ADVERTORIAL POLYPIPE

Custom Drainage System Clicks Perfectly on Former Kodak Site

1

2

Eastman Village is an ambitious, multi-phased project built on the old Kodak factory site in Harrow, with Polypipe Building Services (PBS) currently providing drainage systems for 474 flats, across four towers – working with M&E Contractor, Millharbour on behalf of Barratt London.

3

Images 1-3: Terrain FUZE is made of HDPE, incorporates an extensive range of fittings and is very customisable

THE PROJECT will deliver a complete new

very customisable. Terrain FUZE is also

conventional systems. One person can carry

urban neighbourhood of over 2,000 homes

lightweight and highly resistant to impact

an entire stack section compared to cast-

together with workspace, retail and leisure

and abrasion making it the perfect system

iron which would require a team in itself.”

facilities. The new homes include 40%

for the high-level pipework in the basement.

affordable housing and a new healthcare

This meant that a single system could be

at Millharbour, adds: “Polypipe

facility.

used seamlessly for the whole building,

Building Services have such a complete

while providing a tailored solution that

understanding of the different techniques

could be installed rapidly.

available for jointing drainage stacks

The project is highly specified and carefully designed and incorporates many community amenities. The building layout

The Polypipe Advantage Prefabrication

Andy Stylianou, Company Director

which, together with their prefabrication

is therefore quite complex, requiring a

Team created a design that combined butt-

capability, meant that we were able to

considered approach to how the M&E

welds and expansion joints. The complex

design a system that made quite a complex

elements deliver all the facilities. The

stack design could therefore be installed

installation completely straightforward.

drainage system brief was therefore

with just a single Electrofusion coupling on

Because the amount of on-site jointing work

challenging in that the bathrooms were

the ground floor to connect the stacks to the

was minimised and the system was robust

highly specified, but the build schedule was

high-level pipework in the basement.

but lightweight, we could use the available

Robert Bruce, Technical Sales

manpower very efficiently. A smart solution,

also very ambitious.

Manager for Polypipe Building Services

and we’re very proud that it was Highly

to use a prefabricated approach to the

in London explained: “Prefabrication and

Commended at this year’s Offsite Awards.” 

installation to hit project deadlines, with a

careful design really helped deliver the

highly customised system that would fit the

customisation and streamlined installation

bathroom design specification.

that the project demanded. After the

The Client, Millharbour Group, decided

Following an initial analysis, Millharbour

high-level was installed with the single EF

worked closely with PBS to create a bespoke

coupling at the bottom of each stack, the

solution. It was decided that Terrain FUZE

guys could just drop each floor section of

would be the ideal system for the project.

stack down into the expansion joint below.

Terrain FUZE is made of HDPE, incorporates

And being so lightweight, Terrain FUZE is

an extensive range of fittings and is

also very manpower-efficient compared to

44

Issue 50 November 2025

Find out more about Terrain FUZE and the Polypipe Advantage Off-site Prefabrication Service at: www.polypipe.com/terrain