Quality management plan The purpose of the Quality Management Plan is to detail how the quality processes by Samka Construction Co. Ltd is implemented to ensure that the project outputs are delivered as specified by client or clients representative. Quality is achieved by ensuring that all project management processes are conducted in a quality manner (quality assurance) and by developing quality criteria for the outputs. There are staffing procedures for self-inspecting the quality, schedule, responsiveness, customer satisfaction, and other performance requirements. The project manager, engineer and all other workers have the authority to intervene directly to stop work due to any unsafe work practices or site conditions. The site administration staff monitor performance, give reports for the evaluation of performance objectives targets and achievements, which help in making required changes in processes and practices to ensure effectiveness.

CNOOC engineers inspect works contracted to Samka.

and associated low voltage lines in the districts of Kanungu, Kabale, Kisoro,

Anti-corruption policy Samka Construction Co. Ltd seeks to observe high standards against fraud, corruption, bribery.

Project portfolio Samka Construction Co. Ltd. has been involved in various projects as a sole contractor or in partnership with other companies (in particular Concorp International Ltd). A combination of these has enabled the company to execute multi-billion projects in building construction, water supply systems, roads, electric power installation systems and civil works. Below are a few selected projects: ■■ Modification and renovation of Christeve House on Nkrumah road in Kampala worth Shs 6.4 billion. The works included block walling concrete, terrazzo floor finishes, tiling, plumbing, painting, cladding and other associated works. ■■ Construction of 33KV high voltage

36 September - October 2018

Samka hardware shop.

Ntungamo and Rukungiri (provision of labour only) - under China Jiangxi International (U) Ltd. The works were worth about Shs 250.7million. The works involved exaction for poles, erection of poles, stringing of power lines, installation of transformers, etc. ■■ CNOOC: Construction of resettlement houses for persons affected by the access road project to Kingfisher oil fields by CNOOC. The project was US$ 189,969 ■■ CNOOC: Construction of concrete paved road in Bungoma drilling camp at kingfisher oilfields. This involved earth works, base stabilisation, formworks, mixing, placing and compaction and finishing with a power float. These works were worth US$ 457,762 ■■ Ministry of Water & Environment-

construction of Kagango dam in Isingiro district; included construction of 210,000cubic earth water reservoir with 3km of 160mm uPVC gravity water supply, tanks and troughs. The works were Shs 1.3 billion. ■■ Kaki investments: Construction of NANA hostel in Makerere at US$ 2 million ■■ Islamic Univertity in Uganda: Construction of King Fahad Plaza on Kampala road, a project worth Shs 7 billion (in 2007) ■■ Uganda Industrial Research Instituterenovations, alterations in offices and plant- Shs 645 million ■■ Uganda Management Institute - demolition, modification, painting and fixuresShs 422 million ■■ Ministry of Health - Renovation of Mulago Hospital (under Dragados/Corncorp)-Shs 720 million ■■ Kampala International university modification of former Summer Hotel building –Shs 600 million ■■ Different works with different local governments: Bushenyi district (construction of Kabwohe Health centre IV), Rukungiri district (Katabushera, Kasheny and Kinioga water gravity flow scheme (Shs 62 million); Nyabushenyi gravity water scheme-Shs 297 million; Rwamarengye gravity schemeShs 95.6 million; periodic maintenance of roads-Rukungiri-Kinyasano roads - Shs 856 million. Others are: Soroti district- rehabilitation of Atiriri-Tubur road- Shs 92 million; Mbale district - Buwambwala and Bushiika gravity water schemes-Shs 36 million; Kaliro district-rehabilitation of Kaliro-Namwiwa-Gadumire-Bulumba road - Shs 450 million; Hoima Town council roads- Shs 43.5 million, Kabale district- construction of rainwater catchments - Shs 38.4 million, among many other works

Equipment Samka Construction Co. Ltd has over the year acquired critical equipment to deliver its projects. These include compactors, concrete mixers, tipping trucks, wheel loaders, excavators, water bowsers, bulldozers, graders, among others