NEWS DESK
Holes being bored along railway line Neil Walker neil@mpnews.com.au WORK is being done along the Frankston line to prepare for the removal of eight level crossings between Cheltenham and Frankston. Geotechnical investigations will be conducted until the end of the year so work crews will remain a familiar sight even before the larger scale separation of road from rail at Balcombe Rd (Mentone), Charman Rd (Cheltenham), Edithvale Rd (Edithvale), Eel Race Rd (Carrum), Seaford Rd (Seaford), Skye/Overton Rd (Frankston), Station St (Bonbeach), Station St (Carrum) starting next year. The Level Crossing Removal Authority (LXRA) says more than 130 boreholes, about 100 millimetres in diameter, are being drilled to a depth of 40 metres to analyse soil and rock types and ground water levels at each site. “Geotechnical investigations provide valuable information about ground conditions in and around the dangerous and congested level crossings we are removing on the Frankston rail line,” project director Adam Maguire said. “Geotechnical information, together with feedback from local residents, businesses and traders, will inform the design of the projects in each location and how they will be built.” The LXRA, a state government body, said the investigation results will be published and be part of design options at each level crossing to be removed on the Frankston line.
Testing, testing: Work crews testing soils and water levels between Edithvale and Aspendale along the Frankston line this month as part of the level crossings removal project. Picture: Gary Sissons
A ‘rail trench’ and ‘rail bridge’ are options for level crossings at Seaford, Bonbeach, Edithvale, Mentone and Cheltenham. A rail bridge may be built at a new crossing at McLeod Rd in Carrum and the Station St crossing could be shut and a new rail bridge built at Eel Race Rd. A new ‘road connection’ at Station
St over the Patterson River is also being looked at as an option. The state government says a trench cannot be dug at Carrum due to nearby Patterson River. The government says there is no option at Skye Rd in Frankston – rail over road must be built due to an overland flood plain. Anti-sky rail protesters have
dubbed any form of elevated rail “rollercoaster” rail and say the skyline of bayside suburbs will be marred by any elevated section of the line and raised rail is only being considered since it is less expensive. Frankston and Kingston councillors voted to oppose any form of elevated rail along the rail line before going into caretaker mode before
council elections to elect councillors on 22 October. The LXRA is still seeking feedback before 30 October on options released publicly earlier this year. The final decision on how each level crossing will be removed See your.levelcrossings.vic.gov.au or call 1800 762 667 to give feedback.
YOU BE THE JUDGE
YOU’LL LOVE WHAT WE DO Curtains Awnings
Blinds Shutters
SALON DES REFUSÉS Exclusively in Victoria at Mornington Peninsula Regional Gallery
24 SEPT - 20 NOV 2016
The alternative Archibald and Wynne Prize selection $130 return Searoad Ferries package + entry to Salon for up to 4 people
Book your free home appointment today
call 03 5975 9366.
A National Trust NSW, S.H. Ervin Gallery travelling exhibition
www.mprg.mornpen.vic.gov.au Sally Ryan, #theprincewilkins 2015 (detail), oil on linen, Courtesy of the artist
www.shadesofaustralia.net.au Shop 8a, 1-13 Tyabb Road (cnr Nepean Hwy) Mornington Southern Peninsula News 25 October 2016
PAGE 15