Since being employed in the Douglas Office of Hoare Lea & Partners, I have been granted full membership of the Institute of Healthcare Engineering and Estate Management (MIHEEM) (membership no: 5315 dated 20 November 1996). My continuing interest in keeping abreast of current computing technology was maintained and completed a computer drafting course, concentrating on the ‘AutoCAD’ software carried out at the Isle of Man College. I have also attended the Isle of Man College to undertake a course of study in the IEE 16th Edition wiring regulations, the course culminated in a City & Guilds examination, which I passed. PRINCIPAL PROJECTS UNDERTAKEN The New Hospital – (Braddan) Isle of Man. Responsible for the design, project & financial management of the electrical engineering services installation for a new £110M Hospital for the Isle of Man Government. Responsible for the conceptual & detailed design of all electrical services elements including the following specialist systems: 1. 2. 3. 4. 5. 6. 7. 8. 9.
2 MVA HV substation 4,000A bus bar LV distribution system Lighting & emergency lighting systems Power supplies to specialist medical equipment Nurse & staff call systems Security systems Analogue addressable fire alarm system Voice & data distribution systems Lightning protection systems
The project involved working within a design & construction team appointed by the Isle of Man Government to procure the New Hospital, each element of the work was tendered as separate work packages by the Management Contractor. Cronk-y-Berry Primary School – (Douglas) Isle of Man Performed the role of lead engineer responsible for the conceptual & detailed design of the electrical engineering systems installations for a new large scale primary school located to serve a new residential area on the edge of Douglas. The role involved liaison with the Department of Education to formulate the design brief and working with all members of the design & construction team from inception through to final commissioning and hand-over.
- 38 -