Building Grassroots Partnerships
Design intervention table DESIGN INTERVENTION TABLE S
= SHORT TERM
L
= LONG TERM
*= POLICY RECOMMENDATION
LOW CARBON VEHICLES Reduce bus idling by installing signage
S
Send out enforcement from the Air Resources Board
S
Install low income EV car sharing on affordable housing parking lot
L
TRANSIT ORIENTED DEVELOPMENT +PUBLIC TRANSIT +ACTIVE TRANSPORTATION Improve bus infrastructure (LED lighting, wifi, solar powered charging stations, real time transit information, seating, and shade structures)
L
Install traffic calming measures
S
(crosswalks, speed bumps, and curb extensions)
Install bike share and bike repair station
L
Increase connectivity to Rail to River by providing bike and pedestrian lanes
L
Prevent double parking by repainting diagonal lines and sending out parking enforcement
S
ENERGY EFFICIENCY + RENEWABLE +WEATHERIZATION INCENTIVES Install community solar
L
Install cool roofs + cool pavements
L
Install kinetic tiles on sidewalks
L
Implement the weatherization of residential and commercial uses. Offer energy efficiency incentives to homes in project area eg:replacing refrigerators
L
Place solar panels on qualifying multi-family housing in the project area
L
NATURAL RESOURCES Insert bioswales, rain gardens, rain barrels and vertical gardens in appropriate areas to reduce run off in the area
L
Place curb cuts + curb inlets into sidewalk
S
Urban forestry
S
(tree planting and management)
Green alleyways (planting drought resistant plants, permeable and light colored pavements, traffic calming measures and lighting)
S
Create pocket parks on empty lots
S
ECONOMIC + WORKFORCE DEVELOPMENT
78
Local hire in S+W construction, solar installation and Rail to River contruction*
L
Establish cooperative business in area*
S
Regulate nuisance businesses
L