Skip to main content

Keys Breeze April 2023

Page 20

ACC RULE OF THE MONTH

By: Linda Callahan, Architectural Control Department Manager

It’s that time of year again! Time to start planning for the 2023 Building Season.

submitted within thirty (30) days of notification by the ACC. If no response is received within that time frame, the application will lapse. Plans, sample materials and deposits will be returned.

As stated in last month’s Breeze article, all exterior improvements to your property must be submitted to Denied plans will indicate the reason within thirty (30) the Architectural Control Committee for review. The days from the disapproval. An owner may appeal to the following is taken directly from the Architectural Control ACC for review of any denial. An applicant must resubmit. Rules for Tahoe Keys. Modified plans within ninety (90) days from the date of the disapproval letter or appeal hearing, whichever is later, or the application will lapse, and all materials and deposits will be returned to the applicant. The review fee will not be refunded.

Architectural Control Rules Section 3 Plans and Plan Submittal Procedures Section 3 - Plans, Applications and Plan Submittal Procedures

Plans: An application and plan must be submitted to Plan Submittal: Two sets of building plans must and approved by the ACC prior to any exterior addition or be submitted to the ACC for approval before any modification to a property. construction commences. This includes the breaking of ground for the foundation. One set of plans will be Maintenance: A recurring activity, which is a replacement stamped by TKPOA for submittal to the CSLT. The second in kind and does not exceed 10% of the project, does not set is filed in the ACC's files. The submittal and the hold require an application. harmless document must be signed by the property owner. Once the City and TRPA approve the proposed When additional information is required for the ACC project, a stamped set of final plans must be returned to to evaluate any application, the information must be TKPOA before the project can begin. Keys Breeze

|

APRIL 2023

|

20


Turn static files into dynamic content formats.

Create a flipbook
Keys Breeze April 2023 by Just Imagine Marketing and Design - Issuu