Capitol Ave.
OPTION 1: ONE-LEVEL NORTH ADDITION
a. Site Development
b. Building Addition - Plans and Sections
c. Renderings and Visuals
d. Cost Opinion Details
JeffersonSt.
BroadwaySt.
ECapitolAve.
WHighSt.
WMainSt.
New Addtion at 73,000 SF.
A 73,000-square-foot expansion will be added to the north side of the State Capitol. Reflecting the bullpen office arrangement within the existing State Capitol building, the new addition will accommodate offices for 27 House members, all featuring direct window access.
Incorporation of Hearing Rooms Within the Addition:
Purpose-built hearing rooms will be incorporated into the new addition. These spaces are designed to facilitate formal legislative proceedings, public testimonies, and other civic functions, with integrated technology and public seating that promote engagement.
Removal of Existing Ring Road:
The existing ring road surrounding the Capitol will be fully removed. This transformation will create a more cohesive and pedestrian-friendly campus, offering increased green space, enhanced security, and improved ADA accessibility.
Construction of a New Visitor’s Center:
A dedicated visitor’s center will be included in the addition, featuring integrated security screening areas. This enhancement will streamline entry procedures and offer a more welcoming and informative experience for guests.
Full ADA Accessibility for All Staff Tunnels and Public Entrances:
Tunnels connecting both garages to the new addition will be constructed or upgraded to meet current ADA standards. These improvements ensure full, independent access for individuals with disabilities across the entire complex.
E. CAPITOL E. MAIN
Tunnel
Tunnel NEW ADDITION
GARAGE
The addition in this option is bordered to the North by Legislator offices in bullpen arrangements. House functions overflow is on the interior of the West wing. Hearing rooms and public spaces are on the interior of the East wing.
Permeability is integrated into the foundations of the portico between the existing Capitol level and the lobby and colonnade spaces in the Addition. There are three Vestibule entrances and circulation points. The ends of the colonnades connect to the garages via tunnel. The North connects to the Addition rooftop by exterior stair.
A 92,000-square-foot expansion will be added to the north side of the State Capitol. Reflecting the Standard 1-bay offices office arrangement within the existing State Capitol building, the new addition will accommodate standard offices for 56 House members, all featuring direct window access.
Incorporation of Hearing Rooms Within the Addition:
Purpose-built hearing rooms will be incorporated into the new addition. These spaces are designed to facilitate formal legislative proceedings, public testimonies, and other civic functions, with integrated technology and public seating that promote engagement.
Expanded Visitor Center and Public Lobby
The visitor experience will be significantly enhanced through a larger, more welcoming entrance area on the lower west side of new addition. The updated lobby will include a public gathering space designed to host school groups, tours, and civic engagement activities, featuring integrated security screening areas.
Removal of Existing North Loop Road:
The existing northern section of the loop road surrounding the Capitol will be removed, creating a more cohesive and pedestrian-friendly campus on the north side. This transformation will provide expanded green space, enhanced security, and improved ADA accessibility. To maintain traffic flow through the Capitol campus, the southern loop road will be converted to two-way traffic, with integrated ADA pathways to ensure accessibility on the south side.
Full ADA Accessibility for All Staff Tunnels and Public Entrances:
Tunnels connecting both garages to the new addition will be constructed or upgraded to meet current ADA standards. These improvements ensure full, independent access for individuals with disabilities across the entire complex.
New Tunnel
Tunnel NEW ADDITION
GARAGE
The North addition in this option has two-levels on the West end, extending downward to meet existing grade for a new primary Visitor's Entrance. A cafe, gift shop, and Joint Hearing Room will also be on this level.
A similar colonnade to Option 1 connects the levels and flows into the Capitol Building through the same openings beneath the portico. All sides of this addition on the Plaza Level are ringed with Representative offices. Hearing Rooms and Executive offices occupy the interior space.
The public space creates East/West and North/South axes of circulation through the building which leads to different routes through the grounds and Capitol complex. A new Monumental Stair at the end of the South axis connects the Plaza Level lobby to the Rotunda.
A newly constructed addition will connect the existing State Capitol building and the MODot building. It will include a welcoming Public Lobby, an interactive Visitor Center, and multiple modern hearing rooms designed to enhance public access.
House Offices in Capitol Basement:
The House of Representatives offices will be located in the lower level of the Capitol, optimizing space utilization within the historic structure while ensuring direct access to legislative chambers.
Support Functions in MoDOT Building:
Key support and operational services—including administrative functions, document services, and facilities management—will be relocated to the adjacent MoDOT building to streamline efficiency and reduce congestion within the Capitol.
Removal of Existing Ring Road:
The existing ring road surrounding the Capitol will be fully removed. This transformation will create a more cohesive and pedestrian-friendly campus, offering increased green space, enhanced security, and improved ADA accessibility.
ADA-Compliant Staff Tunnels and Public Entrances:
An underground staff tunnels and public entrances connecting the new addition and new garage will be fully ADA accessible, ensuring inclusive and barrier-free access for individuals with disabilities throughout the Capitol complex.
E. CAPITOL E. MAIN
This addition option is unique in that is connects the Capitol Building to the building currently used by the Department of Transportation. The connecting building is earth integrated, completely concealing itself from view to the South while the low-profile North edge creates a new Visitor's Entrance.
The MODoT building is repurposed for House, Executive, and Committee functions. It will receive a much improved central core with vertical circulation and daylighting. East/West circulation flows between the two buildings through the daylit addition. A Monumental stair provides a fluid transition up into the Capitol museums.
Representative offices in the Plaza Level are kept to a minimum in this scheme and are housed on the interior of the Capitol Building lower level. New Hearing rooms line the South edge of the addition.
A new Senate garage is needed to replace the existing structure, which no longer meets current capacity, safety, and accessibility standards. The proposed facility will accommodate over 600 parking stalls, serving a broad range of users, including visitors to the State Capitol, members of the Senate, legislative staff, and individuals utilizing public transportation. This new garage will be connected to the State capitol complex through a new tunnel and provide secured accessible route for the members of the Senate, legislative staff.
GARAGE OPTION
Minimal Footprint
The new 600-stall parking garage is thoughtfully designed to minimize its site footprint while optimizing vehicular access and reducing the need for extensive site work. Public parking is strategically located on the lower level to provide convenient access to future public transportation, while the top level is designated for visitors to the State Capitol. Senate and staff parking occupy the two middle levels, clearly separated from the top and lower level public areas. Each parking zone features dedicated street access, promoting smooth circulation, enhancing security, and minimizing cross-traffic between public users and government personnel.
Missouri State Capitol Master Plan
APPENDIX: PROJECT PROGRAM
2015 Programming updated with results of 2025 Data Collection
6
1
2Telecom - Jack of all trades
3Print in session - Copiers, Daily journal, Printing for bill room
4Print out of session - Largely independent
5Mail in session - Large volume of mail in and out to Senators
6Mail out of session - High speed labeling
7Telecom has seprate cooling unit
7General Storage/Paper Storage needs accsess to deliveries. Dock?
1
2
3
4
5
6
1
1
2
3
4
5
6
APPENDIX: PHASING PLANS
PHASING OF CONSTRUCTION
Secondary Title
The renovation/restoration of the Capitol Building and the construction of a new addition will be ordered and phased strategically to minimize disruptions to the ongoing operations of Legislators, Executives, Statewide offices, Committees and other functions.
The sequencing of construction will be laid out to ensure the House and Senate can stay in session as scheduled and no essential functions are taken offline. Beginning with the construction of the shell of the addition at the Plaza Level will create a swing space to temporarily house offices from sections within the Capitol.
Renovations within the Capitol will occur in vertical sections or 'quadrants' of all four floors above grade to allow for continuous replacement of MEP/FP systems by zone and avoid shut-offs in occupied spaces. Quadrants of the Capitol Building can be relocated into the swing space of the addition in temporary office spaces with a regulated size of approximately 100 SF per person.
The number of phases of Construction will be dependent on the amount of offices that are able to be housed in the swing space. This will vary by the size of the addition or the amount of additional swing space that can be utilized in other, adjacent buildings such as the Truman, MODoT or Broadway buildings.
A ‘phase’ of construction will encompass the renovation of a quadrant of the Capitol Building; including but not limited to: the modification of mechanical, electrical, plumbing, and fire protection systems, restoration of historic finishes and fixtures, and the creation of new restroom and stair cores. A phase may be roughly the same duration as a session of the Legislature.
The following phased outline uses the approximate square footage of the Option 1 addition as the swing space which will allow for complete construction and renovation to be completed in seven phases. By using additional swing space for offices elsewhere, the timeline of work can be reduced to five phases.
Phase 1: Construction of the Addition (shell only)
Phases 3a and 3b can be combined into a singular Phase based off of MEP-FP renovations with the inclusions of additional temporary office space.
Phase 4a: Plaza Level East Renovation Senate Support + Admin functions
Phase 4b: Plaza Level West Renovation House Support + Admin functions
Phases 4a and 4b can be combined into a singular Phase based off of MEP-FP renovations with the inclusions of additional temporary office space.
Phase 5: Construction of the final interior layout of the Plaza Level Addition Hearing Rooms, Offices, Public space
PHASING PLANS
PHASING PLANS
PHASE 3b - SOUTHWEST WING
PHASING PLANS
PHASE 5 - PLAZA LEVEL ADDITION
APPENDIX: COST ESTIMATE OVERVIEW
APPENDIX: TRIVERS + BNIM TEAM
Combined strengths and relevant experience of our practices
TRANSFORMING THE MISSOURI STATE CAPITOL
The completion of the renovation of the Missouri State Capitol is an important and long-awaited opportunity. This project presents challenges in historic preservation, understanding the workings of State Capitols, and reinterpretation of existing conditions in order to serve contemporary needs. The transformation of the Missouri State Capitol will focus on improving human comfort while reducing operations costs of heating, cooling, and lighting; creating a compelling workplace that helps the State recruit and retain a talented and resilient team; implementing art preservation; and integrating new underground light-filled space that addresses parking needs and supports the operations of Missouri government.
Transforming the Missouri State Capitol
This will be achieved while ensuring work is completed on time and in budget and allowing staff to continue to occupy and carry on governance within the Capitol throughout design and construction. These challenges may appear daunting, however, the multi-disciplinary team we have assembled provides the expertise needed to address these challenges, and we are dedicated to working with the Capitol Commission and other important collaborators to ensure successful delivery and value to the citizens of Missouri.
Kansas City, Missouri, to accomplish similar goals. The museum has remained open and housed nearly 500 employees daily while welcoming over a half million visitors a year.
We have organized this document to demonstrate the unique qualifications of our BNIM + Trivers team and Schooley Caldwell, to help the State complete this important renovation, expansion, and parking facilities project for the Capitol. Each of the projects presented in the following pages of this package demonstrates characteristics and experience important to creating memorable, transformative, and highly functional experiences for visitors, elected officials, and staff of present and future generations who will utilize this remarkable State Capitol.
We are familiar with the Capitol Commission Master Plan and its strategy for how to proceed with the renovations and additions. This plan of delivering parking solutions first, followed by the new visitor center, convening and meeting spaces, and other spaces extending under the transformed landscape south lawn is the same process that we successfully implemented at the Nelson-Atkins Museum in
Trivers’ expertise in historic preservation projects and history of leading exterior renovations of the Missouri State Capitol provides our team with integral knowledge of the Capitol building and informs our approach to this historic context. BNIM’s experience in creating compelling workplace environments, including the Truman State Office Building and Lewis and Clark State Office Building, as well as the firm’s expertise in design of highly efficient and positive parking structures, such as those for Washington University in St Louis, the Nelson-Atkins Art Museum of Art, and the brand new Kansas City International Airport, will also guide our team’s successful approach to this project.
Our team will unite our unique integrated capabilities and relevant project experience to deliver design solutions that will provide value and meaningful experiences for the Capitol for decades to come.
PHASE ONE
Replacement
Parking Facility
PHASE ZERO
Exterior
Bloch Building Addition
Limestone
Renovation
PHASE THREE
Interior
Renovation of Capitol
Underground Parking
PHASE TWO
New 163,000 SF
Underground
Extension
TRANSFORMING THE MISSOURI STATE CAPITOL Sketch by Steve McDowell, BNIM Principal
The creation of a meaningful and successful project relies greatly on a collaborative, multi-disciplinary approach. We are committed to bringing the right balance of expertise to our integrated design team to address project goals for the Missouri State Capitol Transformation in a thoughtful and innovative way. Through an open dialogue of discovery and a highly organized process, BNIM + Trivers and our collaborator Schooley Caldwell provide a strong history of design excellence and specific expertise in the areas of historic preservation, adaptive reuse, and underground structures.
In 1975, Trivers was founded on values that still characterize the firm today: creating architecture of lasting positive consequence. In a city renowned for its historic architecture, but in need of restoration and fresh ideas, we established a reputation for thoughtful design that responded to context of St. Louis. Our early focus on historic renovation and adaptive reuse rapidly grew to include ground up construction. Today, while continuing our commitment to St. Louis, we work for a range of clients across the country providing expertise in civic, education, hospitality, housing and workplace architecture while maintaining an intentional combination of historic renovation, adaptive reuse, and new construction.
St. Louis, Missouri
Belleville, Illinois AREAS OF EXPERTISE
Historic Preservation +
We design and deliver beautiful, integrated environments that inspire change and enhance the human condition.
BNIM is an innovative leader in designing high performance, human-purposed environments. Established in 1970, BNIM has long been a leader in delivering design excellence. We help our clients and the communities we serve through the design create resilient and sustainable environments are more responsible to natural systems while simultaneously enhancing human health, well-being, and productivity.
BNIM redefines design excellence to elevate the human experience for all people in beautiful, equitable, inclusive, healthy, and resilient environments. We aim to connect the quantitative outcomes of our projects with the experiential, measuring the success of our work both through highperformance frameworks and positive community impact.
Our team approaches each project through a lens of Human-Purposed Integrated Design. This deeply collaborative process involves working as an integrated team to create solutions that advance human health and wellness, organizational potential, and building performance through design.
In practice, this multifaceted approach to design excellence has yielded national acclaim, including the 2011 AIA National Architecture Firm Award and consistent design recognition nationally and internationally. BNIM is Building Positive, a notion that describes how our practice leverages its collective capacity for design thinking to solve issues at every scale in a way that is focused on building the positive attributes of community and the built environment.
Schooley Caldwell began as a multi-disciplined partnership, having been founded by John Schooley, a former State Architect of Ohio, Ray Sims, a successful architect and structural engineer, and Bert Cornelius, a mechanical engineer. Civic and public projects were the focus of the founders, and that remains true of the firm today. Our current staff has expertise in architectural and engineering design, planning, and technical services such as code analysis, specifications and construction administration. Schooley Caldwell has 75+ years of experience in preserving assets and envisioning the possibilities that lie within historically significant buildings. It’s a unique expertise that requires indepth understanding of complex and time-honored systems — and a high level of technical and design know-how.
The beautiful, enduring structures we create for government, education, cultural and other public and private clients are inspired by the people that interact with them where they live, learn, work and play. We draw from over 70 years of experience to design unique and innovative new buildings. Our architects breathe new life into time honored spaces through preservation, renovation, additions and adaptive use. The success of our work can be measured by the legacy of impact it has on our clients and communities. Designing and planning a renovation, particularly for an historic building, is a very different challenge from new construction. We’ve built a solid reputation for success in planning cost-effective and sensitive work that preserves the character of a building while turning it into something modern and functional. Much of our work has involved working within historically or culturally rich building contexts, which requires us to have a particularly keen understanding of how to analyze an existing building’s strengths and weaknesses.
HISTORIC PRESERVATION & RENOVATION EXPERTISE
BNIM and Trivers both provide a strong history in historic preservation and adaptive reuse and transformational renovation projects. Transformation may be slight and thoughtful or implemented by bold spirit — all handled by respectful intervention.
Our team has worked on building renovations, ranging from minor tenant improvements to complete demolition and renovation for federal buildings, monuments, courthouses, academic facilities, office buildings and multi-family housing structures. We have experience in building envelope design and replacement, including in occupied buildings and adhering to historic standards. Our team has also dealt extensively and successfully with the Advisory Council on Historic Preservation, the National Trust for Historic Preservation, and the State Historic Preservation Offices of many states.
of multiple agency review coordination and quality control in the careful specification of renovation work. Repair of aging structures requires that the team consistently remain flexible, constantly looking for the best solution as we uncover information about the building’s construction and vulnerabilities. Trivers has worked on more than 100 historic renovation projects that include:
• Original construction dates between 1839 and 1968
• Size range from 1,300 sf to 1,200,000 sf
• 75+ buildings on the National Register of Historic Places
• 75+ received federal historic tax credits (certifying compliance with the Secretary of the Interior’s Standards for Rehabilitation)
• 80+ design awards for buildings of historic significance
• 6 National Historic Landmarks
Through BNIM’s work in preservation and transformation of existing structures, the firm has developed a deep knowledge in the science and construction methods that deliver the best results. Key examples of successful historic preservation and renovation projects and working within historic contexts include the following:
Internal Revenue Service Campus, Kansas City, MO
St. Louis Post Office Renovation, St. Louis, MO
The Nelson-Atkins Museum of Art, Kansas City, MO
American Enterprise Group Headquarters Renovation, Des Moines, IA
Charity Hospital Adaptive Reuse, Spirit of Charity Innovation District, New Orleans, LA
Todd Bolender Center for Dance and Creativity, Kansas City, MO
Science City at Union Station, Kansas City, MO
Washington University in St. Louis East End Campus, St. Louis, MO
• Price Gilbert and Crosland Tower Library Renewal, Georgia Institute of Technology, Atlanta, GA Trivers has a nearly 50-year history with a focus on renovations and rehabilitations of historic structures. Through this project experience, the firm has developed an understanding of a myriad of building materials and construction methodologies. Trivers understands the sensitivity
Trivers is well-versed in the renovation of historic structures. In addition to working as the Architect of Record on historic projects the firm frequently serves as the Historic Architect. Multiple Trivers team members meet Historic Architect Qualifications per 36 CFR 61. The firm is currently working in that capacity on the renovation of the Moss Federal Building in Salt Lake City, the first seismic retrofit project for GSA to receive a “no adverse effect” determination through the Section 106 process.
Trivers has been selected or invited to speak about design for historic structures at several local, national and international conferences and seminars, and the firm’s projects have been featured as case studies at several national conferences and two international conferences.
HISTORIC BUILDING PLANNING TOOLS
Historic properties inevitably require updates, modifications, and additions in order to maintain viability. Understanding that building property owners need guidance as they contemplate modifications to their properties, Trivers has worked to develop planning tools that offer clear guidance for those undertaking design and construction work at historic properties.
Trivers has worked with clients located throughout the country to develop tools that enable a deeper understanding of historic properties while also offering clear guidance and flexibility for planning improvements. This process includes infusing historical research and analysis to offer building owners an understanding of character-defining features, prioritization of areas for preservation and opportunities for full renovation, as well as planning for future additions.
Assisting local municipalities, the federal government and non-profit building owners, Trivers has authored the following planning documents:
2018 — Pettis County Courthouse | Sedalia, MO
2020 — Crittenden County Courthouse Marion, AR
2021 — City Hall Annex | University City, MO
2021 — Piper Palm House + Plant House | St. Louis, MO
2021 — Richard C. Lee U.S. Courthouse BPP | New Haven, CT
2022 — Providence Federal Building BPP | Providence, RI
2022 — Pastore Federal Building BPP | Providence, RI
2022 — MG Emmett J. Bean Federal Center BDS Indianapolis, IN
2022 — Frank E. Moss Federal Building | Salt Lake City, UT
2023 — Montpelier US Courthouse BPP Montpelier, VT
2023 — John Joseph Moakley US Courthouse BDS Boston, MA
2023 — DM & IR Section House HSR, Lake County, MN
INNOVATION IN UNDERGROUND STRUCTURES
With prior expertise in the design of underground buildings, BNIM has the applied experience to design highly functional, safe, sustainable below-grade structures and green roofs that serve as a dynamic asset to a site, both in terms of an infrastructural role and integrated aesthetic presence. Among BNIM’s relevant experience in underground structures and green roofs includes our work on the below-grade East Campus Parking Garage at Washington University in St. Louis; below-grade buildings with a green roof and parking structure for the IRS Kansas City Campus; the Bloch Building at the Nelson-Atkins Museum of Art that includes a ground and below ground addition of art gallery space that complements the historic building structure; and the Main Entry Plaza for the Nelson-Atkins Museum of Art which features a reflecting pool with an installation entitled “One Sun/34 Moons” by Walter De Maria.
Trivers was selected as Lead Architect and Historic Architect to assess and implement creative repair solutions for the exterior of the Capitol, the North Monument Plaza, and all surrounding terraces.
AND RESEARCH
BNIM design team members visited the Missouri State Capitol to inform research and understanding of the existing site considerations and context.
MISSOURI STATE CAPITOL PROJECTS
MISSOURI STATE CAPITOL SITE VISIT
Missouri State Capitol
Trivers was selected to assess the exterior of the Capitol, the North Monument Plaza and all of the surrounding terraces, and implement creative repair solutions. As lead architect and historic architect for the project, Trivers created design solutions to address the State’s primary goals. In order of importance, the priority issues were as follows: life safety, water management and aesthetics. The design team worked in collaboration with the contractor to ensure the building remained fully operational throughout construction. The entire capitol building was tented to enable construction to persist throughout all seasons. This comprehensive exterior restoration exemplifies navigating a multi-year project schedule, ensuring quality renovation on time and on budget.
JEFFERSON CITY, MISSOURI
Water infiltration and freeze/thaw cycles had wreaked havoc on many stone projections and ornate stone details resulting in extensive spalling and cracking, in turn creating life safety issues. To address these problems, any stone that was currently a fall hazard or could potentially become a future fall hazard was to be removed, modified, or replaced. After the construction started, hands-on inspection and sounding were possible via the scaffolding erected around the building.
In creating design solutions for the water management issues, the design team had to uncover the source of the problem. In some cases, the issue was simply a matter of exposure over time as listed above. In other instances, waterproofing materials had reached the end of their useful life and were in dire need of replacement. In order to replace the waterproofing materials, removal, salvage, and re-installation of otherwise quality stone had to be completed to accommodate a new high performing water management system.
Careful investigation and detailing were essential to the successful implementation of the new system. New systems consisted of lead-coated-copper sheet metal flashing where exposed and where length of service required this material selection, combined with PMMA flashing and cost-effective EPDM flashing in accessible nonvisible locations.
Once the two highest priorities had been addressed, remaining funds were utilized to improve aesthetics on the highest profile components of the building. Aesthetic stone scope included strategic replacement to mitigate stone mismatch and replacement of key character defining features such as the fleurons at the column capitals. In addition, the Ceres statue that sits atop the dome and all other exterior statues and light fixtures were removed and sent to specialty restoration companies for refurbishment.
ADDITIONAL PROJECTS COMPLETED FOR THE STATE OF MISSOURI IN CONJUNCTION WITH THE CAPITOL:
• North Monument Plaza Renovation & Erosion Control
• MODOT Masterplan (study to consolidate/relocate)
• Missouri Capitol Annex Renovation
• MODOT Office Building Renovation (HQ Consolidation)
• Missouri Capitol Security Improvements
Nelson-Atkins Museum of Art
Building an enduring relationship beginning in 2001, BNIM started working with the Nelson-Atkins Museum of Art on a transformational vision, not unlike that imagined for the Missouri State Capitol. The initial undertaking at the Nelson-Atkins Museum of Art was organized very similarly to the plan for the Capitol. The first scope included a new underground parking structure that would serve as front door for many users of the museum. The second phase was the construction of new underground gallery building that is carefully integrated into the landscape and thoughtfully connects to the historic 1933 structure. The final phase is more than two-thirds complete which is the renovation of the campus infrastructure and 1933 building.
KANSAS CITY, MISSOURI
500,000 PA-
TRONS VISIT ANNUALLY
56+ PROJECTS OVER TWO DECADES
374,000 SF OF ADDITION / RENOVATION PROJECTS
The Museum’s campus-wide transformation over the last two decades has encompassed a number of renovation, new construction, and restoration projects over two decades that have contributed to the museum’s continued success in building a strong arts community for Kansas City, sustaining tourism, creating jobs, and providing educational opportunities for all ages.
Together, BNIM’s projects with the NelsonAtkins Museum of Art encompass 374,000+ SF. Among the projects over the course of our collaboration with the museum include:
• The Bloch Building
• Underground parking structure and entry plaza
• Bloch Impressionist Galleries
• Native American Art Galleries
• Egyptian Art Galleries
• Sarah and Landon Rowland American Art Galleries
• Ford Learning Center
• Adelaide Cobb Ward Sculpture Hall
• Kirkwood Hall Renovation
• Museum signage and wayfinding
• Property feasibility studies
• Greenroof and envelope repairs
BLOCH BUILDING ADDITION
The Henry W. and Marion H. Bloch Gallery of Art, is the first major expansion to the Nelson-Atkins Museum of Art since it opened in 1933. The addition fuses architecture with landscape and features five striking glass “lenses” nested into the ground and rising from the rolling terrain on the east side of the Museum. These lenses house gallery space that dots the landscape and allows diffuse light to
TWO DECADES OF DESIGN AT THE NELSON-ATKINS MUSEUM OF ART
Sketch by Steve McDowell, BNIM Principal
enter the galleries below and respond to the undulating topography outside. It is considered a “feather” to the original museum’s “stone.”
About 55 percent more space is available for the Museum’s permanent collection and space for special exhibits is doubled. BNIM was selected to serve as Architect of Record with Design Architect Steven Holl on this major expansion.
Underground Parking, Central Plant Improvements, Limestone Facade Restoration
UNDERGROUND PARKING STRUCTURE + ENTRY PLAZA
The main entry plaza for the Nelson-Atkins Museum of Art features a reflecting pool with an installation entitled “One Sun/34 Moons” by Walter De Maria. The 450-car belowgrade parking structure features a specially formed ‘wave tee’ ceiling — made of precast and rest-in-place concrete — with 37 lenses bringing filtered light down from the 160 by 140 foot pool above. The structure provides connections to the surrounding sculpture garden and to the Bloch Building Addition, including an underground entry to the plaza.
1933 BUILDING RENOVATIONS + ENVELOPE
The building envelope restoration at the Nelson-Atkins Museum of Art involved detailed cleaning and tuckpointing of the stone façade, membrane and green roofing replacement, and entrance steps renovation. Certain locations also required removal, repair, and re-setting of stone panels.
Auditorium
Adelaide Cobb Ward Sculpture Kirkwood Hall
Ford Learning Center
Underground Parking
Bloch Building Addition
Gateway Arch Museum
Trivers worked as a partner for Cooper, Robertson & Partners and James Carpenter Design Associates for the expanded and renovated Museum of Westward Expansion below the internationallyrecognized St. Louis Arch. As part of the competition-winning Michael Van Valkenburgh master plan, the museum expanded the existing underground museum to the west, creating a new western entry into the Arch Grounds and the museum. Trivers’ involvement in the coordination with the National Park Service to maintain the integrity of a National Landmark was imperative in executing a project that is historically sensitive yet modern in function and form.
- Relevant Features: Renovation / addition project for historically sensitive National Landmark, underground structure, LEED Gold Certified
- Client: Gateway Arch Park Foundation, National Park Service
- Size: 113,500 SF Renovation | 45,500 SF Addition
- Completion: 2018
- Cost: $108M
ST. LOUIS, MISSOURI
Trivers worked with our design partners to solve the constructability issues that were presented in creating a subterranean structure that needed to address high levels of security affording a structure with National Landmark Status yet remain open and accessible to the public. The project established a new entrance adjacent to Luther Ely Smith Park, the Old Courthouse, and the heart of St. Louis’ downtown.
As a key component of the Gateway Arch Park Foundation lead national monument museum renovation, the new Jefferson National Expansion Memorial Museum Store captivates visitors with its vastness and light. Its design ties seamlessly into the Arch Lobby--modern, yet approachable, a space worthy of representing the St. Louis Arch. The quality of the space and clear-span expanse disguises the store’s subterranean setting. The store’s central location and advanced construction schedule relative to the larger museum project proved to be a complex task. Trivers guided the design and construction of the retail white-box through the many multifaceted coordination concerns innate to an infill project within a still continuously operating national monument and visitor center. Unknown to many is the complexity of what lies beneath. The design team took what originally had been an IMAX theatre and inserted three new programmatic levels of storage, employee offices, and the museum store itself.
Trivers partnered with Cooper Robertson on the store infill and white-box and in conjunction with Anderson Hallas, overseeing the construction and fit out of the 4,000 SF space.
Gateway Arch Park Foundation Master Services Agreement
Through the largest public-private undertaking of its kind, Gateway Arch Park Foundation (formerly known as CityArchRiver) and the National Park Service sought to transform the Jefferson National Expansion Memorial Park. Seven major projects and dozens of smaller projects have been completed with the goal of building connections to neighboring businesses and communities, enhancing the visitor experience, and reinvigorating the heart of downtown St. Louis.
ST. LOUIS, MISSOURI
The Jefferson National Expansion Memorial Park, which includes the Gateway Arch, the Old Courthouse, and surrounding historic grounds stretching north, south and west of the Mississippi River had long been isolated from downtown St. Louis. The primary Arch grounds were separated from downtown by a depressed arterial highway. A parking garage located on the north arch grounds held Ranger offices and further isolated the arch experience from surrounding communities and businesses. An accessible path from downtown through the Arch grounds to the riverfront did not exist. Modifications to grounds and structures were necessary in order to provide accessible routes, enhance the visitor experience, and improve connections to the surrounding downtown community. Projects completed under the MSA include:
KIENER VISITOR SERVICES BUILDING
Situated just west of the Old Courthouse grounds, Kiener Plaza was reimagined in 2015 to build greater connection between the Old Courthouse and downtown St. Louis. In 2018, Trivers began design efforts for a new Visitor Services Center. Careful consideration of site lines, visitor circulation and the need to draw visitors to and through the plaza led to a purposefully playful and modern design solution. The dynamic design utilizes fins set at varied angles with bright color on one side and a grey color on the other. The varied appearance of these colored fins engages visitors driving movement and activity around the building. Painted precast walls on the west, north and east facades are intended to serve as the backdrop for commissioned mural artwork.
RANGER STATION
OLD COURTHOUSE
The full interior and exterior renovation project began construction in 2023. Scope includes careful insertion of the building’s first-ever elevator, full window replacement, complete replacement of the heating and cooling system, a new electrical service and underground transformer, the addition of a fire sprinkler system, complete renovation of exhibit galleries and new wayfinding and signage throughout the building. Creative and innovative solutions for preservation of historic material include plans to provide electrical distribution through an underground bore beneath original foundations so as to maintain integrity of historic material in the foundation walls.
Located on the historic Arch park grounds, the new building is placed between an existing maintenance building and new commuter loop, offering an optimal location for law enforcement to facilitate tactical operations. The design is low in profile and set into a hillside so as not to obscure views of the Arch or otherwise detract from the historic landscape. The new building utilizes similar materials as the adjacent maintenance building with the metal material wrapping the façade to create a more pedestrian scale adjacent to the circulation loop.
ADDITIONAL PROJECT
Additional projects completed under the MSA include an IT infrastructure project, installation of new ramps at the Old Courthouse, a temporary visitor’s center, and electrical upgrades at the Arch Museum. Our team continues to assist GAPF with ongoing projects.
Union Station Ren-
ovations and Additions
Located in the heart of Kansas City, Union Station, originally designed in 1906, served the city as the train depot throughout most of the 20th century. In 1996, BNIM was selected on a team of local architects to carry out a renovation of Union Station and served as Team Leader for Museums and Theaters for Science City. Included in the Museum are permanent and traveling exhibits, a theater for experiential movies, a planetarium, and much more. BNIM later led the design of the Bloch Fountain on Union Station’s front entry plaza, building upon Kansas City’s reputation as “the City of Fountains.” This important historic civic building in Kansas City now welcomes approximately two million visitors every year.
KANSAS CITY, MISSOURI
KANSAS CITY UNION STATION
Sketch by Steve McDowell, BNIM Principal
PHOTO BY NANCY ANDERSON - STOCK.ADOBE.COM
PHOTO BY BRIANA TOZOUR
Todd Bolender Center for Dance & Creativity
The Todd Bolender Center for Dance and Creativity involved the preservation and adaptive reuse of the former Power House at Union Station, originally designed by architect Jarvis Hunt and was constructed from 1913-1914. Listed in the National Register of Historic Places in 2004, the building sat abandoned from the 1970s until 2006 until BNIM began the adaptive reuse transformation of the former power house to bring a vibrant, daylight-filled center for dance to the Kansas City Ballet and greater Kansas City community. A predominant goal of this project was to restore the historic Power House to its original condition while introducing renewed purpose. As a result, the design team meticulously replicated and restored features to adhere to the building’s original design.
KANSAS CITY, MISSOURI
Six studios and a performance theater that seats 180 are large components of the program. The Ballet’s new home also houses administrative offices, wardrobe, costumes, and production areas. The center is now home to the Kansas City Ballet and will create the next generation of dancers through artistic energy and hard work of individuals that benefits the Kansas City community. The mezzanine level houses two spacious studios and the second floor studio level offers several of the building’s most breathtaking moments by maximizing views to the outdoors. BNIM’s design team developed a beautiful and functional “floating studio” concept that provides a band of four smaller studios inset several feet. This provides
a subtle but powerful visual connection between floors. Nestling beautifully in the northeast corner of the building, the 180-seat main professional studio theater is a soaring triple-height space brought to life by daylight from windows and views to the surrounding urban environment.
Daylighting and views were maximized throughout the building in huge expanses of existing windows which are restored and replicated to their original design. Ample natural daylight reduces the need for artificial lighting used during the daytime and provides a connection to the outdoors for the building’s occupants. Interior spaces and studios share and amplify natural daylight.
“Very early in the process we realized that this was not just about transforming an important building in one of the most important and monumental districts of Kansas City. It was also about a new energy, a transformational energy that will propel this building and in many ways the arts and culture of Kansas City into the next 100 years.”
STEVE MCDOWELL, BNIM PRINCIPAL + CEO DESIGN PRINCIPAL FOR THE TODD BOLENDER CENTER FOR DANCE + CREATIVITY
Internal Revenue Service Campus
The Internal Revenue Service in Kansas City, Missouri, is an important historic civic building that required significant transformation to accommodate the evolving needs of the contemporary workplace. Three major goals guided the design process of the IRS Kansas City Campus: integrating the existing historic Kansas City Post Office at Union Station, establishing a relationship with the surrounding urban site, and developing an outdoor connection while maintaining high security needs. The Internal Revenue Service Kansas City Headquarters project includes high level security features, integrated site design, historic preservation, and three above and below ground parking structures.
KANSAS CITY, MISSOURI
The Internal Revenue Service Headquarters facility is composed of three processing wings connected with a circulation corridor. Extensive effort was made to integrate natural lighting features throughout the IRS complex by incorporating secure outdoor courtyards for employees to connect to the outside.
Many of these courtyards are “green roofs” constructed over the parking structure.This resulted in an unprecedented 90% of the workspaces having access to daylight throughout the campus. A one-mile walking trail weaves through a landscape of native trees and grasses, providing an additional benefit for the employees.
The project was completed $2-million under budget, achieved every major milestone including construction start and substantial completion on time, and had phased openings eight months ahead of schedule for tenant occupancy.
30th Street Post Office
Renovation and Federal Office Facility
The preservation and redevelopment of the historic Main Post Office building in Philadelphia transformed the building into a world-class office facility. All character-defining historic features of the Mayan-inspired Art Deco design were retained and meticulously restored. The project reversed 70 years of exterior and interior deterioration. It was one of the largest historic tax credit projects in Pennsylvania history. The restored Main Post Office is now home to nearly 5,000 federal employees, a day care center, credit union, and large cafeteria. This project is LEED Gold certified and BNIM provided sustainability design consulting for the project. Some of the main goals for the project were centered around energy conservation, daylight and views, indoor air quality and water conservation.
PHILADELPHIA, PENNSYLVANIA
U.S. Custom House and St. Louis Post Office Renovation
BNIM, in a joint venture with Harry Weese Associates, won a national design competition sponsored by the General Services Administration to renovate the 1884 St. Louis Old Post Office, a National Historic Landmark in downtown St. Louis. BNIM’s design philosophy for the building focused on renovation with minimal intervention upon the original character and integrity of the building. Following this project, Trivers completed a series of projects at the historic U.S. Custom House and Post Office building. As part of an ongoing fiveyear term contract with the GSA, Trivers executed a variety of projects at the building, commonly called the Old Post Office, ranging from masonry restoration and dome and roof work to total reworking of the building’s HVAC and lighting systems.
BNIM DELIVERABLES
More than 650 federal employees occupy flexible office areas on the upper four floors, with commercial space available in the sub-basement, basement, and first level for shops, restaurants, and display areas. The restoration of an existing second floor skylight subtly separates the commercial activity below from the government functions above. Removing central areas of the first and basement floors and creating a new central staircase, which opens onto the unusual double atrium, provided accessibility to the lower floors. Since the renovation was a sensitive public issue, BNIM’s design philosophy for the building stipulated minimal intervention upon the original character and integrity of the building. The Old Post Office’s design has become a focal point for pedestrian traffic while contributing to the rejuvenation of downtown St. Louis
TRIVERS DELIVERABLES
Preservation Plans were developed in order to better understand the level of alterations that would be appropriate in all locations of the building. Subsequently, Trivers served as Architect as GSA and DESCO/DFC Group joined forces with the State of Missouri Court of Appeals Eastern District and Webster University to redevelop the Old Post Office as a multi-use complex. The Court of Appeals has taken the top two floors, re-utilizing the two historic main courtrooms and developing the remainder of the floors into chambers and support space.
The Level 1 historic areas on the 3rd floor which had originally been courtrooms were restored in keeping with finishes and details based on original drawings. The southwest courtroom is now utilized for “en banc” sessions and cases which generate increased public interest. The southeast courtroom was repurposed as a court library maintaining the original volume and restoring the original detailing. All required security measures were met with only one new opening required to separate public from secure areas on the 3rd and 4th floors.
Truman State Of-
fice Building
The State of Missouri under the leadership of the Board of Public Buildings and the Office of Administration proposed a new State Office Building for Jefferson City to alleviate the crowded conditions of the existing state facilities. The consolidation of state agencies was envisioned to greatly enhance the potential for more efficient and effective state government. As part of a collaborative team, BNIM (formerly PBNL) designed a facility that provided a sympathetic, flexible, and functional space to address the State’s needs and serve as a good neighbor to the surrounding Capitol complex. The interior of the building provides great flexibility and resources to the State. Centralized functions such as the conference center, lobby, state library, and cafeteria harmonize well with special purpose archives and records center. Public and circulation spaces are gracious and highly efficient.
JEFFERSON CITY, MISSOURI
Lewis and Clark State Office Building
As part of its mission to protect and restore our natural resources, the Missouri Department of Natural Resources selected BNIM to design and build an office facility — the Lewis and Clark State Office Building — that showcases affordable and costeffective ‘green’ strategies. Utilizing the LEED rating system as an organizing matrix, it provides a template for the State, as well as other Missouri companies, to build in ways that are more respectful of the environment and people. The LEED Platinum building is located on a formerly developed site that sits on a bluff overlooking the Missouri River, where it offers a strong connection to Missouri’s resources. The building has shown a 7.5% reduction in absenteeism and the lowest construction cost per square foot of any other State office building (2006).
JEFFERSON CITY, MISSOURI
The building is organized around a four-story atrium space that opens to a grand view of the Missouri River valley and provides an active central stair to encourage pedestrian circulation. Natural daylighting, as well as sun shading devices, are responsive to the sun patterns throughout the year.
The building utilized the latest advances in daylighting technologies, electrical lighting and control systems, efficient building envelope design and highly integrated and innovative HVAC systems. Wherever possible, systems are expressed to educate the public about how the building works. The consulting group Conservation Design Forum, designed a restorative site plan that minimizes stormwater run-off and emphasizes the native prairie plants and ecosystems.
Frank Moss Courthouse
The Frank E. Moss U.S. Courthouse (originally known as the U.S. Post Office & Courthouse) is the oldest building in Salt Lake City’s Exchange Place Historic District, which consists of eight buildings, constructed between 1903 and 1917, that reflect Utah’s growing prosperity at the end of the nineteenth century. Trivers and HOK partnered on the pursuit and were awarded the project in early 2020. Trivers serves as the lead Historic Architect for this $100M project which includes a full seismic upgrade and tenant build out on all floors. Charged with creating an award winning project which embraces the ethos of design excellence, balances preservation and advanced technology, and exhibits a high degree of ingenuity, and creativity, the design team worked collaboratively together and with GSA to deliver design solutions on schedule. GSA intends to use the project as a model for other historic buildings in the government’s portfolio. Construction is expected to be complete in Spring 2024.
The original building was constructed between 1902 and 1905 with a U-shaped plan. Two additions, completed in 1912 and 1932, closed the end of the U and added another U-shaped section doubling the size of the original building.
With U.S. Bankruptcy Courts as an anchor tenant occupying the most important historic areas of the building, our team led conversations about appropriate modifications to meet security needs and satisfy the judges personal tastes and desires within the constraints of historic guidelines and GSA’s P100 requirements. In order to meet lease
dates, design had to progress during the pandemic. Our team created panoramic virtual courtroom mock ups for the new bench, attorney table, and clerk desks in order to receive input from the judges and court clerks. The mock up was a successful tool allowing for efficient and detailed dialogue. Our team was able to quickly make slight modifications to the bench and courtroom design until the judges were satisfied with the design approach.
As part of our work as lead Historic Architect, our team also worked in close collaboration with the structural engineer to develop a seismic design strategy that preserved the character-defining features of the historic building while allowing necessary installation of shotcrete. We led the Section 106 process of engagement building consensus and excitement for the project with GSA’s Central Office,
the Advisory Council on Historic Preservation, the State Historic Preservation Office and local preservation groups. The design solution balances necessary and exciting modernizations with preservation and enhancement of character-defining features. The project received GSA’s first-ever “no adverse effect” determination for a seismic retrofit in a historic structure.
Engagement Sessions
Hipolito F. Garcia Federal Building and U.S. Courthouse
As lead design architect for this significant historic renovation, Trivers strived to balance historic preservation and modern improvements for multiple tenant requirements. A focus on preservation, 21st Century techniques, and energy conservation spurred innovations in design and construction in multiple disciplines. Sensitive contemporary elements connected the structure’s historic past to the future. The project exceeded GSA’s expectations by achieving LEED Platinum, a first for a GSA-owned building.
ANTONIO, TEXAS
The new building systems were highly efficient, watersaving, and energy producing. Project cost was tracked at every design phase which helped to deliver the project under budget and allowed for further improvements to building efficiency. Design lasted from 2005 to 2008, at which time it was held for funding. Through the American Recovery and Reinvestment Act (ARRA) of 2009, the project resumed, but with added improvements to meet the ARRA’s higher standards.
Construction began in 2009 and was completed in 2012 after 30 months, which included 7 construction phases and 15 Federal Agency relocations during construction. The project schedule was constantly adjusted to respond to new potential tenants and their fit with the Government’s Housing Plan.
Ambitious construction phasing and complex tenant relocations were executed consistently on schedule, and the overall project was delivered on time. The combination of project management, programming, preservation, sustainability, engineering, and construction has served as a model for other GSA projects.
Power and Light Building Renovation
BNIM renovated its former office space, revitalizing one of the most prestigious Art Deco buildings in the nation and one of Kansas City’s historical treasures of 20th century American architecture. Built in 1931, the Power and Light Building was designed by Hoit, Price & Barnes. The restoration of the existing lobby and 2nd floor mezzanine explores the interplay between old and new by returning the space to its original splendor, yet installing clean and modern workstations, meeting rooms and studios. The adaptive reuse project addressed two important needs for downtown Kansas City. From an architectural standpoint, the project met the unique challenge of incorporating the original historic richness of the structure and its interior with the design elements required of a contemporary architectural firm. From a civic standpoint, it returned a piece of history to the collective memory of the city and spurred renewal efforts in the area.
KANSAS CITY, MISSOURI
Fort Osage Education Center
Located on the banks of the Missouri River, the Fort Osage Education Center invites patrons to learn about the significance of this location on the river as a historic military outpost. The Historic Fort was established along the Missouri River in 1808 under the direction of William Clark, joint commander of the Lewis and Clark expedition. In 2001, the Jackson County Parks Commission set forth to build a new education center that would serve to educate visitors about Fort Osage’s place in American History. The building takes a progressive step forward in its mindful use of the resources and restoration of the land that Lewis and Clark marveled over. Passive design strategies include a vegetated “green roof” and high thermal mass walls to minimize the need for heating and cooling. The center is 100% daylit, which contributes to a 57% overall energy savings when compared to a conventionally designed baseline building.
SIBLEY, MISSOURI
East End Transformation: Master Plan, Landscape & Parking
BNIM collaborated with Washington University in St. Louis (WUSTL) in a major planning endeavor to transform its East Campus to accommodate future growth and create a new gateway to the surrounding city. Through three planning phases, BNIM helped form a new vision for transforming the front door of the campus. Projects were divided among the three phases with each phase building upon the foundation laid by the previous phase. In the third and final phase, BNIM served as architect of a new underground parking structure alongside KieranTimberlake.
The new flexible, functional, and welcoming underground parking garage is the connective tissue for all of the buildings on campus. To create a vibrant campus with thriving landscape and responsible development that respected the prestigious campus history, this parking garage contributes greatly to visitor experience, moving cars to subterranean parking and creating a pedestrian oriented landscape for comfort, safety, and beauty above. A major green roof over the underground garage creates a dynamic, car-free park. The adaptable design incorporates higher floor-tofloor dimensions, heavier floor loads for anticipated occupancies, accommodation for connections to daylight and landscape above, and other strategies that will enhance the transformation of parking spaces into people spaces in the future.
Minnesota State Capitol
The Capitol Restoration Collaborative (an association of Hammel, Green and Abrahamson, Inc.; Schooley Caldwell; and other qualified consultants.) designed a full restoration of the 1905 Minnesota State Capitol Building. The capitol building, designed by Minnesota’s own nationally-acclaimed Cass Gilbert just over 100 years ago, ranks among the most beautiful and majestic of the nation’s capitol buildings. The design successfully addresses project challenges, while preserving and restoring historically significant elements of the building.
As is often the case with much-used historic buildings, under the surface are antiquated mechanical and electrical systems leading to poor air quality and widely varying temperatures, “dead end” corridors and other life safety code problems, inadequate office and public hearing room spaces, a lack of modern technology and security protection, places that are inaccessible to people with disabilities, and virtually no accommodation for the thousands of people who visit each year.
The building’s mechanical and electrical systems were replaced with new, energy-efficient systems; space planning and programming addressed the needs of the legislature and provided improved public spaces, and the Capitol is now fully accessible to those with disabilities.
Utah State Capitol
SALT LAKE CITY, UTAH
Built in 1912, the 327,000 SF Utah State Capitol had, like so many monumental and historic public buildings, deteriorated over decades of heavy use and deferred maintenance—not to mention its location directly over a geologic fault.
In 1998, the Utah State Capitol Preservation Board began an in-depth master planning process for the building’s restoration, and in 2002 they selected the Capitol Restoration Group (Schooley Caldwell in association with VCBO Architects and MJSA Architects, both local firms) as the design team.
While the seismic upgrade was the main impetus for the project, a full restoration was also designed. The fundamental objectives for the project were to stay true to the architect’s original intentions while improving the building’s functional usefulness.
Key historic spaces such as the Governor’s chambers and legislative halls were restored to bring back the original character of the building. In addition, renovation work created secure public and private access points, discreet and efficient service areas, a visitor center, functional committee rooms and efficient office space. Furniture designs preserved the legacy of the past while incorporating the technology of the future.
Kansas Statehouse
TOPEKA, KANSAS
Built in phases between 1866 and 1903, the Kansas Statehouse had, like so many other state capitols, reached a state where it no longer functioned efficiently to support state government. Schooley Caldwell served as design consultants and as prime MEP engineer to Treanor Architects of Topeka. Through sensitive plan interventions, a series of underground additions, and extensive use of “found space,” the usable area was increased by about 30 percent with no visual impact to the historic appearance of the building. The exception is a subtle ground level pavilion entrance that provides an accessible main entrance for visitors.
- Relevant Features: Historic preservation / renovation, underground additions, design of contemporary use space types: accessible restrooms, service spaces, technology savvy hearing room
- Size: 495,000 SF
- Completion: 2006
- Cost: $325 million
An entire floorplate of usable space was added to the building by converting a former basement into a new ground floor. Natural light was introduced though a series of skylights, and the new space was connected to the old by sensitive stairways inserted into the rotunda/dome structural supports. The ground floor houses extensive visitor spaces including an auditorium and classroom, museum displays, food service, security, loading docks and shop spaces, as well as some state agency offices. New mechanical plant equipment is housed in large underground vaults (outside of the building footprint) and in found space in unused attics.
The renovation included adding technology savvy hearing room; office space for legislators; restoration of the House, Senate and Supreme Court chambers and the State Library; and the addition of accessible restrooms and other service spaces. In addition to all new mechanical and electrical systems, the project also included exterior masonry restoration, new energy efficient windows, new and restored furnishings, mural and decorative paint conservation, copper roof and dome replacement, and conservation of the Ad Astra statue atop the dome.
Ohio Statehouse
COLUMBUS, OHIO
The Ohio Statehouse, completed in 1861, is considered one of the nation’s most important architectural gems. The Statehouse itself is centered on a 10-acre site and is complemented by the 1901 Senate Building and a parking garage beneath the Statehouse grounds. After more than a century of intense use, alteration, and neglect, the Statehouse and Senate Building were in dire need of restoration and renovation if they were to continue to meet the increasingly vigorous demands of modern governmental activity. Schooley Caldwell was selected to design this revitalization and restoration.
The client and design team established two essential criteria for the project: the buildings had to be returned to their original architectural image, and they had to be equipped for the same level of use (i.e., technology, etc.) that new buildings would provide. Also of consideration was that the Statehouse had to remain operational throughout the project; with a phasing plan in place, at least half of the building remained open and in active use at all times.
Recapturing the historic integrity of the building while at the same time providing modern conditions for its users proved to be the biggest design challenge.
Other issues included space planning for the legislature, meeting life safety requirements, providing access for people with disabilities, restoring natural light to the interior, and incorporating modern HVAC, lighting, and
security systems. The design is also full of functions to facilitate public participation in government, including a major museum and education center complete with interactive displays.
Schooley Caldwell also designed the award-winning Capitol Atrium, an addition nestled between the Statehouse and Senate Building, which has become one of the most popular event spaces in Columbus.
Since the completion of the full restoration, Schooley Caldwell has served as the “Architect of the Capitol” under contract with the Capitol Square Review and Advisory Board, the state entity that is the official overseer of the Statehouse. We’ve provided on-call services for all projects that take place at the Capitol, including maintenance, repairs, technical services, and capital projects.
Thomas J. Moyer Ohio Judicial Center
COLUMBUS, OHIO
This project involved the adaptive reuse of a 13-story, 400,000 SF state office building completed in 1933 in the “Moderne” style of the day – complete with a collection of interesting art deco details and integral artwork – as a new home for the Supreme Court of Ohio. The building’s public spaces are replete with carved wood, marble mosaics, molded plaster, decorative painting and murals, light fixtures and signage, and seven types of decorative bronze. Used over the years as office space for a wide variety of agencies, the building was originally designed with a great deal of flexible office space and a series of elaborate public spaces intended to be shared by all. The building adapted well for the Court, accommodating office and library functions, as well as educational and legal functions involving visitors and the public. This important and premier public works project was completed on time and almost two million dollars under its $85 million budget.
Specific design challenges included providing adequate security for a modern courts facility and housing the largest and most comprehensive law library in the country, outside of the U.S. Supreme Court in Washington, D.C. Security checkpoints were located in “non-historic” spaces with pathways to historic public areas. The existing “closed” stack library areas were replaced with a unique and very thin structural steel and concrete floor system, allowing three levels of flexible stacks to be inserted into the original stacks area. All of the work was accomplished within a detailed preservation zoning plan developed during the Master Plan phase.